Professional Documents
Culture Documents
Vol.23,aNo. 3,a2010
DOI:10.3901/CJME.2010.04.***,availableonlineatwww.cjmenet.comwww.cjmenet.com.cn
NewMethodtoMeasuretheFillLeveloftheBallMillI
TheoreticalAnalysisandDEMSimulation
HUANGPeng*,JIAMinping andZHONGBinglin
SchoolofMechanicalEngineering,SoutheastUniversity,Nanjing211189,China
Received March3,2009revised May 24,2010 accepted June 10,2010published electronically June 20,2010
Abstract:Uptonow,theaccuratemeasurementofthefilllevelintheballmillhasntbeenresolvedbecauseoftheinterplayofmany
variablefactors,whichledthemilltobeoperatedundertheuneconomicalconditionandlostalotofenergy.Atpresent,somemethods,
suchasvibrationmethodandacousticmethod,havebeenappliedformeasuringthefilllevelbytheresearchers.Aimingattheproblem
ofthetraditionalmethodsformeasuringthefilllevel,thatis,thefeaturevariablesofthefilllevelsuffertheinfluencesoftheballload
andthewatercontentofthecoal,anovelmethodtomeasurethefilllevelisproposedandapossiblerelationbetweenthefillleveland
theangularpositionofthemaximumvibrationpointonthemillshellisinvestigated.Theangularpositionsofthemaximumvibration
point on the mill shell for different fill level cases are calculated theoretically under two assumptions, respectively. Meanwhile the
charge motions of the mill for different fill level cases are simulated with the discrete element method (DEM). And the simulation
resultsareverifiedbycomparingthemotiontrajectoriesofsteelballsandpowerdraftofthemill.Thesimulatedmovementtrajectories
oftheoutmostlayersteelballs inthemill aremonitored andanalyzedtoobtain theangularpositionsofthemaximumvibrationpointon
the mill shell. Both the results of the theoretical calculation and the 3D DEM simulation show that the position of the maximum
vibrationpointonthemillshellmovestoalowerangularpositionsasthefillleveldecreasing,whichprovidesanewideaformeasuring
thefilllevel accurately.
Keywords: ballmill, filllevel, discreteelementmethod(DEM), simulation
YHUANGPeng,etal:NewMethodtoMeasuretheFillLeveloftheBallMillITheoreticalAnalysisandDEMSimulation
Vcoal
100%,
Vmill -Vball
2 TheoreticalCalculation
180 Z
Comparedwithsteelballsinotherlayers,thesteelballs
in the outmost layer steel balls have the greatest impulse
and kinetic energy in the course of falling, and the
maximumvibrationpointon themillshellisgeneratedby
thefallingimpactofsteelballsinthislayer.Thepositions
of the outmostlayersteelballscanbeseeninFig.1.
Outmostlayer
steelballs
v
G
Outmostlayer
steelball
Parabolic
trajectory
Y
270
90
Accumulation
surface
(1)
0H
Fig.2. Schematicdiagramofmotiontrajectory
oftheoutmost steelballinthemill
WhentheballreachesthedetachmentpointG,asshown
in Fig. 2, this ball begins a parabolic movement. The
intersection point (collision point) between this parabolic
trajectoryandaccumulationsurfaceispointD(0,a,b).In
the course of falling, when the steel balls impacts on the
coal particles, the part of impact energy of steel balls is
Fig.1. Schematicdiagramofmotionof the steelballs
absorbed by coal particles to realize the grinding and
inmanylayersinthemill
comminutingofcoal,andanotherpartofimpactenergyis
delivered from the collision point to the mill shell and
Whentheoutmostlayersteelballimpactsdirectly onthe causes the vibration of the shell. So the position of the
mill wall, the collision point is the maximum vibration maximum vibration point is at a minimum distance from
point of themill shell. When thesteel ball in the outmost the collision point on the mill shell, and point B (0, y, z)
layer impacts on coal particles, the impact energy is (seeFig.2)denotesthemaximumvibrationpoint.Herethe
deliveredtothemillshell,whichalsoleadstoamaximum minimum distance is obtained witharestrictive condition,
Y
CHINESEJOURNALOFMECHANICALENGINEERING
whichisexpressedby
u = m 2 = ( a - y ) 2 + (b - z) 2,
y 2 + z 2 = R 2,
(2)
(3)
Thenparameteru canbecalculatedasfollows:
u = ( a - y ) 2 + (b + R 2 -y 2 )2 .
