Commissioning overview
The installation of SURPASS hiT7300 comprises shelves, racks and cable assembly.
TransNet provides a list of material for the entire network and for each NE in
particular, and a bill of material of each DWDM route. The assembly of all the cards,
in each shelf, and all the cabling connections must be based on TransNet reports for
a successful system installation and commissioning.
SURPASS hiT7300 has to be configured on initial commissioning, prior to the regular
operation. NE and Optical Link commissioning is mandatory after all the racks and
shelves hardware are properly installed.
Commissioning a SURPASS hiT7300 is the process of taking the installed NE's and
bringing them to an operational state. The commissioning tasks have to be performed
partially on site; in this case personnel must travel to NE site to perform the
necessary operations.
To perform the NE and Optical Link commissioning, TransNet provides a set of
NCF's and a commissioning report, at the end of the network planning. The NCF's
contain most of the necessary configurations for each NE of the planned network.
To install and commission SURPASS hiT7300, all necessary tasks have to be
performed in sequence. For each task, a separate document is provided:
For the Installation:
Interconnect, Cabling and Mechanical Assembly (ICMA);
Installation Test Manual (ITMN).
For NE Commissioning:
OLR and ONN Commissioning;
SON Commissioning.
For Optical Link Commissioning:
Optical Link Commissioning (OL).
Warning
Before commissioning procedures may be started, the following installation
tasks must be completed for each network element:
TR3583EU00TR_0101
2003 Siemens AG
System commissioning
Siemens
Start
Start
1. ITMN;
2. ICMA;
3. TransNet
reports.
1
Installation
2
NE Commissioning
3
Optical Link
Commissioning
1. OLC;
2. TransNet
reports.
Finish
Finish
Fig. 1 Installation/Commissioning sequence
Installation Steps
done
TR3583EU00TR_0101
2003 Siemens AG
Siemens
System commissioning
TR3583EU00TR_0101
2003 Siemens AG
System commissioning
Siemens
Fig. 3
TR3583EU00TR_0101
2003 Siemens AG
System commissioning
Siemens
2.1
The three delivery formats are available, which differ regarding the pre-installed
Hardware (HW) and Software (SW). The SURPASS hiT7300 system is available in
the following delivery formats:
Shelf preconfiguration;
In the Shelf preconfiguration delivery format, all shelves are equipped with cards
according to the customer LOM. In this case, the required software is installed to
the NE, and the shelf identifier (ID) is the only configured parameter in the NE via
LCT.
Bulk.
The Bulk delivery format does not support any pre-configured parameters for the
NE's.
TIP
According to the purchased delivery format, the corresponding commissioning
strategy has to be selected.
TR3583EU00TR_0101
2003 Siemens AG
System commissioning
Sh
S
A
RP
U
S
Siemens
00
T 73
Shelf preconfiguration
Tools
Opt
ic
fib e a l
rs
done
Sub-Racks are installed
in the Racks.
All cards are plugged in.
Software is installed .
Shelf (ID) is configured.
NCF is loaded.
hiT7300
Sub-Rack
Rack
TNMS-CT
SW
hiT7300
Sub-Rack
hiT7300
Sub-Rack
hiT7300
Sub-Rack
hiT7300
Rack
Bulk delivery
Bulk? Oh
done
Sub-Racks are installed
in the Racks.
All cards are plugged in.
Software is installed .
Shelf (ID) is configured.
NCF is loaded.
Fig. 6 Bulk
TR3583EU00TR_0101
2003 Siemens AG
System commissioning
Siemens
2.2
2.2.1
Prerequisites:
No card fault Light Emitting Diodes (red LED's) are continuously lit.
The NE is powered up and the NE controller card has the OK LED lit.
2.2.1.1
As the first commissioning step the GW NE's that will connect the Data
Communication Network (DCN) to the TMN system, or customer network shall be
configured (on site).
TIP
The GW NE must be configured as a permanent gateway, and support a Dynamic
Host Communication Protocol (DHCP) server.
Procedures:
1. Connecting to NE on site;
2. Configuring NE security settings;
3. Configuring gateway function;
4. Configuring external NTP server or NE time;
5. Configuring ring manager.
2.2.1.2
Once the GW NE that supports DHCP server is commissioned and non GW NE's are
installed in powered, the OSC connectivity is up and running. The non GW NE's
became reachable and commissioning of the remaining NE's shall be performed.
Procedures:
1. Connecting to NE remotely;
2. Configuring NE security settings;
3. Configuring ring manager;
4. Configuring user channel (OLR only).
10
TR3583EU00TR_0101
2003 Siemens AG
System commissioning
Siemens
Prerequisites:
No card fault Light Emitting Diodes (red LED's) are continuously lit.
The NE is powered up and the NE controller card has the OK LED lit.
Fig. 7 Prerequisites
1.
1. Connecting
Connecting to
to NE
NE on
on site
site
2.
2. Configuring
Configuring NE
NE security
security settings
settings
3.
3. Configuring
Configuring gateway
gateway function
function
4.
4. Set
Set NE
NE time
time and
and NTP
NTP
5.
5. Configuring
Configuring ring
ring manager
manager
1.
1. Connecting
Connecting to
to NE
NE remotely
remotely
2.
