You are on page 1of 42

OML100 [ODUDU & FSO UNITY]

ICSS SYSTEM Upgrade


Detailed Engineering
SMR/SOR/SIN nbr.

S0R-100-09-001
ENGINEERING TEAM

CONSTRUCTION TEAM

PROJ ECT TEAM

SURVEY T EA M

ICSS Network Performance DVT Procedure


COMPANY
ref. number

NG-ODU-XODU-IPA-070069

CONTRACTOR ref:

NG-ODU-XODU-IPA-070069

1/42

page:
Discipline

INS

23-Feb-15

Doc. Type

SPEC

--

(Syst.) Unit

NX

Rev.

Status

Rev. date

1.0

IDC

--

--

ICSS Network Performance DVT Procedure

Reserved to COMPANY
TEPNG review comment and/ or Approval shall not be
assumed to indicate either responsability or
liability for accurancy and completeness of this document
or to alter any contract Terms & Conditions.

The document is returned with code


Approved

code 1

Approved with comments

code 2

Rejected

code 3

Reviewed with comments

code 4

No comment

code 5

Date:

Remarks:

1.0

23-Feb-15

Issued for Review

Rev.

Date

Description

Issued by

Reviewed by

This document is the property of TOTAL and must not be reproduced, stored or disclosed without permission from COMPANY.

Approved
by

OML100 [ODUDU & FSO UNITY]


ICSS SYSTEM Upgrade
Detailed Engineering
SMR/SOR/SIN nbr.

S0R-100-09-001
ENGINEERING TEAM

CONSTRUCTION TEAM

PROJ ECT TEAM

SURVEY T EA M

ICSS Network Performance DVT Procedure


COMPANY
ref. number

NG-ODU-XODU-IPA-070069

CONTRACTOR ref:

NG-ODU-XODU-IPA-070069

page:

2/42

Discipline

INS

23-Feb-15

Doc. Type

SPEC

--

(Syst.) Unit

NX

Rev.

Status

Rev. date

1.0

IDC

--

--

TABLE OF CONTENTS
1.

2.

3.

Introduction............................................................................................................ 6

1.1.

Document Scope........................................................................................................ 6

1.2.

Reference Documents................................................................................................ 6

1.3.

Abbreviations............................................................................................................. 7

Overview................................................................................................................ 8

2.1.

DVT Location.............................................................................................................. 8

2.2.

Tests Purposes........................................................................................................... 8

2.3.

General Test Procedure.............................................................................................. 8

2.4.

Network Architecture................................................................................................. 9

2.5.

Platform Equipments................................................................................................ 10

2.6.

PCS & Safety System Communication Interface......................................................10

2.7.

Safety System.......................................................................................................... 11

Network Redundancy Test......................................................................................12

3.1.

PCS Network Test-Step 1.......................................................................................... 12

3.1.1.
3.1.2.
3.1.3.

3.2.

Safety Network Test: Step 2..................................................................................... 15

3.2.1.
3.2.2.
3.2.3.
3.2.4.

3.3.

Test
Test
Test
Test

2.1:
2.2:
2.3:
2.4:

Peer to Peer Redundancy.................................................................................15


Modbus Redundancy........................................................................................17
Digital Data Read.............................................................................................19
Communication Capacity.................................................................................20

Fire and Gas System (FGS): Step 3..........................................................................21

3.3.1.
3.3.2.
3.3.3.
4.

Test 1.1-Vnet/IP Redundancy..........................................................................................12


Test 1.2-Equalization Network........................................................................................13
Test 1.3: Communication Capacity.................................................................................14

Test 3.1: Peer to Peer Communication Redundancy Test................................................21


Test 3.2: Peer to Peer Redundancy.................................................................................21
Test 3.3: Test Sheet Modbus Redundancy......................................................................23

Communication PCS/SSS/FGS-Step 4.......................................................................26

4.1.

Test 4.1: Digital Data (Read).................................................................................... 26

4.2.

Test 4.2: Digital Data (Write).................................................................................... 26

4.3.

Test 4.3: Analogue Data (Read)................................................................................27

This document is the property of TOTAL and must not be reproduced, stored or disclosed without permission from COMPANY.

OML100 [ODUDU & FSO UNITY]


ICSS SYSTEM Upgrade
Detailed Engineering
SMR/SOR/SIN nbr.

S0R-100-09-001
ENGINEERING TEAM

CONSTRUCTION TEAM

PROJ ECT TEAM

SURVEY T EA M

ICSS Network Performance DVT Procedure


COMPANY
ref. number

NG-ODU-XODU-IPA-070069

CONTRACTOR ref:

NG-ODU-XODU-IPA-070069

5.

page:

3/42

Discipline

INS

23-Feb-15

Doc. Type

SPEC

--

(Syst.) Unit

NX

Rev.

Status

Rev. date

1.0

IDC

--

--

4.4.

Test4.4: Analogue Data (Write)...............................................................................28

4.5.

Test 4.5: Interface Cable Failure/ICSS Coms Module Failure.....................................29

Safety Peer to Peer: Step 5....................................................................................30

5.1.

TEST 5.1 - INITIAL SET UP......................................................................................... 30

5.2.

Test 5.2: Input / Output Digital Data (From Device 1 To Device 2)...........................31

5.3.

Test 5.3: Input / Output Digital Data (From Device 2 To Device 1)...........................32

5.4.

Test 5.4: Input / Output Analogue Data (From Device 1 To Device 2)......................33

5.5.

Test 5.5: Input / Output Analogue Data (From Device 2 To Device 1).......................34

5.6.

Test 5.6: P2P Interface Cable Failure/ICSS Coms Module Failure..............................35

6.

Tests Sheets: Formally Agreed Additional Tests......................................................39

7.

Appendix.............................................................................................................. 40

7.1.

Appendix A............................................................................................................... 40

7.2.

Appendix B............................................................................................................... 43

7.3.

Appendix C............................................................................................................... 45

This document is the property of TOTAL and must not be reproduced, stored or disclosed without permission from COMPANY.

OML100 [ODUDU & FSO UNITY]


ICSS SYSTEM Upgrade
Detailed Engineering
SMR/SOR/SIN nbr.

S0R-100-09-001
ENGINEERING TEAM

CONSTRUCTION TEAM

PROJ ECT TEAM

SURVEY T EA M

ICSS Network Performance DVT Procedure


COMPANY
ref. number

NG-ODU-XODU-IPA-070069

CONTRACTOR ref:

NG-ODU-XODU-IPA-070069

page:

4/42

Discipline

INS

23-Feb-15

Doc. Type

SPEC

--

(Syst.) Unit

NX

Rev.

Status

Rev. date

1.0

IDC

--

--

LIST OF TABLES
Table
Table
Table
Table
Table
Table
Table
Table
Table

1:
2:
3:
4:
5:
6:
7:
8:
9:

Reference Documents............................................................................................................6
Operation Station Vnet/IP....................................................................................................12
Operation Station Equalization Network...........................................................................13
Operator Work Station P2P Redundancy...........................................................................15
Operator Work Station......................................................................................................... 21
Operator Work Station......................................................................................................... 23
Appendix A............................................................................................................................. 42
Appendix B............................................................................................................................. 44
Appendix C............................................................................................................................. 46

This document is the property of TOTAL and must not be reproduced, stored or disclosed without permission from COMPANY.

OML100 [ODUDU & FSO UNITY]


ICSS SYSTEM Upgrade
Detailed Engineering
SMR/SOR/SIN nbr.

S0R-100-09-001
ENGINEERING TEAM

CONSTRUCTION TEAM

PROJ ECT TEAM

SURVEY T EA M

ICSS Network Performance DVT Procedure


COMPANY
ref. number

NG-ODU-XODU-IPA-070069

CONTRACTOR ref:

NG-ODU-XODU-IPA-070069

page:

5/42

Discipline

INS

23-Feb-15

Doc. Type

SPEC

--

(Syst.) Unit

NX

Rev.

Status

Rev. date

1.0

IDC

--

--

LIST OF FIGURES

Figure
Figure
Figure
Figure
Figure

1:
2:
3:
4:
5:

Network Architecture............................................................................................................9
Successful Ping Indicate a Request Time........................................................................16
Successful Ping Indicate a Request Time........................................................................17
Successful Ping Indicate a Request Time........................................................................22
Successful Ping Indicate a Request Time........................................................................24

This document is the property of TOTAL and must not be reproduced, stored or disclosed without permission from COMPANY.

