WEEKLY CONSTRUCTION PROGRESS


REPORT
IREP, Kochi

05-Oct-2014
Job No. A307
Page 2 of 49

TABLE OF CONTENTS
SL.
NO

DESCRIPTION

PAGE NO

I.

EXECUTIVE SUMMARY

II.

SUMMARY REPORT OF CONTRACTS

III.

QUANTITATIVE PROGRESS STATUS

10

Site Grading II :: M/s B&R

10

Site Grading III :: M/s REL

11

Civil, Structural & UG Piping for Offsites IREP Area :: M/s KSSPPL

12

Civil, Structural & UG Piping work for Offsites Existing refinery area :: M/s MBE

13

Civil, Structural & UG Piping Work for Offsites DHDS area :: M/s KSSPPL

14

Civil, Structural & Architectural works for MCR, SRRs & Substations :: M/s L&T

15

Mechanical works for Offsites IREP Area :: M/s TSEPL

16

Raw Water Quarry & Pump House :: M/s PGC

17

Raw Water Treatment Plant :: M/s TEIL

18

10

Cooling Towers I & II and CWTP :: M/s PCTL

19

11

Cooling Tower III for SRU & CWTP :: M/s PCTL

20

12

DM Water Plant (RO Based) :: M/s DWEL

21

13

Effluent Treatment Plant :: M/s PL

22

14

Tankage III :: M/s IOT Anwesha

23

15

Tankage I :: M/s B&R

24

16

Tankage II :: M/s B&R

25

17

Civil, Structural & UG Piping for CDU VDU & DCU :: M/s L&T

26

18

CDU Heater Package :: M/s TKTI

27

19

Composite Mechanical works for CDU VDU :: M/s OIL

28

20

Composite Mechanical Work for DCU :: M/s B&R

29

21

DCU Heater Package :: M/s HPSA

30

22

Coke Drum Structure Package :: M/s EPIL

31

23

Coke Handling System Package :: M/s TKII

32

24

Civil, Structural & UG Piping Wotk for VGO HDT & DHDT :: M/s MBE

33

25

Composite Mechanical Works for DHDT :: M/s AELLC

34

26

DHDT Heater Package :: M/s TKTI

35

27

Composite Mechanical Works for VGO HDT :: M/s AELLC

36

28

VGO HDT Heater Package :: M/s PECL

37

29

Civil, Structural & UG Piping work for FCCU :: M/s SEPC

38

Format No. 5-2744-0212-F2 Rev 02/ 31.05.2013

Copyrights EIL All rights reserved

Week ending on

WEEKLY CONSTRUCTION PROGRESS


REPORT
IREP, Kochi

05-Oct-2014
Job No. A307
Page 3 of 49

30

Composite Mechanical Works for FCCU :: M/s PECL

39

31

Reactor Regenerator Package :: M/s EPIL

40

32

Civil, Structural & UG Piping work for SRU :: M/s MBE

41

33

Composite Mechanical Works for SRU :: M/s OIL

42

34

Civil, Structural & UG Piping Work for CPP :: M/s EPIL

43

35

Utility Boiler Package :: M/s ISGEC

44

RESOURCE DEPLOYMENT STATUS

45

IV.

Format No. 5-2744-0212-F2 Rev 02/ 31.05.2013

Copyrights EIL All rights reserved

Week ending on

WEEKLY CONSTRUCTION PROGRESS


REPORT
IREP, Kochi

05-Oct-2014
Job No. A307
Page 4 of 49

EXECUTIVE SUMMARY
Progress achieved during the week is 0.60% against a programme of 1.41%. Cumulative progress
achieved is 30.31% against a catch-up schedule of 33.34% (original schedule is 59.55%) as on
05.10.2014.

MAJOR ACHIEVEMENTS DURING THE WEEK


Buildings: SS10 first floor slab part 1 of 3 cast by M/s L&T.
DHDT Heater: Radiant coil erection commenced for IG-H-102
DHDT: Compressor (IG-C-101 A/B) foundation cast on 04.10.14
VGO & DHDT: Main Pipe Rack (EL 106) handed over to Mechanical contractor (M/s Albanna
Engineering) for start of pipe erection.
Composite Mechanical Work SRU: ISW-E-208 A /B Heat Exchanger erection done on 03.10.2014.
Tankage-II: YT-32 roof truss erection completed by M/s B&R.
C S & U/G Piping DHDS: 1 nos (Cum. 3 nos) Box culvert cast during the week by M/s KSSPPL.

CONSTRAINTS/ HOLD UPS :


Site Grading II (M/s B&R): Delay in grading has delayed release of front for various contractors, SRU
area yet to be filled & handed over.
Site Grading-III works (M/s REL): Additional carpenters, barbenders, masons etc. to be deployed for
RCC works. Current Man power is 180 nos & requirement is 300 nos.
Civil, Strl & U/G piping work for offsite new area (M/s KSSPPL): M/s KSSPPL to expedite RCC
work, U/G Piping erection work & Structural Erection work. Current Civil manpower is 183 nos,
Structural is 58 nos and UG Piping is 26 nos against requirement of 300 nos for civil, 150 nos for
structural & 150 nos for UG Piping.
Civil, Strl & U/G Piping for Offsites Refinery area (M/s MBECL): Non availability of anchor
bolts(available 1588 / 3488 Nos),matching structural steel and inadequate manpower(deployed 200 /
400 Nos) affecting construction progress. Boom placer to be immediately mobilized.
Mechanical works for Offsites Refinery area (M/s B&R): M/s B&R to immediately finalize the sub
agencies for Piping works & radiography.
Civil, Strl & U/G piping work for Offsite DHDS Area (M/s KSSPPL): M/s KSSPPL to augment
manpower & machinery to expedite Earthwork, RCC work, dyke wall modification work. Structural
steel fabrication at yard to be expedited. U/G Piping fabrication, Erection & Structural steel erection
not yet commenced.
Tankage-IV (M/s OIL): Mobilization of key personnel yet to be done. Material procurement such as
plate, nozzle etc. to be expedited.
Raw Water Quarry (M/s PGC): Slow progress for Pump House works in Quarry No. 2 & Quarry No. 8
due to inadequate manpower (Available 150 nos against Required 200 nos)
Raw Water Treatment Plant (M/s TEIL): Contractor to augment resources. Present manpower is
only 182 nos against original plan of 346 nos and this is affecting progress of work in parallel fronts.
Inspite of various commitment, no improvement is being seen.
Cooling Tower I & II and CWTP (M/s PCTL): PCTL to augment manpower from 392 (migrant
workers) to 670 nos. Further, delivery of balance piping materials (84- 13 mtrs, 74-129 mtrs, 32234 mtrs), Re-bars: 566 MT required at site immediately. Electrical & Instrumentation agency yet to be
finalized.
Cooling Tower III (M/s PCTL): M/s PCTL to augment manpower (deployed 89 nos against a
requirement of 160 nos) , Delivery of Bought out item to be expedited. Dedicated boom placer
required to expedited for RCC work.

Format No. 5-2744-0212-F2 Rev 02/ 31.05.2013

Copyrights EIL All rights reserved

Week ending on

WEEKLY CONSTRUCTION PROGRESS


REPORT
IREP, Kochi

05-Oct-2014
Job No. A307
Page 5 of 49

RODM (M/s DWEL): M/s DWEL to augment manpower (deployed 121 nos against a requirement of
260 nos). Chemical house area excavation, RO shed structural fabrication job & Mechanical work to
be expedited. Piling to be started at DM tank.
Effluent treatment Plant (M/s PL): M/s PL to deploy adequate resources at all work fronts. Current
manpower is 85 nos against a requirement of 150 nos. Piling agency to be immediately mobilized.
Tankage-III (M/s IOT Anwesha): Plate erection to be expedited for YT-26/28.
Tankage-I (M/s B&R): To augment resources (Manpower & Machinery) for civil & Mechanical work.
B&R agreed to mobilize manpower to 200 Nos progressively, Current strength is 100 nos. Plate
procurement & delivery to be expedited. Fire brick fixing gang to be remobilized immediately.
Tankage-II (M/s B&R): B&R agreed to mobilize manpower to 200 Nos progressively. Current strength
is 115 nos. Delivery of plate, anchor bolts & procurement of bought out items like foam seal to be
expedited. 100 MT reinforcement steel required at site immediately.
Composite Mechanical Work DCU (M/s B&R): M/s B&R to mobilize multiple agencies for different
works & increase the Piping welders from 7nos to 60 nos by Oct14 to meet the schedule requirement.
B&R to start welding for other piping class. Non-erection of equipments are holding the front to the
another agencies. The delay in mobilization shall have severe impact on completion schedule.
CDSP (M/s EPIL): Manpower to be augmented to 605 nos from 457 nos. Fabrication & delivery of
structural material for Coke drum (by M/s UHE), balance fabricated material from M/s MK Engg, site
fabrication of coke drums & fractionator to be expedited. The schedule (by M/s VTV) with May15
completion is not in line with requirement and hence shall delay the overall completion.
DCU Heater (M/s HEURTEY): Augmentation of work force required from 73 nos to 100 nos for
erection work, welding and to commence work in parallel fronts (platform erection, doors installation).
Shop fabrication of coil, convection modules, APH str and duct to be expedited.
Coke handling system package (M/s TKII): Additional manpower for RCC works required. Piling at
all work fronts to be expedited.
Civil, Strl & U/G piping work for VGO/HDT & DHDT (M/s MBECL): M/s MBECL to augment
resources (manpower requirement is 570 nos & deployed is 416 nos) to expedite the civil work, RCC
& Structural steel work. Delay in anchor bolts (approx 704 nos) affecting equipment foundation
completion. 2 nos additional crane along with additional structural erection gang required.
Heater Package for VGO-HDT (M/s Petron Engg): Inadequate manpower at fabrication yard
affecting fabrication progress (Required around 200 nos & Available 91 nos).
Civil, Strl & U/G piping work for FCCU (M/s SEPC): Contractor to urgently augment skilled
manpower & shuttering material to meet the asking rates (Manpower requirement is 300 nos. &
deployed is 157 nos). Only 27 carpenters & 32 barbenders are available. Ordering of balance
Structural Steel, Non-availability of anchor bolts & non-availability of cranes are serious concerns.
Civil, Strl & U/G Piping for SRU (M/s MBECL): Delivery of Anchor Bolt & TMT bars to be
expedited. & RCC, Piling, Pile cutting & Structural Steel fabrication work to be expedited. Manpower
to be augmented (deployed is 175 nos against requirement of 300 nos). U/G Piping laying yet to be
commenced.
Composite Mechanical Work SRU (M/s OIL): M/s OIL to mobilize the 600 MT crane at site for
erection of ODC equipment. Expedite pipe fabrication.
Civil, Strl & U/G Piping for CPP (M/s EPIL): Additional manpower to be deployed for civil works
particularly Carpenters, Barbenders, masons etc. UG Piping, Cable trench works and Piperack
erection works to be expedited.
Utility Boiler erection works (M/s ISGEC): Site assembly and erection works to be expedited for
UB-1, UB-2 and deaerator.
Mechanical works for CPP Unit (M/s Zillion): M/s ZEPL to mobilize additional resources for GTG
erection.

Format No. 5-2744-0212-F2 Rev 02/ 31.05.2013

Copyrights EIL All rights reserved

Week ending on

WEEKLY CONSTRUCTION PROGRESS


REPORT

05-Oct-2014
Job No. A307

IREP, Kochi

Page 6 of 49

DAYS AFFECTED/LOST :
Days lost due to

Rain

Strikes

Bandh

Festival

During the week


0.5
Cumulative
167
34
4
20
02.10.14 was Gandhi Jayanti. Heavy rain with thunder & lightning on 30.09.14.

Any other

Total

1
8

1.5
233

MATERIAL RECEIPT STATUS :


CAT
CODE

CATEGORY

ORDER QTY

RECEIVED QTY

RECEIVED DURING
THE WEEK

CC
EA
EE
EX
FG
GN
KA
MG
PA
VV

COLUMN
AIR COOLED HEAT EXCHANGER
HEAT EXCHANGERS-SHELL AND TUBE
HEAT EXCHANGERS-MISCELLANIOUS
DIRECT FIRED AIR HEATER
FILTERS
COMPRESSORS
GAS TURBINE DRIVEN ALTENATOR
PUMPS
VESSELS

89
141
449
7
1
66
58
2
855
283

47
99
253
4

WA
WB
WC
WD
WE
XH
YF
YL

Equipments
PIPES
VALVES
FLANGES
FITTINGS
BOLTING MATERIALS
DC POWER SUPPLY EQPT
FLOW
LEVEL

1951
1540784
59895
205349
397351
397999
18
1259
918

928
717866
13726
114113
303874
372022

31
1494
93
240
21783

388
49

44
14
1
383
83

23
5

EQUIPMENT STATUS :
Total Eqpts (Nos)
UNIT

CDU/VDU
DCU
DHDT
VGO-HDT
FCC
SRU
NHT
CPP
U&O
Total

Eqpt Recd (Nos)


Total

On
Fdn

On
Str

For ready
fdns

Overall
Erected
(nos)

119
31
25
8
28
15

299
154
83
43
175
131

180
105
21
19
102
47

119
49
62
24
73
84

93
21
6

135
6
4

12
9

3
66

3
63

954

540

414

FDN
Cast.

Total

On
FDN

On
STR

370
319
197
197
356
327
105
20
160

240
171
105
102
205
185
50
18
151

130
148
92
95
151
142
55
2
9

2051

1227

824

229

Format No. 5-2744-0212-F2 Rev 02/ 31.05.2013

REMARKS

3
144

152

Copyrights EIL All rights reserved

Week ending on
05-Oct-2014
Job No. A307
Page 7 of 49

WEEKLY CONSTRUCTION PROGRESS REPORT


IREP, Kochi

SUMMARY REPORT OF CONTRACTS


S NO

DESCRIPTION OF WORK

% WTG

AGENCY

CONTRACT
VALUE
(Rs. In Cr)

CUM
DURATI
INVOICED
ON
BY AGENCY (months)
(Rs. In Cr)

CONTRACTUAL
START
DATE

COMPLN
DATE

ACTUAL/ANTICIPATED

CUMULATIVE %AGE

START
DATE

COMPLN
DATE

CONSTN
SCH

CATCHUP SCH

CONTR.
SCH.

FRONT

WEEKLY %AGE
ACTUAL

CONTR.
SCH.

PROG

ACTUAL

BACK
LOG #

0.02

1.13

0.23

8.46

1.31

0.16

7.96

0.12

2.67

1.04

28.30

1.00

1.19

0.42

22.18

ENABLING WORK

2.70 100.00

100.00

95.47

99.98

98.44

89.98

A.1

SITE GRADING-II

1.62

60.00

M/S B&R

123.49

62.46

13

22-Nov-12 21-Dec-13

08-Dec-12

31-Dec-14

100.00

100.00

100.00

100.00

92.04

A.2

SITE GRADING-III

0.35

13.00

M/S REL

30.47

8.65

23-Jan-14

22-Sep-14

30-Jan-14

31-Dec-14

100.00

61.92

99.87

88.00

59.70

5.00

M/S CONSTELL

A.3

SOIL INVESTIGATION

0.14

A.4

MECH TEMP. FWPH

0.46

A.5
B
B.1

MISC GRADING & ROCK BLASTING WORK


UTILITIES & OFFSITES
PILING WORK I

0.14

17.00 M/S TECHNOCRAT


5.00

0.86

0.77

21-Jun-12

20-Oct-12

21-Jun-12

20-Oct-12

100.00

100.00

100.00

100.00

100.00

2.41

1.10

20-May-13

19-Oct-13

06-Jun-13

19-Oct-13

100.00

100.00

100.00

100.00

100.00

15-May-14

100.00

100.00

M/S DEENS

27.80 100.00
0.56

100.00

100.00

67.10

29.50

51.28

54.30

26.91

2.00

M/S DBM

29.29

25.80

25-Sep-12

24-Mar-13

21-Nov-12

15-Jul-14

100.00

100.00

100.00

100.00

100.00

M/S L&T

59.90

49.54

12

09-Apr-13

08-Apr-14

29-May-13

15-Jul-14

100.00

100.00

100.00

100.00

100.00

B.2

PILING WORK II

0.97

3.50

B.3

PILING III

0.14

0.50

B.4

MECHANICAL / PIPING WORKS FOR NEW FW PUMP HOUSE

B.5

CIVIL / STRL./UG PIPING - IREP

2.36

8.50

M/S KSSIIPL

149.90

32.91

18

09-Apr-13

08-Oct-14

29-May-13

15-May-15

100.00

99.00
49.49

99.90

94.28

44.03

0.23

1.99

0.95

50.25

B.6

CIVIL / STRL./UG PIPING - DHDS

1.67

6.00

M/S KSSIIPL

120.32

0.99

18

25-Jul-13

24-Jan-15

09-Sep-13

14-Aug-15

97.07

28.57

88.04

72.17

15.75

1.67

1.80

0.30

56.42

B.7

CIVIL / STRL./UG PIPING - REFINERY

1.67

6.00

M/S MBEPL

127.47

8.81

16

26-Sep-13

25-Jan-15

27-Nov-13

15-Jul-15

99.83

28.65

72.90

81.44

18.46

2.41

1.23

0.25

54.45

B.8

CIVIL / STRL. WORK - BUILDINGS

3.75

13.50

M/S L&T

234.74

60.80

20

23-Apr-13

22-Dec-14

22-May-13

15-Mar-15

89.20

62.83

94.62

100.00

57.40

0.97

1.25

0.70

37.22

B.9

CIVIL WORK FLARE AREA GRADING

0.42

1.50

M/S KB-TECH

100.00

100.00

100.00

100.00

100.00

B.10

DEMOUNTABLE FLARE STACK SYSTEM

0.28

1.00

M/S AIROIL

B.11

COMPOSITE WORKS- OFFSITE IREP

3.34

B.12

COMPOSITE WORK - OFFSITE DHDS AREA

2.22

8.00

B.13

COMPOSITE WORK - OFFSITE REFINERY AREA

2.78

10.00

B.14

CONSTRUCTION OF QUARRIES & PUMP HOUSE (RWQT)

0.28

1.00

M/S PGC

23.88

B.15

RAW WATER TREATMENT PLANT

0.42

1.50

M/S TEIL

B.16

COOLING TOWER - I & II

0.63

2.25

M/S PCTL

B.17

COOLING TOWER - III (SRU)

0.21

0.75

M/S PCTL

B.18

RO-DM & CPU

0.56

2.00

B.19

ETP

0.56

2.00

12.00 M/S TECHSHARP

45.50

15.33

13.89

5.00

1.60

2.51

0.95

0.80

3.40

22-Jul-14

24-Jul-15

63.70

8.67

6.72

9.02

2.40

0.95

1.61

0.10

4.32

19-May-14 18-Sep-15

26-May-14

18-Sep-15

45.63

6.00

8.32

5.00

2.50

1.64

1.00

0.50

2.50

25-Mar-14

24-Jul-15

21-Apr-14

24-Jul-15

45.53

8.67

10.39

5.00

2.50

1.30

1.00

0.50

2.50

23-Apr-13

22-Jul-14

17-May-13

31-Dec-14

100.00

70.23

100.00

100.00

81.86

1.47

0.44

18.14

18

25-Jul-13

24-Jan-15

26-Aug-13

24-Mar-15

97.33

50.52

84.96

100.00

52.31

3.14

1.28

32.66

20

21-Feb-13

20-Oct-14

17-Apr-13

15-Mar-15

89.63

76.87

100.00

100.00

60.04

2.32

1.04

39.96

16

11-Sep-13

10-Jan-15

11-Sep-13

10-Jun-15

51.73

33.68

68.46

100.00

35.67

1.87

0.14

32.79

110.40

16

25-Mar-14

M/S OIL

108.81

16

M/S B&R

141.35

16
15.49

15

89.47

16.97

99.75

31.88

13.49

1.84

M/S DWEL

266.75

12.43

M/S PL

114.46

24-Jul-15

1.65
2.54

22

12-Jun-13

11-Apr-15

13-Sep-13

31-Oct-15

86.53

39.48

85.44

100.00

22.65

1.80

2.34

0.71

62.79

21

12-Sep-13

11-Jun-15

16-Nov-13

31-Oct-15

56.67

17.97

38.80

90.00

11.05

2.70

1.30

0.24

27.75

B.20

TANKAGE I

0.42

1.50

M/S B&R

46.53

6.14

22

07-Jun-13

06-Apr-15

23-Aug-13

06-May-15

79.83

55.35

85.20

100.00

39.16

0.33

1.76

0.36

46.04

B.21

TANKAGE II

0.56

2.00

M/S B&R

69.96

1.89

22

25-Sep-13

24-Jul-15

25-Oct-13

24-Sep-15

65.10

26.58

60.83

84.40

20.69

1.79

1.77

0.60

40.14

B.22

NEW CRUDE TANKS TANKAGE III

0.42

1.50

M/S IOTA

66.49

13.40

20

04-Dec-13 03-Aug-15

15-Apr-14

03-Aug-15

36.20

24.67

35.68

93.08

28.85

1.74

1.31

1.04

6.83

B.23

TANKAGE IV

0.28

1.00

M/S OIL

2.33

3.50

40.00

2.75

0.75

0.25

0.75

B.24

Electrical Work (OFFSITE+SRU)

1.11

4.00

7.97

B.25

Instrumentation Work (OFFSITE+SRU)

0.97

3.50

7.97

B.26

MICRO GRADING

B.27

MISCELLANEOUS CIVIL/STRL WORK

0.28

1.00

6.57

B.28

MISCELLANEOUS MECHANICAL WORK

0.28

1.00
0.85

1.53

1.08

15.29

CDU/VDU

10.11 100.00

C.1

PILING WORK - I

0.40

4.00

M/S DBM

C.2

CIVIL / STRL./UG PIPING WORKS

3.54

35.00

M/S L&T

233.58

146.67

18

07-Mar-13

06-Sep-14

C.3

COMPOSITE CDU

4.04

40.00

M/S OIL

179.26

5.13

20

04-Nov-13

03-Jul-15

C.4

ELECTRICAL WORK (CDU/VDU)

0.38

3.75

C.5

INSTRUMENTATION WORK (CDU/VDU)

0.38

3.75

C.6

HEATER PACKAGE

1.01

10.00

M/S TECHNIP

C.7

CDU/VDU COLUMN ERECTION

0.10

1.00

C.8

TRAY INTERNALS

0.10

1.00

C.9

LIFT ERECTION

0.05

0.50

C.10

AIR COOLERS

0.10

1.00

C.11

BALANCE CIVIL / STRL. WORKS

C.12

BALANCE MECH. WORKS - (COMBINED FOR ALL UNITS)

DCU

8.33

73.52

55.70

63.19

67.17

47.66

30-May-13

100.00

100.00

100.00

100.00

100.00

02-Apr-13

06-Mar-15

100.00

99.25

100.00

99.33

81.55

1.35

0.54

17.79

09-Jan-14

31-Oct-15

54.63

33.41

35.49

44.75

20.00

1.68

1.80

1.56

15.48

1.74

2.41

1.62

23.26

27.83
22.13
170.10

13.05

23

07-Mar-13

06-Feb-15

16-Jun-13

06-Jun-15

87.90

66.48

82.93

88.04

59.67

M/S VTV

31-Dec-14

100.00

100.00

100.00

100.00

50.00

M/S BGR

31-Dec-14

100.00

91.67

70.00

70.00

65.00

50.00

10.00

10.00

5.00

0.67

1.01

0.48

13.61

1.31

0.63

22.44

1.37

0.68

0.10

7.68

4.00
13.48 100.00

D.1

PILING WORK - I

0.54

4.00

M/S DBM

D.2

CIVIL / STRL./UG PIPING WORKS

4.99

37.00

M/S L&T

233.58

D.3

COMPOSITE WORK DCU

4.31

32.00

M/S B&R

114.18

D.4

ELECTRICAL WORK (CDU/VDU)

0.51

3.75

D.5

INSTRUMENTATION WORK (CDU/VDU)

0.51

3.75

31-May-13

___________________________________________________________________________________
Format No.5-2744-0212-F2Rev02/31.05.2013

146.67

64.82

40.06

51.31

61.22

37.07

100.00

100.00

100.00

100.00

100.00

18

07-Mar-13

06-Sep-14

02-Apr-13

31-Mar-15

99.53

83.20

100.00

98.31

75.87

18

12-Mar-14

11-Sep-15

23-May-14

11-Dec-15

39.57

10.83

10.38

13.04

2.70

8.60
7.77

____________________________________________________________________________________
Copyrights EIL - All Rights Reserved

Week ending on
05-Oct-2014
Job No. A307
Page 8 of 49

WEEKLY CONSTRUCTION PROGRESS REPORT


IREP, Kochi

SUMMARY REPORT OF CONTRACTS


S NO

DESCRIPTION OF WORK

% WTG

AGENCY

CONTRACT
VALUE
(Rs. In Cr)

D.6

HEATER PACKAGE DCU

1.08

8.00

M/S HUERTEY

134.59

D.7

COKE DRUM STRUCTURE PKG.