2. Configuring
Configuring NE
NE security
security settings
settings
3.
3. Configuring
Configuring ring
ring manager
manager
4.
4. Configuring
Configuring user
user channel
channel (OLR
(OLR only)
only)
TR3583EU00TR_0101
2003 Siemens AG
11
System commissioning
Siemens
2.2.2
Shelf preconfiguration
Prerequisites:
The Network Element Configuration File (NCF) must be available and ready for the
loading to NE's.
2.2.2.1
On site should be commissioned NE's that will connect the DCN to the TMN system,
or customer network (GW NE's) and remaining ONN's (non OLR's), which allows to
establish OSC connectivity in the entire DCN. The GW NE must be configured as a
permanent gateway, and support a Dynamic Host Communication Protocol (DHCP)
server.
1. Connecting to NE on site;
2. Configuring NE security settings;
3. Configuring gateway function (for GW NE's only);
4. Setting NE name;
5. Downloading NCF;
6. Configuring external NTP server (for GW NE's only) or NE time;
7. Configuring ring manager;
8. Setting NE state to commissioned.
2.2.2.2
Once all NE's in the DCN, and a permanent gateway that supports DHCP server are
commissioned, the OSC connectivity is up and running and all NE's in the DCN can
be remotely accessed.
1. Connecting to NE remotely;
2. Configuring NE security settings;
3. Setting NE name;
4. Downloading NCF;
5. Configuring ring manager;
6. Configuring user channel;
7. Setting NE state to commissioned.
12
TR3583EU00TR_0101
2003 Siemens AG
System commissioning
Siemens
Prerequisites:
Assembly and cabling according to TransNet commissioning reports
and Installation and Test Manual (ITMN).
No card fault LED's are continuously lit.
The NE is powered up and the NE controller card has the OK LED lit.
TransNet commissioning reports must be available.
A list with the DCN MAC addresses of all shelves that contain the NE
controller cards (CCEP/CCMP) must be available.
The Network Element Configuration File (NCF) must be available
and ready for the loading to NE's.
Fig. 9 Prerequisites
TR3583EU00TR_0101
2003 Siemens AG
13
System commissioning
Siemens
2.2.3
Bulk
The Bulk delivery format does not support any pre-configured parameters for the
NE's and the corresponding procedures that listed below must be executed in the
correct order.
In order to start NE commissioning, the following prerequisites must be fulfilled.
Prerequisites:
Manufacturing number of the shelves that contain all shelf controller cards
The NCF must be available and ready for the loading to NE's.
14
TR3583EU00TR_0101
2003 Siemens AG
System commissioning
Siemens
Prerequisites:
Assembly and cabling according to TransNet commissioning reports
and Installation and Test Manual (ITMN).
No card fault LED's are continuously lit.
The NE is powered up and the NE controller card has the OK LED lit.
TransNet commissioning reports must be available.
A list with the DCN MAC addresses of all shelves that contain the NE
controller cards (CCEP/CCMP) must be available.
Manufacturing number of the shelves that contain all shelf controller
cards (CCSP), and corresponding shelf ID according to TransNet
commissioning reports must be available;
The Network Element Configuration File (NCF) must be available
and ready for the loading to NE's.
Fig. 11 Prerequisites
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
TR3583EU00TR_0101
2003 Siemens AG
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
15
System commissioning
Siemens
2.2.3.1
On site should be commissioned NE's that will connect the DCN to the TMN system,
or customer network (GW NE's) and remaining ONN's (non OLR's), which allows to
establish OSC connectivity in the entire DCN.
TIP
The GW NE must be configured as a permanent gateway, and support a Dynamic
Host Communication Protocol (DHCP) server.
1.
2.
3.
4.
5.
6.
7.
8.
9.
Connecting to NE on site;
Configuring NE security settings;
Configuring gateway function (for GW NE's only);
Setting NE name;
Setting shelf ID;
Downloading NCF;
Configuring external NTP server (for GW NE's only) or NE time;
Configuring ring manager;
Setting NE state to commissioned.
2.2.3.2
Once all NE's in the DCN, and a permanent gateway that supports DHCP server are
commissioned, the OSC connectivity is up and running and all NE's in the DCN can
be remotely accessed.
1.
2.
3.
4.
5.
6.
7.
8.
16
Connecting to NE remotely;
Configuring NE security settings;
Setting NE name;
Setting shelf ID;
Downloading NCF;
Configuring ring manager;
Configuring user channel;
Setting NE state to commissioned.
TR3583EU00TR_0101
2003 Siemens AG
System commissioning
Siemens
5.
5. Setting
Setting shelf
shelf ID
ID
6.
6. Downloading
Downloading NCF
NCF
1.
1. Connecting
Connecting to
to NE
NE remotely
remotely
7.
7. Set
Set NE
NE time
time and
and NTP
NTP (GW
(GW NEs)
NEs)
2.
2. Configuring
Configuring NE
NE security
security settings
settings
8.
8. Configuring
Configuring ring
ring manager
manager
3.
3. Setting
Setting NE
NE name
name
9.
9. Setting
Setting NE
NE state
state to
to commissioned
commissioned
4.
