Professional Documents
Culture Documents
IIIII
http://www.bd.gov.hk
2010/10
1.1
1.2
1.3
2.1
2.2
2.3
....................... ................................................................. . . . . . 5
....................... ................................................................. . . . . . 5
....................... ................................................................. . . . . . 6
3 .................. ................................................................. . . . . . 8
7 .................. ................................................................. . . . . . 8
118 ............................................................................... . . . . . . 9
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.1 0
3.1 1
3.1 2
3.1 3
3.1 4
3.1 5
3.1 6
3.1 7
3.1 8
3.1 9
3.2 0
3.2 1
3.2 2
3.2 3
................. . . . .
....................................................... ................................. . . .
.................................................................................... . . . .
.................................................................................... . . . .
...................................... . . .
( )
............................................................ . . .
........ ................................................................. . . .
..................................................................... . . . .
................................................................................. . . . .
......................................................... . . . .
................................................... . . .
..... ................................................................. . . .
...................................... . . .
.............................................. . . . .
................. ................................................................. . . .
......................................................... . . . .
........... ................................................................ . . . .
....................... ................................................................ . . . .
.................................... . ..
.......................... . . . .
............................................................... . . . .
..................................................... . . . .
........... ................................................................ . . . .
10
12
14
16
17
19
21
23
24
26
28
30
32
34
35
36
39
40
50
53
56
58
60
2010/10
4 .1
4 .2
4 .3
4 .4
4 .5
............................................................... . . . . . . .
.............. ................................................................ . . . . . . .
.............. ................................................................ . . . . . . .
.............. ................................................................ . . . . . . .
I ........................................... . . . . . .
II .......................................... . . . . . .
III ......................................... . . . . . .
63
63
65
65
68
70
72
................ ................................................................. . . . . . . 7 4
6 .1
6 .2
7 .1
7 .2
15 .............. ................................................................. . . . . . . 7 5
............................................ . . . . . . . 7 8
.............. ................................................................ . . . . . . . 7 9
............................................... . . . . . . . 8 0
......................................... . . . . . . 8 3
.................... ................................... .............................. . . . . . . 8 3
III .............................................. . . . . . . . 8 3
I .............................. . . . . . . . 8 4
.................................................................. . . . . . . . 8 4
.............. . . . . . . 8 4
......................................................... . . . . . . . 8 5
......................................................................... . . . . . . 8 5
....................... . . . . . . 8 5
...................................................................... . . . . . . . 8 5
2010/10
8 .1
8 .2
8 .3
8 .4
8 .5
8 .6
8 .7
8 .8
8 .9
8 .10
9.1
9.2
9.3
9.4
9.5
9.6
9.7
10
86
86
86
86
86
86
87
10.1
10.2
10.3
10.4
10.5
10.6
10.7
10.8
10.9
10.10
11
....................................................................... . . . .
.................. . . .
...................... . . . .
............................................................. . . .
............................................................... . . . .
..................................................... . . . .
................................................................................. . . . .
.......................................................... . .
...................................................................... . . .
................. ................................................................. . . .
........... ................................................................ . . . .
................. ................................................................. . . .
................. ................................................................. . . .
................. ................................................................. . . .
..... ................................................................. . . .
......................................................................... . . .
................. ................................................................ . . . .
88
88
88
89
89
89
90
90
91
91
11.1
11.2
11.3
11.4
11.5
11.6
11.7
................................................................................. . . . .
........ .......................................... ....................... . . .
........... ................................................................ . . . .
........... ................................................................ . . . .
........... ................................................................ . . . .
........... ................................................................ . . . .
.. ................................................................ . . . .
92
93
95
95
95
95
96
12
......................... ................................................................ . . . . 9 7
13
................................................................................. . . . . 9 8
............................................... . . . . 9 8
2010/10
13.1
13.2
14
...................... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 9
15
............................. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . 1 0 1
I
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . 1 0 2
II
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . 1 0 3
III
. . . . . . . . . . . . . . . .. . . . . . 1 1 1
IV
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . 1 1 2
VI
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 2 6
VII
II I I I . . . . . . . . . . . . . . . . . . . . . . . 1 2 7
VIII - . . . . . . . . . . . . . . . . . . . .. . . . . . 2 3 9
2012/06
IX
. . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . 2 4 3
1. 1
1.1.1
1 2 3
2 0 0 8
1 2 3 N
1.1.2
1
(a) 1 4 1
( b ) 1 4 A A
6 2
141
14AA
1 . 1 . 3
2010/10
1. 2
1. 13
2. 6
1. 3
1. 3 .1
1. 3 .2
1 1 1
(a) 1 0 0
(b )
20I
600
APP-126G
1. 3 .3
2010/10
1. 3. 4
h t t p : / / b r a v o . b d . g o v . h k
750 1 3
1. 3. 5
2 5
1
2
3
4
5
1 . 3 . 6
2010/10
2. 1
2 . 1.1
2 . 1.2
IIIIII
2 . 1.3
)20
I
40
II
40
III
38
2 . 2.1
2010/10
2. 2
1 2
I
2. 3
118
2.3.1
1 . 1
I
2.3.2
1 1 8 1 3
II
2010/10
2.2.2
1 1 8 2 3
3
3. 1
1.3
1.33
(i)
(ii)
)250
)1
)1.2
9 A
APP-29
90199611.1
11.2
1.22.1
1.3
1.33
3.
10
1
3II
2010/10
) 250
)
)
) 1
)
) 1.2
1.4
1.34
(i)
(ii)
72
APP-41200813
19
1.4
1.4
1.34
1.34
2010/10
2008
11
3. 2
1.27
3.25
3.37
3.38
> 5 0 0 500
2
>500
750
500
101600
5.5))7.5
102
3.3))7.5
103
104
4.5
12
231
APP139
2010/10
>3
12
1.27
3.25
) 500
>500)
>500
) 2
>3
>3
3.37
3.38
)
) 500
>500)
>500
) 750
2010/10
>3
13
3. 3
2.30
3.23
3.24
3.23
11
24
25
28
29
APP-93
ADV-14
34
APP133
199610
2.30
3.23
2010/10
14
1.25
1.36
2.28
2.36
2.29
1.26
>1.5 3 1.5
>1.5 3
13
30
(i) 15
>30
(i) 3
(ii) 3
(ii)
(iii)
1.5
(i) 3
(ii) 1.5
40
41
A P P 103
1.122.11
2.28
2.29
2.36
2010/10
) 1.5
15
3. 4
3.29
3.36
3.30
750
156.1
>3
73
30
35A
APP-27
3.29
2010/10
) 750
>3
16
1.11
2.10
1.5
10
15
10
>15
10
>1.545
100
50
13
2.10
XII2004
APP-142
47.1.3
ADV-15
41
1.122.11
1.11
>1.5)
>1.5
) 3
2010/10
3. 5
17
1.12
2.11
13
>1.5 3
>0.3 1.5
APP-482005
APP-28
4 1
1.12
2.11
>0.3)
>0.3
) 1.5
2010/10
>1.5)
>1.5
) 3
18
1.31
2.33
>3 10
>10
1.31
2.33
>10
>3)
>3
) 10
2010/10
3. 6
19
2.34
3.31
>3
>3
>14
APP10255
4 8 39
APP-16
ADV-3110
6 7
2.34
3.31
2010/10
>3
) 6
20
1.7
2.6
1.8
2.7
> 1 . 5 5 1.5
> 3 1 0 3
30
APP103
ADV-22
1.122.111.112.10
1.7
1.8
>1.5)
>1.5
) 5
2.6
>3)
>3
) 10
2.7
) 1.5
) 3
2010/10
3. 7
21
1.9
3.4
1.10
3.5
>3
> 1 . 1 3 >5
>3 5
2004
3.4
3.5
>3)
>3
) 5
2010/10
>1.1)
>1.1
) 3
22
2.3
2.4
2
9
1.5
APP-100
2.3
2.4
)
) 1.5
)
) 9
) 9
) 1.5
2010/10
3. 8
23
3. 9
1.1
1.32
3.1
(i)
(ii)
3.1 1.5
8>600
2010/10
2 0 0 4
XII
9 0
1996
5 6 1 0 . 2
72
APP4 1
2008
78
1996
1 2
1.22.1
24
1.1
1.32
>1.5
3.1
2010/10
) 1.5
25
3. 1 0
1.16
2.16
3.13
3.2
>300
>200
300 200
8
6.1
2010/10
15
1996
8.2216.4
APP14668
26
1.40
2.40
3.33
3.2
>300 >200
300 200
8
6.1
2004
1.16
2.16
1.40
2.40
200)
200
) 300
)
) 3.2
) 3.2
>300
3.13
3.33
)
) 3.2
2010/10
>100)
>100
) 200
27
3. 1 1
1.15
2.13
2.15
>1.1 3.5
1.1
3.5
41
XII
APP-24
101495
APP-86
ADV-15
41
10
11
3A
A P P - 1 1 0
2004
1996712.311.711.8
12
1.15
2.15
)
) 3.5
2010/10
>1.1)
>1.1
) 3.5
28
2.14
3.11
3.12
>1.1 3.5
0
1.1
3.5
41
APP-24
101495
APP-86
10
3A
APP-110
199612.3()
12
2004
3.11
2010/10
) 1.1
29
3. 1 2
1.2
2.1
(i)
(ii)
> 1 4 . 5 1
1 6 . 1
2010/10
10
11
90199656
10.2
199612
450
83A
12
30
1.35
2.35
>14.5
2
>150
XII2004
APP-142
ADV1541
1.2
2.1
) 1
1.35
>150
6.1.21
2010/10
>1)
>1
) 4.5
31
3.13
1.6
2.5
3.3
>2
1.1
I1.6
2.53.3
2012/06
APP-110
17
3A
APP-110
APP-37
2011
C11.1
1
2
32
1.6
2.5
>2
3.3
1.6
2.5
1.1
1.6
2.5
2012/06
1.1
33
3. 1 4
2.31
3.26
>750
750
13146.1
5
2.31
3.26
>3
>3
>750
)
) 750
3.26
3.26
>3
>500)
>500
) 750
2010/10
) 750
34
1.37
2.37
10 5
500
2.37
1.37
>5)
>5
) 10
2.37
) 5
) 500
2010/10
3. 15
35
3. 1 6
1.30
2.32
2
>2
>1
1
10
11
APP-21
1.30
>2
2.32
2010/10
<2
36
1.38
2.39
3.32
>5 10
2.5
>1.2
4.5
3.32 2 0
>1.5
10
11
APP-21
3.32
) 5
)
)
) 6
) 2.5
) 4.5
)
)
) 20
>1.5
2010/10
2.39
37
1.39
2.38
10
11
APP-21
2010/10
2.38
38
1.17
2.17
XII
11
ADV1541
APP-1025
5
1.17
1.17
2.17
2.17
2010/10
3. 17
39
3. 1 8
1.20
2.18
3.16
> 1 0 10
20
4.2
600
300
3.16
6
aa
311
APP-126G
APP126CFHI
30
APP-24
AC.114
6
2010/10
6 0 0
2.5
40
1.20
) 4.2
2.18
)
) 4.2
) 10
)
)
) 600
>10 ) 20
>10)
)
) 600
3.16
) 1
)
)
) 1
4.2
2010/10
) 300
)
)
) 6
* 2.5
41
1.21
2.20
2.22
20
600
100
300
600
500
13
APP126CFHI
//
30
1.12
31 2.111.112.10
42
1
aa
A P P - 1 2 6
G
2010/10
A P P 32
1 9 9 6
1.21
2.20
2.22
1.21
2.20
) 600
)
)
) 20
) 6
) 600
) 2
)
)
) 100
2.22
)
) 3
2010/10
) 1
)
)
) 300
)
) 500
43
1.22
2.19
3.17
> 5 2 0 5
> 1 0 4 0 10
>6
6
3.17
1 0 10116.1
6.1
aa
311
APP-126G
APP126CFHI
30
600 2.5
2010/10
2.5
44
) 600
1.22
1.22
) 600
)
>5
) 20
>10
) 40
>6
2.19
>6
2.19
>6
>6
) 10
) 600
)
) 5
) 600
2010/10
>600
45
1.23
2.21
2.23
1 . 2 0
1.211.221.232.18
20
10 2 . 1 9 2 . 2 0 2 . 2 1
2.22
600
2
6
2.21
APP126CFHI
1.122.111.112.10
1.23
) 6
2.23
2010/10
) 600
)
)
) 20
46
1.24
2.242.252.26
2.273.163.17
3.183.193.203.21
3.22
116.1
2.24
3.18
2 0 2
3.18 2
) 4.2
3.18
)
) 2
) 2
)
)
) 6
) 20
)
)
) 600
2010/10
2.24
47
2.25
3.19
3.22
20
3 . 1 9 2
3.22
>1.5 3
2.26
3.20
20
40
10
3.20 1 1 6 . 1
116.1
2010/10
48
2.26
2.26
>6
) 600
)
) 20
) 600
)
) 40
3.20
) 6
) 600
>1)
>1
) 10
2.27
3.21
3.21
2
1
5
3.21
) 5
2010/10
) 1
49
3. 1 9
1.5
2.2
3.2
>1
1
3.2 >1 2
(i)
>1.5
(ii)
1.1
10.6.4
2.2
3.2
>2
>1.5
2010/10
>1)
>1
) 2
50
1.28
3.27
3.35
...
750
600
3
>3
100
>100
3.27
73
3031
APP112
5
10.6.4
3.14
) 100
) 600
>750
>3
2010/10
3.27
51
1.29
3.28
3.34
1.5
150
>150
100
126.1
3031
1996
APP112
5
10.6.4
3.28
) 150
2010/10
) 1.5
)
6.1.212
52
1.13
3.9
1.14
>150
150
1 . 5
1
2.3
APP-32
5
1996
1 . 5 1
2.3
1.512.3
2010/10
3. 20
53
1.13
1.14
>150
) 1.5
)
) 1
)
) 2.3
3.9
) 150
2010/10
1.512.3
1.51
2.3
54
2.12
3.8
3.10
4.5
4.5
2.3
3.8
>1.5
1 . 5 1
2.3
2.12
D>1.5
3.8
) 1.5
)
)
) 4.5
)
) 4.5
)
) 2.3
) 4.5
)
)
) 4.5
)
) 2
1.512.3
55
2010/10
3.10
3. 2 1
1.5
2.2
3.2
...
