Professional Documents
Culture Documents
Reference
fr. MSMA
CATCHMENT
Designer:
Date:
Checker:
Job No:
APPROVED BY :
(Post-Development)
(Pre-Development)
Building Footprint,
Infra and Roads
21,623 m2
Pervious Area
Lawn, Gardens and
Open Space
=
m2
m2
21,623
m2
For:
Minor System ARI
Major System ARI
=
=
Eq. 13.2
Where:
Table 13.A1
For:
R =
a =
b =
2-years ARI
4.5140
0.6729
tc
=
30.00
=
2.2887
=
-2.6734
=
0.4643
Thus,
=
4.594
=
98.84
Converting to rainfall depth using:
P30
=
49.42
b.ln(t)
c.(ln(t))2
d.(ln(t))3
ln(2I30)
2
I30
Eq. 13.4
file:///var/www/apps/conversion/tmp/scratch_2/262788296.xls
c =
d =
-0.2311
0.0118
minutes,
mm/hr
Pd = I x d
mm
Development
Page 1 of 6
Reference
fr. MSMA
Calculation
For:
tc
=
60.00
=
2.7551
=
-3.8741
=
0.8099
Thus,
=
4.205
=
67.01
Converting to rainfall depth using:
P60
=
67.01
minutes,
To find P with tc
FD
mins,
b.ln(t)
c.(ln(t))2
d.(ln(t))3
ln(2I60)
2
I60
Eq. 13.4
Table 13.3
Eq. 13.3
=
=
10
1.037
mm/hr
Pd = I x d
mm
Design
Chart 14.4
Chart 14.3
Development
I
Impervious Area
Pervious Area
Status
(mm/hr)
C
A (m2)
C
A (m2)
Pre-Development, Qp
187.07
0.90
0
0.74
21,623
Post-Development, Qa
187.07
0.90
21,623
0.88
0
* Adopt Runoff Coefficient, C for Qp
from Category
D
* Adopt Runoff Coefficient, C for Qa
from Category
3
From the above, Q (Post-Development) > Q (Pre-Development).
Therefore, OSD Storage required.
Total
CxA
16,001
19,461
Q
(l/s)
831.5
1,011.3
PSD
a-(a2-4b)1/2
2
a
b
Therefore,
=
=
a
b
PSD2
=
=
=
11,011.1
7,187,611.6
696.86
l/s
ln(RIt)
Using:
Where:
Table 13.A1
For:
Thus,
R =
a =
b =
tc
b.ln(t)
c.(ln(t))2
d.(ln(t))3
ln(10I30)
10
I30
10-years ARI
3.7277
1.4393
=
=
=
=
=
=
c =
d =
-0.4023
0.0241
30.00 minutes,
4.8953
-4.6539
0.9482
4.917
136.65 mm/hr
file:///var/www/apps/conversion/tmp/scratch_2/262788296.xls
Development
Page 2 of 6
file:///var/www/apps/conversion/tmp/scratch_2/262788296.xls
Development
Page 3 of 6
Reference
fr. MSMA
Eq. 13.4
Calculation
Thus,
Eq. 13.4
Table 13.3
Eq. 13.3
Design
Chart 14.4
Chart 14.3
tc
b.ln(t)
c.(ln(t))2
d.(ln(t))3
ln(10I60)
10
I60
=
=
=
=
=
=
Pd = I x d
mm
60.00 minutes,
5.8930
-6.7440
1.6541
4.531
92.83 mm/hr
Pd = I x d
To find P with tc
FD
mins,
=
=
10
1.037
mm
Total
CxA
16,001
19,461
Q
(l/s)
1,144.3
1,391.7
PSD
a-(a2-4b)1/2
2
a
b
Therefore,
=
=
a
b
PSD10
7,091.0
6,369,974.6
1,055.41
l/s
The site discharge for 10-year ARI and the corresponding SSR is calculated for
a range of storm durations to determine the maximum SSR for the total storage.
These calculations are summarised in the following two tables as shown below:
td (min)
5
10
15
20
30
40
50
60
70
80
90
10
It
(mm/hr)
164.44
181.83
173.08
160.29
136.65
118.21
104.00
92.83
83.51
76.52
70.40
Impervious Area
C
A (m2)
0.90
21,623
0.90
21,623
0.90
21,623
0.90
21,623
0.90
21,623
0.90
21,623
0.90
21,623
0.90
21,623
0.90
21,623
0.90
21,623
0.90
21,623
file:///var/www/apps/conversion/tmp/scratch_2/262788296.xls
Pervious Area
C
A (m2)
0.57
0
0.60
0
0.59
0
0.58
0
0.52
0
0.47
0
0.44
0
0.30
0
0.38
0
0.35
0
0.34
0
Total
CxA
19,461
19,461
19,461
19,461
19,461
19,461
19,461
19,461
19,461
19,461
19,461
Qd
(l/s)
889
983
936
866
739
639
562
502
451
414
381
Development
Page 4 of 6
file:///var/www/apps/conversion/tmp/scratch_2/262788296.xls
Development
Page 5 of 6
Reference
fr. MSMA
Calculation
td (min)
Qd
5
10
15
20
30
40
50
60
70
80
90
(l/s)
889
983
936
866
739
639
562
502
451
414
381
PSD
(l/s)
696.86
696.86
696.86
696.86
696.86
696.86
696.86
696.86
696.86
696.86
696.86
390.3
411.3
401.3
384.7
345.7
304.5
262.8
221.1
177.7
138.3
97.3
116.91
105.73
111.07
119.93
140.68
162.63
184.85
207.09
230.20
251.23
273.07
SSR
(m3)
114.50
279.52
380.93
434.26
454.11
412.43
343.53
265.07
182.75
115.98
55.23
and
c
d
SSR
=
=
=
454.11
=
=
=
m3 at
1.20
4.00
100.00
480.00
m
m
m
m3
30
>
454.11
minutes
m2
OK
Eq. 19.3
Thus,
Using:
0.15
1.20
1.038
0.60
0.62
m freeboard
m maximum storage depth
m maximum head to the centreline of the orifice, Ho
for Cd when orifice diameter Do < 50mm
for Cd when orifice diameter Do >> 50mm
Area of orifice, Ao
unit/s of
PSD2
Cd (2gHo)1/2
325
0.332
file:///var/www/apps/conversion/tmp/scratch_2/262788296.xls
m2
>
0.249
m2
m2
OK
Development
Page 6 of 6
Output
tc = 10 mins
file:///var/www/apps/conversion/tmp/scratch_2/262788296.xls
Development
Page 7 of 6
Output
Qp = 307.6 l/s
Qa = 374.1 l/s
file:///var/www/apps/conversion/tmp/scratch_2/262788296.xls
Development
Page 8 of 6
file:///var/www/apps/conversion/tmp/scratch_2/262788296.xls
Development
Page 9 of 6
Output
Qp = 423.4 l/s
Qa = 514.9 l/s
file:///var/www/apps/conversion/tmp/scratch_2/262788296.xls
Development
Page 10 of 6
file:///var/www/apps/conversion/tmp/scratch_2/262788296.xls
Development
Page 11 of 6
Output
SSR(Req) =
454.11
Proposed Storage
Dimensions:
Depth = 1.6m
Width = 10.0m
Length = 20.0m
Proposed Orifice
Size:
4 unit x 325mm
file:///var/www/apps/conversion/tmp/scratch_2/262788296.xls
Development
Page 12 of 6