4. Setting
Setting shelf
shelf ID
ID
5.
5. Downloading
Downloading NCF
NCF
Commissioning
NE's on site
6.
6. Configuring
Configuring ring
ring manager
manager
7.
7. Configuring
Configuring user
user channel
channel
8.
8. Setting
Setting NE
NE state
state to
to commissioned
commissioned
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
TR3583EU00TR_0101
2003 Siemens AG
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
17
System commissioning
Siemens
2.3
2.3.1
NE commissioning procedures
Connecting to NE on site
18
TR3583EU00TR_0101
2003 Siemens AG
System commissioning
Siemens
Lever
CCSP
Fault
OK
1
2 UBAT
3
4
CRIT
MAJ COM
- AL
MIN
CRIT
MAJ EQUIP
MIN AL
INFO
RJ 22
ACO
TIF IN
SU BD 25
SUBD 25
D-SUB 9
CCEP
LAxBC
F04MDU
O08VA
LAxPC
DxxxxSMF
F04MDU
F04MDN
DxxxxSMF
I04T2G5
I04T2G5
I04T2G5
I04T2G5
I04T2G5
I04T2G5
TIFOUT
Alarm
EOW
User
2
@CT
User
1
ILAN
2
ILAN
1
Q
QF
Lever
Fig. 13
6
5
4
Fig. 14
TR3583EU00TR_0101
2003 Siemens AG
19
System commissioning
Siemens
2.3.2
Connecting to NE remotely
TIP
This procedure must be completed from the NE, which has been commissioned and
configured as a GW NE.
To establish remote connection to an NE, complete the following steps:
1. To open "Reachable Systems - Info" window select in the LCT main menu,
"Communication > DCN > Reachable Systems..." menu item.
2. Select the correct NE name to be commissioned, and then click "Connect".
The NE name after startup contains the MAC address of the shelf where the main
controller card is installed (e.g. hiT-080006ABCDEF). The commissioner must
identify NE by the MAC address information noted down during installation.
3. A default account is provided to access the NE for the first time. Enter the
following settings of the default user account:
Security Name:" Administrator"
Password: "siemens"
Privacy Protocol: "AES_128"
Authentication Protocol: "MD5"
4. Click "Login" button to open the LCT for the remote NE.
20
TR3583EU00TR_0101
2003 Siemens AG
System commissioning
Siemens
2
4
3
Fig. 15
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
TR3583EU00TR_0101
2003 Siemens AG
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
21
System commissioning
Siemens
2.3.3
It is recommended to modify the default user account or create a new user account
after the initial login.
To modify an existing user account, complete the following steps:
1. In the LCT main menu, select "Security -> Change Password..." menu item.
2. In the "Change Password" window enter the following settings:
"Password"-> new password;
"Confirm Password" -> confirm new password;
3. Click "Apply" to confirm the settings.
To create a new user account, complete the following steps:
1. In the LCT main menu, select "Security -> User Administration..." menu item.
2. In the "User Administration" window click "Add" button to open "User Add"
window.
3. In the "User Add" window enter the following settings:
"Name" -> new account name;
"Password" -> new account password;
"Confirm password" -> confirm new password.
4. In the Group drop-down list, select one of the following user groups:
Administration
Configuration
Operation
Maintenance
Supervision
5. Click Apply to confirm all settings.
22
TR3583EU00TR_0101
2003 Siemens AG
System commissioning
Siemens
Fig. 16
2
5
Fig. 17
TR3583EU00TR_0101
2003 Siemens AG
23
System commissioning
Siemens
2.3.4
24
TR3583EU00TR_0101
2003 Siemens AG
System commissioning
Siemens
Fig. 18
Fig. 19
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
TR3583EU00TR_0101
2003 Siemens AG
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
25
Siemens
System commissioning
Remarks
169.254.0.0 - 169.254.255.255
(prefix subnet length = 16).
172.16.0.0 - 172.31.255.255
(prefix subnet length = 24).
26
TR3583EU00TR_0101
2003 Siemens AG
System commissioning
Siemens
Fig. 21
TR3583EU00TR_0101
2003 Siemens AG
27
System commissioning
Siemens
2
4
Fig. 22
28
TR3583EU00TR_0101
2003 Siemens AG
System commissioning
2.3.5
Siemens
Setting NE name
Fig. 23
TR3583EU00TR_0101
2003 Siemens AG
29
System commissioning
Siemens
2.3.6
Setting shelf ID
TIP
Repeat steps 1 to 5 for all available shelves in the table.
30
TR3583EU00TR_0101
2003 Siemens AG
System commissioning
Siemens
Shelf
Shelf ID
ID should
should be
be
Assigned
Assigned here
here
Shelf
Shelf manufacturing
manufacturing
number
number should
should be
be noted
noted
down
down during
during installation.
installation.
Fig. 24
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
TR3583EU00TR_0101
2003 Siemens AG
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
31
System commissioning
Siemens
2.3.7
Downloading NCF
32
TR3583EU00TR_0101
2003 Siemens AG
System commissioning
Siemens
1
3
4
2
Fig. 25
11
Fig. 26
TR3583EU00TR_0101
2003 Siemens AG
33
Siemens
2.3.8
System commissioning
NTP is used for time synchronization of the NE's. NTP servers can be configured in
NE's where DHCP server is enabled, and SON's. For the remaining NE's, the NTP
servers are configured automatically via DHCP, i.e., the permanent gateway NE is
used as the NTP server by the remaining NE's. If no NTP server is currently
available, the NE goes into a free-running mode, depending only on its internal clock.
