You are on page 1of 12

Statistical Digest

2013

C E Y L O N E L E C T R I C I T Y
C o l o m b o 0 0 2 0 0 S r i
w w w. c e b . l k

B O A R D
L a n k a

SUMMARY STATISTICS - 2013


Units

Annual
2013 Percentage
Change

2012

Number of Power Stations


(with PPP)

No.

159

180

Installed Capacity (with PPP)

MW.

3,312

3,362

1.52%

Maximum Demand (with PPP)

MW.

2146

2164

0.83%
1.37%

13.21%

Gross Generation (with PPP)

GWh.

11,801

11,962

Self Generation Scheme

GWh.

Trans. & Distri. Losses


(On Net Generation)

10.67

10.79

1.12%

Gross Units Sold

GWh.

10,474

10,621

1.41%

Average Selling Price Per Unit

Rs./kWh

15.56

17.93

15.27%

Average Cost per Unit


(@ selling point)

Rs./kWh

23.66

17.70

-25.19%

Revenue from Billed Sales


(with FAC)

m.Rs.

162,956

190,488

16.90%

25,532

32,885

28.80%

Fuel Adjustment Charge

m.Rs.

Consumer Accounts

No.

No. of Area Offices

No.

60

60

4,979,862 5,210,761

4.64%
0.00%

No. CSCs

No.

204

208

1.96%

No. of POS Centers Operated by CEB

No.

49

51

4.08%

% of Household Electrified

94.0 (a)

96.0 (a)

3.00%

System Load Factor

62.8

63.1

0.53%

Total Employed (as @ year end)

No.

16,709

16,326

-2.29%

Capital Investments

m.Rs.

99,878

75,771

Net Fixed Assets in Operation (average)

m.Rs.

444,235

451,501

Rate of Return on fixed assets

-9.95

1.59

No. of Consumers per Employee

No./ Employee

298

319

7.09%

Av. Elect: Consumption per Capita

kWh/ Person

515

519

0.66%

No. of Consumers per length of dist.line

No./ km.

35.2

34.1

0.7

0.2

Electricity Elasticity (w.r.t. GDP)


Total Energy Consumption in Sri Lanka

KTOE

9277 (b)

Per Capita Energy Consumption in Sri Lanka

kgOE/Person

456 (b)

Share of Elect. to Total Energy Supply

9.6 (b)

CSC - Consumer Service Centres

POS - Point of Sales

P.P.P. - Private Power Purchase.

(a) - Estimated. (b) - Provisional

Note -

(1) All financial data are provisional.


(2) Revenue in 2013 includes FAC. (Domestic - up to 30 = 25%, 31 to 60 = 35%,
Above 60= 40% ; Industrial & Hotel = 15% ; GP = 25% ; GV = 0 or 25%)
(3) Local standard time was adjusted to +5 1/2 GMT in April, 2006.
(4) Tariff structure changed effective from 20/04/2013

GENERATION STATISTICS
Ownership & Source
C.E.B.

P.P.P.

No.of Power Stations


2012
25
17
6
1
1
134
109
8
17
159

- Total
- Hydro
- Thermal-Oil
- Thermal-Coal
- Wind
- Total
- Hydro-Small
- Thermal
-NCRE

Total

Installed Capacity in MW.

%
Change
0.00%
0.00%
0.00%
0.00%
0.00%
15.67%
20.18%
-12.50%
0.00%
13.21%

2013
25
17
6
1
1
155
131
7
17
180

2012
2,214
1,357
554
300
3
1,098
227
784
87
3,312

%
Change
0.62%
0.26%
1.84%
0.00%
0.00%
3.34%
17.57%
-1.66%
11.33%
1.52%

2013
2,228
1,361
564
300
3
1,134
267
771
96
3,362

NCRE - Non Conventional Renewable Energy ( Solar, Dendro, Biomass, Wind)

Gross Generation in GWh


Ownership & Source
C.E.B.
- Total
- Hydro
- Thermal-Oil
- Thermal-Coal
- Wind
P.P.P.
- Total
- Hydro-Small
- Thermal
-NCRE
Total Generation

Peacentage of Total
2012
6,162
2,727
2,029
1,404
2
5,640
565
4,906
169
11,801

Av. Daily Generation - GWh/day

32.33

2013 % increase
8,808
42.9%
6,010
120.4%
1,326
-34.6%
1,469
4.7%
2
0.2%
3,154
-44.1%
916
62.2%
1,977
-59.7%
260
54.0%
11,962
1.4%
32.77

2013
74%
50%
11%
12%
0%
26%
8%
17%
2%
100%

1.4%

Gross Generation by Source in GWh.