OML100 [ODUDU & FSO UNITY]


ICSS SYSTEM Upgrade
Detailed Engineering
SMR/SOR/SIN nbr.

S0R-100-09-001
ENGINEERING TEAM

CONSTRUCTION TEAM

PROJ ECT TEAM

SURVEY T EA M

ICSS Network Performance DVT Procedure


COMPANY
ref. number

NG-ODU-XODU-IPA-070069

CONTRACTOR ref:

NG-ODU-XODU-IPA-070069

6/42

page:
Discipline

INS

23-Feb-15

Doc. Type

SPEC

--

(Syst.) Unit

NX

Rev.

Status

Rev. date

1.0

IDC

--

--

Introduction
The oil fields Odudu, together with Afia, Ime and Edikan are located on OML 100. These
fields were developed by TEPNG in the conventional offshore area (water depth: 70m) in the
period 1993-1995 which makes them about 20 years old.
OML 100 fields are developed with a manned central complex comprising a process
platform (ODP1) bridged linked to the wellhead platform (ODD1). Three unmanned satellites
AFD1, IMD1 and EDD1 are tied back to the central complex. The liquids of three satellite
fields (Afia, Ime and Edikan) are piped to ODP1 and onwards to FSO UNITY. The central
complex also handles the oil production from two other blocks, OML 102 (Ofon) and OML 99
(Amenam). This makes ODP1/ODD1 a production hub for OML 99, OML 100 and OML 102.
Its unavailability would have a major impact on TEPNG production, therefore all safety
issues on ODP1/ODD1 shall be treated as highly critical. Odudu offshore field is located
102km south-east of Port Harcourt. It is accessible by boat and Helicopter.
1.1. Document Scope
This document defines and details the Network performance test procedure developed for
the DVT of OML100 Upgrade Project.
1.2. Reference Documents
S. No.

Document Number

Title

GS EP INS 134

Design and supply of integrated


control and safety system

NG-ODU-XODU-IPA-070101

Overall ICSS Architecture Drawing

IM 33M05D10-40E 3rd Edition

HIS Operation

IM 33M01A30-40E 5th Edition

Reference Human Interface Station

IM 33M01A30-40E 4th Edition

Reference Engineering Vol 2

Table 1: Reference Documents

This document is the property of TOTAL and must not be reproduced, stored or disclosed without permission from COMPANY.

OML100 [ODUDU & FSO UNITY]


ICSS SYSTEM Upgrade
Detailed Engineering
SMR/SOR/SIN nbr.

S0R-100-09-001
ENGINEERING TEAM

CONSTRUCTION TEAM

PROJ ECT TEAM

SURVEY T EA M

ICSS Network Performance DVT Procedure


COMPANY
ref. number

NG-ODU-XODU-IPA-070069

CONTRACTOR ref:

NG-ODU-XODU-IPA-070069

page:

INS

23-Feb-15

Doc. Type

SPEC

--

(Syst.) Unit

NX

Status

Rev. date

1.0

IDC

--

--

1.3. Abbreviations

A&E
DVT
ESD
EWS
FGS
FAT :
I/O :
ICSS
OWS
PLC:
PV :
PCS
P2P:
SSS
SP :
TEPNG:
TMR
TCR

:
:
:
:
:

:
:

:
:

:
:

7/42

Discipline

Rev.

Alarm and Event


Device Validation Test
Emergency Shut-Down
Engineer Work Station
Fire and Gas System
Factory Acceptance Test
Input / Output to PCS/SSS/FGS
Integrated Control Safety System
Operator Work Station
Programmable Logic Controller
Process Variable
Process Control System
Peer to Peer
Safety Shutdown System
Set point
Total Exploration and Production Nigeria
Triple Modular Redundant
Tricon Communication Redundancy

This document is the property of TOTAL and must not be reproduced, stored or disclosed without permission from COMPANY.

OML100 [ODUDU & FSO UNITY]


ICSS SYSTEM Upgrade
Detailed Engineering
SMR/SOR/SIN nbr.

S0R-100-09-001
ENGINEERING TEAM

CONSTRUCTION TEAM

PROJ ECT TEAM

SURVEY T EA M

ICSS Network Performance DVT Procedure


COMPANY
ref. number

NG-ODU-XODU-IPA-070069

CONTRACTOR ref:

NG-ODU-XODU-IPA-070069

8/42

page:
Discipline

INS

23-Feb-15

Doc. Type

SPEC

--

(Syst.) Unit

NX

Rev.

Status

Rev. date

1.0

IDC

--

--

Overview
This document specifies to TEPNG the various test types and summarises the scope of
these tests that will be performed to verify the design, and functionality of the Network
Performance for OML 100 project. It also describes the procedures to be followed with
respect to test reporting and the handling of system defects encountered during the tests.
1.4. DVT Location
The tests will be held in Intech USA office, located at:
4903 W. Sam Houston Parkway N. Suite A-100
Houston, TX 77041, USA
DATE:.
1.5. Tests Purposes

Demonstrate that the control system network during steady state condition is
stabilized and
the control system screen update for OML 100 data is as per project specifications.
Generate a sudden high network activity e.g. simulate a simultaneous alarm
generation
and demonstrate that the network can manage the sudden increase of load without
lost of
event, garble time stamping etc.
Demonstrate that the proposed systems are equipped with adequate communication
diagnostic / monitoring

1.6. General Test Procedure.


The body of this document is structured in the form of description of the item to be tested
and Check
sheet. Check sheet describes the test and where appropriate also specifies the expected
Result of the test. On completion of the test, the engineer marks in the related Test Case.
The general procedures include, as well as a register for non-conformances, acceptable
deviations
and change requests which together form an integrated part of the DVT documents.
The register lists the deviations from the specifications which require correction by Intech.
The acceptable deviations are deviations from the specifications which are accepted by
TEPNG
and which do not require corrective Action by Intech.

This document is the property of TOTAL and must not be reproduced, stored or disclosed without permission from COMPANY.

OML100 [ODUDU & FSO UNITY]


ICSS SYSTEM Upgrade
Detailed Engineering
SMR/SOR/SIN nbr.

S0R-100-09-001
ENGINEERING TEAM

CONSTRUCTION TEAM

PROJ ECT TEAM

SURVEY T EA M

ICSS Network Performance DVT Procedure


COMPANY
ref. number

NG-ODU-XODU-IPA-070069

CONTRACTOR ref:

NG-ODU-XODU-IPA-070069

page:

9/42

Discipline

INS

23-Feb-15

Doc. Type

SPEC

--

(Syst.) Unit

NX

Rev.

Status

Rev. date

1.0

IDC

--

--

The change requests (modification) are not deviation and must be confirmed by TEPNG. The
DVT is carried out following the check sheets as specified in this document. The check
sheets refer to standard system documentation such as General Specifications (GS)

This document is the property of TOTAL and must not be reproduced, stored or disclosed without permission from COMPANY.

OML100 [ODUDU & FSO UNITY]


ICSS SYSTEM Upgrade
Detailed Engineering
SMR/SOR/SIN nbr.

ENGINEERING TEAM

S0R-100-09-001
CONSTRUCTION TEAM

SURVEY T EA M

PROJ ECT TEAM

ICSS Network Performance DVT Procedure


COMPANY
ref. number

NG-ODU-XODU-IPA-070069

CONTRACTOR ref:

NG-ODU-XODU-IPA-070069

page:

INS

23-Feb-15

Doc. Type

SPEC

--

(Syst.) Unit

NX

Status

Rev. date

1.0

IDC

--

--

1.7. Network Architecture

Figure 1: Network Architecture

This document is the property of TOTAL and must not be reproduced, stored or disclosed without permission from COMPANY.

10/42

Discipline

Rev.

OML100 [ODUDU & FSO UNITY]


ICSS SYSTEM Upgrade
Detailed Engineering
SMR/SOR/SIN nbr.

S0R-100-09-001
ENGINEERING TEAM

CONSTRUCTION TEAM

PROJ ECT TEAM

SURVEY T EA M

ICSS Network Performance DVT Procedure


COMPANY
ref. number

NG-ODU-XODU-IPA-070069

CONTRACTOR ref:

NG-ODU-XODU-IPA-070069

page:

11/42

Discipline

INS

23-Feb-15

Doc. Type

SPEC

--

(Syst.) Unit

NX

Rev.

