You are on page 1of 17

Level 1: BIM Execution Planning Process

Project Title

Developed with the BIM Project Execution Planning Procedure by the Penn State CIC Research Team.
http://www.engr/psu.edu/ae/cic/bimex

Schematic Design

Design Development

Perform Cost
Estimation
Cost
Estimation

Contractor

Contractor

BIM USES

Schematic Design

Validate Program
Owner

Architect

Programming

3D Macro
Coordination

Architect

Schematic Design

Author Schematic
Design

Design Development

Develop Virtual
Prototypes

Design
Authoring

Architect

Develop Virtual
Prototypes

Design
Authoring

Architect

Contractor

4D Modeling

Schematic Design

INFO. EXCHANGE

Architectural Model

Construction Documents

Engineering
Analysis

Engineer

Engineer

Schematic Design
4D Model

Schematic Design
Engineering Analysis
Model

MEP Model

Architectural Model

Architect

Record Model

End
Process

Virtual
Prototyping

Create 4D Model

4D Modeling

Contractor

4D Modeling

Construction Documents

Perform Engineering
Analysis

Engineering
Analysis

Engineer

Engineering
Analysis

Construction
Documents (WP)

Design Development
Cost Estimation

Design Development Design Development


Engineering Analysis
4D Model
Model

Architectural Model

Construction
Documents (WP)
Cost Estimation

Construction
Documents (WP)
4D Model

Construction
Documents (WP)
Virtual Prototypes

MEP Model

Design Development Design Development


3D Macro Coordination Virtual Prototypes
Model

Schematic Design
Virtual Prototypes

Contractor

Construction Documents

MEP Model

Schematic Design
3D Macro Coordination
Model

3D Macro
Coordination

Develop Virtual
Prototypes

Design
Authoring

Design Development

Schematic Design
Cost Estimation

Compile Record
Model

Construction Documents

Author Construction
Documents

Perform Engineering
Analysis

Schematic Design

Program Model

Architect

Design Development

Perform Engineering
Analysis

Operations

Perform 3D
Coordination

Create 4D Model

Create 4D Model

Engineer

Virtual
Prototyping

Cost
Estimation

Construction Documents

Design Development

Schematic Design

Contractor

Contractor

3D Macro
Coordination

Design Development

Author Design
Development

Virtual
Prototyping

Architect

Cost
Estimation

Perform 3D
Coordination

Perform 3D
Coordination

Planning

Perform Cost
Estimation

Design Development

Schematic Design

Architect

Construction Documents

Perform Cost
Estimation

Structural Model

Structural Model

Structural Model

Civil Model

Civil Model

Civil Model

Construction
Construction
Documents (WP)
Documents (WP)
3D Macro Coordination
Engineering
Model
Analysis Model

Construction
Documents (WP)
3D Micro Coordination
Model

Record Model

REFERENCE INFO.

Level 2: Existing Conditions Modeling


Project Title

Geotechnical Report

Historical Site /
Facilities Information

Developed with the BIM Project Execution Planning Procedure by the Penn State CIC Research Team.
http://www.engr/psu.edu/ae/cic/bimex

GIS Data

Survey Existing
Facilities
Responsible Party

Survey Existing Site


Conditions

PROCESS

Responsible Party

Compile Existing
Conditions
Information

Collect Current Site


Conditions Data

Start
Process

Responsible Party

Responsible Party

End
Process

Collect Data through


Photographs
Responsible Party

Laser Scan Existing


Conditions

INFO. EXCHANGE

Responsible Party

Laser Scan Model

Survey Model

Existing Conditions
Information Model

REFERENCE INFO.

Level 2: Cost Estimation


Project Title

Developed with the BIM Project Execution Planning Procedure by the Penn State CIC Research Team.
http://www.engr/psu.edu/ae/cic/bimex

Cost Database
Cost Reports

Analysis
Method

Evaluate
Quantities and
Cost Breakdown

INFO. EXCHANGE

PROCESS

Contractor

No

No
Establish Cost
Targets

Adjust BIM for


Takeoff

Contractor

Contractor

Start
Process

Yes
Model ready
for QTO/Cost
Analysis?