>1
1
3.2 >1 2
(i)
>1.5
(ii)
1.1
2.2
) 1.5
2010/10
) 1
56
1.19
3.15
1.5
>200
200
1 2 6 . 1
30
APP-32
5
1996
1.19
1.19
) 1.5
)
) 1.5
>200
2010/10
>200
57
3. 2 2
1.5
2.2
3.2
...
>1
1
3.2 >1 2
(i)
>1.5
(ii)
1.1
2010/10
58
1.18
3.14
1.5
> 2 0 0 200
100
1 2 6 . 1
>100
30
APP-32
5
1996
1.18
3.14
)
) 1.5
) 200
) 1.5
2010/10
>200
59
3.23
1.1
2.8
3.6
(i)
(ii)
1.1323.13
>3.5
3.5
6
100
>3.5 100
(i) (i)
(ii)
>1.2
(ii) 1.2
>100
(i)
6
(ii)
1.8
2012/06
902011
C5 C11.1
2933
41995
APP-67
APP-24
10145
APP-37
APP11647
3A
60
2.8
2.8
>1.1
3.6
>3.5100
3.6
3.5
6
6
1.2
>3.5100
3.6
6
1.2
>1.1
1.6
1.6
2.5
2.5
1.1
2012/06
1.1
61
2.9
3.7
>1.1(323.13)
6
3.5
3.7
902011
C5C11.1
2933
41995
APP-67
APP-24
10145
APP11647
3A
2.9
6
>3.5
3.7
3.5
2012/06
600
62
4. 1
4.1.1
1 4 1
4.1.2
4.1.3
/ 1 4
4. 2
4.2.1
1 4 1
1 4 A A
4 /
5
4.
RGBCRSC
RMWC
5.
63
2010/10
4 . 2 . 2 2 7 I
IIIII
4.1.2
4.2.2
II
III
4.2.3
4.2.3
BA456
60
BA8
28
4.2.3
4.2.6
4.2.6
BA10
MW01
MW03
14
14
14
14
4.1.3
4.2.7
4.2.7
4.2.7
BA14
MW02
MW04
MW05
64
2010/10
4 . 2 . 3 2 8
2 8
2 8 II I
4.2.4
III
4.2.5
4.2.7
4.2.8
(a)
(b )
(c)
I V
4 . 2 . 1 2
7 4 . 2 . 1 0
(d )
I 2 0 0 9 6 . 4
6.
70
7.
2010/10
4.2.6
/
I I I
4 . 2 . 8 I I I
65
4 . 2.9
3 7
II
III
4 . 2.1 0 9 3 8
39
(b )
(c)
(d )
1100151
10A3
1 5 0 0
10
8.
(a) 10
(b) 6
(c)
(d) 300
(e)
9.
ADM-10
10. ADM-9
V
66
2010/10
(a)
4 . 2 . 11 V I I I I I I I
4 . 2 . 12
3.30
2010/10
4 . 2 . 13 For m M W 3 3
67
4. 3
I
3 0 3 2
11.1
Form MW01
6.4
Form MW33
MW101200001
III
7
Form
MW11
14
Form MW02
6.4
68
2010/10
1.27
1.251.261.36
1.31
1.71.10
1.161.40
1.35
1.37
1.17
1.201.24
1.281.29
1.131.14
1.19
1.18
2010/10
1.3
1.33
69
4. 4
I I
3 3 3 5
4.2.4
11.1
Form MW03
Form MW33
MW101200001
II
Form
MW12
14
Form
MW04
2010/10
70
2.33
2.62.7
2.32.4
2.162.40
2.35
2.5
2.31
2.37
2.17
2.182.27
2.12
2.82.9
2010/10
2.282.302.36
71
4. 5
I I I
3 6
-
-
4.2.4
4.2.4
11.1
Form MW32
14
Form
MW05
Form MW33
MW101200001
2010/10
72
3.233.24
3.293.303.36
3.31
3.43.5
3.133.33
3.3
3.26
3.23.273.283.343.35
3.83.93.10
3.15
3.14
3.163.22
3.63.7
2010/10
3.253.373.38
73
5
5.1
4 1 3
11 12
5.2
4 1 3 C
5.3
5.4
5.5
2 4
5.6
h t t p : / / b r a v o . b d . g o v . h k
11
11. /
12.
74
2010/10
6. 1
15
6.1.1
4 1 3
6.1.2
4 1 3 B 1 3
1.
2 150
450
2.
2 150
3.
9
2
>1.5
4.
9
>1.5
* 450
) 150
) 9
)
)
) 2
>1.5
) 9
>1.5
2010/10
13. 15 2
75
5.
1.1
6.
7.
3
3
1:4
8.
100
1.2
2.2
) 3
) 3
) 1.2
)
) 2.2
) 100
0.3
13
2010/10
9.
) 1.1
76
10.
1
150
3
2.5
11.
1
600
3
12.
1
>1.5
1.1
13.
600
100
3
) 1
)
)) 150
) 3
* 2.5
) 600
) 1
) 3
) 1
) 100
)
) 600
) 3
2010/10
77
6. 2
14.
500
3
15.
750
3
) 750
) 3
6 . 2.1
2.21001.2
6 . 2.3
2 4
10
6 . 2.4
h t t p : / / b r a v o . b d . g o v . h k
11
2010/10
6 . 2.2
78
7
7. 1
7.1.1
7.1.2
3
4
1.
2.
3.
100
600
100
3
750
3
) 100
) 100
) 600
) 750
2010/10
7.1.3
79
4.
500
3
)) 500
7 . 1.4
3 9 C
24 2 4 C
7 . 1.5
7. 2
7 . 2.1
3 9 C 2
622
2010/10
3.253.273.283.293.343.353.363.37
3.38
80
7 . 2 . 2 6 2 3
/
7.2.4
7.2.5
7.2.6
2010/10
7.2.3
81
3.25
14
3.273.293.343.38
/
750
14
Form
MW06
14
VS101200001
14. 14125
82
2010/10
8. 1
8.1.1
9 A A 4
c 9 A A 6
c
8.1.2
9 A A 4
b 9 A A 6
b
1 2 3 F 7 3 7 5 0 2 . 5
/
8. 2
8.2.1
9 A A 4
a 9 A A 6
a
8 . 2 . 2 4 3
8.2.3
8.2.4
III
8. 3
I I I
8 . 3 . 1 4 4 I I I
2010/10
8 . 3 . 2
83
8. 4
8 . 4.1
I 4 . 2 . 8 d
4 5 1
8 . 4.2
8 . 4.3
4 5 2
8 . 4.4
4 7
8. 5
8 . 5.1
5 1
F o r m M W 1 0 I
II
5 2
8 . 5.2
I I
4 8 4 F o r m M W 0 7
8. 6
2010/10
I
531
84
8. 7
5 6
8. 8
8.8.1
4 3
8.8.2
5 7 I I I
8. 9
5 . 5
6.2
2010/10
8. 10
85
9
9. 1
5 8
5 $ 5 0 , 0 0 0
9. 2
402AAA A 5 $ 5 0 , 0 0 0
9. 3
4 0 2 E
6
$ 1 0 0 , 0 0 0 6
$5,000
9. 4
402B $ 5 0 0 , 0 0 0 1 8
9. 5
1 1 5 1 7 I
$ 350,000 3
9. 6
2010/10
583
6
3
$ 10,0005 $ 5 0 , 0 0 0
86
9.7.1
1 3 2
(a)
(b )
(c)
(d )
(e )
(f )
9.7.2
2010/10
9. 7
87
10
10 .1
10.1.1
IIIII
10.1.2
3APP-53
APP-13
25
10.1.3
10 .2
12171
a
10 .3
1 0.3 .1
1 3 1
2010/10
1 0.3 .2
88
10. 4
3 0 1
10. 5
1 0 . 5 .1
9 5 F 1 4 1 5
(a)
(b )
1 0 . 5 .2
10. 6
1 0 . 6 .1
4 0 0 6 8 8 A
77
4 0 0
1 0 . 6 .2
3 5 4 1 6 1 6 A
354N3
2010/10
1 0 . 6 .3 A D V - 1 9
89
1 0.6 .4
311
IX
(a)
(b )
(c)
(d )
(e )
1 0 .6.5
311R
1 0 .6.6
3 5 8
10 .7
1 0.7 .1
5 3 6
1 0.7 .2
10 .8
2010/10
1 0.8 .1
5 8 3 1 1
90
1 0 . 8 .2 1
(a)
(b )
(c)
(d )
(e )
(f )
1 0 . 8.3
10. 9
1 0 . 9 .1
5 9 6 B A
1 0 . 9 .2
5 9 I 3 8 A 3 8 A A
1 0 . 9 .3 A P P - 1 0 7
1 0 . 9 .4 2
38B
1 0 . 9 .5 1 . 1 2
40 2
10. 1 0
2010/10
201
91
11
11 .1
1 1.1 .1
1 1.1 .2
(a)
(b )
(c)
(d )
(e )
1.17
2.17
1.352 . 3 5
2 . 3
2. 5 3 . 3 5
1 1.1 .3 1 5 1 6
(a)
(b)
9 5
4 1 . 5
1.5
http://bravo.
bd.gov.hk
A P P - 3 9
h t t p : / / w w w . b d . g o v . h k / c h i n e s e T / d o c u m e n t s /
p amp hl et /B IC_c.pdf
15. 75013
16.
92
2010/10
1 1 .1.4
/
11. 2
1 1 . 2 .1
1 1 . 2 .2
(a)
(b )
1 1 . 2 .3
5 9 I
3 400 2 0 0
1 1 . 2 .4
1 1 . 2 .5
2010/10
93
1 1.2 .6
5 9 I 3 8 F
(a)
(b )
(c)
(d )
1 4
1 1.2 .8
94
2010/10
1 1.2 .7
11. 3
1 1 . 3 .1
1 1 . 3 .2
(a)
(b )
(c)
11. 4
1 1 . 4 .1
1 1 . 4 .2
1 1 . 4 .3
11. 5
11. 6
1 1 . 6 .1
1 1 . 6 .2
2010/10
(a)
(b )
95
11 .7
1 1.7 .1
1 1.7 .2
1 1.7 .3
h t t p : / / w w w . l a b o u r . g o v . h k / t c / p u b l i c / p d f / o h / H e a t S t r e s s . p d f
http://hkcic.org/files/chi/documents/
P u b licat ions/Wor king_in_hot _ w e a t he r - c . p d f )
2010/10
1 1.7 .4
96
12
12. 1
12. 2
(a)
(b )
(c)
(a)
(b )
12. 4
2010/10
12. 3
282
97
13
13 .1
13 .2
1 3.2 .1
a
b
c d e
2010/10
1 3.2 .2
h t t p : / / w w w . d e v b - p l b . g o v . h k h t t p : / / w w w . l a n d s d . g o v . h k
h ttp://www.bd.g ov.hk
98
14
I I I 1 4
2 I
I
I
3
2010/10
99
(a)
(b )
5 9
5 9 I
5 9 I
1 2 3
2 2 8
2010/10
http://www.devb.gov.hk/en/publications_and_press_releases/
p u b l i c a t i o n s / c o n s t r u c t i o n _ s i t e _ s a f e t y _ m a n u a l / i n d e x . h t m
l
5 9 A F
2 0 0 5 6 4
h t t p : / / w w w . s a f e t y p a r t n e r i n g . c o m / s m s c d . h t m
100
15
15. 1
7 5 0 1 2
15. 2
: en quiry @bd.gov .h k
15. 3
: 2 626 1616
1823
15. 4
60
5
h ttp ://www.bd.gov.hk
2010/10
15. 5
101
I
II
A
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
1.10
1.11
1.12
1.13
1.14
1.15
1.16
1.17
1.18
1.19
1.20
1.21
1.22
1.23
1.24
1.25
1.26
1.27
1.28
1.29
1.30
1.31
1.32
1.33
1.34
1.35
1.36
1.37
1.38
1.39
1.40
C D E
III
F G
A
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
2.10
2.11
2.12
2.13
2.14
2.15
2.16
2.17
2.18
2.19
2.20
2.21
2.22
2.23
2.24
2.25
2.26
2.27
2.28
2.29
2.30
2.31
2.32
2.33
2.34
2.35
2.36
2.37
2.38
2.39
2.40
C D E
F G
C D E
F G
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.10
3.11
3.12
3.13
3.14
3.15
3.16
3.17
3.18
3.19
3.20
3.21
3.22
3.23
3.24
3.25
3.26
3.27
3.28
3.29
3.30
3.31
3.32
3.33
3.34
3.35
3.36
3.37
3.38
http://www.bd.gov.hk/chineseT/services/index_mwcs.html
102
2010/10
II
1.1
(a)
(b)
(i)
(ii)
1.2
(a)
(b)
(i)
(ii)
(c) 14.5
1.3
1.4
1.5
(a)
(b)
(i)
(ii)
(c) 250
(d) 1
(e) 1.2
(a)
(b)
(i)
(ii)
1.6.