Status

Rev. date

1.0

IDC

--

--

1.8. DVT Equipment


The test platform shall use the same control system hardware and software which is going
to be used within OML-100 project.
The test platform shall consist of one OWS and one redundant PCS controller for the PCS
part, one Safety and FGS Trident controller and PCS and Safety EWS station.
The test for the PCS network and SSS system will be carried out with one redundant PCS
controller, and one OWS. The VNET/IP network will be made close to the OML-100
architecture.
The tests of communication performance between PCS, safety and FGS will be carried out
with one safety Tricon, one FGS Trident and one PCS redundant controller through a
redundant Modbus Ethernet network.
The Peer to Peer communication test will be carried out with one Tricon Controller, one FGS
Trident Controller and the OWS and EWS.
On this test platform, the EWS station is connected on the Peer to Peer network. In the OML100 DVT architecture, the SSS Maintenance Network consisting in the EWS stations, the
controllers will be a separate network. (For the project there are three networks regarding
the Safety architecture: The safety network with Peer to Peer links between Controllers, the
Modbus network for communication to/from the PCS systems, and the SSS Maintenance
Network)
For the redundant PCS controller Test program, the controllers are fully loaded. To perform
the Modbus performance test another test program is downloaded. The projects loaded are
for performance test purpose. The testing will be with the target hardware but using test
database to ensure the CENTUM performs satisfactory when fully loaded. The project
database will be tested during integration testing.
1.9. System Communication Interface

The purpose of this test is to demonstrate that the redundant communication


interface link
between ICSS Triconex Safety equipment and CENTUM VP PCS equipment is working
satisfactorily up to the limit capacity.

This document is the property of TOTAL and must not be reproduced, stored or disclosed without permission from COMPANY.

OML100 [ODUDU & FSO UNITY]


ICSS SYSTEM Upgrade
Detailed Engineering
SMR/SOR/SIN nbr.

S0R-100-09-001
ENGINEERING TEAM

CONSTRUCTION TEAM

PROJ ECT TEAM

SURVEY T EA M

ICSS Network Performance DVT Procedure


COMPANY
ref. number

NG-ODU-XODU-IPA-070069

CONTRACTOR ref:

NG-ODU-XODU-IPA-070069

page:

12/42

Discipline

INS

23-Feb-15

Doc. Type

SPEC

--

(Syst.) Unit

NX

Rev.

Status

Rev. date

1.0

IDC

--

--

Several tests will be conducted to check if all type of data are correctly read and
written from PCS and Triconex Safety System.

Test to be conducted communication recovery between Triconex Safety system and


PCS.

This document is the property of TOTAL and must not be reproduced, stored or disclosed without permission from COMPANY.

OML100 [ODUDU & FSO UNITY]


ICSS SYSTEM Upgrade
Detailed Engineering
SMR/SOR/SIN nbr.

S0R-100-09-001
ENGINEERING TEAM

CONSTRUCTION TEAM

PROJ ECT TEAM

SURVEY T EA M

ICSS Network Performance DVT Procedure


COMPANY
ref. number

NG-ODU-XODU-IPA-070069

CONTRACTOR ref:

NG-ODU-XODU-IPA-070069

page:

13/42

Discipline

INS

23-Feb-15

Doc. Type

SPEC

--

(Syst.) Unit

NX

Rev.

Status

Rev. date

1.0

IDC

--

--

Peer to Peer Communication

The purpose of this test is to demonstrate that the safety communication interface
link between safety equipment is working satisfactorily and satisfy to design capacity
and performance requirements. It will also demonstrate that the transfer of safety
data by peer to peer is reliable.

Tests will be conducted to check if all type of data are correctly read and written from
the safety equipment provided for this DVT.

To demonstrate that the FGS network redundancy is working as it should be


(transparent from operation point of view) and able to detect and perform bump less
transfer between link.

Modbus Communication

SSS Triconex controllers with TCM installed will be operate as a Modbus Slave to
communicate over redundant SSS Data Exchange, each SSS controller connected
with two TCM modules both are used simultaneously to exchange data. The failure of
one path will not affect Data Exchange.

The purpose of this test is to demonstrate that the Modbus FGS Data Exchange link
between FGS and PCS is working properly and to ensure that design capacity and
performance requirements are fulfilled. It will also demonstrate that the transfer of
safety data through Modbus is reliable and can be used as Modbus salve to
communicate with PCS master device.

Sequence of Events Recorded


1.

The purpose of this test is to demonstrate that the sequence of event software connected
to Triconex equipment is working satisfactorily and satisfy to design capacity and
performance requirements.

2. Test will be conducted to check if Boolean type of data is correctly read from ICSS
Triconex system to SOE dedicated system.
3. The performance on a sudden increase of alarms

This document is the property of TOTAL and must not be reproduced, stored or disclosed without permission from COMPANY.

OML100 [ODUDU & FSO UNITY]


ICSS SYSTEM Upgrade
Detailed Engineering
SMR/SOR/SIN nbr.

S0R-100-09-001
ENGINEERING TEAM

CONSTRUCTION TEAM

PROJ ECT TEAM

SURVEY T EA M

ICSS Network Performance DVT Procedure


COMPANY
ref. number

NG-ODU-XODU-IPA-070069

CONTRACTOR ref:

NG-ODU-XODU-IPA-070069

page:

14/42

Discipline

INS

23-Feb-15

Doc. Type

SPEC

--

(Syst.) Unit

NX

Rev.

Status

Rev. date

1.0

IDC

--

--

Network Redundancy Test


1.10. PCS Network Test-Step 1
1.10.1.

Test 1.1-Vnet/IP Redundancy

Outline:
The Vnet/IP provides communication between the operator station, engineering station and
the field control stations via the switch and also peer to peer communication between field
control stations. It is therefore crucial that failure of one bus does not affect the system.
Objective:
The purpose of this test is to ensure that failure of one of the Vnet/IP links has no effect on
the process communications.
Procedure:
1. Check that the communication is working properly from the operator station.
Station
Network
EWS PCS
172.16.163
OWS PCS
192.168.129.192
Table 2: Operation Station Vnet/IP

2. Disconnect Bus1: Pull the network cable on station/controller or power off switch
3. Observe, that there is no lost of communication.
4 Observe the system status display
5 Reconnect Bus 1
Result
1.
2.
3.
4.

No disturbance is observed on the graphic


The system status display shows the disabled V-net cable.
System Alarm is raised
At return of normal condition check that the alarms disappear, no lost of communication.

Record:

This document is the property of TOTAL and must not be reproduced, stored or disclosed without permission from COMPANY.

OML100 [ODUDU & FSO UNITY]


ICSS SYSTEM Upgrade
Detailed Engineering
SMR/SOR/SIN nbr.

S0R-100-09-001
ENGINEERING TEAM

CONSTRUCTION TEAM

PROJ ECT TEAM

SURVEY T EA M

ICSS Network Performance DVT Procedure


COMPANY
ref. number

NG-ODU-XODU-IPA-070069

CONTRACTOR ref:

NG-ODU-XODU-IPA-070069

page:

15/42

Discipline

INS

23-Feb-15

Doc. Type

SPEC

--

(Syst.) Unit

NX

Rev.

Status

Rev. date

1.0

IDC

--

--

Use Appendix A to record the Result.

This document is the property of TOTAL and must not be reproduced, stored or disclosed without permission from COMPANY.

OML100 [ODUDU & FSO UNITY]


ICSS SYSTEM Upgrade
Detailed Engineering
SMR/SOR/SIN nbr.

S0R-100-09-001
ENGINEERING TEAM

CONSTRUCTION TEAM

PROJ ECT TEAM

SURVEY T EA M

ICSS Network Performance DVT Procedure


COMPANY
ref. number

NG-ODU-XODU-IPA-070069

CONTRACTOR ref:

NG-ODU-XODU-IPA-070069

page:

16/42

Discipline

INS

23-Feb-15

Doc. Type

SPEC

--

(Syst.) Unit

NX

Rev.

