TOWN MUNICIPAL COUNCIL, KAMPLI.

Name of Work:- Construction of ladies Toilet at Ward No 17 in TMC, Kampli.


SCHEDULE-B
Head of A/c :-SFC 2009-10 Put tender Estimate cost:2.40.000-00

Sl No Description Unit Qty Rate in Figure Rate in Words


1 KSRB 2-2.1: Earthworkin surface excavation in hard soil for
levelling and lowering the ground manually (other than foundation
of building culverts road drain and trenched of pipe linee and cable )
and removing the excavated a stuff to a distance not exceeding 50m
and lift upto 1.5m excavated surface levelled and neatly dressed
disposed earth to be levelled after breaking of clods and neatly
dressed as per specification One Hundred and
twenty four rupees
Cum 5.04 124.95 ninty five paise
2 Providing and laying in position plain cement concrete of Nominal
mix 1:4:8 using 40mm and down siae graded granite metal,machine
mixed,concrete laid in layers not exceeding 15cms.thick,well
compacted,in foundation and plinth, including cost of all
materials,labour, HOM of machinery,curing complete as per Three thousend
twenty one rupees
specifications Sl.No. 4.3 Page No.12
Cum 1.26 3021.90 ninty paise
3 Providing and construction granite/traps/basalts/size stone masonry
foundation with cement mortar 1:6 bond stone at two m apart in
each course including cost of materials labour curing complete as One thousend six
per specification hundred fifty seven
Cum 3.78 1657.95 rupees nintyfive paise
4 Providing and construction granite/traps/basalts/size stone masonry
in super structure with mud mortar 1:6 edges of stone chistle
dressed in course not less than 15cms high. Bond stone at two m
apart in each course including cost of materials labour curing
Two thousend eight
complete as per specification hundred twentysix
Cum 3.78 2826.00 rupees

No of Correction .............
No of Over writing ..............
5 Providing and laying in position plain cement concrete of Nominal
mix 1:1.5:3 using 20mm and down siae graded granite
metal,machine mixed,concrete laid in layers not exceeding
15cms.thick,well compacted,in foundation and plinth, including cost
of all materials,labour, HOM of machinery,curing complete as per
specifications Sl.No. 4.6 Page No.12 Four thousend fourty
Cum 3.25 4040.40 rupees fourty paise
6 Providing and construction brunt brick masonry with approved
quality of non modular bricks of standerd size of class disignation
50 (table moulded ) with cement mortar 1:4 for basement and Four thousend one
superstructure including cost of materials labour charges hundres thirtyone
scaffolding curing complete as per specification rupees seventy five
Cum 19.43 4131.75 paise
7 Providing 15mm thick cement plaster in single coat with cement
mortar 1:4 to brick masonry including rounding off corners
wherever required smooth rendering providing and removing
scaffolding including cost of materials labour curing complete as per
specification One hundred and six
Cum 191.10 106.05 rupees five paise
8 Providing and fixing white vitreous china clay water closet indian
type of size 580mm with footrests. 100 mm S or P trap cutting and
making good the wall and floor wherever required including cost of
material labour complete as per specifiaction One thousend nintysix
each 7.00 1096.20 rupees twenty paise
9 Construction of embankment with approved Meterial grave/
murrum with all lifts ans lead s trasporting to site spreading grading
to required slope and completing to meet requirment table 300-2
complete as per specification (Which includes cost of gravel /
murrom watering charges and compaction by vibratory roller) P No Two hundred fourty
132 Sl No 19.60 seven rupees eighty
Cum 10.50 247.80 paise

No of Correction .............
No of Over writing ..............
10 Providing and fixing made PVC door frame of size 50x47 mm with
a wall thickness of 5mm. Made out of extruded 5mm rigid PVC
foam sheet matered cut at corner and jointed 2 NO.s of 150mm long
brocket s of 15x15mm MS Square tube the entere door frame to be
reinforced with 19x19mm MS Square tube of 19 gauge the door
frame to be fixed to the wall using MS Screws of 65/80 mm Size
complete as per manufactured specification and direction of
Engineer in charge. Two hundred fifteen
rupees twentyfive
Cum 30.45 215.25 paise
11 Providing and fixing 30 mm thick factory made rigid foam panelled
door cutting shutters made from MS tube of 19x19mm 19gauge for
styles and 15x15 mm for top and bottom rails covered with heat
moulded prelaminated PVC channel of 5 mm thick sheet and 30x50
mm wide to form styles and 5 mm thick and 75 mm wide
prelaminated PVC sheets for top rail lock rail and bottom rail on
either side adn 5 mm thick and 20mm wide Cross PVC sheet
prelaminated on either sidefitted in the MS frame sealed to the styles
and rails with PVC designer beading on either side and jointed
together with solvent cement adhesive etc., complete as per
manufactrurers specification
Two thousend one
sqm 11.02 2100.00 hundred rupees
12 Providing colour glazed tiles all sizes 10mm thick for flooring treads
of steps and landing laid on a bed of 12mm thick cement mortar 1:3
mix flush pointing using white cement with matching colour
pigment including cost of materials labour curing complete as per One thousend four
hundred seventythree
specification
sqm 33.97 1473.15 rupees fifteen paise
13 Providing and laying to required line and slope roofing with
corrugated asbestos cement sheet 6mm thick fixed with galvanised
iron J or L hooks bolts and nuts 8mm L I plain and birumen washers
over the existing purlins rafters and trusses including cost of Three thousend
materials labours complete as per specification seventythree rupees
sqm 26.25 373.80 eighty paise

No of Correction .............
No of Over writing ..............
14 pRoviding and applying one coat with oil bound washeble distemper
of approved brand and shade on wall surfave to give an even shade
agter throughly brooming the surface free from all grease dirt. loose Twenty one rupees
sqm 191.10 21.52 fiftytwo paise
peases of scales. including preparing the surface even and sand
paper smooth cost of materials labour complete as per specification
I/We Sri messer/s/________________________ (Contractor(s)registration No ____________in Class
I am ready to execute the work as per the following rates.
1 _______________________ % (in figure) ____________________________________percent(in words) above the estimate
rates
2 _______________________ % (in figure) ____________________________________percent(in words) above the estimate
3 rates
as per the estimated rates

Contracto Signeture Junier Engineer Chief Officer


kampli TMC, kampli.
Na me of contractor

No of Correction .............
No of Over writing ..............
TOWN MUNCIPAL COUNCIL, KAMPLI.
(BELLARY DISTRICT)
Comparitive statement
Package No -2

Name of Work:- Providing laying of Cement Concrete Road at Ward No 1,2,3,4,5,7 for Package No-2 in TMC, Kampli.
Head Of The Account:- SFC 2009-10
Estimated Cost : 22.30.000-00 Put to tender Rs. 2206601-00
Estimate Rate K. Ranganayakulu N. Mallikarjuna Reddy
Sl.
Description of Work Unit Quantity
No. Figure Amount Figure Amount Figure Amount
1 2 3 4 5 6 7 8 7 8
1 Earthwork in surface excavation in Hard
soil for levelling and lowering the ground
manually ( other than foundation fo
bulilding colverts road drain s and trenched Cum 674.42 124.95 84268.78 140.00 94418.80 124.95 84268.78
of pipe lines and cables) and removing the
excavated struff levelled to a distance not
exce

2 Construction of Road embankment with


approved Meterial grave/ murrum with all
left side trasporting to site spreading
grading to required slope and completing to Cum 492.68 247.80 122086.10 260.00 128096.80 247.80 122086.10
meet requirment table 300-2 complete as
per specification (Which includes cost of
gravel / m

3 Providing and laying in position plain


cement concrete of Nominal mix 1:4:8
using 40mm and down siae graded granite
metal,machine mixed,concrete laid in
layers not exceeding 15cms.thick,well Cum 334.38 3021.90 1010462.92 3300.00 1103454.00 3021.90 1010462.92
compacted,in foundation and plinth,
including cost of all materi
4 Providing and laying in position plain
cement concrete of Nominal mix 1:1.5:3
using 20mm and down siae graded granite
metal,machine mixed,concrete laid in
layers not exceeding 15cms.thick,well Cum 244.94 4040.40 989655.58 4400.00 1077736.00 4040.40 989655.58
compacted,in foundation and plinth,
including cost of all mate

Total 2206473.38 2403705.60 2206473.38

F ªÉÄð£À E§âgÀÄ UÀÄvÉÛÃzÁgÀgÀ°è ²æÃ.PÉ. gÀAUÀ£ÁAiÀÄPÀÄ®Ä EªÀgÀÄ ±ÉÃPÀqÁ


ºÉZÀÄÑ zsÀgÀUÀ¼À ªÉÆvÀÛPÉÌ £ÀªÀÄÆ¢¹zÀÄÝ, ²æÃ. J£ï. ªÀÄ°èPÁdÄð£À gÉrØ. EªÀgÀÄ
±ÉÃPÀqÁ ªÉÆvÀÛPÉÌ zsÀgÀUÀ¼À£ÀÄß £ÀªÀÄÆ¢¹zÀÄÝ, PÁgÀt ²æÃ. J£ï. ªÀÄ°èPÁdÄð£À
gÉrØ. UÀÄvÉÛÃzÁgÀgÀÄ PÀrªÉÄ EzÀÄÝ, zsÀgÀUÀ¼À ªÀÄAdÆgÁwUÉ ¸À°è¹zÉ.