1.7
(a)
(b) 1.55
1.8
(a)
(b) 310
1.9
(a)
(b) 3
1.10
(a)
(b) 5
1.11
(a) 3
(b) 10
15
(c) ( b ) 1 5
(d) (b)1.5
45
(e) 100
50
(f)
(g) 13
(h) 2.10
1.12
(a) 1 3
(b) 1.53
1.13
(a)
(b)
(c) 150
1.14
(a)
(b) 1.5
(c) 1
(d) 2.3
1.15
(a)
(b)
(c) 1.13.5
1.16
(a)
(b)
(c) 300
(d) 3.2
1.17
103
2010/10
II
1.18
(a) 1.5
(b)
200
(c)
100
1.19
(a) 1.5
(b)
200
1.20
(a)
(b)
(c)
(d) 1020
(e) 4.2
(f) 600
1.21
(a)
(b)
(c)
(d) 20
(e)
(f) 600
(g) 6
1.22
(a)
(b)
(c)
520
(d)
1040
(e) 6
1.23
(a) 20
(b) 600
(c) 6
(d) 2.21
1.24
2.242.252.262.273.163.17
3.183.193.203.213.222211
104
1.25
(a) 1.5
3
(b)
(c) 13
(d)
(e) 30
(f) 30
(i) 3
(ii)
1.5
(g)
(i) 3
(ii)
1.5
1.26
(a) 1.5
3
(b)
(c) 13
(d)
(e)
(i) 15
(ii) 3
(iii)
1.27
(a)
(b) 5002
(c)
(d) 3
1.28
(a)
(b) 750
(c) 3
(d) 100
(e) 3.27
1.29
(a) 1.5
(b) 150
2010/10
1.30 2
1.31
10
1.32
(a)
(i)
(ii)
(b) 3.1
1.38
(a)
(b) 510
(c) 2
(d)
1.2
(e) 6
1.39
1.40
(a)
(b)
(c) 300
(d) 3.2
2.1
(a)
(b)
(i)
(ii)
(c) 1
(d) 221
2.2
(a)
(b) (a)
1
(c) 3.2
2.3
(a) 9
2
(b) 1.5
2.4
(a) 9
(b) 1.5
2.5
(a)
(b)
2
2.6
(a)
(b) 1.5
2.7
(a)
(b) 3
1.33
(a) 250
(b) 1
(c) 1.2
1.34
1.35
(a)
(b)
(c) 14.5
1.36
(a) 1.5
3
(b)
(c) 13
(d)
(e) 30
(f) 30
(i) 3
(ii)
1.5
(g)
(i) 3
(ii)
1.5
1.37
(a) 10
(b) 2.37
2010/10
105
II
2.8
2.9
(a)
(b) 6
(c) 3 . 5
(d)
100
(i)
(ii)
1.2
(e) 100
(i)
6
(ii)
1.8
(f)
(i)
(ii)
2.13
(a)
(b)
(c) 1.1
(a) 6
2.16
(a)
(b)
(c) 300
(d) 200
(e) 3.2
(b)
(c) 3.7
2.10
(a) 1 . 5
(b) 10
5
(c) ( b ) 1 5
(d) (b)1.5
45
(e) 100
50
(f)
(g) 13
2.11
(a) 1 3
(b) 0.31.5
2.12
(a) 4.5
(b) 4.5
(c) 2.3
(d) 3.8
106
2.14
(a)
(b)
(c) 1.13.5
2.15
(a)
(b)
(c) 3.5
2.17
2.18
(a)
(b)
(c)
(d) 10
(e) 4.2
(f) 600
(g) 3.16
2.19
(a)
(b)
(c)
5
(d)
10
(e) 6
(f) 3.172210
2010/10
2.20
(a)
(b) 2
(c)
(d) 600
(e) 100
2.21
(a) 10
(b) 600
(c) 2
2.22
(a) 1
(b) 300
(c) 3
(d)
500
(e) 13
2.23 1.201.211.221.232.182.192.20
2.212.22
2.24
(a) 20
(b) 3.18
2.25
(a) 20
(b) 3.193.22
2.26
(a)
20
(b)
40
(c) 3.202211
2.27
3.21
2.28
(a) 1 . 5
(b)
(c) 13
(d)
(e) 30
(f) 30
(i) 3
(ii)
1.5
(g)
(i) 3
(ii)
1.5
2.29
(a) 1 . 5
(b
(c) 13
(d)
(e)
(i) 15
(ii) 3
(iii)
2.30
(a)
(b) 3.23
2.31
(a) 750
(b)
(c) 221314
2.32 2
2.33
310
107
2010/10
II
2.34
(a)
3
(b)
3
(c) 14
2.40
(a)
(b)
(c) 300
(d) 200
(e) 3.2
3.1.
(a) 1.5
(b)
(i)
(ii)
3.2
(a)
(b) 12
(c)
(i)
1.5
(ii) 1.1
3.3
(a)
(b)
2
3.4
(a)
(b) 1.13
3.5
(a)
(b) 35
3.6
(a)
(b) 3.5
100
(i)
(ii) 1.2
(c)
3.56
(d)
(i)
(ii)
2.35
(a)
(b)
(c) 2150
(d) 1
2.36
(a) 1 . 5
(b)
(c) 13
(d)
(e) 30
(f) 30
(i) 3
(ii)
1.5
(g)
(i) 3
(ii)
1.5
2.37
(a) 500
(b) 5
2.38
2.39
(a)
(b) 5
(c)
1.2
(d) 6
(e) 3.32
108
2010/10
3.7
(a)
(b) 3.5
3.8
(a)
1.5
(b)
(c) 4.5
(d) 4.5
(e) 2
3.9
(a)
(b)
(c) 150
3.10
3.11
(a)
(b)
(c) 1.1
3.12
(a)
(b)
(c) 3.5
3.13
(a)
(b)
(c) 200
(d) 3.2
(e) 228
3.14
(a) 1.5
(b)
200
(c)
100
(d) 2212
3.15
(a) 1.5
(b)
200
(c) 2212
3.16
(a)
(b)
(c)
(d) 1
(e) 1
(f) 300
(g) 6
3.17
(a)
(b)
(c) 5
(d) 6
(e) 221011
3.18
(a) 2
(b) 2
(c) 6
3.19
(a) 5
(b) 2
(c) 1.5
3.20
(a) 10
(b) 6
(c) 2211
3.21
(a)
5
(b)
2
(c) 1
3.22
(a) 1
(b) 3
109
2010/10
II
3.23
(a)
(b)
(c)
3.24
3.25
(a)
(b) 500
(c)
(d) 3
3.26
(a)
750
(b)
(c) 221314
3.27
(a)
(b) 600
(c) 3
(d) 100
3.28
(a) 1.5
(b) 150
(c) 2212
3.29
(a)
(b) 750
(c) 3
3.30
2215
3.31
110
3.32
(a)
(b) 2.5
(c)
1.2
(d) 4.5
(e) 20
(f)
1.5
3.33
(a)
(b)
(c) 200
(d) 3.2
(e) 228
3.34
100
3.35
(a)
(b) 600
(c) 100
(d) 3
3.36
(a)
(b) 750
(c) 3
3.37
(a)
(b) 500
(c)
(d) 3
3.38
(a)
(b)
(c) 5 0 0
750
(d)
500
(e) 3
2010/10
III
1.51.91.101.241.301.321.331.341.361.37
1.381.391.40
2.22.42.92.122.242.252.262.272.312.322.37
2.382.392.40
3.13.23.43.53.73.83.103.183.193.203.21
3.223.243.263.303.323.33
1.111.12
2.102.11
1.122.11
2010/10
111
IV
MW01
MW02
MW03
MW04
MW05
III
MW06
MW07
MW08
MW09
MW10
MW11
MW12
2012/06
112
MW31
MW32
III
MW33
V MW01
Please read the Matters to Note, complete the form in BLOCK LETTERS and tick in the appropriate box(es).
Part A Notice of appointment of the appointed persons
(To be completed by the person who arranged for the minor works to be carried out)
1.
Location or Address of the proposed minor works to be carried out
/
The Account Number printed on the top left-hand corner
of the Demand for Rates and/or Government Rent
0 1 2 3 4 5 6 7 8 9 1 2 3 4 5 6 7 8 9
Minor works
Item
Description
/
/ /
Relevant Order / Direction / Notice /
BD Reference Number (if available)
1.1
2.18
Additional Page added
01
1.2
2.
Details of the proposed minor works to be carried out
Every minor works item and its description (including the nature, location and quantity) shall be provided. If space is insufficient,
please attach additional sheet(s) which must be signed, dated and affixed with company seal (if applicable).
3.
Particulars of the appointed persons
a. 28 /
In accordance with the provisions of section 28 of the Building (Minor Works) Regulation, I/we have appointed the prescribed
registered contractor as below in respect of the works detailed in this Part.
GUNG
SI
P A I S IN G G I N
SO E N G
MWC
456790 / 2011
*
Certificate of Registration Number*
E N G I N EERING
COMPANY
LIM ITE D
1/6
113
2012/06
V MW01
3.
Particulars of the appointed persons (Contd)
b. 27 / I
In accordance with the provisions of section 27 of the Building (Minor Works) Regulation, I/we have appointed the prescribed
building professionals as below in respect of the Class I minor works detailed in this Part.
authorized person
*Name in Chinese*
registered inspector
Y IN G
HO
*
Certificate of Registration Number*
YAN
* Name in English*
8888 / 88
RSE
*Name in Chinese*
*
Certificate of Registration Number*
*Name in Chinese*
* Name in English*
RGE
*
Certificate of Registration Number*
* Name in English*
4.
Particulars of the person who arranged for the minor works to be carried out
Name in Chinese
YAN
CHO
01
C H IN G
A 1 23 4 5 6 ( 7 )
HKID Number
Passport Number
1
Correspondence Address (Not required to complete if same as Part A1)
2 1 2 3 4 5 6 8
Fax Number
2 1 2 3 4 5 6 7
Contact Number
cengjanzou@emai l . com
E-mail Address
2012/06
0 3 0 7 20 1 2
Signature of the person who arranged for the minor works to be carried out & affixed with company seal (if applicable) day month
*
114
year
2/6
Part B Confirmation of appointment by the authorized person or registered inspector
I,
*Name in Chinese*
Y IN G
HO
YAN
*Name in English*
30 37
in accordance with the provisions of sections 30 and 37 of the Building (Minor Works) Regulation,
1. I
confirm that I have been appointed as the authorized person or registered inspector (if the works are a prescribed repair or any
associated demolition works) for the Class I minor works detailed in Part A;
1 1
2. I
confirm that the Class I minor works detailed in Part A are to be commenced on
0 7 20 1 2
day month
year
;
;
3. I
submit herewith the prescribed plans and details of the Class I minor works detailed in Part A, and the photographs showing the
physical condition of the premises where the Class I minor works detailed in Part A are to be carried out;
4.
confirm that the prescribed plans and details submitted under this Part, have been prepared and signed by me (as the person who
has signed the plans, I agree to assume all responsibilities under the Buildings Ordinance regarding the plans);
5. I
I
where the Class I minor works detailed in Part A comprise repairs, alterations or additions to any building, certified that, after
inspecting the building, I am of the opinion that the building is capable of bearing the loads and stresses which may be increased or
altered in any way as a result of the Class I minor works;
6. I
where the Class I minor works detailed in Part A involve the erection of a signboard, confirm that the person for whom the signboard
is to be erected has provided the particulars of the person as required by the Building Authority in Part F; and
01
7.
where supervision plan is required by the technical memorandum, submit herewith a supervision plan.
MW
2 1 2 3 4 5 6 6
* Fax Number*
2 1 2 3 4 5 6 5
Contact Number
AP( A)9 9 9 9 /9 9
* 0 4 0 7
Date of expiry
of registration* day month
20 1 3
year
*
Signature* of the authorized person or registered inspector
0 4 0 7 20 1 2
day month
year
3/6
115
2012/06
*
Certificate of Registration Number*
V MW01
Part C Confirmation of appointment by the registered structural engineer
*Name in Chinese*
I,
*Name in English*
30 37
in accordance with the provisions of sections 30 and 37 of the Building (Minor Works) Regulation,
1. I
confirm that I have been appointed as the registered structural engineer for the structural elements of the Class I minor works
detailed in Part A;
2.
confirm that the foundation plans, structural details or calculations submitted under the prescribed plans and details in Part B have
been prepared and signed by me (as the person who has signed the plans, I agree to assume all responsibilities under the Buildings
Ordinance regarding the plans); and
RSE
3. I
I
where the Class I minor works detailed in Part A comprise repairs, alterations or additions to any building, certified that, after
inspecting the building, I am of the opinion that the building is capable of bearing the loads and stresses which may be increased or
altered in any way as a result of the Class I minor works;
8888 / 88
*
Certificate of Registration Number*
20 1 3
01
* 0 4 0 7
Date of expiry
of registration* day month
year
*
Signature* of the registered structural engineer
2 1 2 3 4 5 6 4
Contact Number
0 4 0 7 20 1 2
day month
year
Part D Confirmation of appointment by the registered geotechnical engineer
*Name in Chinese*
I,
*Name in English*
30 37
in accordance with the provisions of sections 30 and 37 of the Building (Minor Works) Regulation,
1. I
confirm that I have been appointed as the registered geotechnical engineer for the geotechnical elements of the Class I minor works
detailed in Part A; and
2.
confirm that the geotechnical plans, geotechnical assessment, geotechnical details or calculations and geotechnical reports
submitted under the prescribed plans and details in Part B have been prepared and signed by me (as the person who has signed the
plans, I agree to assume all responsibilities under the Buildings Ordinance regarding the plans).
RGE
Contact Number
Willing to receive Short
Messaging Service (SMS)
Notification
*
Certificate of Registration Number*
2012/06
*
Date of expiry
of registration* day month
*
116
20
year
*
Signature* of the registered geotechnical engineer
day month
Form MW01 (06/2012)
20
year
4/6
Part E Confirmation of appointment by the prescribed registered contractor
We,
* Name in Chinese*
GUNG
SI
P A I S IN G G I N
* Name in English*
SO E N G
E N G I N EERING
COMPANY
LIM ITE D
* Name in English*(Contd)
30 33 37 II
in accordance with the provisions of sections 30, sections 33 and 37 (where Class II minor works are involved) of the Building (Minor
Works) Regulation,
1.
confirm that we have been appointed as the prescribed registered contractor of the works detailed in Part A;
II
where Class II minor works are involved in the works detailed in Part A,
2. II 2
confirm that the Class II minor works detailed in Part A are to be commenced on the same date as stated in paragraph 2 of Part B;
3. II
submit herewith the prescribed plans and details of the Class II minor works detailed in Part A, and the photographs showing the
physical condition of the premises where the Class II minor works detailed in Part A are to be carried out;
4.
confirm that the prescribed plans and details submitted under this Part, have been prepared and signed by us (as the person who
has signed the plans, we agree to assume all responsibilities under the Buildings Ordinance regarding the plans);
01
5. II
II
where the Class II minor works detailed in Part A comprise repairs, alterations or additions to any building, certified that, after
inspecting the building, we are of the opinion that the building is capable of bearing the loads and stresses which may be increased
or altered in any way as a result of the Class II minor works; and
6. II
where the Class II minor works detailed in Part A involve the erection of a signboard, confirm that the person for whom the
signboard is to be erected has provided the particulars of the person as required by the Building Authority in Part F.
