1. PURPOSE
The present WP aims the execution of welded mesh reinforcement for
beams, columns, plates, frames etc. in terms of quality assurance,
compliance with technological steps, the working mode and records
regarding confirmation and quality assurance of elements executed.
2. FIELD OF APPLICATION
2.1. Plane welded mesh is used as reinforcement for flat or curved
concrete resistance elements (floor slabs, walls, tanks, pools,
frames)
2.2. Welded mesh is used as reinforcement for the slab finishing cast
in, screeds, floorings.
3. DEFINITIONS
Notion
Beton
Armatu
re
Definition
Plain concrete, reinforced or prestressed concrete is one of the
main construction materials of the resistant structures
All steel bars placed in the concrete in order to take over tension
efforts in working with this
4. REFERENCE DOCUMENTS
SR
ISO
7438/1993
STAS 438/1 1989
STAS 438/2 1991
STAS 438/3 1989
Legea 10-1995
Volume
Working procedure
REINFORCEMENT OF
CONSTUCTION ELEMENTS
WITH WELDED MESH
taking
MC-EXE-00
Edition 00 / 2014
Revision 0
Page 2 .
Volume
Working procedure
REINFORCEMENT OF
CONSTUCTION ELEMENTS
WITH WELDED MESH
MC-EXE-00
Edition 00 / 2014
Revision 0
Page 3 .
start discontinuing, and at the holes edges on the top and bottom
sides, additional reinforcement of PC52 si PC60 will be provided,
and will be fixed through welding or through bending by tying with
wire the plate bars.
The technical execution project will include:
- all the quotas regarding the mounting positions of
reinforcement nets, the directions and rows of reinforcement
on which the longitudinal and transversal bars are to be
located, the widths of overlapping between nets, the position
of potential isolated bars and reinforcement nets toward the
provided nets; in case of plates, the project will contain
details regarding the nets position at the upper side
compared to the bearings, the minimal distances with which
the nets at the lower side outweigh the lower bearing edges,
and in case of reinforcement with overlay mesh, their
succession in relation to the thickness of the element;
- the limit of the deviations restrictions admitted to fitting
welded nets will be specified;
- will be provided full welded nets (to remove additional
cutting operations) whose dimensions are equal to the
manufacturing ones;
- will be provided details of obtaining dimensions smaller than
manufacturing ones and how to use the resulting wastes.
There will be treated differently the reinforcement plates resting
on walls, beams or belts, vertical bearing and non-bearing walls,
beams reinforced with stirrups made of foundations welded nets.
5.1.1.
The base materials used to build the welded nets are:
- Welded nets for reinforced concrete (STAS 438/3 89) are
made of STNB, or reinforcing steel OB37, PC52, PC60.
Machine made welded nets are made of drawn wire bars
arranged in perpendicular directions the intersection points
(nodes) being welded through pressure and electrical
resistance.
It is presented as panels (flat welded mesh,) and rolls. Welded
nets in the form of panels are made of form bars of a maximum
diameter of 10mm, and those presented as rolls, of the
maximum diameter 4.5mm (longitudinal bars).
Volume
Working procedure
REINFORCEMENT OF
CONSTUCTION ELEMENTS
WITH WELDED MESH
MC-EXE-00
Edition 00 / 2014
Revision 0
Page 4 .
Volume
Working procedure
REINFORCEMENT OF
CONSTUCTION ELEMENTS
WITH WELDED MESH
MC-EXE-00
Edition 00 / 2014
Revision 0
Page 5 .
have pores, dents, cracks or dark areas and the seamless nodes
to have a maximum of 3% of the total number of nodes.
It is admitted a thin layer of rust, provided that after the removal,
reducing the section of wire deviation not to exceed the limit in
the following table according to the STAS 438/3-89:
Diameter of wire [mm]
The deviation limit [mm]
3 5.6
0.1
6 - 10
0.15
Dimensional verification is made 3% of the batch items (1lot =
20t), but less than 3 items and includes:
- Checking the deviation from flatness;
- Checking the geometric dimensions
Geometrical
Maximum allowable deviations
dimensions
[mm]
Length of net
+20
Length of net
+10
Meshes
+5
Flatness treatments
+10
-
Volume
Working procedure
REINFORCEMENT OF
CONSTUCTION ELEMENTS
WITH WELDED MESH
MC-EXE-00
Edition 00 / 2014
Revision 0
Page 6 .
Volume
Working procedure
REINFORCEMENT OF
CONSTUCTION ELEMENTS
WITH WELDED MESH
MC-EXE-00
Edition 00 / 2014
Revision 0
Page 7 .
- Labour force;
- Materials;
- Machinery and means of transport.
Before the mounting of welded nets there must be provided a
quality reception of works previously performed:
- Checking the nets;
- Fitting the formwork;
- Concreting of construction elements that must be executed
prior to the correct fulfilling of the interruption method of
concrete;
- Verification of positioning the spacers;
- Correct position of the already cast element left whiskers.
5.1.5.
Completion of works. The technological phases are:
5.1.5.1. Making welded nets that are run in centralized workshops or
site workshops.
5.1.5.2. Mounting the welded nets includes:
- Assembling in the workshop or directly in formwork;
- Transport and handling at the mounting location;
- Installing nets in the formwork.
Preparing for installation performs certain operations aimed at
time passing for reinforcing and getting a higher quality as:
- - Qualitative and dimensional checking of the net;
- remedying of defects found (weak knots);
- Proper processing by cutting, additional bars binding;
Mounting the reinforcement is made in two situations:
- to the ground by subsequent introduction of the
formwork, on the nearby platform is achieved the
reinforcement (top, bottom, spacers) after which with
the aid of a framework device, it is taken with a crane
and fit in the framework The method allows the
realisation of the formwork and the reinforcement in
parallel.
- the formwork direct mounting of a net after a net, that
requires marking with a chalk of the net positions in
formwork. Labour productivity is lower but the error
possibility is limited.
Welded nets anchored on the supports are mounted by
cutting the last transversal bar and placing the extensions of
Volume
Working procedure
REINFORCEMENT OF
CONSTUCTION ELEMENTS
WITH WELDED MESH
MC-EXE-00
Edition 00 / 2014
Revision 0
Page 8 .
Volume
Working procedure
REINFORCEMENT OF
CONSTUCTION ELEMENTS
WITH WELDED MESH
MC-EXE-00
Edition 00 / 2014
Revision 0
Page 9 .
7. ACCEPTANCE CRITERIA
7.1. Admitted deviation when installing the of welded nets
Index
Of
M Deviatio
Name of deviation
deviatio
U
n value
n
Deviations from the position of bars
anchorage on net supports the in
relation to the point from which the
A
length of the anchor is determined:
m
+2.5; -5
_ Precast elements
m
+2.5;
- Monolithic elements
m
-12.5
m
Deviations at a distance between the
edge of prefabricated elements and the
B
perpendicular ends of bars on the m
+5; -2.5
respective border
m
C
Deviations at the nets marginal bars
MC-EXE-00
Volume
Working procedure
Edition 00 / 2014
REINFORCEMENT OF
CONSTUCTION ELEMENTS
WITH WELDED MESH
Revision 0
Page 10 .
m
m
m
m
+20
+30
m
m
m
m
m
m
+8
+3
+2
Volume
Working procedure
REINFORCEMENT OF
CONSTUCTION ELEMENTS
WITH WELDED MESH
MC-EXE-00
Edition 00 / 2014
Revision 0
Page 11 .