Hydro
Thermal-Oil
Thermal-Coal
NCRE
Total Generation

2012
52%
23%
17%
12%
0%
48%
5%
42%
1%
100%

Installed Capa. by Source in MW.


110.4%
-52.4%
4.7%
53.3%
1.4%

1,584
1,338
300
90
3,312

1,628
1,335
300
99
3,362

2.74%
-0.21%
0.00%
10.95%
1.52%

3,292
6,935
1,404
171
11,801

6,926
3,304
1,469
263
11,962

Day Maximum Demand in MW.

1759.2

1853.5

5.36%

* - At Wednesday 9th May, 2012

Night Maximum Demand in MW.

2146.4*

2164.2**

0.83%

** - At Monday 8th April, 2013

1259

1259

Self Generation Scheme-GWh

Hydro Reservoir Capacity in GWh

Generation by Ownership - 2012 & 2013


2012

48%

Generation by Source - 2012 & 2013


2012

2013

26%

52%

2013

59%

74%

28%

12%

58%

28%

2%

1%
CEB

PPP

Hydro

Thermal - Oil

12%

Thermal - Coal

NCRE

DATA ON FUEL USED FOR THERMAL GENERATION


Name of
Power Station
K.P.S.(small GT)
K.P.S.(GT 7)
K.P.S.(C.Cy.)
SP.P.S.(Diesel) - A
SP.P.S.(Diesel) - B
Chunnakam - Diesel
Uthuru Janani
Uthuru Janani
Puttalam-Coal
TOTAL

Type of
Fuel
L.A.D.
L.A.D.
L.A.D.
Naphtha
L.A.D.
L.H.F.
L.A.D.
L.H.F.
L.A.D.
L.A.D.
L.F.O.
L.A.D.
Coal

Fuel Cost in m. Rs
2012
2012
2013
m.Rs.
k/Wh
m.Rs.
4,692 47.93
68
3,361 27.93
684
13,823 24.15
5,756
7,421
9,408
130 14.62
243
5,609
3,360
60 13.26
220
7,011
6,785
170 32.94
10
9
2,361
207
7.92
210
10,906
11,193
53,389 15.55 40,308

2013
k/Wh
66.75
41.31
24.85
20.08
18.16
34.56
18.84
7.76
14.26

Fuel Used in
m. Litres
2012
2013
46
1
41
6
124
50
91
105
1
2
91
41
1
2
114
83
2
0
0
27
2
2
625(M. kg) 678(M. kg)
513
318

Fuel Cost for Thermal Generation


C.E.B

25

22442

Million Rs.
Thousands

20
15
10

7421

9408

1262012506

11193
10906

LHF

COAL

7200

5
0
Naptha

LAD

2012

2013

Million Liters / Kgs

700

Fuel Used For Thermal Generation


C.E.B.
678
625

600
500
400
300
200
100

217
91

105

205

151

62

0
Naptha

LAD

2012
RURAL ELECTRIFICATION
SCHEMES
YEAR

No. of Schemes

2007

460

2008

346

2009

487

2010

526

2011

561

2012

694

2013

799

LHF

COAL

2013

% Share of Consumer Accounts by Division


2012
18%
24%

27%
31%

Distribution Division 1
Distribution Division 3

2013
17%
20%

28%
35%

Distribution Division 2
Distribution Division 4

ELECTRICITY SALES BY PROVINCE IN GWh( million kWh)


Province

C.E.B.

