You are on page 1of 1

DRAWING LIST

DWG. NO.

TITLE

WH/KBD/TW/GEN/000
WH/KBD/TW/EXC/PLN/101
PROOF TEST LOADING SCHEDULE
Load

WH/KBD/TW/EXC/SEC/201

0.05 DTL max.(AL)

WH/KBD/TW/EXC/SEC/202

0.25 DTL

WH/KBD/TW/EXC/SEC/203

0.50 DTL

For BCA use only

0.75 DTL

WH/KBD/SPR/301

1.00 DTL

WH/KBD/SPR/302

1.25 DTL

WH/KBD/SPR/303

1.50 DTL (Creep Test)


0 DTL (Unloading)

WH/KBD/SPR/304
WH/KBD/TW/IMM/PLN/401
WH/KBD/TW/IMM/FLC/402

FOR
FOR INFORMATION
CONSTRUCTION

Verification Test
5 Nos.

Proof Test
3% OF TOTAL NUMBERS OF WORKING
or PRODUCTION SOIL NAILS

Declaration By Qualified Person for Structural Works

Declaration By Qualified Person for Geotechnical Aspects


of Geotechnical Building Works

1. In accordance with Regulation 9 of the Building Control


Lim Ken Chai
Regulations, I,____________________,
the Qualified Person
for structural works appointed under section 8(1)(a)or
11(1)(d)(i) of the Building Control Act, hereby submit the
detailed structural plans and design calculations prepared by
me and certify that, they have been prepared in accordance
with the provisions of the Building Control Regulations, the
Building Control Act and any other written law pertaining to
buildings and construction for the time being in force.

1. In accordance with Regulation 10A of the Building Control


Dr Lim Ken Chai
Regulations, I, _____________________,
the Qualified
Person for Geotechnical aspects of the underground building
appointed under section 8(1)(d)(i) or 11(1)(d)(iii) of the
Building Control Act, hereby submit the underground building
works plans and design calculations prepared by me and
certify that, to the best of my knowledge and belief hey have
been prepared in accordance with the provisions of the
Building Control Regulations, the Building Control Act and
any other written law pertaining to buildings and construction
for the time being in force.

2. I further certify that these detailed structural plans and design


calculations are in reference to project reference No:
________________________
3. Total no. of structural plans submitted: _______
Total no. of pages of design calculations in this book: ______

2. I further certify that these geotechnical building works plans


and design calculations are in reference to Project Reference
No.____________________________.
3. Total no. of geotechnical building works plans submitted :
_________.
Total pages of design calculations in this book : __________.

KEPPEL BAY PTE LTD

civil structural geotechnical mechanical electrical

217 UPPER BUKIT TIMAH ROAD


WOH HUP BUILDING SINGAPORE 588185
TELEPHONE : 6385 8585
FAX : 6272 3322

VERIFICATION TEST LOADING SCHEDULE


Load
0.05 DTL max.(AL)

Hold Time

0.25 DTL

1 minute

0.50 DTL

10 minutes

0.75 DTL

10 minutes

1.00 DTL

10 minutes

1.25 DTL

10 minutes

1.50 DTL (Creep Test)

60 minutes

1.75 DTL

10 minutes

2.00 DTL (Max Test Load)

10 minutes

0 DTL (Unloading)

10 minutes

Declaration By Accredited Checker


Allan Teo Kok Jin
1. I,_________________________
(ACCREDITED CHECKER)
hereby certify that I have carried out an evaluation, analysis
and review of the detailed structural plans and design
calculations represented herein and am satisfied that there
are no inadequacies in the key structural elements.
2. I further certify that these detailed structural plans and design
calculations are in reference to the Project Reference No.
____________________________
3. Total number of structural plans checked: _______
4. I hereby declare that I have no professional or financial
interest in the building works as shown in the plans as defined
in section 18 of the Building Control Act (Cap 29)

Accredited Checker's Endorsement

PROJECT TITLE:

Lim Peng Hong

1. I,______________________ being a registered specialist


accredited checker, hereby certify that I have in accordance
with the Building Control (Accredited Checkers and Checking
Organizations) Regulations carried out an evaluation, analysis
and review of the plans do not show any inadequacy in the
geotechnical aspects relating to underground building works if
carried out in accordance with those plans.
2. I append my Evaluation Report (comprising _____ pages) as
well as the analyses and calculations.
I have performed in
carrying out the evaluation, analyses and review geotechnical
reports and design and review geotechnical reports and design
calculations are in reference to Project Ref. No.
_____________________________.
3. I hereby declare that I have no professional or financial
interest in the building works as shown in the plans as defined
in section 18 of the Building Control Act (Cap 29)

TRITECH Consultants Pte Ltd


2 Kaki Bukit Place #02-00 TriTech Building S'416180
Tel: 67428096 Fax: 68482408 email: general@tritech.com.sg

GENERAL NOTES

Allan Teo Kok Jin

Lim Peng Hong

This drawing is COPYRIGHT

Tritech Consultants 2013

You might also like