COUNTY GOVERNMENT OF UASIN GISHU

COUNTY TREASURY

FIRST QUARTER PROGRESS REPORT


JULY-SEPTEMBER 2014

OCTOBER 2014

A Prosperous and Attractive County in Kenya And Beyond

First Quarter Report 2014/2015

First Quarter Progress Report 2014

The County Treasury P. O. Box 40-30100 ELDORET, KENYA


Email: info@uasingishu.go.ke
Website: www.uasingishu.go.ke

1 | Page

First Quarter Report 2014/2015

TABLES AND FIGURES


LIST OF FIGURES
Figure 1: Quarterly Revenue Performance
Figure 2: Revenue collection in Health Facilities

LIST OF TABLES
Table 1: Summary Maize and Bean Stocks as at September, 2014
Table 2: Food consumption compared to population and production in the
county September, 2014
Table 3: Areas Affected by MLND in 2014 Crop Season
Table 4: Activities and Revenue Accrued
Table 5: General Review of the first quarter (July-September) 2014
Table 6: Pond statistics
Table 7: Summary of Hectare, Volume and Value by Category, 2012- 2014
Table 8: Summary of livestock production by category 2012-2014
Table 9: Farmer Trainings/Meetings/visits in July September 2014
Table 10: Courses offered in the Quarter under Review
Table 11: Educational visits
Table 12: Annual Work Plan Progress
Table 13: Status of Programmes Initiated in Trade, Industrialization, Cooperative
& Enterprise Development, Tourism & Wildlife Management
Table 14: AIA Collection July-Sept 2014

2 | Page

First Quarter Report 2014/2015

Table 15: Monthly Collections per Estate July-Sept 2014


Table 16: Arrears per Estate July-Sept 2014
Table 17: Budget/Implementation Matrix
Table18: Grading and Gravelling of Roads.....
Table 19: Human Resource Management
Table 20: Public Relations and Communications....
Table 21: Registered Co-operatives
Table 22: Monthly Revenue Performance per Stream
Table 23: Exchequer Issues and Local Revenue for the period Jul.-Sept. 2014
Table 24: Recurrent Expenditure for the Periods July-September 2014
Table 25: Development Expenditure for the Periods July-September 2014
Table 26: Summary of Health Facilities per Sub-county
Table 27: Monthly Revenue Collections
Table 28: Summary of the items, allocated budget per item and their current status
Table 30: Water Production
Table 31: Quality Assurance
Table 32: County Assembly Financial Return

3 | Page

First Quarter Report 2014/2015

ABBREVIATIONS AND ACRONYMS


A.I.A

Appropriation in Aid

AFP

Acute Flaccid Paralysis

APR

Annual Progress Report

CBROP

County Budget Review Outlook Paper

CBD

Central Business District

CDF

Constituency Development Fund

CEC

County Executive Committee

CIDP

County Integrated Development Plan

CLTS

Community Led Total Sanitation

DCA

Dairy Commercialization Areas

ECDE

Early Childhood Development Education

EMCA

Environmental Management Coordination

ELDOWAS :

Eldoret Water and Sewerage

ESP

Economic Stimulus Program

ICT

Information Communication Technology

IT

Information Technology

GIS

Geographical Information Systems

HIV/AIDS :

Human Immunodeficiency Virus

KECOSO

Kenya Communication Sports Organization

KeNHA

Kenya National Highways Authority

KeRRA

Kenya Rural Roads Authority

KURA

Kenya Urban Roads Authority

KEMRI

Kenya Medical Research Institute

KEPH

Kenya Essential Package for Health

LAN

Local Area Network


4 | Page

First Quarter Report 2014/2015

LVNWSB

Lake Victoria North Water Service Board

MTP

Medium Term Plan

MDR-TN

Mult Drug Resistant TB

NEMA

National Environment Management Authority

NCPB

National Cereals and Produce Board

NGO

Non Governmental Organization

NKCC

New Kenya Cooperatives Creameries

R.V.T.T.I

Rift valley Technical Training Institute

USA

United States of America

SPA

Service Provision Agreement

SGBV

Sexual Gender Based Violence

WASCA

Water Companys Sports Associations

WHO

World Health Organization

5 | Page

First Quarter Report 2014/2015

ACKNOWLEDGEMENT
This is First Quarter Progress Report for the 2014/2015 compiled with a view to
informing the county government, stakeholders and the general public of the
progress made in the first quarter of the financial year.
The County Executive Committee Member for Finance and Economic Planning
therefore, thanks the Planning Unit for compiling this candid report.
Acknowledgements also go to Chief Officers, Directors and staff in the
departments and other agencies of the County Government whose contributions led
to the successful development of this report.
We continue to appreciate stakeholders in the county who participate in the
development process of the county.

6 | Page

First Quarter Report 2014/2015

EXECUTIVE SUMMARY
The County First Quarter Progress Report covers the periods between 1 st July 2014
and 30th September 2014. It reports on activities undertaken by the various county
government departments and other agencies of the county government as reflected
in their work plans. The report, therefore, reports on progress in implementing the
plans, challenges encountered and way forward.

This report captures major activities undertaken during the period under review
and achievements made. It also reports on challenges and way forward of each
department/agencies of the county government. However, departmental reports
contain detailed information on departmental activities.
The Uasin Gishu County Government is committed to the improvement of
implementation of programmes and projects, and to ensuring that residents get
value for money in service delivery. The County First Quarter Progress Report is
therefore important in informing the county government, stakeholders and the
general public on progress made in the first quarter of the financial year. It also
made an assessment of the budget implementation for the period under review by
analyzing, among other issues, budget execution and expenditure trends.
Periodic reports are useful documents for gauging the performance of various
county government departments and entities with the aim of improving the
effectiveness and efficiency in programme/project implementation and service
delivery.

7 | Page

First Quarter Report 2014/2015

CONTENTS
TABLES AND FIGURES.........................................................................................2
ACKNOWLEDGEMENT.........................................................................................6
EXECUTIVE SUMMARY.......................................................................................7
CHAPTER ONE: BACKGROUD INFORMATION..............................................10
1.1 INTRODUCTION..........................................................................................10
1.2 COUNTY BACKGROUND..........................................................................10
1.3 KEY DEVELOPMENT CHALLENGES......................................................11
1.4 METHODOLOGY.........................................................................................12
1.5 LIMITATION OF THE REPORT..................................................................12
CHAPTER TWO: POLICY REVIEW....................................................................13
CHAPTER THREE: PROGRESS REPORTS........................................................15
3.1 INTRODUCTION..........................................................................................15
3.2 EDUCATION, CULTURE, YOUTH AFFAIRS AND SOCIAL
SERVICES...15
3.2.1

Education..............................................................................................15

3.2.2

Culture..................................................................................................15

3.2.3

Youth Affairs.........................................................................................15

3.2.4

Social Services......................................................................................16

3.2.5

Sports....................................................................................................17

3.3 AGRICULTURE, LIVESTOCK AND FISHERIES......................................20


3.3.1

Agriculture............................................................................................21

3.3.2Agricultural Mechanization Station (AMS)27


3.3.3

Livestock..............................................................................................29
8 | Page

First Quarter Report 2014/2015

3.3.4

Fisheries................................................................................................30

3.3.5

Veterinary Services...............................................................................33

3.3.6CHEBORORWA ATC..34
3.4 LANDS, HOUSING AND PHYSICAL PLANNING...................................40
3.4.1

Lands....................................................................................................41

3.4.2

Physical planning..................................................................................42

3.4.3

Survey Section......................................................................................46

3.4.4

Housing.................................................................................................49

3.5 ROADS, TRANSPORT AND PUBLIC WORKS..........................................52


3.5.1

Roads....................................................................................................52

3.5.2

Transport...............................................................................................52

3.5.3

Public Works.........................................................................................53

3.5.4

Electrical...............................................................................................53

3.6 ENVIRONMENT, ENERGY, WATER AND NATURAL RESOURCES.....58


3.6.1

Water.....................................................................................................58

3.6.2

Environment.........................................................................................59

3.7 PUBLIC SERVICE MANAGEMENT...........................................................60


3.8 TRADE, INDUSTRIALIZATION, COOPERATIVE & ENTERPRISE
DEVELOPMENT, TOURISM & WILDLIFE MANAGEMENT.......................65
3.9 FINANCE AND ECONOMIC PLANNING..................................................68
3.10 HEALTH SERVICES...................................................................................73
3.11 ELDOWAS...................................................................................................89
3.12 ICT AND e-GOVERNMENT......................................................................94
3.13 THE COUNTY ASSEMBLY.......................................................................98
CHAPTER FOUR: CONCLUSION AND RECOMMENDATION.....................100

9 | Page

First Quarter Report 2014/2015

CHAPTER ONE: BACKGROUD INFORMATION


1.1

INTRODUCTION

The County First Quarter Progress Report covers the periods between 1 st July 2014
and 30th September 2014. It reports on activities undertaken by the various county
government departments and other agencies of the government as reflected in their
work plans. The report, therefore, reports on progress in implementing the plans,
challenges encountered and way forward.
1.1.1 Vision
A Prosperous and Attractive County in Kenya and Beyond.
1.1.2 Mission
To serve and improve our peoples livelihoods through good leadership, innovative
technology and efficient infrastructure.
1.2

COUNTY BACKGROUND

Uasin Gishu County is one of the 47 counties in the Republic of Kenya. It lies
between longitudes 34 degrees 50 east and 35 degrees 37 West and latitudes 0
degrees 03 South and 0 degrees 55 North. It is a highland plateau with altitudes
falling gently from 2,700 meters above sea level to about 1,500 meters above sea
level. The topography is higher to the east and declines gently towards the western
border. The county experiences high and reliable rainfall which is evenly
distributed throughout the year. The average rainfall ranges between 624.9 mm to
1,560.4mm with two distinct peaks occurring between March and September; and
May and August. Dry spells occur between November and February. The
temperatures range between 7 degrees Celsius and 29 degrees Celsius.
10 | P a g e

First Quarter Report 2014/2015

Uasin Gishu County shares common borders with Trans Nzoia County to the
North, Elgeyo Marakwet County to the East, Baringo County to the South East,
Kericho County to the South, Nandi County to the South West and Kakamega
County to the North West. It covers a total area of 3,345.2 Sq. Km. with a
population, according to the 2009 Population and Housing Census, of 894,179
people. This population was projected to increase to 1,002,153 in 2012, and
1,123,165 and 1,211,853 in 2015 and 2017 respectively. It has six Sub-counties
(constituencies), namely, Soy, Turbo, Kesses, Kapseret, Ainabkoi and Moiben. The
county has thirty (30) County assembly Wards. In addition, there are two divisions,
Kesses and Kapsaret, with fifty one (51) locations and ninety seven (97) sublocations.
Uasin Gishu Countys economy is largely driven by agriculture; it is agro-based. It
has large and fertile lands which can be classified as high potential. The average
farm size in the county is 2-10 acres with a wide range of crop and livestock
enterprises. The crop enterprises include food crops, cash/industrial crops and
horticultural crops. Large scale farming supports wheat, maize, tea, coffee, flowers
and other horticultural crops for export. However, crop farming is mainly
concentrated on maize and wheat. Livestock enterprises include dairy, poultry,
sheep, goats, pigs, bee keeping and fish farming. But concentration is mainly on
dairy. The county can also support agribusiness and industries and this is yet to be
fully exploited. There are manufacturing, wholesale and retail activities taking
place in the county.
1.3

KEY DEVELOPMENT CHALLENGES

Uasin Gishu County, just like any other county in the country, grapples with
challenges inherent in development endevour. During the period under review, the
11 | P a g e

First Quarter Report 2014/2015

county encountered a number of development challenges. The county had shortfall


of technical staff and capacity as the county was yet to undertake comprehensive
recruitment to fill staff and capacity gaps, an exercise not taken awaiting ongoing
staff rationalization and harmonization. HIV/Aids scourge put pressure on the
county resources, compounding the effects already felt due to the high poverty
level. Uasin Gishu County also had inadequate infrastructure, in the poor state of
roads especially during rainy season; water supply; and electricity. Severe
geological and geographical conditions in the county affect the roads sub-sector.
There were not enough infrastructures in schools and other institutions of learning,
though the county government and other devolved programs like CDF made efforts
to address this. There were also not enough teachers in a number of schools and
county polytechnics in the county. Inadequate access to credit and deforestation
were other development challenges in the county.
1.4

METHODOLOGY

The report was compiled with input from the various departmental heads of the
county government by forwarding their respective reports to the Planning Unit of
Budget and Planning section, Finance and Economic Planning Department.
1.5

LIMITATION OF THE REPORT

This report does not incorporate all the literature and narratives contained in the
respective departmental reports. It only reported on major activities and
achievements, challenges and way forward of each department. However, detailed
departmental reports contain information in details on departmental activities.

12 | P a g e

First Quarter Report 2014/2015

CHAPTER TWO: POLICY REVIEW


This chapter gives key policy priorities and objectives guiding development
process in the county in line with CIDP, Vision 2030 and the Medium Term Plan
(MTP). Development process in the county continues to be informed by the desire
to create employment mainly for the youth and women as a way of incorporating
their participation in economic development; food security and poverty alleviation;
development of physical infrastructure to reduce cost of production, improved
competitiveness and provide access to the markets for both goods and services;
development of human resources for enhanced capacity to adopt innovative
approaches to development; and Information Communication Technology, a
growth sub-sector with immense potential of unlocking many opportunities in
business, education, agriculture, industry and security.
By the end of the CIDP (2013-2017) Uasin Gishu County anticipates to realize the
following broad development outputs/outcomes:
Improved physical infrastructure in the county roads network, electricity,
renewable energy technology promotion, housing;
Improved

food

security

and

poverty

alleviation

promotion

of

commercialization of dairy industry, increased agricultural and livestock


production, and trade;
Clean and secured environment and access to clean and affordable water and
sanitation. Also improved environmental regulation in line with EMCA 1999
for environmentally friendly extraction of natural resources such as quarrying
activities;
Improved school infrastructure for enhanced access to education

13 | P a g e

First Quarter Report 2014/2015

Improved health of residents of Uasin Gishu County through improved health


infrastructure and health care and reduced incidences of diseases and conditions
such as malaria, HIV/Aids, tuberculosis e.t.c.

