December 19, 2012

Ref No IFL/NEPRA/1030-02

The Registrar
National Electric Power Regulatory Authority
(NEPRA)
2ND Floor, OPF Building
G-5/2 Islamabad

'es

Sub: - Licensee Proposed Modification (LPM) in Generation and Distribution


Licenses (IFL)
Dear Sir,
Ref our letter No. IFL/NEPRA/1030-01 we have submitted the LPM in generation and
distribution licenses on 17th December 2012 at your good office.
Please find attached herewith resolution draft approved by Ibrahim Fibres Limited board
of directors, authorizing Mr. Abdul Hameed Bhutta G.M.HR/Admin to sign and plead the
LPM documentation and process.
In view of above, it is requested that the attached board resolution may be considered as a
part of documentation /files already submitted for proposed modification in generation
and distribution licenses..
Yours faithfully,

Abdul Ha d Bhutta
General Manager HR/Admin
C

Web Site

WWI igcpk

corn

E. Mail infoegc com.pk

.)'714..toto... C--(..-4._0...,4-

Ibrahim Centre,
Ibrahim Centre, GK7/59,
Ibrahim Centre,
1 - Ahmad Block,
Bagh-e-Zehra Street,
15-Club Road,
New Garden Town,
Kharadar,
Faisalabad,
Lahore, Pakistan.
Karachi, Pakistan.
Pakistan.
Tel 92 42 5869151
Tel 92 21 2311511
Tel 92 41 2617836
Fax 92 42 5864915
Fax 92 21 2312262
Fax 92 41 2617842

,
iTrahun
r

11

11

IBR AIIIM i'IBRES LIMITED

A S
CERTIFIED COPY OF THE RESOLUTION PSED
12
BY THE BOARD OF DIRECTORS ON 20-11-20

Resolved that Mr.Abdul Hameed Bhutta S/o Ghulam Yasin-General Manager HR/Admin
holding CNIC No.35201-1501828-7 be and is hereby authorised to represent the company

and to sign and process


in the office of National Electric Power Regulator)/ Authority (NEPRA)
the documentation of LPM licensee proposed modifications in generation and distribution licenses
already granted by NEPRA as required under National Electricc Power Regulatory authority
licensing (application and modification procedure) Regulations,
-Resolved further that all actions taken by Mr. Abdul Hameed Bhutta in this behalf shall be
deemed to have been taken by the Company itself."

By order

AN
COMP

he Board

AQUE
TARY

Company Seal

Web Site www igcpk tom


E Mail infoArgc corn pk

Ibrahim Centre,
Ibrahim Centre,
11-8, Lala Zar,
15-Club Road,
M T Khan Road,
Faisalabad,
Karachi, Pakistan.
Pakistan.
Tel 92 21 35611601
Tel 92 41 2617836
Fax 92 21 35611609

Fax 92 41 2617842

Ibrahim Centre,
1 - Ahmad Block,
New Garden Town,
Lahore, Pakistan.
Tel 92 42 35869151
Fax 92 42 35864915

brd h IM
6 R

IBROHIM FIBRES LIMITED

ReiNo IFL/NEPRA/1030-01

DecembeN, 2012
F0 t

Registrar

cxyvi4

,z

'R $

IAD (7)

National Electric Power Regulatory Authority


(NEPRA)

1-*
D CLIC)

')N1) Floor, OPF Building


0-5/2 Islamabad

LA

11/4k

CA:lc)

CLI c)

Sub: - Licensee Proposed Modification (LPM) in Generation Licence (No.


SGC/33/2007, October 10, 2007) of Ibrahim Fibres Limited (IFL)
Dear Sir,
The Authority had granted us the above subject generation facilities located at
38-KM- Faisalabad-Shekhupura Road. We will like to inform you that we are in the
process of expansion of our existing power generation facilities of by adding additional
units to cater the growing load requirement of our group companies. The proposed
addition will result in enhancement of our installed capacity, requiring a modification in
our granted Generation Licence.
In view of the above, we hereby communicate to you an LPM in accordance
(2).
with Regulation 10 of the National Electric Power Regulatory authority licensing
(application and modification procedure) Regulations, 1999 (the Regulations) as detailed
below:(a).