To configure an NTP server, or NE time, complete one of the following tasks:
Configuring external NTP server.
1. To open "Network Time Protocol - Config" window right-click on the NE bar in
the "Module View", and then select the "Configuration > Network Time
Protocol..." menu item.
2. Select an available "Server Index" in the table, and enter the IP address of the
external NTP server in the "Server Address" field.
3. Click "Apply" to confirm all settings.
Configuring NE time.
The NE time can only be configured if there is no NTP server has been enabled.
Once an NTP server is configured, the NE time is automatically overridden.
1. To open "Network Element Time - Config" window right-click on the NE bar in
the "Module View" window, and then select the "Configuration > NE Time..."
menu item.
2. Set the NE time in the "Adjust NE Time to" area.
3. Click "Apply" to confirm all settings.
34
TR3583EU00TR_0101
2003 Siemens AG
System commissioning
Siemens
Fig. 27
Fig. 28
TR3583EU00TR_0101
2003 Siemens AG
35
System commissioning
Siemens
2.3.9
In case of a ring or meshed network topologies, the Engineering Order Wire (EOW)
ring manager can be used to prevent feedback distortion due to loop configuration in
an EOW call.
To enable EOW ring manager on a specific shelf, complete the following steps:
1. To open "Shelves" window right-click on the NE bar in the "Module View"
window, and then select "Configuration > Shelves..." menu item.
2. In the "Ring Manager" column, select the checkbox related to the desired shelf.
3. Click "Apply" button to confirm the setting.
3
2
Fig. 29
36
TR3583EU00TR_0101
2003 Siemens AG
System commissioning
2.3.10
Siemens
The user channels are not accessible by default in an Optical Line Repeater (OLR).
To allow customer access to the user channel in an OLR, the User Channel
parameter must be set accordingly.
To configure the user channel access, complete the following steps:
1. To open "Shelves - Config" window right-click on the NE bar in the "Module
View" window, and then select "Configuration > Shelves..." menu item.
2. In the "User Channel Connection" drop-down list, select the "Drop" menu.
3. Click "Apply" to confirm the setting.
Fig. 30
TR3583EU00TR_0101
2003 Siemens AG
37
System commissioning
Siemens
2.3.11
Fig. 31
38
TR3583EU00TR_0101
2003 Siemens AG
System commissioning
Siemens
Fig. 32
TR3583EU00TR_0101
2003 Siemens AG
39
System commissioning
Siemens
3.1
The link control is the core mechanism of the optical link. Most of the link control
functions are executed by the main controller card and the time-critical functions by
the Line Amplifier cards. The link control instances for each transmission direction
work independently of each other, therefore each transmission direction must be
commissioned separately.
Exchange of link control information between Network Elements (NE's) takes place
via the Optical Supervisory Channel (OSC); hence the link commissioning tasks can
only be completed after the OSC channel is functioning.
In an optical path, the segment from the booster of an Optical Network Node (ONN)
to the preamplifier of the next adjacent ONN constitutes an Optical Multiplex Section
(OMS), while the segment from the booster of an ONN-I/T to the preamplifier of the
next adjacent ONN-I/T constitutes a pre-emphasis section. The first ONN within an
OMS serves as the link master, transmitting all relevant link control information to the
downstream NE's in this OMS. An optical path may consist of more than one OMS.
TIP
The OMS sections function independently of each other, and hence they must be
started sequentially, in each transmission direction.
Prior to starting up an OMS, several link control-related parameters must be
configured at the corresponding NE's. Network Element Configuration Files (NCF)
provide automatic configuration for most of the settings although other settings such
as OSC trace must be manually configured.
TIP
At least one channel is required to start up an OMS.
40
TR3583EU00TR_0101
2003 Siemens AG
System commissioning
ONN-T
Siemens
OLR
Link
Link
master
master
(forward)
(forward)
Controller
Card
ONN-I
Controller
Card
Controller
Card
OSC
OSC
OSC
ONN-T
Link
Link
master
master
(forward)
(forward)
Controller
Card
OSC
OSC
OSC
Link
Link master
master
(backward)
(backward)
Link
Link master
master
(backward)
(backward)
Pre-emphasis
Pre-emphasis section
section 11 Forward
Forward
Pre-emphasis
Pre-emphasis section
section 22 Forward
Forward
Pre-emphasis
Pre-emphasis section
section 22 Backward
Backward
Pre-emphasis
Pre-emphasis section
section 11 Backward
Backward
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
TR3583EU00TR_0101
2003 Siemens AG
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
41
System commissioning
Siemens
3.2
Pre-emphasis schemes
Maximum reach (all channels equipped with Variable Optical Attenuators (VOA);
Reduced reach with the possibility for later automation (all channels equipped with
VOA's);
3.2.1
Using the appropriate attenuators/attenuation patch cords (for channels with fixed
attenuators);
or
42
TR3583EU00TR_0101
2003 Siemens AG
System commissioning
Siemens
Attenuator.