14 | P a g e

First Quarter Report 2014/2015

CHAPTER THREE: PROGRESS REPORTS


3.1INTRODUCTION
This chapter gives progress reports by the various county government departments
and other agencies.
3.2EDUCATION,

CULTURE,

YOUTH

AFFAIRS

AND

SOCIAL

SERVICES
This department has four sections, namely, Education, Culture, Youth Affairs and
Social Services. The following activities were carried out in the department
between the periods 1st July, 2014-30th September, 2014.
3.2.1 Education
Processing and issuing of ward Bursary to the tune of Kshs 90,000,000 (3
million per ward).
Twenty (20) officers had one (1) week Training on I.C.T at R.V.T.T.I
Preparation and signing of C.E.C performance contract with H.E. the Governor.
Draft policy on Education.
3.2.2 Culture
Draft Policy on culture. A draft has been made to customize the National
Culture Policy.
3.2.3 Youth Affairs
Uasin Gishu County has eight youth polytechnics, namely, Lainguse Youth
Polytechnic, Eldoret Youth Polytechnic, Ainabkoi Youth Polytechnic, Sogorik
Youth Polytechnic, Kanetik Youth Polytechnic, Sesia Youth Polytechnic,
Mugundoi Youth Polytechnic, and Sergoek Youth Polytechnic.

15 | P a g e

First Quarter Report 2014/2015

This section carried out the following activities:


Processing and admission of 210 Diploma and 390 certificate students at
R.V.T.T.I at the cost of Kshs. 30,000,000 (each Kshs. 50,000). This is a
revolving fund that will be paid back by the student upon completion and
acquiring gainful employment.
Drafted policy on Youth Training.
3.2.4 Social Services
This section seeks to facilitate positive change of individuals or groups through
guiding and counseling services. It also mobilizes community to participate in
decision making, offer advisory services to individuals or youth/women groups as
well as empowering them through training, support and linkages to other service
providers.
The following were carried out during the period under review.
Preparation of Draft Policy on Social Welfare and Protection
Social workers undertook the following activities (Social Welfare)
o Undertook case histories (assessment of destitute, orphans and
o
o
o
o

vulnerable children and street children).


Made home visits to 20 destitutes.
Repatriation of street children whose orders were obtained from court.
Counseling of destitute and street children.
Follow up visits of orphans and vulnerable children.

The Community development officers undertook the following activities within


the quarter.
o Presided over election of seven self-help groups.
o Offered advisory to 10 groups.
o Participated in site meeting in the following settlements (INSIP
projects), Munyaka, Kamukunji and Huruma.
16 | P a g e

First Quarter Report 2014/2015

o Participated in KISIP project Social Economic validation meetings in


the following areas Kimumu, Hawaii, Kambi Nairobi, Hill school
and Race Course and mobilized communities to attend.
o Mobilized Communities to attend County functions.
3.2.5 Sports
The following sporting activities were undertaken, coordinated and some
facilitated by the department during the first quarter.
Deaf Olympic
The department prepared and sponsored a team for deaflympics that was held in
Elgeyo/Marakwet at Kamarini Grounds on 4th and 5th July 2014. We sent a
team of 20 players and more than half selected for trials in Nairobi.
KECOSO
These are games for the Kenya Communication Sports Organization. The
department prepared and supervised the renovation of Kipchoge Stadium in
readiness for the games. We also coordinated the activities of KECOSO and
facilitated efficient running of the games. The games were held at Kipchoge
Stadium i.e. opening and closing ceremony and football. Chepkoilel
playgrounds hosted athletics, and road race held in Eldoret town streets. The
games were held from 11th-16th august 2014 and were successful.
KICOSCA Games
These are games that bring together staff working within the counties for
cultural exchange, sharing of ideas and general interaction. All counties were
expected to participate and they were hosted by Nakuru County from 17 th-24th
August 2014. Uasin Gishu sent a delegation of 120 people including 110
players. We won several events and some of our players qualified and were
17 | P a g e

First Quarter Report 2014/2015

selected to represent the country in Kampala Uganda for the Regionals from
29th September to 6th October 2014. The department prepared and coordinated
the success of the activity.
WASCA Games
Water Companys Sports Association held their sports and cultural competition
at Kipchoge Stadium from 20th to 22nd August 2014. The department prepared
fields, coordinated and facilitated their activities.

They participated in

athletics, ball games and indoor games.


Special Olympics
The department sponsored and facilitated the team to participate in the special
Olympic Games held at Tambach T.T.C on 12 th-13th September 2014. The
department sponsored 25 athletes and 10 were selected to participate in the
trials in Nairobi on 17th-20th September 2014. The department also sponsored
them to the Nairobi event 2 athletes were picked for international
competitions next year from Uasin Gishu County.
World Cup Athletics Championship
This activity was held in Morocco on 13 th-14th September 2014 and 8 of our
athletes participated and some scored medals as follows: Eunice Sum gold in
800; Jairus Kipchoge gold in 3000m steeple chase; and Abel Kiprop silver
in 1500m.
Commonwealth Games
Some of our athletes also participated in the commonwealth games held in
Glasgow, Scotland U.K on 23rd July to 3rd august 2014. Those who won

18 | P a g e

First Quarter Report 2014/2015

medals were: Philemon Cheyech from Kaptagat won gold in Marathon; Ezekiel
Kemboi from Moiben won silver in 1500m.
World Junior Championships
This was held in Eugene, USA, on 22 nd-27th July 2014 and 4 of our junior
athletes participated and Moses Masekonde from Simat High School won silver
medal in 800m.
2nd Youth Olympics
This was held in Nanjing, China, between 16th and 28th of august 2014. Five of
our athletes participated and one Antony Kiptoo from Mois bridge won gold in
800m.
Kesses/Moi University Community Cross-Country
This was held on 27th September 2014 at Moi University aimed at sensitizing
the community on amicable co-existence; over 2000 athletes participated. This
annual event was sponsored by Moil University.
Kimbilio Cross-Country
Held on 4th October 2014 at kipkaren. It attracted over 1000 athletes. Good for
talent identification, nurturing and development. It is also an annual event.

Family Bank Marathon


Held on 5th October 2014 in Eldoret town and over 1500 athletes participated
from all over the country. The Marathon was sponsored by family bank and it is
good for talent nurturing and exhibition.
Ndalat Cross Country
19 | P a g e

First Quarter Report 2014/2015

This was held on 12th October 2014 at Ndalat. Over 6000 athletes participated
and half the number came from Uasin Gishu County.
Soccer Activities
Football league started at the sub-county level on 14th March 2014 with the
following number of teams participating:
Sub-county

No. of teams

Kesses
Kapseret
Turbo
Soy
Moiben
Ainabkoi

10
08
12
14
08
10

Four teams were expected to qualify from each sub county for the county mini
league to be launched on the 28th October 2014. We will give details in our next
reports. The league is ongoing.
3.3AGRICULTURE, LIVESTOCK AND FISHERIES
This department has four sections Agriculture, Livestock, Fisheries and
Veterinary services. The department seeks to improve the livelihoods of residents
of the county by promoting competitive farming as a business. It seeks to realize its
objectives through appropriate policy environment, effective support services and
sustainable natural resources management, create a favorable policy and legal
framework for the sustainable development of the crop and livestock sectors and
facilitate sustainable management and development of fishery resources for
accelerated socio- economic development through research. Due to its central role
in the economy, the County Government is supporting all initiatives geared
20 | P a g e

First Quarter Report 2014/2015

towards improving the livelihood of the farmers. The county government is also
investing in the sector through improvement of infrastructure and policy
framework in order to provide enabling environment for both local and foreign
investors.
3.3.1 Agriculture
Main crops grown in the county are maize and wheat. However, other food crops
are also produced; these include beans, Irish potatoes, sorghum, millet, sweet
potato, cassava, arrow roots and horticultural crops. Main industrial crops
produced are tea, coffee, pyrethrum, sugar cane and barley, with minor ones being
ground nuts, sunflower and soya beans.
Most of the food crops are grown through rain fed production.
Achievements
Grain Storage facility at Tugen Estate Site in Moiben sub-county was almost
complete. Remaining works include terrazzo wrap, sanitary fittings, plumbing
works, painting and access road. Tuiyotich Farmers Cooperative Society was
identified and trained in 2013 in preparation for the project implementation.
Mobile grain drier was operational. It was being stored at AMS Eldoret
awaiting the completion of the store at Tugen estate. Simbi grain store Site in
Soy Sub-county was also almost complete; final touches and plumbing works
on-going. The Soy Cereal Bank Farmers Cooperative Society was identified in
2011 and trained as the group to manage the activities of the Grain Store.
Mobile Grain Drier was being housed at the store. The County was allocated
funds by the national government through the Economic Stimulus Project to

21 | P a g e

First Quarter Report 2014/2015

construct two grain stores each costing Kshs. 34 million and two mobile dryers
each costing Kshs. 8million.
Chepchobit and Sosiani dams in Tembelio Ward and Sosiani location, Kamagut
location respectively received funding from the National government for
desilting under the Water Harvesting for Food Security Programme. AMS
Eldoret was contracted to carry out the desilting which had already started at
Chebchobit dam.
During the quarter the county participated in two trade fairs. Agribussiness
Expo 2014 Kabarak University,Nakuru was held on the 14th to 15th of August
2014 and 4 officers attended this exhibition. The Chepkoilel Agricultural
Trade Fair was held on the 25th to 27th September 2014 and the department of
Agriculture exhibited during the fair. The purpose was to disseminate new
technologies to the farming community and to train farmers as well as showcase
opportunities in the agriculture sector.
Soil fertility in Uasin Gishu County has been declining over the years. This is
because of the continuous use of D.A.P on the same farms for a long time thus
making the soils to be acidic. The Uasin Gishu county government through the
ministry of agriculture thus saw the need to fund 1,000 soil samples through the
department of agriculture as a way of establishing the extent of this acidity
levels and also as a way of sensitizing the farmers in the County to take their
soil samples for analysis to establish the fertilizer recommendations for their
farms. Results dissemination workshop was held on 6th October 2013 at
Sirikwa hotel by Soil Cares Initiative. A total of 132 participants attended
comprising of staff, stakeholders and farmers.
The Horticulture Business Strategy continues with the promotion of export
vegetable and fruits. This has resulted to an increase in demand for certified
seedlings of the same. The strategy distributed avocado seed to farmers of
which most of it germinated and about to be grafted. The screen net and shade
22 | P a g e

First Quarter Report 2014/2015

nets were delivered and the nursery construction would begin soon. ASDSP is
also promoting passion fruit value chain and groups have been funded to
support passion fruit production in the county.
Food Situation Update:
During the period under review, food situation for the county was good as there
were no major incidences of food shortage. The sub counties remained relatively
food secure (most households had adequate and stable access to food). Maize,
beans and Irish potatoes were available in the market at fair prices.
Table 1: Summary Maize and Bean Stocks as at September, 2014
CROP
Maize
Beans

FARMERS

TRADERS

MILLERS

NC&PB

TOTAL

366,252

137,350

71,266

986,335

1,561,203

27,804

8,422

36,226

NB: Weight 90kg bags

Remarks:
There were approximately 1.56 million bags of maize in the hands of NCPB,
farmers, traders, millers and NGOs. The total bean stocks were 36,226bags as at
mid-September 2014.
The current maize stocks are enough to last for 7 months; (the stocks exclude
that with NCPB). The bean stocks were enough to last for two months.

23 | P a g e

First Quarter Report 2014/2015

Table 2: Food consumption compared to population and production in the county


September, 2014
Crop

Maize

Population
County

Monthly
consumption (90
Kg bags)

912,213

83,098

912,213

15,195

Beans

Current stocks (90


KG bags)- Exclude
NCPB
574,868

36,226

End of this End of this


month surplus month deficit
(90 Kg bags)
(90 Ks bags)
491,770

21,031

Challenges:
Environmental degradation and declining soil fertility.
Climate change unpredictable weather and seasonal variations in the onset of
the rains.
Over reliance on rain fed Agriculture.
Post-harvest losses.
The level of soil fertility is low because of continuous use for a long time. This
has had adverse effect on crop production.
The land size has become small due to frequent subdivision. This has negative
impact on crop production.
High Input prices which limit farmers ability to increase input use to increase
production.
Low farm gate prices for produce particularly maize and beans during peak
production period.
Maize and Wheat are major crops in the County. The poor prices of the crops
have had adverse effect on farmers incomes.
24 | P a g e

First Quarter Report 2014/2015

Limited farmer friendly credit sources.


High incidence of pests and diseases.
Cases of Maize Lethal Necrosis Disease (MLND) were reported in all the sub
counties in the county. The disease was wide spread across the county with the
affected farms showing infestations of between 20-100%. Field surveillance
had shown that the disease is widespread in the county this season and the most
affected crop is the late planted maize crop.

25 | P a g e

First Quarter Report 2014/2015

Table 3: Areas Affected by MLND in 2014 Crop Season


County

Sub county

Area affected Remarks


(Ha)

Uasin
Gishu

Turbo

120

Up to 50% infection

Soy

1,670

10-90% extent of infection

Kapsaret

71.7

Kesses

80

Surveillance ongoing

Moiben

420

20-50% extent of infection

Ainabkoi

No report been received on disease

2,361.7

The disease is fast spreading due to the


dry weather, the extent of damage may be
much higher

Total

Remarks: All the 6 Sub Counties have had cases of MLND. The most affected
crop is the late planted crop. The early planted crop may be affected but this maybe
manifested after harvest.

Way Forward:
Crop diversification.
Use of Fertilizers, farmyard and compost manures.
Increase yield/unit area, crop intensification and adoption of high value crops.
Expansion of cultivated area.
Development of Irrigation.
Value addition of farm produce.
Adoption of new technologies

26 | P a g e

First Quarter Report 2014/2015

Through improved livestock production e.g. poultry, dairy, piggery, beekeeping,


fish farming.
Forming marketing groups (cereal banking)
Support farmers to access credit and farm inputs easily.
3.3.2 Agricultural Mechanization Station (AMS)
The A.I.A earned was Kshs.1,704,448.00 and collected Kshs.527,400.00 in the
quarter under review as shown in the table below.
Machinery Performance
CAT D6 E Crawler tractor GK Z975
The machine is at the A.M.S station awaiting major repairs.
Dragline GKA073F
The machine is at Chepchobit dam carrying out Dam construction work. It
requires major Engine repairs.
Changlin Bull Dozer GKB 444D
The machine continued carrying out various constructions /dump site works at
the County of Uasin Gishu.
Grader GK A140T
The grader broke down while at the County (transmission clutches) and is
currently parked at the A.M.S station.
MF 390 GKV 644
The Machine is currently carrying out forage harvesting within the county.