The text of the proposed modification;


At present our installed capacity is 31.80 MW [consisting of 6 x 5.80 MW
Diesel Generating (D.G.) Sets operating on Residual Furnace Oil]. We
plan to add another 26.50 (5 x 5.30 MW D.G.) which will increase our
Installed Capacity to 58.30 MW.

(b).

A statement of the reasons in support of the modification;


Our group plans to install another Polyester Staple Fiber Plant at our
facilities at 38- KM Faisalabad-Shekhupura Road. Being a sensitive
chemical unit requiring uninterrupted power supply for its operation, we
plan to enhance the installed capacity of our above mentioned generation
facility by installing more D.G. sets as explained above.

)41c

4,7,
J

x72

4..-"?

e.

"1
Web Site ,,i..0,1gcph corn
E Mail Tfoxi'!ac car,pt<

ho,

Ibrahim Centre
15-Club Road.
Faisalabad
Pakistan.
T9' 02 41 'R17 83e
C'ix

92 4 , 2i" 174 2

Ibrahim Centre, GK-7/59


Bagh-e-Zehra Street
Kharadar
Karachi,

Pakistan

' Tel 92 21 2311511


Fax 92 21 711226?

Ibrahim Centre.
I 1 - Ahmad Block,
New Garden Town
Lahore, Pakistan.

Tel 92 42 5869151
Fax 92 42 586491 5

Ibrahim
u

IBRREilifi FIBRES MIMED


(c). A statement of the impact on the tariff, quality of service and the
performance by the licensee of its obligations under the licence.
The proposed enhancement in capacity will not have any impact on our
tariff as we are operating the above generation facility for feeding our own
units of Ibrahim Fibers Limited. The proposed addition will result in better
quality of service for IFL as not only we will be able to serve the growing
load of our units but it will result in more flexibility of the plant operation.
All these factors mentioned will definitely improve our performance as
Licensee.

As stipulated in Regulation 10 (3) of the Regulations, we are also sending you a


(3).
demand draft amounting to Rs. 2,39,408/- after tax adjustment as per law as our
enhancement in cacpity falls in the band of 20.00 MW 50.00 MW.
(4).
In order to facilitate you in processing of our LPM, We are also attaching
expansion plant details as per Standard Perfroma used by NEPRA wherein the changes
have been marked in Red. A copy of our Generation License is also attached for your
information and ready reference.
In view of above, it is requested that our LPM for Generation Licence may be
(5).
processed. We will be pleased to furnish any other information required in this regard.
Thanking you for your understanding and consideration.
Yours faithfully,

Abdul Name
hutta
General Mana er FIR/Admin

Ibrahim Centre
15-Club Road
Faisalabad
Pakistan
Web Site wmv1000C corn

TO C? 41 SCI 7P .1t:

E Mail alfuj,igt: Lori) pi.,

Fax ;2 41 22,1754:

Ibrahim Centre GK-7, 59


Bagh-e-Zehra Street
Kharariar
Karachi, Pakistan
re10? 21 24,15,,
T-'ax 52 21 2312262

Ibrahim Centre,
1 - Ahmad Block,
New Garden Town,
Lahore, Pakistan
Tel 92 42 5859151
max 92 42 5864915

HOT TO EXCEED PKR *225,044.00**


REF : 00076912121004 70

Standard Chartered

02963233

Standard Chartered,Bank (Pakistan) Limited

Railway Road Branch Faisalabad


2963233
PKR

10-12-2012
Or Order

Pay

NATIONAL ELECTRIC POWER REGUL TO)Y AUTHORITY


_.,
I z
0/A IBRAHIM FIBRES LTD.
o
PAKISTAN RUPEE TWO HUNDRED TWINqff IVE THOUSAND
I r
FORTY FOUR ONLY.
A/C # 09-9016422-72
BILLS PAY SCB CONSUMER

o
-;:i

PAYABLE AT ANY BRANCH IN PAKISTAN.