2.5G
Filter
booster
In-line amplifier
OLR
ONN-T
VOAs
VOAs or
or fixed
fixed
attenuators
attenuators have
have to
to
be
be adjusted
adjusted here
here
Pre-amplifier
Filter
G5.2
G5.2
Transponder
2.5G
Controller
Card
Controller
Card
Attenuator.
Transponder
Controller
Card
ONN-T
Link
Link
Master
Master
Pre-emphasis
Pre-emphasis section
section
TR3583EU00TR_0101
2003 Siemens AG
43
System commissioning
Siemens
3.2.2
Once the link has been sequentially started, may need to be further optimized, via
enhanced pre-emphasis.
Enhanced pre-emphasis must be performed in the following cases:
The channel count in the pre-emphasis section equals 16, 23, 32 or 40 (i.e. delta
power between these channel counts should be less than 2 dB).
After upgrading several channels, the above channel count limit was exceeded
and more channels need to be upgraded.
External OSA's are required to measure the spectrum power at the transmitting and
the receiving ONN-T/I NE's. Measurement of the near-end and far-end spectrums
must be performed within a window of 5 minutes. Therefore a technician must be
stationed at each end terminal when executing this procedure, with the capability to
communicate the measured values. The OMS within this pre-emphasis section must
be in state "Running".
Enhanced pre-emphasis has the advantage that the penalty is reduced. It offers the
capability to have more than 15 channels in the system.
3.2.3
The pre-emphasis scheme to use depends on how the network was planned in
Trans-Net. The following table shows the relation between the network goal and
which preemphasis to use.
44
Network goal
Pre-emphasis scheme
Maximum reach
Reduced reach,
with future
automation
Reduced reach,
no automation
TR3583EU00TR_0101
2003 Siemens AG
System commissioning
Siemens
OSA
Measured results
Measured results
Attenuator.
2.5G
Filter
booster
In-line amplifier
OLR
ONN-T
VOAs
VOAs have
have to
to
be
be adjusted
adjusted
here
here
Pre-amplifier
Filter
G5.2
G5.2
Transponder
2.5G
Controller
Card
Controller
Card
Attenuator.
Transponder
Controller
Card
ONN-T
Link
Link
Master
Master
Pre-emphasis
Pre-emphasis section
section
TR3583EU00TR_0101
2003 Siemens AG
45
System commissioning
Siemens
3.3
express channels.
Once the NE is selected, the direction to proceed depends on which of the two
transmission directions (clockwise or counter-clockwise) results in the lesser number
of trips to the NE sites. NE's with both add/drop and express traffic must be visited
twice; the first time to adjust the available add/drop channel attenuators, the second
time to adjust the express attenuator, once the express channels from neighboring
links are running.
Optical link commissioning in a mesh network.
To select an NE to start the optical link commissioning in a mesh configuration, follow
this conditions:
46
TR3583EU00TR_0101
2003 Siemens AG
System commissioning
Siemens
TR3583EU00TR_0101
2003 Siemens AG
47
Siemens
3.4
System commissioning
The following steps have to be performed before, during and after starting up the link.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
48
TR3583EU00TR_0101
2003 Siemens AG
System commissioning
Siemens
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
TR3583EU00TR_0101
2003 Siemens AG
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
49
System commissioning
Siemens
3.4.1
Each NE in the commissioned link need to be checked to ensure that the correct
NCF file has been downloaded and swapped successfully. This is indicated by the
value of the Commissioning Status parameter of the NE.
To verify the NE commissioning status, complete the following steps:
1. To open "Network Element - Config" window right-click in the "Module View"
on the Network Element bar and select "Configuration > NE Configuration..."
menu item.
2. The Commissioning Status parameter should have value "Commissioned"
mean that associated NCF file was loaded to the system and activated.
Fig. 42
50
TR3583EU00TR_0101
2003 Siemens AG
System commissioning
3.4.2
Siemens
This procedure is optional, only applicable to NE's used as primary DHCP server. To
ensure the NTP is working in all NE's along the link, complete the following steps:
1. To open "Network Time Protocol - Config" window right-click on the Network
Element bar in the "Module View" of the LCT, and select "Configuration >
Network Time Protocol..." menu item.
2. Verify the NTP status. A "*" next to a given NTP entry indicates NTP is working
with the NTP server IP address shown. A "+" next to a given NTP entry indicates
the corresponding NTP server is used as a second or third source.
TIP
Repeat these steps for all NE's that are used as primary or secondary DHCP servers.
Fig. 43
TR3583EU00TR_0101
2003 Siemens AG
51
System commissioning
Siemens
3.4.3
Prior to starting up the link for the first time, verify that patch cords are properly
connected between transponders and their associated multiplexer/demultiplexer
cards. For each transponder, ensure that The Line Out / Line In ports are connected
to the corresponding input / output port of the multiplexer with the correct attenuator,
as given in the TransNet cabling plan.
In addition, line side parameters of the transponders must be checked.
For I01T10G cards, execute the following steps:
1. To open "Line Traffic - Config" window, right-click on the I01T10G replica in the
"Module View", and select "Traffic > Optical Channel > Configuration..." menu
item.