0.94

7.00

M/S ESSAR

429.14

D.8

COKE HANDLING SYSTEM PKG.

0.54

4.00

M/S TKII

247.10

D.9

BALANCE CIVIL / STRL. WORK

D.10
E

CUM
CONTRACTUAL
DURATI
INVOICED
ON
START
COMPLN
BY AGENCY (months)
DATE
DATE
(Rs. In Cr)
14.64
20
04-Nov-13 03-Jul-15
8.67

ACTUAL/ANTICIPATED
START
DATE

COMPLN
DATE

CONTR.
SCH.

PROG

ACTUAL

BACK
LOG #

15-Aug-15

58.30

30.31

46.26

76.96

25.68

0.94

2.48

2.05

20.58

31-Dec-15

53.03

35.94

38.31

93.02

23.38

1.52

0.98

0.46

14.93

20

04-Nov-13

15-Apr-14

31-Jan-16

57.70

25.33

15.08

100.00

11.13

1.21

1.01

0.37

3.95

57.93

29.22

43.87

52.72

32.04

0.85

1.56

1.30

11.83

08-Apr-14

100.00

100.00

100.00

100.00

100.00

03-Jul-15

BALANCE MECH. WORKS - (COMBINED FOR ALL UNITS)


0.06

1.00

E.2

CIVIL / STRL/UG PIPING WORKS

2.33

39.50

M/S MBEPL

144.32

E.3

COMPOSITE WORK

2.68

45.50

M/S ALBANNA

87.77

E.4

ELECTRICAL WORK (DHDT+VGO+FCCU))

0.21

3.50

E.5

INSTRUMENTATION WORK (DHDT+VGO+FCCU))

0.21

3.50

E.6

HEATER PACKAGE (DHDT)

0.30

5.00

M/S TKTI

40.23

18

04-Sep-13

03-Mar-15

11-Dec-13

03-Jun-15

E.7

TRANSPORTATION OF HEAVY EQUIPMENTS (REACTORS)

0.12

2.00

M/S URMILA

21.70

18

26-May-14 25-Nov-15

02-Jun-14

25-Nov-15

E.8

BALANCE CIVIL / STRL. WORK

E.9

BALANCE MECH. WORKS - (COMBINED FOR ALL UNITS)

M/S L&T
49.65

16

11-Sep-13

10-Jan-15

14-Nov-13

31-Mar-15

97.57

69.41

92.97

93.94

68.22

1.05

2.35

2.30

24.75

16

19-May-14 18-Sep-15

10-Jun-14

18-Nov-15

34.47

6.67

5.85

18.92

3.62

0.78

1.09

0.69

2.24

32.40

64.32

100.00

45.36

1.61

2.26

1.17

18.96

13.50

50.00

9.00

1.00

1.00

4.50

1.82

0.82

17.34

5.53
5.73

VGO-HDT

7.58 100.00

F.1

PILING WORK II

0.08

1.00

F.2

CIVIL / STRL/UG PIPING WORKS

2.69

35.50

M/S MBEPL

144.32

F.3

COMPOSITE WORK

3.56

47.00

M/S ALBANNA

117.81

F.4

ELECTRICAL WORK (DHDT+VGO+FCCU))

0.27

3.50

F.5

INSTRUMENTATION WORK (DHDT+VGO+FCCU))

0.30

4.00

F.6

HEATER PACKAGE (VGO-HDT)

0.61

8.00

M/S PETRON

40.85

18

21-Aug-13

20-Feb-15

20-Jun-14

20-Aug-15

F.7

TRANSPORTATION OF HEAVY EQUIPMENTS (REACTORS)

0.08

1.00

M/S URMILA

21.70

18

26-May-14 25-Nov-15

02-Jun-14

25-Nov-15

F.8

BALANCE CIVIL / STRL. WORK

F.9

BALANCE MECH. WORKS - (COMBINED FOR ALL UNITS)


FCCU

M/S L&T

08-Apr-14
49.65

46.33

58.61

22.57

41.24

47.53

23.90

100.00

100.00

100.00

100.00

100.00

16

11-Sep-13

10-Jan-15

14-Nov-13

31-Mar-15

97.93

57.20

91.89

94.20

56.70

1.06

3.57

1.41

35.19

16

19-May-14 18-Sep-15

10-Jun-14

18-Nov-15

39.77

6.67

5.82

10.42

3.43

0.77

0.81

0.57

2.39

16.00

59.37

96.14

13.35

3.14

1.98

0.57

46.02

13.50

50.00

9.00

1.00

1.00

4.50

1.15

1.79

0.57

14.61

2.45

4.17

1.07

38.72

0.17

0.77

0.41

1.92

2.67

14.32 100.00

PILING WORK II

0.57

4.00

M/S L&T

G.2

CIVIL / STRUCTURAL/UG PIPING - FCCU

4.15

29.00

M/S SEPC

G.3

CIVIL/STRUCTURAL - FCCU (RR, HOPPER)

0.72

5.00

M/S L&T

151.19

G.4

COMPOSITE WORK

5.16

36.00

M/S PETRON

213.28

G.5

ELECTRICAL WORK (DHDT+VGO+FCCU))

0.50

3.50

G.6

INSTRUMENTATION WORK (DHDT+VGO+FCCU))

0.50

3.50

G.7

HEATER PACKAGE

0.43

3.00

M/S PETRON

24.37

G.8

REACTOR & REGENERATOR PACKAGE

1.58

11.00

M/S ESSAR

540.31

G.9

BALANCE CIVIL / STRL. WORK

0.43

3.00

M/S TUAMAN

G.10 BALANCE CIVIL / STRL. WORK

0.14

1.00

M/S ZILLION

08-Apr-14
10.83

47.87

55.96

29.84

38.66

49.49

24.00

100.00

100.00

100.00

100.00

100.00

25-Sep-13 24-Dec-14

23-Nov-13 31-May-15

97.33

50.78

81.48

94.76

42.76

15

25-Sep-13 24-Dec-14

22-Nov-13 31-May-14

97.33

100.00

100.00

100.00

100.00

18

26-Feb-14

25-Dec-15

35.57

7.17

4.10

6.61

2.18

25-Aug-15

4.60
1.90
80.00

16

04-Dec-13

03-Apr-15

27

10-Jul-13

09-Oct-15

05-Mar-14

30-Sep-15

49.00

7.67

27.28

46.35

9.09

3.33

4.79

1.65

18.19

31-Dec-15

39.67

29.31

29.62

71.10

13.05

2.03

1.32

0.51

16.57

8.67

15.80

14.00

3.40

1.91

0.50

0.29

10.60

100.00

SULPHUR BLOCK

7.58 100.00

CIVIL / STRL./ UG PIPING WORKS - SULPHUR BLOCK

3.15

41.50

M/S MBEPL

119.57

M/S OIL

153.36

15.30

16

04-Nov-13

03-Mar-15

18

25-Mar-14

24-Sep-15

17-Dec-13

39.90

14.80

37.45

31.73

11.92

1.29

1.32

0.42

16.64

03-Jul-15

63.13

31.22

77.96

59.71

26.15

2.07

1.97

0.54

33.56

24-Sep-15

32.97

6.00

8.92

17.04

2.60

0.94

1.24

0.48

6.32

44.33

12.33

53.87

10.00

1.75

2.25

0.50

0.25

8.25

0.01

0.07

0.06

0.06

0.15

1.20

1.00

1.00

H.2

COMPOSITE WORKS (MECH./ PIPING/ INSUL./ PAINT)

2.96

39.00

H.3

ELECTRICAL WORK - (OFFSITE + SRU)

0.30

4.00

H.4

INSTRUMENTATION WORK - (OFFSITE + SRU)

0.45

6.00

H.5

TANKAGE TENDER

0.23

3.00

H.6

WASTE HEAT BOILER PKG. FOR INCINERATOR (SUPPLY + ERECTION)


0.11
PACKAGE
1.50 - M/S
I
TECNICAS

2.37

0.67

H.7

MCC PACKAGE (MCC, WHB, SCs)

0.11

1.50

M/S THERMAX

9.33

0.67

H.8

PELLETISATION PKG

0.11

1.50

M/S SANDVIK

7.00

H.9

MISCELLANEOUS CIVIL/STRL WORK (LEFT OUT WORK OF UNITS & OFFSITE)


0.08
1.00

H.10

MISCELLANEOUS MECHANICAL WORK (LEFT OUT WORK OF UNITS &


0.08
OFFSITE)
1.00
NHT / ISOM

1.68 100.00

I.1

HEALTH CHECK

0.08

I.2

COMPOSITE WORKS (CIVIL+MECH.)

2.87
2.30
M/S TUAMAN

M/S M&M
M/S SHILPI

Dismantling of NHDS

0.10

6.00

I.4

CIVIL / STRL./UG PIPING WORKS

0.49

29.00

I.5

Mech/Piping/Painting/Insulation Work

0.66

39.00

I.6

Hook up work NHT/ISOM

0.08

11.40

16

19-Feb-14

18-Jun-15

18-Jun-15

5.00

5.00

I.3

0.99

6.07

G.1

WEEKLY %AGE
ACTUAL

17-Jan-14

5.90 100.00

FRONT

22-Sep-13

PILING WORK II

H.1

CONTR.
SCH.

22-Aug-13 21-Aug-15

E.1

CATCHUP SCH

24

DHDT

CUMULATIVE %AGE
CONSTN
SCH

5.00 M/S TECHNOCRAT

3.91

0.38

01-Apr-14

30-Sep-14

01-Apr-14

5.00

44.63

15.15

16.00

16.00

15.94

11-Jan-13

100.00

100.00

100.00

100.00

100.00

30-Nov-14

100.00

93.33

100.00

100.00

99.00

75.43

3.50
100.00

100.00

100.00

30.00
0.97

___________________________________________________________________________________
Format No.5-2744-0212-F2Rev02/31.05.2013

16-Jan-14

15-Jun-14

16-Jan-14

15-May-14

100.00

____________________________________________________________________________________
Copyrights EIL - All Rights Reserved

Week ending on
05-Oct-2014
Job No. A307
Page 9 of 49

WEEKLY CONSTRUCTION PROGRESS REPORT


IREP, Kochi

SUMMARY REPORT OF CONTRACTS


S NO

DESCRIPTION OF WORK

% WTG

AGENCY

CONTRACT
VALUE
(Rs. In Cr)

CUM
DURATI
INVOICED
ON
BY AGENCY (months)
(Rs. In Cr)

CONTRACTUAL
START
DATE

COMPLN
DATE

ACTUAL/ANTICIPATED
START
DATE

COMPLN
DATE

CUMULATIVE %AGE
CONSTN
SCH

I.7

ELECTRICAL WORK

0.10

6.00

I.8

INSTRUMENTATION WORK

0.17

10.00

0.53

CPP

8.85 100.00

58.66

J.1

PILING WORK I

0.08

J.2

PILING WORK II

0.28

3.10

M/S L&T

J.3

CIVIL / STRL./UG PIPING WORKS

3.36

38.00

M/S ESSAR

76.50

J.4

COMPOSITE WORKS

J.5

Mech/Piping/Painting/Insulation Work

2.30

26.00

M/S ZILLION

35.60

J.6

Electrical Work

0.35

4.00

J.7

Instrumentation Work

0.35

4.00

J.8

HRSG Pkg.

0.71

8.00

M/S THERMAX

137.82

J.9

UTILITY BOILERS Pkg.

1.42

16.00

M/S ISGEC

321.75

J.10

BALANCE CIVIL / STRL. WORK

3.33

OVERALL

59.55

0.90

CONTR.
SCH.

FRONT

WEEKLY %AGE
ACTUAL

CONTR.
SCH.

PROG

ACTUAL

BACK
LOG #

0.98

1.87

0.51

28.13

0.07

MS/ DBM
6.97

CATCHUP SCH

30-May-13

100.00

27.65

53.83

58.58

25.72

100.00

100.00

100.00

08-Apr-14

100.00

100.00

100.00

100.00

100.00

16

19-Aug-13 18-Dec-14

19-Aug-13

30-Apr-15

97.23

50.86

92.03

92.56

45.35

0.97

3.66

0.84

46.68

16

19-May-14 18-Sep-15

27-Aug-14

18-Sep-15

20.57

13.00

5.32

10.00

2.25

0.90

0.75

0.25

3.07

17.23

1.33

2.00
12.70

20

20-Dec-13 19-Aug-15

20

25-Jul-13

24-Mar-15

16-Feb-14

19-Aug-15

31.03

6.17

2.80

10.00

3.05

0.60

0.50

10-Aug-15

56.90

30.28

82.76

100.00

22.81

2.40

1.50

0.54

59.96

33.34

49.38

54.45

30.31

0.93

1.41

0.60

17.63

# With respect to Schedule or front, whichever is lesser.


* CIVIL, STRUCTURAL & UG PIPING WORKS FOR CDU/VDU & DCU IS A SINGLE CONTRACT BEING DONE BY M/s L&T
** CIVIL, STRUCTURAL & UG PIPING WORKS FOR VGO-HDT & DHDT IS A SINGLE CONTRACT BEING DONE BY M/s MBEL

___________________________________________________________________________________
Format No.5-2744-0212-F2Rev02/31.05.2013

____________________________________________________________________________________
Copyrights EIL - All Rights Reserved

Week ending on
05-Oct-2014
Job No. A307
Page 10 of 49

WEEKLY CONSTRUCTION PROGRESS REPORT

IREP, Kochi.

QUANTITATIVE PROGRESS STATUS


Name of Contractor : M/s B&R Co. (India) Ltd. (Code # 203)
Name of Work : Site Grading - II

Contract Award Date :


Contractual Completion Date :
Actual Start Date :
Expected Completion Date :

CUMULATIVE
Sl No.

WORK ITEM

UOM

SCOPE

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67

Engineering
Procurement
Mobilisation
Tree Cutting
Excavation/filling site grading
Hard Rock Blasting
Excavation fdn
Sub Base Course
WBM
Bitumen Carpet
RCC Flooring
Heavy Duty RCC Flooring
Tiling/Vetrified/Granite
Roof Treatment
Building Painting
Cladding
Flase Ceiling
Plinth Protection
PEB W/H 1
PEB W/H 2
PEB W/H 3
Modification U/G Piping
Modification A/G Piping
Fabrication Piping Specials
Piping Painting
Piping Insulation
Pump Erection
RCC Pipes
PVC Pipes
GI Pipes
PCC
RCC Substructure
RCC Precast
RCC Superstructure
RCC Leakproof Str.
Structural Steel Erection
Soling
Backfilling
Transportation of Debris
Brick Masonry
RR Masonry
RR Pitching
Plastering
Chain Link Fencing
Concertina Cable
S/I Transformer
Control Gear
MV Cable
Cable Termination
Cable Tray
Light Poles
Lighting Fixture
Earth Electrode
Earth Strip
Fire Alarm System
Socket, Recepticles, Switches
Junction Box
LDB
Wiring
Conduit
Comm. & Fire Alarm cable
Dismantling of Pipes
Dismantling of Structures
Dismantling & Erection of Shed
Dismantling PIB
Dismantling ETPII
Demolishing of DHDS FHPH + RCC reservoir
SUMMARY CONTRN.
SUMMARY

%
%
%
No
M3
M3
M3
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
%
%
%
IM
IM
No
IM
M2
MT
M
M
M
M3
M3
M3
M3
M3
MT
M2
M3
M3
M3
M3
M2
M2
M
M
No
No
M
No
M
No
No
No
M
%
No
No
No
M
M
M
IM
No
No
%
%
%
%
%

100
100
100
3050
1040000
3100
74665
300200
213200
130000
2725
850
3415
2700
24400
7275
1200
1525
100
100
100
1500
3000
74
2100
150
3
860
2850
80
9680
16692
150
6158
1435
350
25200
28750
98900
2600
8200
42850
23550
6050
3775
8
64
10500
76
700
22
1277
100
11000
100
797
600
50
42000
35000
7500
4600
5
7
100
100
100

22-Nov-12
21-Dec-13
08-Dec-12
31-Dec-14

WEEKLY

SCH.

FRONT

ACT.

100
100
100
3050
1040000
3100
74665
300200
213200
130000
2725
850
3415
2700
24400
7275
1200
1525
100
100
100
1500
3000
74
2100
150
3
860
2850
80
9680
16692
150
6158
1435
350
25200
28750
98900
2600
8200
42850
23550
6050
3775
8
64
10500
76
700
22
1277
100
11000
100
797
600
50
42000
35000
7500
4600
5
7
100
100
100
100.00
100.00

100
100
100
3050
1040000
3100
74665
300200
213200
130000
2725
850
3415
2700
24400
7275
1200
1525
100
100
100
1500
3000
74
2100
150
3
860
2850
80
9680
16692
150
6158
1435
350
25200
28750
98900
2600
8200
42850
23550
6050
3775
8
64
10500
76
700
22
1277
100
11000
100
797
600
50
42000
35000
7500
4600
5
7
100
100
100
100.00
100.00

100
100
100
3050
1031210
3100
74665
92400
69355
19950
1980
555
2000

PGRM.

ACT.

1031

4000

4667
11667
2100
117
69

20

NEXT
WEEK
PGRM.

1031

4667
11667
2100
117
69

13500
4545
930
97
60
91
1500
3000
74
2100
150
3
860
2850
80
4339
11570
150
4379
745
350
5950
28550
98900
1689
5940
11100
13890
4500
3775
8
64
7400
76
700
22
1277
100
11000
100
797
600
50
28200
28100
7500
4600
5
7
100
100
100
82.34
92.04

139
1
5
2

467
467

139
1
2

9
128

447
70
4492
70
213
322
7408
1167
362

467
467
447
70

100

20
46

4492
70
213
322
7408
1167
362

723

723

3313
1657

3313
1657

2.18
1.31

0.26
0.16

2.03
1.22

Note:- %Schedule is calculated base on SOR Qty & %Actual is calculated base on revised Qty.
Remarks: 4 nos out of 9 nos labour amenity & canteen buildings completed. 3 nos / 9 nos Fabrication yard shed completed. Subway culvert wall 1st lift
concrete casted.

Point of Action: RCC work & Grading works are slower than desirable & to be expedited. Concerns raised with top management of B&R. Work is seriously
affected due to non available of manpower at site (Required is 500 nos & deployed is 399 nos). Earth filling, retaining wall, PEB-I, II, III, Drain & Road work to
be expedited. PWD road work to be expedited.

_______________________________________________________________________________
_______________________________________________________________________________
Copyrights EIL All rights reserved
Format No. 5-2744-0212-F2 Rev 02/ 31.05.2013

Week ending on
05-Oct-2014
Job No. A307
Page 11 of 49

WEEKLY CONSTRUCTION PROGRESS REPORT


IREP, Kochi.
QUANTITATIVE PROGRESS STATUS
Name of Contractor : M/s Ray Engg. (Code # 220)
Name of Work : Site Grading -III works

SL. NO.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

WORK ITEM
Mobilisation
Tree Cutting
Excavation
Excavation trenches
Hard rock excavation
Earth Filling
WBM
Premix carpet
UG Piping Fabrication
UG Piping Erection
RR Masonry
Laterite masonry
Concrete - PCC
Concrete-RCC
Structural Steel Fabrication
Structural Steel Erection
Sheeting works
Demolishing
SUMMARY

Contract Award Date :


Contractual Completion Date :
Actual Start Date :
Expected Completion Date :

UOM

SCOPE

%
Nos
Cum
Cum
Cum
Cum
Cum
Sqm
ID
IM
Cum
Cum
Cum
Cum
MT
MT
SQM
Nos

100
1000
225000
9010
8000
225000
72250
10800
1535
6225
2645
545
1304
7860
50
50
1300
7

CUMULATIVE

23-Jan-14
22-Sep-14
16-Mar-14
31-Dec-14

WEEKLY

SCH.*
100
1000
225000
9010
8000
225000
72250
10800
1535
6225
2645
545
1304
7860
50
50
1300
7

FRONT
100
1000
225000
9010
8000
225000
72250
10800

ACT.
100
889
208650
9010
8000
208650
28350

PGRM.

ACT.

NEXT WEEK
PGRM.