1111 0 2963 233003800? LI:

For Standard Chartered Bank (Pakistan) Limited

PKR *225,044.00 **

m thc4id igotory
/
'11'1',,4114:
M,F,,
,",,
..y
,st:,z

0- 1,161
Voz14066
l:e en91.'
,.." ,
S0
,o,
0,
1110 2 0 .0

Generation License
Ibrahim Fibres Limited
38-KM, Faisalabad- Sheikhupura Road
Faisalabad, Punjab

SCHEDULE-1
(Existing + Extension) Power Generation Plant
The location, size (Capacity in MW) technology, interconnection
arrangements, technical limits, technical functional specifications and other
details specific to the generation facilities of the licensee.

Generation License
Ibrahim Fibres Limited
38-KM, Faisalabad- Sheikhupura Road
Faisalabad, Punjab

Plant fle

General Information

1
i.

Name of Applicant

IBRAHIM FIBRES LTD

ii.

Registered/Business
Office

1-A, Ahmed Block, New Garden Town Lahore,


Punjab

iii.

Plant Location

38 Km Faisalabad-Sheikhupura Road, Faisalabad

iv.

Type of Generation
Facility

Thermal Generation

2.

Plant Configuration (Existing)

i.

Plant size installed


Capacity (Gross ISO)

31.8 MW

iii.

Type of Technology

Reciprocating Engines

iv.

Unit Size (MW)/No. of


Units

5.3 MW/06 Units


Unit

Make

Model

Unit (1-4)
Unit (5-6)

NIIGATA
NIIGATA

16V32CLX
16V32CLX

v.

Unit make, Model and


Date of Manufacture

vi.

De-rated Capacity at
Mean Site Conditions
(MW)

26.5 MW

vii.

Auxiliary Consumption

1.MW

ix.
X.

Date of
Commissioning of the
Plant
Expected remaining
life of facility

Date of
Manufacture
1992
1996

Unit (1-4)

November 30, 1993

Unit (5-6)

December 31, 1996

14 years

Generation License
Ibrahim Fibres Limited
38-KM. Faisalabad- Sheikhupura Road
Faisalabad, Punjab

Pj:
.!liv t C 11 S JILL
0 quaL.LrIzTion Ic.
Plant size installed
Capacity (Gross ISO)

26.5 MW

iii.

Type of Technology

Reciprocating Engines

iv.

Unit Size (MW)/No. of


Units

5.3 MWx05 DG Sets

V.

Unit make, Model and


Date of Manufacture

I.

vi.

De-rated Capacity at
Mean Site Conditions
(MW)

vii.

Auxiliary Consumption

viii.

Date of
Commissioning of the
Plant

ix.

3.

Expected remaining
life of facility

Unit

Make

Model

Unit (7-11)

NIIGATA

16V32CLX

Date of
Manufacture
2012

21.2MW

0.8 MW

Unit (7-11)

"-)5

F,,--- bruari 901 3(Prr-,p,-,,,,,,ii)

ears

Fuel Detail

i.

Primary Fuel

Heavy Furnace Oil .(HFO)

ii .

Fuel
(imported/Indigenous)

Imported as well as Indigenous

iii.

Alternate Fuel

Diesel Oil (DO)

iv.

Fuel Supplier

PSO/Shell/Chevron/Attock

v.

Supply Arrangement

Through Oil Tankers

vi.

No. of Tanks

HFO

DO

Generation License
Ibrahim Fibres Limited
38-KM, Faisalabad- Sheikhupura Road
I-aisalabad, Punjab

Vii
vii.
"

Capacity of
Each Tank

viii.

Gross Storage

3.

HFO

DO

2500 M TON

375000 LTRS

HFO
7500 M TON

DO
375000 LTRS

Emission Values

i.