Filllevel
L/%
(4)
0
5
10
15
Eq.(4)takingthederivativeofyatbothitsendscanbe
determinedby
2by
2
(5)
R - y
y =
aR
a2 + b2
(6)
z =-
bR
a2 + b2
(7)
2
z = R cos a + tv sin a - 0.5gt
z =CH - R.
(8)
Angularposition
of point B /()
336.1
334.6
333.6
331.7
u
= -2a+
y
Coordinate
PointD
PointB
a/m
b/m
y/m
z/m
0.47
1.05
0.71
1.60
0.43
0.91
0.75
1.58
0.39
0.78
0.78
1.57
0.35
0.65
0.83
1.54
335
334
333
332
(9)
331
0
10
15
Filllevel L/%
YHUANGPeng,etal:NewMethodtoMeasuretheFillLeveloftheBallMillITheoreticalAnalysisandDEMSimulation
ofballBrelative toballAatthecontactpoint,isgivenby
& B,i - m
&A,i,
vi = m
i =1, 2, 3.
(12)
Thenormalandshearcomponentsof vi are
vn ,i = v j n j ni,
i = j =1, 2, 3.
(13)
(14)
i =1, 2, 3,
(15)
RB
RA
d
Y,2
Z
X
r
n
Z,3
X,1
(a) L=0%
(b)L=5%
(c)L=10%
(d) L=15%
Fig.4. SchematicdiagramofballAtoballBincollision
For theballballcontact,theunitnormalvector,n,from
thecenterofballAtothatofballBthatdefinesthecontact
plane, isgivenby
ni = ( mB,i - mA,i ) d ,
i =1, 2,3.
(10)
2
d = ( mB,i - m A,i )( mB,i - mA,i ) ,
i
i = 1, 2,3. (11)
1.0
0.8
0.6
0.4
0.2
0.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
1.6
zcoordinate
G
Detachment
point
ycoordinate
xcoordinate
B
Collision
point
1.0
2.0 2.5
Time t/s
1.5
Collision
point
zcoordinate
Fig.6. VariationofcoordinatesoftheballCwithtimeduring
foursecondsintheDEMsimulation
Parabolic
movement
1.0
0.0
1.0
2.0
ydirection
3.0
Collision
velocity
4.0
1.0
1.5
3.5
(d) L=15%
3.0
2.0
xcoordinate
0.5
3.0
ycoordinate
Detachment
point
1.2
1.0
0.8
0.6
0.4
0.2
0.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
1.6
0.5
Velocityv/m/s
Coordinatex,y,z/m
ofthemill.Becausethechargemotionoftheexperimental
industrialmillcannotbephotographedbythecamera,the
simulated charge motion was only compared with the
theoretical chargemotion of the test mill in this research.
Thecataractingtrajectoriesoftheouterballsandcascading
trajectories of the inner balls, as shown in Fig. 5, agree
closely with the theoretic trajectories. In the DEM
simulation,thepositionsandvelocitiesofthe steelballCin
the outmost layer were monitored. Fig. 6 shows the
changes of positions (x, y and z coordinate) of the ball C
with respect to time for four levels of fill level (0%, 5%,
10%and15%),respectively.AndFig.7showsthechanges
ofvelocities(yandzdirection)oftheballCwithrespectto
time for four levels of fill level (0%, 5%, 10% and 15%),
respectively.
