Professional Documents
Culture Documents
State of PATRIOT
Presented to
AUSA Conference
26 April 2011
Distribution A: Approved for Public Release; Distribution Unlimited.
UNCLASSIFIED
UNCLASSIFIED
UNCLASSIFIED
CDR
LRIP
MS-C
PAC-3
MEADS
BCP
BCP
(Enhanced)
(Basic)
(Missile Segment)
PAC-3 MSE
GEM-T
Pre-Production
Growth Potential
Performance
Improvements
Sweep-down Synch
ELES
FSC
Canister
CRI
Software
GSE
Pre-Production
Config-3
US Unique
Capability
FRP
Evolutionary
Development
Plan (EDP)
(Mod Kit)
MAP
Pure Fleet
GTA (+2 BNs)
REP-III
CDI-3
RLCEU
Software
11 International
Partners
PDB-5.5.3
Recap 13 BNs
JTAGS
RDP
PDB-6.5
Disposal /
Salvage
Software
PDB-8
PAC-3
International Engineering
Services
Field Surveillance
Program
Case Development
PDB-7
Software
PAC-2
IAMD
UNCLASSIFIED
Pre-PAC-2
UNCLASSIFIED
UNCLASSIFIED
Key Tenets
Readiness
Sustainment Against Threat
Synchronization with IAMD SoS
Top Cost Drivers / Efficiencies
Missile Recertification
Missile, Launcher, and GSE Hardware Modernization / Obsolescence
RECAP / Reset Rate / Efficiencies
Test (range costs and targets)
Readiness (sustainment, reliability, obsolescence, and training base)
Software (modernization and personnel)
UNCLASSIFIED
UNCLASSIFIED
UNCLASSIFIED
2009
2010
2011
MEADS
Intl CDR
2012
2013
2014
MEADS
Prog. Rev.
2015
2016
2017
PDB 8.0
Recap Review
Acronyms
ALTBMD -
Sync 1 (2014)
ECS
MSE
BCP
RS
LS
Increased HTK Range and Altitude
MSE Missile
Comms Modernization
Initial IFCN
IFC
NL
Sentinel
HADM
MSE
JLENS
COMMS MOD
Sync 2 (2016)
IFC Net
IBCS
NL
ECS
JLENS
LS
Improved Combat ID
Sentinel
LS
RS
2041
PDB 9.0
CRI
ECP-24
GEM
GSE
HADM
HTK
IAMD
ICD
IFC
IFPC
IOC
IOT
MAP
MSE
MTBOMF
OIF
IBCS
Sync 3 (2018)
IFC Net
JLENS
Sensor and
Shooter on
the Net
LS
IBCS
RS
Fully Netted & Distributed
Avenger
IFPC
Sentinel
Improved Mobility
Baseline (2009)
Configuration 3 GSE
GEM-T Missile
Improved MTBOMF
OIF Fixes
PDB-6.5 Software
Readiness is a
Prime Concern
Threat
Capability
Force Modernization
Reliability
Spares
FY2000
Provide Increased Performance Over Time At a Reduced Cost, Increased Reliability, and Effectiveness
CAS(06)LWDH_3-125-09 Ver 14 / FMS-PR (U)
UNCLASSIFIED
UNCLASSIFIED
UNCLASSIFIED
3-4 ADA
NETHERLANDS
1-7 ADA
4-3 ADA
FT. SILL
FT. BLISS
GERMANY
FT. BRAGG
6-52 ADA
FT. HOOD
2-43 ADA
SPAIN
1-43 ADA
5-52 ADA
5-7 ADA
1-44 ADA
1-62 ADA
2-1 ADA
GREECE
4-5 ADA
JAPAN
ISRAEL
UAE
1-1 ADA
TAIWAN
KUWAIT
CONF3/PAC-3
GTA
Flags = FMS
KOREA
Bahrain
& UAE
3-2 ADA
SAUDI ARABIA
Qatar &
Kuwait
3-43 ADA
UNCLASSIFIED
UNCLASSIFIED
UNCLASSIFIED
N
Radar Set
(RS)
LS-2A: MSE LS
(with 1 MSE
interceptor)
1st
MSE
Interceptor
Target
Intercept
Target Launch
from
Ft. Wingate, NM
(LC-96)
2nd MSE
Interceptor
Projected Target
Impact Point
LS-3A: MSE LS
(with 1 MSE
interceptor)
NL
Engagement Control
Station (ECS)
Target
TAC-2 Site
LS-1A: PAC-3 LS
(with 1 backup PAC-3