3D Model

Export BIM for


Analysis

Develop
Quantities
Schedule

Review Quantities

Contractor

Contractor

Contractor

Yes

Evaluate Methods
for Assembly
Construction

Organize
Quantities to Cost
Data

Calculate Costs
from Quantities

Review Costs/
Results

Incorporate
Contingencies/
Overheads

Contractor

Contractor

Contractor

Contractor

Contractor

Results
Acceptable?

Quantity Takeoff for


Assemblies

No
Yes
Results in
Compliance with
Cost Target?

End
Process

Cost Estimate for


Assemblies

Level 2: 4D Modeling
Project Title

PROCESS

REFERENCE INFO.

Developed with the BIM Project Execution Planning Procedure by the Penn State CIC Research Team.
http://www.engr/psu.edu/ae/cic/bimex

Productivity
Information

Lead
Times

Set Construction
Sequencing and Flow

Prepare/Adjust
Schedule

All disciplines

All disciplines

Start
Process

No
Establish Information
Exchange
Requirements

Create New or Modify


Previous 3D Model

Link 3D Elements to
Activities

Validate Accuracy of
4D Model

All Disciplines

All disciplines

4D Modeler

All disciplines

No
Yes

INFO. EXCHANGE

Schedule
(Draft)

Yes

All disciplines

End
Process

Schedule
Optimized?

Model
Correct?

3D Model

Review 4D Model/
Schedule

4D Model
(Draft)

Schedule

4D Model

REFERENCE INFO.

Level 2: Site Analysis


Project Title

Developed with the BIM Project Execution Planning Procedure by the Penn State CIC Research Team.
http://www.engr/psu.edu/ae/cic/bimex

Site
Investigation
Data

Analyze Project Site


Data

PROCESS

No

Start
Process

Analyze Area Data

Select a Building Site


Location

Responsible Party

Responsible Party

No

Responsible Party
Determine Building
Location and
Orientation

Yes

Responsible Party

Is Site
Acceptable and
Available?

Is Building
Location
Acceptable

Generate Site
Analysis Model
Responsible Party

INFO. EXCHANGE

Yes

Site Analysis
Model

End
Process

REFERENCE INFO.

Level 2: Programming
Project Title

Developed with the BIM Project Execution Planning Procedure by the Penn State CIC Research Team.
http://www.engr/psu.edu/ae/cic/bimex

Site
Information

Identify Building Use/


Type

PROCESS

Owner

Start Process

Not
Acceptable

Identify Area
Requirements

Create Program

Owner

Owner

Start Design
Programming

Generate Conceptual
Building Layout

Identify Final List of


Requirements

Architect

Owner

Acceptable
End Process

Program
Validation

Identify Cost Targets

INFO. EXCHANGE

Owner

Site Analysis
Model

Existing Conditions
Model

Program
Model

PROCESS

REFERENCE INFO.

Level 2: Design Authoring


Project Title

Developed with the BIM Project Execution Planning Procedure by the Penn State CIC Research Team.
http://www.engr/psu.edu/ae/cic/bimex

Parametric Modeling
Content

Start
Process

Create Schematic
Design Architecture
Model

Create Design
Development
Architecture Model

Create Schematic
Design Architecture
Model

Architect

Architect

Architect

Create Schematic
Design Structural
Model

Create Design
Development
Structural Model

Create Schematic
Design Structural
Model

Identify Models
Required

Identify Content for


Model Creation

Develop Intitial
Architecture Model

Engineer

All Disciplines

All Disciplines

Architect

Create Schematic
Design MEP Model

INFO. EXCHANGE

Preliminary
Architecture Model

No

Engineer

Does the model


meet the
requirements?

Engineer

Yes

Create Design
Development MEP
Model
Engineer

Does the model


meet the
requirements?

Create Schematic
Design MEP Model
Engineer

Create Other Models


(as needed)

Create Other Models


(as needed)

Create Other Models


(as needed)

All Disciplines

All Disciplines

All Disciplines

Schematic Design

Design Development

Architectural Model Structural Model

Architectural Model Structural Model

MEP Model

Other

No

Yes

Yes

Engineer

Program Model

No

MEP Model

Other

Does the model


meet the
requirements?

Construction Documentation

Architectural Model

MEP Model

Structural Model

Other

End
Process

Level 2: Design Review


Project Title

REFERENCE INFO.