2. Select the "Decision Optimization Enabled" check box and set the
"Supervision Mode" to "Automatic" in the "Snk" area.
3. In the "Src" area, verify that the "Laser State" field indicates "Enabled". If this
field indicates "Disabled", select the "Laser Enabled" check box to switch on the
laser and then click "Apply" button to confirm the settings.
For I04T2G5 cards, execute the following steps:
1. To open "Line Traffic - Config" window, right-click on the I04T2G5 replica in the
"Module View", and select " Traffic > Optical Channel > Line #1 >
Configuration..." menu item.
2. In the "Src" area, verify that the "Laser State" field indicates "Enabled". If this
field indicates "Disabled", select the "Laser Enabled" check box to switch on the
laser.
3. In the "Snk" area, set the "Supervision Mode" to "Automatic" from the pulldown menu and then click "Apply" button to confirm the settings.
TIP
Repeat these steps for all line ports of all transponder cards that have been planned
for the optical line commissioning.
52
TR3583EU00TR_0101
2003 Siemens AG
System commissioning
Siemens
2
1
Fig. 44
Fig. 45
TR3583EU00TR_0101
2003 Siemens AG
53
System commissioning
Siemens
3.4.4
Since the exact channel count is not automatically detected, it is recommended to set
this value at the transmitting ONN-T/I, prior to performing pre-calculated preemphasis with measurement (when the Link Status is Running) and enhanced preemphasis (manual).
TIP
The wrong channel count value leads to incorrect amplifier settings.
To update the channel count, complete the following steps:
1. To open "Traffic Config" window right-click on the LAxB card replica in the
"Module View" window and select "Traffic > Configuration..." menu item.
2. In the "Optical Link Control" tab, click the "Recalculate..." button. The "Link
Readjust" window is opened.
3. Enter the current channel count in the "Optimize Channel Count" field and then
click "Apply" to confirm the settings.
Fig. 46
54
TR3583EU00TR_0101
2003 Siemens AG
System commissioning
3.4.5
Siemens
OSA
MonSo
MonSo
port
port
Attenuator.
2.5G
Filter
LAxBC
LAxIC
OLR
ONN-T/I
LAxPC
Filter
G5.2
G5.2
Transponder
2.5G
Controller
Card
Controller
Card
Attenuator.
Transponder
Controller
Card
ONN-T/I
Link
Link
Master
Master
Pre-emphasis
Pre-emphasis section
section
Fig. 47
TR3583EU00TR_0101
2003 Siemens AG
55
Siemens
System commissioning
56
TR3583EU00TR_0101
2003 Siemens AG
System commissioning
Siemens
Fig. 48
Read
Read spectrum
spectrum
power
power level
level
results
results from
from the
the
OSA
OSA screen
screen
Fig. 49
Fig. 50
TR3583EU00TR_0101
2003 Siemens AG
57
System commissioning
Siemens
3.4.6
At this stage the optical link can be started and all NEs in this OMS will be started up
in sequence, beginning with the LAxB at the transmitting ONN T/I.
TIP
To start up optical link at least one channel must be present in the OMS.
To start-up optical link, complete the following steps:
1. To open "Traffic Config" window right-click on the LAxB card replica in the
"Module View", and select "Traffic > Configuration..." menu item.
2. Prior to starting up the link, the Link Status should be in "Prestart" mode and all
line amplifiers should be switched off. To ensure this, in the "Optical Link
Control" tab click the "Shutdown" button.
3. A warning message window is opened. Click "Yes" to proceed with the
shutdown.
4. Verify that Link Status is "Prestart" on the "Traffic - Config" window.
5. To open "Link Startup" window click on the "Startup" button.
6. Enter the "Link Startup Channel Count" and click "OK" button.
Each line amplifier has to reach a certain level of stability, before the next amplifier in
line switches on. The Link Status changes to Startup as soon as the first booster
amplifier has completed its startup.
The start-up is successfully completed when the Link Status changes from Startup to
Running. The start-up may take several minutes to complete, depending on the
number of NE's in this OMS. If the Link Status does not change from Startup to
Running (e.g. change to Prestart), check if any communication or equipment alarms
are currently raised at this OMS.
58
TR3583EU00TR_0101
2003 Siemens AG
System commissioning
Siemens
2
1
3
Fig. 51
IfIf the
the start-up
start-up is
is
successfully
successfully
completed
completed Link
Link
Status
Status changes
changes from
from
Startup
Startup to
to Running
Running
Fig. 52
TR3583EU00TR_0101
2003 Siemens AG
59
System commissioning
Siemens
3.4.7
After the link start, additional post-configuration tasks will need to be performed to
optimize the link.
TIP
If the link is not currently in state running, the following procedures cannot be
executed. In this case, please first execute the pre-configuration and link start-up
procedures for the given link topology.
TIP
The Interstage Loss (ISL) must be checked at all LAx cards against values specified
in the TransNet Commissioning Report. The ISL must be read from the LCT GUI
while the link state is running.
WARNING
If corrective actions are required, the link must be first shut down for laser
safety purposes.