SOX

920 p.p.m

ii.

NOx

1095 p.p.m

iii.

CO2

6.5 %

iv.

Particulate

4.

Cooling System

Cooling Water
Source/Cycle

6.

Underground Water Obtained from tube well is


treated in the Reverse Osmosis plant for
supplying cooling water to the plant/closed Loop
Cycle.

Plant Cost (Existing)

i.

Equity (Rs. Million)

ii.

Debt (Rs.Million)

Hi.
iii.

Project Cost
(Rs. Million)

186.874
370.993
557.867

Generation License
Ibrahim Fibres Limited
38-KM, Faisalabad- Sheikhupura Road
Faisalabad, Punjab

6.

Piqn

p %J.,/ Fs en9i004

i.

Equity (Rs. Million)

ii.

Debt (Rs.Million)

iii.

Total Project Cost


(Rs. Million)

7.

700 000
1800.000
2500.000

Plant Characteristics

1.

Generation
Voltage(kV)

11 kV

ii.

Frequency

50 Hz

iii.

Power Factor

0.8

iv.

Automatic Generation
Control

Yes

v.

Ramping Rate

30min & can be fully loaded in 5 minutes

vi.

Time required to
Synchronize to Grid
and loading the
complex to full load

N/A

Generation License
Ibrahim Fibres Limited
38-KM. Faisalabad- Sheikhupuia Road
Faisalabad, Piaij,ib

Lincensee-Proforma for information regarding Distribution issues.


Network facts
Part-A
A.

B.

No. of Feeders

Length of each feeder


(KM)
XLPE feeders marked
in RED

Length of each feeder


(KM)
C.

Length of each Feeder


to each consumer

D.

In respect of all the


Feeders, describe the
(Streets,
property
farms, Agri land, etc.)
through, under or over
which they pass right
up to the customer's
premises, whether they
pass
cross-over or
near the DISCO lines.

Whether owned by IFL


Consumer or FESCO
(deal with each Feeder
Separately)

Er'.teen (18) Feeders.


Fl

F2

F3

F4

F5

F6

F7

F8

16

16

16

16

16

16

16

16

F9

F10

F11

F12

F13

F14

F15

F16

1.6

1.6

1.6

3.4

3.4

3.4

3.4

3.4

F17

F18

3.4

0.7

-Do-

ri ,

Fio

Feeders FJ, F1 & F11 are crossing over the


FESCO line at one location. Similarly Feeders F12
& F13 crosses FESCO lines at three different
locations.
.

Generation License
Ibrahim Fibres Limited
38-KM, Faisalabad- Sheikimpura Road
Faisalabad. Pun ab

I if owned by F 17- 5; CI1--)


please furnish
particulars of
contractual
arrangement.

N/A

Operation and
maintenance
responsibility for each
feeder.

The Captive Power Plant supplying power to its


sister concerns only. The Operation and
Maintenance is the responsibility of small Power
producer (SPP), IFL.

F.

Whether connection
with network of
FESCO exists
(whether active or
not)- if yes, provide
details of connection
arrangement (both
technical and
contractual)

N/A

G.

Any other network


information deemed
relevant for disclosure
to or consideration by
NEPRA.

N/A
as

Generation License
Ibrahim Fibres Limited
38-KM, Faisalabad- Sheikhupura Road
Faisalabad, Punjab

Licensee Proforma for information regarding Distribution issues,


Consumer Facts
Part-B

A.

No. of Consumers

Four (04) Consumers including Ibrahim


Fibres Limited (Polyester Plant-PP),Ibrahim
Fibres Limited ( Textile Plant-1), Ibrahim
Fibres Limited (Textile Plant-2), Ibrahim
Fibres Limited (Textile Plant-3).
Ibrahim Fibres
Limited
(Polyester Plant-PP), 381.6 KM
Kilometer,
FaisalabadSheikhupura Road.

B.