Status

Rev. date

1.0

IDC

--

--

1. Test 1.2-Equalization Network


Outline:
The database equalization network enables the equalization of database between
engineering station and operator station via the switch. The failure of this single bus will
affect the following general purpose communication

Different station trends display (between HISs).However, Trend gathering in self


station will perform without any interruption.
Long-term Data archive (When it is saved in the disk of another PC, shared file)
Equalization Communication (between ENG and HIS, shared file)
Remote Printer (shared printer)
Sequence table/Drawing/SEBOL/SFC status display data acquisition (between ENG
and HIS, shared file)
"Download", "IOM Download", "Tuning Parameter Save" in the operating status
display window (HIS ENG, shared file)
Network Printer

Objective:
The purpose of this test is to ensure that failure of equalization bus will not affect normal
plant operation and control.
Procedure:
1. Check that the communication is working properly from the operator station Graphic
visualised
Station
Network Address
Graphic Visualised
EWS PCS
172.16.163
Domain no 1/ Station no 2
OWS PCS
192.168.129.192
Domain no 1/ Station no 1
Table 3: Operation Station Equalization Network

2. Disconnect equalization network: Pull the network cable on station or power off switch
3. Reconnect equalization network back.
Result

This document is the property of TOTAL and must not be reproduced, stored or disclosed without permission from COMPANY.

OML100 [ODUDU & FSO UNITY]


ICSS SYSTEM Upgrade
Detailed Engineering
SMR/SOR/SIN nbr.

S0R-100-09-001
ENGINEERING TEAM

CONSTRUCTION TEAM

PROJ ECT TEAM

SURVEY T EA M

ICSS Network Performance DVT Procedure


COMPANY
ref. number

NG-ODU-XODU-IPA-070069

CONTRACTOR ref:

NG-ODU-XODU-IPA-070069

page:

17/42

Discipline

INS

23-Feb-15

Doc. Type

SPEC

--

(Syst.) Unit

NX

Rev.

Status

Rev. date

1.0

IDC

--

--

1. No disturbance is observed on the graphic


2. Observe, that there is no loss of real time process data.
3. At return of normal condition check no lost of communication.

This document is the property of TOTAL and must not be reproduced, stored or disclosed without permission from COMPANY.

OML100 [ODUDU & FSO UNITY]


ICSS SYSTEM Upgrade
Detailed Engineering
SMR/SOR/SIN nbr.

S0R-100-09-001
ENGINEERING TEAM

CONSTRUCTION TEAM

PROJ ECT TEAM

SURVEY T EA M

ICSS Network Performance DVT Procedure


COMPANY
ref. number

NG-ODU-XODU-IPA-070069

CONTRACTOR ref:

NG-ODU-XODU-IPA-070069

page:

18/42

Discipline

INS

23-Feb-15

Doc. Type

SPEC

--

(Syst.) Unit

NX

Rev.

Status

Rev. date

1.0

IDC

--

--

Record:
Use Appendix A to record the Result.
1.11. Safety Network Test: Step 2
1.11.1.

Test 2.4: Communication Capacity

Outline:
To verify that changes are correctly transferred, configured and displayed at maximum load.
Objective:
Purpose of this test is to check reliability of data transmission through Ethernet Modbus
Communication while loaded to its maximum of 1000 words.
Procedure:
1. The test routine will be responsible for generating the corresponding 500 analogue
increments in PCS,
processing them in the Tricon safety system and displaying the corresponding statuses on
the PCS.
2. Trends of send/received values will permit to check that time stamp between sending and
receiving data is respecting the criteria.
Result:
Criteria Max 1 sec
Record:
Use Appendix A to record the Result.

This document is the property of TOTAL and must not be reproduced, stored or disclosed without permission from COMPANY.

OML100 [ODUDU & FSO UNITY]


ICSS SYSTEM Upgrade
Detailed Engineering
SMR/SOR/SIN nbr.

S0R-100-09-001
ENGINEERING TEAM

CONSTRUCTION TEAM

PROJ ECT TEAM

SURVEY T EA M

ICSS Network Performance DVT Procedure


COMPANY
ref. number

NG-ODU-XODU-IPA-070069

CONTRACTOR ref:

NG-ODU-XODU-IPA-070069

page:

19/42

Discipline

INS

23-Feb-15

Doc. Type

SPEC

--

(Syst.) Unit

NX

Rev.

Status

Rev. date

1.0

IDC

--

--

1.12. Test 4.1: Digital Data (Read)


Outline:
To verify that changes are correctly transferred, configured and displayed.
Objective:
Purpose of this test is to check that the PCS is communicating with the Safety system and
there is no system alarm associated with the interface.
Procedure:
1. Initial Set Up

Identify the digital Modbus address input points to be tested from the database.
Check that the address configured on the PCS points correspond to the Modbus
addresses configured in the Safety system

2. Select a point from the CENTUM database. Change the PV of the selected point to ON
(State 1) from the PCS.
3. Change the PV from the selected point to OFF (State 0) from the PCS.
4. Repeats tests 2 and 3 for as many points as required for PCS.
Result:
1. The change of state for the point selected is replicated within the Triconex
2. The change of state for the point selected is replicated within the Triconex
3. Confirm the Results are the same
Record:
Use Appendix B to record the Result.
1.13. Test 4.2: Digital Data (Write)
Outline:
To verify that changes are correctly transferred, configured and displayed.

This document is the property of TOTAL and must not be reproduced, stored or disclosed without permission from COMPANY.

OML100 [ODUDU & FSO UNITY]


ICSS SYSTEM Upgrade
Detailed Engineering
SMR/SOR/SIN nbr.

S0R-100-09-001
ENGINEERING TEAM

CONSTRUCTION TEAM

PROJ ECT TEAM

SURVEY T EA M

ICSS Network Performance DVT Procedure


COMPANY
ref. number

NG-ODU-XODU-IPA-070069

CONTRACTOR ref:

NG-ODU-XODU-IPA-070069

page:

20/42

Discipline

INS

23-Feb-15

Doc. Type

SPEC

--

(Syst.) Unit

NX

Rev.

Status

Rev. date

1.0

IDC

--

--

Objective:
Purpose of this test is to check that the PCS is communicating with the Safety system
and there is no system alarm associated with the interface.
Procedure:
1. Initial Set Up

Identify the digital Modbus address input points to be tested from the database.
Check that the address configured on the PCS points correspond to the Modbus
addresses configured in the Safety system

2. Select a point from the CENTUM database. Change the PV of the selected point to ON
(State 1) from the PCS
3. Change the PV from the selected point to OFF (State 0) from the PCS
4. Repeats tests 2 and 3 for as many points as required for ICSS Triconex system.
Result:
1. The change of state for the point selected is replicated within the ICSS Triconex system
2. The change of state for the point selected is replicated within the ICSS Triconex system
3. Confirm the Results are the same
Record:
Use Appendix B to record the Result.
1.14. Test 4.3: Analogue Data (Read)
Outline:
To verify that changes are correctly transferred, configured and displayed.
Objective:
Purpose of this test is to check that the PCS is communicating with the Safety system and
there is no system alarm associated with the interface.

This document is the property of TOTAL and must not be reproduced, stored or disclosed without permission from COMPANY.

OML100 [ODUDU & FSO UNITY]


ICSS SYSTEM Upgrade
Detailed Engineering
SMR/SOR/SIN nbr.

S0R-100-09-001
ENGINEERING TEAM

CONSTRUCTION TEAM

PROJ ECT TEAM

SURVEY T EA M

ICSS Network Performance DVT Procedure


COMPANY
ref. number

NG-ODU-XODU-IPA-070069

CONTRACTOR ref:

NG-ODU-XODU-IPA-070069

page:

21/42

Discipline

INS

23-Feb-15

Doc. Type

SPEC

--

(Syst.) Unit

NX

Rev.

Status

Rev. date

1.0

IDC

--

--

Procedure:
1.Initial Set Up

Identify the analogue Modbus address input points to be tested from the database.
Check that the address configured on the PCS points correspond to the Modbus
addresses configured in the Safety system

2. Select a point from the CENTUM database. In the ICSS Triconex system, change the PV of
the equivalent tag to 0% of its engineering range.
3. Change the PV of the equivalent tag in the ICSS Triconex system to 50% of its
engineering range
4 Change the PV of the equivalent tag in the ICSS Triconex system to 100% of its
engineering range.
5 Repeats tests 3 and 4 for as many points as required for ICSS
Result:
1.
2.
3.
4.

The PV of the point selected on the CENTUM changes to 0% of its engineering range.
The PV for the point selected on the CENTUM changes 50% of its engineering range
The PV for the point selected on the CENTUM changes 100% of its engineering range
Confirm the Results are the same

Record:
Use Appendix B to record the Result.
1.15. Test4.4: Analogue Data (Write)
Outline:
To verify that changes are correctly transferred, configured and displayed.
Objective:
Purpose of this test is to check that the PCS is communicating with the Safety system and
there is no system alarm associated with the interface.
Procedure:
1. Initial Set Up

Identify the analogue input points to be tested from the database

This document is the property of TOTAL and must not be reproduced, stored or disclosed without permission from COMPANY.

