Unit
Qty
Reduce level
M3
50
M3
44
M3
M3
Rate Only
M2
130
--------------------------------------E
150mm (Consolidated thickness) bed of hardcore as
described, spread, leveled and well consolidated to
received blinding (measured separately)
Lean concrete Grade 15 as described:F
M2
33
M2
12
M2
79
M2
64
In pad footing
M3
In column stump
M3
Ground beam
M3
M2
79
M2
64
B2/2/1
Rate
(RM)
Description
Unit
Qty
Column Stump
6mm Diameter as links
Kg
31
Kg
20
Ground beam
6mm Diameter as stirrups
Kg
104
Pad Footing
12mm Diameter
Kg
625
Column Stump
12mm Diameter
Kg
115
16mm Diameter
Kg
36
20mm Diameter
Kg
75
Ground Beam
12mm Diameter
Kg
296
M2
277
M2
11
M2
24
M2
55
58
B2/2/2
Rate
(RM)
To Collection
Description
Unit
Qty
Rate
(RM)
To Collection
Approved anti-termite chemical soil treatment to substructure works with approved chemicals all in
accordance with the manufacturer's instruction (Works
to be executed by a licensed pest control company and
the Contractor shall submit certificates/Warranty to
provide a guarantee for a period of five (5) years
effective from date of Anti Termite Application including
periodic inspection for every six (6) month during
warranty period (Approximately 155 m2)
Item
62
M2
143
B2/2/3
Description
Unit
Qty
Rate
(RM)
To Collection
COLLECTION
1
...
...
...
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
20
B2/2/4
Description
Unit
Qty
Rate
(RM)
22
23
TOTAL ELEMENT NO. 2 - WORK BELOW LOWEST FLOOR FINISH
CARRIED TO BILL B2 - KUARTERS KELAS E SUMMARY (PAGE B2/SUM/1)
B2/2/5
Amount
(RM)
B2/2/6
Amount
(RM)
B2/2/7
Amount
(RM)
B2/2/8
Amount
(RM)
B2/2/9
Amount
(RM)
B2/2/10