You are on page 1of 5

Structural Survey

Supplier Pre-Survey Questionnaire

Introduction
Dear Sir/Madam, we plan to visit your factory, in the near future, to study the structural condition of the building(s)
and inspect all areas of the building(s).
The visit will be carried out by two Engineers from Arup supported by others, to be advised.
We would appreciate if you could please answer the following questions in this pdf form below and return to us
within 10 working days.
If there are a number of buildings in the factory compound, please copy this form and fill out Sections 2 & 3
for EACH building. Please number or name each building.

Questions

Section 1: Factory Address, Ownership and Number of Buildings


Your Factory Name:
Full Address of Factory:

Factory Managers Name:


Telephone No.:
Are you the Owner of Building
or a Tenant?

Building Owner Name:


Telephone No.:

Fine Tex Knitwears Ltd.


North Masdair, Gabtoli, Fatullah, Narayangonj.

Shaikh Abdul Mannan


1,727,750,328

E-mail:

Tenant

Alhaz Abdul Matin Sikdar

1,713,034,922

E-mail:

mannan.finetex@gmail.com

Section 1 (Continued)
Number of Buildings in the
Factory Compound?

Building 1
Name/Use of Building:
Plan Area of Typical Floor
Plate (sq metres)

Fine Tex Knitwears Ltd.

Number of floors:

2527

Building 2
Name/Use of Building:

Number of floors:

Plan Area of Typical Floor


Plate (sq metres)

Building 3
Name/Use of Building:

Number of floors:

Plan Area of Typical Floor


Plate (sq metres)

Building 4
Name/Use of Building:

Number of floors:

Plan Area of Typical Floor


Plate (sq metres)

Building 5
Name/Use of Building:

Number of floors:

Plan Area of Typical Floor


Plate (sq metres)

Building 6
Name/Use of Building:
Plan Area of Typical Floor
Plate (sq metres)

Number of floors:

Building 7
Name/Use of Building:

Number of floors:

Plan Area of Typical Floor


Plate (sq metres)

Building 8
Name/Use of Building:

Number of floors:

Plan Area of Typical Floor


Plate (sq metres)

Building 9
Name/Use of Building:

Number of floors:

Plan Area of Typical Floor


Plate (sq metres)

If there are a number of buildings in the factory compound, please copy this form and fill out Sections 2 & 3
for EACH building. Please number or name each building.

Section 2: Factory Details


Building Number or Name:

Fine Tex Knitwears Ltd.

No. of Basements:

No of Floors:
(including ground floor and
roof [if used])

Do you occupy all floors?

Are all floors


accessible for survey:

For each floor,


please describe the
activities on that floor:
(e.g. Level 1 - 3 Lines of
Sewing, Cutting and Storage)

No

Yes

If not,
who occupies
the other floors
and what do
they do:

Reliable Poly Industries Ltd occupied the Ground


Floor. They are manufacturing Poly &
Accessories.

If not,
why:

Ground Floor : Reliable Poly Industries Ltd.


1st Floor
: Finishing Section. (Fine Tex)
2nd Floor
: Sewing Line & Office Room.
3rd Floor
: Sewing Line, Cutting, Store, Sample, Inspection, Doctors Room &
Maintenance Room.
4th Floor
: Under Construction.

Section 3: Factory Documentation


What is the permitted use of
the building?
Are building permits in place?

Commercial Purpose.

Permit
Number /
Details:

Yes

What authority has approved


the building?
(i.e. RAJUK, Local Authority)

RAJUK

Number of Floors Permitted:

Are all floors designed for


factory use?

Yes

Will Permit and Approval


Details Be Available by the
Survey Date?

Yes

If not,
please explain:

Have there been any recent


additions or refurbishments,
extensions, addition of floors
or are any planned?

No

If yes,
please explain:

Have you carried out any


structural repair work after
construction?
(i.e. cracking repair,
re-plastering work)

No

If yes,
please explain,
and highlight
these areas
during the
survey:

Name of Building Engineer:


Telephone No.:

Engineer S. Alam
1,711,532,663

Can your Building Engineer


attend Site during our Site
Visit?

Yes

Name of Building Architect::

Syed Monirul Islam

Your Name:

Md. Shamim Hasan

Your Role:

HR & Compliance Manager

E-mail:

Date:

03.02.15

Note: Please save this PDF Form using your Factory Name and Building Number / Name (where appropriate) as the file name
and return by e-mail. Thank you for your cooperation.

You might also like