18 Process Map
Six Sigma Black Belt and Green Belt
Week 1
2008-06-01
Detailed
Detailedmapping
mappingcan
canbe
beused
usedand
andbe
beuseful
usefulfor
forANY
ANYprocess.
process.
Such
SuchMaps
Mapsare
arerequired
requiredfor
forevery
everySix
SixSigma
Sigmaproject.
project.
2008-06-01 SKF Group Slide 1
Project Charter
SIPOC
MSA & Baseline Study on Y(s)
Value Stream Map and Lean Tools
Process Map
Cause & Effect Study
Potential Failure Mode and Effects Analysis
.
Measurement Systems Analysis
Data Collection & Sampling
Statistical Process Behaviour
Capability Study
Quantitative X,Y Relationships
Statistical Validation
Control Plan
Celebrate
What is a Process?
Inputs
Outputs
People
Transformation
Equipment
Products
Goods
Services
Materials
Supplies
Information
Consequences
AAprocess
processisisaaseries
seriesof
ofactivities
activitiesthat
thattransforms
transformsaaset
setof
ofinputs
inputsinto
intoaa
specific
specificset
setof
ofoutputs.
outputs.
2008-06-01 SKF Group Slide 3
Major activities/tasks
Variables, and their settings, tolerances, specifications
Customer expectations
Bottlenecks
Rework sub-processes
Suppliers
Process Map
process
pathways
Shows the steps of how the process May not show the process steps asactually works
Value Stream
Flow charts
reduce Waste
FE E
Process Maps
drive reduction
in Variation
Inputs to Mapping:
Brainstorming
Operator Manuals
Specifications
Process Owner Experience
6Ms: Man, Machine, Method,
Material, Measurement, Mother
Nature
55 Easy
Easy Steps
Steps
A Belt should have the Process Map complete within the first meeting with the team
High-Level Map
Dept. 45
Valve Body
Machining
Inputs
Valve body blanks
Labour
Tooling
Schedule
Outputs
Finished valve bodies
Volume
Model mix
OK?
Broach
Splines
Truck Parts
to Rework Area
Truck Parts
to Next OP
Include non-value-added
steps
Audit &
Sort Blanks on
Length & Diameter
AutoInspect
Sleeve CBores
Drill
Missing Holes
Induction Harden
Splines
Grind
Sleeve OD
OK?
N
AutoInspect
Press Force
Audit
for ID
OK?
N
OK?
Audit
for
Skirt ID
Wash
Sort by
ID Grooves
Scrap
OK?
UnderSized?
Finish OD &
Wire Brush
No - Scrap
Rough
ID
N Scrap
Truck Parts
to Next OP
Diamond
Size ID
Scrap
Wash
Grind
OD
OK?
Vibratory
Deburr
Yes - Rework
Drill, Ream
& Press in Pin
Deburr CBore
on Sleeve End
Inspect
Sleeve Depth
Truck Parts
to Next OP
Wash
Scrap
Grind
Slot
Draw
Furnace
Press In
Sleeves
Sleeve Blanks
from Dept. 30
Audit
for
Missing Holes
Final
Inspection
(Visual)
100%
Inspection
of ID
OK?
N
Scrap
OK?
N
Scrap
Store for
Transfer to Dept. 88
Finish OD &
Wire Brush
Rough
ID
Audit
for ID
OK?
N
Scrap
Outputs
Outputs
Finish ground part 51.26/51.21 mm
De-burred part
Finish OD &
Wire Brush
Rough
ID
Ground ID at 29.289/29.307 mm
Run-out to OD 0.006 mm
Taper, roundness, & straightness
of 0.001 mm
Audit
for ID
OK?
N
Scrap
Outputs
Ground ID at 29.289/29.307 mm
Run-out to OD 0.006 mm
Taper, roundness, & straightness
of 0.001 mm
Finish OD &
Wire Brush
Rough
ID
Inputs
S!- Dress grinder to size
S!- Tool change!