27 | P a g e

First Quarter Report 2014/2015

28 | P a g e

First Quarter Report 2014/2015

Mont
h

July

Machin
e

GK
Z975
GK
B444D
GK A
140T
GK A
073F

Augu
st

House
rent
GK
Z975
GK
B444D
GK A
140T
GK A
073F

Septe
mber

GK
V644
House
rent
GK
Z975
GK
B444D
GK A
140T
GK A
073F
GK
V644
House
rent

Total

Activit
y

Road
openin
g
Various
-

Road
openin
g
Various
-

Various

Road
openin
g
Various
-

Various

Locatio
n

Non
Productiv
productive e
(HRS)
(HRS)

Revenue

Remarks

Earned
(Ksh)

Kipkare
n

153

Collecte
d
(Kshs)
462,060
0

Eldoret
Town
County
yard
Chepch
obit
Dam

114

430,008

71

214,420

County

Kipkare
n

0
County
0 County
yard
0
Awaiting
Dozer
57,400
0
County

Eldoret
Town
County
yard
Chepch
obit
Dam
UG
County

30

113,160

0
County
0 County
yard
0
Awaiting
Dozer
9,000

9,000

73,500

73,500

Kipkare
n

Eldoret
Town
County
yard
Chepch
obit
Dam
UG
County

169,800

232,500

368

AMS
Station
0 County
Dump Site
0 AMS
Station
0
Chepchob
it Dam
155,000 Within the
county
232,500

1,704,44 527,400 29 | P a g e
8

First Quarter Report 2014/2015

Table 4: Activities and Revenue Accrued


3.3.3 Livestock
Livestock section seeks to improve livestock production in the areas of breeding,
feeding, routine animal husbandry practices, pests and disease control and
marketing.
The livestock subsector in the county comprises mainly of milk production from
dairy cattle and goats, beef/meat from cattle, sheep & goats, hides and skins,
eggs/meat from poultry, honey from beekeeping and wool production from sheep.
Achievements:
Value addition of livestock (like registration of dairy animals), livestock
products and diversification in livestock production are highly emphasized.
Currently, over 1,000 dairy cattle have been registered in the Smallholder Dairy
Commercialization Programme (SDCP) funded by IFAD/GoK.
The department offered extension services in the development of the entire
livestock production enterprises. The extension methodology was through
individual farm visits and farmer groups approach.

30 | P a g e

First Quarter Report 2014/2015

Table 5: General Review of the first quarter (July-September) 2014


MAIN LIVESTOCK ENTERPRISES: UASIN GISHU County
Q1 FY2014-15
Enterprise
Dairy
Cattle

Estimated
Numbers

327,350

Beef Cattle
Hair Sheep
Meat Goat
Pigs
Poultry
Meat(Kg)
Poultry
Exotic:
Beekeeping

37,150
120755
79654
9235
628112
92815

Worth
Quantity
(Value)

Product

47,513,8
10

Milk (Kg)

486,975

Beef(Kg)

49,849

Mutton(Kg)

17,096

Chevon(Kg)

53,506

Pig Meat(Kg)

14,071

Poultry Meat(Kg)
Eggs (Trays@ 30 )
Honey(Kg)

56,180
22,128

Total Value

Price
range
(KSH)

Av.
Price

1,187,845,24
4

30-34

32

163,136,625

300370

335

10,468,238

360400

380

3,590,160

360400

380

16,586,783

270350

310

5,628,200

350450

400

18,539,318

300360

330

5,532,063

200
-300

250

1,411,326,63
1

The dairy herd comprises approximately 20 percent pure breeds, 70 percent


crossed breeds and 10 percent indigenous cattle.
3.3.4 Fisheries
31 | P a g e

First Quarter Report 2014/2015

This section seeks to improve fish production in the county. It has the following
main objectives:
To enhance good corporate Governance.
To enhance revenue levels of the County.
To enhance the implementation of the CIDP.
To increase fish production and productivity in the county.
To improve value addition and market access of fish and fish products in the
County.
Planned activities for the financial year 2014/2015 include the following:
Create an enabling environment through development and review of 1 policy
and legal instruments by end of June 2015.
To promote Good Aquaculture Practices (GAPs) in all aspects of fish farming
by reaching 20,000 farmers through dissemination of 3,000 extension material,
30 trainings/Field days, 5 bench marking tours and 5 demonstrations by end of
June 2015.
Promote production of high quality Fish feeds
To promote Fish and Fish products safety by visiting fish preparation and
selling points the year to ensure the Fish handlers adhere to the recommended
food safety standards and Issue licenses/permits to establishments who meet
the standards to raise Kshs. 40,000 in A.I.A.
To mobilize fish farmers into groups and oversee election of leaders from ward,
sub county to county level and support them to register Uasin Gishu Fish
Farmers cooperative by end of September 2015.
Recruit 100 new fish farmers through aggressive promotion of Fish Farming.
32 | P a g e

First Quarter Report 2014/2015

Improve aquaculture technology through construction of a modern fish hatchery


by end of September 2015.
Increase fish production by stocking Fish ponds/ dams with 500,000 fish
fingerlings by April 2015.
Publish at least 12 Fisheries related articles in the County e-page during the
contract period
Promote fish and fish products marketing and consumption in the County by
conducting at least six eat more fish campaigns.
Achievements:

636 visits to individual farmers were made.


Market data collection and fish quality control.
Participated in 1 trade Fare.
Participated in 4 Open Days.
A total of 1,000 training Materials Issued to potential/farmers.
4 Dams in Soy (Ziwa, Soy Dam), Moiben (Koitoror Dam), and Kesses

(Ndarakuta) Sub- Counties Stocked with 5,000 Fingerlings each.


One Staff Participated in Agricultural Economy Improvement Seminar in
China.
Received 345 farmers in the office enquiring on fish farming.
The department recorded a training Documentary and aired in Sayare TV.
Table 6: Pond statistics
Sub-Counties

Moiben

Ainabkoi

Turbo

Soy

Kesses

Kapsaret

Totals

No. of farmers

291

283

289

277

281

329

1750

No. of ponds

294

295

301

296

283

354

1,823

Area of ponds

80,250

88,450

89,045

82,880

74,430

106,200

521,255

(M2)
33 | P a g e

First Quarter Report 2014/2015

3.3.5 Veterinary Services


The mandate of this section involves animal disease control and zoonosis control
through vaccinations against infectious, notifiable diseases and zoonotic diseases.
It also does veterinary extension and training through field days, farmers open days
and training seminars.
Achievements:
Vaccinated against notifiable diseases in the county including 20,000 FMD,
20638 Anthrax, 7105 LSD and 118 Rabies. One case of Anthrax in bovine was
confirmed in Soy Sub County. Foot and Mouth disease quarantine was lifted in
the month of August.
Used Kshs 2.5 million for the purchase of 20,000 doses of quadivalent FMD
and 16,000 doses of Black quarter Anthrax vaccines. Farmers also supported
control of black quarter (BQ) Anthrax, LSD, and Rabies through purchase of
vaccine.
Eldoret Municipal slaughter house was rehabilitated at a cost of Ksh.4M. A
further Ksh.700, 000 was used to revamp toilets and changing rooms.
A total of 3237 Bovine, 2267 Caprine, 9208 Ovine and 321 porcine carcasses
were inspected with projected revenue of Ksh.618, 600 collected in the first
quarter.
Hides and skins traders sold 137,716 tonnes of hides; 7,882 pieces of goat skins
and 19,420 pieces of sheep skins worth Ksh. 17,189,000.00 to Athi River and
Nairobi. Ken Knit (K) Limited exported 75.2 tonnes of wool to United
Kingdom and India.
East Africa Agricultural Productivity programme is being carried out in the
entire County using sexed semen to improve dairy cattle. A total of 26 calves
(24 female, 2 males) were born during the period.

34 | P a g e

First Quarter Report 2014/2015

Challenges:

Population of stray dogs in the county was on the rise.


Inadequate vaccine supply.
Inadequate personnel and transport.
Information flow both horizontally and vertically was not being handled

properly.
Inadequate protective clothing and inspection gear for meat inspectors.
Way Forward:
There is need to provide protective clothing and inspection gear for the meat
inspectors.
Provision of enough vaccines for disease control.
Provision of additional personnel and transport.
Tame the rise of stray dogs in the county.
3.3.6 CHEBORORWA ATC
Chebororwa ATC was started in late 1957 as a holding ground for livestock. It was
later converted to livestock improvement centre (L.I.C.) by veterinary department
before being changed to Farmers Training Centre in 1959. It is among the oldest
ATCs in the country. The institution was devolved from the national government to
the County Government of Uasin Gishu in February 2014. It trains farmers from
Trans-Nzoia, Uasin Gishu, West Pokot and Elgeyo-Marakwet counties, which form
part of its mandate districts.
Achievements:

35 | P a g e

First Quarter Report 2014/2015

Farm Operations during the Quarter:


Table 7: Summary of Hectare, Volume and Value by Category, 2012- 2014
Achieved Area
(Ha)

Volume (MT)

2012 2013

2014 2012

2013

Commercial
Maize
Seed Maize

60

68

68

128.
3

120.6
3

Commercial
Wheat
Seed Wheat

40

40

52

78

54

Seed FingerMillet
Seed Pasture

Irish potatoes

Tissue culture Bananas


Mangoes
Avocadoes
Tree Nursery
(no.)

Value (Million Kshs.)

2014

2012

2013

2014

7.601

7.2

93.6

2.61

1.40

3.3

7.2

22.5

6.6

0.01

0.170

0.12

250

270

350

0.003
2

0.0040 0.0035

114.75 6.82

36 | P a g e

First Quarter Report 2014/2015

Table 8: Summary of livestock production by category 2012-2014


Achieved production
2012
Dairy herd
Sahiwal herd

2013

72
68

Galla goats

Weaners, culls sales

Jul-Sept
2014

64 52
72 57
122
200

132

Dorpper
sheep

86

96

Dairy goats

41

65

Chicken
beekeeping
Milk sales
(ltrs)

2012

2013

JulSept
2014
20 3
32 3
5
69

31
30
0.74
4

88
70

1.22

52

0.06

8,200

- 12,435

Revenue Value
(Million Kshs.)
2012
2013
JulSept
2014
0.62M
0.021
0.85M
0.88M 0.021
0.044
0.015
M
0.192
M
0.002
0.003
M
0.62M
0.268

0
1

Trainings and extension achievements during the period July-September


Table 9: Farmer Trainings/Meetings/visits in July September 2014
Summary of ATC Farmer Training in 2014/2015
Other
ATC

R10

ATC Name

Stakeholder
Meetings/ Education

Funded
Courses

Organize
d Courses

Organized
Courses

Workshops

visits

42
Chebororwa

Stakeholder

F
26

F
62

Field days

Outreach
No. of
farmers
reached

Total

490
1

436
6

39
200

139

67

32

80

72 4220

F
389
1

230

F
167

37 | P a g e

First Quarter Report 2014/2015

Table 10: Courses offered in the Quarter under Review


Type of
course

Attendance
Title(S)

Date(s)

Sponsor
Adults
M

RC

Youth
F M

Total

Education Bench Marking


Seminar

10-Jul-14

Education Bench Marking


Seminar

11-Jul-14

RC

Education Day

8-Jul-14

NRC

Registration Of Births

25-Jul-14

10

NRC

Schools Strategic Plan

29-Jul-14

13

NRC

Farm Visits

1-Aug-14

20

27

47

NRC

Children Rights

13-Aug-14

30

13

43

WORLD VISION

NRC

Community Health Workers

21-Aug-14

38

20

58

MOE HEALTH

NRC

Community Health Workers

1-Sep-14

17

14

31

MO HEATH

NRC

Farm Visits

7-Sep-14

23

17

40

MOE

RC

Alcohol And Drug Abuse

15-Sep-14

81

63

144

WORLD VISION

NRC

Climate Change Forecasting

30-Sep-14

62

33

95

ASDSP

294

238

RC

58
20

38

WORLD VISION
51

30

21

WORLD VISION
100

208

WORLD VISION

10

20

WORLD VISION

22

25

WORLD VISION

150

108

148

820

Type of course: RC-Residential or NRC-Non-residential

Educational visits
Table 11: Educational visits
Name of School /

Date

Attendan

Total

Purpose
38 | P a g e

First Quarter Report 2014/2015

Institution/Group
Sosiot sec school

nd

ce
M
21

F
19

40

22

22

27

27

Kokwet sec school

2 Aug,
2014
4th , Sept,
2014
14th July 2014

Sosio sec school

29th Sept 2014

15

16

31

Kondabilet sec
school

15th Aug 2014

18

13

31

Moiben sec school

Learning new agri.


Technologies
Learning new agri.
Technologies
Learning new agri.
Technologies
Learning new agri.
Technologies
Learning new agri.
Technologies

Challenges:
Water flows to the station have diminished and no longer sufficient to satisfy
water needs. This is due to old, rusted and clogged pipes.
The original fence of the institution has been vandalized by the surrounding
community leading to intrusion by outsiders and recurrent illegal grazers,
leading to increased insecurity and animal disease outbreak within the farm.
The centre has two tractors and old farming implements. The two tractors were
repaired and are currently in a fair working condition although breakages are
still experienced because of their old nature.

The demand for residential training is increasing and the station has only one
modern hostel which can accommodate 21 clients. The other two hostels are old
and not attractive to our clients.
Demand for practical dairy skills has increased since the revival of dairy
industry. The station has no model dairy unit for practical training despite

39 | P a g e

First Quarter Report 2014/2015

offering training in this area. The existing unit was old and required complete
overhaul.
The ATC depended on rain fed Agriculture for its Agricultural activities and this
limited its attainment of maximized production.
Way Forward:
There is need to increase funding for fencing the institution boundaries.
Construction of additional modern hostel which can accommodate at least 50
clients.
Construction of a complete modern dairy unit that can accommodate at least 10
dairy cows.
Venture into the production of high value crops for local and international
markets through irrigation by constructing a dam using a seasonal river passing
through farm, and which offers a good opportunity for the dam construction.
Surveys were done by county engineers and are yet to develop the bill of
quantities for the project.
Make use of the wide availability of crop and livestock products within the
catchment of the ATC and therefore offers an opportunity for Agro processing
and value addition.
Introduction of short agricultural courses for the youth and farmers for
enhanced knowledge and skill transfer, increased self-employment and reduced
food insecurity.
3.4LANDS, HOUSING AND PHYSICAL PLANNING
This department reports on activities carried out by Lands, Housing and Physical
Planning sections. It is charged with the following broad mandates.

