1.6. That the COMPLETION CERTIFICATE shall mean the certificate to be given after
PROVING TEST has been conducted and on satisfactory performance of all the
EQUIPMENT.
CLAUSE 2. CONTRACT DOCUMENTS:
That the CONTRACT DOCUMENTS shall include and consist of this contract of Agreement and
relevant Technical documents like Product Certificate, Operation and Maintenance Manuals, Electric
and Hydraulic Principle Diagram, related foundation drawing, Packing list, catalogue, brochure with
specific technical specifications, layout plan, single line diagram referred to thereof all of which are
incorporated reference herein and made integral part of this CONTRACT.
CLAUSE 3. SCOPE OF CONTRACT:
That the SUPPLIER shall depute full time skilled Erection Engineer / Supervisor and other personnel in
accordance with provision of this Agreement to complete the work up to the satisfaction of the
PURCHASER.
CLAUSE 4. SCOPE OF SUPLLY :
That the SUPPLIER in response to the order of the PURCHASER will supply the following
commodity as per the specifications, brand, quantity, unit price and amount:
Sl.
Commodities & specifications
Brand
Qty
Unit Price
Amount
No.
in USD
in USD
1.
CJDY-E 800kV/60kJ Impulse voltage
?????
1Set
84,300.00
84,300.00
test system. HS Code : 9031.80.00
Total (CFR Chittagong basis)
84,300.00
CLAUSE 5. MODE OF PAYMENT:
That the payment will be made to the SUPPLIER through LC by the PURCHASER on the following
terms & conditions :
90% payment will be made by AT SIGHT LC and balance 10% will be made after submission of
performance certificate issued by the PURCHASER/LC applicant on their letter head pad certifying
that the quality, quantity, packing, marking & all other specifications of the machines & accessories are
found OK as per P/I No. PI201412001 dated 10 December 2015.
The Advice bank information should be as follows:
Bank Name
: Bank of China Ltd, Jiangsu Branch
Having registered office at : 148, Shongshan Nanlu, Nanjing, Jiangsu, China.
SWIFT Code
: BKCHCNBJ95H
Beneficiary
: Yangzhou Xinyuan Electric Co Ltd
Account
: 475458233259
Address
: Wujian Industrial Park, Yangzhou City, Jiangsu Province, 225253, China.
CLAUSE 6. DEFECTS AND REMEDIES
That the SUPPLIER shall be responsible for all defects of commodities and be under obligation to
remedy any defect after being notified by the PURCHASER .
CLAUSE 7. DELIVERY:
That the Production, shipment and total work of supply at site, installation, testing, commissioning,
proving tests with accessories for completion will be completed within 45 (Forty-five) days from the
date of opening L/C.
CLAUSE 8. INSPECTION OF THE EQUIPMENT:
That the SUPPLIER shall provide the PURCHASER with every reasonable facility and make
arrangement for carrying out inspection without causing any delay and / or hindrance.
CLAUSE 9. ERECTION AND INSTALLATION:
9.1. That the erection, installation, testing, commissioning and proving tests of the Equipment /
Machine will be carried out by the qualified Engineers/Technicians of the SUPPLIER. Under
the technical assistants of manufacturer. Both the PURCHASER and the SUPPLIER will
Page 2 of 6
render full co- operation so that the work commences and is completed within the time
schedule. The PURCHASER shall be taken full responsibility to apply complete worksite with
proper workstation for testing. The Power Supply must work at the PURCHASERs worksite.
Otherwise the testing cannot be started.
9.2. That the Engineers/Technicians of the SUPPLIER round trip tickets from China to Bangladesh
accommodation, food and local transportation shall be covered by PURCHASER. The
SUPPLIER shall be taken full responsibility to apply VISA for the Engineers/Technicians.
9.3. The SUPPLIER shall depute full time skilled and competent erection Engineer/Supervisor and
other personnel for the aforesaid erection, installation, testing and commissioning of the
contract till successful completion and commission of the contractual obligations. Any loss due
to such delay shall be borne by the SUPPLIER.
9.4. That on completion of erection, installation, testing and commissioning of the machines with
accessories, the PROVING TEST shall be conducted under the supervision of Erection
Engineer/Supervisor to be deputed by the SUPPLIER to the entire satisfaction of the
PURCHASERs representative.