Colombo City
North Western
North Central
Northern
Division - 1 Total
Western-North
Central
Eastern
Division - 2 Total
Western-South II
Uva
Sabaragamuwa
Division - 3 Total
Western-South I
Southern
Division - 4 Total
Bulk Sup. To LECO
TOTAL

2012
1,247
1,049
384
213
2,892
1,755
776
472
3,003
1,072
381
485
1,938
537
801
1,338
1,302
10,474

Percentage
Change
2012/13
-0.2%
-0.2%
3.5%
12.9%
1.2%
0.3%
14.0%
2.0%
4.1%
1.4%
-15.5%
-0.7%
-2.4%
2.5%
2.0%
2.2%
0.5%
1.4%

C.E.B.
2013
1,244
1,046
397
240
2,928
1,761
884
482
3,127
1,088
322
482
1,891
551
816
1,367
1,308
10,621

Percentage
of Total
2013
11.7%
9.9%
3.7%
2.3%
27.6%
16.6%
8.3%
4.5%
29.4%
10.2%
3.0%
4.5%
17.8%
5.2%
7.7%
12.9%
12.3%
100.0%

Monthly
Av.Sales
kWh/Cons.
2013
630
126
93
92
170
263
86
102
144
249
87
103
148
185
103
126
170

ELECTRICITY SALES BY TARIFF IN GWh( million kWh)


Tariff

C.E.B.

Percentage
Change
2012/13
-1.0%
6.7%
0.8%
4.3%
-5.4%
4.6%
4.5%
27.4%
3.5%
5.7%
1.8%
0.8%
3.0%
0.6%
-

C.E.B.

2012
2013
Domestic
3,522
3,488
Religious
55
58
General Purpose Total
2,042
2,059
GP 1 -Small
1,074
1,121
GP 2 - Medium
740
699
GP 3 - Large
228
239
Hotel Total
160
168
H 1 -Small
1
2
H 2 - Medium
100
104
H 3 - Large
59
62
Industrial Total
3,285
3,344
IP 1 -Small
272
274
IP 2 - Medium
1,628
1,676
IP 3 - Large
1,385
1,394
Government Total
89
GV 1 -Small
0.1
GV 2 - Medium
87.4
GV 3 - Large
1.5
Bulk Supply to LECO
L2 -11kV & above
1,302
0.5%
1,308
Street Lighting
109
-0.4%
108
TOTAL
10,474
1.4%
10,621
* - Due to new tariff category introduced effective from 01/04/2013.

Percentage
of Total
2013
32.8%
0.5%
19.4%
10.6%
6.6%
2.2%
1.6%
0.0%
1.0%
0.6%
31.5%
2.6%
15.8%
13.1%
0.8%
0.0%
0.8%
0.0%

Monthly
Av.Sales
kWh/Cons.
2013
63
153
321
176
16,716
197,029
30,042
585
40,101
645,834
5,242
469
32,530
577,758
24,027
3,958
23,883
128,081

12.3%
1.0%
100.0%

170

NO.OF CONSUMER ACCOUNTS BY PROVINCE


Province

C.E.B.

Colombo City
North Western
North Central
Northern
Division - 1 Total
Western-North
Central
Eastern
Division - 2 Total
Western-South II
Uva
Sabaragamuwa
Division - 3 Total
Western-South I
Southern
Division - 4 Total
Bulk Sup. To LECO
TOTAL

2012
161,018
663,514
338,951
188,284
1,351,767
542,495
653,912
366,942
1,563,349
352,462
401,725
433,969
1,188,156
240,341
636,247
876,588
1
4,979,862

Increase
in Accounts
2013
3,547
29,526
17,495
29,689
80,257
14,593
204,534
25,494
244,621
11,640
-93,018
-43,930
-125,308
8,031
23,298
31,329
0
230,899

Percentage
Change
2012/13
2.2%
4.4%
5.2%
15.8%
5.9%
2.7%
31.3%
6.9%
15.6%
3.3%
-23.2%
-10.1%
-10.5%
3.3%
3.7%
3.6%
4.6%

C.E.B.
2013
164,565
693,040
356,446
217,973
1,432,024
557,088
858,446
392,436
1,807,970
364,102
308,707
390,039
1,062,848
248,372
659,545
907,917
1
5,210,761

Percentage
of Total
2013
3.2%
13.3%
6.8%
4.2%
27.5%
10.7%
16.5%
7.5%
34.7%
7.0%
5.9%
7.5%
20.4%
4.8%
12.7%
17.4%
100.0%

NO.OF CONSUMER ACCOUNTS BY TARIFF


Tariff

C.E.B.