Land Administration and Management


Planning, Management, Administration and Development of County Houses
Physical Planning and Development Control
Land Survey and Mapping
40 | P a g e

First Quarter Report 2014/2015

Boundaries and Fencing


The department seeks to meet the following objectives.
To ensure order in developments through spatial planning and development
control.
To secure land rights through efficient administration and management.
To disseminate information on new approaches and technologies in house
construction.
To maintain county houses in good condition.
To carry out research on housing in the county.
To reduce land disputes through speedy settlement of boundary disputes and
promote use of alternative disputes resolution mechanisms in settling land
disputes.
To regulate survey services through quality controls and production of quality
maps.
To implement court orders.
3.4.1 Lands
The achievements outlined in this section were realized in the county head
quarters.
Achievements:
Formation of the following ad hoc committees to assist in discharging some
duties,
o Lands committee
o Housing committee
41 | P a g e

First Quarter Report 2014/2015

o Development control and Plan approval committee


Completed preparation of departmental organization structure.
Documentation of public land (Draft report ready).
Completed the process of nomination of County Land Management Board
members and forwarded the list to NLC for formal appointment.
The department participated in formulation and presentation of Finance Bill
2014/2015.
The department procured land for High Altitude Training Centre at Chagaiyat
and land at Langas for Langas Youth Polytechnic.
Development of Bills and Cabinet papers
o Housing Policy
o Housing Corporation Bill
o Physical Planning Bill
o Rating Bill
o Extension of valuation roll for Eldoret town and preparation of valuation
rolls for Burt Forest and Turbo towns.
o Street naming and management of billboards and advertisements.
o Interim Lang Use Regulatory Framework 2014-2017.
3.4.2 Physical planning
Core functions of the section include:

Preparation of physical development plans


Implementation of physical development plans
Processing and approving development applications
Surveillance, monitoring and control of developments
Professional and administrative services

42 | P a g e

First Quarter Report 2014/2015

Achievements:
Table 12: Annual Work Plan Progress
Department Development Project S
Objective

Tasks/
Activities

Duration/
Time

Cost
(Kshs)

Allocation
(Ksh.)

Targets for
the 1st
Quarter

%
Complete

Comments

Prepare
county spatial
plan

Preparation of
terms of
reference

August

25M

100%

100%

To complete
Karandili
Trading Centre
Local Physical
Development
(advisory)
Plan

2nd Stakeholders meeting


Send
invitation
letters
Purchase
materials
(stationery)
Organize
for venue
Plan
Amendments
and Editing
Submission to
the Minister for
approval
2nd Stakeholders meeting
Send
invitation
letters
Purchase
materials
(stationery)
Organize
for venue
Plan
Amendments
and Editing

July
August
2014

60,000

320,000

100%

100%

-This is
being shared
with the
national
director of
physical
planning
The stage
was
completed
at the
trading
centre
committee
expense

50%

0%

100%

0%

To complete
Ziwa Local
Development
Plan

September 100,000
October
November
2014
July
August
2014

60,000

September 100,000
October
November

260,000

0%

43 | P a g e

Delayed
advertisement of
completion

First Quarter Report 2014/2015

To Prepare
Zoning Plan
Eldoret Town

To prepare a
Zoning Plan
along the ByPass Corridor
Plan
Cheplaskei
Kapsaret lemook Leseru Maili
Tisa

Submission to
the Minister for
approval
Reconnaiss
ance
Consult
with the
County
Executive
Committee(
CEC)
member
and Chief
Officer
Land
Draft and
send notice
of intention
to the
media
Review of
Secondary
data
including
the existing
development plans
Reconnaiss
ance
Consult
with the
County
Executive
Committee(
CEC)
member
and Chief
Officer
Land
Draft and
send notice
of intention
to the
media
Review of

2014
July
August
2014

100,000

5M

100%

0%

Preliminaries complete
and work
will start in
the 2nd
quarter

July
August
2014

100,000

4M

100%

0%

Preliminaries complete
and work
will start in
the 2nd
quarter

44 | P a g e

First Quarter Report 2014/2015

Secondary
data
including
the existing
development plans
Routine Work
Objective
To provide
Administrative
and
Professional
Services

Tasks/
Activities
Allocate
duties
Appraise Staff
Consult
County
Executive
Member
(CEC)
Member
Land, County
chief Officer
Land,
County Heads
of
Departments,
Members of
Public
Convene and
attend
Development
Control
Committee
Meetings

Duration/
Time
July-June
2015

Cost
(Kshs)
Stationery
Fuel
Mail
Registers

Allocation

Duration

LPO

Continuous

July 2014
June
2015(per
schedule)

Stationery
Fuel
Mail
Registers
Member
allowance

LPO
pool

Once in
fortnight

No In 1st
Quarter
Continuous

Comm
ents
-

Challenges in
conven
-ing
the
meetin
g since
members of
the
commit
tee are
from
different
County
Depar-

45 | P a g e

First Quarter Report 2014/2015

tments;
Excess
work
load.
Scrutinize/Inspect
development
applications and
recommend

July 2014
June 2015

Stationery
Vehicle
Fuel

LPO

Daily

251

Monitoring and
Control

July 2014
June 2015

Stationery LPO
Vehicle
Fuel
Mail
Registers
Developm
ent
application
register

Daily

Approx 7
sites a day

Challenges:
Inadequate transport: the department has one vehicle which is mainly used for
surveillance

purposes

making

it difficult to visit sites, monitoring

developments and field work for plan preparations;


Untimely release of funds to run proposed projects in the work plan which has
impacted on meeting the set targets;
Difficulties in convening meetings the committee on Development control
and approval membership is from different county departments

therefore

making it difficult to convene meetings since they are committed elsewhere;


Inadequate capacity to monitor and arrest illegal developments in the whole
county.
3.4.3 Survey Section
Achievements:
46 | P a g e

Transport
challenges in
making
site
visits
Inadequate
capacity to
monitor
and
arresting
illegal
developments

First Quarter Report 2014/2015

The department procured survey and printing equipment worth 6 million


Table 13: Performance in the Survey Section
Performance
Objective
Departmental

Task/Activities

Expected
Output

Actual

Remarks

Collection of AIA

Enhance collection of
A.I.A

To collect
125,000/= per
month

Ks. 90,650,

Subdivision process
in the county banned

Processing of
Mutation Surveys

Amendment of RIMs

To amend 900
parcels per
week

Nil for the County

Subdivision in the
county banned

Retracing of wornout Registry Index


Maps

To retrace 3
RIMs per week

Nil for the County

Subdivision in the
process in the
county banned

Enlargement of small
scale Registry Index
Maps

To fair draw 1
sheet per month

Nil for the County

Subdivision in the
process in the
county banned

Implementation of
Boundary Disputes
and Court Orders

Assist the Land


Registrar in
Boundary Dispute
resolutions

Attend to 2
disputes per
week

16

Lack of transport

Production of
Dyeline Prints

Print and sell RIM


prints to customers

To print and sell Nil for the County


32 RIM prints
per week

Subdivision in the
county banned

Ensure Compliance
with Set Standards

- Check mutations
presented for

- To check 30
mutations per

Subdivision in the
process in the

Individual

Nil

47 | P a g e

First Quarter Report 2014/2015

accuracy, plotability
and reliability for
amendments

week

county banned

Discourage
Encroachment of
Public Utilities

Survey of public
utility plots

30

Poor implementation

Improve Survey
Services

Purchase of survey
equipment

-I Total Station

- 1 Rtk

- 1RTK

-1 3 in one plotter

Inadequate
Allocations

- 13 in one
plotter

Challenges:
Lack of Reliable transport.
Inadequate equipment and tools.
Allocations not cascaded to sections.
Financial Achievements:
Table 14: AIA Collection July-Sept 2014
NO

ACTUVITY/ SERVICE

JULY
COLLECTION(KS
H)

AUGUST
COLLECTION(KS
H)

SEPT
COLLECTION(KS
H)

TOTAL

Building plans
a Submission forms

55600

47000

51500

154100

b Public health fee

97000

140000

114000

351000

c Renovation bills

135100

14800

14800

143950

2600

2600

d Temporary occupation
license bill

48 | P a g e

First Quarter Report 2014/2015


e Hording fee bill

53000

215000

720677

1865500

Scrutiny fee

1099795

264579

1151500

3085051

Occupation permit
building bill

140000

1327200

141000

418200

Occupation permit
sanitation bill

139000

1135200

140000

1414200

Advertising
a Promotion bill

1102900

387303

634700

2124903

b Bill
boards/illuminated/signbo
ard bill

593600

198600

2191740

4771390

Court fines on illegal


devpt

330000

95000

111000

536000

3623395

3824682

4173517

1274424
4

Tota
l

3.4.4 Housing
Achievements:

Table 15: Monthly Collections per Estate July-Sept 2014


S/No

Estate

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

Macharia
Kilimani
Tom mboya
Kuria
Mayabi
Kodhek
Kamanda
Uhuru
Transit
Pioneer -i
Pioneer-ii
St Marys
Kidiwa -K
Teachers i
Teachers ii
Moiben

No. of
Rent Per
Expected July
Aug
Sept
Units
Month
Rent P/M Payment Payment Payment
256
800
204,800
199,160
201,420
255,085
186
2,000
372,000
280,360
371,263
377,913
48
2,000
96,000
64,500
60,000
80,800
88
3,500
308,000
107,490
249,940
287,800
58
5,000
290,000
215,640
348,550
340,420
21
12,000
252,000
66
3,500
231,000
156,190
296,840
342,310
240
4,000
960,000
850,480
942,520 1,006,050
16
1,500
24,000
11,000
20,800
36,800
76
4,500
342,000
806,130
927,160 1,239,240
124
5,000
620,000
16
800
12,800
10,310
14,070
24,670
12
2,000
24,000
11,340
42,720
22,840
18
5000
90,000
71640
67070
100,010
14
3000
42,000
12
2,500
30,000
49 | P a g e

First Quarter Report 2014/2015

17
18
19

Totals

Turbo
Elgon view
staff houses
AMS Estate
AMS Estate
AMS Estate
AMS Estate

2,500
15,000

20,000
300,000

30,000

10,000

70,000

26
600
20
800
26
1200
45
1800
Payroll rent deductions

143,800

57,400

73,500

232,500

3,762,400

207,030
3,078,030

232,030
3,857,883

213,530
4,629,968

50 | P a g e

First Quarter Report 2014/2015

Table 16: Arrears per Estate July-Sept 2014


S/No

Estate

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

Macharia
Kilimani
Tom mboya
Kuria
Mayabi
Kodhek
Kamanda
Uhuru
Transit
Pioneer
St Marys
Kidiwa -K
Teachers
Moiben
Turbo
AMS Houses
Elgon-view
staff Houses
Totals

No. of
Expected July Arrears Aug
Sept
Units
Rent P/M
Arrears
Arrears
256
204,800
497,974
499,139
452,784
186
414,000
879,185
872,089
869,476
48
96,000
242,475
275,255
290,815
88
308,000
741,830
805,550
820,950
58
290,000
633,507
561,717
496,537
21
252,000
307,500
212,600
212,600
66
231,000
575,620
506,280
400,770
240
960,000
1,990,235
1,991,115
1,907,325
16
24,000
50,640
49,340
32,190
200
962,000
2,060,499
2,086,459
1,684,239
16
12,800
55,860
58,960
52,090
12
24,000
63,062
38,440
44,446
32
132,000
12
30,000
8
20,000
117
143,800
184,800
20
300,000
11,090,225 11,343,225 11,521,225
3,762,400 19,188,612

19,300,609

18,970,247

During the period under review, the following activities were undertaken at the
estates.
Kodhek estate tenancy was terminated to pave way for renovation of the
houses. Since the issuance of termination notices, some tenants have vacated
the houses and some went to court to challenge the termination.
Eviction of rent defaulters went on during the period and some estates have
shown reduction of arrears.
Unblocking of blocked sewer lines and waste water drainages was carried out in
several estates during the period.
Tenants complaints concerning rent balances were attended to.

51 | P a g e

First Quarter Report 2014/2015

Transfer of AMS houses which were formerly under the Ministry of Agriculture
was done and rent received from the estate is now being deposited to the
County revenue account.
Renovation of staff house in Elgon view block 13/85 was done and is now
ready for occupation
Preparation of BQs for fencing of house on block 13/85 and repair of the SQ.
Preparation of BQs for rehabilitation works to 21 No. houses at Kodhek Estate
Houses.
Formulation of county housing bill and policy.
Monitoring of ongoing upgrading activities in informal settlements under World
Bank funding (KISSIP and KMP Programmes).
Challenges:
Transport section has no vehicle to move round the estates now taking into
consideration the expansive county.
Lack adequate office space the estates office which was at social hall was
taken over by the ministry of education rendering the section with no office
to serve tenants.
Ownership dispute of Elgon view staff houses it has been difficult for
housing section to collect rent from staff houses in Elgon view mainly
occupied by outsiders claiming they have ownership documents
Repairs and maintenance of old houses most of the county estates were
constructed several years back and capital maintenance is not commensurate
to the income.
Arrears from staff houses reflected do not portray the true picture because
reconciliations have not been done. This is because the system used in
payment of salaries which is IPPD is different from the system used to
collect house rents.

52 | P a g e

First Quarter Report 2014/2015

Way Forward:
Provision of vehicles to enhance performance.
Establish a central office area that adequate for all staff so that staff output
can be properly controlled and monitored.
There is need to develop a system which can apply uniformly in the
collection of house rents.
3.5ROADS, TRANSPORT AND PUBLIC WORKS
This department is vested with the responsibility of providing a holistic and
integrated transport system within the county as well as operating and maintaining
an efficient, safe and cost effective transport system.
3.5.1 Roads
The Subsector is responsible for development, rehabilitation and maintenance of
road network in the county (all roads except those currently classified as KeNHA,
KURA and KeRRA).
3.5.2 Transport
The Subsector is responsible for transport policy formulation and development of
regulatory framework, transport infrastructure and management of the vehicle
fleet.