Developed with the BIM Project Execution Planning Procedure by the Penn State CIC Research Team.
http://www.engr/psu.edu/ae/cic/bimex

INFO. EXCHANGE

PROCESS

Compile Design
Review Feedback

Start
Process

Create Virtual
Mockups

Perform End User


Review

Architect

Architect/User

Compile Info for O&M


Review

Perform O&M Review

All Disciplines

Facility Manager

Return to Design
Authoring

All Disiciplines

No

Yes

Design
Acceptable?
Compile Model for
Constructability
REview

Perform
Constructability
Review

All disciplines

Contractor

Design Model
Design Review
Information

End
Process

Level 2: Energy Analysis


Project Title

REFERENCE INFO.

Developed with the BIM Project Execution Planning Procedure by the Penn State CIC Research Team.
http://www.engr/psu.edu/ae/cic/bimex

Energy Tariff

Analysis
Method

Space Type
Mechanical
Library
System Library

Construction Type
Library

Weather Data

Assign Construction
Types to Building
Elements
Contractor

PROCESS

No
Adjust BIM for
Energy
Analysis

Assign Outside
Design Criteria and
Energy Targets

Responsible Party

Mechanical Engineer

No

Yes

Export BIM for


Analysis

Analyze Energy
Demand and
consumption

Review Energy
Anaysis Results

Prepare Report for


Documentation

Mechanical Engineer

Mechanical Engineer

Mechanical Engineer

Mechanical Engineer

Start
Process

Yes

Results
acceptable ?

Is model ready
for simulation?

Create and Assign


Thermal Zones

End
Process

INFO. EXCHANGE

Mechanical Contractor

Design Model

Energy Analysis
Model

Note: This map was developed from a review of the


bSa/OGC AECOO-1 Testbed Project

REFERENCE INFO.

Level 2: Structural Analysis


Project Title

Developed with the BIM Project Execution Planning Procedure by the Penn State CIC Research Team.
http://www.engr/psu.edu/ae/cic/bimex

Soil Data

Wind Loads

Seismic Loads

Snow Loads

INFO. EXCHANGE

PROCESS

No

Start
Process

Generate Structural
Layout

Generate Structural
Design Model

Export Model to
Structural Analysis
Application

Analyze Model

Structural Engineer

Structural Engineer

Structural Engineer

Structural Engineer

Yes

Export Model to
Structural Design
Application

Update Structural
Design Model

Structural Engineer

Structural Engineer

End
Process

Is Site
Acceptable and
Available?

Arch. Model

Structural Design
Model
(Draft)

Structural Analysis
Model

Structural Design
Model

REFERENCE INFO.

Level 2: Lighting Analysis


Project Title

Developed with the BIM Project Execution Planning Procedure by the Penn State CIC Research Team.
http://www.engr/psu.edu/ae/cic/bimex

Solar Data

Weather Data

Analyze Model for


Daylighting
Lighting Engineer

PROCESS

No
Identify Lighting
Criteria

Generate Lighting
Layout

Generate Basic
Lighting Model

Export Model to
Lighting Analysis
Application

Lighting Engineer

Lighting Engineer

Lighting Engineer

Lighting Engineer

Modify Model for


Analysis
Lighting Engineer

Analyze Model for


Lighting Levels

Yes

Lighting Engineer

Start
Process
Analyze Model for
Density Levels

Export Model to
Lighting Design
Application

Update Lighting
Model

Lighting Engineer

Lighting Engineer

End
Process

Is Building
Lighting
Acceptable?

INFO. EXCHANGE

Lighting Engineer

Arch. Model

Other Applicable
Models

Struct. Model

Lighting Design
Model (Draft)

Lighting Analysis
Model

Lighting Design
Model

REFERENCE INFO.

Level 2: Design Coordination


Project Title

Developed with the BIM Project Execution Planning Procedure by the Penn State CIC Research Team.
http://www.engr/psu.edu/ae/cic/bimex

Information
Exchange
Requirements

Company
Contract
Implementation Requirements
Standards

Create Model Sharing


System
BIM Coordinator

Define Coordination
Meeting Location

PROCESS

BIM Coordinator

Define Information for


Discipline Models
All Disciplines

Start
Process
Define the Areas of
Coordination

Develop Schedule for


Coordination

All Disciplines

All Disciplines

Start Design
Coordination
Process

Create Discipline
Models

Compile Composite
Model

Perform Collision
detection

All Disiciplines

BIM Coordinator

BIM Coordinator

Yes

Identify Solutions to
Collisions
All Disciplines

Any
Collisions?
No

Establish a Protocol
to Address Collisions

End Process

INFO. EXCHANGE

All Disciplines

Design Model

Coordination Model
by Discipline

Coordination
Model

REFERENCE INFO.