MW 1 2 0 3 9 9 9 9 9
CYU
YAN
20 1 4
year
2 1 2 3 4 5 6 2
Contact Number
*
Certificate of Registration Number*
* 0 4 0 7
Date of expiry
of registration* day month
* Fax Number*
Willing to receive Short
Messaging Service (SMS)
Notification
456790 /2011
MWC
2 1 2 3 4 5 6 3
*
Signature* of the prescribed registered contractor (authorized signatory)
0 4 0 7 20 1 2
day month
year
5/6
117
2012/06
C IM
V MW01
Part F
Particulars of the person for whom the signboard is to be erected
(Only applicable to works involving the erection of a signboard and to be completed by the person for
whom the signboard is to be erected)
Name in Chinese
S IG N B O A R D
OWNER
84503832
HKID Number
Passport Number
1
Correspondence Address (Not required to complete if same as Part A1)
2 9 9 3 4 5 6 8
Fax Number
2 9 9 3 4 5 6 7
Contact Number
01
E-mail Address
0 4 0 7 20 1 2
Signature of the person for whom the signboard is to be erected & affixed with company seal (if applicable) day month
year
Part G
Particulars of the corresponding Owners Corporations or Property Management Company where the
works to be carried out may involve common parts
(Only applicable where the works to be carried out may involve common parts and to be completed by
the authorized person or registered inspector appointed)
Name & Correspondence Address of Owners Corporations or Property Management Company
2 6 6 3 4 5 6 8
Fax Number
2 6 6 3 4 5 6 7
Contact Number
2012/06
E-mail Address
118
6/6
V MW02
Please read the Matters to Note, complete the form in BLOCK LETTERS and tick in the appropriate box(es).
I,
MUST COMPLETE
*Name in Chinese*
Y IN G
HO
MW 1 2 0 5 0 9 9 9 9
YAN
*Name in English*
31 32 37
in accordance with the provisions of sections 31, 32 and 37 of the Building (Minor Works) Regulation,
02
1. I I
I
where the completed Class I minor works are different from those shown in the submitted prescribed plans and details, notify that the
Class I minor works as completed are different from the prescribed plans and details submitted before under the submission with the
above mentioned submission number; submit herewith the revised prescribed plans and details showing the Class I minor works as
completed and such revisions have been detailed in Part E; confirm that the prescribed plans and details submitted under this part,
have been prepared and signed by me (as the person who has signed the plans, I agree to assume all responsibilities under the
Buildings Ordinance regarding the plans);
2. I
certify that all the Class I minor works under the submission with the above mentioned submission number have been carried out in
accordance with the Buildings Ordinance and the submitted prescribed plans and details;
3. I
confirmed that all the Class I minor works were completed on
2 4 0 7 20 1 2 ;
day month
year
4. I
submit herewith photographs showing all the Class I minor works as completed;
5. I I
where the completed Class I minor works are other than demolition works, certify that, in my opinion, all the completed Class I
minor works are structurally safe; and
6. I I
where the completed Class I minor works are demolition works, certify that, in my opinion, any land or street affected by the said
Class I minor works has an adequate margin of safety and any structure remaining on the premises is structurally safe.
2 1 2 3 4 5 6 6
* Fax Number*
2 1 2 3 4 5 6 5
Contact Number
* 0 4 0 7
Date of expiry
of registration* day month
20 1 3
year
*
Signature* of the authorized person or registered inspector
2 7 0 7 20 1 2
day month
year
1/6
119
2012/06
*
Certificate of Registration Number*
V MW02
I
Part B Certificate of completion of Class I minor works by the registered structural engineer
*Name in Chinese*
I,
*Name in English*
31 32 37
in accordance with the provisions of sections 31, 32 and 37 of the Building (Minor Works) Regulation,
1. I
where the completed Class I minor works are different from those shown in the submitted prescribed plans and details, confirm that the
foundation plans, structural details or calculations submitted under the revised prescribed plans and details in Part A, have been prepared and
signed by me (as the person who has signed the plans, I agree to assume all responsibilities under the Buildings Ordinance regarding the plans);
2. I
certify that all the Class I minor works under the submission with the above mentioned submission number have been carried out in
accordance with the Buildings Ordinance and the submitted prescribed plans and details;
3. I I
where the completed Class I minor works are other than demolition works, certify that, in my opinion, all the completed Class I
minor works are structurally safe; and
8888 / 88
RSE
4. I I
where the completed Class I minor works are demolition works, certify that, in my opinion, any land or street affected by the said
Class I minor works has an adequate margin of safety and any structure remaining on the premises is structurally safe.
*
Certificate of Registration Number*
* 0 4 0 7 20 1 3
Date of expiry
Contact Number
2 7 0 7 20 1 2
day month
year
02
*
Signature* of the registered structural engineer
2 1 2 3 4 5 6 4
I
Part C Certificate of completion of Class I minor works by the registered geotechnical engineer
*Name in Chinese*
I,
*Name in English*
31 32 37
in accordance with the provisions of sections 31, 32 and 37 of the Building (Minor Works) Regulation,
1. I
where the completed Class I minor works are different from those shown in the submitted prescribed plans and details, confirm that
the geotechnical plans, geotechnical assessment, geotechnical details or calculations and geotechnical reports submitted under the
revised prescribed plans and details in Part A, have been prepared and signed by me (as the person who has signed the plans, I
agree to assume all responsibilities under the Buildings Ordinance regarding the plans);
2. I
certify that all the Class I minor works under the submission with the above mentioned submission number have been carried out in
accordance with the Buildings Ordinance and the submitted prescribed plans and details;
3. I I
where the completed Class I minor works are other than demolition works, certify that, in my opinion, all the completed Class I
minor works are geotechnically safe; and
4. I I
where the completed Class I minor works are demolition works, certify that, in my opinion, any land or street affected by the said
Class I minor works has an adequate margin of safety and any structure remaining on the premises is geotechnically safe.
RGE
2012/06
*
Certificate of Registration Number*
*
20
Date of expiry
120
Contact Number
*
Signature* of the registered geotechnical engineer
20
day month
Form MW02 (06/2012)
year
2/6
Part D Certificate of completion of works by the prescribed registered contractor
We,
* Name in Chinese*
GUNG
SI
P A I S IN G G I N
* Name in English*
SO E N G
E N G I N EERING
COMPANY
LIM ITE D
,
* Name in English*(Contd)
31 32 34 35 II
36 III
37 II III
in accordance with the provisions of sections 31, 32, 34 and 35 (where Class II minor works are involved), 36 (where Class III minor
works are involved), and 37 (where the completed Class II minor works are different from those shown in the submitted prescribed plans
and details or where plans of Class III minor works are involved) of the Building (Minor Works) Regulation,
02
where the completed Class II minor works are different from those shown in the submitted prescribed plans and details, notify that the Class II
minor works as completed are different from the prescribed plans and details submitted before under the above mentioned submission
number; submit herewith the revised prescribed plans and details showing the Class II minor works as completed and such revisions have
been detailed in Part F; confirm that the prescribed plans and details submitted under this part, have been prepared and signed by us (as the
person who has signed the plans, we agree to assume all responsibilities under the Buildings Ordinance regarding the plans);
2. II 3
confirmed that all the Class II minor works were completed on the same date as stated in paragraph 3 of Part A;
3. II
submit herewith photographs showing all the Class II minor works as completed;
4. II II
where the completed Class II minor works are other than demolition works, certify that, in our opinion, all the completed Class II
minor works are structurally safe;
5. II II
where the completed Class II minor works are demolition works, certify that, in our opinion, any land or street affected by the said
Class II minor works has an adequate margin of safety and any structure remaining on the premises is structurally safe;
III Where Class III minor works are involved in the completed works
6.
confirm that we have been appointed as the prescribed registered contractor of the works detailed in Part G;
7. 3
confirm that the works detailed in Part G had been commenced on the same date together with other works under the submission
with the same minor works submission number and were completed on the same date as stated in paragraph 3 of Part A;
8.
submit herewith the photographs showing the physical condition of the premises immediately before the commencement and after
the completion of the works detailed in Part G, and the plans or description of works showing the works as completed;
9.
confirm that the plans or description of work submitted under this part, have been prepared and signed by us (as the person who
has signed the plans, we agree to assume all responsibilities under the Buildings Ordinance regarding the plans);
10. III
where the Class III minor works detailed in Part G involve the erection of a signboard, confirm that the person for whom the
signboard is to be erected has provided the particulars of the person as required by the Building Authority in Part H; and
11.
certify that all the minor works under the submission with the above mentioned submission number have been carried out in
accordance with the Buildings Ordinance, the submitted prescribed plans and details, and plans or description of works (if applicable).
* Name in Chinese of the authorized signatory*
CYU
YAN
MWC
456790 /2011
20 1 4
year
Contact Number
*
Certificate of Registration Number*
* 0 4 0 7
Date of expiry
of registration* day month
* Fax Number*
2 1 2 3 4 5 6 2
*
Signature* of the prescribed registered contractor (authorized signatory)
2 7 0 7 20 1 2
day month
year
3/6
121
2012/06
C IM
2 1 2 3 4 5 6 3
V MW02
I
Part E I
(Only applicable where the completed Class I minor works are different from those shown in the submitted
prescribed plans and details and to be completed by the authorized person or registered inspector appointed)
Additional Page added
Minor works
Item
Description
1.2
02
APP-147
Refer to Practice Note for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers No. APP-147
for the Description of the differences. Every minor works item and its revised description (including the nature, location and
quantity) shall be provided. If space is insufficient, please attach additional sheet(s) which must be signed and dated.
II
Part F II
(Only applicable where the completed Class II minor works are different from those shown in the submitted
prescribed plans and details, and to be completed by the prescribed registered contractor appointed)
Minor works
Item
Additional Page added
Description
2.18
2012/06
71
Refer to the Practice Note for Registered Contractors No.71 for the Descriptions of the differences. Every minor works item and
its revised description (including the nature, location and quantity) shall be provided. If space is insufficient, please attach
additional sheet(s) which must be signed and dated.
*
122
4/6
III
Part G III
Notice of appointment of the prescribed registered contractor for Class III minor works
(Only applicable where Class III minor works are involved, and to be completed by the person who
arranged for the minor works to be carried out)
/
I/We,
Name in Chinese
C H IN G
YAN
CHO
am/are the person who arranged for the minor works to be carried out detailed in the submission with the above mentioned submission
number, in accordance with the provisions of section 28 of the Building (Minor Works) Regulation, I/we have appointed the prescribed
registered contractor appointed under the submission with the above mentioned submission number, as prescribed registered contractor
in respect of the works detailed in this part.
Minor works
Item
III
Details of the Class III minor works completed at the same location or address of the submission with the
above mentioned submission number
Additional Page added
Description
02
3.16
/
/ /
Relevant Order / Direction / Notice /
BD Reference Number (if available)
2 7 0 7 20 1 2
Signature of the person who arranged for the minor works to be carried out & affixed with company seal (if applicable) day month
*
year
5/6
123
2012/06
Every minor works item and its description (including the nature, location and quantity) shall be provided. If space is insufficient,
please attach additional sheet(s) which must be signed, dated and affixed with company seal (if applicable).
V MW02
Part H III
Particulars of the person for whom the signboard is to be erected
(Only applicable to the completed Class III minor works involving the erection of a signboard and to be
completed by the person for whom the signboard is to be erected)
MW01
Where the particulars of the person for whom the signboard is to be erected had been provided in the Form MW01 submitted
under the submission with the above mentioned submission number
/
I/We,
Name in Chinese
S IG N B O A R D
OWNER
36(a)(v)
/
am/are the person for whom the signboard is to be erected detailed in the submission with the above mentioned submission number,
in accordance with the provisions of section 36(a)(v) of the Building (Minor Works) Regulation, hereby confirm that I am/we are also
the person for whom the signboard is to be erected detailed in Part G, and my particulars had been provided in the submission with
the above mentioned submission number.
Name in Chinese
02
HKID Number
Passport Number
Correspondence Address
Fax Number
Contact Number
E-mail Address
2012/06
Signature of the person for whom the signboard is to be erected & affixed with company seal (if applicable)
124
2 7 0 7 20 1 2
day month
year
6/6
V MW03
Please read the Matters to Note, complete the form in BLOCK LETTERS and tick in the appropriate box(es).
Part A Notice of appointment of the appointed prescribed registered contractor
(To be completed by the person who arranged for the minor works to be carried out)
1.
Location or Address of the proposed minor works to be carried out
/
The Account Number printed on the top left-hand corner
of the Demand for Rates and/or Government Rent
1 2 3 4 5 6 7 8 9 1 2 3 4 5 6 7 8 9 0
2.
Details of the proposed minor works to be carried out
Additional Page added
/
/ /
Relevant Order / Direction / Notice /
BD Reference Number (if available)
2.19
Description
03
Minor works
Item
Every minor works item and its description (including the nature, location and quantity) shall be provided. If space is insufficient,
please attach additional sheet(s) which must be signed, dated and affixed with company seal (if applicable).
3.
Particulars of the appointed prescribed registered contractor
28 /
In accordance with the provisions of section 28 of the Building (Minor Works) Regulation, I/we have appointed the prescribed
registered contractor as below in respect of the works detailed in this Part.
GBC
TAI P A I SING GIN S O ENG
*
Certificate of Registration Number*
CONSTRUCTION
4 5 6 7 8 9 /2 0 0 9
COMPANY
LIM ITE D
1/4
125
2012/06
V MW03
4.
