LMC Overlay

Construction Method
(Latex Modified Concrete)

()IMC
Hybrid Innovation Maintenance Construction

PRESENTER :

Sang-Reung Choi
Representative Director
Civil Engineering PhD

LMC Overlay Construction Method

(Hybrid Innovation Maintenance Construction)

Problems of Existing Bridge-Deck Surfacing

Air + Rain + Chloride


Ion

Existing bridge-deck
surfacing
Early distortion and crack
Uncertain Waterproofing

Paving Boundary
Low adhesive strength
Early damage on
waterproofing stratum

1. Asphalt overlay method


Structure is damaged due to the rain
and chloride ion

2. Ultra rapid harding cement


method
surface abrasion and decreased
durability

RC Slab
Corrosion of rebar and
deterioration of concrete
Decreased durability of
bridge
Repeated maintenance
and repair
Unreasonable
maintenance control

Develop and apply LMC


on existing and new
bridges

LMC Overlay Construction Method

(Hybrid Innovation Maintenance Construction)

Damaged Bridge-Deck Surfacing

Just after breakdown

Leaving the breakdown

LMC Overlay Construction Method

(Hybrid Innovation Maintenance Construction)

Existing Bridge-Deck Repair Scenes


High Early Strength LMC produced by Remicon 5 ( L=200m,
: 2011 )

Remove
deterioration of
concrete
Rebar crops out

Produce and transport LMC from Remicon Factory

Deck Finisher Construction

LMC Overlay Construction Method

(Hybrid Innovation Maintenance Construction)

Analysis of Structural Behavior After Repair


Availability of structural behavior forecast after repair

Deterioration of cement
Decreased section force

Remove deterioration of
cement

Recovery and increase of


section force

Decreased bearing
capacity

Recovery and increase of


bearing capacity

Reinforcement Effect of LMC(Concrete Institute Paper, Vol.20.No.4,08,8)


Specimens

Yield
Strength
(kN)

Ultimate
Strength
(kN)

Maximum
Deflection
(mm)

(kN)

Cracking
Moment
(Nm)

Ultimate
Moment
(Nm)

Control
(H=250mm)

58

70

35

30

7.83

56.7

VES-LMC
(8cm repair)

60

80

33

50

13.4

72.63

LMC Overlay Construction Method

(Hybrid Innovation Maintenance Construction)

LMC Mechanism

Latex particles immediately after compound

The passive film formed on the


inside of LMC

Aggregate

Cement

Latex

Latex particles after hardening of concrete

LMC Overlay Construction Method

(Hybrid Innovation Maintenance Construction)

Main Physical Properties of LMC

Compressive Strength (Mpa)

Age (Day)

Bending Strength (Mpa)

Age (Day)

LMC Overlay Construction Method

(Hybrid Innovation Maintenance Construction)

Main Physical Properties of LMC

Adhesion Strength (Mpa)

Resistance Against Chloride Ion


(Coulomb)

Age (Day)

Age (Day)

LMC Overlay Construction Method

(Hybrid Innovation Maintenance Construction)

Comparison of Pavement Methods


Regular LMC for Remicon
Method

Asphalt

( Opens to traffic after 28 days )

Pavement
Figure

Overlay

8cm
5cm

Thickness
Lifespan

( Outer layer 4cm + 4cm )


20~25 years

3~6 years
36,857 ~ 54,121 Won/m2

Design
Unit Cost

46,000 Won/m2
(42 /m2 )

(34 ~ 49 /m2 )
( Include construction cost of
waterproofing stratum )

Life Cycle

Cost

66,000 Won/m2

130,808 ~ 181,964 Won/m2

(60 /m2 )

(119 ~ 165 /m2 )

LMC Overlay Construction Method

(Hybrid Innovation Maintenance Construction)

Comparison of Pavement Methods


Rapid Set LMC
Method
( Opens to traffic after 4 hours )

High Early Strength LMC for Remicon


( Opens to traffic after 3 days )

Pavement
Figure
Overlay
5cm

5cm

20~25 years

20~25 years

110,000 Won/m2

90,000 Won/m2

(100 /m2 )

(82 /m2 )

153,000 Won/m2

126,000 Won/m2

(139 /m2 )

(115 /m2 )

Thickness
Lifespan

Design Unit
Cost

Life Cycle
Cost

Present Status of LMC Construction in South Korea

(Hybrid Innovation Maintenance Construction)

Examples of LMC Construction

Geoga bridge (L = 3.5km, 2010)

Geoga bridge (L = 3.5km, 2010)

Present Status of LMC Construction in South Korea

(Hybrid Innovation Maintenance Construction)

Examples of LMC Construction

Highway L = 630m, 2005

540m,2005

Present Status of Authentication

(Hybrid Innovation Maintenance Construction)

Related Certificate of Patent

Polymer modified concrete and its pavement method

Chloride-shielding cement mixture for pavement and repair

(Hybrid Innovation Maintenance Construction)

- Thank you -