To check ISL complete the following steps:
1. To open "LAx - Config" window right-click on the LAx card replica in the
"Module View" window, and select "Card > Configuration..." menu item.
2. Check if the value displayed in the "Interstage Loss" field is within the
minimum/maximum values specified in the TransNet Commissioning report.
a) If the current ISL is less than the minimum ISL allowed, check if the correct
attenuation cable or DCM cards are being used and add padding fibers, if
necessary.
b) If the current ISL is higher than the maximum ISL allowed, clean all fiber
connectors at the LAx ports and reduce/remove the padding fiber, if
necessary.
60
TR3583EU00TR_0101
2003 Siemens AG
System commissioning
Siemens
Fig. 53
The
The value
value displayed
displayed in
in the
the
"Interstage
"Interstage Loss"
Loss" field
field
must
must be
be checked
checked against
against
minimum/maximum
minimum/maximum values
values
specified
specified in
in the
the TransNet
TransNet
Commissioning
Commissioning report.
report.
Fig. 54
TR3583EU00TR_0101
2003 Siemens AG
61
System commissioning
Siemens
3.4.8
The span attenuation must be checked at the Rx ONN/OLR against the End-of-Life
(EOL) span attenuation values specified in the TransNet Commissioning Report. This
procedure applies to LAxPC and LAxIC cards.
TIP
The span attenuation must be read from the LCT GUI while the link state is
"Running".
To check the span losses complete the following steps:
1. To open "LAxxC - Config" window right-click on the LAxxC card replica in the
"Module View" window, and select "Card > Configuration..." menu item.
2. Read the "Span Attenuation" and "EOL Span Attenuation Threshold" values
and compare with the BOL span attenuation values listed in the TransNet
Commissioning Report.
a) If the current span attenuation value is within the EOL - BOL range, corrective
actions are not required for this LAxxC.
c) If the current span attenuation is less than the BOL span attenuation specified
in the TransNet Commissioning Report, add padding fiber to the LAxxC-Line2
port of the upstream site feeding into this LAxxC card.
d) If the current span attenuation exceeds the EOL span attenuation, clean all
fiber connectors between the upstream LAxxC "Out" (LAxBC/LAXIC) and the
downstream LAxxC "In" (LAxPC/LAxIC) ports.
WARNING
If corrective actions are required, the link must be first shut down for laser
safety purposes.
TIP
A Span Loss Low (SLL) alarm would be raised if the current span attenuation is less
than (EOL Span Attenuation Threshold - 10.0 dB).
TIP
A Span Loss High (SLH) alarm would be raised if the current span attenuation is
greater than (EOL Span Attenuation Threshold + 1.0 dB).
62
TR3583EU00TR_0101
2003 Siemens AG
System commissioning
Siemens
2
Read
Read the
the "Span
"Span Attenuation"
Attenuation" and
and
"EOL
"EOL Span
Span Attenuation
Attenuation
Threshold"
Threshold" values
values and
and compare
compare
with
with the
the BOL
BOL span
span attenuation
attenuation
values
values listed
listed in
in the
the TransNet
TransNet
Commissioning
Commissioning Report.
Report.
Fig. 55
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
TR3583EU00TR_0101
2003 Siemens AG
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
63
System commissioning
Siemens
3.4.9
Once the entire pre-emphasis section (ONN-T/I -> ONN-T/I) has been started, the
optical channels may need to be further optimized, via enhanced pre-emphasis.
Enhanced pre-emphasis must be performed if the channel count in the pre-emphasis
section equals 16, 23, 32, 40 or after upgrading several channels, the above
mentioned channel count limit was exceeded and more channels need to be
upgraded.
External OSA's are required to measure the spectrum power at the transmitting and
the receiving ONN-T/I NE's. Measurement of the near-end and far-end spectrums
must be performed within a window of 5 minutes. Therefore a technician must be
stationed at each end of the pre-emphasis section when executing this procedure,
with the capability to communicate the measured values. To perform enhanced preemphasis connect an external OSA to "MonSo" port of the LAxxC card at the
beginning and at the end of the pre- emphasis section to be commissioned, as it
shown in the sketch below.
TIP
The OMS within this pre-emphasis section must be in state "Running".
64
TR3583EU00TR_0101
2003 Siemens AG
System commissioning
Siemens
The
The OMS
OMS within
within this
this pre-emphasis
pre-emphasis section
section must
must be
be in
in state
state "Running
"Running !!!!
Enhanced
pre-emphasis
must
be
performed
if
the
channel
count
Enhanced pre-emphasis must be performed if the channel count inin the
the pre-emphasis
pre-emphasis section
section
equals
equals 16,
16, 23,
23, 32,
32, 40
40 or
or after
after upgrading
upgrading several
several channels,
channels, the
the above
above mentioned
mentioned channel
channel count
count
limit
limit was
was exceeded
exceeded and
and more
more channels
channels need
need to
to be
be upgraded
upgraded !!!!
OSA
OSA
Measured results
Measured results
MonSo
MonSo
port
port
MonSo
MonSo
port
port
Attenuator.
2.5G
Filter
booster
Filter
Pre-amplifier
In-line amplifier
OLR
ONN-T
G5.2
G5.2
Transponder
2.5G
Controller
Card
Controller
Card
Attenuator.