Increase
in Accounts
2013
198,484
1,618
28,020
28,085
-78
13
66
34
31
1
2,402
2,265
125
12
309
3
305
1

Percentage
Change
2012/13
4.5%
5.4%
5.5%
5.6%
-2.2%
14.8%
16.5%
16.4%
16.8%
14.3%
4.7%
4.9%
3.0%
6.3%
-

C.E.B. Percentage
of Total
2013
2013
4,589,929
88.1%
31,627
0.6%
535,267
10.3%
531,679
10.2%
3,487
0.1%
101
negli.%
465
0.01%
241
negli.%
216
negli.%
8
negli.%
53,162
1.0%
48,667
0.9%
4,294
0.1%
201
negli.%
309
negli.%
3
negli.%
305
negli.%
1
negli.%

2012
Domestic
4,391,445
Religious
30,009
General Purpose Total
507,247
GP 1 -Small
503,594
GP 2 - Medium
3,565
GP 3 - Large
88
Hotel Total
399
H 1 -Small
207
H 2 - Medium
185
H 3 - Large
7
Industrial Total
50,760
IP 1 -Small
46,402
IP 2 - Medium
4,169
IP 3 - Large
189
Government Total
GV 1 -Small
GV 2 - Medium
GV 3 - Large
Bulk Supply to LECO
L2 -11kV & above
1
1
Street Lighting
1
1
TOTAL
4,979,862
230,899
4.6%
5,210,761
* - Due to new tariff category introduced effective from 01/04/2013.
Note - Trans.Bulk Supply to LECO Accounts are accounted as one from 2011 negli.

negli.%
negli.%
100.0%
- negligible.

REVENUE FROM ELECTRICITY SALES BY PROVINCE IN m.Rs.


Province

Colombo City
North Western
North Central
Northern
Division - 1 Total
Western-North
Central
Eastern
Division - 2 Total
Western-South II
Uva
Sabaragamuwa
Division - 3 Total
Western-South I
Southern
Division - 4 Total
Bulk Sup. To LECO
TOTAL

C.E.B.
2012
29,464
14,313
5,415
3,449
52,642
25,824
11,049
6,719
43,591
16,412
5,112
6,411
27,935
9,332
10,828
20,159
18,628
162,956

Percentage
Change
2012/13
10.7%
16.8%
20.2%
28.9%
14.5%
16.0%
32.6%
19.5%
20.7%
17.1%
-5.4%
14.1%
12.3%
18.3%
18.2%
18.2%
20.1%
16.9%

C.E.B.
2013
32,621
16,716
6,507
4,446
60,289
29,946
14,653
8,027
52,626
19,212
4,834
7,315
31,362
11,038
12,798
23,835
22,376
190,488

Percentage
of Total
2013
17.1%
8.8%
3.4%
2.3%
31.6%
15.7%
7.7%
4.2%
27.6%
10.1%
2.5%
3.8%
16.5%
5.8%
6.7%
12.5%
11.7%
100.0%

Ave.Price
Rs./kWh
2013
26.23
15.97
16.38
18.50
20.59
17.00
16.57
16.66
16.83
17.67
15.01
15.19
16.58
20.03
15.68
17.43
17.11
17.93

REVENUE FROM ELECTRICITY SALES BY TARIFF IN m.Rs.


Tariff

C.E.B.

