LAW 89 /1998
CHAPTER 3: SURVEY
QUESTIONNAIRE DESIGN
QUESTIONNAIRE DETAILES
PROCEEDINGS.
RESULT CATEGORIZATIONS
RESULT ANALYSIS
RESULTS VERIFICATION
RISKS ASSESSMENT
RISKS PRIORITIZATION
REFERENCES:
A frame work for Risk Assessment in Egyptian Real Estate projects using Fuzzy Approach.
Constructability and its Relation with TQM, Cost Shifting Risk and Cost-Benefit.
Development of project cost contingency estimation model using risk analysis and fuzzy expert system.
Heuristic Approach of Risk Assessment Modeling EPCCM Application: Engineer Procure Contract
Management.
Managing Construction Projects Using the Advanced Programmatic Risk Analysis and Management
Model.
Predicting the risk of contractor default in Saudi Arabia utilizing artificial neural network (ANN) and
genetic algorithm (GA) techniques.
Risk provisions in Building and Construction Contracts, A comparative Study in the Egyptian Civil Law
and FIDIC Conditions of Contracts.
Risk ranking and analysis in target cost contracts Empirical evidence from the construction industry.
Risk ranking and analysis in target cost contracts Empirical evidence from.