Addendum 1

Clarifications to the queries of Pre Bid Meeting for Development of Operation, Maintenance and
Management of the State-of-the-Art Pack House
Clarifications to the queries raised by prospective bidders during the Pre – Bid Meeting held on 11th December 2009 at the Committee Room of
PSAMB, Chandigarh

Sr. Queries Response


No.
1. It will be useful to have independent continuous power supply The connection for the independent continuous power supply will
connection for Uninterrupted power supply? Can the Owner be provided by the owner at its own cost.
provide the same?
2. Whether the necessary clearances from Pollution control Board is The Project site does not have the clearance from Pollution control
been taken? Board. However the Owner will provide the clearance at its own
cost.
3 What is the Time Period unto which the guarantee of the The Time Period for the guarantee of the equipments provided by
equipments provided by M/s Voltas Ltd. is applicable? M/s Voltas Ltd. is applicable till 3. 11. 2010.

4 Whether the clearances from Pollution control Board is been taken? The Project site does not have the clearance from Pollution control
If no, then the Owner shall get the clearances before the Compliance Board. However the Owner will provide the same before the
date? Compliance date.
5 What is the Time Period unto which the guarantee of the The Time Period for the guarantee of the equipments provided by
equipments provided by M/s Voltas Ltd. is applicable? M/s Voltas Ltd. is applicable till 3rd Nov. 2010.

6 Whether the Conference Room can be used by the Operator for The Conference Hall cannot be used by the Operator; however the
meetings with the prior consent of the Owner? same can be used for specific purposes with the prior approval of
General Manager (Projects).
7 Whether the permission for Gen Set has been taken? The permission for the Gen Set will be taken by the owner before
handling over the site.
8 Whether the Service Tax is applicable on the services provided by The service tax has to borne by the Operator, if applicable.
the Operator? If Yes whether the Operator or the Owner will pay
the same?
9 Correction: The Clause 6.1 of the Management Contract is: “Within The Clause 6.1 of the Management Contract shall be read as
4 (four) weeks of execution of this Management Contract, a follows: “Within 4 (four) weeks of execution of this Management
Maintenance Board shall be constituted by the Owner, having Contract, a Maintenance Board shall be constituted by the Owner,
representation from the Owner and Operator. Maintenance Board having representation from the Owner and Operator.
shall comprise of 5 (five) members out of which 2 (two) shall be Maintenance Board shall comprise of 5 (five) members out of
nominated by the Owner, 1 (one) shall be a representative of Punjab which 2 (two) shall be nominated by the Owner, 1 (one) shall be
Post Harvest Technology Centre Ludhiana, 1 (one) shall be a nominated by Punjab Post Harvest Technology Centre Ludhiana,
representative of Secretary- Marketing Committee and 1 (one) by 1 (one) shall be nominated by the Operator and Secretary
the Operator and headed by representative of the Owner.” Marketing Committee Ludhiana will be the Fifth member.”
10. Correction: The Clause 5.1 (xv) of the Management Contract is The Clause 5.1 (xv) of the Management Contract shall be read as
“Shall have the right to alter the cold storage facility into ripening follows: “Shall have the right to alter the cold storage facility into
facility and vice versa, at its own cost, with the prior approval of the ripening facility, at its own cost, with the prior approval of the
Owner. However, Operator shall ensure that no damage is caused Owner. However, Operator shall ensure that no damage is caused
to the Facility and the related infrastructure in relation to the to the Facility and the related infrastructure in relation to the
concerned technical parameters. Also, at all times, the Operator concerned technical parameters. Also, at all times, the Operator
shall be made liable for any damages caused to the Facility or any shall be made liable for any damages caused to the Facility or any
of its components” of its components”

*****