Transponder
Controller
Card
ONN-T
Link
Link
Master
Master
Pre-emphasis
Pre-emphasis section
section
Fig. 56
Fig. 57
TR3583EU00TR_0101
2003 Siemens AG
65
Siemens
System commissioning
3. Read spectrum power level results of valid channels from the OSA screen in the
near-end and the far-end spectrums.
4. In the "Power Pre-emphasis" window, for each valid channel enter the
measured power values in the "Near End Tx" - > (transmitting ONN power
levels) and "Far End Rx" -> (receiving ONN power levels) columns.
TIP
The measured spectrum data can be loaded from a file, using the "Load" button.
Please ensure that the selected text file is correct, i.e. only text files with the correct
strings can be loaded.
5. Click on the "Calculate" button to start the pre-emphasis.
6. The "Power Pre-emphasis - Result" window is opened, when pre-emphasis is
completed. The Pre-emphasis Delta Attenuation values are displayed.
7. Read the calculated delta attenuation value for each channel, displayed in the
"Power Adjust Delta Attenuation" column and do one of the following:
a) For channels with fixed attenuators: if the delta attenuation values are outside
the range [-2.5 ... 2.5] dB, replace these attenuators at the "Mux-In" ports of
the transmitting ONN-T/I. Perform another power adjustment by repeating
steps 2 to7, until this range is reached.
e) For channels with VOA's: if the delta attenuation values are outside the range
[- 0.6 dB ... 0.6 dB], perform another power adjustment by repeating steps 2
to7, until this range is reached.
TIP
Steps 2 to 7 can be repeated up to five times, in order to reach the target power
range.
66
TR3583EU00TR_0101
2003 Siemens AG
System commissioning
Siemens
Read
Read spectrum
spectrum power
power level
level
results
results of
of valid
valid channels
channels from
from
the
the OSA
OSA screen
screen in
in the
the near-end
near-end
and
and the
the far-end
far-end spectrums.
spectrums.
Fig. 58
Fig. 59
TR3583EU00TR_0101
2003 Siemens AG
67
System commissioning
Siemens
3.4.10
At the receiving ONN-T/I, the power level of each drop channel must be manually
adjusted, if the power level at the receiving transponder exceeds the range specified
in the TransNet Commissioning Report.
Verifying the power level
To verify the power level of the drop channels, complete the following steps:
1. To open "Line Traffic - Config" window of the transponder card at the receiving
(dropping) NE, right-click on the transponder card replica and select "Traffic >
Optical Channel > Configuration..." menu in case of I01T10G card, or "Traffic
> Optical Channel > Line #x -> Configuration..." menu item in case of I04T2G5
card.
2. Read the Optical Input Power value under the Optical Channel tab:
a) If the Optical Input Power value is within the range specified in the TransNet
Commissioning Report, the received power level of this transponder does not
need to be adjusted.
b) If the Optical Input Power value exceeds the range specified in the TransNet
Commissioning Report, received power level of this transponder has to be
adjusted.
Adjusting power level
To adjust the received power level of the transponder, complete the following steps:
3. If a fixed attenuator is connected to the demultiplexer for this channel, replace the
external attenuator at the corresponding demultiplexers output, such that the
received power level at the terminating transponder is in the range indicated by
the TransNet Commissioning Report.
4. If a VOA (O08VA card) is connected to the demultiplexer for this channel, rightclick on the port symbol of the corresponding O08VA card replica in the "Module
View" and select "Port Configuration..." menu item to open "Port Config"
window.
5. Adjust the Attenuation, such that the Optical Input Power value of the terminating
transponder is within the range specified in the TransNet Commissioning Report.
TIP
Repeat steps 1 to 5 for each drop channel remaining.
68
TR3583EU00TR_0101
2003 Siemens AG
System commissioning
Siemens
Fig. 60
Fig. 61
TR3583EU00TR_0101
2003 Siemens AG
69
System commissioning
Siemens
3.4.11
Clearing NE logs
Each NE has its own configuration, alarm, event and security log. During the
commissioning phase, several events are written into these logs that are not required
once the system is in a running state. To make maintenance and troubleshooting
easier, the configuration, alarm and events logs have to be cleared (contents of the
security log cannot be deleted).
To clear NE logs complete the following steps:
1. In the "Module View" window of the LCT, right-click on the network element bar
and select:
a) "NE Logs > Configuration > Clear" menu item to clear configuration log.
b) "NE Logs > Alarms > Clear" menu item to clear alarm log.
c) "NE Logs > Events > Clear" menu item to clear Events and Protection Events
log.
TIP
Repeat this procedure for each NE.
Fig. 62
70
TR3583EU00TR_0101
2003 Siemens AG
System commissioning
3.4.12
Siemens
Once the optical link has been started up and all procedures outlined in this chapter
have been successfully executed, it is important to check for any existing alarms.
To verify alarm status complete the following steps:
1. To open "Alarm List" window select from the main menu "Fault > Alarm List..."
menu item.
2. If an alarm is raised, check this alarm with a help of TSMN and follow the
instructions provided to clear alarms.
TIP
Repeat this procedure for each NE.
Fig. 63