N Grinding wheel
N Wire brush
S- Preventative maintenance
C- Coolant level
C- Coolant temp
S!- Audit requirements
Key:
! - Critical
N - Noise
S - Standard Operating Procedure
C - Controllable
2008-06-01 SKF Group Slide 15
Audit
for ID
OK?
N
Scrap
Inputs
S- Tool change
S- Preventative maintenance
S!- Audit requirements
Diameter
Taper
Concentricity
Outputs
Ground ID at 29.289/29.307 mm
Run-out to OD 0.006 mm
Taper, roundness, & straightness
of 0.001 mm
Finish OD &
Wire Brush
Rough
ID
Audit
for ID
Inputs
S!- Dress grinder to size
S!- Tool change!
N Grinding wheel
N Wire brush
S- Preventative maintenance
C- Coolant level
C- Coolant temp
S!- Audit requirements
OK?
N
Scrap
Inputs
S- Tool change
S- Preventative maintenance
S!- Audit requirements
Diameter
Taper
Controllable/Critical
Concentricity
Input Parameter
Key:
! - Critical
N - Noise
S - Standard Operating Procedure
C - Controllable
2008-06-01 SKF Group Slide 17
Coolant Level
Coolant Temp
Target
17 gal
84 F
Upper
spec
18 gal
86 F
Lower
spec
16 gal
82 F
1st Filtration
Die pump
to 2nd Filtration
Coating
Filtered
adhesive
Rehumidification
Lamination
Speed
Steam Pressure
Temp profile
Temperature
Air temp
Inert gas flow
Silicone
differential speed
Nozzle
coverage
Roll Pressure
velocities
die settings
Face Moisture
+ Oven settings
Back up roll
+ die settings
Good DRY coverage
Rolls of
Good wet coverage
Adhesive to
V.C.
good
Coatweight
die CR2
Ctwt distribution
product
Profile Measure
Moisture
Pressure
+ Filters
Pressure
+ Filters
Drying
FMEA
MSA
DOE
SPC
I&CIM Tools
Regressions
Process
ProcessMapping
Mappingisisthe
thefoundation
foundationfor
forcontinuous
continuousimprovement.
improvement.
Team Exercise
For the exercise given by the Instructor, prepare a Process Map.
Things to keep in mind
What are the boundaries of your process? Where does it begin & end?
What is the big "Y"?
What are the process outputs desired at the end of each stage? How do
you know the step is complete?
What are the inputs to each step? Can they be characterised? Who are
the key players required?
Catapult Exercise
You have been selected to serve on the Companys elite catapult
squad. Your mission is to optimise the catapult process so that we
can overcome our competition.
A successful catapult squad can place a projectile on target nearly
every time (they will miss just 3.4 times per million).
Good luck! The penalties for failure are severe!! (Remember, this is
the 11th century!).
Appendix
SKF
Example
Paper Making
Paper Supercalendering
(UPM)
Inputs
C
C!
S
S
S
C
C
C
Packaging/Shipping
fiber type
uncalendered sheet
papermaking factors
basis weight
paper machine
caliper
SOP
caliper uniformity
operators
density
density uniformity
size press
moisture content
size coating
(UPM)
Inputs
C!
