FORM NO : KJM/IP/CONST/002 Rev00

,
INSPECTION CHECKLIST FOR REINFORCED CEMENT CONCRETE WORKS

Date :

- 2014

Building / Area :
Location : ( For Location / Grid please refer Location plan attached herewith )
Structure Member/ ID / No. : Footing / Raft

Pedestal

RCC Wall Lift-

Other

Reference Latest revision of GFC Drawing :

Inspection Items

Sr.
No.

Plinth Beam

Date & Time of


Checking

Checking Status

B0__

Remarks

1.0 CONCRETE PRE POUR CHECK


Check for Base (PCC) and Survey
1.1 Check for Cleaning of PCC Base

Ok

1.2 Check for Centerline marking

Ok

1.3 Check for PCC Top Level

Ok

Rectification
Required
Rectification
Required
Rectification
Required

CHECK FOR SHUTTERING WORKS


1.4 Check for Shuttering material Suitability

Ok

1.5 Check for Shuttering Size as per ref. drawing

Ok

1.6 Check for Shuttering Line, Level & Plumb

Ok

1.7 Check for Shuttering Supports system

Ok

1.8 Check for Provision of Pockets and its sizes

Ok

1.9 Check for Formwork Tightness

Ok

Rectification
Required
Rectification
Required
Rectification
Required
Rectification
Required
Rectification
Required

Rectification
Required
Rectification
Required
Rectification
Required
Rectification
Required

1.10 Check for Concrete Top Level

Ok

1.11 Check for Shuttering Release oil Application

Ok

1.12 Check for Concrete Cover as specified in the ref. drawing

Ok

1.13 Check for marking of Concrete Top Level

Ok

Rectification
Required

Ok

Rectification
Required

1.15 Check for Bar Dia, Spacing & , Bar Shape & Spacing

Ok

Rectification
Required

1.16 Check for Provision of Chairs / Supports

Ok

Rectification
Required

Ok

Rectification
Required

Ok

Rectification
Required

Ok

Rectification
Required

CHECK FOR REINFORCEMENT WORKS


1.14 Check for Cleanliness of Rebar (Free from Rust, Oil,
Grease, Oil & Dirt)

CHECK FOR INSERTS IF ANY


1.17 Check for Size, Spacing of Inserts / Structural Steel
CHECK FOR RESOURCES (MATERIAL, PLANT & MACHINERY)
1.18 Check for Concrete Qty. availability from RMC
Check for availability of Concrete Pumps, Chutes, Vibrators
CHECK FOR SAFETY
1.19 Check for Working Area / Area Lighting / Platform
availability
P.T.O. For During Concrete Pour Check & Rectification Compliance Status

FORM NO : KJM/IP/CONST/002 Rev00

Inspection Items

Sr.
No.

Date & Time of


Checking

Checking Status

Remarks

2.0 DURING CONCRETE POUR CHECK


2.1 Check for Concrete Grade (M30)

Ok

2.2 Check for Concrete Slump @ Site

Ok

2.3 Check for Concrete Sampling (Concrete Cube Casting)

Ok

Rectification
Required
Rectification
Required
Rectification
Required

Legend :
CECL : Coromandel Engineering Construction Limited
VRC : VR Earthmovers & Constructions (Pvt. Ltd.)

RECTIFICATION COMPLIANCE STATUS


Sr.
No.

Inspection Items

Checking Record

Checking Status

Signature

Concrete Quantity_____________Cum