ITEM
NO.
4.1
UNIT
4.2
4.2.1
Earthworks
i)
ii)
4.2.3
4.2.4
4.2.5
RATE
(RM)
AMOUNT
(RM)
(SEN)
Temporary Works
Provide, erect,maintain and remove from site on
completion of works temporary crossing all in
accordance with the relevant sub section of the
specification for the proposed culverts.
4.2.2
QTY
sum
m3
m3
m2
ii)
m2
m2
m3
m3
ii)
m3
Crushed aggregate
m3
ii)
m3
Crushed aggregate
m3
ii)
m3
Crushed aggregate
Carried to Collection
BQ 4/1
02/24/2015
PROJEK :
ITEM
NO.
4.2.6
UNIT
QTY
RATE
(RM)
AMOUNT
(RM)
(SEN)
Pile Foundation
i)
ii)
sum
4.2.7
nr
nr
nr
nr
nr
m2
m2
m2
m3
Pipe Culverts
Precast reinforced concrete pipe culvert including
jointing.
i)
ii)
m2
Carried to Collection
BQ 4/2
02/24/2015
PROJEK :
ITEM
NO.
ii)
UNIT
4.3.1
4.3.2
Earthworks
ii)
4.3.3
4.3.4
4.3.5
RATE
(RM)
AMOUNT
(RM)
(SEN)
m3
4.3
i)
QTY
nr
m3
m3
m2
ii)
m2
m2
m3
m3
ii)
m3
Crushed aggregate
m3
m3
ii)
4.3.6
Crushed aggregate
m3
ii)
m3
Crushed aggregate
Carried to Collection
BQ 4/3
02/24/2015
PROJEK :
ITEM
NO.
4.3.7
UNIT
RATE
(RM)
AMOUNT
(RM)
(SEN)
Pile Foundation
i)
ii)
sum
nr
4.3.8
QTY
nr
nr
nr
nr
nr
m2
m2
m2
m3
Pipe Culverts
Precast reinforced concrete pipe culvert including
jointing.
i)
ii)
4.3.9
m
m
m2
ii)
m3
Carried to Collection
BQ 4/4
02/24/2015
PROJEK :
ITEM
NO.
UNIT
4.4
4.4.1
4.5
i)
nr
i)
nr
i)
nr
i)
nr
ii)
nr
i)
m3
ii)
m3
4.6.1
Earthworks
i)
ii)
m3
m3
AMOUNT
(RM)
(SEN)
Normal Foundation
Fill, spread, grade and compact granular fill material.
i) Mining sand
ii)
m3
m3
Crushed aggregate
RATE
(RM)
Fill Material
4.6
4.6.2
QTY
m2
Pile Foundation
i)
sum
Carried to Collection
BQ 4/5
02/24/2015
PROJEK :
ITEM
NO.
ii)
UNIT
4.6.4
QTY
RATE
(RM)
AMOUNT
(RM)
(SEN)
nr
nr
nr
nr
nr
nr
m2
m2
m2
m3
4.7
4.7.1
4.7.2
i)
ii)
nr
Earthworks
i)
ii)
m3
m3
BQ 4/6
02/24/2015
PROJEK :
ITEM
NO.
UNIT
QTY
RATE
(RM)
AMOUNT
(RM)
(SEN)
Carried to Collection
4.7.3
Normal Foundation
Fill, spread, grade and compact granular fill material.
i) Mining / river sand
ii)
Crushed aggregate.
m3
m3
m2
Pile Foundation
i)
ii)
sum
4.7.5
nr
nr
nr
nr
nr
m2
m2
m2
m3
ii)
BQ 4/7
02/24/2015
PROJEK :
ITEM
NO.
UNIT
QTY
RATE
(RM)
AMOUNT
(RM)
(SEN)
Carried to Collection
4.8
4.8.1
Earthworks
i)
ii)
4.8.2
m3
m3
Normal Foundation
Fill, spread, grade and compact granular fill material.
i) Mining sand
ii)
m3
Crushed aggregate.
m3
m2
Pile Foundation
i)
ii)
sum
nr
nr
nr
nr
nr
nr
m2
m2
m2
BQ 4/8
02/24/2015
PROJEK :
ITEM
NO.
UNIT
QTY
RATE
(RM)
AMOUNT
(RM)
(SEN)
Carried to Collection
xii) Concrete grade 20/20.
m3
4.8.4
m2
4.8.5
t
t
t
t
t
4.8.6
t
t
t
t
Mild Steel.
i) 12mm diameter
ii) 16mm diameter
t
t
4.8.7
4.8.8
4.8.9
4.8.10
nr
4.9
4.9.1
Earthworks
4.9.2
m3
i)
m3
ii)
m3
Normal Foundation
Fill, spread, grade and compact granular fill material.
i) Mining / river sand
ii)
m3
m3
Crushed aggregate
BQ 4/9
02/24/2015
PROJEK :
ITEM DESCRIPTION
UNIT
QTY
RATE
(RM)
AMOUNT
(RM)
(SEN)
m2
Carried to Collection
4.9.3
Pile Foundation
i)
ii)
sum
nr
nr
nr
nr
nr
nr
m2
m2
m2
m3
m2
4.9.5
t
t
t
t
t
4.9.6
t
t
4.9.4
BQ 4/10
02/24/2015
PROJEK :
ITEM
NO.