11000

8134

13000

12000
1250

8134

60
12000
1350

2645
545
1304
7860

1480
432
455
2565

120
25
100
250

5
19
4
15

120
25
100
450

99.87

88.00

59.70

2.67

1.04

3.39

* Scope Revised.
Remarks: Site grading activities in progress.RCC works in retaining wall of SRU area & Flare areacompleted. RCC works in progrss Chitrapuzha Boundary
wall in progress. Excavation works in progress for 204-205-206-207 Piperack DHDS area.
Points of action: Additional manpower to be deployed for RCC works. Current Manpower deployed is 180 nos against requirement of 300 nos.

_____________________________________________
______________________________________________
_______________________________________________
Format No. 5-2744-0212-F2 Rev 02/ 31.05.2013
Copyrights EIL All rights reserved

Week ending on
05-Oct-2014
Job No. A307
Page 12 of 49

WEEKLY CONSTRUCTION PROGRESS REPORT


IREP, Kochi.
QUANTITATIVE PROGRESS STATUS
Name of Contractor : M/s KSS Petron Pvt Ltd (Code # 206)
Name of Work : Civil, Structural & U/G Piping works for IREP Offsite Area

SL. NO.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30

WORK ITEM
Engineering
Procurement
Mobilisation
Excavation
Hard rock blasting
Pile chipping
PCC
RCC substructure
RCC superstructure
RCC precast (shop)
RCC precast (erection)
RCC leakproof
RCC Pavement
Anchor bolt/ insert
Transport & disposal
Backfilling
Structural Steel Fabrication
Structural Steel Erection
Grating
Handrail
Sheeting
WBM
Premix carpet
Masonry
Hume pipe
U/G Piping fab
U/G piping erection
U/G piping hydrotest
Earth Strip
Earth Electrode
SUMMARY

UOM

SCOPE*

%
%
%
m3
m3
nos
m3
m3
m3
m3
m3
m3
m3
MT
m3
m3
MT
MT
MT
RM
m2
m2
m2
m3
m
ID
IM
IM
RM
nos

100
100
100
85000
8000
380
2250
13190
1800
3200
3200
1621
500
85
48050
41500
6400
6400
75
3575
100
50000
1700
310
3765
57890
294725
294725
2000
35

Contract Award Date :


Contractual Completion Date :
Actual Start Date :
Expected Completion Date :
CUMULATIVE

09-Apr-13
08-Oct-14
29-May-13
15-May-15

WEEKLY

NEXT
WEEK
PGRM.

SCH.

FRONT

ACT.*

PGRM.

ACT.*

100
100
100
85000
8000
380
2250
13190
1800
3200
3200
1621
495
85
48050
41131
6400
6400
75
3575
97
49853
1650
310
3765
57890
294725
294725
2000
35

100
100
100
76500
8000
380
1643
12990
1780
1600
1600
1621
500
85
46000
35275
6050
6050
70
3500

98
94
98
44359
6188
375
822
7321
339
724
230

1
2

1
1

1295
583
6
47
373
47
47
47

211
990

56
31983
15246
3692
1364

3
1633
1633
152
128

4
39
30

3
1633
1633
152
128

46962
1020
290
2000
57492
292699
292699
1900
32

4068
15193

23
435
5722

108
3432

23
435
5722

99.90

94.28

44.03

1.99

0.95

2.03

1
41

2
2
1295
583
6
47
373
47
47
47

* Scope Revised
Remarks : Rock blasting in progress. Retaining wall in progress in area 119. Structural fabrication for balance areas commenced.
Points of Action : To expedite area handing over to mechanical agency. UG Piping manpower to be augmented urgently (currently 26 nos
against requirement of 150 nos). Retaining wall works in areas 119 & 120, backfilling of excavated pits/trenches, precast manholes & trenches
erection & structural fabrication for areas 119 & 120 to be expedited. Balance structural steel to be procured for areas 105, 117, 119 & 120.

___________________________________________
___________________________________________
___________________________________________
Format No. 5-2744-0212-F2 Rev 02/ 31.05.2013
Copyrights EIL All rights reserved

Week ending on
05-Oct-2014
Job No. A307
Page 13 of 49

WEEKLY CONSTRUCTION PROGRESS REPORT


IREP, Kochi.
QUANTITATIVE PROGRESS STATUS
Name of Contractor : M/s Mc Nally Bharat Engineering Co. Ltd. (Code # 217)
Name of Work : Civil, Structural & Underground Piping Works Of Existing Refinery Area

Sl. No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35

WORK ITEM
Engineering
Procurement
Mobilisation
Excavation
Back Filling & compaction
Pile Chipping
PCC
RCC Substructure
RCC Superstructure
RCC Flooring
RCC Heavyduty Flooring
RCC Pavement
RCC Leakproof
Precast Concrete - shop
Precast Concrete - erection
Structural Steel Fabrication
Structural Steel Erection
MS Grating
UG Piping Fabrication
UG Piping Laying
U/G piping hydrotest
MS Handrail
WBM
Premix carpet
RR / Random Stone Masonry
Brick / Random Stone Masonry
Air-Conditioning Package
Pressurization & Ventilation System
Clean Agent System
Elevator Installation
Safe Area Lighting Fixtures
Circuit Wiring
Fire Alarm Cable
Earth Electrodes
Earth Strips
SUMMARY

UOM

SCOPE

%
%
%
M3
M3
Nos
M3
M3
M3
M2
M2
M3
M3
M3
M3
MT
MT
MT
ID
IM
IM
RM
M2
M2
M3
M3
%
%
%
Nos
Nos
RM
RM
Nos
RM

100
100
100
90000
61300
950
4230
13986
3240
2095
2640
240
285
3457
3457
5010
5010
168
2153
10765
10765
950
8560
550
8425
1550
100
100
100
1
795
11090
4500
105
1650

Contract Award Date :


Contractual Completion Date :
Actual Start Date :
Expected Completion Date :
CUMULATIVE

WEEKLY

26-Sep-13
25-Jan-15
10-Oct-13
15-Jul-15
NEXT
WEEK
PGRM.
3
3
3
1000
450
25
30
200
100

SCH.

FRONT

ACT.

PGRM.

ACT.

100
100
100
90000
35261
950
3799
13986
2834
823
1058

100
100
100
90000
36000
250
2250
13986
3240
2095
1500

77
72
72
20570
1760
60
363
2784
25

4
3
3
1000
450
40
30
150
140

1
2
2
195

285
3457
2333
4800
3933
95
1847
7261
6104
265
619
32
5186
1550
45
45
45

285
1600
1600
5010
5010

750

150
30

150
30

32

20

20

10
5
64

1000
100
100
100
1

10
10
10

430
4058
1652
6
65
72.90

81.44

18.46

1.23

0.25

3.03

Remarks: RCC works for Substation, SRR and Piperack area (312,313,314,321/322/359) in progress. Foundation works of Substation building completed.
Grade slab of SRR building completed. Shuttering for slab cast of substation in progress. RCC wall in progress for SRR. Excavation works in progress for
Compressor house.
Point of Action: Non availability of anchor bolts, matching structural steel and inadequate manpower(Required is 400 nos & deployed is 200 nos) affecting
construction progress.

________________________________________________________________________________________
______________________________________________
Format No. 5-2744-0212-F2 Rev 02/ 31.05.2013
Copyrights EIL All rights reserved

Week ending on
05-Oct-2014
Job No. A307
Page 14 of 49

WEEKLY CONSTRUCTION PROGRESS REPORT


IREP, Kochi.
QUANTITATIVE PROGRESS STATUS
Name of Contractor : M/s KazStroy Service Infrastructure India Pvt. Ltd (Code # 212)
Name of Work : Civil, Structural & UG Piping works for DHDS Area

Sl No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27

WORK ITEM

UOM

SCOPE*

SCH.
100
100
100
55730
12532
0
1823
6287
697
595
3032
3032
4266
3739
9
261
7900
28500
22450
1390
51200
2150
4940
108
7
336

Contract Award Date :


Contractual Completion Date :
Actual Start Date :
Expected Completion Date :

CUMULATIVE
FRONT
90
90
100
21700
6000
0
2034
4906
300

ACT.
55
45
77
8647
1956
0
210
1338
100

WEEKLY
PGRM.
ACT.
2
1
4
2
2
1
700
153
350
70

25-Jul-13
24-Jan-15
09-Sep-13
14-Aug-15
NEXT
WEEK
2
4
2
700
350

%
100
Engineering
%
100
Procurement
%
100
Mobilisation
m3
60140
Excavation
m3
18650
Back Filling compaction
Nos
0
Pile Chipping
m3
2034
18
7
18
PCC
m3
6406
193
23
193
RCC Substructure
m3
800
64
64
RCC Superstructure
m3
1675
RCC Pavement
m3
3032
1000
18
29
8
29
Precast Concrete - shop
m3
3032
1000
Precast Concrete - erection
MT
4545
4545
259
93
17
93
Structural Steel Fabrication
MT
4545
4545
35
35
Structural Steel Erection
MT
30
15
11
1
1
Anchor bolt
MT
275
90
6
6
MS Grating
ID
8072
3639
47
47
UG Piping Fabrication
IM
40355
15000
UG Piping Laying
IM
40355
15000
U/G piping hydrotest
RM
1775
850
MS Handrail
m3
65000
WBM
SQM
10000
Premix carpet
m3
5000
2500
304
140
26
140
RR Masonry
m3
180
127
127
Brick / Random Stone Masonry
Nos
73
73
Earth Electrodes
RM
600
600
Earth Strips
Nos
50
50
Earth plates
%
88.04
72.17
15.75
1.80
0.30
1.80
SUMMARY
* Scope Revised.
Remarks: 151 nos of pedestals casting completed. 78 RM / 475 RM dyke modification RCC completed. 3 nos box culvert completed. 199 MT structural
steel received at site for 216 area.
Point of Action: Manpower to be augmented (Required: 300 Nos & Available: 100 nos) . Agency for structural erection to be finalized. U/G piping
fabrication & erection, Cable trench & Precast yet to started. Uninterrupted supply of TMT & cement to be ensured. To be expedited : Procurement of
balance Structural steel & fabrication, anchor bolts, GI-gratings, handrails, RCC Hume Pipe, Geo-textile material, Cast Iron Manhole cover, Wrapping &
Coating material.

______________
___________________________________________________________________________________________________________________
__________
Copyrights EIL All rights reserved
Format No. 5-2744-0212-F2 Rev 02/ 31.05.2013

Week ending on
05-Oct-2014
Job No. A307
Page 15 of 49

WEEKLY CONSTRUCTION PROGRESS REPORT


IREP, Kochi.
QUANTITATIVE PROGRESS STATUS
Name of Contractor : M/s Larson & Toubro (Code # 208)
Name of Work : Civil, Structural & Architectural Work for SSs, SRRs & MCR

SL. NO.

WORK ITEM

UOM

SCOPE

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42

Mobilization
Procurement
Excavation
Pile Chipping
PCC
RCC Substructure
Backfilling
Transporting & Disposing surplus
Brick Masonry
RCC Super structure
Anti-termite treatment
RCC Flooring
RCC Precast elements
MS Steel Inserts
GI Water Piping Laying
Plumbing Work - RCC, HDPE, CI
PCC plinth protection of building
Plastering & Pointing
Under Deck Insulation
False Ceiling
CC Flooring
Heavy Duty Flooring
Tile / Kota Stone / Granite Flooring
False Flooring
Doors, Windows & Partitions
Whitewashing / Painting / Polishing /
Textured Wall Coating
Bituminous water proofing
Air Conditioning System
Pressurization & Ventilation System
Clean Agent System
Installation of Elevators
GI / Steel Conduits
Circuit Wiring
Lighting / Power / Fire Alarm Panels
Lighting Fixtures
Fire Alarm Cabling
Fire Detectors
Earth Electrodes
Earth Strips
Metsec Channels
Composite Steel Roofs Over RCC

%
%
CUM
Nos
CUM
CUM
CUM
CUM
CUM
CUM
SQM
CUM
CUM
MT
RM
RM
SQM
SQM
SQM
SQM
SQM
SQM
SQM
SQM
SQM
SQM
SQM
SQM
%
%
%
Nos
RM
RM
Nos
Nos
RM
Nos
Nos
RM
RM
SQM

100
100
75000
1950
4200
22205
82769
72420
10767
27601
30000
3052
200
267
2564
745
4550
129959
34167
11088
16940
15587
9072
5279
2525
148394
6303
31533
100
100
100
4
60000
60000
146
6182
34000
3477
325
4700
5500
36150

SUMMARY

Contract Award Date :


Contractual Completion Date :
Actual Start Date :
Expected Completion Date :

23-Apr-13
22-Dec-14
22-May-13
15-Mar-15

PGRM.

ACT.

NEXT
WEEK
PGRM.

6
75

240

400
200
250
600
350
50

105
250
22
419
250

400
200
250
600
350
50

2
40
25
200
3000
800

2
40
25
200
2500
800

CUMULATIVE

WEEKLY

SCH.

FRONT

ACT.

100
100
75000
1950
4200
22205
82769
72420
10767
27601
30000
3052
200
267
2564
745
4550
126923
33259
9820
16400
12123
9072
2913
2050
122694
1556
25135
87
85
97
2
60000
60000
146
4550
34000
3477
207
2833
5500
21867

100
100
75000
1950
4200
22205
82769
72420
10767
27601
30000
3052
200
267
2564
745
4550
129959
34167
11088
16940
15587
9072
5279
2525
148394
6303
31533
100
100
100
4
60000
60000
146
6182
34000
3477
325
4700
5500
36150

100
96
75000
1768
4088
22205
81804
71712
4177
16001
26183
2753

94.62

100

190

23255
3661
1123

500
550

823
200
1123

50

500
550
50

1473
45
38
20

640
1
1

1
1
1

600
1
1
1

17433
3304

2800
800

574
992

2800
800

739

600

600

1700
130

200
200

250
70

57.40

1.25

0.70

1.25

Remarks : Under deck insulation work in progress in SS02. Lift structure manufacturing in progress.
Points of Action : SS01, SS10 & MCR work to be expedited. Finishing works for all SRRs to be expedited. Switch gear rooms of substations & rack rooms
of SRRs to be completed on priority to receive panels.

___________________________________________
___________________________________________
___________________________________________
Format No. 5-2744-0212-F2 Rev 02/ 31.05.2013
Copyrights EIL All rights reserved

WEEKLY CONSTRUCTION PROGRESS REPORT

Week ending on
05-Oct-2014
Job No. A307
Page 16 of 49

IREP, Kochi.
QUANTITATIVE PROGRESS STATUS
Name of Contractor : M/s Tech-Sharp Engineers Pvt. Ltd. (Code # 326)
Name of Work : Mechanical works of Offsites IREP Area

SL. NO.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28

WORK ITEM
Mobilization
Piping fabrication CS NIBR
Piping erection CS NIBR
Piping hydrotest CS NIBR
Piping fabrication CS IBR
Piping erection CS IBR
Piping hydrotest CS IBR
Piping fabrication SS
Piping erection SS
Piping hydrotest SS
Piping fabrication AS IBR
Piping erection AS IBR
Piping hydrotest AS IBR
Steam tracing
Cement lining
Erection of cement lined pipes
SR
RT
Pipe support Fabrication
Pipe support Erection
Painting of Pipes
Insulation Piping
Chemical cleaning of pipes
Erection Pumps
Alignment Pumps
Structural fabrication
Structural Erection
Structural painting
SUMMARY

UOM

SCOPE

%
ID
IM
IM
ID
IM
IM
ID
IM
IM
ID
IM
IM
RM
RM
RM
Nos
Nos
MT
MT
m2
m2
RM
MT
MT
MT
MT
MT

100
241950
1061975
1061975
29480
87295
87295
7375
38285
38285
6700
26775
26775
103890
1590
1590
4204
8780
374
374
191495
93045
9000
180
180
120
120
5600

Contract Award Date :


Contractual Completion Date :
Actual Start Date :
Expected Completion Date :
CUMULATIVE

25-Mar-14
24-Jul-15
22-Jul-14
24-Jul-15

WEEKLY

SCH.

FRONT

ACT.

PGRM.

ACT.

NEXT WEEK
PGRM.

61
24200
38775

100
13588
80312

40
1163
17604

10
4000
18000

1
122
1284

10
4000
18000

1920

1517
6415

800

1200

1042
1857

424
2465

500
2200

500
2200

69

20
250
30
14000

1800

2000

2000

417

80

20

20

6.72

9.02

2.40

1.61

44
2175

12

6
30

10

0.10

1.71

Remarks : CS NIBR piping erection progressing in areas 101, 102, 112. CS NIBR piping fabrication commenced for area 111.
Points of Action : To expedite Structural & piping painting works. Currently, 6 nos welders are available. This is to be urgently increased to a minimum of
18 nos.

_________________________________________________________________________________________________________________________________
Copyrights EIL All rights reserved
Format No. 5-2744-0212-F2 Rev 02/ 31.05.2013

Week ending on
05-Oct-2014
Job No. A307
Page 17 of 49

WEEKLY CONSTRUCTION PROGRESS REPORT


IREP, Kochi
QUANTITATIVE PROGRESS STATUS
Name of Contractor : M/s Paulose George Construction Company Pvt Ltd (Code # 210)
Name of Work : Construction of Raw Water Quarry & Pump House

SL. NO.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

WORK ITEM
Mobilization
Tree Cutting
Excavation
Excavation Rock Blasting
PCC
RCC Substructure
RCC Superstructure
Backfilling
De watering of Quarry
Grouting of Quarry
WBM
Premix Carpet
RR Masonry
Laterite Masonry
Plastering & Pointing
Steel / Aluminum Door
Floor Finishing
Roofing / Cladding
Structural steel Fabrication
Structural Steel Erection
Hand Railing
Stone soling for sub base
Chain link / concertina cable
Transportation of rock
Micrograding
SUMMARY

UOM

SCOPE

%
NOS
CUM
CUM
CUM
CUM
CUM
CUM
CUM
SQM
SQM
SQM
CUM
CUM
SQM
SQM
SQM
SQM
MT
MT
RM
SQM
RM
CUM
SQM

100
219
46869
6050
1965
6670
420
8150
246327
6000
8650
3570
600
915
2825
97
200
910
170
170
3000
1100
1500
5400
0

Contract Award Date :


Contractual Completion Date :
Actual Start Date :
Expected Completion Date :

SCH.
100
219
46869
6050
1965
6670
420
8150
246327
6000
8650
3570
600
915
2825
97
200
910
170
170
3000
1100
1500
5400
0

CUMULATIVE
FRONT
100
219
46869
6050
1965
6670
420
8150
246327
6000
8650
3570
600
915
2825
97
200
910
170
170
3000
1100
1500
5400
0

ACT.
100
219
42700
5259
1940
6149
405
5725
246327
6000
4832
648
525
849
1569
0
0
0
3
1
0
719
0
4000
0

100.00

100

81.86

23-Apr-13
23-Jul-14
17-May-13
30-Dec-14

WEEKLY
PGRM.
ACT.
0
0
0
0
117
15
93
14
6
0
82
36
0
0
233
200
0
0
0
0
434
232
0
0
25
1
50
16
0
0
0
0
0
0
0
0
12
0
12
0.0
0
0
0
0
0
0
0
0
0
0
1.47

0.44

NEXT WEEK
PGRM.
0
0
117
93
6
82
0
233
0
0
434
0
13
26
0
0
0
0
12
12
0
0
0
0
0
1.33

Remarks : Retaining wall for Quarry-2 completed (except a small portion left out for access to Quarry 2). Work in progress for Pump-House (Quarry No. 8
& Quarry No. 2), retaining walls in Quarry No. 8
Points of Action : Resource deployment (especially carpenters & barbenders) to be augmented for work at retaining wall and pump house in quarry no. 2
(Total Required = 200 nos and Available = 150 nos). Interconnection of Quarry No. 7 & 8 to be expedited. Watch Tower works to be taken up

___________________________________________
_______________________________________________
___________________________________________
Format No. 5-2744-0212-F2 Rev 02/ 31.05.2013
Copyrights EIL All rights reserved

Week ending on
05-Oct-2014
Job No. A307
Page 18 of 49

WEEKLY CONSTRUCTION PROGRESS REPORT


IREP, Kochi
QUANTITATIVE PROGRESS STATUS
Name of Contractor : M/s Triveni Engineering Industries Ltd (Code # 211)
Name of Work : Construction of Raw Water Treatment Plant

SL. NO.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38

WORK ITEM
Mobilisation
Excavation
Hard Rock Excavation
Backfilling
Sand filling
PCC
RCC substructure
RCC Superstructure
RCC Flooring
Structural Fabrication
Structural Erection
WBM
Premix Carpeting
Galv. Al. Sheet Roofing
Hand rail
Installation of Metallic Valves
Piping Fabrication
Piping Erection
Piping Hydrotest
Non Metallic Piping Erection
Erection - Pumps
Erection - Blowers + Motors
Erection - Gates
Erection - Thickener
Erection - Clarifiers
Erection - Belt Filter Press
Erection - Dosing Tanks
ClO2 Dosing System
Erection - Panels
Erection - Transformers
Electrical Cable Tray
Power Cable Laying - HT
Power Cable Laying - LT
Control Cable
Instrumentation Cable Tray
Instrumentation Cable Laying
Instrument Calibration
Instrument Erection
SUMMARY

UOM

SCOPE

%
M3
M3
M3
M3
M3
M3
M3
M3
MT
MT
M2
M2
M2
RM
Nos
ID
IM
IM
RM
Nos
Nos
Nos
Nos
Nos
Nos
Nos
%
Nos
Nos
RM
RM
RM
RM
RM
RM
Nos
Nos

100
29941
5406
8561
1940
3850
3952
5577
276
61
61
1500
1500
2076
1460
397
6000
10000
10000
2000
47
4
16
1
2
2
4
100
10
2
2000
3078
49914
32670
1000
14175
60
119

Contract Award Date :


Contractual Completion Date :
Actual Start Date :
Expected Completion Date :
SCH.
100
29941
4381
8561
1940
3850
3952
4667
47
59
40
133
0
400
333
203
4600
6500
5367
1533
37
4
13
1
2
2
4
93
3
1
1067
1500
31247
14670
533
9042
0
53

CUMULATIVE
FRONT
100
29941
5406
8561
1940
3850
3952
5577
276
61
61
1500
1500
2076
1460
397
6000
10000
10000
2000
47
4
16
1
2
2
4
100
10
2
2000
3078
49914
32670
1000
14175
60
119

ACT.
81
29941
5406
8561
1840
3484
3275
2916
0
0
0
1200
0
0
0
0
3100
276
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

84.96

100

52.31

12-Jul-13
24-Jan-15
26-Aug-13
24-May-15

WEEKLY
PGRM.
ACT.
10
0
0
0
0
0
0
0
45
0
140
8
160
205
240
36
0
0
10
0
0
0
0
0
0
0
0
0
0
0
0
0
350
0
108
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
3.14

1.28

NEXT WEEK
PGRM.
3
0
0
0
0
140
160
240
70
10
0
0
0
0
0
0
410
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2.99

Remarks : Work in progress for Filter Water Reservoir (1 & 2), Pump House, Clarifier, Thickener, Filter House & Sub-Station Building
Points of Action : Work in Filter House, Sub-Station and Chemical House to be expedited. Manpower to be expedited urgently (Manpower is 182 nos against
plan of 346 nos). As per commitment in meeting held on 05.09.2014, TEIL shall mobilize additional 71 nos manpower by 20.09.2014 to take up the works in
Sub-Station, Filter House and Chemical House buildings. However, only 12 nos have been added and further 15 nos shall be mobilized by next week. TEIL
further committed to cover up the backlog by 30.11.2014

_____________________________________________________________________________________________________________________________________
Copyrights EIL All rights reserved
Format No. 5-2744-0212-F2 Rev 02/ 31.05.2013

Week ending on
05-Oct-2014
Job No. A307
Page 19 of 49

WEEKLY CONSTRUCTION PROGRESS REPORT


IREP, Kochi.

