Professional Documents
Culture Documents
Construction Method
(Latex Modified Concrete)
()IMC
Hybrid Innovation Maintenance Construction
PRESENTER :
Sang-Reung Choi
Representative Director
Civil Engineering PhD
Existing bridge-deck
surfacing
Early distortion and crack
Uncertain Waterproofing
Paving Boundary
Low adhesive strength
Early damage on
waterproofing stratum
RC Slab
Corrosion of rebar and
deterioration of concrete
Decreased durability of
bridge
Repeated maintenance
and repair
Unreasonable
maintenance control
Remove
deterioration of
concrete
Rebar crops out
Deterioration of cement
Decreased section force
Remove deterioration of
cement
Decreased bearing
capacity
Yield
Strength
(kN)
Ultimate
Strength
(kN)
Maximum
Deflection
(mm)
(kN)
Cracking
Moment
(Nm)
Ultimate
Moment
(Nm)
Control
(H=250mm)
58
70
35
30
7.83
56.7
VES-LMC
(8cm repair)
60
80
33
50
13.4
72.63
LMC Mechanism
Aggregate
Cement
Latex
Age (Day)
Age (Day)
Age (Day)
Age (Day)
Asphalt
Pavement
Figure
Overlay
8cm
5cm
Thickness
Lifespan
3~6 years
36,857 ~ 54,121 Won/m2
Design
Unit Cost
46,000 Won/m2
(42 /m2 )
(34 ~ 49 /m2 )
( Include construction cost of
waterproofing stratum )
Life Cycle
Cost
66,000 Won/m2
(60 /m2 )
Pavement
Figure
Overlay
5cm
5cm
20~25 years
20~25 years
110,000 Won/m2
90,000 Won/m2
(100 /m2 )
(82 /m2 )
153,000 Won/m2
126,000 Won/m2
(139 /m2 )
(115 /m2 )
Thickness
Lifespan
Design Unit
Cost
Life Cycle
Cost
540m,2005