Level 2: Site Utilization Planning


Project Title

Developed with the BIM Project Execution Planning Procedure by the Penn State CIC Research Team.
http://www.engr/psu.edu/ae/cic/bimex

Construction
Equipment Libraries

Schedule

Add Construction
Equipment
Contractor
Analyze Site Layout
for Phase Transition

No

No

PROCESS

Contractor

Start
Process

Identify Construction
Phases

Determine Temporary
Facilities

Contractor

Contractor

Insert Phased Staging


Areas

Yes

Are All Phases


Analyzed?
(Occurs for
each Phase)

Yes

Contractor
Analyze Site Layout
for Space and Time
Conflict

Is Plan
Acceptable?

Contractor

INFO. EXCHANGE

Contractor

Design Model

Existing Site
Conditions Model

Distribute Plan to
Various Parties

Site Utilization Plan

End
Process

INFO. EXCHANGE

PROCESS

REFERENCE INFO.

Level 2:3D Control and Planning


Project Title

Developed with the BIM Project Execution Planning Procedure by the Penn State CIC Research Team.
http://www.engr/psu.edu/ae/cic/bimex

Design Specifications
and Intent

Schedule, Cost and


Labor Info

3D Controls Report
Construction Families
and Libraries

Determine Scope of
Work to be Analyzed

Identify Alternative
Construction Methods

Model Alternative
Methods

Analyze Various
Methods

Compare and Select


Options

Coordinate
Construction
Sequences

Contractor

Contractor

Contractor

Contractor

Contractor

Contractor

Start
Process

Is Model
Acceptable?

Design Model
Site Utilization Model

Generate
Construction Plans
Contractor

End
Process

Is Construction
Sequence
Acceptable?

Construction
Model

REFERENCE INFO.

Level 2: Record Modeling


Project Title

Developed with the BIM Project Execution Planning Procedure by the Penn State CIC Research Team.
http://www.engr/psu.edu/ae/cic/bimex

Equipment
Information

Project
Submittal
Information

COBIE
Requirements

INFO. EXCHANGE

PROCESS

No

Start
Process

Identify Information
Requirements

Compile Information

Generate Additional
Required Information

Compile Information
in FM Application

Owner

Facility Manager

Facility Manager

Facility Manager

Yes
End Process
Model
Acceptable?

Design Model

Coordination
Model

4D Model
Record Model

PROCESS

REFERENCE INFO.

Level 2: Maintenance Scheduling


Project Title

Sensor
Information

CMMS
Information

Collect Building
System Data

Start
Process

Facility Manager

Developed with the BIM Project Execution Planning Procedure by the Penn State CIC Research Team.
http://www.engr/psu.edu/ae/cic/bimex

Warranty and
Specification
Information

Productivity
Information

Interpret Data for


Maintenance Needs
Facility Manager

Prepare/Adjust
Schedule

Perform Maintenance

Responsible Party

Facility Manager

No
Validate Equipment
Performance

Regenerate
Maintenance Data

Yes

Responsible Party

Facility Manager

INFO. EXCHANGE

Correct?

Record Model

Schedule

REFERENCE INFO.

Level 2: Building System Analysis


Project Title

Sensor Data

Developed with the BIM Project Execution Planning Procedure by the Penn State CIC Research Team.
http://www.engr/psu.edu/ae/cic/bimex

Other Performance
Data

Performance
Targets

Performance Cost

Weather Data

Assign Performance
Targets

No

No

PROCESS

Facility Manager

Yes

Adjust BIM for


Peformance Analysis

Start
Process

Responsible Party
Collect Sensor and
Building Performance
Data

Is Model Ready
For Simulation?

Export BIM for


Analysis

Analyze Performance
Demand and
Consumption

Review Building
Performance Anaysis
Results

Prepare Preformance
Analysis Reports

Responsible Party

Responsible Party

Facility Manager

Facility Manager

Yes

Results
Acceptable?

End
Process

INFO. EXCHANGE

Facility Manager

Energy Analysis
Record Model
Model

Building
Performance
Analysis Model

Building
Performance
Analysis Output