You are on page 1of 6

JOB PROCEDURE FOR

SURVEYING WORK

PROJECT:- GOLDEN PANORAMA


RESIDENSIAL LUXURY APARTMENTS

PROCEDURE FOR SURVEYING WORKS


PROJECT NAME

: GOLDEN PANORAMA RESIDENTIAL


LUXURY APARTMENTS. BANGALORE

CLIENT

: GOLDEN GATE PROPERTIES LIMITED.


BENGALURU.

CONSULTENT

: FBA CONSULTING PMC.

DOCUMENT NO

: FBA/GGP/JP/001.

Procedure No:
FBA/GGP/JP/001
REV 0

DATE

Page 3 of 6

ISSUED FOR
APPROVAL&
IMPLEMENTATION

DESCRIPTION

PREP.
BY
FBA

CHD.
BY
FBA

APPROVED
BY
FBA

REVIEWED & APPROVED


BY GGPL

JOB PROCEDURE FOR


SURVEYING WORK

PROJECT:- GOLDEN PANORAMA


RESIDENSIAL LUXURY APARTMENTS

CONTENTS:

1.

PURPOSE

2.

SCOPE

3.

REFERENCES & CONTROLLING


SPECIFICATIONS

4.

METHODOLOGY

5.

PREPARATION OF FIELD SURVEY LAYOUT

5.

HEALTH, SAFETY AND ENVIRONMENT

FBA
6.0 PURPOSE
Page 3 of 6

GOLDEN GATE

JOB PROCEDURE FOR


SURVEYING WORK

PROJECT:- GOLDEN PANORAMA


RESIDENSIAL LUXURY APARTMENTS

The purpose of this procedure is to prepare a sequential system & control on


the Survey activities to achieve the desired product to the satisfaction of
client/consultant.
6.0 SCOPE
This procedure is applicable for the survey work for all kind of land survey
required to establish Temporary Bench Marks(TBM), Levels and to fix -up
Coordinates of battery limit, Centre line markings for all Towers in Golden
PANORAMA site.
In brief it controls the following activities.
1
2
3
4

Site clearance.
Fixing of permanent and Temporary Bench marks.
Fixing of reference points / Grid pillars.
Layout and survey.

In case of conflict between this procedure and the contracts specification, the
contract specification shall govern.
6.0 REFERENCES & CONTROLLING SPECIFICATIONS
1. Applicable Technical Amendments.
2. AFC Drawings.

FBA
4.0

METHODOLOGY

Page 3 of 6

GOLDEN GATE

JOB PROCEDURE FOR


SURVEYING WORK

PROJECT:- GOLDEN PANORAMA


RESIDENSIAL LUXURY APARTMENTS

4.1

Equipments
Measuring steel tapes, Electronic Total Station, Auto Level, Leveling staff,
plumb bob, line threads, lime powder for marking, wooden pegs, nails,
paints, and other helping aids. All measuring and survey instruments shall
have valid calibration certificate. Project approved drawings and
specifications will be the basis of acceptance criteria

4.2

Acceptance Criteria
The sequential activities and corresponding methods are detailed below:

4.3

Site clearance
Shrubs, bushes etc, shall be cleared off from site location. Cleaning, grubbing
etc. shall be completed before starting of site layout, Necessary profiles with
pegs, bamboos, buries shall be made to show the formation levels before
survey work starts, if required.

4.4

Bench Mark
Permanent bench mark at site shall be established at battery limit or at the
suitable location with reference to the standard local benchmark approved by
client/ consultant. For all construction activities, the same bench mark shall
be used and this permanent Bench mark shall be made of concrete pillars of
sufficient depth & size as per site requirement. It will be fixed with punched
mark nail to be executed and cross direction to be marked with respective
coordinates & RL.

FBA

Page 3 of 6

GOLDEN GATE

JOB PROCEDURE FOR


SURVEYING WORK

PROJECT:- GOLDEN PANORAMA


RESIDENSIAL LUXURY APARTMENTS
4.5

Reference Points
Reference Points in and around sites with respect to permanent benchmark
shall be marked and these points shall be made of masonry pillars or wooden
pegs with a nail on top. All reference points shall be checked and guarded
against any disturbances. All the survey pillars shall be marked with
reference level, coordinates and these shall be offered for PMC inspection.

4.6 Layout and Survey works


The Layout shall be done in accordance with approved drawings and shall be
offered for PMC inspection and records of this layout inspection shall be
submitted to PMC.
Detailed layout of survey work for the location of individual structures shall
be done with respect to North direction.
Checking of survey work and confirmation of location and orientation of
structures shall be done with respect to the whole project layout plan.
All the marking / grid lines / levels, etc shall be transferred to permanent
structures after completion of jobs.
All utilities, under ground and above ground shall be identified and
recorded on Survey inspection report-Format.
5

PREPARATION OF FIELD SURVEY LAYOUTS


Prepare the surveying layouts for all Towers in Golden PANORAMA Site in the
given format and submit to concern PMC Engineer and get his Review and
Approval sign.

FBA

Page 3 of 6

GOLDEN GATE

JOB PROCEDURE FOR


SURVEYING WORK

PROJECT:- GOLDEN PANORAMA


RESIDENSIAL LUXURY APARTMENTS

6.0 HEALTH, SAFETY AND ENVIRONMENT

Following measures but not limited to here under shall be taken for the
execution of Survey Works. Risk Assessment of all activities associated with
this procedure shall be done before starting any activity.
Entire working area shall be within the boundary limit. Only authorized
equipment/ personnel will be allowed within the working area.
All utilities shall be identified and protected.
All lifting tools and tackles shall be periodically inspected against any
Damage.
All instruments / equipments shall be maintained in good working condition as
per maintenance schedule.
All workmen supervisors and engineers shall use proper personnel
Protection gears.
All employees shall follow the employee Health , Safety & Environment rules.

FBA