Issues

1. Low UL throughput of 3G network;


2. Poor voice quality of 3G network in Plateau(Indoor);
3. EDGE attach issue at the coverage border;

Team management
Leader and Custer
interface

Feb 16

Feb 17

Technical
Leader

Opeyemi Dada

Feb 18

Feb 19

Feb 20

Feb 21

1. Top Risks an
No.

Risk and challenges

Priority

4 SIMs Provided for Test can only support


voice, Management need to push customer
reconfigure 2 of them to support data for
throughput test;

High

Building detail name list with Indoor Coverage


and Voice Quality issues need to be provided
to RF team for walk test;

High

Configuration, license and Alarms data need


to be provided to RF team for detail analysis;
(Plateau RNC)

High

Software/methods to trace Air/Iub/IU


interfaces need assistance from customer

Medium

Timingly Monitoring method/Software to trace


the number of Users and RTWP

Medium

2. Today's Progress Update

1.
2.
3.
4.

Tools and SIMs preparsion;


Logfile Analysis of drive test;
High RTWP cells root causes analysis based on KPI statistics;
HSUPA and R99 traffic ratio analysis for 12 RNCs;

Issues

02/24/2015

No.

Content

Deadline

16

261537527.xlsx

Low UL
Througput of
3G Network

3G Poor Voice
Quality

EDGE Coverage
Issue

02/24/2015

Network&RNC Level UL
throghput, Volume KPI check

2/17/2015

UL Data Stationary Test

2/19/2015

Parameters audit/Analysis and


Soft tuning output

2/24/2015

License Utilization checking

2/23/2015

Resource(Power/CE/CODE/IUB)
and Capacity Analysis

2/24/2015

2rd Carrier load balance,


Service Strategy, DRD,
Neighbor, HO Parameter
Analysis and Optimization

2/24/2015

High RTWP Cell, Pilot polution, High


number of Users, External
Interference, Analysis with
Geography Distrubtion

2/20/2015

Data Upload test in the chosen area

2/23/2015

Voice Drive test in Plateau Area

2/18/2015

Drive test log analysis and RF


tuning

2/23/2015

Indoor Walk test for the building


provided by customer

2/19/2015

Parameters soft tuning

2/25/2015

Redrive in Plateau Area

2/26/2015

BSC/Cell configuration and


parameter checking

2/24/2015

IRAT Cooperation parameters


checking and analysis

2/25/2015

Drive test and coverage analysis

2/24/2015

26

261537527.xlsx

Orange Project Daily Report 20150219

(Indoor);

Ryan Sihongbiao

Feb 21

Feb 22

DT and RF arrangement

Feb 23

Feb 24

Komenan Bakary

Feb 25

Feb 26

Feb 27

1. Top Risks and Challenges


Responsibility Date to resolve

Current Progress

Koffi Dominique;
Shengongjian;

2/18/2015

Data SIM card now available but modem not compactible with pro
for the investigation

Koffi Dominique;
Shengongjian;

2/18/2015

Request has been escalated to customer and wait for the feedbac
need Management team push for speeding up;

Koffi Dominique;
Shengongjian;

2/18/2015

WMS installed but password denied so we can not login yet

Oyeme;
Koffi Dominique;
Shengongjian;

2/18/2015

Request has been escalated to customer and wait for the feedbac
need Management team push for speeding up;

Oyeme;

2/19/2015

Disscuss with customer and confirm the availability;

pdate

3. Actions Plan for the next Day

1. 3G UL throughput stationary test in choosen locations(Customer office) a


analysis;
2. Cells Recommendation for phusical optimization
3. Configuration/Parameter, License Analysis if data provided;
4. High RTWP cells recommendations;

tistics;

Process

02/24/2015

Status

Remark

36

261537527.xlsx

100%

Close

(1). HSUPA utilization of Cocody_2 RNC is 75% in BH


hour(21:00)lower than the average value other BSC, 9
(2). Need license and configuration check further;

0%

Open

Available modem not compactible with genex probe

0%

Open

Configuration is unavailable

5%

Open

Counters compararism ongoing

20%

Ongoing

0%

Open

90%

Ongoing

0%

Open

100%

Close

100%

Ongoing

Configuration is unavailable

As aggreement, Will only focus on Plateau area due to


number of cells and time limitation

Analysis in progress
Will be ready before noon of 19/02/2015

0%

Open

Need the building name list provided by customer

0%

Open

Configuration is unavailable

0%

Open

0%

Open

Configuration is unavailable

0%

Open

Configuration is unavailable

0%

Open

02/24/2015

46

261537527.xlsx

Komenan Bakary

Feb 27

Feb 28

Progress

odem not compactible with probe

omer and wait for the feedback,


peeding up;

so we can not login yet

omer and wait for the feedback,


peeding up;

m the availability;

for the next Day

locations(Customer office) and

tion
data provided;

Remark

02/24/2015

56

261537527.xlsx

of Cocody_2 RNC is 75% in BH


n the average value other BSC, 95%;
configuration check further;
compactible with genex probe

ailable

sm ongoing

ailable

only focus on Plateau area due to large


ime limitation

noon of 19/02/2015

me list provided by customer

ailable

ailable

ailable

02/24/2015