Particulars of the person who arranged for the minor works to be carried out
Name in Chinese
C H IN G
YAN
CHO
A 1 23 4 5 6 ( 7 )
HKID Number
Passport Number
1
Correspondence Address (Not required to complete if same as Part A1)
2 1 2 3 4 5 6 8
Fax Number
2 1 2 3 4 5 6 7
Contact Number
cengjanzou@emai l . com
03
E-mail Address
3 0 0 6 20 1 2
year
2012/06
Signature of the person who arranged for the minor works to be carried out & affixed with company seal (if applicable) day month
125A
2/4
Part B Confirmation of appointment by the prescribed registered contractor
We,
* Name in Chinese*
* Name in English*
CONSTRUCTION
COMPANY
LIM ITE D
* Name in English*(Contd)
33 37
in accordance with the provisions of sections 33 and 37 of the Building (Minor Works) Regulation,
1.
confirm that we have been appointed as the prescribed registered contractor of the works detailed in Part A;
2.
confirm that the works detailed in Part A are to be commenced on
0 7 0 7 20 1 2 ;
day month
year
3.
submit herewith the prescribed plans and details of the works detailed in Part A, and the photographs showing the physical condition
of the premises where the minor works detailed in Part A are to be carried out;
4.
confirm that the prescribed plans and details submitted under this Part, have been prepared and signed by us (as the person who has
signed the plans, we agree to assume all responsibilities under the Buildings Ordinance regarding the plans);
5.
II
where the works detailed in Part A comprise repairs, alterations or additions to any building, certified that, after inspecting the
building, we are of the opinion that the building is capable of bearing the loads and stresses which may be increased or altered in
any way as a result of the Class II minor works; and
03
6.
where the works detailed in Part A involve the erection of a signboard, confirm that the person for whom the signboard is to be
erected has provided the particulars of the person as required by the Building Authority in Part C.
MW
S IGNATO R Y
* 3 1 0 1
Date of expiry
of registration* day month
20 1 3
year
Contact Number
Willing to receive Short
Messaging Service (SMS)
Notification
4 5 6 7 8 9 /2 0 0 9
GBC
* Fax Number*
2 6 6 6 1 2 3 5
*
Signature* of the prescribed registered contractor (authorized signatory)
3 0 0 6 20 1 2
day month
year
3/4
125B
2012/06
A U T H O R IZE D
2 6 6 6 1 2 3 4
V MW03
Part C
Particulars of the person for whom the signboard is to be erected
(Only applicable to works involving the erection of a signboard and to be completed by the person for
whom the signboard is to be erected)
Name in Chinese
S IG N B O A R D
OWNER
84503832
HKID Number
Passport Number
1
Correspondence Address (Not required to complete if same as Part A1)
2 9 9 3 4 5 6 8
Fax Number
2 9 9 3 4 5 6 7
Contact Number
03
E-mail Address
Signature of the person for whom the signboard is to be erected & affixed with company seal (if applicable)
day month
year
Part D
Particulars of the corresponding Owners Corporations or Property Management Company where the
works to be carried out may involve common parts
3 0 0 6 20 1 2
(Only applicable where the works to be carried out may involve common parts and to be completed by
the prescribed registered contractor appointed)
Name & Correspondence Address of Owners Corporations or Property Management Company
2 6 6 3 4 5 6 8
Fax Number
2 6 6 3 4 5 6 7
Contact Number
2012/06
E-mail Address
125C
4/4
V MW04
Please read the Matters to Note, complete the form in BLOCK LETTERS and tick in the appropriate box(es).
MUST COMPLETE
We,
* Name in Chinese*
* Name in English*
CONSTRUCTION
*Name in English*(Contd)
LIM ITE D
COMPANY
34 35 36 III
37
III
in accordance with the provisions of sections 34, 35, 36 (where Class III minor works are involved), and 37 (where the completed works
are different from those shown in the submitted prescribed plans and details or where plans of Class III minor works are involved) of the
Building (Minor Works) Regulation,
14 0 7
2. II
confirmed that all the Class II minor works were completed on
day month
20 1 2 ;
year
3. II
submit herewith photographs showing all the Class II minor works as completed;
4. II II
where the completed Class II minor works are other than demolition works, certify that, in our opinion, all the completed Class II
minor works are structurally safe;
5. II II
where the completed Class II minor works are demolition works, certify that, in our opinion, any land or street affected by the said
Class II minor works has an adequate margin of safety and any structure remaining on the premises is structurally safe;
III Where Class III minor works are involved in the completed works
6.
confirm that we have been appointed as the prescribed registered contractor of the works detailed in Part C;
7. 2
confirm that the works detailed in Part C had been commenced on the same date together with other works under the submission
with the same minor works submission number and were completed on the same date as stated in paragraph 2;
8.
submit herewith the photographs showing the physical condition of the premises immediately before the commencement and after
the completion of the works detailed in Part C, and the plans or description of works showing the works as completed;
9.
confirm that the plans or description of work submitted under this part, have been prepared and signed by us (as the person who
has signed the plans, we agree to assume all responsibilities under the Buildings Ordinance regarding the plans);
10. III
where the Class III minor works detailed in Part C involve the erection of a signboard, confirm that the person for whom the
signboard is to be erected has provided the particulars of the person as required by the Building Authority in Part D; and
*
1/4
125D
2012/06
04
1. II II
II
where the completed Class II minor works are different from those shown in the submitted prescribed plans and details, notify that the Class II
minor works as completed are different from the prescribed plans and details submitted before under the above mentioned submission
number; submit herewith the revised prescribed plans and details showing the Class II minor works as completed and such revisions have been
detailed in Part B; confirm that the prescribed plans and details submitted under this part, have been prepared and signed by us (as the person
who has signed the plans, we agree to assume all responsibilities under the Buildings Ordinance regarding the plans);
V MW04
11.
certify that all the minor works under the submission with the above mentioned submission number have been carried out in
accordance with the Buildings Ordinance, the submitted prescribed plans and details, and plans or description of works (if applicable).
2 6 6 6 1 2 3 4
A U T H O R IZE D
* Fax Number*
2 6 6 6 1 2 3 5
S IGNATO R Y
Contact Number
4 5 6 7 8 9 /2 0 0 9
GBC
*
Certificate of Registration Number*
* 3 1 0 1
Date of expiry
of registration* day month
20 1 3
year
*
Signature* of the prescribed registered contractor (authorized signatory)
1 8 0 7 20 1 2
day month
year
II II
Part B
Revisions of the completed Class II minor works
Minor works
Item
Description
Additional Page added
04
2.19
(Only applicable where the completed Class II minor works are different from those shown in the submitted
prescribed plans and details, and to be completed by the prescribed registered contractor appointed)
2012/06
71
Refer to the Practice Note for Registered Contractors No.71 for the Descriptions of the differences. Every minor works item and
its revised description (including the nature, location and quantity) shall be provided. If space is insufficient, please attach
additional sheet(s) which must be signed and dated.
*
125E
2/4
III
Part C III
Notice of appointment of the prescribed registered contractor for Class III minor works
(Only applicable where Class III minor works are involved, and to be completed by the person who
arranged for the minor works to be carried out)
/
I/We,
Name in Chinese
C H IN G
YAN
CHO
am/are the person who arranged for the minor works to be carried out detailed in the submission with the above mentioned submission
number, in accordance with the provisions of section 28 of the Building (Minor Works) Regulation, I/we have appointed the prescribed
registered contractor appointed under the submission with the above mentioned submission number, as prescribed registered contractor in
respect of the works detailed in this part.
Minor works
Item
III
Details of the Class III minor works completed at the same location or
address of the submission with the above mentioned submission number
Additional Page added
Description
04
3.16
/
/ /
Relevant Order / Direction / Notice /
BD Reference Number (if available)
1 4 0 7 20 1 2
Signature of the person who arranged for the minor works to be carried out & affixed with company seal (if applicable) day month
*
year
3/4
125F
2012/06
Every minor works item and its description (including the nature, location and quantity) shall be provided. If space is insufficient,
please attach additional sheet(s) which must be signed, dated and affixed with company seal (if applicable).
V MW04
Part D III
Particulars of the person for whom the signboard is to be erected
(Only applicable to the completed Class III minor works involving the erection of a signboard and to be
completed by the person for whom the signboard is to be erected)
MW03
Where the particulars of the person for whom the signboard is to be erected had been provided in the Form MW03 submitted
under the submission with the above mentioned submission number
/
I/We,
Name in Chinese
S IG N B O A R D
OWNER
36(a)(v)
/
am/are the person for whom the signboard is to be erected detailed in the submission with the above mentioned submission number,
in accordance with the provisions of section 36(a)(v) of the Building (Minor Works) Regulation, hereby confirm that I am/we are also
the person for whom the signboard is to be erected detailed in Part C, and my particulars had been provided in the submission with
the above mentioned submission number.
Name in Chinese
04
HKID Number
Passport Number
Correspondence Address
Fax Number
Contact Number
E-mail Address
1 8 0 7 20 1 2
2012/06
Signature of the person for whom the signboard is to be erected & affixed with company seal (if applicable) day month
125G
year
4/4
V MW05
III
NOTICE AND CERTIFICATE OF COMPLETION OF CLASS III MINOR WORKS UNDER THE
SIMPLIFIED REQUIREMENTS
14
This form and all supporting document(s) must be submitted within 14 days after the date of completion of the minor
works item(s)
Please read the Matters to Note, complete the form in BLOCK LETTERS and tick in the appropriate box(es).
Part A Notice of appointment of the appointed prescribed registered contractor
(To be completed by the person who arranged for the minor works to be
carried out)
1.
Location or Address of the completed minor works
MW
/
The Account Number printed on the top left-hand corner
of the Demand for Rates and/or Government Rent
1 2 3 4 5 6 7 8 9 1 2 3 4 5 6 7 8 9 0
Minor works
Item
Description
Additional Page added
/
/ /
Relevant Order / Direction / Notice /
BD Reference Number (if available)
3.13
05
2.
Details of the completed minor works
Every minor works item and its description (including the nature, location and quantity) shall be provided. If space is insufficient,
please attach additional sheet(s) which must be signed, dated and affixed with company seal (if applicable).
3.
Particulars of the appointed prescribed registered contractor
28 /
In accordance with the provisions of section 28 of the Building (Minor Works) Regulation, I/we have appointed the prescribed
registered contractor as below in respect of the works detailed in this Part.
*Name in Chinese of the prescribed registered contractor*
1/3
125H
2012/06
V MW05
4.
Particulars of the person who arranged for the minor works to be carried out
Name in Chinese
C H IN G
YAN
CHO
A 1 23 4 5 6 ( 7 )
HKID Number
Passport Number
1
Correspondence Address (Not required to complete if same as Part A1)
2 1 2 3 4 5 6 8
Fax Number
2 1 2 3 4 5 6 7
Contact Number
cengjanzou@emai l . com
05
E-mail Address
0 7 0 7 20 1 2
year
Signature of the person who arranged for the minor works to be carried out & affixed with company seal (if applicable) day month
Part B Confirmation of appointment, notice and certificate of completion by the prescribed registered contractor
I/We,
* Name in Chinese*
GWO
YAN PAI
* Name in English*
*Name in English*(Contd)
36 37
in accordance with the provisions of sections 36 and 37 of the Building (Minor Works) Regulation,
1. /
confirm that I/we have been appointed as the prescribed registered contractor of the works detailed in Part A;
0 707
2.
confirm that the works detailed in Part A had been commenced on
day month
20 1 2
year
1 4 0 7 20 1 2
and completed on
day month
year
3.
submit herewith the photographs showing the physical condition of the premises immediately before the commencement and after
the completion of the works detailed in Part A, and the plans or description of works showing the works as completed;
4.
//
certify that all the works detailed in Part A, have been carried out in accordance with the Buildings Ordinance and the plans or
description of works submitted in this Part; and the said plans have been prepared and signed by me/us (as the person who has
signed the plans, I/we agree to assume all responsibilities under the Buildings Ordinance regarding the plans) (if applicable);
2012/06
125I
2/3
5. 11
where I am a contractor registered under section 11 of the Building (Minor Works) Regulation [also known as Registered Minor
Works Contractor (Individual)], certify that I have personally carried out the works detailed in Part A; and
6.
where the works detailed in Part A involve the erection of a signboard, confirm that the person for whom the signboard is to be
erected has provided the particulars of the person as required by the Building Authority in Part C.
MW
3 1 2 3 3 3 3 3
* Fax Number*
3 1 2 3 3 3 3 4
Contact Number
MWC(W) 6789 / 20 10
20 1 3
2 0 0 7 20 1 2
*
Signature* of the prescribed registered contractor
(authorized signatory, if applicable)
year
day month
year
* 3 1 0 1
Date of expiry
of registration* day month
*
Certificate of Registration Number*
Part C
Particulars of the person for whom the signboard is to be erected
Name in Chinese
05
(Only applicable to works involving the erection of a signboard and to be completed by the person for
whom the signboard is to be erected)
HKID Number
Passport Number
1
Correspondence Address (Not required to complete if same as Part A1)
Fax Number
Contact Number
Signature of the person for whom the signboard is to be erected & affixed with company seal (if applicable)
*
20
day month
year
3/3
125J
2012/06
E-mail Address
V MW06
Please read the Matters to Note, complete the form in BLOCK LETTERS and tick in the appropriate box(es).
For Buildings Departments Use only
Validation Scheme
Submission Number
Part A Notice of appointment of the appointed persons (To be completed by the person who arranged for the inspection)
1.
Location or Address of the prescribed building or building works
/
The Account Number printed on the top left-hand corner
of the Demand for Rates and/or Government Rent
1 2 3 4 5 6 7 8 9 1 2 3 4 5 6 7 8 9 0
2.
Details of the prescribed building or building works
Description
06
Works Item
/
/ /
Relevant Order / Direction / Notice /
BD Reference Number (if available)
Additional Page added
3 2 2010 12 31
The above works items are the prescribed building or building works items as stipulated in Part 2 of Schedule 3 of the Building
(Minor Works) Regulation and have been completed or carried out before 31 December 2010. Every works item and its description
(including the location and quantity) shall be provided. If space is insufficient, please attach additional sheet(s) which must be
signed, dated and affixed with company seal (if applicable).
3.
