Project

SCHEDULE OF TESTS AND STATUS REPORT

S. No.

Test Name

Test Procedure Code

No. of Samples
Date
to be tested
Ordered

Status
Completed
(%)

Remaining
(%)

Remarks

Borrow Area Soil

i)

Soil Classification

IS 1498

26

100

100

Completed

ii)

Sieve Analysis

IS 2720 (Part-4)

26

100

100

Completed

iii)

Atterbergs Limits

IS 2720 (Part-5)

26

100

100

Completed

iv)

Compaction Test (Modified Proctor Test)

IS 2720 (Part-8)

26

100

100

Completed

v)

CBR at 3 / Single energy level

IS 2720 (Part-16)

26

100

100

Completed

vi)

Free Swell Index (if LL>50%)

IS 2720 (Part-40)

26

100

100

LL of all samples is <50%

vii)

Shear Parameters (Direct Shear Test) *

IS 2720 (Part-13)

km 140 (NH-6),km 299 (NH-3)

viii)

Permeability Test *

IS 2720 (Part-17)

km 140 (NH-6),km 299 (NH-3)

Existing Sub-grade Soil

i)

Soil Classification

IS 1498

82

100

100

Completed

ii)

Sieve Analysis

IS 2720 (Part-4)

82

100

100

Completed

iii)

Atterbergs Limits

IS 2720 (Part-5)

82

100

100

Completed

iv)

Compaction Test (Modified proctor test)

IS 2720 (Part-8)

82

100

100

Completed

v)

CBR at 3 energy levels

IS 2720 (Part-16)

82

100

100

Completed

Widening area Soil

i)

Soil Classification

IS 1498

ii)

Sieve Analysis

IS 2720 (Part-4)

iii)

Atterbergs Limits

IS 2720 (Part-5)

iv)

Free Swell Index (if LL>50%)

IS 2720 (Part-40)

Existing Sub-grade Soil for Other areas (Service Road, Bypass, etc.)

i)

Soil Classification

IS 1498

ii)

Sieve Analysis

IS 2720 (Part-4)

iii)

Atterbergs Limits

IS 2720 (Part-5)

iv)

Compaction Test (Modified proctor test)

IS 2720 (Part-8)

v)

CBR at 3 energy levels

IS 2720 (Part-16)

Pond Ash

i)

Sieve Analysis

IS 2720 (Part-4)

100

100

Completed

ii)

Atterbergs Limits

IS 2720 (Part-5)

100

100

Completed

iii)

Compaction Test (Modified proctor test)

IS 2720 (Part-8)

100

100

Completed

iv)

CBR at 3 / single energy level

IS 2720 (Part-16)

100

100

single energy level is finished, 3


energy level has to be done

v)

Direct Shear Test

IS 2720 (Part-13)

Completed

vi)

Permeability Test

IS 2720 (Part-17)

Completed

vii)

Chemical Characteristics of fly ash

IRC:SP:58-2001 Section 3.3.18

Completed

Coarse Aggregates

i)

Sieve Analysis

IS 2386 (Part-1)

100

100

Completed

ii)

Flakiness and Elongation Index

IS 2386 (Part-1)

100

100

Completed

iii)

Specific Gravity and Water Absorption

IS 2386 (Part-3)

100

100

Completed

iv)

Aggregate Impact Value (AIV)

IS 2386 (Part-4)

100

100

Completed

v)

Soundness Test

IS 2386 (Part-5)

water absorption >2% (km 287.100


NH-33) Yet to be completed

vi)

Alkali Aggregates Reactivity Test

IS 2386 (Part-7)

Yet to be completed

vii)

Stripping and Coating test

IS 6241

Yet to be completed

viii)

Water sensitivity test

AASHTO-T283

Yet to be completed

ix)

Los Angeles Abrasion Value (LAV)

IS 2386 (Part-4)

Yet to be completed

x)

Polished Stone Value (PSV)

AASHTO-T283

Yet to be completed

Fine Aggregates (Sand)


Completed

i)

Sieve Analysis

IS 2386 (Part-1)

100

100

ii)

Specific Gravity and Water Absorption

IS 2386 (Part-3)

100

100

Completed

iii)

Sand Equivalent Test

ASTM D2419-95

Yet to be completed

iv)

Fineness Modulus

v)

Designation of zone

Water

i)

pH Value, Chlorides, Sulphates


(SO4), Organic, Inorganic impurities and
suspended matter

100

100

Completed

MOSRTH

100

100

Completed

MOSRT&H specification
Clause 1010

14

100

100

Completed

Existing Pavement Materials


9A GSB Sample

i)

Gradation Test

ii)

Ten percent Fines Value (TFV)

iii)

Atterberg Limits

IS 2386 (Part-1)

14

100

100

Completed

BS 812 111: 1990

14

Yet to be completed

IS 2720 (Part-5)

14

100

100

Completed

9B WMM Sample
i)

Gradation Test

IS 2386 (Part-1)

100

100

Completed

ii)

Atterberg Limits

IS 2720 (Part-5)

100

100

Completed

9C Bituminous Concrete
i)

Residual Bitumen Content

ASTM D2172-05

13

Yet to be completed

ii)

Gradation Test

IS 2386 (Part-1)

13

Yet to be completed

* On selected samples.