OML100 [ODUDU & FSO UNITY]


ICSS SYSTEM Upgrade
Detailed Engineering
SMR/SOR/SIN nbr.

S0R-100-09-001
ENGINEERING TEAM

CONSTRUCTION TEAM

PROJ ECT TEAM

SURVEY T EA M

ICSS Network Performance DVT Procedure


COMPANY
ref. number

NG-ODU-XODU-IPA-070069

CONTRACTOR ref:

NG-ODU-XODU-IPA-070069

page:

22/42

Discipline

INS

23-Feb-15

Doc. Type

SPEC

--

(Syst.) Unit

NX

Rev.

Status

Rev. date

1.0

IDC

--

--

2. Check that the address configured on the PCS points correspond to the addresses
configured in the Safety system
3. Select a point from the ICSS Triconex system database. In the CENTUM, change the PV of
the equivalent tag to 0% of its engineering range.
3. Change the PV of the equivalent tag in the CENTUM to 50% of its engineering range
4 Change the PV of the equivalent tag in the CENTUM to 100% of its engineering range.
5 Repeats tests 3 and 4 for as many points as required for ICSS
Result:
1. The PV of the point selected on the Triconex system changes to 0% of its engineering
range.
2. The PV for the point selected on the Triconex system changes 50% of its engineering
range
3. The PV for the point selected on the Triconex system changes 100% of its engineering
range
4. Confirm the Results are the same
Record:
Use Appendix B to record the Result.
1.16. Test 4.5: Interface Cable Failure/ICSS Coms Module Failure
Outline:
Ensure that the redundancy of the Modbus Ethernet network allows failure on one cable
Objective:
Test the response of the PCS and the database to a failure in the cable(s) to the Safety
System.
Procedure:
1. Initial Set Up,
Ensure that PCS is communicating to the Safety system.
2. Build a group that contains points of various point type.
3. Disconnect cable between CENTUM communication controller and Triconex
communication module 1 (Device ICS 1).
4. Change the PV of the selected point in the group from the Triconex System.
5. Re-connect cable between CENTUM communication controller and the Triconex
communication module 1 (Device ICS 1).

This document is the property of TOTAL and must not be reproduced, stored or disclosed without permission from COMPANY.

OML100 [ODUDU & FSO UNITY]


ICSS SYSTEM Upgrade
Detailed Engineering
SMR/SOR/SIN nbr.

S0R-100-09-001
ENGINEERING TEAM

CONSTRUCTION TEAM

PROJ ECT TEAM

SURVEY T EA M

ICSS Network Performance DVT Procedure


COMPANY
ref. number

NG-ODU-XODU-IPA-070069

CONTRACTOR ref:

NG-ODU-XODU-IPA-070069

page:

23/42

Discipline

INS

23-Feb-15

Doc. Type

SPEC

--

(Syst.) Unit

NX

Rev.

Status

Rev. date

1.0

IDC

--

--

6. Remove the Triconex communication module 1 (Device ICS 1) on the same link to
simulate communication failure.
7. Restore the Triconex communication module 1 on the same link to recover
communication between CENTUM PCS and Triconex system.

This document is the property of TOTAL and must not be reproduced, stored or disclosed without permission from COMPANY.

OML100 [ODUDU & FSO UNITY]


ICSS SYSTEM Upgrade
Detailed Engineering
SMR/SOR/SIN nbr.

S0R-100-09-001
ENGINEERING TEAM

CONSTRUCTION TEAM

PROJ ECT TEAM

SURVEY T EA M

ICSS Network Performance DVT Procedure


COMPANY
ref. number

NG-ODU-XODU-IPA-070069

CONTRACTOR ref:

NG-ODU-XODU-IPA-070069

page:

24/42

Discipline

INS

23-Feb-15

Doc. Type

SPEC

--

(Syst.) Unit

NX

Rev.

Status

Rev. date

1.0

IDC

--

--

Result:
1. Verify that the PV of the points is valid and are the same as the Triconex system.
2. Confirm that the communication between CENTUM system and the Triconex is still
healthy and there is spurious data change but no alarm appears in the alarm summary to
indicate one link is not communicating.
3. Confirm PCS follow changes in Triconex system.
4. Confirm alarm is clear from the alarm summary.
5. Confirm that the Result is the same as point 2.
6. Confirm communication is re-established automatically without any intervention and the
system Status alarm is clear.
Record:
Use Appendix B to record the Result.
Safety Peer to Peer: Step 5
1.17. TEST 5.1 - INITIAL SET UP
Outline:
Initial Set up to verify the hardware and software set-ups are correct
Procedure:
1. Check test set-up and confirm that the equipment is connected as show in architecture
2. Check cable connection as per architecture. Mark-up drawing, if there are any
discrepancies.

Confirm ICSS device 1 module 1 is configured as follow


TCP/IP 1 address:
Sub-Mask address:
Confirm ICSS device 2 Module 2 is configured as follow
TCP/IP 1 address:
Sub-Mask address:
3. Check that ICSS Tricon, Trident system devices are set-up in a Master philosophy
4. Check that Tricon, Trident points are built and loaded into each device (16 digital values
and 16 analogue values as input and output)
6 Check that each Triconex system is powered up and the connection between Tricon,
Trident systems are as per architecture

This document is the property of TOTAL and must not be reproduced, stored or disclosed without permission from COMPANY.

OML100 [ODUDU & FSO UNITY]


ICSS SYSTEM Upgrade
Detailed Engineering
SMR/SOR/SIN nbr.

S0R-100-09-001
ENGINEERING TEAM

CONSTRUCTION TEAM

PROJ ECT TEAM

SURVEY T EA M

ICSS Network Performance DVT Procedure


COMPANY
ref. number

NG-ODU-XODU-IPA-070069

CONTRACTOR ref:

NG-ODU-XODU-IPA-070069

page:

25/42

Discipline

INS

23-Feb-15

Doc. Type

SPEC

--

(Syst.) Unit

NX

Rev.

Status

Rev. date

1.0

IDC

--

--

7 Check that each Triconex system is communicating to the other one (device 1 to device 2
and vis-versa).
Result:
ICSS Triconex system device 1 communicating to the ICSS Triconex system device 2.
Record:
Use Appendix C to record the Result.
Note:

Device 1 Module 1 = SSS module (Tricon)


Device 2 Module 2 = FGS module (Trident)

1.18. Test 5.2: Input / Output Digital Data (From Device 1 To Device 2)
Objective:
To verify that changes are correctly transferred, configured and displayed between two ICSS
SSS & FGS system.
Procedure:
1. Initial Set Up

Ensure that the initial conditions of test are set up correctly and ICSS Tricon system
device 1 is communicating to the ICSS Trident system device 2.
Identify the input/output digital points to be tested from the database of each ICSS
Triconex systems (SSS & FGS).

2. Select a point from the ICSS Tricon device 1 database. Change the PV of the selected
point to ON (State 1) from the ICSS Tricon System device 1.
3. Change the PV from the selected point to OFF (State 0) from the ICSS Tricon system
device 1
4 Repeats tests 2 and 3 for as many points as required for ICSS Tricon system device 1.

This document is the property of TOTAL and must not be reproduced, stored or disclosed without permission from COMPANY.

OML100 [ODUDU & FSO UNITY]


ICSS SYSTEM Upgrade
Detailed Engineering
SMR/SOR/SIN nbr.

S0R-100-09-001
ENGINEERING TEAM

CONSTRUCTION TEAM

PROJ ECT TEAM

SURVEY T EA M

ICSS Network Performance DVT Procedure


COMPANY
ref. number

NG-ODU-XODU-IPA-070069

CONTRACTOR ref:

NG-ODU-XODU-IPA-070069

page:

26/42

Discipline

INS

23-Feb-15

Doc. Type

SPEC

--

(Syst.) Unit

NX

Rev.