QUANTITATIVE PROGRESS STATUS


Name of Contractor : M/s Paharpur Cooling Tower Ltd. (Code # 204)
Name of Work : Cooling Towers I & II and CWTP

SL. NO.
A
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
B
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40

WORK ITEM
CT I :: REFINERY AREA
Mobilisation
Excavation
PCC
RCC substructure CT
RCC upto Basin
RCC upto Basin kerb
RCC upto air intake
RCC upto drift eliminator
RCC upto deck
RCC upto stack
RCC stair
RCC sump & channel
RCC Pavement
RCC substructure CWTP
RCC superstructure CWTP
Brick Masonry
RCC eqpt fdn
Hydrotest Basin, Sump
Painting of cooling tower
Backfilling
Structural steel erection
Grating
Handrail
Piping Fabrication U/G
Piping Erection U/G
Piping Hydrotest U/G
Piping Fabrication A/G
Piping Erection A/G
Piping Hydrotest A/G
Sluice Gate
Fill installation
Distributor piping
Fan assembly (incl. GB & M)
Pumps
Dosing system
SSF
EOT/HOT/Chain block
Panel Installation
LCS
Light fixtures
Cable tray
Cable laying
Inst callibration
Inst installation
Inst cable laying
Loop checking
SUMMARY - REF (CT I)
CT II :: PFCCU AREA
Mobilisation
Excavation
PCC
RCC substructure CT
RCC upto Basin
RCC upto Basin kerb
RCC upto air intake
RCC upto drift eliminator
RCC upto deck
RCC upto stack
RCC stair
RCC sump & channel
RCC Pavement
RCC eqpt fdn
Hydrotest Basin, Sump
Painting of cooling tower
Backfilling
Structural steel erection
Grating
Handrail
Piping Fabrication U/G
Piping Erection U/G
Piping Hydrotest U/G
Piping Fabrication A/G
Piping Erection A/G
Piping Hydrotest A/G
Sluice Gate
Fill installation
Distributor piping
Fan assembly (incl. GB & M)
SSF
EOT/HOT/Chain block
LCS
Light fixtures
Cable tray
Cable laying
Inst callibration
Inst installation
Inst cable laying
Loop checking
SUMMARY - FCC (CT II)
SUMMARY

Contract Award Date :


Contractual Completion Date :
Actual Start Date :
Expected Completion Date :
UOM

SCOPE

%
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
cum
%
sqm
cum
MT
MT
RM
ID
IM
IM
ID
IM
IM
Nos
Set
RM
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
M
M
Nos
Nos
M
%
%
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
cum
%
sqm
cum
MT
MT
RM
ID
IM
IM
ID
IM
IM
Nos
Set
RM
Nos
Nos
Nos
Nos
Nos
M
M
Nos
Nos
M
%
%

CUMULATIVE

21-Feb-13
20-Oct-14
17-Apr-13
15-Mar-15

WEEKLY

SCH.

FRONT

ACT.

100
15300
440
798
889
406
625
566
238
533
70
2150
450
110
250
125
110
100
15000
12000
4
10
300
4700
13850
13850
6179
15090
15090
11
7
1750
7
20
7
2
3
7
38
80
6150
4000
56
56
6873
100

100
15300
440
798
889
406
625
566
238
533
70
2150
450
100
250
125
110
100
15000
12000
4
10
300
4700
13850
13850
6179
15090
15090
11
7
1750
7
20
7
2
3
7
38
80
6150
4000
56
56
6873
100
100.00

100
15300
440
798
889
406
625
566
238
533
70
2150
450
110
250
125
110
100
15000
12000
4
10
300
4700
13850
13850
6179
15090
15090
11
7
1750
7
20
7
2
3
7
38
80
6150
4000
56
56
6873
100
100.00

100
14500
402
798
889
389
563
519
149
257
28
2029
15
107
55

100
14600
430
1026
1143
522
803
728
307
686
70
2323
500
55
100
20000
13490
4
10
310
4876
8980
8980
7562
21213
21213
15
9
2250
9
2
3
18
134
4250
6200
50
50
8837
100

100
14600
430
1026
1143
522
803
728
307
686
70
2323
500
50
100
20000
13490
4
10
310
4876
8980
8980
7562
21213
21213
15
9
2250
9
2
3
18
134
4250
6200
50
50
8837
100
100.00
100.00

100
14600
430
1026
1143
522
803
728
307
686
70
2323
500
55
100
20000
13490
4
10
310
4876
8980
8980
7562
21213
21213
15
9
2250
9
2
3
18
134
4250
6200
50
50
8837
100
100
100

100
14200
430
1026
939
457
398
607
133
391
32
1600
15
51

100

PGRM.

ACT.

300
10

15
25
26
7
3

5
10

NEXT WEEK
PGRM

400
10

12
4
3
3
36
15
18

10

15
15
61
3
50
25
10
10

10300
237
1386

10
300
1500

75
600

10
300
1500

5679
660
1

25

25

60.88

1.96

0.84

200

2.06
200
209

10
54
24
15
31

31

15

14

55

15

10

12550

300

340

228
3928
5942

10
200
900

7514
8710

2900

2900

50

50

75
2146

10
200
900

59.27
60.04

2.66
2.32

1.22
1.04

3.46
2.79

Remarks : CT I - Shuttering & R/F work for wall upto deck for cell 2 is in progress. CT II: Cells #5-9 fan cylinder shuttering & rebar work in progress.
Points of Action : Man Power to be urgently augmented (Required is 670 nos & deployed workers 392 nos). Supply of balance U/G and A/G Piping Material by PCTL to be expedited. Shortage of
TMT steel to be expedited.

________________________________________________________________________________
___________________________________________________________________________________
Format No.5-2744-0212-F2 Rev 02/31.05.2013
Copyrights EIL All rights reserved

Week ending on
05-Oct-2014
Job No. A307
Page 20 of 49

WEEKLY CONSTRUCTION PROGRESS REPORT


IREP, Kochi.
QUANTITATIVE PROGRESS STATUS
Name of Contractor : M/s Paharpur Cooling Towers (Code #215)
Name of Work : Cooling Tower III & CWTP

SL. NO.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46

WORK ITEM
Mobilisation
Excavation
PCC
RCC substructure CT
RCC upto Basin
RCC upto Basin kerb
RCC upto air intake
RCC upto drift eliminator
RCC upto deck
RCC upto stack
RCC stair
RCC sump & channel
RCC Pavement
RCC substructure CWTP/PH
RCC superstructure CWTP/PH
Brick Masonry
RCC Eqpt Foundation
Hydrotest Basin, Sump
Painting of cooling tower
Backfilling
Structural steel erection
Grating
Handrail
Piping Fabrication U/G
Piping Erection U/G
Piping Hydrotest U/G
Piping Fabrication A/G
Piping Erection A/G
Piping Hydrotest A/G
Sluice Gate
Fill installation
Distributor piping
Fan assembly (incl. GB & M)
CT Motors
Dosing system
SSF
EOT/HOT/Chain block
Panel Installation
LCS
Light fixtures
Cable tray
Power / Lighting Cable laying
Inst callibration
Inst installation
Inst cable laying
Loop Checking
SUMMARY

Contract Award Date :


Contractual Completion Date :
Actual Start Date :
Expected Completion Date :

UOM

SCOPE

%
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
cum
%
sqm
cum
MT
MT
RM
ID
IM
IM
ID
IM
IM
Nos
Set
RM
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
M
M
Nos
Nos
M
%

100
1800
40
280
290
130
85
300
110
180
25
600
300
80
75
200
50
100
10000
2000
2
1
100
700
2000
2000
2500
7000
7000
2
2
450
2
2
6
2
1
8
24
72
680
4000
50
50
2500
100

CUMULATIVE

11-Sep-13
10-Jan-15
11-Sep-13
10-Mar-15

WEEKLY

FRONT

ACT.

PGRM.

100
1800
40
280
290
130
85
300
110
150
11
600
88
80
75
93
50
93
1400
1880
0

100
1800
40
280
290
130
85
300
110
180
25
600
300
80
75
200
50
100
10000
2000
2
1
100
700
2000
2000
2500
7000
7000
2
2
450
2
2
6
2
1
8
24
72
680
4000
50
50
2500
100

88
1800
40
280
290
124
52

12
8

12
8

5
353

5
54

5
54

600

175

150

175

100

35.67

1.87

0.14

1.87

700
1820
1350
2500
4700
2
1
326
2
1
10

25

68.46

ACT.

NEXT WEEK
PGRM.

SCH.

Remarks: 1st level beam cast completed. 2nd lift of 30 out of 66 nos basin slab columns completed. Basin wall casting of cell-1 completed. Channel: 7 nos
footing & column first lift (6 nos) casting done out of 7 nos.
Point of Action: Manpower to be augmented urgently (required is 160 nos & deployed is 89 nos). Uninterrupted RMC supply to be ensured. Delivery of Bought
out item to be expedited. Dedicated boom placer required to expedited for RCC work.

_________________________________________________________________________
__________________________________________________________________________
Format No. 5-2744-0212-F2 Rev 02/ 31.05.2013
Copyrights EIL All rights reserved

Week ending on
05-Oct-2014
Job No. A307
Page 21 of 49

WEEKLY CONSTRUCTION PROGRESS REPORT


IREP, Kochi.

QUANTITATIVE PROGRESS STATUS


Contract Award Date :
Contractual Completion Date :
Actual Start Date :
Expected Completion Date :

Name of Contractor : M/s Driplex Water Engineering Ltd (Code # 307)


Name of Work : DM Water Plant (RO based) & CPU

Sl No.
1
2
3
4
5
6
7
8
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58

WORK ITEM
Mobilisation
Barricading
Excavation
PCC
RCC - Up to Plinth Level
RCC - Super Structure
Brickwork
Paving (RCC)
Tanks Fab & Rolling
Tanks fab - Erection & Welding
Hydrotest of Tanks
Erection of Tanks & Measuring Tanks
Erection - Filters & Pressure Vessels
Erection - UF and RO Skids
Erection - Heat Exchangers
Erection - Steam Turbine
Erection - Pumps, Blowers & Agitator
Erection - Dosing Pumps
Erection - clariflocculator
Erection - Centrifuges
Erection - Static Mixers
Internal Painting
External Painting
Fabrication (field) - CS Piping
Erection - CS Piping & Valves
Fabrication (field) - SS Piping
Erection - SS Piping & Valves
Erection - MSRL Piping & Valves
CPVC Piping
Steam Piping
Hydrotest of Piping
Painting
Erection of PCC & MCC
Erection - Distribution Transformer
Bus Duct (4000A) & 2000A
Laying of Cable Tray
Laying of Power & Control Cables
Earthing and Lighting Protection
Lighting Indoor
Lighting Outdoor
Local Push Button station
VFD
Testing of Transformers
Testing of Panels
No Load test of motors
Laying of Cable Tray
Laying of Instrument Cables
Erection of Transmitters
Erection of Pressure Gauges
Erection of Level Gauges
Erection of Level Indicators
Erection of Temperature Indicators
Erection of Rotameters
Erection of Analysers
Erection of PLC System
Mechnical Clearance & Format
SUMMARY

UOM

SCOPE

%
Mtr
Cum
Cum
Cum
Cum
Cum
Cum
MT
MT
MT
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Sq M
Sq M
ID
IM
ID
IM
IM
IM
IM
IM
Sq.m
Panels
Nos
Nos
KM
KM
Mtr
Nos
Lot
Nos
Nos
Nos
Nos
Nos
KM
KM
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
%

100
360
22500
934
3885
2683
1294
400
1950
1950
1950
31
40
24
2
2
124
36
1
2
8
21300
23165
13800
63563
15200
54652
15021
1150
2367
136753
10645
95
8
2
8
102
10000
650
80
180
19
8
95
150
4
58
319
306
29
25
25
33
122
2
100

SCH.
100
360
22500
934
3885
2683
1294
400
1950
1950
1862
31
40
24
2
2
117
34
1
2
8
9919
9550
11690
52300
13190
42756
9671
1150
1690
79500
3150
95
8
1
5
60
5690
155
29
28
4
28
2
31
112
116
9
12
12
57
2
85.44

CUMULATIVE
FRONT

ACT.

12-Jun-13
11-Apr-15
13-Sep-13
11-Jul-15

WEEKLY
PGRM.
ACT.

NEXT
WEEK

100
360
22500
934
3885
2683
1294
400
1950
1950
1950
31
40
24
2
2
124
36
1
2
8
21300
23165
13800
63563
15200
54652
15021
1150
2367
136753
10645
95
8
2
8
102
10000
650
80
180
19
8
95
150
4
58
319
306
29
25
25
33
122
2
100

92
355
12408
465
1303
684
100

2
1
817
35
163
93

991
200

117
105

7010

467
817

467
817

210

210

70

70

100.00

22.65

2.34

10
68

0.71

2
1
817
35
163
93

117
105

2.34

Remarks: Substation: Pile cutting & excavtion is in progress. Feed collection Tank-A: Annular, 3 nos shell & Roof structural erection completed & welding is in
progress. Feed collection tank-B: Wind girder fit-up is in progress. Bottom plate & 2 nos shell erection completed. Unpolished tank A: Roof structural erection
completed, 1 no shell erection completed. Unpolished tank B: Roof structural, Bottom Plate, 4 nos shell erection completed. 7 nos tank anticorrosion treatment
completed. RO-I & III Feed collection tank: Anti-corrosion layer completed. Clarifier RCC wall completed. Filter feed tank: 2nd lift of RCC wall casting completed.
Chemical House: 9 nos / 34 nos footing completed; RO shed: 36 nos / 42 nos footing completed & 35 nos / 42 nos 1 lift column completed.
Point of Action: Manpower to be augmented (121 nos deployed against a requirement of 260 nos). Excavation for Chemical house to be expedited, RO shed
excavation & foundation work to be expedited. DM tank pile work to start. Drawing for Equipment foundation, Piping GAD, Pump foundation & Waste disposal
Tank yet to submit.

___________________________________________________________________________________
__________________________________________________________________________________
Format No. 5-2744-0212-F2 Rev 02/ 31.05.2013
Copyrights EIL All rights reserved

WEEKLY CONSTRUCTION PROGRESS REPORT

Week ending on
05-Oct-2014
Job No. A307
Page 22 of 49

IREP, Kochi.
QUANTITATIVE PROGRESS STATUS
Contract Award Date :
Contractual Completion Date :
Actual Start Date :
Expected Completion Date :

Name of Contractor : M/s Paramount Limited (Code # 313)


Name of Work : Effluent Treatment Plant

WORK ITEM
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58

Mobilization
Excavation
PCC
RCC
Back filling/ Disposing the Surplus Soil
Brick Masonry Works
Plaster
Waterproofing
Painting
Acid Alkali proof treatment
Architectural works
Anti-Termite Treatment
RCC tank Hydrotest
Fabrication Structural Steel
Erection Structural Steel
Galvalume Pre-coated Coloured Metal Steel
Hand Railing
G.I. Chequered Plate
WBM Grade-II
Tank Pad Excavation
Tank Pad PCC
Tank Pad RCC
Sand filling
Anti-Corrosive Layer
Tank Bottom Plate Fabrication & Erection
Tank Shell Fabrication & Erection
Tank Roof Fabrication & Erection
Tank Hydro Test
Tank PWHT
Tank Blasting & Painting / Lining
Static Equipment Erection
Rotating Equipment erection
Rotating Equipment Alignment
Other Package /Process Item
Pipe Fabrication
Pipe Erection
Pipe Testing and Flushing
Pipe Painting
Earthing Strip
Electrical Equipment & Panel
Distributer Transformers Installation
Lighting Fixtures
Installation of Local Control Stations (LCS)
Variable Frequency Drive Systems (VFDs)
Laying of Cable Trays
Electrical Cable Laying
Cables Laying Fire Alarm and Communication
Termination & Glanding
Instrumntation of Cable Trays/ Duct
Installation of PLC system
Instrumentation Cable Laying
Termination & Glanding
Calibration of Instruments
Instrument Mounting
Installation of Analysers
Loop Checking
Non P&ID system
P&ID system
SUMMARY

UOM

SCOPE

%
CUM
CUM.
CUM.
CUM.
CUM.
SQ.M
SQ.M
SQ.M
SQ.M
%
SQ.M
NOS.
MT
MT
SQ.M
RMT
MT
SQ.M
CUM
CUM
CUM
CUM
SQ.M
MT
MT
KG.
NO.
NO.
SQ.M.
NOS.
NOS.
NOS.
%
ID
IM
IM
SQ. M
RMT
NOS.
NOS.
NOS.
NOS.
NOS.
MTRS.
KM.
KM.
NOS.
MTRS.
NO
KM.
NOS.
NOS.
NOS.
NOS.
NOS.
%
%

100
13378
789
6120
15848
943
9887
1669
16344
6743
100
1541
14
369
369
2619
2014
91
1045
672
23
143
614
365
37
132
44
5
2
2454
40
119
119
100
6915
12950
12950
6100
2200
10
6
430
154
17
3500
90
2
1000
1935
1
15
150
450
450
12
150
100
100

CUMULATIVE

WEEKLY

NEXT WEEK
PGRM.

SCH.

FRONT

ACT.

PGRM.

100
11750
613
3200
9867
500
733

100
12040
710
5508
14263
849
8898
1502
14710
6069
90
1387
13
332
332
2357
1813
82
941
605
21
129
553
329
33
119
40
5
2
2209
36
107
107
90
6224
11655
11655
5490
1980
9
5
387
139
15
3150
81
2
900
1742
1
14
135
405
405
11
135
90
90

67
5164
114
655
1000
14

4
250
25
100
50
20

15
15
705

50

50

225
15
160
675
20

75
3
30
450
150

75
3
30
450
150

90.00

11.05

1.30

0.24

1.33

1541
350
153
1400
65
672
23
143
614
365
37
123
43
2
1
19
77
68
7
2133
1000

17
900
7

38.80

ACT.

12-Sep-13
11-Jun-15
16-Nov-13
31-Oct-15

117
17
10

165

4
250
25
100
50
20

Remarks: RCC Work of substation foundation ,Equalisation tank A/B , H2O2 tank A/B completed ,RCC works for Oxidation column, Chemical House, Spent caustic
tank, Sludge thicknener etc in progress.Surge pond : GI sheet fixing completed.
Points of action: Man Power required is 150 nos & deployed is 85 nos.

____________________________________________________________________________________________________________________________________________
Format No. 5-2744-0212-F2 Rev 02/ 31.05.2013
Copyrights EIL All rights reserved

Week ending on
05-Oct-2014
Job No. A307
Page 23 of 49

WEEKLY CONSTRUCTION PROGRESS REPORT


IREP, Kochi.
QUANTITATIVE PROGRESS STATUS
Contract Award Date :
Contractual Completion Date :
Actual Start Date :
Expected Completion Date :

Name of Contractor : M/s IOT Anwesha (Code # 320)


Name of Work : Tankage -III works

SL. NO.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

WORK ITEM
Mobilization
Engineering
Supply
Excavation
Sand Gravel Mix
RCC Ring wall for Tank pads
M-Sand filling
Laying of PVC Liner
Laying of geotextile fab
Anticorrosive Treatment
PCC
RCC
Fabrication of tank plate
Erectino of tank plate
Inst. Of floating roof -YT 25/26/29
Inst. Of roof drain system
Foam/Cooling system for tank
Hydrotest
Painting
Inst. Of primary & secondary seal
Calibration of tanks
Inst. Of propeller mixer
UG Pipe fabrication
UG Pipe laying
Inst. Of Rim Seal fire protection system
SUMMARY

UOM

SCOPE

%
%
%
M3
M3
M3
M3
SQM
SQM
SQM
M3
M3
MT
MT
MT
NOS
NOS
NOS
NOS
NOS
NOS
NOS
ID
IM
NOS

100
100
100
17070
11000
250
21160
14800
5885
13900
272
123
2200
2200
1300
2
4
4
8
2
4
2
1730
8650
2

SCH.
96
80
74
16903
11000
235
20940
13667
4633
11167
113
87
633
250
233

35.68

CUMULATIVE
FRONT
100
100
100
14510
9350
213
17986
12580
5002
11815
231
105
2200
2200
1105
2
3
3
7
2
3
2
1471
7353
2
93.08

ACT.
77
85
85
14658
6275

04-Dec-13
03-Aug-15
15-Apr-14
03-Aug-15

WEEKLY
PGRM.
ACT.
2
2
2
3
2
3
2500
500
3000

NEXT WEEK
PGRM.
2
2
2
2500
3000

10105
6252
2564
4200

6000

2800

6000

2
1025
5

50
20

40

50
20

0.6

0.2

0.2

0.2

28.85

1.31

1.04

1.35

Remarks: Sand filling works, PVC liner and GeoTextile laying completed for YT-26/28. 2416/3200MT plate received. Shell Fabrication works in
progress.Excavation of YT-25 completed.
Points of action: Tank plate erection to be expedited.

___________________________________________
______________________________________________________________________________________________________
Format No. 5-2744-0212-F2 Rev 02/ 31.05.2013
Copyrights EIL All rights reserved

WEEKLY CONSTRUCTION PROGRESS REPORT

Week ending on
05-Oct-2014
Job No. A307
Page 24 of 49

IREP, Kochi.