QjAiÀÄ ªÀÄÄSÁå
C©üAiÀÄAvÀgÀgÀÄ CzsÀåPÀëgÀÄ ¢üPÁjUÀ¼ÀÄ
¥ÀÄgÀ¸À¨sÉ ¥ÀÄgÀ¸À¨sÉ ¥ÀÄgÀ¸À¨sÉ
PÁAiÀiÁð®AiÀÄ PÁAiÀiÁð®AiÀÄ PÁAiÀiÁð®AiÀÄ
PÀA¦è. PÀA¦è. PÀA¦è.
TOWN MUNCIPAL COUNCIL, KAMPLI.
(BELLARY DISTRICT)
Pacakage No 3

Comparitive statement
Name of Work:- Providing laying of Cement Concrete Road at Ward No 9,10,11,12,14,18, for Package No-3 in TMC, Kampli.

Head Of The Account:- SFC 2009-10


Estimate Cost 23.24.000-00 Put to Tender 2279881-00
Estimate Rate K. Ranganayakalu. N. Mallikarjuna Reddy
Sl.
Description of Work Unit Quantity
No. Figure Amount Figure Amount Figure Amount
1 2 3 4 5 6 7 8 7 8
1 Earthwork in surface excavation in Hard
soil for levelling and lowering the ground
manually ( other than foundation fo
bulilding colverts road drain s and trenched Cum 746.95 124.95 93331.40 124.95 93331.40 130.00 97103.50
of pipe lines and cables) and removing the
excavated struff levelled to a distance not
exce

2 Construction of Road embankment with


approved Meterial grave/ murrum with all
left side trasporting to site spreading
grading to required slope and completing to Cum 509.50 247.80 126254.10 247.80 126254.10 250.00 127375.00
meet requirment table 300-2 complete as
per specification (Which includes cost of
gravel / m

3 Providing and laying in position plain


cement concrete of Nominal mix 1:4:8
using 40mm and down siae graded granite
metal,machine mixed,concrete laid in
layers not exceeding 15cms.thick,well Cum 316.02 3021.90 954980.84 3021.90 954980.84 3200.00 1011264.00
compacted,in foundation and plinth,
including cost of all materi
4 Providing and laying in position plain
cement concrete of Nominal mix 1:1.5:3
using 20mm and down siae graded granite
metal,machine mixed,concrete laid in
layers not exceeding 15cms.thick,well Cum 273.55 4040.40 1105251.42 4040.40 1105251.42 4040.40 1105251.42
compacted,in foundation and plinth,
including cost of all mate

total 2279817.76 2279817.76 2340993.92

ºÉZÀÄÑ zsÀgÀUÀ¼À ªÉÆvÀÛPÉÌ £ÀªÀÄÆ¢¹zÀÄÝ, ²æÃ.PÉ. gÀAUÀ£ÁAiÀÄPÀÄ®Ä. EªÀgÀÄ


±ÉÃPÀqÁ ªÉÆvÀÛPÉÌ zsÀgÀUÀ¼À£ÀÄß £ÀªÀÄÆ¢¹zÀÄÝ, PÁgÀt ²æÃ. PÉ.
gÀAUÀ£ÁAiÀÄÄPÀÄ®Ä. UÀÄvÉÛÃzÁgÀgÀÄ PÀrªÉÄ EzÀÄÝ, zsÀgÀUÀ¼À ªÀÄAdÆgÁwUÉ
¸À°è¹zÉ.

C©üAiÀÄAvÀgÀgÀÄ CzsÀåPÀëgÀÄ ¢üPÁjUÀ¼ÀÄ


¥ÀÄgÀ¸À¨sÉ ¥ÀÄgÀ¸À¨sÉ ¥ÀÄgÀ¸À¨sÉ
PÁAiÀiÁð®AiÀÄ PÁAiÀiÁð®AiÀÄ PÁAiÀiÁð®AiÀÄ
PÀA¦è. PÀA¦è. PÀA¦è.
TOWN MUNCIPAL COUNCIL, KAMPLI.
(BELLARY DISTRICT)
Comparitive statement
Package No -4
Name of Work:- Providing laying of Cement Concrete Road at Ward No 19.20 for Package No-4
in TMC, Kampli.
Head Of The Account:- SFC 2009-10
Estimated Cost : 9.80.000-00 Put to tender Rs. 969816-00
Estimate Rate K. Ranganayakalu L. Rangaswamy
Sl.
Description of Work Unit Quantity
No. Figure Amount Figure Amount Figure Amount
1 2 3 4 5 6 7 8 7 8
1 Earthwork in surface excavation in Hard
soil for levelling and lowering the ground
manually ( other than foundation fo
bulilding colverts road drain s and trenched Cum 340.80 124.95 42582.96 125.00 42600.00 124.95 42582.96
of pipe lines and cables) and removing the
excavated struff levelled to a distance not
exce

2 Construction of Road embankment with


approved Meterial grave/ murrum with all
left side trasporting to site spreading
grading to required slope and completing to Cum 226.60 247.80 56151.48 260.00 58916.00 247.80 56151.48
meet requirment table 300-2 complete as
per specification (Which includes cost of
gravel / m

3 Providing and laying in position plain


cement concrete of Nominal mix 1:4:8
using 40mm and down siae graded granite
metal,machine mixed,concrete laid in
layers not exceeding 15cms.thick,well Cum 136.32 3021.90 411945.41 3150.00 429408.00 3021.90 411945.41
compacted,in foundation and plinth,
including cost of all materi
4 Providing and laying in position plain
cement concrete of Nominal mix 1:1.5:3
using 20mm and down siae graded granite
metal,machine mixed,concrete laid in
layers not exceeding 15cms.thick,well Cum 113.60 4040.40 458989.44 4200.00 477120.00 4040.40 458989.44
compacted,in foundation and plinth,
including cost of all mate

Total 969669.29 1008044.00 969669.29

F ªÉÄð£À E§âgÀÄ UÀÄvÉÛÃzÁgÀgÀ°è ²æÃ.PÉ.gÀAUÀ£ÁAiÀÄPÀÄ®Ä EªÀgÀÄ ±ÉÃPÀqÁ


ºÉZÀÄÑ zsÀgÀUÀ¼À ªÉÆvÀÛPÉÌ £ÀªÀÄÆ¢¹zÀÄÝ, ²æÃ.J¯ï.gÀAUÀ¸Áé«Ä EªÀgÀÄ ±ÉÃPÀqÁ
ªÉÆvÀÛPÉÌ zsÀgÀUÀ¼À£ÀÄß £ÀªÀÄÆ¢¹zÀÄÝ, PÁgÀt ²æÃ. J¯ï.gÀAUÀ¸Áé«Ä.
UÀÄvÉÛÃzÁgÀgÀÄ PÀrªÉÄ EzÀÄÝ, zsÀgÀUÀ¼À ªÀÄAdÆgÁwUÉ ¸À°è¹zÉ.

QjAiÀÄ ªÀÄÄSÁå
C©üAiÀÄAvÀgÀgÀÄ CzsÀåPÀëgÀÄ ¢üPÁjUÀ¼ÀÄ
¥ÀÄgÀ¸À¨sÉ ¥ÀÄgÀ¸À¨sÉ ¥ÀÄgÀ¸À¨sÉ
PÁAiÀiÁð®AiÀÄ PÁAiÀiÁð®AiÀÄ PÁAiÀiÁð®AiÀÄ
PÀA¦è. PÀA¦è. PÀA¦è.
TOWN MUNCIPAL COUNCIL, KAMPLI.
(BELLARY DISTRICT)
Comparitive statement
Package No -5
Name of Work:- construction Masonry drain in ward No 1.4.15. 11. for Package No 5 in TMC, Kampli.