Coordinatex,y,z/m
CHINESEJOURNALOFMECHANICALENGINEERING
2.0 2.5
Time t/s
3.0
5.0
3.5
zdirection
6.0
0.5
1.0
1.5
2.0 2.5
Time t/s
(a) L=0%
3.0
3.5
1.0
0.8
0.6
0.4
0.2
0.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
1.6
Detachment
point
ycoordinate
Velocity v/m/s
Coordinatex,y,z/m
(a) L=0%
zcoordinate
xcoordinate
B
Collision
point
0.5
1.0
1.5
2.0 2.5
Time t/s
3.0
4.0
3.0
2.0
1.0
Parabolic
movement
0.0
1.0
2.0
3.0
4.0
5.0
6.0
3.5
ydirection
0.5
1.0
Detachment
point
ycoordinate
xcoordinate
Collision
point
1.0
1.5
2.0 2.5
Time t/s
zcoordinate
0.5
1.5
3.0
3.5
(b) L=5%
Velocityv/m/s
Coordinatex,y,z/m
(b) L=5%
1.0
0.8
0.6
0.4
0.2
0.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
1.6
Collision
velocity
zdirection
2.0 2.5
Time t/s
(c)L=10%
3.0
3.5
Parabolic
movement
4.0
3.0
2.0
1.0
0.0
1.0
2.0
ydirection
3.0
4.0
5.0
zdirection
Collision
velocity
6.0
0.5
1.0
1.5
2.0 2.5
Time t/s
(c)L=10%
3.0
3.5
YHUANGPeng,etal:NewMethodtoMeasuretheFillLeveloftheBallMillITheoreticalAnalysisandDEMSimulation
ballsinthemillandclingstothemillwall.Whenthemill
begins to rotate, ball C runs circular movement firstly,
which can be reflected by the changes of y and z
coordinates of ball C in Fig. 6. Once ball C passes across
the detachment point G, ball C starts to do parabolic
movement, which can be demonstrated by the constant
velocityprocessinydirectioninFig.7.Andtheprocesses
of parabolic movement are tagged by four ellipses in Fig.
7(a), 7(b), 7(c) and 7(d), respectively. When ball C in y
direction begins to do uniform motion, this ball locates at
thedetachmentpoint,andthecoordinatesofthispointcan
be gained from Fig. 6. Table 2 shows a comparison of
theoreticandsimulatedvaluesofpositionsandvelocitiesof
detachment point for ball C. An exact match between the
simulated and theoretic values can be obtained fromTable
2,whichcanclarifythepositionsofthetoeandshoulderof
theballchargearealsocloselymatched.
Parabolic
movement
3.0
Velocity v/m/s
2.0
1.0
0.0
1.0
2.0
ydirection
3.0
4.0
zdirection
Collision
velocity
5.0
6.0
0.5
1.0
1.5
2.0
2.5
Time t/s
3.0
3.5
(d) L=15%
Fig.7. Variationof velocities of ballCwithtimeduring 4 s
intheDEMsimulation
Coordinateofdetachmentpoint
Velocityofdetachmentpoint
Theoreticalvalue
Coordinateofdetachment
Velocityofdetachmentpoint
point
y/m
z/m
vy/ (ms1)
vz/ (ms1)
y/m
z/m
vy/(ms1)
vz/ (ms1)
1.39
0.98
2.02
2.10
1.40
1.05
1.93
2.57
1.36
0.99
2.03
1.98
1.40
1.05
1.93
2.57
10
1.33
1.00
2.07
1.96
1.40
1.05
1.93
2.57
15
1.29
1.04
2.06
2.03
1.40
1.05
1.93
2.57
PowerofballmillP/kW
DEMsimulation
Experiment
608
622
675
689
10
743
715
15
778
760
3.3Analysisofmotiontrajectoryoftheoutmostlayer
steelball
During the period of parabolic movement, ball C does
uniformmotioniny direction,anddoesfreefallmotioninz
direction, which can be demonstrated by the changes of
velocitiesinyandzdirectionsinFig.7.Whenthevelocity
of ball C in z direction reaches at a maximum value, the
parabolic movement is ended and a collision between ball
Candothersteelballsorcoalis occurred.InFig.7(a),7(b),
7(c) and 7(d), four maximum speeds in z direction are
denotedbyfourcircles,respectively.InFig.7,thecollision
point is expressed bypoint D.The coordinates ofpoint D
can be obtained by the velocity in z direction and the
changes of coordinates. And the coordinates (y and z
coordinates)ofthemaximumvibrationpoint(pointB)can
be calculatedbymeansofEqs.(6)and(7).Table4shows
thepositionsofcollisionpoint(pointD)andthemaximum
vibration point (point B) for four fill level cases in the
DEMsimulation.