QUANTITATIVE PROGRESS STATUS


Name of Contractor : M/s Bridge & Roof (Code # 305)
Name of Work : Tankage Works - I

SL. NO.
A
B
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
C
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30

WORK ITEM

Contract Award Date :


Contractual Completion Date :
Actual Start Date :
Expected Completion Date :
UOM

SCOPE

M3
M2
M3
M3
M3
M
M2
M2
MT
MT
MT
MT
MT
MT
MT
NOS
%
M2
M2
MT
RM
NOS
NOS
IM
IM
MT
MT
MT
RM
%

100
1
12600
5795
7200
520
4400
128
400
1480
3800
600
52.828
198.83
614.04
167.35
158.28
44.864
4.46
6798.6
31
2
1200
2400
10.592
2.692
7.464
2000
1063.5
100
6400
8000
1
7200
2200
456
132
2000
40
225
1560
22.636
90.612
321.31
67.324
78.368
28.904
1
27
100
4400
6400
25
400
4
4
1000
2000
4.688
3.156
28.104
693.4
100

100
100
100

Mobilization
TF 3
Excavation (TF-3)
Sand & Mouram Filling (1:1)
Sand Filling
Stone Ring Wall + Leak Detection System
Geo-Textile
Pvc Leak Detection Pipe
Premix Carpet
Anti-Corrosive Layer
Isolation Barrier
PCC
Annular Plate
Bottom Plate
Shell Section
Roof Structure
Roof Plate
Wind Girders
Curb Angle
Heating Coil
Shell & Roof Appurtenances
Mixers
Foam System
Cooling Water Ring
Ladder, Stair, Platform
Grating
Gauge Well
Insulation
Handrail
Hydrotest
Painting Internal
Painting External
TF 5
Excavation (TF-5)
PCC
RCC
Leak Detection System
Sand Filling
Pvc Leak Detection Pipe
Premix Carpet
Anti-Corrosive Layer
Annular Plate
Bottom Plate
Shell Section
Roof Structure
Roof Plate
Wind Girders
Curb Angle
Shell & Roof Appurtenances
Hydrotest
Painting Internal
Painting External
Aluminium Floating Roof
Tank Seals
Roof Lift Test
Mixers
Foam System
Cooling Water Ring
Ladder, Stair, Platform
Grating
Gauge Well
Handrail
Mechanical Clearance
SUMMARY - CONSTRN.
Engineering

II
III

Supply
Construction

%
%

SUMMARY
Note: Quantity revised.

M3
M3
M3
M3
M2
RM
M2
M2
M2
M3
MT
MT
MT
MT
MT
MT
MT
IM
NOS
NOS
IM
IM
MT
MT
MT
M2
RM
%
M2
M2

CUMULATIVE

WEEKLY

07-Jun-13
06-Apr-15
23-Aug-13
06-May-15
NEXT
WEEK
PGRM.
2

SCH.
100

FRONT
100

ACT.
79

12600
5795
8300
120
4100
200
400
1480
3000
2620
50
200
600
215
140
17
10
1000
33
1
810
1350
10
7

12600
5795
6690
350
4025
120
400
1480
1738
330
17

73.54
95.00

12600
5795
7200
520
4400
128
400
1480
3800
600
53
199
614
167
158
45
4
6799
31
2
1200
2400
11
3
7
2000
1064
100
6400
8000
1
7200
2200
456
132
2000
40
225
1560
23
91
321
67
78
29
1
27
100
4400
6400
25
400
4
4
1000
2000
5
3
28
693
100
100
100

22.02
93.00

1.65
1.00

0.27

1.65
1.00

100.00
73.54

100
100

56.00
22.02

2.00
1.65

0.50
0.27

2.00
1.65

85.20

100

39.16

1.76

0.36

1.76

150
93

7200
2200
600
70
4750
150
225
825
30
92
375
105
72
10
7
33
100
2450

280
560
7
5
110

7200
2200
456
66
1150
20
225
742
18
3
21

PGRM.
2

ACT.

174
40
187
12

35

174
40
187
12

315
36
9
12
12
3

100
5
2

315
36
9
12
12
3

8
58
5
91
2
5
6
2

30

2
2

8
58
5
91
2
5
6
2

Remarks: YT-341 Fire brick work completed, Annular plate welding is in progress. YT-342: PVC liner laying completed & Geo Textile laying is in
progress . YT-343: PCC is in progress. YT-344: fire Brick work completed, Annular plate laying is in progress. YT-111: Annular & Bottom plate
welding completed & 2 nos Shell plate erection completed & welding is in progress. YT-112: Annular plate laying & welding is in progress. YT-113:
RCC Wall completed, 11th / 12 th layer earth filling is in progress. YT-114: 3rd / 8th Layer Sand filling completed.
Point of Action: To augment resources (Manpower required is 200 nos & deployed is 100 nos ) for Civil & Mechanical work. Procurement of Bought
out item to be expedited. Procurement of Balance Quantity of Plates (890 MT out of 1650 MT) to be expedited. Procurement of Structural Materials
for Roof fabrication. Delivery of Aluminium Floating Roof and Foam Seals to be expedited.

________________________________________________________________________________________________________________________________________________________________
Format No. 5-2744-0212-F2 Rev 02/ 31.05.2013
Copyrights EIL All rights reserved

Week ending on
05-Oct-2014
Job No. A307
Page 25 of 49

WEEKLY CONSTRUCTION PROGRESS REPORT


IREP, Kochi.
QUANTITATIVE PROGRESS STATUS
Name of Contractor : M/s Bridge & Roof ( Code # 314)
Name of Work : Tankage Works - II

Sl No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44

WORK ITEM
Mobilization
Engineering
Supply
Cleaning Of Crude Oil Tank
Sludge Processing For Crude Oil Tank
Dismantling & Removal Of Foam Seal From Existing Tanks
Installation Foam Seal From Existing Tanks
Modification Of Existing Tanks From EFR To IFR (YT-440 & 450)
Dismantling Of Existing Tanks: Yt-32/33/270
Floatation Test For Nozzle Modification Tank
Fabrication And Installation Of Shell Nozzles On Existing Tank
Installation Of Propeller Mixer On Existing Tanks
Excavation & Sand Filling
Backfilling
Filling Of M-Sand Gravel Mix
Stone Ring For Tank Pads
Laying Of Pvc Liner
Laying Of Geo Textile Fab.
Laying Of Gravel / Crush Stone
PCC
RCC
Fabrication Of Tank Plate
Erection Of Tank Plate
Anchor Bolt
Structural Steel Fabrication
Structural Steel Erection
Thermal Isolation Barrier Of Tank
Radiography
Stress Relieve - Tank
Erection Shell & Roof Appurtenances
Erection & Welding Heating Coil
Installation Of PVRV On Tank
Installation Of Emergency Vent
Installation Of Gauge Hatch
Installation Of Bleeder Vent
Installation Of Mixers
Semi Fixing Foam System
Cooling System For Tank
Hydro test
Painting
Erection & Welding Grating
Erection & Welding Insulation
Erection & Welding Handrail
Calibration Of Tanks
SUMMARY

Contract Award Date :


Contractual Completion Date :
Actual Start Date :
Expected Completion Date :
UOM

SCOPE

%
%
%
M3
M3
RM
RM
%
NOS
Nos
NOS
nos
M3
M3
M3
M3
M3
M3
M3
M3
M3
MT
MT
MT
MT
MT
NOS
RM
NOS
NOS
RM
NOS
NOS
NOS
NOS
NOS
NOS
NOS
NOS
SM
MT
SM
RM
NOS

100
100
100
3005
1850
2572
2572
100
3
11
25
4
35890
9900
19115
160
6555
4300
505
870
1749
2214
2214
28
362
362
6
9067
13
174
1300
9
4
13
13
6
11
11
13
54800
4
18480
296
13

CUMULATIVE

WEEKLY

SCH.

FRONT

ACT.

100
100
100
1268
234
1969
168
48
3
1
16

100
100
100
2000
1850
700
700
75
2
3
8

67
72
39
1372
700
500

15794
4245
19115
160
6555
4300
505
727
1109
1653
1053
28
362
362
6
5077
5
120

35890
9900
19115
160
6555
4300
505
870
1749
2214
2214
28
362
362
6
5000
8
100
900
5
4
9
5
2
3
3
7
18362

3
3
21710

25-Sep-13
24-Jul-15
25-Oct-13
24-Sep-15

PGRM.

ACT.

NEXT WEEK
PGRM.

8
5

1
1
1

5
5

15
2

3500
560
1230
100
1160
880
178
176
528
698
60

700

500
158
1000

52
31
1
30
2

1300

70
50
15

43

20
15

4
24

50

30
340
40
15
20
20
100

1228

500

120

400

20.69

1.77

0.60

1.85

9181
100
7
60.83

84.40

Remarks: YT-32-Roof truss erection completed. YT-291- 1st lift of ring wall completed, Sand filling is in progress. YT-107: 1 lift RCC wall completed. YT-108: 1st lift of ring wall
completed, 4th / 13th sand filling is in progress. YT-115: 1st lift of wall completed, 11th / 13 th layer sand filling is in progress. YT-116: 1st lift ring wall casting completed, 10th /
13th layer sand filling is in progress. YT-46 & 47: Marking completed & Excavation started. YT-45: Sand gravel filling started.
Modification work: YT-60: Handover to BPCL on 26.04.2014; YT-380: hand over on 29.06.2014. YT-23: Modification work completed,YT-19:Shell to bottom plate erection
completed. YT-440:Horizontal welding completed.YT-80: Handed over on 19.08.14.
Point of Action: Delivery of 375 MT Plates ( SA 516 Grade 70 & 200 MT: IS 2062 GR B) to be expedited. Procurement of boughtout material to be expedited. Order finalisation
for Foam Seals. Insulation material for YT-250 & 260 to be started. Anchor bolt (206 nos) delivery to be expedited. 100 MT reinforecement steel required immediately.

_____________________________________________________________________________
_____________________________________________________________________________
Format No. 5-2744-0212-F2 Rev 02/ 31.05.2013
Copyrights EIL All rights reserved

Week ending on
05-Oct-2014
Job No. A307
Page 26 of 49

WEEKLY CONSTRUCTION PROGRESS


REPORT

IREP, Kochi.

QUANTITATIVE PROGRESS STATUS


Name of Contractor : M/s L&T (Code # 205)
Name of Work : Civil, Structural & UG Piping works for CDU/VDU and DCU

SL. NO.

WORK ITEM

UOM

SCOPE

100
100
100
87000
8000
42800
2375
3300
22800
4560
1245
5800
1580
35000
72000
72000
170
67500
7550
7550
190
550
6000
200
4500
35

Contract Award Date :


Contractual Completion Date :
Actual Start Date :
Expected Completion Date :
CUMULATIVE

07-Mar-13
06-Sep-14
02-Apr-13
31-Mar-15

WEEKLY

SCH.

FRONT

ACT.

100
100
100
87000
8000
42800
2375
3300
22800
4560
1245
5800
1580
35000
72000
72000
170
67500
7550
7550
190
550
6000
200
4500
35

100
100
100
87000
8000
40000
2375
3300
22800
4560
1245
5000
1580
35000
72000
72000
170
58000
7550
7550
185
530
6000
200
4500
35

100
98
100
79850
7920
19840
2375
2132
19708
3338
804
272

1322
1

240

100.00

99.33

80.97

1.35

0.54

100
100
100
47000
8500
9700
1165
2300
11110
2050
1340
3840
1200
24000
46000
46000
140
37500
4500
4500
95
275
5000
3600
3500
20

100
100
100
47000
8500
9700
1165
2300
11110
2050
1340
3840

100
97
100
41017
8500

24000
40400
40400
130
36300
4500
4500
95
225
5000
3600
3500
20

21433
25739
16665
78
14596
4338
2159
77

100.00

98.31

75.87

1.31

0.63

1.99

100.00

99.02

79.39

1.34

0.57

1.66

A
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

CDU / VDU
Engineering
Procurement
Mobilisation
Excavation
Hard Rock Excavation
WBM
Pile cutting
PCC
RCC substructure
RCC Superstructure
RCC Precast
RCC Pavement
GI Piping Erection
U/G Piping Fabrication
U/G Piping Erection
U/G Piping Hydrotest
RT
Backfilling
Structural Steel Fabrication
Structural Steel Erection
Anchor bolts
Grating
Hand rail
Roof sheeting
Earth Strip
Earth Electrode
SUMMARY - CDU/VDU

%
%
%
m3
m3
m2
no
m3
m3
m3
m3
m3
IM
ID
IM
IM
no
m3
MT
MT
MT
MT
M
m2
M
No

B
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

DCU
Engineering
Procurement
Mobilisation
Excavation
Hard Rock Excavation
WBM
Pile cutting
PCC
RCC substructure
RCC Superstructure
RCC Precast
RCC Pavement
GI Piping Erection
U/G Piping Fabrication
U/G Piping Erection
U/G Piping Hydrotest
RT
Backfilling
Structural Steel Fabrication
Structural Steel Erection
Anchor bolts
Grating
Hand rail
Roof sheeting
Earth Strip
Earth Electrode
SUMMARY - DCU

%
%
%
m3
m3
m2
no
m3
m3
m3
m3
m3
IM
ID
IM
IM
no
m3
MT
MT
MT
MT
M
m2
M
No

SUMMARY

%
100
100
100
47000
8500
9700
1165
2300
11110
2050
1340
3840
1200
24000
46000
46000
140
37500
4500
4500
95
275
5000
3600
3500
20

32984
49742
43058
118
26207
6247
4707
133
94
1701

1058
1054
8200
1187
639

PGRM.

ACT.

NEXT
WEEK
PGRM.
1

450

150

200

90
25
450
70
20
109
120
320
1360
760
6
500
100
160
8
110

6
197
10
20
280
370
750
10
190
75
74
1
6
110

180
1

420

20
240
25
40
240
980
4
500
30
90
6
30

16
500
100
20
300
240
360
1360
1500
6
200
80
160
1
8
110

1.51

280

91
25
252
93
900
8
280
8
47
1

80

10
450
45
50
280
1320
2800
6
500
35
105
1
6
30
250

Remarks : Balance equipment saddles handing over in progress in TS I of CDU VDU.


Points of Action : Balance front handing over to mechanical agencies to be expedited in CDU VDU & DCU.

___________________________________________________________________________________
________________________________________________________________________________
Format No. 5-2744-0212-F2 Rev 02/ 31.05.2013
Copyrights EIL All rights reserved

Week ending on
05-Oct-2014
Job No. A307
Page 27 of 49

WEEKLY CONSTRUCTION PROGRESS REPORT


IREP, Kochi.
QUANTITATIVE PROGRESS STATUS
Name of Contractor : M/s Technip KTI (Code # 302)
Name of Work : Heater Package for CDU/VDU

Contract Award Date :


Contractual Completion Date :
Actual Start Date :
Expected Completion Date :

SL.
NO.

WORK ITEM

UOM

SCOPE

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34

Mobilization
Fabrication :: Radiant Section
Fabrication :: Convection Section
Fabrication :: Coils - Rad, Conv & Cross over
Fabrication :: Supports, Ladder, Platform,
Fabrication :: Ducts
Fabrication :: Stack
Erection / Welding :: Convection Coils in
NDT :: Shop :: Coils
Ceramic / Refractory Lining :: Convection, Duct
Dry out :: Convection, Duct & Stack
Erection :: Radiant Floor & Panels
Erection :: Radiant Arch
Erection :: Convection Section
Erection :: Supports, Platform, Ladder
Installation :: Gratings
Erection / Welding :: Radiant Coils
Erection :: Cross over / Jump over
Erection :: Duct
Erection :: Stack
NDT :: Field
Hydrotesting :: Coil Loops
Ceramic / Refractory Lining :: Radiant Section
Erection :: Burner Control Panels & Burner
Erection/ Alignment :: ID / FD Fans
Erection & Alignment :: Dampers
Erection & Alignment :: Expansion Bellows
Erection & Alignment :: APH
Erection & Alignment :: Soot Blowers
Electrical Works
Erection :: Heater Tube Skin Thermocouple
Instrumentation Works
Finishing Painting
Checklisting & Mechanical Completion

%
MT
MT
ID
MT
MT
MT
ID
ID
CuM
CuM
MT
MT
MT
MT
SqM
ID
ID
MT
MT
ID
Nos
CuM
Nos
Nos
Nos
Nos
MT
Nos
%
Nos
%
MT
%

100
504
208
9212
873
648
425
2232
11444
899
899
400
104
208
873
4612
3788
2010
648
425
5798
40
538
58
6
30
122
661
78
100
60
100
2656
100

SUMMARY

CUMULATIVE

07-Mar-13
06-Feb-15
16-Jun-13
06-Feb-15

WEEKLY

SCH.

FRONT

ACT.

100
504
208
8927
873
648
421
1599
10684
893
601
400
104

100
504
208
9212
873
648
425
2232
11444
899
899
400
104
208
873
4612
3788
2010
400
425
2500
40
538
58

100
504
208
9178
811
508
260
1164
10429
420
256
400
104
101
207
433
1200

6
10
300
78
1
60
100
150

3
6
276

110

16

88.04

59.67

864
3788
357
258
2972
7
509
4
122
460
61
56
49
82.93

PGRM.

ACT.

20
35
25
150
250
30

2
13

76

38
25

NEXT
WEEK
PGRM.

15
35
25
150
250
20
50

25
200
150

150

116
126

12
15

6
20

12
20

459

25

25

2.41

1.62

2.14

Remarks : Installation of hot air ducts commenced & in progress in VDU Heater.
Points of Action : Fabrication of Ducts, stack & supply of balance structural steel to be expedited. Rectification & transportation of Convection module to
be expedited.

___________________________________________
___________________________________________
___________________________________________
Format No. 5-2744-0212-F2 Rev 02/ 31.05.2013
Copyrights EIL All rights reserved

Week ending on
05-Oct-2014
Job No. A307
Page 28 of 49

WEEKLY CONSTRUCTION PROGRESS REPORT


IREP, Kochi.
QUANTITATIVE PROGRESS STATUS
Name of Contractor : M/s Offshore Infrastructure Ltd.(Code # 317)
Name of Work : Composite Mechanical work for CDU/VDU

SL. NO.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39

WORK ITEM
Mobilisation
Piping welding CS NIBR
Piping erection CS NIBR
Piping welding CS IBR
Piping erection CS IBR
Piping welding SS
Piping erection SS
Piping welding AS
Piping erection AS
Clad Pipes Field Joint
Clad pipes Erection
Piping hydrotest
Steam tracing
Cement lining
Erection of cement lined pipes
Fire water GI pipes
SR
RT
Pipe support Fabrication
Pipe support Erection
Painting of Pipes
Insulation Piping
Chemical cleaning of pipes
Erection Pumps
Erection Compressors
Alignment of Rotory Eqpt
Pkg eqpt installation
Desalter erection
Electrodes & internals
Erection of static eqpt
Alignment & grouting
Structural fabrication
Structural Erection
Structural painting
Fireproofing
Equipment Insulation
Painting of equipments
Chemical cleaning of equipments
Fabrication & erection of tanks
SUMMARY

UOM

SCOPE

%
ID
IM
ID
IM
ID
IM
ID
IM
ID
IM
IM
RM
IM
IM
RM
Nos
Nos
MT
MT
m2
m2
RM
MT
MT
MT
MT
MT
MT
MT
MT
MT
MT
MT
m3
m2
m2
LS
%
%

100
374860
622600
49240
84175
3740
6265
64295
95325
2585
21420
829785
68245
12410
12410
5310
38481
25008
528
528
70000
130000
5405
729
44
773
32
700
35.8
4154
4154
670
670
4450
2790
12564
8380
31
100

Contract Award Date :


Contractual Completion Date :
Actual Start Date :
Expected Completion Date :
CUMULATIVE

04-Nov-13
03-Jul-15
09-Jan-14
03-Jul-15

WEEKLY

SCH.

FRONT

ACT.

PGRM.

ACT.

100
200000
216667
17833
31667

100
290000
265000
30100
10000

84
98460
67131

2
9250
13430

3957
5030

20333
23000

25000
10000

667
12410
12107
8067
8367
463
87

67

200
3621
2063
667
583

35.49

8500
2000
500
1000
3100
250
50
17500

NEXT
WEEK
PGRM.
1
9500
13540
2500

2500

5468

1000
500

950
2425

150
650
20
8
110

2797

1000
1000
43
89
21

200
650
20
8
110

60
25

10

2900
2400
473
150
1000
700

2880
1397
127
7
5

100
200
30
15
120

78

25
44.75

10
20.00

1.80

1.56

1
2

100
200
30
15
120
250

1.86

Remarks : Backlog in RT & spool shifting has been liquidated.


Points of Action : OIL to expedite the approval of IBR package, augment piping welders from 39nos to 50 nos, target piping fabrication rate of 1500
ID/day & mobilise additional 1 auto blasting machine to expedite blasting of pipes.
Equipment Type
Static
Exchangers
Columns & Vessels
Silencer
Heater Ejector
Total

Unit

Scope

Erected

Nos
Nos
Nos
Nos

109
45
4
5
163

66
23
89

___________________________________________
___________________________________________
___________________________________________
Format No. 5-2744-0212-F2 Rev 02/ 31.05.2013
Copyrights EIL All rights reserved

Week ending on
05-Oct-2014
Job No. A307
Page 29 of 49

WEEKLY CONSTRUCTION PROGRESS REPORT


IREP, Kochi.

QUANTITATIVE PROGRESS STATUS


Name of Contractor : M/s Bridge & Roof (Code # 324)
Name of Work : DCU Composite Mechanical Work

SL. NO.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40

WORK ITEM
Mobilization
Piping fabrication CS NIBR
Piping erection CS NIBR
Piping hydrotest CS NIBR
Piping fabrication CS IBR
Piping erection CS IBR
Piping hydrotest CS IBR
Piping fabrication SS
Piping erection SS
Piping hydrotest SS
Piping Fabrication AS NIBR
Piping erection AS NIBR
Piping Hydrotest AS NIBR
Piping fabrication AS IBR
Piping erection AS IBR
Piping hydrotest AS IBR
Steam tracing
Cement lining
Erection of cement lined pipes
Fire water GI pipes
SR
RT
Pipe support Fabrication
Pipe support Erection
Painting of Pipes
Insulation Piping
Chemical cleaning of pipes
Erection Pumps
Erection Compressros
Alignment of Rotory Eqpt
Pkg eqpt installation
Erection of static eqpt
Alignment & grouting : Static Eqpt
Structural fabrication
Structural Erection
Structural painting
Fireproofing
Equipment Insulation
Painting of equipments
Chemical Cleaning Of Equipments
SUMMARY

Contract Award Date :


Contractual Completion Date :
Actual Start Date :
Expected Completion Date :
UOM

SCOPE

%
ID
IM
IM
ID
IM
IM
ID
IM
IM
ID
IM
IM
ID
IM
IM
RM
IM
IM
RM
Nos
Nos
MT
MT
m2
m2
RM
MT
MT
MT
MT
MT
MT
MT
MT
MT
m2
m2
m2
LS

100
304970
412580
412580
45940
61775
61775
24695
19030
19030
30430
30040
30040
940
3010
3010
47545
12060
12060
6800
52856
31476
325
325
93359
40425
9520
238
180
418
10
2379
2379
1035
1035
3070
36500
3566
4466
31

CUMULATIVE

WEEKLY

SCH.