Percentage
Change
2009/10
22.1%
7.5%
8.6%
12.6%
2.9%
8.9%
23.2%
43.5%
23.8%
21.4%
16.2%
18.9%
17.0%
14.6%
-

C.E.B. Percentage
of Total
2010
2010
52,373
27.5%
405
0.2%
56,783
29.8%
30,092
15.8%
20,355
10.7%
6,336
3.3%
3,297
1.7%
43
0.0%
2,145
1.1%
1,110
0.6%
53,529
28.1%
3,977
2.1%
28,603
15.0%
20,949
11.0%
1,724
0.9%
3
0.0%
1,695
0.9%
26
0.0%

Ave.Price
Rs./kWh
2010
15.02
6.96
27.58
26.85
29.10
26.53
19.67
25.13
20.64
17.90
16.01
14.51
17.06
15.03
19.35
19.62
19.39
16.93

11.7%
100.0%

17.11
17.93

2009
Domestic
42,887
Religious
377
General Purpose Total
52,309
GP 1 -Small
26,716
GP 2 - Medium
19,772
GP 3 - Large
5,820
Hotel Total
2,676
H 1 -Small
30
H 2 - Medium
1,732
H 3 - Large
914
Industrial Total
46,079
IP 1 -Small
3,344
IP 2 - Medium
24,448
IP 3 - Large
18,288
Government Total
GV 1 -Small
GV 2 - Medium
GV 3 - Large
Bulk Sup. to LECO
L2 -11kV & above
18,628
20.1%
22,376
Street Lighting
TOTAL
162,956
16.9%
190,488
* - Due to new tariff category introduced effective from 01/04/2013.

M+RP
.8%

LECO ELECTRICITY SALES


SALES BY TARIFF IN GWh.
%

CONSUMER ACCOUNTS BY TARIFF


%

2012

2013

Change

2012

2013

Change

Domestic

531

513

-3.4%

415,098

434,148

4.6%

Religious

3.8%

2,339

2,441

4.4%

374

386

3.2%

69,358

75,491

8.8%

General Purpose Total


GP 1 -Small

219

224

2.5%

68,424

74,507

8.9%

GP 2 - Medium

150

156

4.3%

931

981

5.4%

GP 3 - Large
Hotel Total
H 1 -Small
H 2 - Medium
H 3 - Large
Industrial Total
IP 1 -Small
IP 2 - Medium
IP 3 - Large
Government Total

3.3%

0.0%

38

45

18.9%

46

47

2.2%

0.0%

36

43

19.8%

44

46

4.5%

1.3%

0.0%

236

239

1.4%

3,106

3,476

11.9%

24

24

-1.5%

2,617

2,915

11.4%

187

190

1.4%

482

553

14.7%

25

25

3.7%

14.3%

206

GV 1 -Small

169

GV 2 - Medium

37

GV 3 - Large

Temporary Connections

-8.9%

403

947

135.0%

29

24

-18.5%

3,106

3,703

19.2%

1,217

1,222

0.3%

493,456

520,459

5.5%

Street Lighting
TOTAL

C.E.B. ELECTRICITY SALES BY TARIFF


BULK+S.L.
13.5%

2012

BULK+S.L.
13.3%

DOM+RP
34.1%

2013
DOM+RP
33.4%

INDUSTRIAL
31.5%

INDUSTRIAL
31.4%

HOTEL
1.5%

GENERAL+GV
20.2%

HOTEL
1.6%

GENERAL+GV
19.5%

C.E.B. CONSUMER ACCOUNTS BY TARIFF


2013

2012
GENERAL
10.2%
HOTEL
0.0%

DOM+RP
88.8%

INDUSTRIAL
1.0%
BULK+S.L.
0.0%

DOM+RP
88.7%

GENERAL+
GV
10.3%
HOTEL
0.0%

INDUSTRIAL
1.0%

BULK+S.L.
0.0%

GENERAL STATISTICS
Population (Mid Year)
GNP at Current Prices
GNP at Constant (2002) Prices
GDP at Current Prices
GDP at Constant (2002) Prices
Per Capita GDP at Market Prices
Per Capita GDP at Market Prices
CCPI Index (2002 = 100)
GDP Deflator (2002 = 100)
Area of Sri Lanka
Average Exchange Rate
* - Provisional

Units
Thous.
Rs.m.
Rs.m.
Rs.m.
Rs.m.
Rs.
U.S.$
%
sq.km.
Rs/US $

2012
20,328
7,423,623
2,983,032
7,578,554
3,045,288
372,814
2,922
162.9
248.9
65,610
127.60