C
C
C
C
C
S
S
C
C
N
supercalender factors
steam
Outputs
9-12 calendered rolls
roll properties
temperature
CD position
pressure
length
# nips
weight
speed
SOP
C
C
S
S
packaged rolls
packaging materials
paper properties
slitters
caliper
winding tension
caliper uniformity
plant environment
density
optical properties
density uniformity
opacity
moisture content
IR transparency
PTC
Receiving
SOP
operators
QA Testing
width
basis weight
Outputs
9-12 rolls
(UPM)
paper properties
operators
Inputs
Inputs
S
S
S
S
Outputs
COA
test instruments
Test results
SOPs
operators
test methods
runnability properties
tear strength
tensile strength
surface properties
smoothness (Bekk)
Parker print surf
oil absorbancy
porosity (Bekk)
IGT stain length
optical properties
opacity
IR transparency
sample for QA testing
dirt/debris (slitting)
N Noise
! Critical Parameter
0Controllable Parameter
*SOP
QA Testing
(UPM)
PTC Receiving
Inputs
C
C
S
C
PC-4
Liner Unwind
Outputs
paperwork
packaged rolls on trucks
operator
COA receipt
Inputs
C
S
S
S
S
C
C
C
C
S
N
PC-4
Liner Remoisturization
S
S
S
C
C
C
N
BTG solution
SOP
operator
process variables
steam pressure
# steam bars
liner width y
paper rolls
flying splice system
splice tape
SOP
operator
ramp-up speed
paper properties
runnability props.
roll width
web cleaner
dirt/debris (slitting)
remoist. liner
liner width z
Inputs
C
C
S
S
C
S
N
adhesive
adhesive ct wt
SOP
operator
process variables
coating applicator
plant environment
N
Noise
Critical Parameter
C Controllable Parameter
0
S SOP
Inputs
C
S
N
C
S
S
C
C
C
C
N
silicone chemistry
silicone applicator
silicone poisons
silicone coat weight
SOP
operator
process variables
paper properties
runnability props.
surface props.
plant environment
PC-4
Silicone Drying/Curing
Outputs
Inputs
N
S
S
C
C
C
N
N
PC-4 Facestock
Lamination
Outputs
Inputs
C
S
S
C
N
S
facestock
SOP
operator
process variables
plant environment
release tester
Outputs
uncured silicone
SOP
operator
process variables
oven temps.
line speed
plant environment
liner width x
cured silicone
liner width y
web breaks per yardage
PTC
Slitting / Shipping
Outputs
roll laminate constr.
scrap
release
dye stain
Inputs
C
S
S
C
S
Outputs
slitter
SOP
operator
process variables
packaging materials
Customer
Converting
Outputs
PC-4
Adhesive Coating/Drying
Outputs
Inputs
PC-4
Silicone Coating
scrap
packaged slit rolls
Mail Invoice
to Asiana
Invoice Issued
S
C
C
C
Invoice Received
Invoice Document
Price
Quantity
Workscope
S
S
S
C
Collect
Invoices at
Asiana
7 (7)
Customer Address
Shipping Document
Postal Service (Asia)
Fedex
S
C
N
C
3 (10)
Distribute
Invoices to
each Section 1 (11)
Mail Box
N Mail Clerk
Mail Checking Frequency
S Classification of Invoice by P.O #
Mail Clerk
Queue Time
Invoice Received
by Each Section
APU R&O
System Input
Payment Voucher
Enter Data
into System
4 (24)
Database
Acceptance Decision
Create
Payment
Voucher
7 (20)
Bank Notified to
Release Payment
Payment Approved
N
C
C
S
N
30 (54)
Notify Bank
to make
Payment
Accounting Rep
Budget Allocation
Purchasing Influence
ATLs Influence
Priority of Payment
N
S
C
S
2 (56)
Finance Rep
Bank Notice
Budget Allocation
Accounts Payable
Payment Submitted
Bank Submits
Payment
Component R&O
Review &
Confirm
2 (13)
Invoice
Accept
Invoice?
N Priority
N Shipment Hold
N AOG
No
S Invoice Data
N Purchasing Manager
C Time to Create Voucher
N Accounting Rep
S Payment Voucher
S Database System
Approve
Payment
Yes
Y
N
S
S
C
APU Purchase
Part Purchase
Receipt of Invoice
Inbox Location
Queue Time
Purchasing Section Manager
Dispute Resolved
Resolve
Dispute
30 (43)
New Invoice
Re-Issue
Invoice
10 (53)