The Indian solar sector has the potential to generate up to 1,000,000 jobs (excluding manufacturing) if India achieves its targeted
0 that take into
100 GW
0 of grid-connected solar power capacity by 2022. NRDC and CEEWs analysis presents a range of scenarios
Permanent
One-time
consideration whether this 100 GW goal will be supported through more emphasis on larger solar parks and grid-connected
largejobs
jobs
Business
Designor smaller,
Construction
Operation
scale 5-10
MW projects
more labor-intensive
rooftop projects, with varying short-term and long-term job projections
Development
and
and
and
depending
on the types
installed.
The
three scenarios show that not only does the targeted amount of solar power
Phase
Pre-of projects
Commissioning
Maintenance
Construction
matter when developing
policies to support clean energy growth, but also the type of solar project. The Indian government
has recently focused on the creation of ultra mega solar parks, concentrated zones of solar project development that ease
permitting and avoid some transmission losses, but could create fewer jobs than other project types. If energy access and 24/7
HOHFWULFDWLRQDUHWZRRIWKHXOWLPDWHDLPVRIWKLVDPELWLRXV*:VRODUJRDOWKHQWKHJRYHUQPHQWVKRXOGFRQVLGHUWRZKDW
degree labor-intensive rooftop solar projects are also prioritized.
JOB CREATION SCENARIOS TO ACHIEVE 100 GW OF SOLAR ENERGY IN INDIA BY 2022
JOBS
800,000
789,152
526,102
526,102
400,000
326,819
217,879
140,400
Rooftop
104,191
Large-Scale
156,287
140,400
210,600
217,879
104,191
45,654 52,191
Solar Parks
SCENARIO 1
SCENARIO 1, 40 GW ROOFTOP, 40 GW
LARGE-SCALE PROJECTS, 20 GW SOLAR
PARKS, reflects the job creation potential
based on MNREs recently proposed mix of
project types to achieve the 100 GW goal.
If this recent policy shift towards creating
vast solar parks is realized, with a balanced
approach that also encompasses a significant
amount of rooftop solar, this scenario could
create a potential 789,000 short-term FTE and
296,000 long-term FTE jobs, totaling more than
1,080,000 FTE jobs by 2022.
Rooftop
Large-Scale
SCENARIO 2
SCENARIO 2, 40 GW ROOFTOP, 60 GW
LARGE-SCALE PROJECTS, shows the
short and long-term job creation
potential if the governments policy
approach focused primarily on 5-10 MW
grid-connected large-scale projects
rather than solar parks. This scenario
create a potential 850,000 short-term
FTE and 296,000 long-term FTE jobs,
totaling more than 1,140,000 FTE jobs
by 2022.
Rooftop
Large-Scale
SCENARIO 3
SCENARIO 3, 60 GW ROOFTOP, 40 GW
LARGE-SCALE PROJECTS, shows the
job creation potential if rooftop solar is
prioritized and makes up the majority of
solar installations by 2022. Of the three
scenarios presented, this scenario reflects
the most jobs potentially created due to
its focus on labor-intensive rooftop solar.
This scenario could create a potential
1,000,000 short-term FTE and 310,000
long-term FTE jobs, totaling more than
1,310,000 FTE jobs by 2022.