3.5.3 Public Works


The Subsector is responsible for development, maintenance and rehabilitation of
Government buildings and other public works in the county. The county fire and
disaster management unit is included in this section.
53 | P a g e

First Quarter Report 2014/2015

3.5.4 Electrical
The Subsector is responsible for development, maintenance and rehabilitation of
street lights and other electrical works on Buildings.
Achievements:
Table 17: Budget/Implementation Matrix
Budget/Implementation Matrix
S/No

Sub Sector

Roads

Activity

Public
Works

Implementation
Status

Construction of Donyo
Lessos-Pan Villa Rd

20,000,000 Tendering Stage

Construction of Iten Rd
Jnc-Vetinery-PCEA Rd

8,000,000 Tendering Stage

Street Lights Eldoret


CBD

Contract
12,000,000 documentation

Grading and Gravelling


of County Roads

150,000,00
0 Ongoing

Purchase/ Lease of
Borrow pits

30,000,000 Tendering Stage

Drainage works and


Bush Clearing

Contract
45,000,000 documentation

Survey of County
Roads

10,000,000 Ongoing

Construction of
NMT(Foot/Cycle Paths)

Budget
Estimate

Remarks

Contract
4,000,000 documentation

Bridges and Foot


Bridges

Contract
50,000,000 documentation

Design of County
Headquarters

5,000,000 Contract
documentation

54 | P a g e

First Quarter Report 2014/2015

Lift/Ramp Installation
at County Headquarters

Transport

County
Corporation
s

Contract
5,000,000 documentation

Purchase of specialized
Equipment

260,000,00
0 Ongoing

Purchase of fuel
Tankers

Contract
10,000,000 documentation

Purchase of Mobile
Workshop

Contract
10,000,000 documentation

Purchase of assorted
asphalt equipment

Contract
5,000,000 documentation

Construction and
Equipping of
Mechanical workshop

Contract
10,000,000 documentation

Purchase of Rapid
Response Fire Vehicle

Contract
5,000,000 documentation

Purchase of essential
fire Equipment

Contract
2,790,000 documentation

County Mechanical and


Tranport Fund(CMTF)

3,000,000 Bill Drafting

County Roads
Authority

3,000,000

Bill Drafting

The Tender Documentation and advertisement for the construction of the Two
Roads are complete and the tenders are currently open for Bids. The other
works for bridges construction are at contract documentation stage as indicated
in the table above.
Grading and gravelling is ongoing and so far 76km of grading has been done
and 16.6Km of roads gravelled.
Table 18: Grading and Gravelling of Roads
55 | P a g e

First Quarter Report 2014/2015

Ward
Moiben

Road Name
Moiben-Bidii Rd

Activity
Dozing

Kms
2.7

Kabenes Rd

Grading

Total
Kaptagat

5.70

91,680.00
2,207,255.00

Kiluka-Kongasis Rd

Grading

2.8

195,128.00

Kipsangui-Soy

Grading

51,240.00

Total
Soy

Cost (Kshs.)
2,115,575.00

5.80

246,368.00

Soy-Kaptebengwet Rd

Grading

11.6

485,000.00

Vumilia Pri-Cereals Rd

Grading

119,840.00

13.60

604,840.00

Total
Quarry

Murrum
Excavation

40
Hrs

1,232,086.00

Kuinet

Quarry

Murrum
Excavation

76
Hrs

686,140.00

Ngenyilel

Kimbilio Hospice Rd

Gravelling

1,744,780.00

Kapsaos

Teldet-Emgoin Pri Rd

Gravelling

2.1

1,002,248.00

Tulwet/Chuiyat Murgor Primary Rd

Grading

0.9

23,700.00

Racecourse

Racecourse-Oasis Rd

Grading

5.9

311,028.00

Annex- Natalies Hotel

Grading

0.5

21,580.00

Marriot-Taning-Swamp Rd

Grading

1.3

70,320.00

Kambi Nguruwe-Oasis

Grading

54,252.00

Hill School Rd

Grading

6,340.00

Jumbo- Racecourse

Grading

0.5

15,220.00

Oasis-Old Nrb Rd

Grading

2.5

91,944.00

Eldoret Poly-Royalton

Grading

48,940.00

Car-Doctor Rd

Grading

57,220.00

15.70

676,844.00

168,580.00

Kiplombe

Total
Ainapkoi

Waunifor-Tilol Rd

Grading

56 | P a g e

First Quarter Report 2014/2015

Meibeki

Kaplolo Center Rd

Grading

0.7

38,920.00

Koisagat-Kasurur Rd

Grading

3.7

156,328.00

Kabomoi-Chepkener Rd

Grading

69,896.00

Total

9.40

433,724.00

Kapsoya

Borderfarm-Kapsoya Rd

Grading

0.6

22,660.00

Sergoit

Chembulet-Chemarmar Rd

Grading

173,740.00

Kruger-Chepkoileel

Grading

0.8

36,420.00

Tugen Estate Loop Rds

Grading

2.5

57,580.00

Chepkanga-Lilit Close

Grading

2.6

27,940.00

Chepkanga-Chepkoileel Rd

Grading

2.8

147,340.00

15.70

443,020.00

Total
Kimumu

Kipchoge-Paradise Rd-Nmt

Gravelling

1,556,751.00

Ngeria

Royalton-Kapkobil Rd

Gravelling

7.4

4,318,108.50

Moi Sec-Ngeria Pri Rd

Murram
Spreading

1.1

64,788.00

Megun

Total

9.50

5,939,647.50

NYS Returns
Tembelio

Kaplogoi-Kimoning-Kapteren
Rd

Grading

1.8

175,446.00

Kamukono-Mutei Rd

Grading

0.3

33,240.00

Mutei- Kimoning

Grading

1.3

309,840.00

Kimoning-Aic-Kapkei Rd

Grading

1.5

63,912.00

Aic Kapkei- Kimore

Grading

0.5

38,280.00

Total
Ngenyilel

5.40

620,718.00

Chepsaita Manda Rd

Grading

3.3

204,948.00

Chepsaita -Tuiyobei Rd

Grading

3.4

328,500.00

57 | P a g e

First Quarter Report 2014/2015

Kona Mbaya Rd
Total

Grading

4.9

329,862.00

11.60

863,310.00

Challenges:
1. Inadequate Machinery there is not enough machinery to repair and maintain
the road network within the county; the existing ones are old.
2. Frequency of breakdown of the few available machinery and long time to repair
due to nature of procurement process to acquire spare parts.
3. Lack of enough office space for the department.
4. Congestion and unsustainable infrastructure in the CBD.
Way forward:
In conclusion, a lot of the planned activities and projects are on course and all the
targets are achievable.
The department is expediting the procurement of a mobile workshop in order to
curb the challenge of delayed repair work.
The department in collaboration with development partners and other
stakeholder are exploring ways of utilizing the available resources to attain
maximum benefits.
The department, in collaboration with the National Government, is developing
the CBD. This entails surveying and designing of by-passes, new roads,
walkways and cycle ways. This will be followed by constructing the designed
passages.
New plant operators are in the process of being hired to manage the new
equipment hence beefing up the construction and maintenance of roads is on
course.
3.6ENVIRONMENT, ENERGY, WATER AND NATURAL RESOURCES
58 | P a g e

First Quarter Report 2014/2015

The Department of Environment, Energy, Water and Natural Resources was


created to oversee the devolved functions within this area. However, there were
some grey areas on the department that should squarely fall within its jurisdiction
but still ran by the national government, a good example being forestry. To achieve
the 10% forest cover by 2030, the mandate of forestry should have been given to
the county governments.
3.6.1 Water
The mandate of the subsector is to coordinate water supply and catchment
protection within the county. The functions of this section include: Water, sewerage
&

sanitation

services

provision;

Water

infrastructure

development

and

maintenance; Local water catchment protection; and County water sector coordination. The county is endowed with a number of water sources which includes
rivers, dams and underground water. It also has six gazetted water supplies: Turbo
water supply; Moisbridge water supply; Burnt forest water supply; Sosiani water
supply; Sambut water supply; and Kipkabus water supply.
3.6.2 Environment
The mandate of this section involves Waste management; Control of air pollution,
noise pollution, Public nuisance and outdoor advertising; and Implementation of
national government policies on natural resources and environmental conservation.
Achievements:
Maintained the six water supplies (operational) in the quarter through repairs
and maintenance of the system.
The department identified 60 community water projects to fund to increase the
availability of water to the residents.
59 | P a g e

First Quarter Report 2014/2015

Supervision and management of the ongoing Kipkabus water project was done
and the project is expected to be completed by 31st December 2014.
Identified areas across the county which will be planted with indigenous trees
on the commencement of long rains next year. The department was allocated
Ksh 3,000,000 for purchase of seedlings to enrich water catchment areas.
In the quarter, 125 noise permits were issued within the county.
26 Environmental Impact Assessment reviews were done.
Conducted two sensitization campaigns on waste management at Kimumu and
Kipkaren estates.
Issued 30 permits for solid wastes from outside the county to be dumped at the
dumpsite.
Introduced the seven-day street cleaning by creating a team that work within the
CBD on Sundays and be compensated by offs within the course of the week.
Challenges:
Implementation of the Kipkabus water project faced resistance from neighbours
upstream and KFS whose land the dam is located.
Way Forward:
Following on the expansion of the water treatment plant at Chebara.
Plans are underway to procure a noise meter for efficient accurate capture of
noise levels within the county.
3.7PUBLIC SERVICE MANAGEMENT
Public Service Management is made up of five sections, namely, Human Resource
Management, public Relations, Security and Enforcement, Governors office and
international relations and the legal section.
60 | P a g e

First Quarter Report 2014/2015

It is a service department that co-ordinates service delivery in the county, with the
strategic theme being Re-defining service delivery for efficient and timely service
delivery.
Achievements:
Worked with different agencies like the National Land Commission and Ethics
and Anti-corruption Commission to ensure that illegally acquired public land is
reverted back to its original purpose. This involves investigating the various
documents used in the transactions. We then forward the documents to the
agencies to verify their authenticity.
Handled 54 legal cases during the period under review. Also took over cases
that were being handled by the defunct local authorities.
Governors office and Intergovernmental Relations - Intergovernmental
relations continued to be enhanced. In August we had a team from Minneapolis
visiting the county and they carried out training in the following areas: Disaster
preparedness and management; Leadership for the county Executive and
legislative arm; Leadership for women in policy making; and Youth training on
oral health.
In the month of October, two people from the Sister City of Arizona visited the
county and were helping us in the planning for establishment of a Pediatric
Hospital and School of Medicine at the University of Eldoret.
Table 19: Human Resource Management

1.
1

Planned
Activity
Performance
management

Achievements

Expected Output

Expenditure

Remarks

-Improved
performance
-Quality Service
delivery

KSH. 5.8 M

Performance
management
and target
setting to be
cascaded to
the lower
levels

Performance contracts
for C.E.Cs already
signed
Contracts for C.Os
and Directors
developed and ready
for signing and
implementations
CECS, COS and
Directors trained on

61 | P a g e

First Quarter Report 2014/2015

1.
2

Training and
Development

1.
3

Payroll
cleansing

1.
4

performance
management system
The following training
programmes were
conducted:
Performance
Management training
for C.E.Cs, C.Os and
Directors conducted
I.C.T Trainings for Sub
county and Ward
administrators
Training for PAs
Refresher course for 21
security and
enforcement officers
Procurement rules and
regulations for
procurement staff
Training for the
switchboard operators
on the new telephone
system

-Payroll cleansing
through continuous
update of payroll
changes.
-Employees from national
government and former
local authority already
placed under one payroll
-A consultant undertook
headcount and academic
certificate verifications
Capacity
-Staff sensitized on the
Assessment and exercise
Rationalization -A committee to assist in
s of the public
the exercise identified
service
and trained
(CARPS)
-Biometric exercise
undertaken and concluded
by Ernest and Young
Consultant

-Improved service
delivery
-Enhanced
capacity for
employees to
handle their job
-Motivated staff
-Teambuilding
for performance

-Each
employee to
benefit from
at least 5
days
training in
the year

-No ghost workers


-A lean payroll

Continuous
update of
payroll
necessary

-Rationalized staff
-Skills identified
-Strategic placement
of employees
according to the
sills they possess

The
programme
is ongoing
conducted
by national
Government

62 | P a g e

First Quarter Report 2014/2015

-Departmental reports
being developed
1.
5

Head count and


Internal HR
audit

-Internal Headcount done


-Report on skills,
numbers and quality of
the workforce being
worked on.

-Rationalization

1.
6

Deployments

-Staffing of the devolved


offices undertaken
-Skills matching ongoing
=HR Unit in preparations
to receive Personal files
for the devolved staff

-Rationalizations
exercise is expected
to pave way for
more deployments
-Improved staff
distribution

Ksh
3,003,300/
-

The process
is ongoing
alongside
the national
government
rationalizati
on
Process is
continuous
based on
need

Table 20: Public Relations and Communications


1.1

1.2

1.3

1.4

Planned Activity
Productions of county
quarterly newspaper

Establishment of county
radio

Achievements
-Negotiations and content
development in progress

Frequency allocated by
CCK
Development of
technical requirements
being undertaken by ICT
Department
Technical CEC
committee formed to
spearhead
implementation
Development of county Training of county directors
service delivery charters
done
Technical team to
spearhead departmental
service charter formed and
operationalised
Draft service charter
developed
Production of county staff Staff details taken
identifications cards
Designs produced

Expected Output
The first issue
expected in the
month of November

Expenditure

-County Radio in
place

-Service charter in
place and operational

-Staff photos and


printing of the cards
to be completed by
63 | P a g e

First Quarter Report 2014/2015

1.5

1.6

1.7

Procurement process started November


-Enhanced security
due to easy staff
identification
County branding
-Branding on course
Branding areas identified
or within the
and mapped out
timelines
Terms of reference for
-Creation of Uasin
consultancy developed
Gishu as a strong
Procurement process for
brand
sourcing consultant
-County buildings,
already initiated
vehicles and
machinery branded
for easy
identification
Development of county
-County logo, seal
Logo seal and county
logo , Public seal and flag
and flag in place
flag already identified
Enactment of law by
county assembly already
passed
The process of
registrations initiated
Improvement of
customers/clients
handling at the county
hall

Issuance of customer tags


initiated
Development of customer
feedback forms and use of
them
Statistics of customers and
the nature of their visit
taken and appropriate
recommendations made

-High customer
satisfaction levels
-challenges and
conflicts resolved
-Report on frequently
asked questions and
services sought for.
-Enhanced public
relations

3.8TRADE, INDUSTRIALIZATION, COOPERATIVE & ENTERPRISE


DEVELOPMENT, TOURISM & WILDLIFE MANAGEMENT
This department is responsible for the implementation, formulation, coordination
and administration of activities in respect to Trade, Industrialization, Tourism,
Wildlife and Cooperative Development sectors at the County Level.

64 | P a g e

First Quarter Report 2014/2015

Weights & Measures


The subsection is fully staffed and is guided by an Act of Parliament which is in
force and we implement the same. Specifically the law relating to weights and
measures, known internationally by the name Legal Metrology is not only a vital
instrument of consumer protection but is also vital for the scientific, technical and
industrial development of the county. Legal metrology law has application in
almost all spheres of human activity within Uasin Gishu County ranging from
ordinary trade transactions in the market place to those measurements needed for
ensuring public health and human safety. We ensured that in ordinary trade
transactions, the sale of any commodity in loose form, the quantity delivered to the
purchaser is not less than the quantity contracted for and paid for.
Weights and measures subsection is mandated to do the following:
Calibration of Machines
Inspection of Standards
Prosecution in case of failure to comply with the set standards
Betting Control and Licensing Board
This subsection seeks to regulate and control betting, lotteries and gaming
activities, protect members of the public against Fraud, eradicate illegal gambling
and promote responsible gaming in Uasin Gishu County. We are committed to
ensuring that gaming is conducted honestly and competitively with minimum costs
but maximum contribution to the County of Uasin Gishu and that it is free from
criminal activities like money laundering.
There is only one fully pledged casino at Wagon wheel hotel which operates from
Monday to Saturday and closed on Sunday.
65 | P a g e

First Quarter Report 2014/2015

Trade
Trade section is charged with the development of trade and investment activities in
the county. It seeks to realize the following.