Head Of The Account:- SFC 2009-10


Estimated Cost : 6.00.000-00 Put to tender Rs. 593467-00
Estimate Rate T. Veenugopal Krishna S. Bhaskar Reddy
Sl.
Description of Work Unit Quantity
No. Figure Amount Figure Amount Figure Amount
1 2 3 4 5 6 7 8 7 8
1 KSRB 2-2-2. Earthwork excavation for
foundation fo buildings, culverts, Water
supply, sanitary lines and electrical
conduits either in pits or trenches 1.5m and Cum 259.14 159.60 41358.74 159.60 41358.74 159.60 41358.74
above in width in hard soil not exceeding 1.5
m anin depth including dressing the bottom and
s

2 KSRB 4-1.3: Providing and laying in


position plain cement concrete of mix
1:4:8using 40mm and down size graded
granite metal, machine mixed, concrete laid Cum 57.39 3021.90 173426.84 3021.90 173426.84 3021.90 173426.84
in layers not exceeding 15 cms, thick well
compacted, in foundation and plinth,
including cost of

3 Providing and constructing


granite/trap/basalt SIZE STONE
MASONARY in foundation with mud martor
1:6 stones hammered dressed in courses
not less than 20cm high, bond stones at Cum 105.55 2361.45 249251.05 2361.45 249251.05 2361.45 249251.05
2mt. apart in each courses including cost of
materials labours curing, complete

4 KSRB 4-1.7: Providing and laying in


position plain cement concrete of mix 1:3:6
using 20mm and down size graded granite
metal, machine mixed, concrete laid in Cum 14.52 3453.45 50144.09 3453.45 50144.09 3453.45 50144.09
layers not exceeding 15 cms, thick well
compacted, in foundation and plinth,
including cost of a
5 Providing 12mm thick cement plaster in
single coat with cement mortar 1:4, to
stone masonry including rounding off
corners wherever required smooth sqm 234.60 101.64 23844.74 101.64 23844.74 101.64 23844.74
rendering, :providing and removing
scaffolding including cost of materials,
labour, curing complete as per

6 Earthwork in surface excavation in Hard


soil for levelling and lowering the ground
manually ( other than foundation fo
bulilding colverts road drain s and trenched Cum 35.10 124.95 4385.75 124.95 4385.75 124.95 4385.75
of pipe lines and cables) and removing the
excavated struff levelled to a distance not
exce

7 Construction of Road embankment with


approved Meterial grave/ murrum with all
left side trasporting to site spreading
grading to required slope and completing to Cum 23.40 247.80 5798.52 247.80 5798.52 247.80 5798.52
meet requirment table 300-2 complete as
per specification (Which includes cost of
gravel / m

8 Providing and laying in position plain


cement concrete of Nominal mix 1:1.5:3
using 20mm and down siae graded granite
metal,machine mixed,concrete laid in
layers not exceeding 15cms.thick,well Cum 8.78 4040.40 35474.71 4090.40 35913.71 4040.40 35474.71
compacted,in foundation and plinth,
including cost of all mate

Total 583684.45 584123.45 583684.45

F ªÉÄð£À E§âgÀÄ UÀÄvÉÛÃzÁgÀgÀ°è ²æÃ.n.ªÉÃtÄUÉÆÃ¥Á®PÀȵÀÚ EªÀgÀÄ ±ÉÃPÀqÁ


ºÉZÀÄÑ zsÀgÀUÀ¼À ªÉÆvÀÛPÉÌ £ÀªÀÄÆ¢¹zÀÄÝ, ²æÃ.J¸ï.¨sÁ¸ÀÌgï gÉrØ. EªÀgÀÄ ±ÉÃPÀqÁ
ªÉÆvÀÛPÉÌ zsÀgÀUÀ¼À£ÀÄß £ÀªÀÄÆ¢¹zÀÄÝ, PÁgÀt ²æÃ.J¸ï.¨sÁ¸ÀÌgï gÉrØ. UÀÄvÉÛÃzÁgÀgÀÄ
PÀrªÉÄ EzÀÄÝ, zsÀgÀUÀ¼À ªÀÄAdÆgÁwUÉ ¸À°è¹zÉ.

QjAiÀÄ ªÀÄÄSÁå
C©üAiÀÄAvÀgÀgÀÄ CzsÀåPÀëgÀÄ ¢üPÁjUÀ¼ÀÄ
¥ÀÄgÀ¸À¨sÉ ¥ÀÄgÀ¸À¨sÉ ¥ÀÄgÀ¸À¨sÉ
PÁAiÀiÁð®AiÀÄ PÁAiÀiÁð®AiÀÄ PÁAiÀiÁð®AiÀÄ
PÀA¦è. PÀA¦è. PÀA¦è.
TOWN MUNCIPAL COUNCIL, KAMPLI.
(BELLARY DISTRICT)
Comparitive statement
Package No -6

Name of Work:- Construction of RCC Drain Both side at Ward No 6,15.16.17. for Package No 6 in TMC,Kampli.
Head Of The Account:- SFC 2009-10
Estimated Cost : 11.60.000-00 Put to tender Rs. 1147815-00
Estimate Rate K.Ranganayakulu T. Raghavendra
Sl.
No.
Description of Work Unit Quantity
Figure Amount Figure Amount Figure Amount
1 2 3 4 5 6 7 8 7 8
1 KSRB 2-2-2. Earthwork excavation for
foundation fo buildings, culverts, Water
supply, sanitary lines and electrical
conduits either in pits or trenches 1.5m
and above in width in hard soil not cum 649.34 159.60 103634.66 159.00 103245.06 159.60 103634.66
exceeding 1.5 m anin depth including
dressing the bottom and s

2 Providing and laying in position plain


cement concrete of nominal mix
1:2:4using 40mm and down siae graded
granite metal,machine mixed,concrete
laid in layers not exceeding cum 57.16 3021.90 172731.80 3100.00 177196.00 3021.90 172731.80
15cms.thick,well compacted,in
foundation and plinth, including cost of
all materi

3 Providing and removing centering


shuttering propping etc., and removal of
form work vertical surface such as walls
at any thickness including attached
cum 1104.20 222.60 245794.92 250.00 276050.00 222.60 245794.92
pilasters buttresses plinth and string
courses cost of all materials labour
complete as per specificatio
4 Providing and laying in position plain
cement concrete of nominal mix
1:1:5:3 using 20mm and down siae
graded granite metal,machine
mixed,concrete laid in layers not cum 95.32 4539.15 432671.78 4600.00 438472.00 4539.15 432671.78
exceeding 15cms.thick,Vibrated for all
works in foundation plinth and ground
floor level

5 Providing mild Steel Reinforcement for


R C C work including straightening,
cutting,bending, hooking,placing,in
position, lapping and or welding wherever qtl 32.38 5342.40 172986.91 5400.00 174852.00 5342.40 172986.91
required,tying with binding wire and
anchoring to the adjoining members
wherever necessary complete as

6 Formation of road embankment with


approved materials Gravel/Murrum
with all lift and leads transprorting to
site spreading grading to required slope
and compacting to meet requirment cum 85.20 247.80 21112.56 250.00 21300.00 247.80 21112.56
table 300-2 complete as per
specification (which includes cost of
gravel

Total 1148932.64 1191115.06 1148932.64


ºÉZÀÄÑ zsÀgÀUÀ¼À ªÉÆvÀÛPÉÌ £ÀªÀÄÆ¢¹zÀÄÝ, ²æÃ.n.gÁWÀªÉÃAzÀæ. EªÀgÀÄ ±ÉÃPÀqÁ
ªÉÆvÀÛPÉÌ zsÀgÀUÀ¼À£ÀÄß £ÀªÀÄÆ¢¹zÀÄÝ, PÁgÀt ²æÃ.n.gÁWÀªÉÃAzÀæ UÀÄvÉÛÃzÁgÀgÀÄ
PÀrªÉÄ EzÀÄÝ, zsÀgÀUÀ¼À ªÀÄAdÆgÁwUÉ ¸À°è¹zÉ.

QjAiÀÄ ªÀÄÄSÁå
C©üAiÀÄAvÀgÀgÀÄ CzsÀåPÀëgÀÄ ¢üPÁjUÀ¼ÀÄ
¥ÀÄgÀ¸À¨sÉ ¥ÀÄgÀ¸À¨sÉ ¥ÀÄgÀ¸À¨sÉ
PÁAiÀiÁð®AiÀÄ PÁAiÀiÁð®AiÀÄ PÁAiÀiÁð®AiÀÄ
PÀA¦è. PÀA¦è. PÀA¦è.
TOWN MUNICIPAL COUNCIL, KAMPLI.