Status

Rev. date

1.0

IDC

--

--

Result:
1. The change of state for the point selected is replicated within the ICSS Trident system
device 2. Check that if the state corresponds to State 1 in the ICSS Trident system device 2,
the point goes to ON (State 1).
2. The change of state for the point selected is replicated within the ICSS Trident system
device 2. Check that if the state corresponds to State 0 in the ICSS Trident device 2, the
point goes to OFF (State 0).
3. Confirm the Results are the same.
Record:
Use Appendix C to record the Result.
Note:
Device 2: Trident controller (FGS)
1.19. Test 5.3: Input / Output Digital Data (From Device 2 To Device 1)
Objective:
To verify that changes are correctly transferred, configured and displayed between two ICSS
Triconex Systems.
Procedure:
1. Initial Set Up

Ensure that the initial conditions of test are set up correctly and ICSS Trident system
device 2 is communicating to the ICSS Tricon system device 1.
Identify the input/output digital points to be tested from the database of each ICSS
Triconex system.

2. Select a point from the ICSS Tricon system device 2 database. Change the PV of the
selected point to ON (State 1) from the ICSS Tricon System device 2.
3. Change the PV from the selected point to OFF (State 0) from the ICSS Tricon system
device 2
4 Repeats tests 2 and 3 for as many points as required for ICSS Tricon system device 2.
Result:

This document is the property of TOTAL and must not be reproduced, stored or disclosed without permission from COMPANY.

OML100 [ODUDU & FSO UNITY]


ICSS SYSTEM Upgrade
Detailed Engineering
SMR/SOR/SIN nbr.

S0R-100-09-001
ENGINEERING TEAM

CONSTRUCTION TEAM

PROJ ECT TEAM

SURVEY T EA M

ICSS Network Performance DVT Procedure


COMPANY
ref. number

NG-ODU-XODU-IPA-070069

CONTRACTOR ref:

NG-ODU-XODU-IPA-070069

page:

27/42

Discipline

INS

23-Feb-15

Doc. Type

SPEC

--

(Syst.) Unit

NX

Rev.

Status

Rev. date

1.0

IDC

--

--

1. The change of state for the point selected is replicated within the ICSS Trident system
device 1. Check that if the state corresponds to State 1 in the ICSS Trident system device 1,
the point goes to ON (State 1).
2. The change of state for the point selected is replicated within the ICSS Trident system
device 1. Check that if the state corresponds to State 0 in the ICSS Trident device 1, the
point goes to OFF (State 0).
3. Confirm the Results are the same.
Record:
Use Appendix C to record the Result.
1.20. Test 5.4: Input / Output Analogue Data (From Device 1 To Device 2)
Objective:
To verify that changes are correctly transferred, configured and displayed between two ICSS
Triconex Systems.
Procedure:
1. Initial Set Up

Ensure that the initial conditions of test are set up correctly and ICSS Tricon system
device 1 is communicating to the ICSS Trident system device 2.
Identify the input/output analogue points to be tested from the database of each
ICSS
Triconex system.

2. Select a point from the ICSS Tricon system device 1 database. In the ICSS Tricon system
device 1, change the PV of the equivalent tag to 0% of its engineering range.
3. Change the PV of the equivalent tag in the ICSS Tricon system device 1 to 50% of its
engineering range.
4 Change the PV of the equivalent tag in the ICSS Tricon system device 1 to 100% of its
engineering range.
5 Repeats tests 2 and 4 for as many points as required for ICSS Trident system device 2.
Result:
1. The PV of the point selected on the ICSS Trident system device 2 changes to 0% of its
engineering range.
2. The PV for the point selected on the ICSS Trident system device 2 changes 50% of its
engineering range.

This document is the property of TOTAL and must not be reproduced, stored or disclosed without permission from COMPANY.

OML100 [ODUDU & FSO UNITY]


ICSS SYSTEM Upgrade
Detailed Engineering
SMR/SOR/SIN nbr.

S0R-100-09-001
ENGINEERING TEAM

CONSTRUCTION TEAM

PROJ ECT TEAM

SURVEY T EA M

ICSS Network Performance DVT Procedure


COMPANY
ref. number

NG-ODU-XODU-IPA-070069

CONTRACTOR ref:

NG-ODU-XODU-IPA-070069

28/42

page:
Discipline

INS

23-Feb-15

Doc. Type

SPEC

--

(Syst.) Unit

NX

Rev.

Status

Rev. date

1.0

IDC

--

--

3. The PV for the point selected on the ICSS Trident system device 2 changes 100% of its
engineering range.
4. Confirm the Results are the same.
Record:
Use Appendix C to record the Result.
1.21. Test 5.5: Input / Output Analogue Data (From Device 2 To Device 1)
Objective:
To verify that changes are correctly transferred, configured and displayed between two ICSS
Triconex Systems.
Procedure:
1. Initial Set Up

Ensure that the initial conditions of test are set up correctly and FGS system device 2
is communicating to the SSS system device 1.
Identify the input/output analogue points to be tested from the database of each
ICSS Triconex system.

2. Select a point from the FGS system device 2 database. In the FGS system device 2,
change the PV of the equivalent tag to 0% of its engineering range.
3. Change the PV of the equivalent tag in the FGS system device 2 to 50% of its
engineering range.
4 Change the PV of the equivalent tag in the FGS system device 2 to 100% of its
engineering range.
5 Repeats tests 2 and 4 for as many points as required for FGS system device 2.
Result:
1. The PV of the point selected on the SSS system device 1 changes to 0% of its
engineering range.
2. The PV for the point selected on the SSS system device 1 changes 50% of its engineering
range.
3. The PV for the point selected on the SSS system device 1 changes 100% of its
engineering range.
4. Confirm the Results are the same.

This document is the property of TOTAL and must not be reproduced, stored or disclosed without permission from COMPANY.

OML100 [ODUDU & FSO UNITY]


ICSS SYSTEM Upgrade
Detailed Engineering
SMR/SOR/SIN nbr.

S0R-100-09-001
ENGINEERING TEAM

CONSTRUCTION TEAM

PROJ ECT TEAM

SURVEY T EA M

ICSS Network Performance DVT Procedure


COMPANY
ref. number

NG-ODU-XODU-IPA-070069

CONTRACTOR ref:

NG-ODU-XODU-IPA-070069

29/42

page:
Discipline

INS

23-Feb-15

Doc. Type

SPEC

--

(Syst.) Unit

NX

Rev.

Status

Rev. date

1.0

IDC

--

--

Record:
Use Appendix C to record the Result.
Note:
Device1= Tricon Module(SSS)
Device2= Trident Module(FGS)
1.22. Test 5.6: P2P Interface Cable Failure/ICSS Coms Module Failure
Objective:
Test the response between ICSS Triconex systems to a failure in the cable(s) to the ICSS
Triconex systems
Procedure:
1. Initial Set Up

Ensure that the initial conditions of test are set up correctly and ICSS Triconex system
device 1 is communicating to the device 2.

ACTION 1: Build a group that contains points of various point type.


RESULT 1: Verify that the PV of the points is valid and are the same in device 1and 2
ACTION 2: Disconnect network 1 cable between ICSS Tricon communication module 1
device 1 and
ICSS Trident communication module 1 device 2.
RESULT 2: Confirm that the communication between device 1 and the device 2 is still
healthy on network 2.
Check that the status bit of input data (network 1) is set to 0 (FALSE) after refresh time out
period exceeded, and input data do not go to the fail safe value depending on CONTROL
rack variable state set by the application. Refer to appendix D for detail of CONTROL
racksetup.
Check that the status bit of device 2 (network 2) of input data is set to 1 (TRUE).
Check that the status bit of device 1 (network 1) of input data is set to 0 (FALSE). Idem as
device 2
Check that the status bit of device 1 (network 2) of input data is set to 1 (TRUE).
ACTION 3: Change the PV of the selected point in the group from the ICSS Tricon System
device 1.
RESULT 3: Confirm ICSS Triconex system device 2 follow changes in ICSS Trident system
device 1.

This document is the property of TOTAL and must not be reproduced, stored or disclosed without permission from COMPANY.

OML100 [ODUDU & FSO UNITY]


ICSS SYSTEM Upgrade
Detailed Engineering
SMR/SOR/SIN nbr.

S0R-100-09-001
ENGINEERING TEAM

CONSTRUCTION TEAM

PROJ ECT TEAM

SURVEY T EA M

ICSS Network Performance DVT Procedure


COMPANY
ref. number

NG-ODU-XODU-IPA-070069

CONTRACTOR ref:

NG-ODU-XODU-IPA-070069

page:

30/42

Discipline

INS

23-Feb-15

Doc. Type

SPEC

--

(Syst.) Unit

NX

Rev.