9.5. That after full and complete performance of the work and the successful test run of all
Equipment/Machines, a completion certificate shall be issued by the SUPPLIER stating that
the erection and installation of the Equipment has been satisfactorily completed as per contract.
9.6. That adequate and full proof safety and security measures including all incidental insurance
coverage, if any, shall be maintained at site with the full responsibility of the SUPPLIER from
the delivery of the Machines at site and till satisfactory completion of installation and during
any maintenance or rectification works, so that no damage is caused to the Machines and no
injury or loss of life is caused by such work to any individual or individuals either employed
by the SUPPLIER or to any other person, visitor, PURCHASERs agent, representative or
employee of PURCHASERs/SUPPLIERs consultants or their employees. And for any such
damage or injury or loss of life the SUPPLIER shall remain fully liable and bear all
responsibilities, costs & legal consequences and also keep the PURCHASER fully indemnified
from the same.
9.7. That after sale service by the SUPPLIER shall be considered from the date of successful
commissioning certificate given by SUPPLIERs Competent Authority and during the warranty
period all the spare parts, if required, due to manufacturing defects or damages due to defective
works, bad workmanship, defective assembling shall be supplied free of cost including all
services by the SUPPLIER.
CLAUSE 10. TRAINING OF PERSONNEL:
That during the erection, installation, testing and commissioning of the equipment/machines, the
SUPPLIER shall train the local personnel of the PURCHASER to enable them to operate and maintain
the said equipment/machines.
Theres only one time training term at the worksite of PURCHASERs for about 3 or 5 days.
Therefore, the PURCHASER shall depute qualified Engineers/Technicians for the training and take the
Video for memory. All raw materials and tools for testing and training will be borne by PURCHASER.
CLAUSE 11. PRICE TERMS :
The Price terms will be CFR Chittagong, Bangladesh as agreed mutually by both the parties
CLAUSE 12. PACKAGING:
Packaging of machines and its accessories and technical document will be Seaworthy Packing, plastic
film packing and finally to be packed in new strong wooden case(s) for long distance ocean freight
transportation. It will be carried as a whole, with books, catalogues or any necessary documents for use
and installation by the SUPPLIER.
CLAUSE 13. DELIVERY TIME TERMS:
The delivery time by the SUPPLIER will be within 100 (hundred) days after the receipt of the order
and LC by the SUPPLIER.
Page 3 of 6
That the SUPPLIER also undertakes to supply spare parts for imported items at least for
one year at prevailing cost after successful installation & commissioning.
18.3.
That the SUPPLIER will exercise diligence in ensuring the safe and intact condition of the
supplied equipments from point of unloading to that of commissioning. The SUPPLIER
undertakes to compensate/indemnify the PURCHASER for any manner of damage or loss
with accessories for completion and its components during the transition period, if not,
covered by insurance.
18.4.
That the SUPPLIER shall execute an after sale servicing contract with the PURCHASER
on the day of commissioning the items which shall be effective from the following day of
the expiry of warranty period of key parts of 1 year from the date of shipment.
18.5.
That the Handing over & Taking over of the project will be on energization and
completion of the same.
That the commissioning of the machines with accessories for completion of the project
shall be deemed to be satisfactory if during normal operating for a period of 30 days under
the supervision of the representative of the SUPPLIER in presence of the PURCHASERs
representative has achieved guaranteed performance and thereafter COMPLENTION
CERTIFICATE will be issued by the PURCHASER to SUPPLIER.
19.3.
That in the event of the commissioning test, not being scheduled as above because of
deficiencies, defects in the machines with accessories for completion of project supplied,
then the SUPPLIER shall at his own expenses carry out such modifications to the
aforementioned supply including replacement thereof as considered necessary and
thereafter, commissioning test shall take place under the direction of the PURCHASER or
as may be mutually settled between the parties.
20.2.
That the SUPPLIER will make good at their cost any breakage or damages caused to the
construction due to installation work.
20.3.
That if the SUPPLIER fails to complete the project as per schedule, then the SUPPLIER
will be bound to compensate at the rate of 100 USD per each day of delay.
---------------------
------------------------------
Managing Director
ADEX ENGINEERING LIMITED
Signature of ;PURCHASER
Managing Director,
YANGZHOU XINYUAN
ELECTRIC CO LTD.
Signature of SUPPLIER