Particulars of the appointed persons
62(2)/
In accordance with the provision of section 62(2) of the Building (Minor Works) Regulation, I / we have appointed the person below
in respect of the inspection of the prescribed building or building works detailed in this Part.
authorized person
registered structural engineer
registered inspector
registered general building contractor
2012/06
3.343.353.363.37 3.38
registered minor works contractor registered for Type A minor works under Class I, II or III, Type E minor works under Class I, II or
III, or item 3.25, 3.27, 3.28, 3.29, 3.34, 3.35, 3.36, 3.37 or 3.38 of Class III minor works
*
125K
1/4
*Name in Chinese*
*
Certificate of Registration Number*
*Name in English*(Contd)
4.
(Only applicable where alteration or strengthening works are involved, and restricted to items 3.34, 3.35,
3.36, 3.37 and 3.38 of Class III minor works)
Additional
Minor works
Item
Description
06
3.35
Page added
/
/ /
Relevant Order / Direction / Notice /
BD Reference Number (if available)
Every minor works item and its description (including the nature, location and quantity) shall be provided. If space is insufficient,
please attach additional sheet(s) which must be signed, dated and affixed with company seal (if applicable).
28 /
In accordance with the provisions of section 28 of the Building (Minor Works) Regulation, I/we have appointed the prescribed
registered contractor as below in respect of the works detailed in this Part.
3 3
Identical to the appointed person in Part A3 (Not required to complete, please make reference to Part A3 for details)
*Name in Chinese*
/
*
Certificate of Registration Number*
* Name in English*
* Name in English*(Contd)
5.
Particulars of the person who arranged for the inspection
If alteration or strengthening works are involved, also the particulars of the person who arranged for the
alteration and strengthening works to be carried out
2/4
125L
2012/06
Name in Chinese
V MW06
A 1 23 4 5 6 ( 9 )
HKID Number
Passport Number
2 1 2 3 4 5 6 8
Fax Number
2 1 2 3 4 5 6 7
Contact Number
2 0 0 7 20 1 2
Signature of the person who arranged for the inspection, alteration and strengthening works to be carried out day month
and affixed with company seal (if applicable)
year
06
Part B Confirmation of appointment by the appointed person and Notice of Inspection and Certification
I/We,
* Name in English*
,
* Name in English*(Contd)
39C () 62
in accordance with the provisions of section 39C of the Buildings Ordinance and section 62 of the Building (Minor Works) Regulation,
* Name in Chinese*
1. / 2
confirm that I / we have been appointed as the appointed person for the inspection of the prescribed building or building works
1 707
detailed in Part A2, and the inspection had been carried out on
day month
20 1 2 ;
year
2. 2
submit herewith photographs and description showing the physical condition of the prescribed building or building works detailed in
Part A2 as inspected; and
3. /
123
14(1)
123 A 25
certify that the prescribed building or building works detailed in Part A are structurally safe in my/our opinion and comply with the
Buildings Ordinance (Cap. 123) [except section 14(1) of the Buildings Ordinance (Cap. 123) and regulation 25 of the Building
(Administration) Regulations (Cap.123 sub. leg. A)].
authorized person
registered structural engineer
2012/06
registered general building contractor
125M
registered inspector
3/4
VS
2 1 2 3 4 5 6 6
* Fax Number*
2 1 2 3 4 5 6 5
Contact Number
Willing to receive Short
Messaging Service (SMS)
Notification
20 1 3
year
*
Signature* of the appointed person
2 0 0 7 20 1 2
day month
year
* 3 1 0 1
Date of expiry
of registration* day month
Part C Confirmation of appointment, notice and certificate of completion by the prescribed registered contractor
/
I/We,
06
* Name in English(Contd)*
36 37
in accordance with the provisions of sections 36 and 37 of the Building (Minor Works) Regulation,
1. / 4
confirm that I/we have been appointed as the prescribed registered contractor of the works detailed in Part A4;
10 07
2. 4
confirm that the works detailed in Part A4 had been commenced on
day month
20 1 2
year
1 707
and completed on
20 1 2
day month
year
3. 4
submit herewith the photographs showing the physical condition of the premises immediately before the commencement and after
the completion of the works detailed in Part A4, and the plans or description of works showing the works as completed;
4. 4
//
certify that all the works detailed in Part A4, have been carried out in accordance with the Buildings Ordinance and the plans or
description of works submitted in this Part; and the said plans have been prepared and signed by me/us (as the person who has
signed the plans, I/we agree to assume all responsibilities under the Buildings Ordinance regarding the plans) (if applicable); and
5. 11
4
where I am a contractor registered under section 11 of the Building (Minor Works) Regulation [also known as Registered Minor
Works Contractor (Individual)], certify that I have personally carried out the works detailed in Part A4.
year
* Fax Number*
2 1 2 3 4 5 6 5
Contact Number
*
Signature* of the prescribed registered contractor
(authorized signatory, if applicable)
2 0 0 7 20 1 2
day month
year
4/4
125N
2012/06
20 1 3
2 1 2 3 4 5 6 6
*
Certificate of Registration Number*
* 3 1 0 1
Date of expiry
of registration* day month
V MW07
Please read the Matters to Note, complete the form in BLOCK LETTERS and tick in the appropriate box(es).
MW 1 2 0 7 0 9 9 9 9
(To be completed by the person who arranged for the minor works to be
carried out)
I/We,
Name in Chinese
C H IN G
YAN
CHO
MUST COMPLETE
am/are the person who arranged for the minor works to be carried out under the submission with the above mentioned submission number.
07
*Name in Chinese*
RSE
RGE
*
Certificate of Registration Number*
* Name in English*
*Name in Chinese*
*
Certificate of Registration Number*
* Name in English*
/ 27 / 28
I / We specify hereby the new appointed person detailed below as the person appointed under section 27 and/or 28 of the Building
(Minor Works) Regulation in the place of the original appointed person.
4 5 6 7 8 9 /2 0 0 9
GBC
*
Name in Chinese*
*
Certificate of Registration Number*
CONSTRUCTION
COMPANY
LIM ITE D
2 6 6 6 1 2 3 4
* Fax Number*
2 6 6 6 1 2 3 5
Contact Number
Willing to receive Short
Messaging Service (SMS)
Notification
2012/06
1 0 0 9 20 1 2
Effective from day month
125O
year
Signature of the person who arranged for the minor works to be carried out
and affixed with company seal (if applicable)
1 3 0 9 20 1 2
day month
year
1/3
Part B Confirmation of appointment by the registered structural engineer
I,
*Name in Chinese*
,
*Name in English*
48(2) I
in accordance with the provisions of section 48(2) of the Building (Minor Works) Regulation, confirm that I have been appointed as the
registered structural engineer, in the place of the original registered structural engineer appointed for the structural elements of the Class I
minor works detailed in the submission with the above mentioned submission number.
* Fax Number*
RSE
20
day month
*
Signature* of the registered structural engineer
year
*
Date of expiry
of registration*
*
Certificate of Registration Number*
Contact Number
Willing to receive Short
Messaging Service (SMS)
Notification
20
day month
year
Part C Confirmation of appointment by the registered geotechnical engineer
I,
*Name in Chinese*
*Name in English*
48(2) I
in accordance with the provisions of section 48(2) of the Building (Minor Works) Regulation, confirm that I have been appointed as the
registered geotechnical engineer, in the place of the original registered geotechnical engineer appointed for the geotechnical elements of
the Class I minor works detailed in the submission with the above mentioned submission number.
* Fax Number*
RGE
Contact Number
Willing to receive Short
Messaging Service (SMS)
Notification
*
Certificate of Registration Number*
*
Date of expiry
of registration*
day month
20
year
*
Signature* of the registered geotechnical engineer
20
day month
year
2/3
125P
2012/06
07
V MW07
Part D Confirmation of appointment by the prescribed registered contractor
We,
* Name in English*
CONSTRUCTION
COMPANY
LIM ITE D
* Name in English*(Contd)
48(2) 48(4)
in accordance with the provisions of section 48(2) and section 48(4) of the Building (Minor Works) Regulation, confirm that I have been
appointed as the prescribed registered contractor, in the place of the original prescribed registered contractor appointed for the minor
works detailed in the submission with the above mentioned submission number.
2 6 6 6 1 2 3 4
A U T H O R IZE D
S IGNATO R Y
GBC
4 5 6 7 8 9 /2 0 0 9
* 3 1 0 1
Date of expiry
of registration* day month
20 1 3
year
2 6 6 6 1 2 3 5
Contact Number
*
Certificate of Registration Number*
* Fax Number*
* Name in Chinese*
*
Signature* of the prescribed registered contractor (authorized signatory)
1 3 0 9 20 1 2
day month
year
(Only applicable when supervision plan is required by the technical memorandum, and to be completed
by the authorized person or registered inspector appointed)
*Name in Chinese*
I,
*Name in English*
48(2)
am the authorized person or registered inspector appointed in the submission with the above mentioned submission number, in
accordance with the provisions of section 48(2) of the Building (Minor Works) Regulation, submit herewith a revised supervision plan.
07
Part E
Submission of the revised supervision plan
* Fax Number*
Contact Number
Willing to receive Short
Messaging Service (SMS)
Notification
/
*
Certificate of Registration Number*
*
Date of expiry
of registration*
2012/06
day month
125Q
20
year
*
Signature* of the authorized person or registered inspector
20
day month
year
3/3
V MW08
Please read the Matters to Note, complete the form in BLOCK LETTERS and tick in the appropriate box(es).
(To be completed by the person who arranged for the minor works to be carried out)
MUST COMPLETE
Name in Chinese
C H IN G
YAN
CHO
I/We,
am/are the person who arranged for the minor works to be carried out in the submission with the above mentioned submission number.
I/we specify hereby the new appointed person detailed below as the person appointed under section 27 in the place of the original
appointed person.
*
Name in Chinese*
* Name in English*
2 0 0 7 20 1 2
year
Signature of the person who arranged for the minor works to be carried out
and affixed with company seal (if applicable)
1 8 0 7 20 1 2
day month
year
Effective from day month
*
Certificate of Registration Number*
08
RI(S)7777 / 09
Part B Confirmation of appointment by the authorized person or registered inspector
I,
*Name in Chinese*
,
*Name in English*
48(3)
in accordance with the provisions of section 48(3) of the Building (Minor Works) Regulation,
1. I
confirm that I have been appointed as the authorized person or registered inspector (only applicable where the works are a
prescribed repair or any associated demolition works) in the place of the original appointed person for the Class I minor works
detailed in the submission with the above mentioned submission number; and
2. 48(3)(b)
where supervision plan is required by the technical memorandum, in accordance with the provisions of section 48(3)(b) of the
Building (Minor Works) Regulation, submit herewith a revised supervision plan.
2 1 2 3 4 5 6 1
* Fax Number*
2 1 2 3 4 5 6 0
Contact Number
RI(S)7777 / 09
*
Certificate of Registration Number*
*
20 1
Date of expiry 0 3 0 2
of registration*
day month
year
*
Signature* of the authorized person or registered inspector
1 8 0 7 20 1 2
day month
year
1/1
125R
2012/06
V MW09
Please read the Matters to Note, complete the form in BLOCK LETTERS and tick in the appropriate box(es).
MUST COMPLETE
N O M INATO R
, am the
*Name in English*
/
authorized person
registered inspector
registered structural engineer
registered geotechnical engineer
49 4A(5)
appointed in the submission with the above mentioned submission number and all submission numbers listed in Part C. In accordance
with the provisions of section 49 of the Building (Minor Works) Regulation, I hereby notify and confirm that I have nominated under section
4A(5) of the Buildings Ordinance the prescribed building professional as below to act in my place for the period of my
I,
09
*Name in Chinese*
1 6 0 7
as from
illness
20 1 2
day month
year
to
2 0 0 7 20 1 2
day month
year
or
until further notice
temporary absence from Hong Kong
in respect of the minor works detailed in the submission with the above mentioned submission number and all submission numbers listed in Part C.
A P ( A ) 8 8 8 8 /8 8
2 1 2 3 4 5 6 1
* Fax Number*
*
Certificate of Registration Number*
20 1 7
* 0 3 0 2
Date of expiry
of registration* day month
year
*
Signature* of the nominator
1 3 0 7 20 1 2
day month
year
Part B Confirmation of nomination by the nominee (To be completed by the prescribed building professional nominated)
2012/06
*Name in Chinese*
,
HO YAN
*Name in English*
49
in accordance with the provisions of section 49 of the Building (Minor Works) Regulation, confirm my acceptance of the nomination
detailed in Part A and that I will act in the place of the nominator for the period detailed in Part A in respect of the minor works detailed in
the submission with the above mentioned submission number and all submission numbers listed in Part C.
I,
Y IN G
AP( A)9 9 9 9 /9 9
*
Certificate of Registration Number*
*
20 1 3
Date of expiry 0 4 0 7
of registration*
day month
125S
year
2 1 2 3 4 5 6 6
* Fax Number*
*
Signature* of the nominee
1 3 0 7 20 1 2
day month
Form MW09 (06/2012)
year
1/2
V MW10
Please read the Matters to Note, complete the form in BLOCK LETTERS and tick in the appropriate box(es).
Notice of the prescribed registered contractor on ceasing to be appointed Minor Works Submission Number
We,
* Name in Chinese*
LIM ITE D
MUST COMPLETE
CONSTRUCTION
COMPANY
,
* Name in English*(Contd)
51
are the prescribed registered contractor appointed under the submission with the above mentioned submission number, in accordance
with the provisions of section 51 of the Building (Minor Works) Regulation, submit herewith this notice of the fact that, with effect from
1 0 0 9 20 1 2
year
, we have ceased to be appointed as the prescribed registered contractor of the minor works detailed in the
submission with the above mentioned submission number; and certify that all the following minor works under the above mentioned
submission number have been carried out in accordance with the Buildings Ordinance and the submitted prescribed plans and details;
/
/ /
Relevant Order / Direction / Notice /
BD Reference Number (if available)
2.30
Description
Minor works
Item
Additional Page added
Every minor works item and its description (including the nature, location and quantity) shall be provided. If space is insufficient, please
attach additional sheet(s) which must be signed and dated.