Name of Work:- Romoving and refitting of BS Slab flooring construction at Chamber pipeline in Ward NO 13,18 for Package NO 7
in TMC Kampli
SCHEDULE-B
Head of A/c :-SFC 2009-10 Put tender 319215-00 Estimate cost:4.00.000-00

Sl No Description Unit Qty Rate in Figure Rate in Words


Removing B.S.slab of Drain and stacking Thirtyfive rupees
seventeen paise
1 sqm 1107.00 35.17
KSRB 2-2-2. Earthwork excavation for foundation fo buildings, One hundred
culverts, Water supply, sanitary lines and electrical conduits either fiftynine rupees
in pits or trenches 1.5m and above in width in hard soil not sixty paise .
exceeding 1.5 m anin depth including dressing the bottom and s
2 cum 453.60 159.60
Formation of road embankment with approved materials Two hundred
Gravel/Murrum with all lift and leads transprorting to site spreading fourtyseven rupees
grading to required slope and compacting to meet requirment table eighty paise
300-2 complete as per specification (which includes cost of gravel
3 cum 302.40 247.80
Refixing stone slabs of drain and pointing in C.M (1:3) Fourtysix rupees
4 sqm 1512.00 46.20 twenty paise
Providing granite slab of selected quality roughly dressed and fixed Two hundred
in cement mortor 10cms Thick including fixing curing etc., seventeen rupees
complete thirtyfive paise
5 sqm 225.40 217.35

I/We Sri messer/s/________________________ (Contractor(s)registration No ____________in Class


I am ready to execute the work as per the following rates.
1 _______________________ % (in figure) ____________________________________percent(in words) above the estimate
rates
2 _______________________ % (in figure) ____________________________________percent(in words) above the estimate
3 rates
as per the estimated rates

Contracto Signeture Junier Engineer Chief Officer


kampli TMC, kampli.
Na me of contractor

No of Correction .............
No of Over writing ..............
TOWN MUNICIPAL COUNCIL, KAMPLI.
Name of Work:- Formation of metal road and Bridge at ward No 22 Govt Primery School Poster Raja House in TMC kampli

SCHEDULE-B
Head of A/c :-SFC 2009-10 Put tender 449081 Estimate cost 4.50.000-00

Sl NoDescription Unit Qty Rate in Figure Rate in Words


1 KSRB 2-2-2. Earthwork excavation for foundation fo buildings, culverts, Cum 226.26 159.60
Water supply, sanitary lines and electrical conduits either in pits or
trenches 1.5m and above in width in hard soil not exceeding 1.5 m anin
depth including dressing the bottom and s
One hundred fifty nine
rupees sixty paise
2 KSRB 4-1.3: Providing and laying in position plain cement concrete of Cum 4.50 3021.90
mix 1:4:8using 40mm and down size graded granite metal, machine
mixed, concrete laid in layers not exceeding 15 cms, thick well Three thousend
compacted, in foundation and plinth, including cost of twenty one rupees
ninty paise
3 Providing and constructing granite/trap/basalt SIZE STONE Cum 13.50 2361.61 Two thousend three
MASONARY in foundation with cement martor 1:6 stones hammered hundred sixty one
dressed in courses not less than 20cm high, bond stones at 2mt. apart in rupees sixtyone
each courses including cost of materials labours curing, comp paise

4 Providing and laying in position plain cement concrete of Nominal mix Cum 9.60 4040.40
1:2:4 using 20mm and down siae graded granite metal,machine
mixed,concrete laid in layers not exceeding 15cms.thick,well
compacted,in foundation and plinth, including cost of all materi Four thousend fourty
rupees fourty paise
5 Providing and laying rubble stone pitching in cement mortar 1:3 including Cum 23.40 1061.55 One thousend
cost of all materials labour curing complete as per specification P No 207 sixtyone rupees
I NO 35.30 DSR NO 2008-09 fiftyfive paise
6 Construction of Road embankment with approved Meterial grave/ murrum Cum 392.40 247.80
with all left side trasporting to site spreading grading to required slope and
completing to meet requirment table 300-2 complete as per specification Two hundred fourty
(Which includes cost of gravel / m seven rupees eithty
paise
7 Contruction of granular sub base by providing closing graded material Cum 98.10 1077.30 One thousend
mixing in a mechanical mix plant atOMC. Carriage of mixed material to seventyseven rupees
work site spreading in uniform layers with motor grader on prepared thirty paise
surface and compacting with bibratory power rol

No of Correction .............
No of Over writing ..............
I/We Sri messer/s/________________________ (Contractor(s)registration No ____________in Class
I am ready to execute the work as per the following rates.
1 _______________________ % (in figure) ____________________________________percent(in words) above the estimate
rates
2 _______________________ % (in figure) ____________________________________percent(in words) above the estimate
3 rates
as per the estimated rates

Contracto Signeture Junier Engineer Chief Officer


kampli TMC, kampli.
Na me of contractor

No of Correction .............
No of Over writing ..............
TOWN MUNCIPAL COUNCIL, KAMPLI.
(BELLARY DISTRICT)
Comparitive statement
Package No -9
Name of Work:- Construction of RCC deck slab at ward No 10 & Bridge at Ward No 23 in TMC Kampli.
Head Of The Account:- SFC 2009-10
Estimated Cost : 6.00.000-00 Put to tender Rs. 549117.95
Estimate Rate T. Gopal Krishna N. Mallikarjuna Reddy
Sl.
Description of Work Unit Quantity
No. Figure Amount Figure Amount Figure Amount
1 2 3 4 5 6 7 8 7 8
1 KSRB 2-2-2. Earthwork excavation for
foundation fo buildings, culverts, Water
supply, sanitary lines and electrical conduits
either in pits or trenches 1.5m and above in
width in hard soil not exceeding 1.5 m anin
depth including dressing the bottom and
cum 119.97 159.60 19147.21 159.60 19147.21 160.00 19195.20
sides of pits and trenches stacking the
excavated soil clear from edges of
excavation with lead upto 50m after breaking
of colds complete as per specification
specification P No 5 INo 2.4

2 Providing and filling in foundation with


granite/trapbroken metal 100 m and down
size with approved sand including hand
pakcing, ramming, watering, including cost cum 15.84 917.70 14536.37 917.70 14536.37 1000.00 15840.00
of all materials and labour with all lead and
lift complete as per specification P no 6 I no
2.15 PWD DSR 2009-10
3 KSRB 4-1.3: Providing and laying in
position plain cement concrete of mix
1:4:8using 40mm and down size graded
granite metal, machine mixed, concrete laid
in layers not exceeding 15 cms, thick well
compacted, in foundation and plinth,
including cost of all materials, labour, HOM cum 8.27 3021.90 24991.11 3021.90 24991.11 3100.00 25637.00
of machinery, curing complete as per
specifications No. KBS 4.1,4.2. PNo 12 I
No 4.3

4 Providing and constructing


granite/trap/basalt SIZE STONE
MASONARY in foundation with cement
martor 1:6 stones hammered dressed in
courses not less than 20cm high, bond stones
at 2mt. apart in each courses including cost cum 18.94 3223.50 61053.09 3223.50 61053.09 3500.00 66290.00
of materials labours curing, complete as
specifications P NO 21 I No 5.6

5 Providing and laying in position plain


cement concrete of Nominal mix 1:2:4 using
20mm and down siae graded granite
metal,machine mixed,concrete laid in layers
not exceeding 15cms.thick,well
compacted,in foundation and plinth, cum 4.30 4040.40 17373.72 4040.40 17373.72 4200.00 18060.00
including cost of all materials,labour, HOM
of machinery,curing complete as per
specifications Sl.No. 4.6 Page No.12

6 Providing and constructing


granite/trap/basalt size STONE
MASONARY in superstructure with cement
martor 1:4 edges of stone chistle dressed in
courses not less than 15cm high, bond stones
at 2mt. apart in each courses including cost cum 23.53 3223.50 75848.96 3223.50 75848.96 3300.00 77649.00
of materials labours scaffolding curing,
complete as per specification P No 22 INo
5.13
7 Providing and laying in position Reinforced
cement concrete of nominal mix 1:1:2 with
20mm and down size graded granite metal,
machine mixed, concrete laid in layers not
exceeding 15 cms thick, vibrated for all
works in foundation plinth and ground floor
level for roff slab staircase lintles retaining
walls, return walls, walls ( any thickness)
including attached plasters, columns, piers,
abutments, pillars, posts, struts, buttresses, cum 21.08 5328.75 112330.05 5328.75 112330.05 5500.00 115940.00
string or lacing courses, parapets, coping,
bed blocks, anchor blocks, plain window
cills, fillets etc., including cost of all
materials, labour, HOM of machinery,
curing, complete as per specifications.
Specification P No 12 I No 4.10

8 Providng mild steel reinforcement for RCC


work including straightening cutting bending
hooking placing in position lapping and
welding wherever required tying with cum 20.00 5342.40 106848.00 5342.40 106848.00 5500.00 110000.00
bending wire and anchoring to the adjoining
mombers wherever necessary complete as
per design ( laps and wastage shall not be
9 measured
Providing and
andpaid ) cost of
removing materialsshttering
centering labours
HOM ofpropping
strutting machinary complete
etc., and as form
removal of per
specification.
work for flatP surface
No 16 I Nosuch4.45
as suspended
floors roofs landing balconies and likes
cum 90.60 291.90 26446.14 291.90 26446.14 300.00 27180.00
thickness upto 200mm including cost of all
materials labour complete as per
specifiaction P No 14 I No 4.29

10 Providing 12mm thick cement plaster in


single coat with cement mortar 1:4, to stone
masonry including rounding off corners
wherever required smooth rendering,
:providing and removing scaffolding cum 67.17 101.64 6827.16 101.64 6827.16 110.00 7388.70
including cost of materials, labour, curing
complete as per specifications. P.No. 97.
I.No. 15.22.