FRONT

ACT.

PGRM.

ACT.

72
46367
49667

60
80612
16018

40
10530
1078

4000
2500

1178

6449

106

150
5

6900

967

700

716
439
182
65

1100
1100
280
100
280

259
41
36
4

115
100
7
5

10.38

13.04

2.70

0.68

12-Mar-14
11-Sep-15
23-May-14
11-Dec-15
NEXT
WEEK
PGRM.
5500
2500

1960
2095
487
3030

6523
32
4492

150
6
212

700

19
7

0.10

280
150
7
6

1.08

Remarks : CS NIBR fabrication in progress.


Points of Action : B&R to mobilise multiple agencies for completion of works on time.

___________________________________________
_______________________________________________________________
___________________________________________
Format No. 5-2744-0212-F2 Rev 02/ 31.05.2013
Copyrights EIL All rights reserved

Week ending on
05-Oct-2014
Job No. A307
Page 30 of 49

WEEKLY CONSTRUCTION PROGRESS REPORT


IREP, Kochi.
QUANTITATIVE PROGRESS STATUS
Name of Contractor : M/s Heurtey Petrochem S A (Code # 318)
Name of Work : DCU Heater Work

SL. NO.
1
2
3
4
5
5
6
7
8
9
10
10
10
10
10
10
10
11
12
12
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

WORK ITEM

Contract Award Date :


Contractual Completion Date :
Actual Start Date :
Expected Completion Date :
UOM

Mobilization
%
Fabrication :: Radiant Section
MT
Fabrication :: Convection Section
MT
Fabrication :: Radiant, Convection & Cross over Coils
ID
Fabrication :: Supports, Ladder, Platform, Staircase
MT
Fabrication :: APH Str
MT
Fabrication :: Ducts
MT
Fabrication :: Stack
MT
Refracory Lining
CuM
Castable Refractory Dry Out :: Convection , Duct & Stack CuM
Erection :: Radiant Floor & Panels
MT
Erection :: Anchor Welding
Nos
Erection : Blanket & Module Lining
Nos
Erection : Brick Lining
Nos
Erection : Observation & Explosion Doors
Nos
Erection : Radiant Cast Tube Supports
Nos
Erection : Instrument Nozzles
Nos
Erection :: Convection Modules
Nos
Erection :: Supports, Platform, Ladder
MT
Erection : APH Structure
MT
Erection : Spring Supports
Nos
Installation :: Gratings
MT
Erection / Welding :: Radiant Coils
MT
Erection :: Duct
MT
Erection :: Stack
MT
Hydrotesting :: Coil Loops
Nos
Erection :: Burners
Nos
Erection/ Alignment :: ID / FD Fans
Nos
Erection & Alignment :: Dampers / Shut-off blinds
Nos
Erection & Alinment :: Fabric Expansion Bellows
Nos
Erection & Alinment :: APH
Nos
Erection :: Heater Tube Skin Thermocouple
Nos
Structural Finishing Painting (incl all)
MT
Checklisting & Mechanical Completion
%
Miscellaneous
%
SUMMARY

SCOPE
100
694
159
9600
609
130
367
372
1576
690
694
45600
45600
98000
308
96
144
14
609
130
48
73
180
367
372
12
192
6
56
244
6
192
2290
100
100

CUMULATIVE

WEEKLY

SCH.

FRONT

ACT.

100
694
159
6537
505

100
694
159
9600
609
130
367
372
1576
690
694
45600
45600
98000
308
96
72
14
400

60
694
108
2736
171
67
60

338
81
528
694

187
10
7
37

421
10123

PGRM.

ACT.

04-Nov-13
03-Jul-15
15-Aug-15
NEXT
WEEK
PGRM.

2
16
900
30
30

60

17
432
30
2
13

24
1000
30

56
1262

70

60

20

20

8
20

30

30

48
40
90
12
192

3
1390

1374

27

27

14

46.26

76.96

25.68

2.48

2.05

2.82

Remarks : Heater A Radiant section -all panels erected and welding in progress, Anchor welding is also in progress. Heater- B: 25 panels out of 66 panels
erected. Fabrication of convection section for Heater-A is in progress and for Hater B fabrication commenced. Duct fabrication also comenced at shop. Coil
Welding is in progress.
Points of Action : Augmentation of work force for erection work as well as for Anchor Welding to be expedited, presently 73 nos available required 100
nos. Further, shop fabrication to be expedited for coil fabrication & convection module.

___________________________________________
___________________________________________
___________________________________________
Format No. 5-2744-0212-F2 Rev 02/ 31.05.2013
Copyrights EIL All rights reserved

Week ending on
05-Oct-2014
Job No. A307
Page 31 of 49

WEEKLY CONSTRUCTION PROGRESS REPORT


IREP, Kochi.
QUANTITATIVE PROGRESS STATUS
Name of Contractor : M/s Essar Projects (I) Ltd. (Code # 311)
Name of Work : Coke Drum Structure Package

SL. NO.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43

WORK ITEM
Mobilization
Excavation
Pile Chipping
PCC
RCC Coke Drum
RCC Coke & maze Pit
RCC Equipment foundation
RCC Pavement / Hardstand
Backfilling
Stuctural Steel Fabrication
Stuctural Steel Erection
Coke Drums Erection
Coke Fractionator Erection
Alignment
Coke Fractionator Internals
Decoking System
Antifoam Injection Package
Erection of hyrocyclone
Erection of Bridge Crane
Coke Drum Discharge Chute
Erection of Static Equipment
Erection of Rotatry Equipment
Fabrication of U/G Pipe
Erection of U/G Pipe
Fabrication of A/G Pipe
Erection of A/G Pipe
Piping Insulation
Piping Radiography
Piping Hydrotesting
Equipment Insulation
Painting
Fire Protection
Cable Trays
Cable laying and termination
Local Control Station
Junction Box installation
Distribution Board Installation
Earthling (Bars & Electrodes
Inst. Cable Laying
Instrument Installation
Clear Water Tank Fab/ Erec.
Clear Water Tank Hyrotest
Mechanical Completion
SUMMARY

UOM

SCOPE

%
CUM
NOS
CUM
CUM
CUM
CUM
CUM
CUM
MT
MT
MT
MT
MT
%
%
%
%
MT
MT
NOS
NOS
ID
IM
ID
IM
SM
ID
IM
SM
SM
SM
RM
KM
NOS
NOS
NOS
NOS
KM
NOS
MT
MT
%

100
24140
825
1052
9477
9241
2378
804
3721
3560
3560
2280
550
2830
100
100
100
100
370
66
9
4
978
5837
13741
82015
4700
14719
87852
7250
5000
1860
19800
42
28
135
18
130
371
16
160
160
100

Contract Award Date :


Contractual Completion Date :
Actual Start Date :
Expected Completion Date :

PGRM.

ACT.

NEXT
WEEK
PGRM

100

1
268

100

16
204
65

18
51
132

16
204
65
95

2532
495
51

50
125
25

1465
14

40
125
25

656
743

40
100

23.38

0.98

CUMULATIVE

WEEKLY

SCH.

FRONT

ACT.

53
22980
825
1052
8467
5600
467
150
2709
2706
308

100
23000
825
950
9477
9241
1500
804
2700
3560
3560
2280
550
2830
100
100
100
100
370
66
9
4
978
5837
13741
61511
4700
14719
67348
7250
5000
1860
19800
30
20
95
12
95
285
16
100

68
20379
825
940
6372
3998
942

93.02

978
5837
5004
1840
5837

40

38.31

22-Aug-13
21-Aug-15
22-Sep-13
15-Oct-15

40
100

0.46

1.12

Remarks : 54 Panels for Coke Pit Grde Slab completed; Casting of 2 columns out of 10 columns at EL 120.5 completed.
Points of Action : Man power (required is 605 nos & deployed is 457 nos). To expedite procurement of strl steel and delivery of fabricated structural
steel.

_________________________________________________________________________________________________________________________________
Format No. 5-2744-0212-F2 Rev 02/ 31.05.2013
Copyrights EIL All rights reserved

Week ending on
05-Oct-2014
Job No. A307
Page 32 of 49

WEEKLY CONSTRUCTION PROGRESS REPORT


IREP, Kochi.
QUANTITATIVE PROGRESS STATUS
Name of Contractor : M/s Thyssen Krupp (Code # 319)
Name of Work : Coke Handling System Package

S. No.
A
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
B
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
C
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
D
1
2
3
4
5
6
7
8
9
10
11
12
13

WORK ITEM

Contract Award Date :


Contractual Completion Date :
Actual Start Date :
Expected Completion Date :
UOM

CIVIL WORKS
Mobilisation
%
Piling
Nos
Excavation in Foundations
CuM
Backfilling
CuM
PCC
CuM
RCC in Foundations upto GL level
CuM
RCC in Super Structure
CuM
Brick Work
CuM
Plastering & painting
SqM
Doors & Windows
SqM
False Ceiling & Tiling,
SqM
IPS Flooring
SqM
Roof Water Proofing
SqM
WBM
SqM
Bitumen Carpet
SqM
MECHANICAL
STRUCTURAL ERECTION
0
Structure- TT-1 to TT-6, chequered plates, Gratings,Sheds, Drive House, HopperMT
House
Pipe & Trough Conveyors Trestles, Galleries,
MT
MECHANICAL ERECTION
0
Dome Structure
MT
Stringer shoprtpost
MT
Pulleys
NO
Idlers
NO
Deckplates
MT
Head frame, Tail frames, Bend frames
MT
Skirtboards
MT
Chutes
MT
Drive Assemblies- Frames, Gear box, motors, couplings, brakes, guards
MT
Take up , Counter weight
MT
Belt in M (6139)
RM
Circular Stacker Reclaimer
MT
Rail & Truck Loading System
NO
Monorail
MT
Liners
MT
GI SHEET
SQM
Manual hoist
MT
Hoist electrical
MT
Scraper
MT
Road weigh bridge
MT
Dry Fog/Sewage/Plain water DS/spray
MT
ELECTRICAL WORKS
G.I. Strip
RM
415 V LT MCC
NO
6.6 / 0.433 KV, ONAN transformers
NO
415V bus duct
NO
6.6 KV Isolator panel
NO
Battery & Battery charger
NO
UPS system
NO
VFD
NO
Motors
NO
Cables
0
HT Power Cable
RM
LT Power Cable
RM
Control Cable
RM
Illumination System
0
Lighting fixtures
NO
Lighting wires
RM
G.I. Conduits
RM
Junction boxes
NO
Cable trays and accessories
RM
Termination
LOT
INSTRUMENTATION WORKS
PLC system
NO
Control Desk
NO
Instrumentation Cabling
RM
Cable trays and accessories
RM
Termination
LOT
Field Devices
NO
Precommissioning
0
Charging of HT Switchgear
NO
Charging of LT Switchgear
NO
Charging of Transformer
NO
Charging & Commissioning of PLC
NO
No load trial run of Equipments
LOT
Instrument loop checking
%
SUMMARY

CUMMULATIVE

4-Nov-13
3-Jul-15
15-Apr-14
31-Jan-16

WEEKLY

SCH.

FRONT

ACT.

PGRM.

ACT.

NEXT WEEK
PGRM.

100
1642
42989
45700
970
12950
4090
535
8790
340
700
1450
455
5100
5100

65
1544
22848
4935
566
3546
291
0
0
0
0
0
0
0
0

100
1642
42989
45700
970
12950
4090
535
8790
340
700
1450
455
5100
5100

52
716
7827
0
220
2537
200
0
0
0
0
0
0
0
0

3
50
5000
0
5
33
209
0
0
0
0
0
0
0
0

0
0
0
0
0
0
132
0
0
0
0
0
0
0
0

3
50
5000
0
7
151
50
0
0
0
0
0
0
0
0

1
1300
1700
1
240
56
74
18000
10
13
18
110
100
75
6080
304
120
32
206
21730
18
12
32
6
250

0
135
152
0
69
4
3
839
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

1
1300
1700
1
240
56
74
18000
10
13
18
110
100
75
6080
304
120
32
206
21730
18
12
32
6
250

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

12000
1
2
2
2
1
1
6
45
1
6000
17600
9000
1
1000
19000
17000
70
9500
1

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

12000
1
2
2
2
1
1
6
45
1
6000
17600
9000
1
1000
19000
17000
70
9500
1

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

5
5
15000
6000
1
445
1
2
2
2
5
1
100

0
0
0
0
0
0
0
0
0
0
0
0
0

5
5
15000
6000
1
445
1
2
2
2
5
1
100

0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0

15.08

100.00

11.13

1.01

0.37

0.73

SCOPE

Remrks:RCC works in progress in CSDS area, rail loading Silo 1 & 2 and Conveyor system. Piling works in progress in TT4 .
Points of action: Additional manpower for civil works (Carpeneters, Barbenders and masons etc.) to be deployed.

______________________________________________________________________________________
Format No.5-2744-0212-F2Rev 02/31.05.2013

______________________________________________________________________________________
Copyrights EIL All rights reserved

Week ending on
05-Oct-2014
Job No. A307
Page 33 of 49

WEEKLY CONSTRUCTION PROGRESS REPORT


IREP, Kochi
QUANTITATIVE PROGRESS STATUS
Name of Contractor : M/s McNally Bharat Engineering Company Ltd (Code # 214)
Name of Work : Civil, Structural & UG Piping works for VGO-HDT & DHDT

SL. NO.
A
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

WORK ITEM
VGO-HDT
Engineering
Procurement
Mobilisation
Excavation
Hard Rock Excavation
WBM
Pile cutting
PCC
RCC substructure
RCC Superstructure
RCC Precast
RCC Pavement
GI Piping Erection
U/G Piping Fabrication
U/G Piping Erection
U/G Piping Hydrotest
RT
Backfilling
Structural Steel Fabrication
Structural Steel Erection
Grating
Hand rail
Roof sheeting
Earth Strip
Earth Electrode
SUMMARY - VGO HDT

B
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

DHDT
Engineering
Procurement
Mobilisation
Excavation
Hard Rock Excavation
WBM
Pile cutting
PCC
RCC substructure
RCC Superstructure
RCC Precast
RCC Pavement
GI Piping Erection
U/G Piping Fabrication
U/G Piping Erection
U/G Piping Hydrotest
RT
Backfilling
Structural Steel Fabrication
Structural Steel Erection
Grating
Hand rail
Roof sheeting
Earth Strip
Earth Electrode

UOM

SCOPE

%
%
%
M3
M3
M2
No
M3
M3
M3
M3
M3
RM
ID
IM
IM
No
M3
MT
MT
MT
RM
M2
RM
No

100
100
100
34000
19000
31320
292
2537
10000
1350
350
3500
465
11500
42000
42000
141
28000
3065
3065
150
1100
4800
1300
18

%
%
%
%
m3
m3
m2
no
m3
m3
m3
m3
m3
IM
ID
IM
IM
no
m3
MT
MT
MT
M
m2
M
No

100
100
100
26000
8300
20880
403
1533
9500
1000
350
3103
310
9000
25400
25400
94
21237
2600
2600
140
1700
3640
1860
30

Contract Award Date :


Contractual Completion Date :
Actual Start Date :
Expected Completion Date :

11-Sep-13
10-Jan-15
14-Nov-13
31-Mar-15

SCH.

CUMULATIVE
FRONT

ACT.

WEEKLY
PGRM.
ACT.

100
100
100
34000
19000
21928
292
2537
10000
1350
287
1791
330
11500
34706
32659
102
22550
3038
2565
89
699
4057
834
11

100
100
100
34000
19000
0
292
1275
10000
1112
350
0
0
11500
42000
42000
141
28000
3065
3065
150
1100
4800
1300
18

92
80
95
20750
17543
0
292
1270
8806
766
126
0
0
10778
8138
8138
40
12579
1651
579
0
0
0
0
0

3
5
0
250
125
50
0
75
336
115
15
0
0
250
1625
3750
4
3750
103
88
0
0
0
0
0

0
0
0
250
0
0
0
1
243
0
4
0
0
198
350
680
0
2000
18
55
0
0
0
0
0

3
5
0
250
125
50
0
75
336
115
15
0
0
250
1625
3750
4
3750
103
88
0
0
0
0
0

91.89

94.20

56.70

3.57

1.41

3.57

100
100
100
26000
8300
14252
403
1533
9500
1000
289
1589
220
9000
20730
20397
68
14339
2584
2257
112
1124
2974
1194
18

100
100
100
26000
8300
0
403
600
9500
869
344
0
0
9000
25400
25400
94
21237
2600
2600
140
1700
3640
1194
18

100
80
95
25962
8209
0
403
541
7316
655
126
0
0
8130
7408
7408
29
11912
2273
662
0
0
0
0
0

0
5
0
0
23
0
0
38
300
3
25
50
0
330
1500
3000
3
750
25
125
0
0
0
0
0

0
5
0
0
0
0
0
10
182
136
0
0
0
120
490
1672
3
500
1
49
0
0
0
0
0

0
5
0
0
23
0
0
38
300
3
25
50
0
330
1500
3000
3
750
25
125
0
0
0
0
0

NEXT WEEK
PGRM.

SUMMARY - DHDT

92.97

93.94

68.22

2.35

2.30

2.35

SUMMARY - OVERALL

92.33

94.09

61.42

3.07

1.78

3.07

Remarks : DHDT Compressor foundation casted. Structural Erection for Main Pipe Rack in progress for VGO & DHDT. Structural Erection in progress for
TS-1 in DHDT. UG Piping erection works in progress for DHDT & DHDT
Points of Action : Manpower especially structural erection gang to be increased (Total required is 570 nos and available is 416 nos). Delivery of anchor
bolts, erection of UG Piping (by mobilizing separate gang for both VGO & DHDT), procurement of balance structural steel, detailing of balance drgs and
fabrication of structures to be expedited. Additional 2 nos cranes to be mobilized in order to carry out structural erection in both VGO & DHDT
simultaneously.

______________________________________________
_______________________________________________
______________________________________________
Format No. 5-2744-0212-F2 Rev 02/ 31.05.2013
Copyrights EIL All rights reserved

Week ending on
05-Oct-2014
Job No. A307
Page 34 of 49

WEEKLY CONSTRUCTION PROGRESS REPORT


IREP, Kochi.
QUANTITATIVE PROGRESS STATUS
Name of Contractor : M/s Albanna Engineering LLC (Code # 333)
Name of Work : Composite Mechanical Works for DHDT

SL. NO.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37

WORK ITEM
Mobilization
Procurement / Supply
Fabrication :: CS Piping (Non IBR)
Piping Erection :: CS Piping (Non IBR)
Piping Hydrotesting :: CS Piping (Non IBR)
Fabrication :: CS Piping (IBR)
Piping Erection :: CS Piping (IBR)
Piping Hydrotesting :: CS Piping (IBR)
Fabrication :: SS Piping (Non IBR)
Piping Erection :: SS Piping (Non IBR)
Piping Hydrotesting :: SS Piping (Non IBR)
Fabrication :: AS Piping (Non IBR)
Piping Erection :: AS Piping (Non IBR)
Piping Hydrotesting :: AS Piping (Non IBR)
Fabrication :: AS Piping (IBR)
Piping Erection :: AS Piping (IBR)
Piping Hydrotesting :: AS Piping (IBR)
Steam Tracing
Piping Erection :: Cement Lined Pipes
Stress Relieving
Radiography test
Piping Support
Painting of Pipes
Piping Insulation
Structural Fabrication
Structural Erection
Structural Painting (inc other structures)
Erection :: Galvanized Grating
Handrails
Erection :: Pumps
Erection :: Compressors
Alignment :: Rotary Equipments
Erection :: Static Erection
Alignment & Grouting :: Static Equipments
Fireproofing
Insulation :: Static Equipments
Internals
SUMMARY

Contract Award Date :


Contractual Completion Date :
Actual Start Date :
Expected Completion Date :

UOM

SCOPE

%
%
ID
IM
IM
ID
IM
IM
ID
IM
IM
ID
IM
IM
ID
IM
IM
RM
RM
NO
NO
MT
M2
M2
MT
MT
MT
MT
RM
MT
MT
MT
MT
MT
M3
M2
%

100
100
171745
242245
242245
16485
24815
24815
15885
21945
21945
4970
8840
8840
1520
4150
4150
7545
395
18359
15251
58
28957
12456
420
420
2240
150
1540
211
447
658
3404
3404
708
5418
100

CUMULATIVE

19-May-14
18-Sep-15
10-Jun-14
18-Sep-15

WEEKLY

SCH.

FRONT

ACT.

PGRM.

ACT.