Bhaskar Deol
PAGE 3
80,000
80,00080,000
PERCENTAGE BREAKDOWN
OF JOBS BY TYPE
20,000
20,00020,000
0
3,9953,995
511 511
90,000
90,00090,000
59,099
59,099 59,099
24,70124,701
60,000
60,00060,000
24,701
28,703
28,703 28,703
16,65216,652
16,652
6,6096,609
3,995
511
6,609
15,93415,934
120,000
120,000120,000
SKILLED
SKILLED
SKILLED
16% 16% 16%
UNSKILLED
UNSKILLED
UNSKILLED
25%25% 25%
60,000
60,00060,000
40,000
40,00040,000
150,000
150,000150,000
Q Unskilled
QFTE
Unskilled
Q Unskilled
FTE FTE
20,681
Q Semi-skilled
Q Semi-skilled
FTE FTE FTE
Q Semi-skilled
Q Skilled
FTE
Q Skilled
Q Skilled
FTE FTE
15,934
6,6246,624
SEMI-SKILLED
SEMI-SKILLED
SEMI-SKILLED
59%59% 59%
30,000
30,00030,000
6,624
Business
Business
Design
Construction
Construction
Operation
Operation
Business
Design Design
Construction
Operation
Development
Development
and and and and and and and and and
Development
Phase
Pre- Pre- Commissioning
Pre-Commissioning
Commissioning
Maintenance
Maintenance
Phase Phase
Maintenance
Construction
Construction
Construction
0
Permanent
Permanent
One-time
One-time
One-time
Permanent
jobs jobs jobs
jobs jobs jobs
100000
100000100000
150000
150000150000
80000
80000 80000
120000
120000120000
60000
60000 60000
90000
90000 90000
40000
40000 40000
60000
60000 60000
20000
20000 20000
30000
30000 30000
PAGE 4
GW target is only for grid-connected solar energy, but offgrid solar also presents a tremendous power resource and
jobs opportunity for villages across the country that cannot
feasibly be reached by the grid and existing infrastructure.
Unlike international markets, Indian companies do not
regularly report job numbers, making it difficult to accurately
measure job creation. However, the local job opportunities
created by renewable energy projects offer a powerful
economic rationale for the government and public to support
more solar and wind power. In order to truly realize the
potential for employment opportunities from solar and wind
energy, Indian industry should strive for greater transparency
regarding the impact of clean energy projects on job creation.
As an easy solution, Indian companies can voluntarily
provide their projects job creation numbers in press releases
and project announcements. The government agencies and
local companies could also collaborate on skills development
in order to ensure that progress made toward energy and
ecological security also helps India address its need to
generate jobs for its rapidly growing workforce.
First Solar suggests that the project will create $192 million
in pay for approximately 400 construction positions over the
three-year build in California.1
PAGE 5
11%
Rajasthan
(2,785 MW)
Maharashtra
(4,096 MW)
2.
13%
3.
Tamil Nadu
(7,270 MW)
16%
19%
Maharashtra
(4,096 MW)
3$*(
1.
19%
35%
Gujarat
(3,454 MW)
OVERALL FINDINGS
KEY RECOMMENDATIONS
1.
2.
3.
Bhaskar Deol
Wind turbines at
Gamesa-Renew
Powers 85 MW
wind project in Jath,
Maharashtra.
Kiran Energys 20 MW
Solar Plant in Jodhpur,
Rajasthan.
Bhaskar Deol
Solar PV panels
installed on Hero
MotoCorps factory
roof in Haryana.
PAGE 7
INTERNATIONAL: INDIA
AUGUST 2014
REPORT
PREPARED BY:
Council on Energy, Environment and Water
Natural Resources Defense Council
Bhaskar Deol
INTERNATIONAL: INDIA
AUGUST 2014
REPORT
INTERNATIONAL: INDIA
SEPTEMBER 2014
ISSUE BRIEF
SURGING AHEAD:
SCALING INDIAS CLEAN ENERGY MARKET
THROUGH JOBS AND FINANCING
Increasing energy access, clean energy development, and economic livelihoods are national priorities for India Prime
Minister Narendra Modis new government. As India faces rising fuel prices, threats to energy security, and the
impacts of climate change, renewable energy offers a critical solution, which also supports the new governments
agenda. Indias solar and wind programs have catalyzed rapid growth. In just four years, Indias solar market has
grown more than one hundred fold. India is also the worlds fifth largest wind energy producer.
Bhaskar Deol
Natural Resources
Defense Council
40 West 20th Street
New York, NY 10011
212 727-2700
Fax 212 727-1773
www.nrdc.org
Council on Energy,
Environment and Water
Thapar House
124 Janpath
New Delhi 110001
+91 11 40733300
Fax: +91 11 40733399
www.ceew.in