CRI interceptor)
UNCLASSIFIED
UNCLASSIFIED
UNCLASSIFIED
Test/Targets
EVALUATE
DMAIC
OPPORTUNITY
SHOULD COST
UNCLASSIFIED
UNCLASSIFIED
UNCLASSIFIED
Funded Initiatives
Missile Recertification
GSE Qualification
PIP
Recap
GSE Production
RECAP Rate/Efficiencies
Reset
GEM-T Production
PAC-3 Production
PAC-3 Production
FSP
IESP
IESP
FSP (Pre-PAC-3)
Modernization/Obsolescence
FMS Modernization
FMS Sales
Radar/Launcher on
the NET
Restructured
Recap
UNCLASSIFIED
PATRIOT 30 Year
Plan
SS 3286 (8) 5/5/2011 11:15 AM
UNCLASSIFIED
UNCLASSIFIED
PATRIOT ENHANCEMENTS
MAP/PDB7
Increased Processor Throughput/Memory
Facilitates Integration of MMS,RDP, Commo Upgrades, etc.
COMMO UPGRADES
Supports Joint Technical Architecture
Provides BLOS/NLOS Communications
Communicates with Supported Force
RECAP
Improved RAM
Reduced ONS Costs
Technology Insertion
UNCLASSIFIED
UNCLASSIFIED
UNCLASSIFIED
FMS LIFT
Radar Data Processor (RDP)
64 module types replaced with 6
432 total modules to 12
Digital Track Via Missile (TVM)
32 of 38 Module Types eliminated
328 total modules eliminated
10 racks eliminated
Reconfigurable Table Top Trainer (RT3)
Replaces obsolete hardware with COTS based solution
Runs tactical software
Modern Manstation (MMS)
30 color LCD displays with touch screens
Upgrade replaces 221 obsolete parts in 41 assemblies
Opportunity to reduce IAMD costs
UNCLASSIFIED
UNCLASSIFIED
UNCLASSIFIED
LAUNCHER RELIABILITY
Background
The US Patriot Launchers require improved
reliability
Root Cause
Launcher draws significantly higher peak load
than steady state
The 15KW generator is sized for worst case
peak load with margin
Low power usage leads to wet stacking
Wet stacking results in increased generator
maintenance and eventually generator failure
UNCLASSIFIED
UNCLASSIFIED
UNCLASSIFIED
HYBRID GENERATOR
Solution
Replace the 15KW generator with a 5KW generator
Add a Power Distribution Unit/Control Logic
Assembly (PDU/CLA)
Accepts power from 5KW generator, power grid or
alternate power sources (solar, wind, etc.)
Supplements the 5KW generator with batteries to
provide peak power
Hybrid designed for ease of maintenance
Anticipated 18 Fold Increase in MTBF
Incorporates prognostics
Generator, batteries and other BRUs fully
accessible
5KW generator is hot swappable
Batteries keep the Launcher electronics alive
Reduced fuel consumption
5KW Generator
Ladder Frame
(same mtg. pattern as 15KW Gen Set)
UNCLASSIFIED
UNCLASSIFIED
UNCLASSIFIED
Key Tenets
Readiness
Sustainment Against Threat
Synchronization with IAMD SoS
Top Cost Drivers / Efficiencies
Missile Recertification
Missile, Launcher, and GSE Hardware Modernization / Obsolescence
RECAP / Reset Rate / Efficiencies
Test (range costs and targets)
Readiness (sustainment, reliability, obsolescence, and training base)
Software (modernization and personnel)
UNCLASSIFIED
UNCLASSIFIED