You are on page 1of 29

System Process Document

Entering Quality Results

Department
Responsibility/Role
File Name 27814164.doc
Revision
Document Generation Date 19/01/2010 12:23:00
Date Modified 1/19/2010 12:23:00 PM
Last Changed by
Status

Entering Quality Results


Trigger:

Concept
You can use the Quality Workbench page to search for and enter quality results for a collection
plan. You can enter quality records for collection plans in any of the four tabs: Collection Results,
Nonconformances, Corrective Actions, and Skip Lot Inquiry.

In this topic, you will enter quality results.

Required Field(s) Comments

Output - Result(s) Comments

Additional Information

Last changed on: 1/19/2010 12:23:00 PM Page 1


System Process Document
Entering Quality Results

Procedure

Step Action
1. Begin by navigating to the Quality Workbench-Collection Results page.

Click the vertical scrollbar.

Page 2 Last changed on: 1/19/2010 12:23:00 PM


System Process Document
Entering Quality Results

Step Action
2. Click the Manufacturing and Distribution Manager link.

Last changed on: 1/19/2010 12:23:00 PM Page 3


System Process Document
Entering Quality Results

Step Action
3. Click the vertical scrollbar.

Step Action
4. Click the Collection Results link.

Page 4 Last changed on: 1/19/2010 12:23:00 PM


System Process Document
Entering Quality Results

Step Action
5. The Quality Workbench page includes the following tabs:
• Collection Results.
• Nonconformances.
• Corrective Actions.
• Skip Lot Inquiry.

You can perform a simple or advanced search within each tab.

Last changed on: 1/19/2010 12:23:00 PM Page 5


System Process Document
Entering Quality Results

Step Action
6. You can search and find a collection plan in all four tabs in the Quality
Workbench page by first narrowing your search by organization.

Page 6 Last changed on: 1/19/2010 12:23:00 PM


System Process Document
Entering Quality Results

Step Action
7. Click in the Organization field.

Step Action
8. Enter the desired information into the Organization field. Enter "M1".

Last changed on: 1/19/2010 12:23:00 PM Page 7


System Process Document
Entering Quality Results

Step Action
9. Click the Go button.

Page 8 Last changed on: 1/19/2010 12:23:00 PM


System Process Document
Entering Quality Results

Step Action
10. Click in the Collection Plan field.

Step Action
11. Enter the desired information into the Collection Plan field. Enter "CB
COLLECTION PLAN".

Last changed on: 1/19/2010 12:23:00 PM Page 9


System Process Document
Entering Quality Results

Step Action
12. Click the Go button.

Page 10 Last changed on: 1/19/2010 12:23:00 PM


System Process Document
Entering Quality Results

Step Action
13. Click the CB COLLECTION PLAN link.

Step Action
14. The list of quality results data previously collected for the collection plan appears
in the Quality
Workbench-View Results page.

Select Add Data to enter quality results.

Last changed on: 1/19/2010 12:23:00 PM Page 11


System Process Document
Entering Quality Results

Step Action
15. Click the Add Data (0) button.

Page 12 Last changed on: 1/19/2010 12:23:00 PM


System Process Document
Entering Quality Results

Step Action
16. Use the Add Data: Enter Results page to enter quality results.

Step Action
17. Click the Select to show information button.

Last changed on: 1/19/2010 12:23:00 PM Page 13


System Process Document
Entering Quality Results

Step Action
18. Click in the Item field.

Page 14 Last changed on: 1/19/2010 12:23:00 PM


System Process Document
Entering Quality Results

Step Action
19. Enter the desired information into the Hide field. Enter "CB1000".

Step Action
20. Click in the Quantity field.

Last changed on: 1/19/2010 12:23:00 PM Page 15


System Process Document
Entering Quality Results

Step Action
21. Enter the desired information into the Hide field. Enter "2".

Page 16 Last changed on: 1/19/2010 12:23:00 PM


System Process Document
Entering Quality Results

Step Action
22. Click in the LINETHICKNESS field.

Step Action
23. Enter the desired information into the Hide field. Enter ".25".

Last changed on: 1/19/2010 12:23:00 PM Page 17


System Process Document
Entering Quality Results

Step Action
24. Click in the SPECTHICKNESS field.

Page 18 Last changed on: 1/19/2010 12:23:00 PM


System Process Document
Entering Quality Results

Step Action
25. Enter the desired information into the SPECTHICKNESS field. Enter ".25".

Step Action
26. Click in the DEVIATION field.

Last changed on: 1/19/2010 12:23:00 PM Page 19


System Process Document
Entering Quality Results

Step Action
27. Click in the Show field.

Page 20 Last changed on: 1/19/2010 12:23:00 PM


System Process Document
Entering Quality Results

Step Action
28. Click the Select to show information button.

Step Action
29. Click in the Item field.

Last changed on: 1/19/2010 12:23:00 PM Page 21


System Process Document
Entering Quality Results

Step Action
30. Enter the desired information into the Hide field. Enter "CB1000".

Page 22 Last changed on: 1/19/2010 12:23:00 PM


System Process Document
Entering Quality Results

Step Action
31. Click in the Quantity field.

Step Action
32. Enter the desired information into the Hide field. Enter "1".

Last changed on: 1/19/2010 12:23:00 PM Page 23


System Process Document
Entering Quality Results

Step Action
33. Click in the Hide field.

Page 24 Last changed on: 1/19/2010 12:23:00 PM


System Process Document
Entering Quality Results

Step Action
34. Enter the desired information into the Hide field. Enter ".5".

Step Action
35. Click in the Hide field.

Last changed on: 1/19/2010 12:23:00 PM Page 25


System Process Document
Entering Quality Results

Step Action
36. Enter the desired information into the Hide field. Enter ".25".

Page 26 Last changed on: 1/19/2010 12:23:00 PM


System Process Document
Entering Quality Results

Step Action
37. Click in the DEVIATION field.

Step Action
38. Point to the Finish button.

Last changed on: 1/19/2010 12:23:00 PM Page 27


System Process Document
Entering Quality Results

Step Action
39. Click the Finish button.

Page 28 Last changed on: 1/19/2010 12:23:00 PM


System Process Document
Entering Quality Results

Step Action
40. Click the Apply button.

Step Action
41. You have completed the Entering Quality Results procedure.
End of Procedure.

Last changed on: 1/19/2010 12:23:00 PM Page 29

You might also like