Promotion of Trade
Capacity building of traders/groups
SMEs promotion/Exhibitions and trade fairs
Investor/Jual Kali promotion

The department embarked on creating an enabling environment for all the players
in the sector to have an equal opportunity in doing their businesses. This was done
through various programme activities that included; development of wholesale
and retail markets, receiving applications for financing of micro small and medium
enterprises through Uasin Gishu Trade Dev. Joint Loan Board, attended and funded
organized trade forums to boost inter-county and intra-county trade activities,
organized training programmes for MSMEs to upscale their entrepreneurial skills
and worked in collaboration with other ministries in trying to decongest the CBD
through relocation of hawkers, kiosk owners. This is to pave way for the planning
of the kiosks in the town and the fabrication/erection of over 5000 modern kiosks
in designated areas of the town.
Wildlife and Tourism
Uasin Gishu County is well known in terms of sports, and particularly in athletics.
The county has branded itself as a home of champions because it has produced
international athletes who have won several races, and scooping medals for many
years. Uasin Gishu hosts several training camps which include 64 Stadium,
Kipchoge Keino Stadium, Eldoret Sports Club, Rosa Training camp and the
proposed Timboroa High Altitude Training camp.
66 | P a g e

First Quarter Report 2014/2015

Main functions of the section include: Tourism promotion and marketing; Research
and development; and Tourism product development.
The department also has Industrialization and Enterprise Development, and
Cooperative Development section which never registered substantial activities
during the quarter.
Achievements
In ensuring compliance with the provisions of the standards act, calibrated the
standards for purpose of use in the field to carry out verification, on the
following equipment: Counter sales; Road Tankers; Platform machine;
Weighbridge; Spring balance; and Petrol pumps.
Inspection was conducted for compliance especially on prepackaged goods and
the following common commodities were weighed to ascertain the accuracy of
quantity: Maize grains; Maize floor; Wheat flour; Rice; Sugar; and bread
Supervised and inspected betting and gaming activities in the Casino.
Conducted spot checks on betting, lotteries and other gaming operations in the
County.
Did authorization amusement machines and pool tables.
Attended National Jua Kali Dialogue conference where the county ranked 34th
overall with 4 exhibitors proposed to go to Rwanda.
Celebrated World Ushirika Day on first Saturday of July 2014 and registered 10
new cooperative societies including the six boda boda from each sub county.
The process of reviving dormant cooperative societies also started. There is no
much change in the statistics as shown in the table.

67 | P a g e

First Quarter Report 2014/2015

Table 21: Registered Co-operatives


S/No Type/Activity
.

Active

Share Capital/
Deposits

1
2.
3.
4.
5.
6.
7.

Urban Saccos
Matatu Saccos
Rural Saccos
Marketing co-ops
Investment
Housing
Consumer

47
37
3
23
3
4
3

2.7billion
44.6million
106.7million
7.3million
65.7million
1.5million
20.8million

Total
Membershi
p
24,526
1390
3277
2244
3653
122
48

8.
9.

Multipurpose
Union
Total

1
2
122

5.9million
13,720
2.3billion

45
51
35,305

3.9FINANCE AND ECONOMIC PLANNING


Finance and Economic Planning is a Service Department that finances all the
activities of the County Government of Uasin Gishu. During the first quarter of
financial year 2014/2015 local revenue collection stood at Kshs. 250,988,926. The
National Government transferred to the county an amount totaling to Kshs.
566,207,861 during the quarter. This gave a total of Kshs. 817,196,787 in total
revenue. In the same period, recurrent expenditure amounted to Kshs. 660,314,605
and development expenditure amounted to Kshs. 190,867,414.
Revenue collection was at Kshs. 125,736,880.00 in the month of July. Collections
dropped in the months of August and September realizing Kshs. 75,821,863.60 and
Kshs. 49,430,182.35 respectively. This is illustrated in the figure below.

68 | P a g e

First Quarter Report 2014/2015

Figure 1: Quarterly Revenue Performance

REVENUE
140,000,000.00
120,000,000.00
100,000,000.00
80,000,000.00

REVENUE

60,000,000.00
40,000,000.00
20,000,000.00
0.00
JULY

AUG.

SEPT.

69 | P a g e

First Quarter Report 2014/2015

Table 22: Monthly Revenue Performance per Stream


Item

Jul-14

Aug-14

Court Fines

1,040,119.00

1,940,796.00

955,456.00

Financial Management Unit

2,172,128.00

850,377.00

371,853.00

6,331,653.00

6,321,812.00

7,470,715.00

Street Parking
Land Rates Management
Unit

49,651,076.00

25,397,732.00

11,902,657.00

Business Permit Unit

2,521,650.00

2,068,575.00

1,382,717.00

42,000.00

8,348,130.00

1,491,997.80

Cess Management Unit


Home Craft Center
Management

5,500.00

1,000.00

7,500.00

Housing Management Units

3,868,536.00

4,686,946.00

4,999,203.00

23,300.00

6,000.00

168,800.00

10

Nursery School Fees


Epidemic Control and
Inspection Unit

244,300.00

349,080.00

375,050.00

11

Cemetery Unit

75,400.00

84,200.00

76,400.00

12

Food Quality Inspection Fee

73,600.00

83,400.00

111,360.00

13

Health Centers Former EMC

195,850.00

242,100.00

183,750.00

14

282,520.00

217,660.00

173,200.00

322,340.00

311,790.00

311,750.00

2,970,842.00

9,157,297.00

3,942,127.00

17

Refuse Collection Unit


Slaughter House
Management Unit
Engineering & Urban
Planning Management Unit
Fire Fighting & Ambulance
Management Unit

84,500.00

80,500.00

77,500.00

18

County Markets

1,096,717.00

1,085,608.00

1,601,154.00

19

5,981,035.00

5,839,680.00

6,453,820.00

20

Bus Parks
Coperative Socities Audit
and Supervision

33,800.00

22,730.00

23

Alcoholic DrinksLicence

616,000.00

917,006.00

24

Stadium Hire

25

DEVOLVED FUNCTIONS

26

15
16

Sep-14

2,922,335.00

3,474,492.00

916,703.00

Direct Banking

45,181,679.00

4,174,952.60

5,653,469.55

Total
3,936,371.0
0
3,394,358.0
0
20,124,180.0
0
86,951,465.0
0
5,972,942.0
0
9,882,127.8
0
14,000.0
0
13,554,685.0
0
198,100.0
0
968,430.0
0
236,000.0
0
268,360.0
0
621,700.0
0
673,380.0
0
945,880.0
0
16,070,266.0
0
242,500.0
0
3,783,479.0
0
18,274,535.0
0
56,530.0
0
2,336,006.0
0
160,000.0
0
7,313,530.0
0
55,010,101.1
5

Grand Totals

125,736,880.00

75,821,863.60

49,430,182.35

250,988,925.95

803,000.00

160,000.00

70 | P a g e

First Quarter Report 2014/2015

Table 23: Exchequer Issues and Local Revenue for the period Jul.-Sept. 2014
No.

Month

Amount Received from


National Government
(Kshs.)

1 July
2 August
3 September
Total

566,207,861
566,207,861

Local Revenue
Received
(Kshs.)

Total Amount
Received

125,736,880
75,821,864
49,430,182
250,988,926

125,736,880
75,821,864
615,638,043
817,196,787

Table 24: Recurrent Expenditure for the Periods July-September 2014


No
.

Department

1.

Governor's Office

2.

Finance and Economic Planning

3.

Public Service Management

4.

ICT and E-Government

5.

Roads, Transport and Infrastructure


Lands, Housing and physical
planning
Water, Environment, Energy and
Natural Resources

6.
7.
8.

11.

Health Services
Agriculture, Livestock and
Fisheries
Trade, Cooperatives, Tourism and
Wildlife
Education, Social Cultural, Youth
and Sports

12.

County Public Service Board

13.

County Assembly

9.
10.

Total

Approved
Estimates (Net)
1
02,187,569
4
47,078,406
4
02,785,405
33,983,360
2
70,107,609
1
45,312,143
2
04,135,011
7
95,832,282
3
49,392,980
82,195,655
2
59,041,035
34,870,280
5
77,195,603
3,7
04,117,338

Total
Payment
10,57
6,184
87,52
5,730
159,27
7,944
1,4
93,518
27,65
4,482
1,7
15,450
10,50
7,148
29,79
5,817
152,92
0,730
3,9
45,955
88,12
9,465
9
61,400
85,81
0,782
660,31
4,605

Balance
91,611
,385
359,552
,676
243,507
,461
32,489
,842
242,453
,127
143,596
,693
193,627
,863
766,036
,465
196,472
,250
78,249
,700
170,911
,570
33,908
,880
491,384
,821
3,043,802,
733

71 | P a g e

First Quarter Report 2014/2015

Table 25: Development Expenditure for the Periods July-September 2014


No.
Department
1.

Governor's Office

2.

Finance and Economic Planning

3.

Public Service Management

4.

ICT and E-Government


Roads, Transport and
Infrastructure
Lands, Housing and physical
planning
Water, Environment, Energy and
Natural Resources

5.
6.
7.
8.

11.

Health Services
Agriculture, Livestock and
Fisheries
Trade, Cooperatives, Tourism and
Wildlife
Education, Social Cultural, Youth
and Sports

12.

County Public Service Board

13.

County Assembly

9.
10.

TOTAL

Approved
Estimates (Net)

Total
Payment

10,000,000
1
53,316,000
59,960,000
1
40,557,000
1,5
38,453,400
1
07,373,000
2
14,805,625
3
16,882,925
2
16,765,816
1
51,290,000
4
34,109,400

7,9
46,680
19,58
8,270

71,65
0,000
30,59
2,150
61,09
0,314

3,732,000
68,500,000
3,4
15,745,166

190,86
7,414

Balance
10,000
,000
153,316
,000
59,960
,000
132,610
,320
1,518,865,
130
107,373
,000
214,805
,625
245,232
,925
186,173
,666
151,290
,000
373,019
,086
3,732
,000
68,500
,000
3,224,877,
752

Achievements:
County Budget Review and Outlook Paper (CBROP) was prepared and

submitted to county executive committee (CEC).


Annual Progress Report (APR) was completed.
Payment of personnel emoluments was done.
Funds were made available at the time required.
Finance Bill was done and submitted to the County Assembly.
Revenue improved compared to the same period last financialyear.
72 | P a g e

First Quarter Report 2014/2015

Challenges:
Inadequate number of technical staff.
Late disbursement of funds by the national government.
Way forward:
Recruit and deployment of technical staff.
National Government should ensure timely disbursement of shareable funds to
the county.
Fast track implementation of projects.
Continue enhance revenue collection, especially in the rural areas.
The Finance Department is committed to ensuring that all the activities of the
County regarding Operations and Development are implemented as per the Budget
approved by the County Assembly in a transparent and accountable manner for the
benefit of the County of Uasin Gishu County residents.
3.10

HEALTH SERVICES

Uasin Gishu County has 185 health facilities ranging from level 2 to 6. Of these
113 are public health facilities and others are either private or faith based. Of the
113 public facilities, 6 are categorized as level IV, 18 as level III and 98 as level II.
Most of the facilities are concentrated within Eldoret urban area. The average
distance to a health facility in the county is 7 Km which is slightly higher than the
recommended 5 Km.

Table 26: Summary of Health Facilities per Sub-county


Sub County

Public

FBO

NGO

Private

Total

Ainabkoi
Kapsabet

17
18

3
6

2
0

12
11

34
27
73 | P a g e

First Quarter Report 2014/2015

Kesses
Moiben
Soy
Turbo
Uasin Gishu
County

18
21
22
17
113

3
1
4
11
28

0
0
0
1
3

7
6
7
12
55

27
26
34
39
185

Nursing Section
Achievements
Participation in AWP development and implementation. Trainings of CHMT &
ScHMTs were done; the actual preparation of the Annual Work Plans and their
subsequent implementation is ongoing. Participation of nursing sector in the
development of Health strategic plan is worth being mention. Staff were also
trained on Rota, Meascles (18month) and the Tetanus Toxoid implemantation
campagn.
Facilitative support supervision. Support supervision activities were carried out
at the sub county level by the Sub County HMTs both facilitated by the County
department of health and partners.
Procurement of Nursing Commodities. During the report period, Reproductive
Health equipment was received from the Kenya Red Cross including MVA sets,
Delivery Packs, Caesarian Section sets, Oxygen Concentrators, cervical cancer
screening equipment etc. the equipment was donated for specific health centres
and hospitals. To improve on adequacy of nonpharmaceauticals, the nursing
department has asigned an officer the ensure sustained availability and
mainatinance of the commodities. commodities & stores and sets aside a buffer
stock of such supplies at the county stores to address shortages as and when
they occur.
Skilled Deliveries. The proportions of expectant mothers delivered by skilled
personell steadily increased from 42% as at end of june to 54.8 % end of
74 | P a g e

First Quarter Report 2014/2015

Septemba. This is attributable to training of staff on Basic emergency


maternal/Obstetric and neonatal care coupled with free maternity services.
Family planning. There is improvement in utilization of family planning
services from the year 2013/2014/ that was at 65% to 99.1% in the first quarter
of 2014/2015.
TB/HIV program. The total number of TB patient diagnosed during the period
the quater were 370 patiets and all are on treatment. 38 % of the patients are
sputum positive meaning that this patients are potentially infectious. About 80
% of the patients are adults. All 99% of the TB patietns were tested for HIV.
Challanges
There is worrying trend is the emergence of MDR TB (multi drug resistant TB)
with langas RCEA facility reporting 6 cases alone. 26 Patients have been ever
diagnosed, 23 commenced treatment, 2 died before treatment was commenced
(while awaiting Rx) and 1 currently being work up to start treatment. So far 23
have been put on treatment: 9 are still on treatment, while 11 successfully
completed treatment, 2 died and 1 defaulted. The defaulted case have been
traced and put in isolation through a court order.
There is a challenge in unavailability of auxiliary drugs for management of side
effects and Isolation wards for MDR TB patients.
Mothers accessing ANC services testing for HIV slightly reduced from 96.2%
the year 2013/2014 to 95.5% in the first quarter of the year 2014/2015. This
could be attributed to change in the new algorythm of HIV testing introduced
early this year.
Pharmacy Section
Achievements