Status

Rev. date

1.0

IDC

--

--

ACTION 4: Re-connect cable between ICSS Tricon communication module 1 device 1 and
the ICSS
Trident communication module 1 device 2.
RESULT 4: Confirm communication between ICSS Triconex system on network 1 is reestablished
Check that the status bit of device 1 (network 1 & 2) of input data is set to 1 (TRUE).
Check that the status bit of device 2 (network 1 & 2) of input data is set to 1 (TRUE).

This document is the property of TOTAL and must not be reproduced, stored or disclosed without permission from COMPANY.

OML100 [ODUDU & FSO UNITY]


ICSS SYSTEM Upgrade
Detailed Engineering
SMR/SOR/SIN nbr.

S0R-100-09-001
ENGINEERING TEAM

CONSTRUCTION TEAM

PROJ ECT TEAM

SURVEY T EA M

ICSS Network Performance DVT Procedure


COMPANY
ref. number

NG-ODU-XODU-IPA-070069

CONTRACTOR ref:

NG-ODU-XODU-IPA-070069

page:

31/42

Discipline

INS

23-Feb-15

Doc. Type

SPEC

--

(Syst.) Unit

NX

Rev.

Status

Rev. date

1.0

IDC

--

--

ACTION 5: Disconnect network 2 cable between ICSS Tricon communication module 2


device 1 and
ICSS Trident communication module 2 device 2.
RESULT 5: Confirm that the communication between ICSS Tricon system device 1 and
device 2 is still healthy on network 1.
Check that the status bit of input data (network 2) is set to 0 (FALSE) after refresh time out
period exceeded, and input data do not go to the fail safe value depending on CONTROL
rack variable state set by the application. Refer to appendix D for detail of CONTROL rack
setup.
Check that the status bit of device 2 (network 1) of input data is set to 1 (TRUE).
Check that the status bit of device 1 (network 2) of input data us set to 0 (FALSE). Idem as
device 2
Check that the status bit of device 1 (network 1) of input data is set to 1 (TRUE).
ACTION 6: Change the PV of the selected point in the group from the ICSS Tricon System
device 1.
RESULT 6: Confirm FGS system device 2 follow changes in ICSS Tricon system device 1.
ACTION 7: Re-connect cable between ICSS Tricon communication module 2 device 1 and
the ICSS
Trident communication module 2 device 2.
RESULT 7: Confirm communication between ICSS Triconex system on network 2 is reestablished
Check that the status bit of device 1 (network 1 & 2) of input data is set to 1 (TRUE).
Check that the status bit of device 2 (network 1 & 2) of input data is set to 1 (TRUE).
ACTION 8: Disconnect network 1 and 2 cable between ICSS Tricon communication module
1&2 device1 and ICSS Trident communication module 1&2 device 2.
RESULT 8: Confirm that the communication between ICSS Tricon system device 1 and the
ICSS
Trident system device 2 is still shutdown on both network 1 & 2.
Check that the status bit of input data of each device (network 1 & 2) is set to 0 (FALSE)
after refresh time out period exceeded, and input data go to the fail safe value depending
on CONTROL rack variable state set by the application.
ACTION 9: Change the PV of the selected point in the group from the ICSS Tricon System
device 1.
RESULT 9: Confirm ICSS Trident system device 2 do not follow changes in Tricon system
device 1.
ACTION 10: Change the PV of the selected point in the group from the ICSS Trident System
device 2.

This document is the property of TOTAL and must not be reproduced, stored or disclosed without permission from COMPANY.

OML100 [ODUDU & FSO UNITY]


ICSS SYSTEM Upgrade
Detailed Engineering
SMR/SOR/SIN nbr.

S0R-100-09-001
ENGINEERING TEAM

CONSTRUCTION TEAM

PROJ ECT TEAM

SURVEY T EA M

ICSS Network Performance DVT Procedure


COMPANY
ref. number

NG-ODU-XODU-IPA-070069

CONTRACTOR ref:

NG-ODU-XODU-IPA-070069

page:

32/42

Discipline

INS

23-Feb-15

Doc. Type

SPEC

--

(Syst.) Unit

NX

Rev.

Status

Rev. date

1.0

IDC

--

--

RESULT 10: Confirm ICSS Tricon system device 1 do not follow changes in ICSS Trident
system device 2.

This document is the property of TOTAL and must not be reproduced, stored or disclosed without permission from COMPANY.

OML100 [ODUDU & FSO UNITY]


ICSS SYSTEM Upgrade
Detailed Engineering
SMR/SOR/SIN nbr.

S0R-100-09-001
ENGINEERING TEAM

CONSTRUCTION TEAM

PROJ ECT TEAM

SURVEY T EA M

ICSS Network Performance DVT Procedure


COMPANY
ref. number

NG-ODU-XODU-IPA-070069

CONTRACTOR ref:

NG-ODU-XODU-IPA-070069

page:

33/42

Discipline

INS

23-Feb-15

Doc. Type

SPEC

--

(Syst.) Unit

NX

Rev.

Status

Rev. date

1.0

IDC

--

--

ACTION 11: Change Failure from FAIL SAFE state to HOLD state and repeats Actions tests 1
to 7.
RESULT 11: Confirm the Results are the same withhold data.
ACTION 12: Remove the Tricon communication module 1 device 1 on the network 1 to
simulate
communication failure.
RESULT 12: Confirm that the Result is the same as Result 2.
ACTION 13: Restore the ICSS Tricon communication module 1 device 1 on the network 1 to
recover
communication between ICSS Triconex system device 1 and 2.
RESULT 13: Confirm communication is re-established automatically without any
intervention and the
system Status alarm is clear.
ACTION 14: Remove the ICSS Tricon communication module 2 device 1 on the network 2
to simulate
communication failure.
RESULT 14: Confirm that the Result is the same as Result 2.
ACTION 15: Restore the ICSS Tricon communication module 2 device 1 on the network 2 to
recover
communication between ICSS Triconex system device 1 and 2.
RESULT 15: Confirm communication is re-established automatically without any
intervention and the
system Status alarm is clear.
ACTION 16: Remove the ICSS Trident communication module 1 device 2 on the network 1
to simulate
communication failure.
RESULT 16: Confirm that the Result is the same as Result 2.

This document is the property of TOTAL and must not be reproduced, stored or disclosed without permission from COMPANY.

OML100 [ODUDU & FSO UNITY]


ICSS SYSTEM Upgrade
Detailed Engineering
SMR/SOR/SIN nbr.

S0R-100-09-001
ENGINEERING TEAM

CONSTRUCTION TEAM

PROJ ECT TEAM

SURVEY T EA M

ICSS Network Performance DVT Procedure


COMPANY
ref. number

NG-ODU-XODU-IPA-070069

CONTRACTOR ref:

NG-ODU-XODU-IPA-070069

page:

34/42

Discipline

INS

23-Feb-15

Doc. Type

SPEC

--

(Syst.) Unit

NX

Rev.

Status

Rev. date

1.0

IDC

--

--

ACTION 17: Restore the ICSS Trident communication module 1 device 2 on the network 1
to recover
communication between ICSS Triconex system device 1 and 2.
RESULT 17: Confirm communication is re-established automatically without any
intervention and the
system Status alarm is clear.
ACTION 18: Remove the ICSS Trident communication module 2 device 2 on the network 2
to simulate
communication failure.
RESULT 18: Confirm that the Result is the same as Result 2.
ACTION 19: Restore the ICSS Trident communication module 2 device 2 on the network 2
to recover
communication between ICSS Triconex system device 1 and 2.
RESULT 19: Confirm communication is re-established automatically without any
intervention and the
system Status alarm is clear.
ACTION 20: Remove the ICSS Tricon communication module 1 & 2 device 1 to simulate
communication
failure.
RESULT 20: Confirm that the Result is the same as Result 8.
ACTION 21: Remove the Trident communication module 1 & 2 device 2 to simulate
communication failure.
RESULT 21: Confirm that the Result is the same as Result 8.

This document is the property of TOTAL and must not be reproduced, stored or disclosed without permission from COMPANY.

OML100 [ODUDU & FSO UNITY]


ICSS SYSTEM Upgrade
Detailed Engineering
SMR/SOR/SIN nbr.

S0R-100-09-001
ENGINEERING TEAM

CONSTRUCTION TEAM

PROJ ECT TEAM

SURVEY T EA M

ICSS Network Performance DVT Procedure


COMPANY
ref. number

NG-ODU-XODU-IPA-070069

CONTRACTOR ref:

NG-ODU-XODU-IPA-070069

page:

35/42

Discipline

INS

23-Feb-15

Doc. Type

SPEC

--

(Syst.) Unit

NX

Rev.