UNIT
QTY
RATE
(RM)
AMOUNT
(RM)
(SEN)
Carried to Collection
4.9.7
Mild Steel.
i) 12mm diameter
ii) 16mm diameter
t
t
4.9.8
4.9.9
4.9.10
nr
4.10
4.10.1
m3
i)
nr
ii)
nr
4.12
4.12.1
m3
m3
ii)
m
m
BQ 4/11
m
m
02/24/2015
PROJEK :
ITEM
NO.
UNIT
QTY
RATE
(RM)
AMOUNT
(RM)
(SEN)
Carried to Collection
4.12.2
m
m
v) ..
- 300mm to 500mm deep
- exceeding 500mm deep
m
m
m
m
ii)
m
m
iii) ..
- 300mm to 500mm deep
- exceeding 500mm deep
m
m
4.12.3
i)
m
m
ii)
m
m
m
m
m
m
v)
..
- 300mm to 500mm deep
- exceeding 500mm deep
m
m
BQ 4/12
02/24/2015
PROJEK :
ITEM
NO.
UNIT
QTY
RATE
(RM)
AMOUNT
(RM)
(SEN)
Carried to Collection
4.12.4
Interceptor Drain
i)
ii)
4.12.5
m
m
m
m
m
m
iv) ..
- 300mm to 500mm deep
- exceeding 500mm deep
m
m
Bench Drain
i)
m
m
ii)
m
m
iii) ..
- 300mm to 500mm deep
- exceeding 500mm deep
m
m
Berm Drain
4.12.6
i)
m
m
ii)
m
m
iii) ..
- 300mm to 500mm deep
- exceeding 500mm deep
m
m
BQ 4/13
02/24/2015
PROJEK :
ITEM
NO.
UNIT
QTY
RATE
(RM)
AMOUNT
(RM)
(SEN)
Carried to Collection
4.12.7
Shoulder Drain
i)
ii)
4.12.8
4.12.9
..
- 300mm to 500mm deep
Cascade Drain
i)
ii)
v) ..
m
m
m
m
m
m
m
m
BQ 4/14
02/24/2015
PROJEK :
ITEM
NO.
UNIT
QTY
RATE
(RM)
AMOUNT
(RM)
(SEN)
Carried to Collection
i)
ii)
m
m
m
m
m
m
m
m
m
m
m
v) ..
- 300mm to 500mm deep
- exceeding 500mm deep
m
m
4.13
SUB-SURFACE DRAIN
4.13.1
Subsoil Drains
i)
ii)
iii)
4.14
SUMPS
4.14.1
Sump At Cut
BQ 4/15
02/24/2015
PROJEK :
ITEM
NO.
UNIT
QTY
RATE
(RM)
AMOUNT
(RM)
(SEN)
nr
ii)
nr
nr
iv)
nr
Carried to Collection
4.14.2
Sump At Fill
Brick sump including excavation, lean concrete,
concrete bedding, plastering, formworks, joints,
backfilling and disposal of surplus material.
4.14.3
4.14.4
i)
nr
ii)
nr
nr
iv)
Brick sump including excavation, lean concrete,
concrete bedding, reinforcement, plastering,
Median Sump
(Rural
Area)
formworks,
joints,
stone
pitching, laying outlets
concrete pipe, fix with grating, iron steps, backfill and
disposal of surplus material.
nr
i)
nr
ii)
nr
ii)
4.14.5
nr
nr
BQ 4/16
02/24/2015
PROJEK :
ITEM
NO.
UNIT
QTY
RATE
(RM)
AMOUNT
(RM)
(SEN)
m2
m3
Carried to Collection
ii)
m2
m2
m2
BQ 4/17
02/24/2015
PROJEK :
ITEM DESCRIPTION
UNIT
QTY
RATE
(RM)
AMOUNT
(RM)
(SEN)
Carried to Collection
COLLECTION PAGE
BQ 4/1
BQ 4/2
BQ 4/3
BQ 4/4
BQ 4/5
BQ 4/6
BQ 4/7
BQ 4/8
BQ 4/9
BQ 4/10
BQ 4/11
BQ 4/12
BQ 4/13
BQ 4/14
BQ 4/15
BQ 4/16
BQ 4/17
BQ 4/18
02/24/2015
PROJEK :
ITEM DESCRIPTION
UNIT
QTY
RATE
(RM)
AMOUNT
(RM)
(SEN)
BQ 4/18
BQ 4/19
02/24/2015