75 | P a g e

First Quarter Report 2014/2015

EMMS supplies to health facilities. Distribution of pharmaceuticals and nonpharmaceuticals was done to health facilities in the month of August 2014.
Moiben and Kipkabus health centres however did not receive the last KEMSA
consignment but both have received some pharmaceutical and nonpharmaceuticals that will last them until we purchase more commodities for the
county.
KEMSA supplied 134 tins of albendazole tablets as a replacement of an excess
delivery of chlorpromazine tablets that had been delivered to sugoi B
dispensary. These will be redistributed to facilities
Support Supervision. During the period under review the department has
conducted support supervision to various facilities. These include Turbo subcounty hospital, Kesses sub-county hospital, burnt forest sub-county hospital,
Ziwa sub-county hospital, Huruma district hospital, kipkabus and Chukura
dispensary.
Challenges
There was a shortage of antibiotic registers in the high volume facilities but 10
of them were produced and distributed to the same
The department has very inadequate pharmaceutical personnel. This is the
reason why commodity management is a big challenge. Ideally, there should be
at least two pharmaceutical technologists in the high volume facilities and three
in each sub-county hospital then at least four at the district hospitals. The
county pharmacist has no computer with access to the internet and the
stationery necessary for day today running of an office.
The county pharmacist also requires an assistant, either a pharmaceutical
technologist or a clerical officer or both to assist with reports for various
commodities for programmes, commodity management and management of
pharmacies in the county as well as the management of pharmacy staff
76 | P a g e

First Quarter Report 2014/2015

The 10 antibiotic registers in stock were only for the sub-county and high
volume facilities but the other facilities do dispense antibiotics too.
Wayforwad
As a way forward facilities need to make their quarterly orders this month so
that by end of November, KEMSA or meds will be working on the orders. This
will help in reducing out of stock duration in the facilities
Negotiations with KEMSA need to be finalised so that the county can have a
storage facility for pharmaceutical and non-pharmaceuticals that are not
delivered directly to facilities or those that need close monitoring and control. It
will also enable the county to store buffer stock for emergencies and any other
eventualities.
Proper mechanisms have to be devised to ensure they are enough and
consistently supplied to facilities to ensure proper commodity management and
reporting.
Laboratory Section
The medical laboratory department is a key pillar in the provision of health
services. The mandate is achieved through application of modern scientific
knowledge and skills to guide in promoting health in diagnosis of both
communicable and non communicable conditions. Well established consistent
medical laboratory diagnostic services are essential for health promotion, disease
prevention, diagnosis, monitoring and client management. There are forty four (44)
GOK facilities with functional laboratory services in the county. Quality diagnostic
services will ensure early disease detection, guide in treatment and management of
clients, improved quality of care for communicable and non communicable

77 | P a g e

First Quarter Report 2014/2015

conditions in the county therefore promoting healthy living for all residents in the
county.
Achievements
Diagonistic servicess. The laboratory diagnostic service provision was achieved
at all active sites. The diagnosis falls in two groups of essential tests (routine
test) available at all diagnostic sites and specialized tests which are available at
specific higher level laboratory facilities at tier 3. Requisition for the supply
reagents is ongoing.
Specialized Equipments were acquired through National TB & Leprosy
program are three (3) Fluorescent Microscopes and One (1) Gene XPERT
machine for MDR TB & XDR TB Diagnosis. Two binocular electric
microscopes were donated by EXACT DIAGNOSIS Malaria study to Railways
and Mois bridge facilities.
Challenges
Inadequate staffing, part of these being attributed to end of contract for ESP
staff. 11 labs were manned by ESP staff and with expiry of their contracts,
laboratory services in those facilities were distrupted.
The lack of pre-qualified contracter to supply lab commodities have rendered
the department have operate sub optimally. The request is to the county to help
to enhance consistent diagnostic service delivery through continuous and
consistent supply of commodities.
Lack of specialized equipment in county and sub county hospitals. The county
to consider procurement of specialized equipment to promote quality health
care to guide in management of communicable, non communicable and lifestyle
diseases.
78 | P a g e

First Quarter Report 2014/2015

Laboratory infrastructure and equipment in some facilities are in a state of


disrepair. The county is requested to consider building a modern laboratory
meeting the required standard.
Clinical Medicine Section
Achievements
Service workload.The workload for the months of July. August and September
has remained steady with an average client total levels at approximately 2,100
per day at the OPD in the 31 facilities .
CCC clinics. on the on going hiv testing & counseling the county is doing well ,
so far 3482 index clients have been seen and out of that 9466 contacts were
traced, counseled and tested for hiv. out of the traced contacts 273 turned
positive and were linked to care (an hiv/aids prevalence of 2.8 % among
contacts).
Eye Clinic. sensitization workshop on primary eye care for CHMT/HMT done.19 partcipants.
SGBV Clinic. There is an upcoming sexual Gender Based centre at UGDH,
three staff trained, now open. To be officially opened soon.
Challenges
Some health facilities have some drugs out of stock,
need

for trainings to be harmonized so that all departments are inclusive

including clinical officers.


Nutrition Section
Nutrition department is one of the many departments that offers both promotive
and curative services in health. The department was able to perform most of the
activities well.
79 | P a g e

First Quarter Report 2014/2015

Achievements
Growth monitoring of all the children that were brought to all our facilities in
the county were weighed and the appropriate advice given to them .
Nutrition clinics in our facilities where we have a nutritionist were well
covered. Patients at risk of the main none communicable diseases were
identified through taking of anthropometric parameters. Action mainly
counseling was done to all these patients.
Other patients seen at the nutrition clinics were TB patients and all the other
patients screened and needed nutrition interventions.
Staff redistribution was also successfully done with a nutritionist manning a
health facility . The 12 nutritionists are now distributed to various health
facilities although he number of nutritionists is too low compared to the
population that they need to serve.
The department was able to source and get some therapeutic feeds for our TB
patients from partners. though little the feeds were able to lift the need for these
feeds temporarily..
The last quarter has seen the establishment of our very first mother support
group in ziwa health centre.Tthe group has been carrying monthly activities
with the mothers from the community at the health facilities grounds .
Micronutrient supplementation to different age groups has also been achieved
in the last quarter
the last quarter has also seen the establishment of the Ari-Nutrition project by
Amref in 5 units in the county with the aim of improving the nutritional status
and economic status of the community members through good nutrition and
agricultural practices.
Challenges

80 | P a g e

First Quarter Report 2014/2015

Very few nutrition staff for the county. we wish to have a nutritionist in every
ward and at least three in every sub county health facility. this would enable the
department to reach most of the community members that need nutrition
interventions.
Reporting tools have also been a hindrance in reporting
The correct prevalence for our nutrition indicators has not yet been realized
since the department needs to conduct a baseline survey to establish prevalence

Wayforward
Establishment of mother support groups in every sub county hospital to be used
as a forum for educating mothers on various health issues
Establish demonstration kitchen gardens in all sub county health facilities with
the aim of teaching the community on ways of reducing micronutrient

deficiencies by growing and proper preparation of foods.


Acquire enough nutrition reporting tools
Hold an inter- departmental training on IFAS supplementation
Acquire enough nutrition commodities for the county
Improve the reporting rates on nutrition indicators especially on DHIS

Public Health Section


The aim of the public health department is to promote health, prolong life and
prevent diseases through organized community efforts so as to ensure a healthy and
productive society. The department achieves this by undertaking health promotion
and health prevention activities. The activities undertaken by the public health
department in Uasin Gishu include; food quality control, plan approval, sanitation,
solid and liquid waste disposal, school health, hygiene promotion, vector/vermin

81 | P a g e

First Quarter Report 2014/2015

control, public health law enforcement, vaccination, revenue collection,


community strategy and disease surveillance and control.
Achievements

Food quality control. As per the requirements of the Alcoholic drinks control
Act 2013 of Uasin Gishu County the department received 200 applicants for the
alcoholic drinks license as compared to 500 received last quarter. The
department was able to generate Kshs. 1,919,000 through licensing. Mapping
and licensing of food premises were carried out and all food premises that met
minimum public health requirements were licensed and revenue collected
through licensing was Kshs. 344,060 compared with last quarter whereby Kshs.
1,249,820 were raised. This is due to the fact that most of the food premises had
already been licensed at the beginning of the calendar year. In order to ensure
that there were good hygiene practices in handling of food during preparation,
transportation, and sale, food handlers were medically examined where Ksh
517,300 was raised compared with last quarter whereby kshs 754,150 was
collected as revenue.
Prosecution. The department issued statutory notices to various authors of
nuisance who contravene the Public Health Act cap 242 whereby 700 statutory
notices were served and 456 complied compared to last quarter whereby 750
were served and 489 complied, . There were 297 cases taken to court, 8 are due
for mention and hearing and so far Ksh. 987,570 has been paid inform of fines
compared with last quarter whereby 250cases were taken to court, 11 were due
for mention and Kshs.735, 000 fined and this forms part of revenue generated
by the department of public health.
Disease Surveillance and Control. Detection and reporting of diseases targeted
for eradication, elimination and control is ongoing. So far we have investigated
82 | P a g e

First Quarter Report 2014/2015

13 cases of Acute Flaccid Paralysis (AFP) and specimen taken to KEMRI


Nairobi for analysis out of 18 expected cases. In disease surveillance where 42
diseases are monitored on weekly basis, reporting rate has improved from 49%
to 56%. This has enabled the county to maintain high degree of alertness on
disease outbreaks monitoring, response and notification.
Environmental Sanitation. Waste management was well coordinated in liaison
with department of environment and where collection was carried out on
weekly basis from trading centres from sub-counties. In urban, public toilets
were also hired out for easy management whereby a total of Kshs. 380,000
compared to Kshs. 240,000 last quarter. The Public health office is charged with
Cemetery management and ensures that best practices were observed during the
calendar year and disposal of bodies as required by law. The office managed to
collect Kshs. 236,600 compared Ksh 219,000 collected last quarter as part of
revenue paid for the services. As part of ensuring that the population was
provided with good housing and safe occupation for businesses operation,
building plans were approved for construction and Kshs. 300,000 was collected
compared to Ksh 314,000 collected last quarter.
Slaughter House Management. The public health office is charge with
cleanliness at slaughter house so as to ensure that good hygiene practices are
observed. The office also is charged with revenue collection and Kshs. 781,570
compared to Ksh 742,150 collected last quarter.
Institutional health. Schools were routinely inspected and health education
given to children and new schools were inspected for registration, the office
managed to raise the standard of learning in schools. A total of 23 schools were
inspected for registration purposes and Kshs. 69,000 was collected.
Sanitation and hygiene. The department held a sensitization meeting on
Community Led Total Sanitation (CLTS) which is yet to be rolled out to the
entire county so as to improve sanitation and hygiene. The department works
83 | P a g e

First Quarter Report 2014/2015

with communities to improve latrine coverage which increased from 85% in


June 2014 to 89% in September 2014. In general the department of public
managed to collect a total of Kshs. 6,398,190 this quarter compared to
approximately Kshs. 6,288,320 collected last quarter.
Challenges
Inoculation department managed to raise Kshs. 863,690 compared to Ksh
1,199,850 collected last quarter due to a shortage of vaccines.
Financial Section
Achievements
The table below summarises first quarter revenue performance from the
department of health services.
Table 27: Monthly Revenue Collections
Summary
Facility
Hospitals
Public Health
Health/C & Dispensaries
Totals

Jul-14
2,256,600
391,100
580,170
3,227,870

Aug-14
2,467,380
416,800
556,975
3,441,155

Sep-14
1,544, 300
457,800
468,640
2,470,740

Total
6,065,990
1,265,700
1,605,785
8,937,475

84 | P a g e

First Quarter Report 2014/2015

Figure 2: Revenue collection in Health Facilities


Total Revenue Collection

HOSPITALS

PUBLIC HEALTH

HEALTH/C & DISPENSARIES

85 | P a g e

First Quarter Report 2014/2015

Table 28: Summary of the items, allocated budget per item and their current status
NO.

Item

Allocated

Budget Current status

(KSH.)
1

Construction of 4 Sub County hospital

120,000,000

Architectures,

PHOs,

and

Works officers preparing bill


of quantities (BQs)
2

Purchase of 4 Ambulances

30,000,000

At procurement level

Kesses Health Centre Upgrading

12,500,000

Architectures,

PHOs,

and

Works officers preparing bill


of quantities (BQs)
4

Purchase of medical equipments

2,090,000

At procurement level

Construction of peadiatric hospital

7,000.000

Awaiting

steering

committees
recommendations.
6

Refurbishment of ward facilities

78,000,000

Awaiting specific allocation


per facility

Rehabilitation Section
Rehabilitation

department

comprises

the

following

sub-departments;

Physiotherapy, occupational therapy, orthopaedic technology and speech language


pathologists. Its one of the components of the Kenya essential package for health
(KEPH) as indicated in the 2005 2010 second National health Sector strategic
plan.

Achievements

86 | P a g e

First Quarter Report 2014/2015

In the first quarter under review a total of 630 patients were treated in the out
patient clinics
Outreach services. Through facilitation of APDK, rehab staff visited 13
outreach centres through mobile clinics. These are as follows: Sugoi, Mois
Bridge, Moiben, Ziwa, Ainabkoi, Tugen Estate, Elgeyo Border, Osorongai,
Chembulet, St Georges, Soy, Turbo and Burnt Forest. Each clinic site received
two visits totaling to 26 outreaches in the quarter under review. A total number
of 1106 clients were seen. It was facilitated by a partner called APDK
Disability mainstreaming. Rehabilitation has also been tasked with the
responsibility of disability mainstreaming in the county. That is to mainstream
disability in all sectors of development in the county. This has been made
possible by the goodwill of disability assessment and evaluation committee in
the county.
In the first quarter a total of 182 persons were assessed and evaluated for
registration by the National Council for persons with disabilities
Provisions of Devices and Mobility Aids.In the first quarter under review 100
devices were prescribed and 80 delivered, leaving a balance of 20
In the side of mobility appliance 30 were prescribed and 30 delivered. 20
wheelchairs funded by Sirikwa Pentecostal, 2 wheel chairs funded Catholic
Dioceses of Eldoret and 8 wheel chairs funded by National Development Fund
for persons with disabilities.
Trainings . In the first quarter, rehabilitation department conducted two
trainings, one for health workers and another for headteachers for primary
schools. A total of 70 people were trained on disability mainstreaming.
Challenges
Limited office space in the out patient departments
Limited number of staff.
Lack of consistent supply of specialized materials
87 | P a g e

First Quarter Report 2014/2015

Lack of enough equipments in Outpatients department


Wayforward (Department)
There is an urgent need to recruit additional staff to mitigate the biting shortage
and improve the quality of health care.
The CME program has to be strengthened to achieve its goals. A lot of support
is needed in terms of facilitation and adoption of the proposed mentorship
program.
Efforts have to be made to urgently develop and implement annual work plans
from the facility, Sub County and county levels.
Facilitative support supervision to be strengthen and fully facilitated in terms
getting means of transport and financial. A training/sensitization of middle and
lower level managers on facilitative support supervision is needed to address
their gaps and challenges.
Strengthen support supervision, mobilize funds for the same and advocate for
provision of utility vehicles for support supervision and redistribution of
commodities and supplies.
Utility vehicle for distribution of commodities is needed
Conduct short courses trainings in reproductive health and eMTCT programs to
capacity

built

service

providers

e.g.