2013*
20,483
8,442,261
3,178,888
8,673,870
3,266,099
423,467
3,280
174.2
265.6
65,610
132.05

Change
0.8%
13.7%
6.6%
14.5%
7.3%
13.6%
12.3%
6.9%
6.7%
3.5%

FUEL RATE AND THERMAL EFFICIENCY


Fuel Rate in Litres/kWh
2012
2013
0.47
0.58
0.34
0.36
0.48
0.33
0.23
0.23
0.32
0.26
0.21
0.22
0.23
0.22
0.28
0.27
0.30
0.30
0.22
0.45
0.45
0.45
0.46

K.P.S.(smallGT - L.A.D)
K.P.S.(new GT - L.A.D)
SP.P.S. - A ( L.A.D.)
SP.P.S. - A (L.H.F.)
SP.P.S.- B (L.A.D.)
SP.P.S.- B (L.H.F.)
K.P.S. - C.Cy. (L.A.D.)
K.P.S. - C.Cy. (Naptha)
Chunnakam
Uthuru Janani (L.A.D)
Uthuru Janani (L.F.O)
Puttalam - LAD
Puttalam - Coal

Note:- K.P.S. - Kelanitissa Power Station.


SP.P.S. - Sapugaskande Power Station.
C.P.S.- Chunnakam Power Station.
G.T. - Gas Turbines.

Av: Thermal Efficiency


2012
2013
19.9%
16.2%
27.5%
26.4%
19.6%
28.3%
40.1%
40.2%
29.0%
36.2%
43.7%
43.3%
41.8%
42.1%
44.4%
45.6%

21.4%
30.7%

40.3%
21.7%
29.7%

L.A.D.- Lanka Auto Diesel


L.H.F. - Lanka Heavy Fuel.
C.Cy. - Combined Cycle.
KKS.- Kankasanthurai
F.O - Furnace Oil

No. of Areas, Consumer Service Centres & POS Centres in CEB


Province / Division
Colombo City
North Western
North Central
Nothern
Division - 1
Western-North
Central
Eastern
Division - 2
Western-South II
Uva
Sabaragamuwa
Division - 3
Western-South I
Southern
Division - 4
TOTAL

Area
4
7
3
2
16
6
10
4
20
5
4
6
15
3
6
9
60

2012
CSC
8
22
10
11
51
18
31
18
67
13
17
20
50
10
26
36
204

POS
4
5
1
2
12
5
5
2
12
6
4
2
12
4
5
9
49*

Area
4
7
3
2
16
6
12
4
22
5
3
5
13
3
6
9
60

2013
CSC
8 **
24
10
12
46
18
39
19
76
13
12
17
42
10
26
36
208

* Added 4 centers managed by CEB Head Office.


** All CSC activities handled at the E - City Centres at the Area Engineer Offices.

POS
4
5
1
2
12
7
6
2
15
6
3
2
11
4
5
9
51*

LENGTH OF TRANSMISSION AND DISTRIBUTION LINES IN km.


2012
501
1,791
50
25,953
36
1,583
759
113,003
34,862
3,500
74,642

220 kV Route Length O.H.


132 kV Route Length O.H.
132 kV Route Length U.G.
33 kV Route Length O.H.
33 kV Route Length U.G.
11 kV Route Length O.H.
11 kV Route Length U.G.
Low Voltage Circuit Length O.H.& U.G.-Total
Single Phase O.H. & U.G.
Two Phase O.H. & U.G.
Three Phase O.H. & U.G.

2013
501
1,885
50
28,677
37
1,657
754
121,349
34,826
3,635
82,888

% Change
0.0%
5.2%
0.0%
10.5%
2.8%
4.7%
-0.7%
7.4%
-0.1%
3.9%
11.0%

NUMBER
AND
CAPACITYOF
OF SUBSTATIONS
SUBSTATIONS
NUMBER
AND
CAPACITY
Units
Grid S.S. (132/33 kV)
Capacity
Grid S.S.(220/132/33kV)
Capacity
Grid S.S.(220/132kV)
Capacity
Grid S.S.(220/33kV)
Capacity
Grid S.S. (132/11 kV)
Capacity
Primary S.S. (33kV/11kV )
Capacity
Distribution S.S.(33kV/LV & 11kV/LV)
Capacity
Total number of substations
Total capacity