.
11 Providing and laying rubble stone pitching in
cement mortar 1:3 including cost of all
materials labour curing complete as per cum 13.50 1061.64 14332.14 1061.64 14332.14 1100.00 14850.00
specification P No 207 I NO 35.30 DSR NO
2008-09
12 Construction of Road embankment with
approved Meterial grave/ murrum with all
left side trasporting to site spreading grading
to required slope and completing to meet
requirment table 300-2 complete as per cum 280.00 247.80 69384.00 247.80 69384.00 250.00 70000.00
specification (Which includes cost of
gravel / murrom watering charges and
compaction by vibratory roller) P No 132 Sl
No 19.60
549117.95 549117.95 568029.90
zsÀgÀUÀ¼À ªÉÆvÀÛPÉÌ £ÀªÀÄÆ¢¹zÀÄÝ, ²æÃ.n. UÉÆÃ¥Á® PÀȵÀÚ EªÀgÀÄ ±ÉÃPÀqÁ
ªÉÆvÀÛPÉÌ zsÀgÀUÀ¼À£ÀÄß £ÀªÀÄÆ¢¹zÀÄÝ, PÁgÀt ²æÃ.n. UÉÆÃ¥Á® PÀȵÀÚ
UÀÄvÉÛÃzÁgÀgÀÄ PÀrªÉÄ EzÀÄÝ, zsÀgÀUÀ¼À ªÀÄAdÆgÁwUÉ ¸À°è¹zÉ.

ªÀÄÄSÁå
QjAiÀÄ C©üAiÀÄAvÀgÀgÀÄ CzsÀåPÀëgÀÄ ¢üPÁjUÀ¼ÀÄ
¥ÀÄgÀ¸À¨sÉ ¥ÀÄgÀ¸À¨sÉ ¥ÀÄgÀ¸À¨sÉ
PÁAiÀiÁð®AiÀÄ PÁAiÀiÁð®AiÀÄ PÁAiÀiÁð®AiÀÄ
PÀA¦è. PÀA¦è. PÀA¦è.
TOWN MUNICIPAL COUNCIL, KAMPLI.

Name of Work:- Formation of metal road at ward No 8 S.N. Pet Govt School area, in TMC kampli
SCHEDULE-B
Package No 10
Head of A/c :-SFC 2009-10 Put tender 4.75.268-00 Estimate cost 4.80.000-00

Sl NoDescription Unit Qty Rate in Figure Rate in Words


1 Earthwork in surface excavation in Hard soil for levelling and lowering the Cum
ground manually ( other than foundation fo bulilding colverts road drain s
and trenched of pipe lines and cables) and removing the excavated struff
levelled to a distance not exce One hundred fifty nine
226.80 159.60 rupees sixty paise
2 Construction of Road embankment with approved Meterial grave/ murrum Cum
with all left side trasporting to site spreading grading to required slope and
completing to meet requirment table 300-2 complete as per specification Two hundred fourty
(Which includes cost of gravel / m seven rupees eithty
567.00 247.80 paise
3 Contruction of granular sub base by providing closing graded material Cum One thousend
mixing in a mechanical mix plant atOMC. Carriage of mixed material to seventyseven rupees
work site spreading in uniform layers with motor grader on prepared
surface and compacting with bibratory power rol
thirty paise
141.75 1077.30
4 Contruction of granular sub base by providing closing graded material Cum
mixing in a mechanical mix plant atOMC. Carriage of mixed material to
work site spreading in uniform layers with motor grader on prepared
surface and compacting with bibratory power rol
One thousend twenty
141.75 1029.00 nine rupees

I/We Sri messer/s/________________________ (Contractor(s)registration No ____________in Class


I am ready to execute the work as per the following rates.
1 _______________________ % (in figure) ____________________________________percent(in words) above the estimate
rates
2 _______________________ % (in figure) ____________________________________percent(in words) above the estimate
3 rates
as per the estimated rates

Contracto Signeture Junier Engineer Chief Officer


kampli TMC, kampli.
Na me of contractor

No of Correction .............
No of Over writing ..............
TOWN MUNCIPAL COUNCIL, KAMPLI.
(BELLARY DISTRICT)
Comparitive statement
Package No -11

Name of Work:- Construction of of Drain and pootpath pavemant right side of Ambedkar circle to Valmiki Circle in TMC Kampli

Head Of The Account:- SFC 2009-10


Estimated Cost : 35.70.000-00 Put to tender Rs. 3564393-00
Estimate Rate S Pedda Pulla Reddy G. Murulidhara Reddy
Sl.
Description of Work Unit Quantity
No. Figure Amount Figure Amount Figure Amount
1 2 3 4 5 6 7 8 7 8
I RCC BUILT UP DRAIN
1 KSRRB 2900-3.1 : Earthwork excavation for
foundation trenches in drains and channels in ordinary
soil not exceeding 2 m. in depth including dressing
the bottom and sides of trenches, stacking the
excavated soil clear from edges of excavation
including disposal of surplus soil as directed with all
leads cost of labour complete as per specifications.
Specifications. No. KSRB 300-1, 300-4 MOST Cum 450.00 113.61 51124.50 115.00 51750.00 113.61 51124.50
Specification No. 304

2 KSRRB 2900-4.3 : Providing and laying in position


plain cement concrete M15 mix with stone
aggregate 20 mm and down size in
foundation upto a depth of 2 m. below
ground level and upto a height of 1.5 m. Cum 34.00 3194.10 108599.40 3200.00 108800.00 3194.10 108599.40
above ground level machine mixed, concrete
laid in layers not exceeding 15 cms. thick
well compacted, cost all materials, labour,
HOM of machineries, curing complete as per
specifications.
Specifications . No. KSRB 1000, 1700
MOST Specification No. 1000 / 1700
3 KSRB 4.2.2: Providing & laying in position
reinforced cement concrete of nominal mix
1:1.5:3 with 20 mm and down size graded
granite metal, mahcine mixed, concrete laid
in layers not exceeding 15 cms thick,
vibrated for all works in foundation plinth
and ground floor level for roof slabs,
staircase, lintles, retaining walls, return
walls, walls (any thickness) including
attached plasters, columns, piers, abutments,
Cum 128.00 4396.35 562732.80 4500.00 576000.00 4396.35 562732.80
pillars, posts, struts, butterresses, string or
lacing courses, parapets, coping, bed blocks,
anchor blocks, plain windows cills, fillets
etc., including cost of all materials, labour,
HOM of machinery, curing, complete as per
specifications No. KBS 4.1, 4.6

4 KSRB 4-6.4 : Providng and removing centering,


shuttering strutting, propping etc., and removal of
form work for vertical surface such as walls at
any thickness, including attached pilasters,
buttresses, plinth and string courses cost of Sqm 1200.00 166.95 200340.00 200.00 240000.00 166.95 200340.00
all materials, labour complete as per
Specification No. KSB 4.6.2

5 KSRRB 2900-6.2 : Providing and fabricating TMT


Steel reinforcement bars including
straightening, cutting bending, hooking,
placing in position, lapping and / or welding
wherever required, tieing with binding wire,
anchoring to the adjoining members q 103.00 5845.35 602071.05 6000.00 618000.00 5845.35 602071.05
wherever necessary, as per design (laps,
hooks and wastage shall not be measured
and paid) including cost of all materials,
labour, HOM of machineries complete as per
Specifications No. KSRB 1000, 1600 MOST
6 Providing
Speci. No.and fixing
1000 Precast RCC Cover
/ 1600
with M-20 grade (Size : 900X
600x100mm) etc.complete.Spec.As NO 500.00 891.00 445500.00 1000.00 500000.00 891.00 445500.00
directed by Engg in charge.
II FOOTPATH 0.00 0.00 0.00
1 KSRRB 300-1.1 : Earthwork excavation by
manual means in ordinary soil involving an
average horizontal throw upto 2 meters and an
average lift upto 0.5 m, excavated surface
levelled and sides neatly dressed, the disposed
earth to be levelled neatly after breaking of clods Cum 150.00 39.90 5985.00 50.00 7500.00 39.90 5985.00
complete as per specifications.
Specifications No. KRBS 300-1 MORTH
Specification No. 301 to 305

2 Supplying and Fixing P.C.C. Precast M-20 grade


concrete kerb stone of size 500x450x150 mm
thick at site, fixing P.C.C. to bed of 150mm thick
filling the joints in C.M. 1:3 pointing to exposed
face of concrete kerb stone including curing Rmt 500.00 480.20 240100.00 500.00 250000.00 480.20 240100.00
,painting etc.complete.Spec.As directed by
Engg.-in charge.