Ibrahim Fibres
Limited
(Textile
Plant-1),
403.4 KM
Kilometer,
Faisalabadconsumers Sheikhupura Road.
of
Location
(distance and/or premises)
Length of each Feeder
Ibrahim Fibres
Limited
(Textile
Plant-2),
403.4 KM
Kilometer,
FaisalabadSheikhupura Road.
Ibrahim Fibres
Limited
(Textile
Plant-3),
380.7 KM
Kilometer,
FaisalabadSheikhupura Road.

Generation License
Ibrahim Fibres Limited
38-KM, I-aisalabad- Sheikhupura Road
taisalabad, Punjab

C.

Contracted Capacity and Load


Factor for consumer

Ibrahim Fibres Limited


( Polyester Plant )

Ibrahim Fibres Limited


( Textile Plant-1 )
Ibrahim Fibres Limited
( Textile Plant-2 )
Ibrahim Fibres Limited
( Textile Plant-3 )

12 MW at 0.83
load
factor(Existing)
+
10 MW at 0.83
load factor(New
Extension)
6.0 MW at
0.92 load
factor
4.2 MW at
0.88 load
factor
3.5 MW at
0.94 load
factor

Specify Whether
i)

The consumer is an
Associate undertaking of
the IFL- If yes, specify
percentage ownership of
equity;

Ibrahim Fibres Limited (Polyester PlantPP), Ibrahim Fibres Limited (Textile Plant1), Ibrahim Fibres Limited (Textile Plant-2),
Ibrahim Fibres Limited (Textile Plant-3), are
the Associated Undertaking of IFL.

ii)

There are common


directorships:

Yes

iii)

Either can exercise


influence or control over
the other.

Yes

D.

Specify nature of contractual


Relationship Between
E.

F.

i)

each consumer and SPP

ii)

consumer and DISCO

Capacity originally sanctioned


by Provincial Government If

Firm Supply of Electricity on continuous


basis.
No
Phase-1

21.2 MW by Government of
Punjab

Generation License
Ibrahim Fibres Limited
3O-KN1, Faisalabad- Sheikhupura Road
Faisalabad, Punjab

subsequently enhanced,
evide n ce of permission foi
enhancement.

G.

Phase-2
!Thaz ., 2,

Any other network information


deemed relevant for disclosure
to or consideration by NEPRA.

10.6 MW by Government of
.
Punjab
26.5 MW (Applied NEPRA fo
permission)

Nil

SCHEDULE-II

The net capacity of the Licensee's Generation Facilities

Generation License
Ibrahim Fibres Limited
38-KM. Faisalabad- Sheikhupura Koad
laisalabad, Punjab

SCHEDULE-II
(EXISTING)

1.

Installed Capacity Gross ISO

31.8 MW

3.

De-rated Capacity Mean at Site


Conditions

26.5 MW

4.

Auxiliary Consumption

1.00 MW

Net Capacity of the Plant at Mean Site


Conditions

25.50 MW

(NEW EXTENTION)

1.

Installed Capacity Gross ISO

3.

De-rated Capacity Mean at Site


Conditions

4.

Auxiliary Consumption

Net Capacity of the Plant at Mean Site


Conditions

26.5 MW
21.2 MW
0.8 MW
20.4 MW

\II

PLANT LAYOUT

I (III Sli )1( \I I I \

0 0
0

1 1

) 1 |(
1111M, 1(m1 NS 1.11,1 I

:
0011,0 IIMIKSPII

177

IBRAHIM FIBRES LIMITED POWER GENERATIONI I I KV DISTRIBUTION NETWORK


11 11)1 I4

1;)

ouee
sof-, 00 OU LI LI

r. I -I I5

0 43e--ee--

o o 0 oo-fau.e-4pii n eta f;

000

0000

es

0 0

no oaidocp
i
7

27I

C5-1 H-F1
o

51
II I I

II'- 2

Fs
I.11111101 (

1:1,

if,. cs:
P.I' )

,,

1 '1'1"

