ENVIRONMENTAL ENGINEERING
- II
'
PARTA-(10x 2=2omarks)
"/
1.
Z.
3.
.4.
'5.
requirement.
.
6.
7.
8.
9.
10.
ASP?
'
PARTB-(5x16=80marks)
flow.
How will you do the Storm water flow estimation? '
Or
(9)
(7)
(b)
L2.
13.
(i)
(iil
(a)
Explain the step by step proced.ure of laying and testing of sewer line.
.Or
(b)
(a)
(b)
(r)
(ii)
14.
t/i
(a)
Design a single stage high rate trickling filter for treating sewage flow of
4 million litres per day with a BOD = 300 mgll. Take the recirculation
ratio as 1.5. BOD removal in PST as 35% and the final BOD of effluent
as 20 mgll
Or
(b)
.1
15.
(a)
Or
(b)
(i)
(ii)
sludge.