No.
MVA
No.
MVA
No.
MVA
No.
MVA
No.
MVA
No.
MVA
No.
MVA
No.
MVA

2012

2013

% Change

47
3,138
5
2100/500
2
405
5
369
120
1,068
24,324
5,144
24,503
12,723

49
3,484
5
2100/500
2
405
1
75
5
369
119
1,082
25,452
5,413
25,633
13,429

4.3%
11.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
-0.8%
1.4%
4.6%
5.2%
4.6%
5.5%

Distribution Line
& Region
DISTRIBUTION
LINELength
LENGTHbyBYProvince
PROVINCE
& DIVISION
Province /
Division
Colombo City
North Western
North Central
Nothern
Division - 1 Total
Western-North
Central
Eastern
Division - 2 Total
Western-South II
Uva
Sabaragamuwa
Division - 3 Total
Western-South I
Southern
Division - 4 Total
Total

33 kV Route km

25
3,962
2,825
1,199
8,010
1,610
3,297
2,140
7,046
1,076
3,025
2,821
6,922
710
3,300
4,010
25,989

2012

11 kV Route km

601
276
287
188
1,352
124
141
397
662
17
0
16
34
58
236
294
2,342

L.V. Circuit km

844
19,994
8,605
4,193
33,636
9,275
13,368
7,589
30,232
5,615
10,132
11,431
27,178
3,358
18,599
21,956
113,003

33 kV Route km

25
4,183
4,067
1,533
9,809
1,671
4,460
2,300
8,431
1,095
2,682
2,509
6,287
722
3,465
4,187
28,714

2013

11 kV Route km

613
285
316
208
1,422
125
124
397
647
17
0
27
44
59
240
298
2,411

L.V. Circuit km

883
20,807
10,209
4,689
36,588
9,430
16,520
8,526
34,477
5,848
9,719
11,666
27,233
3,472
19,579
23,051
121,349

C.E.B. TARIFF - EFFECTIVE FROM 20-04-2013


(for each 30 days billing period)

Unit Charge

Fixed Charge

DOMESTIC Consumption 0 - 60 kWh per month


Block 1 - 0 - 30
units @ Rs 3.00
Block 2 - 31 - 60
units @ Rs 4.70
Consumption above 60 kWh per month
Block 1 - 0 - 60
units @ Rs 10.00
Block 2 - 61 - 90
units @ Rs 12.00
Block 3 - 91 - 120
units @ Rs 26.50
Block 4 - 121 - 180
units @ Rs 30.50
Block 5- Above 180
units @ Rs 42.00
RELIGIOUS & CHARITABLE INSTITUTIONS:Block 1 - 0 - 30
units @ Rs 1.90
Block 2 - 31 - 90
units @ Rs 2.80
Block 3 - 91 - 120
units @ Rs 6.75
Block 4 - 121 - 180
units @ Rs 7.50
Block 5 - Above 180
units @ Rs 9.40
OTHER CUSTOMER
CATEGORIES
Rate - 1
Supply at 400/230V
Contract demand
< or = 42 kVA
Unit Charge
(Rs/unit)

General Purpose

Fixed Charge
(Rs./Month)
FAC from Unit Charge

GP1 - 1
For 210 kWh/month
19.50 +
240.00
GP1 - 2
For > 210 kWh/month
21.50 +
240.00
+
25%

Rate - 2
Supply at 400/230V
Contract demand
above42 kVA
Unit Charge
(Rs/unit)
+
Demand Charge
(Rs./kVA)
Fixed Charge
(Rs./Month)
FAC from Unit Charge

Day
- 20.50
(5.30 am to 6.30 pm) +
Peak - 25.00
(6.30 pm to 10.30 pm) +
Off-Peak - 14.50
(10.30 pm to 5.30 am)
+
1100.00
+
3000.00
+
25%