II ,

134

\t-

rl

_1
11

F C:13

et7

-444---,

AHORE

1
AI'S A LA BA D

'

IP I

III I III-I I

I 111

TV 1

111
IC] I

"

I
0

_I

UF1

Ibrahim Fibres Limited


Plant Location Map
38-Kilometer Faisalabad-Sheikhupura Lahore Road

40-Km- Faisalabad-Sheikhupura Lahore road

v/i

Lahore
SHAHKOT
BO', STOP

SHAHKOT TOOLPLAZA

IBRAHIM FIBRES LTD


(TEXTILE PLANT-2)

FAISALABAD-SHEIKHOPURA ROAD

Faisalabad
BALOCHINI

POLICE
STATION
RAI OEIIINT

BUS STOP

IBRAHIM FIBRES LTD


(TEXTILE PLANT-I)

IBRAHIM FIBRES LTD


(POLYESTER PLANT-I)
(POLYESTER PLANT-2)

IBRAHIM FIBRES LTD


(POWER GENERATION-I)
(TEXTILE PLANT-3)

SOCIAL
SECURITY
'ANNEAL

61-LANK BUS
SITS

SINGLE LINE DIAGRAM GEN. & DIST.

TO

\ 11
1
....

FEEDE QI
I4

;EEC,To

P11.1.4

:2

X ele-ou
In ...AR III, 1,10,

COUli et

elmnteen X

wwwwomamma

X wwwww.....1 X
vcrILTV:.

X
11=7,r

7or. A.:.

_C

(11E
-1F
21
`,1

IlokM11 I OR/

V.11
WI

SCH121711111/(1111141,11,7,
I I xl

(56101

111,

A
14,
053,(13Sef

DS 1

loo

"
III

I I 2.
Proirction %chernc .okme for
Proircioon arhroor some for Il fertler.

11-1
\

-.!

1
/

CHAK NO 61 R B.
CHAK NO

60 R 8

rai
ll 1111111.111111111111

- ram im
aimanamaamiamaiiii - ammo - -mom Immulanimmaimsfill.
IITa aisiamosiamon maim - - orm , fillammooll morums- --Lr-, anamonsianaaan imam - - a an....iammomoun me anal
oneammaanasan amino a ansaamasmaaa ansaalanimma i
ligilimmassimumma
isseemir
mmormasmill
. /. out
me . monsommill
- anaammaanuman
ummummus H
. nail
MI10111
. ilmonammonsenamman
sparammea esimase - . mom - sanamenasasan no In-mai
nril." mans .- - met . - - , MINION
ligiiiainamina
. 110000101000 MEN IMMIMPI
. UNE I am
nammisma sivimmammuto
in
111111 - MONO , iri
m
pERIROPI
mai- emarimmilm oluilmnau
0_ MOIMMIllamanigra . ,.._._ . sin"
Nor
mil
..P.millumonitimmaimi
, mml, .EN
L' . a Nuannamamtummaiiiiimi

111111 IMMUMML 011.117111.1111111111111110110 Maiiiiiill '

NNE

j,

Jrnilmal

i liallirallirall
:..a see
mem aea asemaimmonee
.1
mommommummomm.
=MOO OM
El
IIII
11
'0 II
imm
OM
MOMOMMOMOMMOOM
MORON
pm
MOMM
.
...
If
IMILIMMI OMIIIII IIMIIIMIMMill MIPP
IA iirmv
I I NM= I
a asammeassmaa
E
ell
- IOW - OM 100
11011111M0010000
i
i
Mir laillinKal
ilMOIMOMMIBOMORM
OMMIOOOMOM 111. PIP. 10111100101101M OOMMOOMMIM pr
,,
nismenesse
mommaii
-111MMOONIMMO 00101010110,"-! 1 - - 1
100101101101010 - - - - PPWATER DRAIN

FEEDER #

FEEDER # 2
FEEDER # 2 & 3
FEEDER # 8 & 1
FEEDER # 5
FEEDER
FEEDER # 10
FEEDER # 9 & 10