EMoNC,

CTU,

eMTCT

and

Comprehensive RH.
There is an urgent need for pharmaceatical and non-pharmaceatical stores at the
County level. This will allow allow establishment of a buffer stock of
commodities at the county stores to avoid unnecessary shortages.
The development and implementation of the Annual Work Plan need to be
Completed forthwith.
Repair and replace all worn out EPI fridges and Equipment.

88 | P a g e

First Quarter Report 2014/2015

3.11

ELDOWAS

Eldoret Water and Sanitation Company Limited is a corporate entity established in


1997 under companies Act CAP. 486 of the laws of Kenya and started operations in
the year 2000. Under the Water Act 2002 Eldowas carries out its functions as a
Water Service Provider under Service Provision Agreement (SPA) with the Lake
Victoria North Water Services Board (LVNWSB). LVNWSB has engaged
ELDOWAS to be a Water Service Provider in Eldoret and its environs through
service provision agreement (SPA) as required by the water Act 2002. ELDOWAS
is, therefore, expected to provide water services efficiently and economically in
Eldoret and its environs in compliance with SPA.
Achievements
Water production
A total of 2,676, 517m3 of water was produced over the period under review as
shown in the table below.

Table 29: Water Production


Month

Chebara
(M3)

Sosiani (M3)

Kapsoya
(M3)

Kesses

Total Production (M3)

July 2013

509517

390510

13490

913,517

August 2014

483964

400298

12770

461,464

September
Total

468,944.00
1462425

382,350.00
1173158

2,244.00
2244

12430
38690

865,968
2,676,517

Average daily
production

15895.9239
1

12751.7173
9

24.3913043

420.54

29,092

64.36%

89.80%

0.80%

79.65%

68.57%

% utilization

89 | P a g e

First Quarter Report 2014/2015

The percentage utilization of Kesses T. Plant increased to 79.65% from 56% the
previous quarter due to continued increase in the number of connections.
Water Distribution
Over the period under review, the company maintained the distribution network
satisfactorily. Reported leaks and bursts were attended to, and continuous
improvement of the system was also undertaken within the period.
Sewer Lines
Over the period under review, a total of 296 sewer blockages were reported
and cleared within the network and 61 new sewer connections as shown in
the table below.
Quality Assurance
The table below gives a summary of the number of samples that were
collected and analyzed over the period under review.

Table 30: Quality Assurance


Month

Drinking Water

Waste Water

Factories

July 2014

71

10

Aug. 2014

72

10

Sept 2014

75

10

Total

218

30

Monthly Average

72.67

10

Monthly Target

70

10

3
90 | P a g e

First Quarter Report 2014/2015

Compliance with WHO Standards


92% of all the drinking water samples collected and analyzed complied with the
WHO Physico-Chemical Parameter while 100% of the samples complied with the
Bacteriological Parameters.
Compliance with NEMA standards for Effluent
Quarry 70% of the samples collected and analyzed complied with the BOD and
60% complied with the COD standards.
Boundary 74.4% of the samples collected and analyzed complied with the BOD
and 66% complied with the COD standards.
Factories 64.1% of the samples collected and analyzed complied with the BOD
standards and 51.3% complied with the COD standards.

Facilities Maintenance
During the period under review, the scheduled preventive maintenance was
undertaken and breakdowns addressed whenever they occurred. The following
activities were undertaken over the period under review:
o Scheduled preventive maintenance in the five treatments works Quarry,
Boundary, Sosiani, Kapsoya and Chebara.
o Replacement of pneumatic controls at Sosiani Treatment plant.
o Alignment of trickling filters at Boundary and Quarry Sewage treatment
plant.
o Repair of defective recirculation pumps at Quarry Sewage T. Plant.
o Repair of standby power generator (Fitting of trickle charger).
91 | P a g e

First Quarter Report 2014/2015

o Painting of staff quarters at Sosiani Water T. Plant.


Geographical Information System
The company has a GIS section whose mandate is to map out all the facilities. In
the first quarter, the company acquired a handheld GPS gadget for use in mapping
out the existing water and sewer networks. The team mapped out the entire
infrastructure in Kesses and lessoss within the first quarter.
Billing and Revenue collection
During the period under review, the companys billing for water services amounted
to Kshs. 439,425,909.40 and collected a total of Ksh. 417,443,177.97 equivalent to
95% collection efficiency. The over 100% collection efficiency is as a result of
collection of previous outstanding debts.

Customer Services
The company has a Customer Service Section with four area Offices. During the
period under review, a total of 803 customer complaints were received out of
which 760 resolved equivalents to 94.6%.
Challenges
The 64.36% utilization of Chebara Treatment Plant is as a result of the technical
challenges of the Chebara pipeline to transmit the additional flow to the 24,700
m3/day design capacity. During the period, there were several stoppages to
allow for assessment and improvement of the pipeline by a consultant engaged
by LVNWSB to carry out condition survey of the pipeline.
92 | P a g e

First Quarter Report 2014/2015

Kapsoya Treatment plant has not been receiving water due to aged pipes and
abstractions by the community upstream
Quarry Sewage Treatment Plant experienced breakdown of the mechanical
screen in August which necessitated shut down for repairs. All the wastewater
was redirected to Boundary Sewage Treatment Plant. The company is in the
process of importing replacement parts for the screen.
Way Forward
LVNWSB has engaged a consultant to carry out designs to upgrade the raw
water pipeline and the treatment plant.

93 | P a g e

First Quarter Report 2014/2015

3.12 ICT AND e-GOVERNMENT


This report gives a synopsis of the status of project implementation and assesses
the performance of the Department of ICT & e-Government in the first quarter of
financial year 2014/2015.
Achievements
Development of Performance Management Tool the department while
working with other departments was able to adopt the performance
management practice which allows all cadres of staff to be apprised to ascertain
delivery of targets stipulated in work plans.
Signing of Performance Contract by CEC and H.E. The Governor on Service
Delivery. The CEC signed performance contract with H.E. The Governor on
key deliverables contained in the work plan attached. The key objective is to
ensure delivery of ICT services in development agenda as well as, making
services efficient at all levels.
Recognition of 100% utilization of Development Budget of 2013/14 As a
department, ICT and E-Government utilized resources totally within time frame
stipulated. This is in line with government policy of spending. Unfortunately,
budgets should allow growth by 4% from previous year in deciding the
allocations for the sub-sequent budget figures.

Continuing projects:
County Data Centre
The department has been supervising the construction of the countys
ultramodern data center situated at the county headquarters. The data center
94 | P a g e

First Quarter Report 2014/2015

shall serve as the nerve center for all data storage and information for the
county and the region at large.
CCTV
The department has been supervising the installation of the CCTV at the county
headquarters. The installation of CCTV at the county headquarters is expected
to enhance security in various critical offices e.g. the county registries and the
entire county headquarters.
LAN installation
The installation of Local Area Network at the County headquarters shall
enhance communication at the county.
Car Tracking and Fleet Management System
The car tracking and fleet management information system is almost complete
as over 70 vehicles out of the projected 100 vehicles have been fitted with the
car tracking system. The remaining vehicles expected to be installed in all new
roads equipment and vehicles in the health sector programs.
GIS System
The GIS system is at an advanced stage with almost all the sectors in the county
mapped. The project is at user training stage as all Ward Administrators and Sub
County Administrators have been sensitized and trained on how to access the
system which is available at www.station.net/uasingishu.
County Website
The County website www.uasingishu.go.ke has been enhanced to a modern site.
It is indeed one of the most dynamic website which allows more than 100
persons to be enlisted for content contribution. Plans are under way for training
95 | P a g e

First Quarter Report 2014/2015

of officers in each department or entity to be able to capture their own


information on the website for public access.
Tele-Conferencing Facility
This project is at 75 percent completion, as it was awaiting installation of
various local area network equipment and completion of Data Centre. A similar
facility has been proposed for installation in County Assembly making it
possible for County Executive and Assembly to utilize technology for purpose
of clarification on programme implementation.
Partnership framework
The County has been pursuing engagement with World Bank on key support
areas namely, ICT infrastructure support, capacity building, and connectivity
and office automation aspects. Through ICT Authority of Kenya, County will
receive a Consultant who will help in preparing a road map for the County in
line with National, thereby helping us become competitive.
Challenges
Procurement Delays due to Capacity Challenges. It has come to be witnessed
that a lot of delays are related to capacity of the finance department to provide
enough personnel on procurement skills to support this critical service.
Under Staffing in ICT and e-Government department. Though the same have
been presented to County Assembly and Public Service Board, little has been
done to allow recruitment process proceed as initially planned. Now ICT is
relying on its 5 staff members to delivery on the huge mandate.
Insufficient Funds to support ICT and e-Government operations. Although ICT
was voted least; the resources can only support a small fraction of automation
process, particularly on revenue processes.
Way forward
96 | P a g e

First Quarter Report 2014/2015

Establish a County Policy and Strategy for ICT integration in service delivery.
A draft is available for discussion in next forum and sharing with County
Assembly once comments from stakeholders are received.
Create an e-leadership capacity development framework. The department has
identified capacity building for leaders to be two-fold: use of workshop and
study visits to relatively well established economies for purposes of learning on
experiences. Notably the study visit to Belgium Business expo in the week of
18 26 November 2014; Study visit to Cape Town in End of November and
early December. Visit to Belgium in March 2015 to check on establishment of
CIPAL, equivalent of County ICT Consultancy Firm. This aspect also looks at
capacity development of leaders across all levels.
Establishing ICT infrastructures. For County to leverage ICT as a socioeconomic agent, necessary infrastructure is required. County headquarters and
all campus networks (connecting to buildings housing officers here at Eldoret
town) need to be established. Then need for expansion to reach to the subcounty and ward level become timely. The ICT Department will also be
expanding and office accommodation will be urgent. This has been factored in
the budget 2014/15 resources.
To build a spatial infrastructure of the County. The ICT4D Department has
focused in setting a fully equipped division on Geo-spatial resource
management and tools in conjunction with Department responsible for land
matters. The spatial infrastructure of the county will be domicile in the Lands
docket, but digital support will be handled by ICT4D Department. Recruitment
has also been started off by the department for purpose of helping in the initial
setup phase.
Create a capacity development framework and exchanges on best practices.
This is the training of staff both local and long-distance. ICT capacity building

97 | P a g e

First Quarter Report 2014/2015

of more than 2000 staff is key for delivery of services to be captured in an


online sphere.
Create a platform for collaboration amongst the youth. From stakeholders
meeting, it became apparent that we have dire need for a platform that supports
youth engagement in the county. Particularly more towards job creation,
innovation and creativity in county services and citizen participation.
3.13

THE COUNTY ASSEMBLY

Article 174 (1) of the Constitution of Kenya (2010) stipulates that There shall be a
County Government for each County consisting of County Assembly and County
Executive. The County Assembly of Uasin Gishu consists of 30 elected members
and 14 nominated members.

It is headed by the Speaker who is the Chief

Executive. The function of County Assembly as prescribed in the Constitution of


Kenya includes but not limited to Legislation, Representation, and Oversight.

98 | P a g e

First Quarter Report 2014/2015

No.

Codes

1
2
3
4
5
6
7
8
9
10
11
12
14
15
16
17
18
19
20
22
23
24
25

Description

2210300NIGHTOUT ALLOWANCE
2110100SALARIES
TRANSFER TO WARD OFFICE
2110200 EXPENSES
3110300REFURBISHMENT OF BUILDINGS
2211305SECURITY SERVICES
2210201MOTOR VEHICLES FUEL
2220101MOTOR VEHICLES-REPAIR
2210102WATER AND SEWERAGE
INTER COUNTY ASSEMBLY SPORTS &
2620184 CULTURAL ACTIVITIES
HOSPITALITY SUPLIES AND
2210800 SERVICES
PAYMENT OF ANNUAL
2620185 SUBSCRIPTION
2210101ELECTRICITY COST
BEAUTIFICATION OF COUNTY
3110303 ASSEMBLY
SANITARY AND CLEANING
2211103 MATERIALS SUPLIES & SERVICES
STATIONARIES AND GENERAL
2211101 OFFICE SUPPLIES
2210706PUBLIC PARTICIPATION
2210400FOREIGN PER DIEM
2211016CLOTHING AND UNIFORMS
2210201TELEPHONE CHARGES
2210700MEMBERS TRAINING AND SEMINARS
2210403MEMBERS AIRTIME ALLOWANCE
2110314MILEAGE ALLOWANCE
2110312RESPONSIBILITY ALLOWANCE

TOTAL

July

August

September

Totals

526,000.00
6,244,216.00

2,497,490.00
15,350,286.00

4,494,349.00
14,966,377.00

7,517,839.0
36,560,879.0

335,889.00
-

4,130,000.00
2,083,876.00
360,000.00
566,857.00
52,000.00

2,100,000.00
6,593,794.00

6,230,000.0
8,677,670.0
360,000.0
593,389.0
652,305.0
59,303.

1,540,000.00

431,100.00

257,500.00
85,448.00
7,303.00

1,540,000.0
702,293.00

1,133,393.0

235,900.00
29,513.00

51,685.00

235,900.0
81,198.

26,614.00

23,200.00

49,814.

25,500.00

25,500.

28,270.00

7,132,719.00

597,500.00
109,300.00
1,109,500.00
230,000.00
1,739,232.00
1,021,000.00
32,111,824.00

274,330.00
302,600.0
1,550,000.00
1,550,000.0
12,288,672.00 12,288,672.0
62,756.00
660,256.0
92,800.00
202,100.0
- 1,109,500.0
230,000.00
460,000.0
1,739,232.00
3,478,464.0
1,021,000.00
2,042,000.0
46,566,239.00

Table 31: County Assembly Financial Return

99 | P a g e

85,810,782.0

First Quarter Report 2014/2015

CHAPTER FOUR: CONCLUSION AND RECOMMENDATION


The period under review is the first quarter of the financial year 2014/2015. A
number of departments were characterized by a lot of activities while some did not
have quite a number of activities. However, in general, the county undertaken
substantial amount of activities coupled with a lot of progress aimed at addressing
developmental challenges in the county. The county government needs to look at
the challenges highlighted by various departments for further meaningful progress.

100 | P a g e