*
1/2
125T
2012/06
day month
10
V MW10
1.
submit herewith plans and photographs showing all the minor works as completed;
2.
where the completed works are other than demolition works, certify that, in our opinion, all the completed works are structurally
safe;
4. I 7
27 4A(5)
where the completed works involve Class I minor works, deliver herewith to the authorized person or registered inspector appointed
under section 27 of the Building (Minor Works) Regulation or nominated under section 4A(5) of the Buildings Ordinance this notice
within 7 days after the date of cessation.
2 6 6 6 1 2 3 4
A U T H O R IZE D
* Fax Number*
2 6 6 6 1 2 3 5
S IGNATO R Y
GBC
4 5 6 7 8 9 /2 0 0 9
*
Certificate of Registration Number*
20 1 3
year
Willing to receive Short
Messaging Service (SMS)
Notification
*
Signature* of the prescribed registered contractor (authorized signatory)
* 3 1 0 1
Date of expiry
of registration* day month
Contact Number
3.
where the completed works are demolition works, certify that, in our opinion, any land or street affected by the said works has an
adequate margin of safety and any structure remaining on the premises is structurally safe; and
1 0 0 8 20 1 2
day month
year
Part B Submission by the authorized person or registered inspector (To be completed by the authorized person or
*Name in Chinese*
,
*Name in English*
27 I 4A(5)
52
51(1)(a)
am the authorized person or registered inspector appointed under section 27 of the Building (Minor Works) Regulation or nominated under
section 4A(5) of the Buildings Ordinance for the Class I minor works detailed in the submission with the above mentioned minor works
submission number. In accordance with the provisions of section 52 of the Building (Minor Works) Regulation, I submit herewith the notice
detailed in Part A which was delivered to me on
I,
20
by the prescribed registered contractor as required by section 51(1)(a) of the Building (Minor Works) Regulation.
10
day month
year
* Fax Number*
Contact Number
Willing to receive Short
Messaging Service (SMS)
Notification
/
*
Certificate of Registration Number*
*
Date of expiry
of registration*
2012/06
day month
125U
20
year
*
Signature* of the authorized person or registered inspector
day month
20
year
2/2
V MW11
Please read the Matters to Note, complete the form in BLOCK LETTERS and tick in the appropriate box(es).
MW 1 2 0 7 0 9 9 9 9
(To be completed by the person who arranged for the minor works to be
carried out)
Name in Chinese
C H IN G
YAN
CHO
11
am/are the person who arranged for the minor works to be carried out under the submission with the above mentioned submission
number, in accordance with the provisions of sections 27 and 28 of the Building (Minor Works) Regulation, I/we have respectively
appointed the prescribed building professionals and prescribed registered contractor appointed under the submission with the above
mentioned submission number, as prescribed building professionals and prescribed registered contractor in respect of the works detailed
in this Part.
Minor works
Item
Description
/
/ /
Relevant Order / Direction / Notice /
BD Reference Number (if available)
1.28
Details of the proposed additional minor works to be carried out at the same
location or address under the submission with the above mentioned
submission number
Additional Page added
2.18
Every minor works item and its description (including the nature, location and quantity) shall be provided. If space is insufficient,
please attach additional sheet(s) which must be signed, dated and affixed with company seal (if applicable).
0 5 0 7 20 1 2
Signature of the person who arranged for the minor works to be carried out & affixed with company seal (if applicable) day month
*
year
1/6
125V
2012/06
I/We,
MUST COMPLETE
V MW11
Part B Confirmation of appointment by the authorized person or registered inspector
*Name in Chinese*
Y IN G H O Y A N
,
*Name in English*
30 37
am the authorized person or registered inspector appointed under the submission with the above mentioned submission number, in
accordance with the provisions of sections 30 and 37 of the Building (Minor Works) Regulation,
I,
12 0 7
2. I
confirm that the Class I minor works detailed in Part A are to be commenced on
day month
20 1 2 ;
year
3. I
submit herewith the prescribed plans and details of the Class I minor works detailed in Part A, and the photographs showing the
physical condition of the premises where the Class I minor works detailed in Part A are to be carried out;
4.
confirm that the prescribed plans and details submitted under this Part, have been prepared and signed by me (as the person who
has signed the plans, I agree to assume all responsibilities under the Buildings Ordinance regarding the plans);
5. I
I
where the Class I minor works detailed in Part A comprise repairs, alterations or additions to any building, certified that, after
inspecting the building, I am of the opinion that the building is capable of bearing the loads and stresses which may be increased or
altered in any way as a result of the Class I minor works;
6. I
where the Class I minor works detailed in Part A involve the erection of a signboard, confirm that the person for whom the signboard
is to be erected has provided the particulars of the person as required by the Building Authority in Part F; and
11
1. I
confirm that I have been appointed as the authorized person or registered inspector (if the works are a prescribed repair or any
associated demolition works) for the Class I minor works detailed in Part A;
7.
where supervision plan is required by the technical memorandum, submit herewith a supervision plan.
*
Certificate of Registration Number*
2012/06
20 1 3
125W
year
* Fax Number*
2 1 2 3 4 5 6 5
Contact Number
Willing to receive Short
AP( A)9999 / 99
* 0 4 0 7
Date of expiry
of registration* day month
2 1 2 3 4 5 6 6
*
Signature* of the authorized person or registered inspector
0 5 0 7 20 1 2
day month
year
2/6
Part C Confirmation of appointment by the registered structural engineer
*Name in Chinese*
,
GUNG CHI SZE
*Name in English*
30 37
am the registered structural engineer appointed under the submission with the above mentioned submission number, in accordance with
the provisions of sections 30 and 37 of the Building (Minor Works) Regulation,
I,
1. I
confirm that I have been appointed as the registered structural engineer for the structural elements of the Class I minor works
detailed in Part A;
2.
confirm that the foundation plans, structural details or calculations submitted under the prescribed plans and details in Part B have
been prepared and signed by me (as the person who has signed the plans, I agree to assume all responsibilities under the Buildings
Ordinance regarding the plans); and
RSE
3. I
I
where the Class I minor works detailed in Part A comprise repairs, alterations or additions to any building, certified that, after
inspecting the building, I am of the opinion that the building is capable of bearing the loads and stresses which may be increased or
altered in any way as a result of the Class I minor works;
8888 / 88
* 0 4 0 7
Date of expiry
of registration* day month
20 1 3
year
11
*
Certificate of Registration Number*
*
Signature* of the registered structural engineer
2 1 2 3 4 5 6 4
Contact Number
Willing to receive Short
Messaging Service (SMS)
Notification
0 5 0 7 20 1 2
day month
year
Part D Confirmation of appointment by the registered geotechnical engineer
*Name in Chinese*
,
*Name in English*
30 37
am the registered geotechnical engineer appointed under the submission with the above mentioned submission number, in accordance
with the provisions of sections 30 and 37 of the Building (Minor Works) Regulation,
I,
1. I
confirm that I have been appointed as the registered geotechnical engineer for the geotechnical elements of the Class I minor works
detailed in Part A; and
2.
confirm that the geotechnical plans, geotechnical assessment, geotechnical details or calculations and geotechnical reports
submitted under the prescribed plans and details in Part B have been prepared and signed by me (as the person who has signed the
plans, I agree to assume all responsibilities under the Buildings Ordinance regarding the plans).
RGE
Contact Number
Willing to receive Short
Messaging Service (SMS)
Notification
*
Certificate of Registration Number*
*
Date of expiry
of registration* day month
*
20
year
*
Signature* of the registered geotechnical engineer
day month
Form MW11 (06/2012)
20
year
3/6
125X
2012/06
V MW11
Part E Confirmation of appointment by the prescribed registered contractor
We,
* Name in Chinese*
GUNG
SI
P A I S IN G G I N
* Name in English*
SO E N G
E N G I N EERING
COMPANY
LIM ITE D
,
* Name in English*(Contd)
30 33 37
II
are the prescribed registered contractor appointed under the submission with the above mentioned submission number, in accordance
with the provisions of sections 30, sections 33 and 37 (where Class II minor works are involved in works detailed in Part A) of the Building
(Minor Works) Regulation,
1.
confirm that we have been appointed as the prescribed registered contractor of the works detailed in Part A;
II
where Class II minor works are involved in the works detailed in Part A,
2. II
confirm that the Class II minor works detailed in Part A are to be commenced on
2
day month
20
2
(Only applicable where no date is specified in paragraph 2 of Part B).
year
3. II
submit herewith the prescribed plans and details of the Class II minor works detailed in Part A, and the photographs showing the
physical condition of the premises where the Class II minor works detailed in Part A are to be carried out;
4.
confirm that the prescribed plans and details submitted under this Part, have been prepared and signed by us (as the person who
has signed the plans, we agree to assume all responsibilities under the Buildings Ordinance regarding the plans);
11
5. II
II
where the Class II minor works detailed in Part A comprise repairs, alterations or additions to any building, certified that, after
inspecting the building, we are of the opinion that the building is capable of bearing the loads and stresses which may be increased
or altered in any way as a result of the Class II minor works; and
6. II
where the Class II minor works detailed in Part A involve the erection of a signboard, confirm that the person for whom the
signboard is to be erected has provided the particulars of the person as required by the Building Authority in Part F.
C IM C Y U
2 1 2 3 4 5 6 2
456790 /2011
2012/06
* 0 4 0 7
Date of expiry
of registration* day month
125Y
20 1 4
year
Contact Number
Willing to receive Short
Messaging Service (SMS)
Notification
*
Certificate of Registration Number*
* Fax Number*
YAN
MWC
2 1 2 3 4 5 6 3
*
Signature* of the prescribed registered contractor (authorized signatory)
0 5 0 7 20 1 2
day month
year
4/6
Part F
Particulars of the person for whom the signboard is to be erected
(Only applicable to works involving the erection of a signboard and to be completed by the person for
whom the signboard is to be erected)
MW01
Where the particulars of the person for whom the signboard is to be erected had been provided in the Form MW01 submitted
under the submission with the above mentioned submission number
/
I/We,
Name in Chinese
S IG N B O A R D
OWNER
MW01
Where the works stated in the Form MW01 submitted under the submission with the above mentioned submission number do not
involve the erection of a signboard
Name in Chinese
11
HKID Number
Passport Number
Correspondence Address
Fax Number
Contact Number
E-mail Address
0 5 0 7 20 1 2
year
5/6
125Z
2012/06
Signature of the person for whom the signboard is to be erected & affixed with company seal (if applicable) day month
V MW11
Part G
Particulars of the corresponding Owners Corporations or Property Management Company where the
works to be carried out may involve common parts
(Only applicable where the works to be carried out may involve common parts and to be completed by
the authorized person or registered inspector appointed)
MW01
Where the particulars of the Owners Corporations or Property Management Company had been provided in the Form MW01
submitted under the submission with the above mentioned submission number
MW01
Where the particulars of the Owners Corporations or Property Management Company had not been provided in the Form MW01
submitted under the submission with the above mentioned submission number
Name & Correspondence Address of Owners Corporations or Property Management Company
Fax Number
Contact Number
2012/06
11
E-mail Address
125AA
6/6
V MW12
Please read the Matters to Note, complete the form in BLOCK LETTERS and tick in the appropriate box(es).
(To be completed by the person who arranged for the minor works to be
carried out)
I/We,
MUST COMPLETE
Name in Chinese
C H IN G
YAN
CHO
MW 1 2 0 7 1 1 1 4 7
am/are the person who arranged for the minor works to be carried out under the submission with the above mentioned submission
number, in accordance with the provisions of section 28 of the Building (Minor Works) Regulation, I/we have appointed the prescribed
registered contractor appointed under the submission with the above mentioned submission number, as prescribed registered contractor
in respect of the works detailed in this Part.
12
Details of the proposed additional minor works to be carried out at the same
location or address under the submission with the above mentioned
submission number
Additional Page added
Minor works
Item
2.23
/
/ /
Relevant Order / Direction / Notice /
BD Reference Number (if available)
2.15
Description
2.18
2 0 0 7 20 1 2
Signature of the person who arranged for the minor works to be carried out & affixed with company seal (if applicable) day month
*
year
1/4
125AB
2012/06
Every minor works item and its description (including the nature, location and quantity) shall be provided. If space is insufficient,
please attach additional sheet(s) which must be signed, dated and affixed with company seal (if applicable).
V MW12
Part B Confirmation of appointment by the prescribed registered contractor
We,
* Name in Chinese*
* Name in English*
CONSTRUCTION
COMPANY
LIM ITE D
,
* Name in English*(Contd)
33 37
are the prescribed registered contractor appointed under the submission with the above mentioned submission number, in accordance
with the provisions of sections 33 and 37 of the Building (Minor Works) Regulation,
1.
confirm that we have been appointed as the prescribed registered contractor of the works detailed in Part A;
2 7 0 7 20 1 2 ;
day month
year
3.
submit herewith the prescribed plans and details of the works detailed in Part A, and the photographs showing the physical condition
of the premises where the works detailed in Part A are to be carried out;
4.
confirm that the prescribed plans and details submitted under this Part, have been prepared and signed by us (as the person who has
signed the plans, we agree to assume all responsibilities under the Buildings Ordinance regarding the plans);
2.
confirm that the minor works detailed in Part A are to be commenced on
5.
where the works detailed in Part A comprise repairs, alterations or additions to any building, certified that, after inspecting the
building, we are of the opinion that the building is capable of bearing the loads and stresses which may be increased or altered in
any way as a result of the works; and
12
6.
where the works detailed in Part A involve the erection of a signboard, confirm that the person for whom the signboard is to be
erected has provided the particulars of the person as required by the Building Authority in Part C.