Rate - 3
Supply at 11 kV &
above

Day
- 19.50
(5.30 am to 6.30 pm) +
Peak - 24.00
(6.30 pm to 10.30 pm) +
Off-Peak - 13.50
(10.30 pm to 5.30 am)
+
1000.00
+
3000.00
+
25%

Unit Charge
(Rs/unit)
+
Demand Charge
(Rs./kVA)
Fixed Charge
(Rs./Month)
FAC from Unit Charge
Street Lightning

FAC (% OF
TOTAL ENERGY
CHARGE)

(Apply Last Block %)


per unit
per unit

+
+

Rs. 30.00
Rs. 60.00

+
+

25%
35%

per unit
per unit
per unit
per unit
per unit

+
+
+
+
+

N/A
Rs. 90.00
Rs. 315.00
Rs. 315.00
Rs. 420.00

+
+
+
+

N/A
10%
40%
40%
40%

per unit
per unit
per unit
per unit
per unit

+
+
+
+
+

Rs. 30.00
Rs. 60.00
Rs. 180.00
Rs. 180.00
Rs. 240.00

Government
(Schools, Hopitals.)

14.65

Industrial

Hotel

12.50

22.00

600.00
+
0% or 25%

600.00
+
15%

600.00
+
15%

Day - 11.30
(5.30 am to 6.30 pm) +
Peak - 21.00
(6.30 pm to 10.30 pm) +
Off-Peak - 7.00
(10.30 pm to 5.30 am)
+
1100.00
+
3000.00
+
15%

Day
- 15.00
(5.30 am to 6.30 pm) +
Peak - 24.00
(6.30 pm to 10.30 pm) +
Off-Peak - 10.00
(10.30 pm to 5.30 am)

Day
- 10.50
(5.30 am to 6.30 pm) +
Peak - 24.00
(6.30 pm to 10.30 pm) +
Off-Peak - 6.00
(10.30 pm to 5.30 am)
+
1000.00
+
3000.00
+
15%

Day - 14.00
(5.30 am to 6.30 pm) +
Peak - 23.00
(6.30 pm to 10.30 pm) +
Off-Peak - 9.00
(10.30 pm to 5.30 am)

14.55
+
1100.00
+
3000.00
+
0% or 25%

14.35
+
1000.00
+
3000.00
+
0% or 25%

1100.00
+
3000.00
+
15%

1000.00
+
3000.00
+
15%

@ Rs. 17.00 per unit

Note - 1. Fuel Adjustment Charge (FAC) imposed on 16/02/2012 was continued in 2013.
2. FAC not applied for Government owned Hospitals and Schools.

220 kV
Under implementation

Transmission
Network
2013

132 kV
220 kV/ 132 kV Grid Substation
Hydro Power Plant
Wind Power Plant

New
Chunnakam

Thermal Power Plant

Uthuru Janani
Chunnakam

Kilinochchi

Vavuniya
Trincomalee

Anuradhapura
New Anuradhapura

Puttalam
Coal

Heladhanavi

Habarana

Puttalam
Puttalam Wind Power

Valachchenai

Pannala
Madampe
Bowatenna

Bolawatte

Veyangoda
Kotugoda
Kerawalapitiya
AES
Kelanitissa

Kurunegala

Veyangoda
Kiribathkumbura
Kotugoda
Thulhiriya

Aniyakanda
Kelaniya

Biyagama
CPPL
Kotahena
APPL
Fort
Sapugaskanda
Kollupitiya
Kolonnawa
Maradana
Havelock Town
Aturugiriya
Sri Jayewardenepura
Oruwala
Dehiwela
Pannipitiya

ACE
Horana

Kotmale

Padukka

Randenigala

Inginiyagala

Mahiyangane

Rantembe
Upper Kotmale

Canyon

ACE

Horana

Ratnapura

Matugama

Balangoda
Samanala Wewa

Kukule

Deniyaya

Embilipitiya

Ambalangoda
Matugama

Ampara

Badulla
Polpitiya Laxapana
Sitawaka
Wimalasurendra
New Lax Nuwara Eliya
Kosgama

Ratmalana

Panadura

Ukuwela
Victoria

ACE

Galle
Matara

Beliatta

Hambantota Wind Power

Hambantota

BST

You might also like