3 Providing and constructing burnt brick masonry


with approved quality of modular bricks of
standard size of class designation 50 ( table
moulded ) with cement mortar 1:6 for basement
and superstructure including cost of Cum 138.00 3598.35 496572.30 4000.00 552000.00 3598.35 496572.30
materials,labour charges,scaffolding,curing
complete as per specifications NO.KBS 6.2.3

4 KSRB 4.2.1 : Providing and laying in position


reinforced cement concrete of nominal mix
1:2:4 with 20mm and down size graded granite
metal , machine mixed,concrete laid in layers not
exceeding 15cms thk.vibrated for all foundation
plinth and ground floor level for roof
slabs,staircase,lintels,retaining walls return
walls,walls ( any thicknesses )including attached
plasters,columns,piers,abutment,pillars,posts,str Cum 9.00 3958.50 35626.50 4000.00 36000.00 3958.50 35626.50
uts,buttersses,string, or lacing cource,parapetes
coping,bed block,anchor blocks,plain window
cills,fillets etc.,including cost of all
materials,labour,HOM of machinery,curing
complete as per specifications.Specification No.
KBS 4.1 , 4.6

5 KSRB 15-5.1 : Providing rough cement plastering


15 mm thk.in single coat with cement mortar 1:4
to brick masonry for base of dadoing works with
sand of approved quality, providing and Sqm 500.00 93.19 46595.00 100.00 50000.00 93.19 46595.00
removing scaffolding,including cost of
materials,labour ,labour curing completeas per
specifications.
6 Providing and fixing 60mm thick Interlocking
unishape concrete paver (monolithic single
layer precast concrete blocks) of grey cement
coloured having average crushing strength of 35
N/mm2 as per technical specification, placed on
average thickness of 45 mm uniformly graded
river sand cushioning with properly compacted Sqm 1000.00 768.60 768600.00 800.00 800000.00 768.60 768600.00
with mechanical compactor with required level,
grade and camber etc. complete Spec.As
directed by Engineer-in-charge.

Total 3563846.55 3790050.00 3563846.55

F ªÉÄð£À E§âgÀÄ UÀÄvÉÛÃzÁgÀgÀ°è ²æÃ.J¸ï.¥ÉzÀÝ¥ÀįÁègÉrØ. EªÀgÀÄ ±ÉÃPÀqÁ ºÉZÀÄÑ


zsÀgÀUÀ¼À ªÉÆvÀÛPÉÌ £ÀªÀÄÆ¢¹zÀÄÝ, ²æÃ.f. ªÀÄÄgÀĽzsÀgÀ gÉrØ EªÀgÀÄ ±ÉÃPÀqÁ ªÉÆvÀÛPÉÌ
zsÀgÀUÀ¼À£ÀÄß £ÀªÀÄÆ¢¹zÀÄÝ, PÁgÀt ²æÃ. f. ªÀÄÄgÀĽzsÀgÀ gÉrØ. UÀÄvÉÛÃzÁgÀgÀÄ
PÀrªÉÄ EzÀÄÝ, zsÀgÀUÀ¼À ªÀÄAdÆgÁwUÉ ¸À°è¹zÉ.

ªÀÄÄSÁå
QjAiÀÄ C©üAiÀÄAvÀgÀgÀÄ ¢üPÁjUÀ¼ÀÄ
¥ÀÄgÀ¸À¨sÉ CzsÀåPÀëgÀÄ ¥ÀÄgÀ¸À¨sÉ
PÁAiÀiÁð®AiÀÄ ¥ÀÄgÀ¸À¨sÉ PÁAiÀiÁð®AiÀÄ PÁAiÀiÁð®AiÀÄ
PÀA¦è. PÀA¦è. PÀA¦è.
TOWN MUNICIPAL COUNCIL, KAMPLI.

Name of Work:- construction Jum Building in TMC Complex in TMC Kampli


SCHEDULE-B
Package No 18
Head of A/c :-SFC 2009-10 Put tender Estimate cost 1.00.000-00

Sl NoDescription Unit Qty Rate in Figure Rate in Words


1 Dismantling of existing structures like culverts bridges rataining Cum 6.55 154.35 One hundred fifity
wall and other structure comprising of masonry. Cement four rupees
concrete.wood work, steel work, including T&P and scaffolding thirtyfive paise
wherever necessary sorting the dismentaled material, dispolas if
unserviceble material and stacking the serviceble materials with all
lifts and lead of 1000 metres complete as per specification
dismentling brick/ tile work. A. in lime mortar.

2 Providing and construction brunt brick masonry with approved Cum 3.97 4536.77 four thousend five
quality of modular bricks of standerd size of class disignation 75 hundred thirtysix
(Machine moulded wirecut bricks) with cement mortar 1:3 for rupees seventyseven
basement and superstructure including cost of materials labour paise
charges scaffolding curing complete as per specification

3 Providing and fixing MS grill work for windows and ventilators Sqm 21 90.82 ninty rupees
weighing 21kg/sqm using MS flats. Or MS square rods, or eightytwo paise
combination MS flats and square rods as per approved design
dreawing including cutting steel section asd welding the same to
required pattern with a coat or red lead primer cost of materials
fuxtures labour and HOM of machinary complete as per
specification
4 Providing 18m m thick cement plaster in single coat with cement Sqm 41.59 124.8 One hundred
mortar 1:3 to brick masonry including rounding of corners wherever twentyfour rupes
required smooth rendering : Providing and removing scaffolding eighty paise
including cost of amterials labour curing complete as per
specifications
5 Providing and applying enamel metal paint one coats (excluding Sqm 105.4 98.22 ninty eight rupees
priming coat) on over new steel of other metal surface brushing to twentytwo paise
give an even shade ofter cleaning oil, grease, dirt and other foring
matter including cost of materials labours, complete as per
specification

No of Correction .............
No of Over writing ..............
6 Providing and applying two coats with oil bound washable Sqm 157.99 53.33 Fiftythree rupees
distemper fo approved brnd and shade on wall surface including thirtythree paise
priming coat with distemper primer after throughly brooming the
surface free from mortar drops and other forign matter including
preparing the surface even and sand paper smooth cost of materials
labour complete as per specification

I/We Sri messer/s/________________________ (Contractor(s)registration No ____________in Class


I am ready to execute the work as per the following rates.
1 _______________________ % (in figure) ____________________________________percent(in words) above the estimate
rates
2 _______________________ % (in figure) ____________________________________percent(in words) above the estimate
3 rates
as per the estimated rates

Contracto Signeture Junier Engineer Chief Officer


kampli TMC, kampli.
Na me of contractor

No of Correction .............
No of Over writing ..............
TOWN MUNICIPAL COUNCIL, KAMPLI.
Name of Work:- Providing UGD line for Old housing Board Colony in Kampli Sugar Factry i n TMC, Kampli.

SCHEDULE-B

Head of A/c :-SFC 2009-10 Put tender Estimate cost 4.65.000-00

Sl NoDescription Unit Qty Rate in Figure Rate in Words


1 KSRB 2-2-1. Earthwork excavation for foundation fo buildings, Cum 179.55 102.00 One hundred two
culverts, Water supply, sanitary lines and electrical conduits either rupees
in pits or trenches 1.5m and above in width in Ordinary Soil not
exceeding 1.5 m anin depth including dressing the bottom
and sides of pits and trenches stacking the excavated soil
clear from edges of excavation with lead upto 50m after
breaking of colds complete as per specification
2
specification No KBS 2.1(b)/2.3.5 P No 5. I No 2.4 as per
KSRB 2.6: Providing and Filling sand in foundation upto plinth to Cum 11.40 766.00 Seven hundred
DSR 2009-10
required depth forBellary
sub soilCircle
treatment including watering ramming sixtysix rupees
with lead upto 50m and lift upto 1.5m complet as per specifications
No. KBS 2.10.2No.4.3

3 KSRB 12-2.5: Providing and laying in position plain cement m 380.00 287.00 Two hundred eighty
concrete of mix 1:4:8 using 40mm and down size graded granite seven rupees
metal, machine mixed, concrete laid in layers not exceeding 15 cms,
thick well compacted, in foundation250.mm internal diamate

4 Providing and laying in position to required to level or slope 230 No 380.00 558.00 Five hundred
mm Internal diameter salt glazed stoneware pipes grade a and fiftyeight rupee
jointing with stiff mixtere of cement mortar in proportion of 1:1
testing of pipes and joints including cost

5a Constraction brick masonry circular type manhole 0.91 m internal No 5.00 8734.00 Eight Thousend
dia at bottom 0.91 m deep and 0.56m at top with table moulded non seven hundred
modular bricks of 50 class disignation 50 in cement mortar 1:4 thirtyfour rupees
inside cement plastered 12mm thick with cement

No of Correction .............
No of Over writing ..............
b Constraction brick masonry circular type manhole 0.91 m internal No 5.00 12896.00 Twele thousend
dia at bottom 1.67 m deep and 0.56m at top with table moulded non rupees eight
modular bricks of 50 class disignation 50 in cement mortar 1:4 hundred nintysix
inside cement plastered 12mm thick with cement rupees

6 Refilling available earth a round pipe lines, cables in layers not Cum 174.55 41.00 Fourty one rupees
exceeding 20cms in depth com pacting each deposited layer by
remming after watering with lead upto 50m and lift upto 1.5m
including cost of all labour complete as per specification

I/We Sri messer/s/________________________ (Contractor(s)registration No ____________in Class