A U T H O R IZE D
S IGNATO R Y
4 5 6 7 8 9 /2 0 0 9
GBC
*
Certificate of Registration Number*
2012/06
* 3 1 0 1
Date of expiry
of registration* day month
125AC
20 1 3
year
2 6 6 6 1 2 3 4
* Fax Number*
2 6 6 6 1 2 3 5
Contact Number
Willing to receive Short
Messaging Service (SMS)
Notification
*
Signature* of the prescribed registered contractor (authorized signatory)
2 0 0 7 20 1 2
day month
year
2/4
Part C
Particulars of the person for whom the signboard is to be erected
(Only applicable to works detailed in Part A involving the erection of a signboard and to be completed by
the person for whom the signboard is to be erected)
MW03
Where the particulars of the person for whom the signboard is to be erected had been provided in the Form MW03 submitted
under the submission with the above mentioned submission number
/
I/We,
Name in Chinese
Name in Chinese
S IG N B O A R D
OWNER
MW03
Where the works stated in the Form MW03 submitted under the submission with the above mentioned submission number do not
involve the erection of a signboard
12
84503832
HKID Number
Passport Number
2 9 9 3 4 5 6 8
Fax Number
2 9 9 3 4 5 6 7
Contact Number
E-mail Address
Signature of the person for whom the signboard is to be erected & affixed with company seal (if applicable)
2 0 0 7 20 1 2
day month
year
3/4
125AD
2012/06
V MW12
Part D
Particulars of the corresponding Owners Corporations or Property Management Company where the
works to be carried out may involve common parts
(Only applicable where the works to be carried out may involve common parts and to be completed by
the prescribed registered contractor appointed)
MW03
Where the particulars of the Owners Corporations or Property Management Company had been provided in the Form MW03
submitted under the submission with the above mentioned submission number
MW03
Where the particulars of the Owners Corporations or Property Management Company had not been provided in the Form MW03
submitted under the submission with the above mentioned submission number
Name & Correspondence Address of Owners Corporations or Property Management Company
2 6 6 3 4 5 6 8
Fax Number
2 6 6 3 4 5 6 7
Contact Number
2012/06
12
E-mail Address
125AE
4/4
V MW31
Please read the Matters to Note, complete the form in BLOCK LETTERS and tick in the appropriate box(es).
MW 1 2 0 7 0 8 8 8 8
appointed or nominated)
MUST COMPLETE
*Name in Chinese*
, am the
Y IN G H O Y A N
*Name in English*
/
authorized person
registered inspector
registered structural engineer
registered geotechnical engineer
50
appointed or nominated in the above mentioned submission number, in accordance with the provisions of section 50 of the Building
(Minor Works) Regulation, submit herewith this notice of the fact that, with effect from
I,
1 6 0 7 20 1 2
day month
year
, I have ceased to be appointed or nominated as the prescribed building professional of the minor works detailed in
31
the submission with the above mentioned submission number; and confirm that the following minor works under the submission with the
above mentioned submission number have been carried out in accordance with the Buildings Ordinance and the submitted prescribed
plans and details under my supervision.
Minor works
Item
/
/ /
Relevant Order / Direction / Notice /
BD Reference Number (if available)
1.17
Description
Additional Page added
Every minor works item and its description (including the nature, location and quantity) shall be provided. If space is insufficient, please
attach additional sheet(s) which must be signed and dated.
2 1 2 3 4 5 6 6
* Fax Number*
2 1 2 3 4 5 6 5
Contact Number
Willing to receive Short
Messaging Service (SMS)
Notification
*
Certificate of Registration Number*
* 0 4 0 7
Date of expiry
of registration* day month
*
20 1 3
year
1 8 0 7 20 1 2
*
Signature* of the prescribed building professional ceased to be appointed day month
or nominated
year
1/1
125AF
2012/06
AP( A)9999 / 99
V MW32
III
REQUEST FOR SUBMISSION NUMBER FOR CLASS III MINOR WORKS RELATING
TO THE ERECTION OR ALTERATION OF SIGNBOARD UNDER THE SIMPLIFIED
REQUIREMENTS
Please read the Matters to Note, complete the form in BLOCK LETTERS and tick in the appropriate box(es).
Part A Preliminary information of the erection or alteration works of signboard
1.
/
The Account Number printed on the top left-hand corner
of the Demand for Rates and/or Government Rent
1 2 3 4 5 6 7 8 9 1 2 3 4 5 6 7 8 9 0
2.
Details of the proposed signboard works to be carried out
Additional Page added
1 3 3.16 3.17
Restricted to the erection and alteration works of signboard described under items 3.16 and 3.17 of the List of Minor Works in
Part 3 of Schedule 1 of the Building (Minor Works) Regulation
3.17
Description
3.17
/
/ /
Relevant Order / Direction / Notice /
BD Reference Number (if available)
32
Minor works
Item
Every minor works item and its description (including the nature, location and quantity) shall be provided. If space is insufficient,
please attach additional sheet(s) which must be signed, dated and affixed with company seal (if applicable).
2012/06
14
125AG
0 7 20 1 2
day month
and
year
1 6 0 7
and
day month
respectively.
20 1 2
year
respectively.
1/2
3.
Particulars of the person who arranged for the minor works to be carried out
Name in Chinese
C H IN G
YAN
CHO
4.
Particulars of the person for whom the signboard is to be erected
Name in Chinese
S IG N B O A R D
OWNER
* Name in Chinese*
I/We,
* Name in English*
LIM ITE D
Part B Request of the prescribed registered contractor
CONSTRUCTION
COMPANY
,
32
* Name in English*(Contd)
am /are the prescribed registered contractor appointed for the works detailed in Part A,
1.
submit the preliminary information detailed in Part A to request for a submission number for the works detailed in Part A to be
displayed on the signboard to be erected or altered;
2.
understand and realize that:
6
this request is not a submission under the simplified requirements, obtaining the submission number is not equivalent to compliance
in accordance with provisions of the simplified requirements in Part 6 of the Building (Minor Works) Regulation;
36 MW05 14
a notification in Form MW05 should be submitted separately within 14 days after the completion of the works detailed in Part A in
accordance with section 36 of Building (Minor Works) Regulation;
the minor works submission number obtained can only be used for displaying on the signboards to be erected or altered at the
location or address detailed in Part A; and
71
the displaying of the minor works submission number on the signboard should follow the standards and guideline in the Practice
Note for Registered Contractors No.71.
* Name in Chinese of the authorized signatory*
S IGNATO R Y
20 1 3
year
Contact Number
Willing to receive Short
Messaging Service (SMS)
Notification
*
Certificate of Registration Number*
* 3 1 0 1
Date of expiry
of registration* day month
2 6 6 6 1 2 3 5
4 5 6 7 8 9 /2 0 0 9
GBC
* Fax Number*
*
Signature* of the prescribed registered contractor (authorized signatory)
3 0 0 6 20 1 2
day month
year
2/2
125AH
2012/06
A U T H O R IZE D
2 6 6 6 1 2 3 4
V MW33
Please read the Matters to Note, complete the form in BLOCK LETTERS and tick in the appropriate box(es).
MW 1 2 0 7 0 7 7 7 7
MUST COMPLETE
/
I/We,
*Name in Chinese*
Demolition Proposal
,
*Name in English*(Contd)
am/are the appointed person of the submission with the above mentioned submission number, submit herewith the following
supplementary document(s) or information for the minor works detailed in the above mentioned submission number:
structural calculations
catalogue
supervision plan
Others______________________________________________
33
authorized person
registered inspector
prescribed registered contractor
registered structural engineer
registered geotechnical engineer
2 1 2 3 4 5 6 1
* Fax Number*
2 1 2 3 4 5 6 0
Contact Number
RI(S)
7777/
77
2012/06
*
Certificate of Registration Number*
* 0 3 0 2
Date of expiry
of registration* day month
*
125AI
20 1 7
year
*
Signature* of the appointed person
1 8 0 7 20 1 2
day month
Form MW33 (06/2012)
year
1/1
VI
BS 5252
06 C 33
06 C 39
04 E 55
14 E 53
20 E 56
24 E 53
06 E 55
08 E 49
02 E 33
10 E 50
20 E 50
06 D 44
00 A 03
24 C 39
10 E 55
12 E 53
2010/10
1 .
2.
3 .
4 .
126
2010/10
GN-1
VII II III
127
2010/10
GN-2
VII II III
128
129
2010/10
2.1
12
2010/10
2.1
22
VII II III
130
131
2010/10
2.2
2010/10
2.3
VII II III
132
133
2010/10
2.4
2010/10
2.5
VII II III
134
135
2010/10
2.6
12
2010/10
2.6
22
VII II III
136
137
2010/10
2.7
12
2010/10
2.7
22
VII II III
138
139
2010/10
2.8
12
2010/10
2.8
22
VII II III
140
141
2010/10
2.9
2010/10
2.10
12
VII II III
142
143
2010/10
2.10
22
2010/10
2.11
VII II III
144
145
2010/10
2.12
2010/10
2.13
VII II III
146
147
2010/10
2.14
12
2010/10
2.14
22
VII II III
148
149
2010/10
2.15
2010/10
2.16
12
VII II III
150
151
2010/10
2.16
22
2010/10
2.17
VII II III
152
153
2010/10
2.18
13
2010/10
2.18
23
VII II III
154
155
2010/10
2.18
33
2010/10
2.19
12
VII II III
156
157
2010/10
2.19
22
2010/10
2.20
VII II III
158
159
2010/10
2.21
12
2010/10
2.21
22
VII II III
160
161
2010/10
2.22
12
2010/10
2.22
22
VII II III
162
163
2010/10
2.23
2010/10
2.24
VII II III
164
165
2010/10
2.25
2010/10
2.26
12
VII II III
166
167
2010/10
2.26
22
2010/10
2.27
VII II III
168
169
2010/10
2.28
2010/10
2.29
VII II III
170
171
2010/10
2.30
2010/10
2.31
VII II III
172
173
2010/10
2.32
2010/10
2.33
VII II III
174
175
2010/10
2.34
2010/10
2.35
12
VII II III
176
177
2010/10
2.35
22
2010/10
2.36
VII II III
178
179
2010/10
2.37
2010/10
2.38
VII II III
180
181
2010/10
2.39
2010/10
2.40
VII II III
182
183
2010/10
3.1
2010/10
3.2
VII II III
184
185
2010/10
3.3
2010/10
3.4
VII II III
186
187
2010/10
3.5
2010/10
3.6
12
VII II III
188
189
2010/10
3.6
22
2010/10
3.7
VII II III
190
191
2010/10
3.8
2010/10
3.9
VII II III
192
193
2010/10
3.10
2010/10
3.11
12
VII II III
194
195
2010/10
3.11
22
2010/10
3.12
VII II III
196
197
2010/10
3.13
12
2010/10
3.13
22
VII II III
198
199
2010/10
3.14
13
2010/10
3.14
23
VII II III
200
201
2010/10
3.14
33
2010/10
3.15
13
VII II III
202
203
2010/10
3.15
23
2010/10
3.15
33
VII II III
204
205
2010/10
3.16
12
2010/10
3.16
22
VII II III
206
207
2010/10
3.17
12
2010/10
3.17
22
VII II III
208
209
2010/10
3.18
2010/10
3.19
VII II III
210
211
2010/10
3.20
2010/10
3.21
VII II III
212
213
2010/10
3.22
2010/10
3.23
VII II III
214
215
2010/10
3.24
2010/10
3.25
VII II III
216
217
2010/10
3.26
2010/10
3.27
14
VII II III
218
219
2010/10
3.27
24
2010/10
3.27
34
VII II III
220
221
2010/10
3.27
44
2010/10
3.28
13
VII II III
222
223
2010/10
3.28
23
2010/10
3.28
33
VII II III
224
225
2010/10
3.29
12
2010/10
3.29
22
VII II III
226
227
2010/10
3.30
2010/10
3.31
13
VII II III
228
229
2010/10
3.31
23
2010/10
3.31
33
VII II III
230
231
2010/10
3.32
2010/10
3.33
VII II III
232
233
2010/10
3.34
2010/10
3.35
VII II III
234
235
2010/10
3.36
2010/10
3.37
VII II III
236
237
2010/10
3.38
12
2010/10
3.38
22
VII II III
238
VIII -
1
5 0 9
$ 200,0006
(a)
(b )
(c)
/ / / / :
2010/10
239
VIII -
(d )
//
( )
( )
(a)
2010/10
9001150450600
22
750900
4 0 0 2 0 0
240
(c)
(d )
(e )
2010/10
(b )
/
/
241
VIII -
2010/10
h t t p : / / w w w .
l a b o u r . g o v . h k / t c / p u b l i c / c o n t e n t 2 _ 8 . h t m
25592297
242
IX
http://www.bd.gov.hk/chineseT/documents/guideline/MW/GG_c/GGc_appI_V.pdf
12
2010/10
243
........................... . . . . . . 3 4
................................................65,66
................................. 68,70 , 7 2 , 8 1
........................... 79
........................................ . . . . . . 9 2
................................. 63
......................... . . . . . . 1 0
..................................... 63
................................................12,34
.... ................................. . . . . . . 6 4
.............................................. . . . . . . 3 5
.......... ................................. . . . . . . 2 0
I .......................... . . . . . . 6 8
II ......................... . . . . . . 7 0
III ....................... . . . . . . 7 2
........................... . . . . . . . . 8
........................................ . . . . . . 9 8
........................................ . . . . . . 8 9
..... . . . . . . 9 8
.................................. . . . . . . 7 5
.......... ................................. . . . . . . 1 4
.......... ................................. . . . . . . 1 6
........... . . . . . . 1 7
.................................. . . . . . . 7 4
........................................ . . . . . . 2 1
......... . . . . . . 2 0
.............................................. . . . . . . 2 1
........................... . . . . . . 2 3
........................................ . . . . . . 2 4
........... . . . . . . 2 6
........................................ . . . . . . . . 9
........................... . . . . . . 8 8
......... . . . . . . 2 8
/ ............................ . . . . . . 6 5
............................... . . . . 2 3 9
........................... . . . . . . 3 0
. . . . 1 9
.............................................. . . . . . . 6 7
.............................. 63
.............................................. 32
. . . . . . . . . . . . . . . . . . . . 6 5
. . . . . . . . . . . . . . . . . . . . 6 5
.................................................... 93
.................................................... 40
.............................................. 63
.............................................. 65
. . . . . . . . . . . . . . . . . 1 7
.............................................. 39
................................. 68,70,72,82
........................................... 65
..........................................34,50
........................................ 53
........................... 56
.................. 58
A .................................................... 9
B .................................................... 9
C .................................................... 9
D . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
E .................................................... 9
F .................................................... 9
G .................................................... 9
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
.............................................. 38
........................................... 36
.................................................... 79
........................................ 60
2010/10
$72