83
35
10333
3333

100
50
73472

39
6
3169

13
5
3817

1032

733

28

67

464

NEXT
WEEK
PGRM.
8
3
2544

1498

95
2
967

5464

58

255

3455

36
633

325

191

217
7

33

117
33

110
110

108

5.85

18.92

3.62

1.09

0.69

0.76

Remarks : Piping spool Fabrication in progress


Points of Action :Welders to be augmented (Present Requirement: 20 nos, Available: 6 nos) to achieve the desired progress

___________________________________________
___________________________________________________________________
___________________________________________
Format No. 5-2744-0212-F2 Rev 02/ 31.05.2013
Copyrights EIL All rights reserved

Week ending on
05-Oct-2014
Job No. A307
Page 35 of 49

WEEKLY CONSTRUCTION PROGRESS REPORT


IREP, Kochi
QUANTITATIVE PROGRESS STATUS
Name of Contractor : M/s Technip KT India Ltd (Code # 312)
Name of Work : Heater Package for DHDT

SL. NO.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37

WORK ITEM
Mobilization
Fabrication :: Radiant Section
Fabrication :: Convection Section
Fabrication :: Convection Section Support Str
Fabrication :: Staircase, Platform & Ladder
Fabrication :: Duct & Supports
Fabrication :: Stack & Supports
Prefabrication :: Radiant Section Coils
Prefabrication :: Convection Section Coils
Erection/Welding of Convection coils
NDT
Refractory lining :: Convection/stack
Dry-out :: Convetion, Duct & Stack
Erection :: Radiant Floor & Panels
Erection :: Radiant Arch
Erection :: Convection Module
Erection :: Duct
Erection :: Stack
Erection :: Ladders/Platforms
Grating Installation
Erection :: Radiant Coils
Erection :: Cross over/Jump Over
NDT
Hydrotesting :: Coil Loops
Refractory Lining :: Radiant Section
Erection :: Burner/Burner Control Panels
Erection/Alignment :: ID/FD Fans
Erection/Alignment :: Dampers
Erection :: Expansion Bellows
Erection :: SAPH (inc alignment)
Erection :: Soot Blowers (inc alignment)
Erection :: Heater tube skin thermocouple
Erection :: Venture Tubes
Electrical/Instrumentation cabling
Motors - No Load Test
Final Painting
Liquidation of checklist
SUMMARY

Contract Award Date :


Contractual Completion Date :
Actual Start Date :
Expected Completion Date :
UOM

SCOPE

%
MT
MT
MT
MT
MT
MT
ID
ID
ID
ID
cum
cum
MT
MT
MT
MT
MT
MT
sqm
ID
ID
ID
Nos
sqm
Nos
Nos
Nos
Nos
MT
Nos
Nos
Nos
m
Nos
sqm
%

100
118
71
70
82
50
54
2204
2917
2740
5121
109
109
96
22
391
114
70
128
1133
1040
1152
2192
7
1474
16
4
9
11
1
12
22
3
6350
4
17218
100

CUMULATIVE

WEEKLY

SCH.
100
118
71
70
82
50
54
2204
2917
2726
5121
109
109
96
22
84
33
0
94
872
370
0
255
0
690
0
0
0
3
0
0
0
0
0
0
998
0

FRONT
100
118
71
70
82
50
54
2204
2917
2740
5121
109
109
96
22
391
114
70
128
1133
1040
1152
2192
7
1474
16
4
9
11
1
12
22
3
6350
4
17218
100

ACT.
95
118
71
70
82
45
27
1500
1341
1110
2130
58
28
96
19
0
5
0
57
297
0
0
0
0
1031
0
0
0
0
0
0
0
0
0
0
0
0

PGRM.
0
0
0
2
2
3
5
90
130
0
200
10
10
0
0
0
0
0
5
70
0
0
0
0
125
0
0
0
0
0
0
0
0
0
0
0
0

ACT.
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
5
16
0
0
0
0
141
0
0
0
0
0
0
0
0
0
0
0
0

64.32

100

45.36

2.26

1.17

04-Sep-13
03-Mar-15
11-Dec-13
03-Mar-15
NEXT WEEK
PGRM.
0
0
0
2
0
3
6
100
150
0
250
15
10
0
0
0
0
0
6
70
0
0
0
0
130
0
0
0
0
0
0
0
0
0
0
0
0
2.51

Remarks :Refractory works of Radiant Section in progress for IG-H-101 in progress. Erection done for Radiant coil for IG-H-102. Welding yet to commence
Points of Action : Prefabrication of radiant coils for IG-H-101, refractory of stack, convection sections to be expedited.

___________________________________________
_______________________________________________
___________________________________________
Format No. 5-2744-0212-F2 Rev 02/ 31.05.2013
Copyrights EIL All rights reserved

Week ending on
05-Oct-2014
Job No. A307
Page 36 of 49

WEEKLY CONSTRUCTION PROGRESS REPORT


IREP, Kochi.
QUANTITATIVE PROGRESS STATUS
Name of Contractor : M/s Albanna Engineering LLC (Code # 332)
Name of Work : Composite Mechanical Works for VGO HDT

SL. NO.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40

WORK ITEM
Mobilization
Procurement / Supply
Fabrication :: CS Piping (Non IBR)
Piping Erection :: CS Piping (Non IBR)
Piping Hydrotesting :: CS Piping (Non
Fabrication :: CS Piping (IBR)
Piping Erection :: CS Piping (IBR)
Piping Hydrotesting :: CS Piping (IBR)
Fabrication :: SS Piping (Non IBR)
Piping Erection :: SS Piping (Non IBR)
Piping Hydrotesting :: SS Piping (Non
Fabrication :: AS Piping (Non IBR)
Piping Erection :: AS Piping (Non IBR)
Piping Hydrotesting :: AS Piping (Non
Fabrication :: AS Piping (IBR)
Piping Erection :: AS Piping (IBR)
Piping Hydrotesting :: AS Piping (IBR)
Fabrication :: Duplex SS Pipes
Piping Erection :: Duplex SS Pipes
Piping Hydrotesting :: Duplex SS Pipes
Steam Tracing
Piping Erection :: Cement Lined Pipes
Stress Relieving
Radiography test
Piping Support
Painting of Pipes
Piping Insulation
Structural Fabrication
Structural Erection
Structural Painting (inc other structures)
Erection :: Galvanized Grating
Handrails
Erection :: Pumps
Erection :: Compressors
Alignment :: Rotary Equipments
Erection :: Static Erection
Alignment & Grouting :: Static
Fireproofing
Insulation :: Static Equipments
Internals
SUMMARY

UOM

SCOPE

%
%
ID
IM
IM
ID
IM
IM
ID
IM
IM
ID
IM
IM
ID
IM
IM
ID
IM
IM
RM
RM
NO
NO
MT
M2
M2
MT
MT
MT
MT
RM
MT
MT
MT
MT
MT
M3
M2
%

100
100
145080
248080
248080
19760
30765
30765
20000
35690
35690
6095
9510
9510
945
2350
2350
11910
9885
9885
26685
345
25073
22759
93
28957
12456
1145
1145
3060
250
2310
272
586
858
4374
4374
758
5365
100

Contract Award Date :


Contractual Completion Date :
Actual Start Date :
Expected Completion Date :

19-May-14
18-Sep-15
10-Jun-14
18-Sep-15

SCH.

FRONT

ACT.

PGRM.

ACT.

83
35
12000
3333

100
50
26110

40
5
3624

8
3
3000

1503

NEXT
WEEK
PGRM.
12
4
3400

733

1359

241

18
5
270

59

25
10
300

CUMULATIVE

WEEKLY

595
1087

383
2
967

2448

33

420

1038

15

28

33

232
124

5.82

55
24

10.42

3.43

0.81

0.57

1.20

Remarks : CS NIBR piping spool fabrication in progress.


Points of Action : To augment the resources (Present welder Requirement : 20 nos, Mobilized : 13 nos, Working : 8 nos, Present Fitter Requirement : 20
nos, Mobilized : 5 nos, Working : 3 nos) so as to achieve the required progress

___________________________________________ ___________________________________________ ___________________________________________


Format No. 5-2744-0212-F2 Rev 02/ 31.05.2013
Copyrights EIL All rights reserved

Week ending on
05-Oct-2014
Job No. A307
Page 37 of 49

WEEKLY CONSTRUCTION PROGRESS REPORT


IREP, Kochi.

QUANTITATIVE PROGRESS STATUS


Name of Contractor : M/s Petron Engineering Construction Ltd. (Code # 310)
Name of Work : Heater Works for VGO HDT

SL. NO.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35

WORK ITEM
Mobilization
Fabrication :: Radiant Section
Fabrication :: Convection Section/Supports
Fabrication :: APH Structure
Fabrication :: Stack and supports
Fabrication :: Duct & Supports
Fabrication :: Platforms/Gratings/Staircases
Prefabrication :: Radiant Section Coils
Prefabrication :: Convection Coils
Prefabrication :: Cross over Coils
NDT
Refractory works :: Convection Section
Refractory works :: Stack & Ducts
Erection of Coils :: Convection Section
Erection :: Radiant Sections & Arch
Erection :: APH Structure
Erection :: Stack
Erection :: Ducts
Erection :: Platforms/Gratings/Staircases
Erection :: Convection Section
Refractory works :: Radiant Section Blankets
Refractory works :: Radiant Section Castable
Erection of Coils :: Radiant Section
Hydrotesting :: Coil Loops
Erection :: Burners
Erection :: ID/FD Fans with Motors
Erection :: APH
Erection :: Dampers/SOB's
Erection :: Soot Blowers
Erection :: Cable Trays
Erection :: Cable Laying
Erection :: Venturimeter
Erection :: Skin Thermocouples
Final Painting
Liquidation of Checklist
SUMMARY

UOM

SCOPE

%
MT
MT
MT
MT
MT
MT
ID
ID
ID
ID
MT
MT
IM
MT
MT
MT
MT
MT
MT
M2
MT
IM
IM
NO
NO
NO
NO
NO
RM
RM
NO
NO
%
%

100
164
89
143
149
165
226
4640
2600
800
8040
228
94
7329
164
143
149
165
226
89
2300
16
9766
17095
10
6
6
28
12
1343
6310
2
28
100
100

Contract Award Date :


Contractual Completion Date :
Actual Start Date :
Expected Completion Date :
CUMULATIVE
FRONT

ACT.

100
164
89
143
128
165
190
4368
467

100
164
89
143
149
165
226
4640
2600
800
8040
228
94
7329
164
143

36
164
16

164
37
13
21
167
2233
15
3762

1
533
2833
30
59.37

31-Mar-15

WEEKLY

SCH.

4835
228
50

21-Aug-13
20-Feb-15

NEXT
WEEK
PGRM.
3

PGRM.

ACT.

16

8
15
20
10
5

8
10
30
10
12

101

10

11

30

13.35

1.98

0.57

2.80

165
226
89
2300
16
9766
17095
10
6
6
28
12
1343
6310
2
28
100
100
96.14

Remarks : Radiant panel erection in progress for IV-H-101 & IV-H-102


Points of Action : Procurement of structural steel to be expedited. Fabrication at shop to be expedited

____________________________________________________________________________
____________________________________________________________________________
Format No. 5-2744-0212-F2 Rev 02/ 31.05.2013
Copyrights EIL All rights reserved

Week ending on
05-Oct-2014
Job No. A307
Page 38 of 49

WEEKLY CONSTRUCTION PROGRESS REPORT


IREP, Kochi
QUANTITATIVE PROGRESS STATUS
Name of Contractor : M/s Shriram EPC Ltd (Code # 216)
Name of Work : Civil, Structural & UG Piping works for FCCU

SL. NO.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

WORK ITEM
Engineering
Procurement
Mobilisation
Excavation
Hard Rock Excavation
WBM
Pile cutting
PCC
RCC substructure
RCC Superstructure
RCC Precast
RCC Pavement
GI Piping Erection
U/G Piping Fabrication
U/G Piping Erection
U/G Piping Hydrotest
RT
Backfilling
Structural Steel Fabrication
Structural Steel Erection
Grating
Hand rail
Earth Strip
Earth Electrode
SUMMARY

UOM

SCOPE

%
%
%
M3
M3
M2
No
M3
M3
M3
M3
M3
RM
ID
IM
IM
No
M3
MT
MT
MT
RM
RM
No

100
100
100
37540
0
21200
1593
3000
10968
831
884
7150
1245
16500
65340
65340
140
25000
4765
4765
840
7400
4050
40

Contract Award Date :


Contractual Completion Date :
Actual Start Date :
Expected Completion Date :
SCH.
100
100
100
33511
0
18167
1593
3000
9685
831
884
5133
915
15853
53899
46532
97
17374
4115
3017
430
4022
1900
17

CUMULATIVE
FRONT
100
100
100
37540
0
0
1593
600
10968
831
884
0
100
16500
65340
65340
140
22086
4765
4765
840
7400
0
0

ACT.
90
50
60
28497
0
0
941
486
8544
376
176
0
0
16481
24665
9575
37
6047
1605
0
0
0
0
0

81.48

94.76

42.76

25-Sep-13
24-Dec-14
23-Nov-13
31-May-15

WEEKLY
PGRM.
ACT.
2
0
3
0
2
0
150
80
0
0
0
0
20
0
5
0
702
53
155
33
8
10
0
0
50
0
250
138
1500
0
0
0
0
0
150
300
300
127
0
0
0
0
0
0
0
0
0
0
4.17

1.07

NEXT WEEK
PGRM.
2
3
2
150
0
0
20
5
97
125
8
0
50
250
1500
0
0
150
300
25
0
0
0
0
3.03

* Scope Revised based on drgs taken back from M/s SEPC


Remarks : Work in progress for Main Pipe Rack, Tech-E, Tech - H, Branch Pipe Rack-2, PRU and other equipment foundations
Points of Action : Deployment of skilled workment to be increased (Carpenters, Barbenders). Labour requirment is 300 nos while availabe is 157 nos.
SEPC to expedite Main Pipe Rack super-structure works (so as to generate front for structural erection), Fabrication sequence to be monitored at shop
so that only those sections are fabricated and despatched which are due for erection in near future. Anchor bolts delivery to be maintained as per the
set priority. SEPC to mobilize cranes to commence structural erection

___________________________________________
_______________________________________________
___________________________________________
Format No. 5-2744-0212-F2 Rev 02/ 31.05.2013
Copyrights EIL All rights reserved

Week ending on
05-Oct-2014
Job No. A307
Page 39 of 49

WEEKLY CONSTRUCTION PROGRESS REPORT


IREP, Kochi.
QUANTITATIVE PROGRESS STATUS
Name of Contractor : M/s Petron Engineering Constructions Ltd.(Code # 323)
Name of Work : Composite Mechanical work for FCCU

SL. NO.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37

WORK ITEM
Mobilisation
Piping fabrication CS NIBR
Piping erection CS NIBR
Piping hydrotest CS NIBR
Piping fabrication CS IBR
Piping erection CS IBR
Piping hydrotest CS IBR
Piping fabrication SS
Piping erection SS
Piping hydrotest SS
Piping fabrication AS
Piping erection AS
Piping hydrotest AS
Steam tracing
Cement lining
Erection of cement lined pipes
Fire water GI pipes
SR
RT
Pipe support Fabrication
Pipe support Erection
Painting of Pipes
Insulation Piping
Erection Pumps
Erection Compressors
Alignment of Rotory Eqpt
Pkg eqpt installation
Erection of static eqpt
Alignment & grouting
Structural fabrication
Structural Erection
Structural painting
Fireproofing
Equipment Insulation
Painting of equipments
Handrailing
Pre fab hook ups
SUMMARY

UOM

SCOPE

%
ID
IM
IM
ID
IM
IM
ID
IM
IM
ID
IM
IM
RM
IM
IM
RM
Nos
Nos
MT
MT
m2
m2
MT
MT
MT
MT
MT
MT
MT
MT
MT
m2
m2
m2
RM
NOS

100
416170
689610
689610
47300
91785
91785
7350
11715
11715
15375
18005
18005
30300
15962
15962
7795
26868
19926
341
341
16965
34890
384
413
797
449
6695
6695
645
645
6200
37450
16330
12093
1970
323

Contract Award Date :


Contractual Completion Date :
Actual Start Date :
Expected Completion Date :
CUMULATIVE

26-Feb-14
25-Aug-15
16-Aug-14
30-Nov-15

WEEKLY

SCH.

FRONT

ACT.

PGRM.

ACT.

57
23333

60
64326

35
1038

2
5500

3
356

NEXT
WEEK
PGRM.
2
6000

800

667
83
10
1833

200
147

150

10
1000

548

200

250
250
150

193
193

100

6.61

2.18

0.77

200

100

4.10

0.41

0.51

Remarks : Alignment of IF-E-101D completed


Points of Action : PECL to expedite the installation of fabrication yard, mobilise pipe welders

___________________________________________
___________________________________________
___________________________________________
Format No. 5-2744-0212-F2 Rev 02/ 31.05.2013
Copyrights EIL All rights reserved

Week ending on
05-Oct-2014
Job No. A307
Page 40 of 49

WEEKLY CONSTRUCTION PROGRESS REPORT


IREP, Kochi.
QUANTITATIVE PROGRESS STATUS
Name of Contractor : M/s Petron Engineering Constructions Ltd.(Code # 316)
Name of Work : Heater package for FCCU

SL. NO.

WORK ITEM

UOM

SCOPE

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36

Mobilisation
Fabrication : Radiant section
Fabrication : Convection Section
Fabrication : APH Structure
Fabrication : Stack
Fabrication : Ducts
Fabrication : Platform, ladder,
Fabrication : Radiant Coils
Fabrication : Convection coils
Fabrication : Jump over coils
Fabrication : Installation of
Refractory : Convection modules,
Refractory : stack
Erection : Radiant section
Erection : Convection Section
Erection : APH Structure
Erection : Radiant Coils
Erection : Jump over coils
Erection : Coil Hydrotest
Erection : Ducts
Erection : Stack
Erection : Platform, ladder
Refractory blanket installation
Refractory castable
Installation & Alignment of APH
Installation of Burners
Installation & Alignment of FD Fans
Installation of Dampers & SOBs
Installation of Soot blowers
Cable tray installation
Cable laying
Venturimeter installation
Skin Thermocouple
Painting
Heater dryout
Miscelleneous
SUMMARY

%
MT
MT
MT
MT
MT
MT
ID
ID
ID
IM
MT
MT
MT
MT
MT
IM
IM
IM
MT
MT
MT
M2
MT
NO
NOS
NOS
NOS
NOS
M
M
NO
NO
M2
%
%

100
56
53
16
16
21
31
956
840
542
9005
51
25
56
53
16
3200
1588
13793
21
16
31
560
5
1
6
2
6
9
280
1068
1
16
4818
100
100

Contract Award Date :


Contractual Completion Date :
Actual Start Date :
Expected Completion Date :
CUMULATIVE

04-Dec-13
03-Apr-15
16-Sep-14
02-Jun-15

WEEKLY

SCH.

FRONT

ACT.

PGRM.

ACT.

95
52
32
15
5
9
12
133

100
56
53
16
16
21
31
956
840
542
9005

25
30

1
6
8
4
2
4
3

5
8

15

NEXT
WEEK
PGRM.
1
7
9
4
4
1
3

13

27.28

25

46.35

9.09

1
4.79

1.66

5.06

Remarks : Fabrication of radiant panels, stack in progress


Points of Action : PECL to expedite the erection of radiant panels.

___________________________________________
___________________________________________
___________________________________________
Format No. 5-2744-0212-F2 Rev 02/ 31.05.2013
Copyrights EIL All rights reserved

Week ending on
05-Oct-2014
Job No. A307
Page 41 of 49

WEEKLY CONSTRUCTION PROGRESS REPORT


IREP, Kochi.
QUANTITATIVE PROGRESS STATUS
Name of Contractor : M/s Essar Projects (India) Ltd. (Code # 308)
Name of Work : RR Package for FCCU

SL. NO.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42

WORK ITEM
Mobilisation
Structural Erection - RR Structure
Structural Erection - TSS Structure
Assembly & Welding of Reactor
Assembly & Welding of Regenerator
Assembly & Welding of TSS
Erection & alignment of Riser
Erection & alignment of Reactor
Erection of Regenerator
Erection of Hoppers
Erection of TSS
Erection of Orifice chamber
Hydrotest of Regenerator
Hydrotest of Reactor
Hydrotest of TSS Vessel
Temp support erection
Dish end cutting
Erection of Cyclones
Refractory lining of Reactor &
Erection of risers & catalyst stand
Erection of Reactor internals
Erection of Regenerator internals
Piping fabrication (DUCT)
Piping erection
FGC Structural
FGC Pressure parts
Insulation
ESP
ESP Internals
Erection of Stack
Elevator
F CAT Loader Receiver
Piping fabrication (Package items of
Structural Erection works
Piping erection
Cable tray
Cable laying
LDB/JB
Lighting fixture / poles
Instrument cable laying (control &
Refractory dryout/Hydrotest
Alkali Boil out

UOM

SCOPE

%
MT
MT
MT
MT
MT
MT
MT
MT
MT
MT
MT
Lot
Lot
Lot
MT
Nos
Nos
m2
RM
lot
No
ID
IM
MT
MT
SQM
MT
%
MT
MT
MT
ID
MT
IM
KM
KM
Nos
Nos
KM
%
%

100
2900
1700
510
585
210
70
510
585
580
280
110
1
1
1
300
3
86
2010
66
1
1
20000
50000
375
1030
400
450
100
350
130
90
10000
350
25000
1.5
8
50
400
5
100
100

SUMMARY

Contract Award Date :


Contractual Completion Date :
Actual Start Date :
Expected Completion Date :
CUMULATIVE

WEEKLY

SCH.

FRONT

ACT.

PGRM.

100
1717
623
263
447
14
70

100
2900
1700
510
585
210
70
510
585
580
280
110
1
1
1
300
3
86
2010
66
1
1
20000
15000

75
1057
178
143
228

2
100
35
15
30
5

71.10

13.05

1.32

257

33

5333

10-Jul-13
09-Oct-15
05-Mar-14
09-Oct-15

ACT.

12
7
6

NEXT
WEEK
PGRM.
1
100
40
15
30
10

147

59

1167
187

29.62

0.51

1.39

Remarks : Regenerator skirt fabrication completed.


Points of Action : Structural welders to be increased to 25 nos from presently deployed 16 nos.

___________________________________________
_______________________________________________
___________________________________________
Format No. 5-2744-0212-F2 Rev 02/ 31.05.2013
Copyrights EIL All rights reserved

Week ending on
05-Oct-2014
Job No. A307
Page 42 of 49

WEEKLY CONSTRUCTION PROGRESS REPORT


IREP, Kochi.
QUANTITATIVE PROGRESS STATUS
Name of Contractor : M/s Mc NALLY BHARAT ENGINEERING Co. Ltd. (Code # 218)
Contract Award Date :
Name of Work : Civil, Structural & UG Piping works for SRU
Contractual Completion Date :
Actual Start Date :
Expected Completion Date :
Sl No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

WORK ITEM
Engineering
Procurement
Mobilisation
Piling
Pile Testing
Excavation
Hard Rock Excavation
WBM
Pile cutting
PCC
RCC substructure
RCC Superstructure
RCC Precast
RCC Pavement
GI Piping Erection
U/G Piping Fabrication
U/G Piping Erection
U/G Piping Hydrotest
RT
Backfilling
Structural Steel Fabrication
Structural Steel Erection
Grating
Hand rail
Earth Strip
Earth Electrode
SUMMARY

UOM

SCOPE

%
%
%
No
No
M3
M3
M2
No
M3
M3
M3
M3
M3
RM
ID
IM
IM
No
M3
MT
MT
MT
RM
RM
No

100
100
100
1800
45
89700
1400
21500
1800
3710
15150
1600
658
6020
650
17595
29157
29157
1198
64800
4290
4290
300
4700
1850
70

CUMULATIVE

WEEKLY

04-Nov-13
03-Mar-15
11-Dec-13
03-Jul-15
NEXT WEEK
PGRM.

SCH.
100
100
100
1800
45
88281
1400
3048
1800
3549
15150
1600
468
691
302
15289
18222
8387
433
32574
3246
2656
84
1374

FRONT
82
80
100
1150
45
30000

ACT.
54
51
82
982
11
18881

PGRM.
1
1
2
61
1
1330

ACT.
1
1
1
7

950
700
9000
100
21

454
315
3945

47
32
350
23

40
9
161

47
32
350
23

12186
8016
8016
500
9800
4290
2500
100
807
1850
70

8776

117

340

117

6830
806
152

420
163
70

270
13
19

420
163
70

77.96

59.71

26.15

1.97

0.54

1.91

16

340

1
1
61
1
1330

Remarks: Silo support foundation: 7 nos / 14 nos raft completed. Blow down drum: Wall for chember is in progress. Waste heat
boiler foundation: 1st lift column for 8 no column completed & 4 nos / 5 nos foundation completed. TS-2: Structural erection is in
progrress . TS-3 :All foundation completed. Piling: 982 nos/ 1800 nos pile completed. TS-6: 5 nos / 12 nos completed. North West
Main pipe rack: 4 nos / 35 nos raft completed. IST-T-501/502 raft completed.
Point of Action: To expedite : Piling work, RCC work, balance anchor bolts (1513 /2100 Nos received), balance TMT bars
(1041/1450MT TMT steel received), fabrication of structural steel to be expedited.U/G piping yet to commence. Manpower to be
augmented for Civil work. (required is 300 nos & deployed is 175 nos).