I am ready to execute the work as per the following rates.
1 _______________________ % (in figure) ____________________________________percent(in words) above the estimate
rates
2 _______________________ % (in figure) ____________________________________percent(in words) above the estimate
rates
3 as per the estimated rates

Contracto Signeture Junier Engineer Chief Officer


kampli TMC, kampli.
Na me of contractor

No of Correction .............
No of Over writing ..............
TOWN MUNICIPAL COUNCIL, KAMPLI.
Name of Work: fixing of Jum instruments in TMC Complex in TMC Kampli
Comparitive Statement
Pacakage No 18
S. Weight Rate Per Pices Total Estimated Price Venugopal Krishna N. Mallikarjuna Reddy
No kg weight

Rate Rate
Particulars
1 Peck Deck 60 kg 30000.00 33000.00 30000.00
Bench Press(Parallel &
2 100kg 30000.00 33000.00 30000.00
incline)

3 High lat pulley 80 kg 29000.00 32000.00 29000.00

4 Seated rowing pulley 80kg 29000.00 31000.00 29000.00

5 Leg curl & leg extension 60kg 29000.00 31000.00 29000.00

6 Biceps curl 50kg 28000.00 30000.00 28000.00

7 Deltoid flexor 80kg 32000.00 34000.00 32000.00

9 Chinning Machine 80kg 30000.00 33000.00 30000.00


10 Wrist curl 40kg 20000.00 22000.00 20000.00
11 Pull over lateral flexor 80kg 32000.00 34000.00 32000.00
Non Weight stations
1 Bench press parallel 1 10000.00 11000.00 10000.00

Bench press incline with


2 1 11000.00 12000.00 11000.00
support platform
4 Hack squat 1 27000.00 29000.00 27000.00
5 T-Bar 1 10000.00 11000.00 10000.00
6 Hyper extension 1 9000.00 10000.00 9000.00
7 Bar stand 1 9000.00 10000.00 9000.00

Double twister (Sitting &


8 1 11500.00 12500.00 11500.00
standing )

Abdominal board leg


9 1 11000.00 12000.00 11000.00
locking & ladder type

10 Ab-king pro 1 10000.00 11000.00 10000.00

Vertical knee raise &


11 1 11000.00 12000.00 11000.00
parallel bar

12 Adjustable bench 1 10000.00 11000.00 10000.00

13 Weight rack 1 8600.00 9000.00 8600.00

Dumbbells (per kg.Rs


14
75.00)

1Dumbles 1 k 1 85 8 8 680.00 700.00 680.00

1Dumbles 2 k 2 85 8 16 1360.00 1500.00 1360.00

1Dumbles 2.5 k 2.5 85 8 20 1700.00 2000.00 1700.00

1Dumbles 3 k 3 85 8 24 2040.00 2100.00 2040.00

1Dumbles 3.5 k 3.5 85 8 28 2380.00 2500.00 2380.00

1Dumbles 5 k 5 85 6 30 2550.00 2700.00 2550.00

Dumbles 6k 6 85 4 24 2040.00 2200.00 2040.00


Barbells (plated) (per Ft
15 10000.00 11000.00 10000.00
Rs 250

Weight (per kg. Rs.


17
70.00)
Plates 2.5 80 10 25 2000.00 2100.00 2000.00
Plates 5 80 10 50 4000.00 4200.00 4000.00
Plates 7.5 80 8 60 4800.00 5000.00 4800.00
Plates 10 80 6 60 4800.00 5000.00 4800.00
Plates 15 80 4 60 4800.00 5000.00 4800.00
Barbells (Olympic
21 2000 2 4000.00 4200.00 4000.00
sleeve) 3ft z bar

22 3ftarbells 2000 3 6000.00 6500.00 6000.00


23 4ft Barbells 2500 3 7500.00 8000.00 7500.00
24 5ft Barbells 3000 3 9000.00 10000.00 9000.00
25 6ft Barbells 3500 4 14000.00 15000.00 14000.00
26 Dumbbells stand \ (12 dumbbells ) 17000 3 51000.00 55000.00 51000.00
27 Gym Chair 7500 2 15000.00 17000.00 15000.00
28 Gym Bench 11500 2 23000.00 25000.00 23000.00
29 Sony Home theater 10000 1 10000.00 11000.00 10000.00
Total 609750.00 661200.00 609750.00
F ªÉÄð£À E§âgÀÄ UÀÄvÉÛÃzÁgÀgÀ°è ²æÃ.ªÉÃtÄ UÉÆÃ¥Á® PÀȵÀÚ. EªÀgÀÄ ±ÉÃPÀqÁ ºÉZÀÄÑ
zsÀgÀUÀ¼À ªÉÆvÀÛPÉÌ £ÀªÀÄÆ¢¹zÀÄÝ, ²æà J£ï. ªÀÄ°èPÁdð£À gÉrØ. EªÀgÀÄ ±ÉÃPÀqÁ ªÉÆvÀÛPÉÌ
zsÀgÀUÀ¼À£ÀÄß £ÀªÀÄÆ¢¹zÀÄÝ, PÁgÀt ²æÃ. J£ï. ªÀÄ°èPÁdð£À gÉrØ. UÀÄvÉÛÃzÁgÀgÀÄ PÀrªÉÄ EzÀÄÝ,
zsÀgÀUÀ¼À ªÀÄAdÆgÁwUÉ ¸À°è¹zÉ.
QjAiÀÄ
C©üAiÀÄAvÀgÀgÀÄ CzsÀåPÀëgÀÄ
¥ÀÄgÀ¸À¨sÉ ¥ÀÄgÀ¸À¨sÉ ªÀÄÄSÁå¢üPÁjUÀ¼ÀÄ
PÁAiÀiÁð®AiÀÄ PÁAiÀiÁð®AiÀÄ ¥ÀÄgÀ¸À¨sÉ PÁAiÀiÁð®AiÀÄ
PÀA¦è. PÀA¦è. PÀA¦è.
TOWN MUNCIPAL COUNCIL, KAMPLI.
(BELLARY DISTRICT)
Comparitive statement
Package No -15
Name of Work:- Construction of SC/ST additional work in TMC, Kampli.

Head Of The Account:- SFC 2009-10

Estimated Cost : 6.50.000-00 Put to tender Rs.


Estimate Rate S. Sampath Kumar Reddy K Chandra Mohan Reddy
Sl.
No.
Description of Work Unit Quantity
Figure Amount Figure Amount Figure Amount
1 2 3 4 5 6 7 8 7 8
1 Providing and laying in position plain
cement concrete of Nominal mix 1:1.5:3
using 20mm and down siae graded granite
metal,machine mixed,concrete laid in
layers not exceeding 15cms.thick,well
compacted,in foundation and plinth, Cum 11.55 4040.40 46666.62 4040.40 46666.62 4100.00 47355.00
including cost of all materials,labour,
HOM of machinery,curing complete as per
specifications Sl.No. 4.6 Page No.12

2 Providing and laying flooring using grey


granite water cut/gang saw 19mm thick
granite laid over existing flloor in CM 1:4
Sqm 146.70 2318.40 340109.28 2318.40 340109.28 2400.00 352080.00
at 20mm thick and painted with white /
gey pigment tec complete

3 Providing and fixing iin position anodized


aluminium windows and ventilators as per
approved drawing with sliding shutters
using four track window frame of size
122.2x31.75 mm for bottom section 1.1
mm thick weight 1.205 kg/m sides and Sqm 17.77 3527.85 62689.89 3527.85 62689.89 3600.00 63972.00
tops section 1.2 mm thick weight 1.093
kg/m. shutter section comprising top and
bottom section of size 40x18 mm wall
thickness 1.25mm. weight 0.417kg/m.
shutter side outer 40*18mm wall thickness
1.25mm. weihgy 0.417kg/m. shutter
interlock section 40*26.7mm. wall
thickness 1.1 mm weight 0.469kg/m.
shutters mounted on bylonrolleres with
approved quality of fixxtures such as
aluminium handles tower bolts etc.,
4 Providing and construction brunt brick
masonry with approved quality of non
modular bricks of standerd size of cement
mortar 1:4 for basement and Cum 0.82 4131.75 3388.04 4131.75 3388.04 4200.00 3444.00
superstructure including cost of materials
labour charges scaffolding curing complete
as per specification

5 Providing 18mm thick cement plaster in


single coat with cement mortar 1:4 to
brick masonry including rounding off
corners wherever required smooth
Sqm 7.20 106.05 763.56 106.05 763.56 110.00 792.00
rendering providing and removing
scaffolding including cost of materials
labour curing complete as per specification

6 Providing colour glazed tiles all sizes 10


mm thick for flooring treads of steps and
landings laid on a bed of 12mm thick
cement mortar 1:3 mix flush pointing Sqm 73.20 1473.15 107834.58 1473.15 107834.58 1500.00 109800.00
using white cement with matching colour
pigment including cost of materials labour
curing complete as per specification

Total 561451.97 561451.97 577443.00

F ªÉÄð£À E§âgÀÄ UÀÄvÉÛÃzÁgÀgÀ°è ²æÃ.PÉ. ZÀAzÀæ ªÉÆúÀ£ï gÉrØ. EªÀgÀÄ ±ÉÃPÀqÁ ºÉZÀÄÑ
zsÀgÀUÀ¼À ªÉÆvÀÛPÉÌ £ÀªÀÄÆ¢¹zÀÄÝ, ²æÃ.J¸ï. ¸ÀA¥Àvï PÀĪÀiÁgï gÉrØ. EªÀgÀÄ ±ÉÃPÀqÁ
ªÉÆvÀÛPÉÌ zsÀgÀUÀ¼À£ÀÄß £ÀªÀÄÆ¢¹zÀÄÝ, PÁgÀt ²æÃ.J¸ï. ¸ÀA¥Àvï PÀĪÀiÁgï gÉrØ.
UÀÄvÉÛÃzÁgÀgÀÄ PÀrªÉÄ EzÀÄÝ, zsÀgÀUÀ¼À ªÀÄAdÆgÁwUÉ ¸À°è¹zÉ.

