EMERGENCY/CONTINGENCY PLANNING
1.0
PURPOSE:
GENERAL:
A. The HydroGeoLogic, Inc.s office and each field office site will have a plan of
actions to be taken in the event of an emergency threatening office personnel,
visitors, and/or its property. See Attachment A which is a blank form
accompanied by an example of a filled out form.
B. Coping with an emergency requires planning, experience and good judgment.
The Emergency/Contingency Plan is to include:
1. Procedures to report an emergency and to sound the alarm to the employees
and visitors.
2. A designated rally point.
3. Procedures to account for all employees in the event of an evacuation.
4. A building diagram showing paths of emergency exit and the location of
emergency equipment.
5. Directions and map to the nearest emergency medical facility
6. Emergency telephone numbers with names and titles of essential personnel.
7. Contingency plan for expected emergencies.
8. A list of any critical equipment which must be shut down/off during an
emergency.
9. The location of the critical equipment noted in the plan and the personnel
responsible for shutting down/off the equipment.
This Emergency/Contingency Plan will be filed with the Fire Prevention Plan,
the Hazard Communication Program and the Respiratory Protection Program.
The location of this plan shall be noted on the Health and Safety Emergency
Action Plan for employees to review.
/var/www/apps/conversion/tmp/scratch_4/259934052.doc
Policy 1.3
Revision 0
6/15/00
Page 2 of 10
PROCEDURE:
Responsibility
Action
Office/Area Managers
1.
1.
2,
1.
2.
1.
Audit
compliance
with
Emergency/Contingency
Action
development,
implementation
administration.
Employees
Attachments:
A: Emergency/Contingency Action Plan Form
B. Example of completed Emergency/Contingency Action Plan Form
/var/www/apps/conversion/tmp/scratch_4/259934052.doc
the
Plan
and
Policy 1.3
Revision 0
6/15/00
Page 3 of 10
/var/www/apps/conversion/tmp/scratch_4/259934052.doc
Policy 1.3
Revision 0
6/15/00
Page 4 of 10
HydroGeoLogic, Inc.
EMERGENCY/CONTINGENCY ACTION PLAN
I.
INTRODUCTION:
The purpose of this Plan is to provide information about the steps to be taken in
the case of an emergency and who is responsible to take these steps
The administration of this Emergency/Contingency Action Plan for this location is
the responsibility of:
Area/Office Manager
The implementation of this Emergency/Contingency Action Plan for this facility
has been delegated to:
Area/Office Safety Officer
II.
GENERAL
A.
B.
/var/www/apps/conversion/tmp/scratch_4/259934052.doc
Policy 1.3
Revision 0
6/15/00
Page 5 of 10
C.
D.
The building diagram showing paths of emergency exits and the locations
of emergency equipment is located:
E.
F.
G.
Title
Assigned Task
Telephone #
/var/www/apps/conversion/tmp/scratch_4/259934052.doc
Policy 1.3
Revision 0
6/15/00
Page 6 of 10
H.
Located
/var/www/apps/conversion/tmp/scratch_4/259934052.doc
Responsible Personnel
Policy 1.3
Revision 0
6/15/00
Page 7 of 10
/var/www/apps/conversion/tmp/scratch_4/259934052.doc
Policy 1.3
Revision 0
6/15/00
Page 8 of 10
HydroGeoLogic, Inc.
EMERGENCY/CONTINGENCY ACTION PLAN
I.
INTRODUCTION:
The purpose of this Plan is to provide information about the steps to be taken in
the case of an emergency and who is responsible to take these steps
The administration of this Emergency/Contingency Action Plan for this location is
the responsibility of:
Area/Office Manager
The implementation of this Emergency/Contingency Action Plan for this facility
has been delegated to:
Area/Office Safety Officer
II.
GENERAL
A.
B.
/var/www/apps/conversion/tmp/scratch_4/259934052.doc
Policy 1.3
Revision 0
6/15/00
Page 9 of 10
C.
D.
The building diagram showing paths of emergency exits and the locations
of emergency equipment is located:
E.
F.
G.
Title
Assigned Task
Telephone #
/var/www/apps/conversion/tmp/scratch_4/259934052.doc
Policy 1.3
Revision 0
6/15/00
Page 10 of 10
H.
Located
/var/www/apps/conversion/tmp/scratch_4/259934052.doc
Responsible Personnel