_____________________________________________________________________
___________________________________________________________________
Format No. 5-2744-0212-F2 Rev 02/ 31.05.2013
Copyrights EIL All rights reserved

Week ending on
05-Oct-2014
Job No. A307
Page 43 of 49

WEEKLY CONSTRUCTION PROGRESS REPORT


IREP, Kochi.
QUANTITATIVE PROGRESS STATUS
Name of Contractor : M/s OFFSHORE INFRASTRUCTURES LTD.
Name of Work : COMPOSITE WORK OF PROCESS UNIT SRU

SL. NO.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38

WORK ITEM

UOM

Mobilisation
%
Supply
%
Piping fabrication CS NIBR
ID
Piping erection CS NIBR
IM
Piping fabrication CS IBR
ID
Piping erection CS IBR
IM
Piping fabrication SS
ID
Piping erection SS
IM
Pipe Davits fabrication & fixing
MT
Jacketed Piping Fabriction
RM
Jacketed Piping Erection
RM
Piping hydrotest
IM
Steam tracing
RM
Cement lining
IM
Erection of cement lined pipes
IM
Fire water GI pipes
RM
SR
Nos
RT
Nos
Pipe support Fabrication
MT
Pipe support Erection
MT
Painting of Pipes
m2
Insulation Piping
m2
Chemical cleaning of pipes
RM
Erection Pumps
MT
Erection Compressros
MT
Alignment of Rotory Eqpt
MT
Erection of static eqpt
MT
Alignment & grouting
MT
Structural fabrication
MT
Structural Erection
MT
Structural painting
MT
Fireproofing
m3
Equipment Insulation
m2
Painting of equipments
m2
Chemical cleaning/ Degreasing of equipments
LS
Loading Crystall balls
Nos
Refractory Lining
Nos
Sulphur Pit
Nos
SUMMARY

SCOPE

Contract Award Date :


Contractual Completion Date :
Actual Start Date :
Expected Completion Date :
CUMULATIVE

25-Mar-14
24-Sep-15
05-Aug-14
24-Sep-15

WEEKLY

SCH.

FRONT

ACT.

PGRM.

ACT.

100
100
208770
299780
48390
71190
41745
38890
13
5265
5265
409860
32405
1170
1170
240
24106
23942
318
318
370970
270965
16408
221
146
378
2517
2517
435
435
4035
36700
6398
7126
37
6
4
2

77
48
30400
15500

40
30
100085

30
10
1948

20
5
2200

2
2
214

4450

20632

100

8.92

NEXT
WEEK
PGRM.
10
5
2200

12000
500

500

1500
1500
10

100
100

200
100

15000

400

400

32

200
1320
520
35

780

670
670
101

42

17.04

2.60

120

19

300
120
30

1.24

0.48

1.42

10

Remarks : CS NIBR piping fabrication in progress. 2 nos heat exchager ISW -E-208 A/B ercection done on 03.10.2014
Points of Action : Equipment erection to be expedited. 600 MT crane yet ti be mobilised at site.

___________________________________________
______________________________________________________________
___________________________________________
Format No. 5-2744-0212-F2 Rev 02/ 31.05.2013
Copyrights EIL All rights reserved

Week ending on
05-Oct-2014
Job No. A307
Page 44 of 49

WEEKLY CONSTRUCTION PROGRESS REPORT


IREP, Kochi.
QUANTITATIVE PROGRESS STATUS
Name of Contractor : M/s ESSAR PROJECTS INDIA LTD. (Code # 213)
Name of Work : CIVIL, STRUCTURAL & UG PIPING WORK FOR CPP

SL. NO.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29

WORK ITEM
Engineering
Procurement
Mobilisation
Excavation
Pile Chipping
PCC
T&D Surplus Earth, Debris & Rock
RCC Substructure
Back Filling & compaction
RCC Superstructure
RCC Leakproof
Precast Concrete - shop
Structural Steel Fabrication
Structural Steel Erection
Sheeting & Cladding
UG Piping Fabrication
UG Piping Laying
U/G piping hydrotest
Earth Electrodes
Earth Strips
Earth plates
RCC Heavy Duty Flooring
RCC Pavement
Precast Concrete - erection
WBM
Brick Masonry
Premix carpet
MS Handrail
MS Gratings & Chequered Plates
SUMMARY

UOM

SCOPE

%
%
%
M3
Nos
M3
M3
M3
M3
M3
M3
M3
MT
MT
M2
ID
IM
IM
Nos
RM
Nos
M2
M3
M3
M2
M3
M2
RM
MT

100
100
100
21728
1500
1362
9570
8691
11276
100
500
2300
1550
1550
19220
1868
9340
9340
35
3250
60
5210
3256
2720
18306
710
605
1760
90

Contract Award Date :


Contractual Completion Date :
Actual Start Date :
Expected Completion Date :
CUMULATIVE

WEEKLY

NEXT WEEK
PGRM.

SCH.*

FRONT

ACT.

PGRM.

100
100
100
21728
1500
1362
7320
8691
9868
100
500
2300
1550
1195
13907
1868
7485
6308

95
95
100
21728
1500
1362
9570
8691
10050
100

96
96
95
13308
1470
429
712
4720
9248
84

1
1
1
250
5
15
50
440
100

1500
1550
1550
19220
1868
9340
9340
35
3250
60

90
670
210

20
85
80

20
12

20
95
100

45.4

3.7

0.8

4.0

1266
13
4452
2129
1996
18306
635
113
1061
55
92.0

ACT.

19-Aug-13
18-Dec-14
19-Aug-13
30-Apr-15

1020
9
8
140
1170

1
1
1
250
5
20
50
433
100

1500
18306
200
605
1249
80
92.6

* Scope Revised.
Remarks : Structural steel fabrication works: 1100MT received for GTG shed & Piperack. 670MT fabrication completed. De aerator structure:
Handing over complete. HRSG-3,4 & HRSG -5: Handed over.GTG Air filter:2/3 Foundation hand over. Foundation for GTG Bypass stack :Completed.
Pump foundation works in progress.
Point of action: Dedicated gangs to be deployed for Piperack, Pump foundation works, cable trench works etc.

___________________________________________________________________________________
__________________________________________________________________________________
Copyrights EIL All rights reserved
Format No. 5-2744-0212-F2 Rev 02/ 31.05.2013

Week ending on
05-Oct-2014
Job No. A307
Page 45 of 49

WEEKLY CONSTRUCTION PROGRESS REPORT


IREP, Kochi.
QUANTITATIVE PROGRESS STATUS
Name of Contractor : M/s ISGEC (Code # 309)
Name of Work : Utility Boiler works of CPP

SL. NO.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86

WORK ITEM
Mobilisation
UB-1:Boiler Supporting Steelworks and canopy
UB-1:Gallery & Ladder
UB-1:Drum
UB-1:Boiler Water Wall and Circulating System Components
UB-1:Casing
UB-1:Buckstay
UB-1:Superheater Assembly
UB-1:Forced Flow Assembly
UB-1:Pipe erection
UB-1:Pipe Supports
UB-1:Seal Boxes and Sealing Arrangements
UB-1:Refractory arrangement
UB-1:Airheater
UB-1:Ducting, Expansion Joint ,Dampers and Supports
UB-1:HP Dosing
UB-1:Blow down vessels
UB-1:Oil /Gas Firing system
UB-1:FD Fan
UB-1:Scanner Fan
UB-1:Seal Air Fan
UB-1:Soot Blower
UB-1:Boiler Mounting & Fitting
UB-2:Boiler Supporting Steelworks and canopy
UB-2:Gallery & Ladder
UB-2:Drum
UB-2:Boiler Water Wall & Circulating System Components
UB-2:Casing
UB-2:Buckstay
UB-2:Superheater Assembly
UB-2:Forced Flow Assembly
UB-2:Pipe erection
UB-2:Pipe Supports
UB-2:Seal Boxes & Sealing Arrangements
UB-2:Refractory arrangement
UB-2:Airheater
UB-2:Ducting, Expansion Joint ,Dampers and Supports
UB-2:HP Dosing
UB-2:Blow down vessels
UB-2:Oil /Gas Firing system
UB-2:FD Fan
UB-2:Scanner Fan
UB-2:Seal Air Fan
UB-2:Soot Blower
UB-2:Boiler Mounting & Fitting
Deaerator, Pipe rack & Dump condenser Structure
Gallery & Ladder
Deaerator Head & Storage tank (2 no)
Dump Condenser
Condensate strorage tanks (2 no)
Knockout Drum (1 no HP Gas + 1 no NG)
Gas condensate tank
Fuel oil surge tank
Buried closed blow down tank
Morpholine & LP dosing system
Pipework
Pipe Supports
Sample Coolers
Boiler feed pump for UB
Blow Down transfer pump
Gas condenaste pump
FO Pump
burried blow down tank transfer pump
boiler feed pump for HRSG
export boiler feed pump
condenaste transfer pump
Mountings & Fittings
HP heater for oil heating
Insulation and Cladding
RCC Chimney
Chimney steel stack 1 & 2
Refractory Dry out
Installation of panels
HT&LT Motors
Installation of cable trays
Laying of HT&LT Power cables
Steel supports for cable trays
Earthing system
Installtion of local bush button
Installation of lightning protection system
Installation of lighting fixtures
Installation of Instruments
Control valve installation
SWAS & STACK Analayser
Loop checking
Mechanical Clearance
SUMMARY

Contract Award Date :


Contractual Completion Date :
Actual Start Date :
Anticipated Completion Date :
UOM

SCOPE

%
MT
MT
NOS
MT
MT
MT
MT
MT
IM
MT
MT
MT
MT
MT
NOS
NOS
MT
NOS
NOS
NOS
NOS
MT
MT
MT
NOS
MT
MT
MT
MT
MT
IM
MT
MT
MT
MT
MT
NOS
NOS
MT
NOS
NOS
NOS
NOS
MT
MT
MT
NOS
MT
NOS
NOS
NOS
NOS
NOS
NOS
IM
MT
NOS
NOS
NOS
NOS
NOS
NOS
NOS
NOS
NOS
MT
NOS
SQM
CUM
MT
MT
NOS
NOS
RM
RM
%
%
NOS
%
NOS
NOS
NOS
NOS
%
%

100
465
131
1
151
46
40
80
200
5000
50
6
170
54
230
1
2
55
1
2
2
10
50
465
131
1
151
46
40
80
200
5000
50
6
170
54
230
1
2
55
1
2
2
10
50
700
100
2
40
2
2
1
1
1
2
10000
184
2
4
2
2
4
2
4
2
5
296
1
25000
1560
242
250
6
166
9700
139174
100
100
100
100
702
967
90
2
100
100

CUMULATIVE

25-Jul-13
24-Mar-15
16-Feb-14
10-Aug-15

WEEKLY

SCH.

FRONT

ACT.

PGRM.

100
465
131
1
151
46
40
80
200
5000
50
6
90
54
150
1
2
48
1
2
2
8
50
465
131
1
151
46
40
80
200
5000
50
6
90
54
150
1
2
48
1
2
2
8
50
700
100
2
40
2
2
1
1
1
2
7290
123
2
4
2
2
4
2
4
2
5
202
1
6581
1600
174
250
3
62
7635
68529
73
16
69
16
461
646
59
1
13

100
465
131
1
151
46
40
80
200
5000
50
6
170
54
230
1
2
55
1
2
2
10
50
465
131
1
151
46
40
80
200
5000
50
6
170
54
230
1
2
55
1
2
2
10
50
700
100
2
40
2
2
1
1
1
2
10000
184
2
4
2
2
4
2
4
2
5
296
1
25000
1560
242
250
6
166
9700
139174
100
100
100
100
702
967
90
2
100
100

97
345
22

5
17
2
1
20

82.76

100

ACT.
23
4

13

48

160

NEXT
WEEK
PGRM.
5
18
3
1
10

20

25

10

30

10

10

1522
63
250

30
8

30
8

22.81

1.50

0.54

1.50

Remarks: Received 1472/2057 MT material for UB-1 and 1421/2057 MT material for UB-2 works. Site assembly and erection works in progress for UB-1 and UB-2.
Points of Action: Erection of UB-1 & 2 and Deaerator structure to be expedited .

_________________________________________________________________________________
Format No. 5-2744-0212-F2 Rev 02/ 31.05.2013

__________________________________________________________________________________
Copyrights EIL All rights reserved

Week ending on
05-Oct-2014
Job No. A307
Page 46 of 49

WEEKLY CONSTRUCTION PROGRESS REPORT


IREP, KOCHI
RESOURCE DEPLOYMENT STATUS

15

Khalasi

Rock
Blasting
gang

Painter

Operator

Electrician

Mechanic

Helper /
Unskilled

Total

100

44

80

23

22

209

545

75

38

45

23

209

429

15

35

22

35

10

20

140

304

14

10

18

15

95

183

12

16

75

10

60

35

35

25

25

14

12

28

24

250

669

10

53

42

12

10

17

98

283

40

40

15

10

C&S and UG :: OFF DHDS :: KSSPPL

20

23

20

15

10

50

25

50

45

C&S and UG :: OFF REF :: MBE

15

22

22

28

48

20

35

180

60

100

45

C&S and ARCHI :: SSs, SRRs &


MCR :: L&T

47

12

25

120

18

65

19

30

10

16

16

10

10

10

MECHANICAL :: OFF IREP :: TSEPL

12

13

14

13

RWQ :: PGC

12

14

10

12

11

RWTP :: TEIL

RODM & CPU :: DWEL

ETP :: PL

TANKAGE III :: IOTA

TANKAGE I :: B&R

16

TANKAGE II :: B&R

17

C&S and UG :: CDU/VDU & DCU ::


L&T

1
1

14

2
60

Pipe Welder

Pipe
Fitter/Fab

Str. Welder

14

Barbender

10

Mason

Suveyor

Rigger

C&S and UG :: OFF IREP :: KSSPPL

CT III :: PCTL

14

Gas Cutter

SG III :: REL

10

13

Grinder

SG II :: B&R

CT I & II :: PCTL

12

P
A

CONTRACT :: CONTRACTOR

11

Mill wright
fitter

Wrapping
Coating gang

Scaffolder

Structural
fitter/fabric
ator

Carpenter

Foreman

Safety
Officer

Supervisor

Engineers

Sl. No.

Site In
charge

MAN POWER

10

50

44

46

120

30

50

42

15

12

43

17

28

29

35

16

17

16

55

10

40

30

15

30

30

125

281

51

119

170

404

88

202

12

11

450

994

305

639

54

200

76

15

100

264

73

201

15

15

10

20

290

670

195

392

70

151

54

99

14

10

176

359

10

81

166

18

15

80

245

16
0

11

12

10

10

45

124

10

10

15

15

10

100

199

11

12

50

103

10

25

80

15

44

10

10

10

15

10

90

190

10

35

96

20

10

20

16

90

240

16

89

70

15

50

20

50

110

50

85

10

15

90

52

11

37

16

18

111

30

67

10

20

58

123

12

10

86

60

10

36

290

1106

12

93

63

33

298

984

_____________________________
_____________________________________________________________________________________________________________________
Format No. 5-2744-0212-F2 Rev 02/ 31.05.2013
Copyrights EIL - All rights reserved

Week ending on
05-Oct-2014
Job No. A307
Page 47 of 49

WEEKLY CONSTRUCTION PROGRESS REPORT


IREP, KOCHI
RESOURCE DEPLOYMENT STATUS
Pipe Welder

12

10

13

20

45

28

45

15

15

10

10

43

25

10

60

40

10

10

27

32

40

15

50

39

44

15

10

20

12

15

31

34

40

24

34

22

19

15

45

10

90

10

75

25

78

53

24

54

75

10

50

11

36

37

34

60

75

15

33

15

C&S and UG :: SRU :: MBE

15

12

10

C&S and UG :: CPP :: EPIL

26

UTILITY BOILER PACKAGE :: CPP :


ISGEC

HEATER :: DCU :: Heurtey


Petrochem S.A.
MECHANICAL :: DCU :: B&R

COMP MECH ::SRU :: OIL

32

36
29

Total

Helper /
Unskilled

Mechanic

Electrician

Operator

Painter

26

12

60

214

24

10

14

103

50

125

24

73

22

100

15

46

12

160

605

18

84

13

45

10

120

457

40

30

120

448

27

19

82

313

18

25

10

25

10

15

220

654

10

22

22

11

171

433

10

18

10

10

30

312

717

39

187

11

100

300

Rock
Blasting
gang

Khalasi

Rigger

Gas Cutter

13

5
0

Grinder

Scaffolder

Barbender

Mason

14

Foreman

15

Suveyor

Mill wright
fitter

Pipe
Fitter/Fab

C&S and UG :: FCCU :: SEPC

25

29

Str. Welder

CDSP :: EPIL + VTV

22

28

Structural
fitter/fabric
ator

HEATER PACKAGE :: CDU VDU ::


TKTI

C&S and UG :: VGO HDT & DHDT ::


MBE

27

17

Carpenter

COMP MECH :: CDU VDU :: OIL

CHSP :: TKII

24

30

P
A

CONTRACT :: CONTRACTOR

21

23

20

Safety
Officer

20

Supervisor

19

Engineers

18

Site In
charge

Sl. No.

Wrapping
Coating gang

MAN POWER

12

53

201

15

12

15

15

100

255

40

123

15

18

35

50

15

40

263

10

15

21

47

13

12

166

35

100

24

73

12

10

25

15

60

15

30

80

436

21

15

40

60

15

20

30

32

32

26

114

12

60

220

70

_____________________________
_____________________________________________________________________________________________________________________
Format No. 5-2744-0212-F2 Rev 02/ 31.05.2013
Copyrights EIL - All rights reserved

Week ending on
05-Oct-2014
Job No. A307
Page 48 of 49

WEEKLY CONSTRUCTION PROGRESS REPORT


IREP, KOCHI
RESOURCE DEPLOYMENT STATUS

11

12

13

14

15

MECHANICAL :: OFF IREP :: TSEPL

RWQ :: PGC

CT I & II :: PCTL

CT III :: PCTL

RWTP :: TEIL

RODM & CPU :: DWEL

ETP :: PL

TANKAGE-III :: IOTA

TANKAGE I :: B&R

TANKAGE II :: B&R

17

C&S and UG :: CDU/VDU & DCU ::


L&T

19

20

Boom Placer

Concrete
Vibrator

levelling
inst.

Trailer

Dumper/
Tipper

Dewatering
Pump

DG Set

Testing eqpt

Hydraulic
Piling Rig

Conventiona
l piling Rig

15

75

33

13

63

15

12

40

131

10

35

12

16

16

14

11

10

10

10

COMP MECH :: CDU VDU :: OIL


HEATER PACKAGE :: CDU VDU ::
TKTI
CDSP :: EPIL + VTV

91
126

10

23

66

30

22

11

30

12

15

12

160

28

10

15

10

135

217

Total

Concrete
Pump

11

Welding
Rectifier

Welding M/c

Plate
Compactor
Barbending
/ cutting
M/c

19

Wheel
Loader

2
0

Hydra

1
1

JCB With
Breaker

Transit
Mixer

C&S and UG :: OFF DHDS :: KSSPPL

16

18

Gas cutting
set

C&S and UG :: OFF IREP :: KSSPPL

10

Grinding
M/c

SG III :: REL

C&S and ARCHI :: SSs, SRRs & MCR


:: L&T

Roller

SG II :: B&R

C&S and UG :: OFF REF :: MBE

P
A

CONTRACT :: CONTRACTOR

Dozer

JCB

Proclain

Crane

Batching
plant

Sl. No.

Tower Crane

MACHINERY

20

20

20

12

18

10

67
73

68

35

19

19

15

18

99

13

13

13

13

26

26

17

19

P
A

7
0

1
1

1
0

2
1
2

2
0

1
0

10
2

11

11

30

15

30

15

10

10

38

8
6

10

10

180

220

10

168

200

35

80

60

50
5

37
0

27
2

81

71

38

26

29

40

20

40

20

15

9
33

31

33

0
1

16

30

15

10

15

21

10

1
1

105
45
39
587

553
238

25
120

22

23
29

31

2
0

10

1
0

51

49
70

15

144

96

66

_____________________________ ________________________________________________________________________________________________________________________
Format No. 5-2744-0212-F2 Rev 02/ 31.05.2013
Copyrights EIL - All rights reserved

Week ending on
05-Oct-2014
Job No. A307
Page 49 of 49

WEEKLY CONSTRUCTION PROGRESS REPORT


IREP, KOCHI
RESOURCE DEPLOYMENT STATUS

Hydra

Wheel
Loader

Dozer

Roller

Welding M/c

Welding
Rectifier

Grinding
M/c

Gas cutting
set

Transit
Mixer

Concrete
Pump

Boom Placer

Concrete
Vibrator

levelling
inst.

Trailer

Dumper/
Tipper

Dewatering
Pump

DG Set

Testing eqpt

Hydraulic
Piling Rig

Conventiona
l piling Rig

Total

25

93

18

10

40

20

20

12

10

19

10

15

26

UTILITY BOILER PACKAGE::CPP


UNIT : ISGEC
HEATER :: DCU :: HUERTEY

MECHANICAL :: DCU :: B&R

COMP MECH ::SRU :: OIL

Plate
Compactor
Barbending
/ cutting
M/c

JCB With
Breaker

C&S and UG :: SRU :: MBE

C&S and UG :: CPP :: EPIL

29

JCB

C&S and UG :: FCCU :: SEPC

25

28

Proclain

22

C&S and UG :: VGO HDT & DHDT ::


MBE

27

Crane

CHSP :: TKII

24

P
A

CONTRACT :: CONTRACTOR

21

23

Tower Crane

Sl. No.

Batching
plant

MACHINERY

10

10

40

18

10

18

10

10

10

41

20

20

92

15

15

63

15

25

10

10

78

18

10

10

16

10

10

10

10

10

10

10

10

P
A

10
3
0

3
0

3
0

57
154

46
166

68
82

47

31

47

16
1
0

2
0

1
0

22
47

22

_____________________________ ________________________________________________________________________________________________________________________
Format No. 5-2744-0212-F2 Rev 02/ 31.05.2013