QjAiÀÄ ªÀÄÄSÁå
C©üAiÀÄAvÀgÀgÀÄ ¢üPÁjUÀ¼ÀÄ
¥ÀÄgÀ¸À¨sÉ CzsÀåPÀëgÀÄ ¥ÀÄgÀ¸À¨sÉ
PÁAiÀiÁð®AiÀÄ ¥ÀÄgÀ¸À¨sÉ PÁAiÀiÁð®AiÀÄ PÁAiÀiÁð®AiÀÄ
PÀA¦è. PÀA¦è. PÀA¦è.
TOWN MUNICIPAL COUNCIL, KAMPLI.

Name of Work:- Sinking of Borewell and Submarsible pumpset motor connection to SC/ST Computer training center
and ladies tailering center. In TMC Kampli.
SCHEDULE-B
Package No 17
Head of A/c :-SFC 2009-10 Put tender - 22480-00 Estimate cost 2.50.000-00

Sl NoDescription Unit Qty Rate in Figure Rate in Words


1 Sinking borewell of 150mm dia clear using superfast hydraulic rig Mtr 220 270.00 Two hundred
of capacity 250 mm PSIG & above 900 CFM & above in all start including 0.00 seventy rupees
to 50.00mt. 50.00 ot 100.00 mt 100.00 to 150.00 mt 150.00 to and above

2 Cost of 150mm dia ERW PVC Pipe Mtr 40 350.00 Three hundred fifty
with collars ( as per market rate ) rupees

3 Geophysical investigation of site for sinking borewell for supplying drinking No 2 1200.00 One thousend two
water to the habitation hundred rupees
4 Supply water storage tanks made og virgin polymer (LDPE) with two layers Ltrs 4000 5.04 five rupees four
outer blank or blue and inner white layer of approved quality and make. paise
Vonfirming of ISI/ISO/SSI specification Pno 234 I No 37.59 PWD DSR 2009-10

5 Supply and delivery at site new TREXMO/ AROMA/ LUMI/FLOTECH make SHP No 2 21600.00 Twentyone
10 stages of suitable HP deep well submersible pumpset suitable for vertical thousend six
installation in 150mm dia borewell comprising of multi stages pump coupled hundred rupees
speed totally enclosed and filled with pure drinking water (Wet type) squired
cage submersible induction motor suitable for oparetion on 3ph 50Hz 380 /440
volts AC supply fitted with required accessories such as suction casing
suction strainer and guard non return valve etc., complete the pump and motor
shall from on intergral unit with all the required fittings
PUMP: the submersible pump conforming to the latest IS 8043 1989) shall
comprise of the following
a) bowl assembly with required number of closed grained c ast iron castings
hydraulically tested with its inner passage smooth finished and coated with
zinc chrome to ensure better efficiency and less wear. every stage bowl shall
be provieded with a brnze wear ring.
b) mixed folw "or" radial flow inpeller shall be made of bronze and shalll be
balanced both statically and dynamicallly.

No of Correction .............
No of Over writing ..............
6 Combiend speicification of meter board until and panel board unit are detailed No 2 5816.00 Five thousend eight
abouve for out door installation housed in a box of site 12000x90000x450 mm hundred sixteen
machanical strong vermn froog and water proff the appearance vermin of the rupees
unit shall have detachable door and two no's spring loaded leaths locking
devices with kes labs should be provided with door canopy apron and lavetry
ventilation shalll provided complete unit comprising of all the above

7 Supply and delivery of brand new best pro insulated cable of 1fat 3 core of Mtr 150 45.00 Fourtyfive rupees
nominal cross sectional area 1.5,2.5 and 4mm as per SI 694/1990 with latest
amendments with ISI mark service from panel board under gournd cable to
pumpset

8 All conections supplying brand new PVC insulated sheet steel / wire / stell / Mtr 70 69.30 Sixtynine rupees
trap abounded variable with pre/oout door sheeting 1.1 KV as per IS 1558/88 thirty paise
with amendments with ISI mark from KEB pole ti meter bound unit of the
following sizes services line from panel bound to electrical pole.

9 Erection a bore ground level GI pipes 40 mm dia clamps bolt nuts VG cable 10 Mtr 30 70.00 Seventy rupees
mtrs Rs 70.00/ Rmt
10 GI Pipe clamps bell nuts UC cable new bestmake presure guage bounded type No 2 165.00 One hundred
the site with ISI mark sixtyfive rupees
11 Supply and delivery of brand new KIRLOSKAR / MAYUR / UPADHAYA of any No 2 725.00 Seven hundred
other board approved make suitable size bronze metal gate valve as per twenty five rupees
relevant IS Specification
12 Supply and delivery of brand new KIRLOSKAR / MAYUR / UPADHAYA of any No 2 650.00 Six hundred fifity
other board approved make suitable size bronze metal non return valve as per rupees
relevant 778
13 Supply and delivery at site brand star/ Essen/ lotus / sun shines / adarsh / GK No 2 6950.00 Six thosuend nine
controlbests. Indegeneous make combined energy meter -cum- control panal hundred fifty rupees
bourd unit of size 1200x600x350 mm minimum mechanically strong vermin and
water proof the unit shall have two detachable doors suitable for operation on
3 Ph 50 Hz 380/440 volts. AC Supply with spring loaded latch locking device
with a key ribs should be provided in side the door canoy spron and louvers
ventilators shall be provided the combined energy meter - cum - control panel
board unit suitable for operation on 3 ph 50Hz 380/440 volts

14 supplying laying jointing testing and commisssions of GI pipes conforming IS No 2 275.00 Two hundred
1239- 1990 with latest amendmnets including fixing collars elbows tees bends seventy five rupees
gland cocks and other fittings with cuts and threads wherever necessary
including conveying the materials to workspot including testing for water
tightness with all lead 50 mm dia

No of Correction .............
No of Over writing ..............
15 Erection of pumpset including aligning and balancing with all necessary mm 120 206.80 Two hundred six
crection materials and labour including supply and erection of one pair rupees eighty paise
supports clamps one borewell cap. Cable clips with bolts nuts valve gauges
etc., invalved in the job
16 LAYING OF MAIN CABLE Mtr 80 104.00 One hundred four
a) labour charge for layig the cable above ground excluding the cost of calbe rupees
b) labour charge for layig the cable in tench including digging of tranch 0.5
mtrs wide 0.6 mtrs depth and refilling and consolidation
c) labour charge for layig the cable in GI pipe of 2.9mm thick 40 mm dia. with
necessary clamps bolts nuts washers etc.,

17 EARTHING: Supplying fixing and wiring for ground ing circuits IC sutouts and No 2 460.00 Four hunred sixty
other equipments on the meter board GI pipes clectrode 2.9 mm thick 40mm rupees
dia . 2.5 mtrs length having 16 though holes of 12mm dia staggereed along the
300 mm dia pit the pit should be filled with alternative layers of salts and
chorcoal in 150mm thick layers alround the electrode to the complete depth.

18 Supply and delivery of ISI marks 50 mm 2"c'' class GI pipes 30 mtrs @ Rs Mtr 80 208.55 Two hundred eight
208.55 rmt rupees fiftyfive paise

19 Cap sealers 5 KVR x 160 No 2 800.00 Eight hundred


rupees

20 Circuit breakes No 2 500.00 five hundred rupees

21 Erection of panel board and meter board unit with all necessary materials and No 2 375.00 three hundred
labour including providing cement concrete foundation bed etc., complete seventy five rupees
outdoor type

I/We Sri messer/s/________________________ (Contractor(s)registration No ____________in Class


I am ready to execute the work as per the following rates.
1 _______________________ % (in figure) ____________________________________percent(in words) above the estimate rates
2 _______________________ % (in figure) ____________________________________percent(in words) above the estimate rates
3 as per the estimated rates

Contracto Signeture Junier Engineer Chief Officer


kampli TMC, kampli.
No of Correction .............
No of Over writing ..............
Na me of contractor

No of Correction .............
No of Over writing ..............