Status

Rev. date

1.0

IDC

--

--

Tests Sheets: Formally Agreed Additional Tests


Objective:

Procedure:

Result:

Record:

This document is the property of TOTAL and must not be reproduced, stored or disclosed without permission from COMPANY.

OML100 [ODUDU & FSO UNITY]


ICSS SYSTEM Upgrade
Detailed Engineering
SMR/SOR/SIN nbr.

S0R-100-09-001
ENGINEERING TEAM

CONSTRUCTION TEAM

PROJ ECT TEAM

SURVEY T EA M

ICSS Network Performance DVT Procedure


COMPANY
ref. number

NG-ODU-XODU-IPA-070069

CONTRACTOR ref:

NG-ODU-XODU-IPA-070069

36/42

page:
Discipline

INS

23-Feb-15

Doc. Type

SPEC

--

(Syst.) Unit

NX

Rev.

Status

Rev. date

1.0

IDC

--

--

Appendix
1.23. Appendix A
Project NO
:
Project Name :
Customer
:

TN140721
OML 100 UPGRADE PROJECT
TOTAL E&P NIGERIA
End User

TOTAL E&P NIGERIA

Step:1
Test # 1.1

Communication
YES
established
Tag #
State 1

State 2

Test # 1.2

Tag #

State 1

State 2

Test # 1.3

Tag #

State 1

State 2

TEPNG

Signature

NO

Fault log #

Intech Process Automation

Name:

Name:

Date:

Date:

This document is the property of TOTAL and must not be reproduced, stored or disclosed without permission from COMPANY.

Signature

OML100 [ODUDU & FSO UNITY]


ICSS SYSTEM Upgrade
Detailed Engineering
SMR/SOR/SIN nbr.

S0R-100-09-001
ENGINEERING TEAM

CONSTRUCTION TEAM

PROJ ECT TEAM

SURVEY T EA M

ICSS Network Performance DVT Procedure


COMPANY
ref. number

NG-ODU-XODU-IPA-070069

CONTRACTOR ref:

NG-ODU-XODU-IPA-070069

37/42

page:
Discipline

INS

23-Feb-15

Doc. Type

SPEC

--

(Syst.) Unit

NX

Rev.

Status

Rev. date

1.0

IDC

--

--

Step 2
Test # 2.1

Communication
YES
established
Tag #
State 1

State 2

Test # 2.2

Tag #

State 1

State 2

Test # 2.3

Tag #

State 1

State 2

Test # 2.4

Tag #

State 1

State 2

TEPNG

NO

Intech Process
Automation

Signature

Name:

Name:

Date:

Date:

Fault log #

Signature

This document is the property of TOTAL and must not be reproduced, stored or disclosed without permission from COMPANY.

OML100 [ODUDU & FSO UNITY]


ICSS SYSTEM Upgrade
Detailed Engineering
SMR/SOR/SIN nbr.

S0R-100-09-001
ENGINEERING TEAM

CONSTRUCTION TEAM

PROJ ECT TEAM

SURVEY T EA M

ICSS Network Performance DVT Procedure


COMPANY
ref. number

NG-ODU-XODU-IPA-070069

CONTRACTOR ref:

NG-ODU-XODU-IPA-070069

38/42

page:
Discipline

INS

23-Feb-15

Doc. Type

SPEC

--

(Syst.) Unit

NX

Rev.

Status

Rev. date

1.0

IDC

--

--

Step 3
Test # 3.1

Communication
YES
established
Tag #
State 1

State 2

Test # 3.2

Tag #

State 1

State 2

Test # 3.3

Tag #

State 1

State 2

TEPNG

NO

Intech Process
Automation

Signature

Name:

Name:

Date:

Date:

Fault log #

Signature

Table 4: Appendix A

This document is the property of TOTAL and must not be reproduced, stored or disclosed without permission from COMPANY.

OML100 [ODUDU & FSO UNITY]


ICSS SYSTEM Upgrade
Detailed Engineering
SMR/SOR/SIN nbr.

S0R-100-09-001
ENGINEERING TEAM

CONSTRUCTION TEAM

PROJ ECT TEAM

SURVEY T EA M

ICSS Network Performance DVT Procedure


COMPANY
ref. number

NG-ODU-XODU-IPA-070069

CONTRACTOR ref:

NG-ODU-XODU-IPA-070069

39/42

page:
Discipline

INS

23-Feb-15

Doc. Type

SPEC

--

(Syst.) Unit

NX

Rev.

Status

Rev. date

1.0

IDC

--

--

1.24. Appendix B
Project NO
:
Project Name :
Customer
:

TN140721
OML 100 UPGRADE PROJECT
TOTAL E&P NIGERIA
End User

TOTAL E&P NIGERIA

Step:4
Test # 4.1

Communication
YES
established
Tag #
State 1

State 2

Test # 4.2

Tag #

State 1

State 2

Test # 4.3

Tag #

State 1

State 2

Test # 4.4

Tag #

State 1

State 2

NO

Fault log #

This document is the property of TOTAL and must not be reproduced, stored or disclosed without permission from COMPANY.

OML100 [ODUDU & FSO UNITY]


ICSS SYSTEM Upgrade
Detailed Engineering
SMR/SOR/SIN nbr.

S0R-100-09-001
ENGINEERING TEAM

CONSTRUCTION TEAM

PROJ ECT TEAM

SURVEY T EA M

ICSS Network Performance DVT Procedure


COMPANY
ref. number

NG-ODU-XODU-IPA-070069

CONTRACTOR ref:

NG-ODU-XODU-IPA-070069

Test # 4.5

Tag #

TEPNG

State 1

40/42

page:
Discipline

INS

23-Feb-15

Doc. Type

SPEC

--

(Syst.) Unit

NX

Rev.

Status

Rev. date

1.0

IDC

--

--

State 2

Intech Process
Automation

Signature

Name:

Name:

Date:

Date:

Signature

Table 5: Appendix B

This document is the property of TOTAL and must not be reproduced, stored or disclosed without permission from COMPANY.

OML100 [ODUDU & FSO UNITY]


ICSS SYSTEM Upgrade
Detailed Engineering
SMR/SOR/SIN nbr.

S0R-100-09-001
ENGINEERING TEAM

CONSTRUCTION TEAM

PROJ ECT TEAM

SURVEY T EA M

ICSS Network Performance DVT Procedure


COMPANY
ref. number

NG-ODU-XODU-IPA-070069

CONTRACTOR ref:

NG-ODU-XODU-IPA-070069

41/42

page:
Discipline

INS

23-Feb-15

Doc. Type

SPEC

--

(Syst.) Unit

NX

Rev.

Status

Rev. date

1.0

IDC

--

--

1.25. Appendix C
Project NO
:
Project Name :
Customer
:

TN140721
OML 100 UPGRADE PROJECT
TOTAL E&P NIGERIA
End User

TOTAL E&P NIGERIA

Step:5
Test # 5.1

Communication
YES
established
Tag #
State 1

State 2

Test # 5.2

Tag #

State 1

State 2

Test # 5.3

Tag #

State 1

State 2

Test # 5.4

Tag #

State 1

State 2

NO

Fault log #

This document is the property of TOTAL and must not be reproduced, stored or disclosed without permission from COMPANY.

OML100 [ODUDU & FSO UNITY]


ICSS SYSTEM Upgrade
Detailed Engineering
SMR/SOR/SIN nbr.

S0R-100-09-001
ENGINEERING TEAM

CONSTRUCTION TEAM

PROJ ECT TEAM

SURVEY T EA M

ICSS Network Performance DVT Procedure


COMPANY
ref. number

NG-ODU-XODU-IPA-070069

CONTRACTOR ref:

NG-ODU-XODU-IPA-070069

Test # 5.5

Tag #

State 1

State 2

Test # 5.6

Tag #

State 1

State 2

TEPNG

INS

23-Feb-15

Doc. Type

SPEC

--

(Syst.) Unit

NX

Status

Rev. date

1.0

IDC

--

--

Intech Process
Automation

Signature

Name:

Name:

Date:

Date:

42/42

page:
Discipline

Rev.

Signature

Table 6: Appendix C

This document is the property of TOTAL and must not be reproduced, stored or disclosed without permission from COMPANY.