Fig. 8 shows a rule that the position of the maximum
vibrationpointon themillshellforhigherfilllevelisata
lower angular position than that of lower fill level in the
DEM simulation, which has a agree consistency with the
CHINESEJOURNALOFMECHANICALENGINEERING
resultof the theoreticalcalculation.
Table4. CoordinatesofpointD and pointB,theangular
positionsofpoint B forfourlevelsoffilllevel
Filllevel
L/%
Coordinate
PointD
PointB
a/m
b/m
y/m
z/m
Angular
positionof
point B /()
0.52
1.15
0.72
1.59
335.6
0.48
0.98
0.77
1.57
333.9
10
0.46
0.86
0.83
1.54
331.7
15
0.42
0.68
0.92
1.49
328.3
0.6
0.4
0.2
Coordinate y,z/m
336
Angularposition/()
335
334
333
0
0.2
0.4
y
Theoreticalvalue
DEMsimulation
Theoreticalvalue
DEMsimulation
0.6
332
0.8
331
330
1.2
0
328
0
10
15
Filllevel L/%
329
5
10
15
Filllevel L /%
Figs.911showthecomparisonsbetweenthetheoretical
calculationand DEM simulatedresults. Dueto themotion
of the steel balls and coal in the DEM simulation, the
accumulatedheightofthesteelballsandcoalatthebottom
ofrollerissmallerthanthatoftheoreticalcalculationatthe
samefilllevel.Sothe absolutevaluesofzcoordinate ofthe
collision point (point D) in the DEM simulation is bigger
thanthatofthetheoreticalresultsatthesamefilllevel,and
this conclusion can be observed from Fig. 9. Although at
the same filllevel themotiontime of parabolic movement
for ball C in the DEM simulation is shorter than that of
theoretical calculation, the simulated velocity for
detachment point in y direction is larger than that of
theoretical value (see Table 2), and the absolute value of
simulated y coordinate for detachment point is relatively
smaller compared with that of theoretical value, which
leadsthatthevalueofycoordinateforcollisionpointisnot
smallerthanthatoftheoreticalvalueasshowninFig.9.
From the results presented in Fig. 9, it can be clearly
seen that the absolute values of simulated y and z
coordinates for collision point are all larger than those of
theoretical values at the same fill level. However, the
increased proportion of absolute value of the simulated y
coordinate over the theoretical y coordinate for collision
pointisbiggerthanthatofabsolutevalueofzcoordinateof
0
0.5
y
Theoreticalvalue
DEMsimulation
Theoreticalvalue
DEMsimulation
1.5
2
0
z
5
10
15
Filllevel L/%
Coordinate y,z/m
0.5
335
334
333
332
Theoreticalvalue
DEMsimulation
331
330
329
328
0
10
15
Filllevel L/%
YHUANGPeng,etal:NewMethodtoMeasuretheFillLeveloftheBallMillITheoreticalAnalysisandDEMSimulation
5 Conclusions
(1)Theangularpositionsofthemaximumvibrationpoint
on themillshellfordifferentfilllevelcasesarecalculated
theoretically undertwoassumptiveconditions,respectively.
The result shows that there is a descendent trend in the
angularpositionofthemaximumvibrationpoint alongwith
theincreaseofthefilllevel.
(2)The charge motion and power draft of the mill for
differentlevelsaresimulatedandpredictedbythediscrete
element method. The simulated charge motion and power
draft results are verified against the theoretical charge
profiles and measured power drafts with an industrial ball
mill, and then the DEM is validated to be very useful for
simulatingchargemotionofthemill.
(3)Simulated motion trajectories of the steel ball in the
outmost layer were tracked and analyzed to obtain the
positionsofthemaximumvibrationpointonthemillshell.
Having a same conclusion with result of theoretical
calculation,theangularpositionofthemaximumvibration
pointislowerforhigherfilllevelthanforlowerfilllevel.
The angular position of the maximum vibration point
may be utilized for measuring the fill level. However,this
viewpoint needs to be validated further by processing the
actual vibration signals that are collected from the mill
shell. In the next work, ahigh resolution vibration sensor
(accelerometer)willbemountedonthemillshell,andalot
of vibration signals will be collected under different
experimental conditions and analyzed to verifythe results
ofthispaper.
References
[1] ZHANGYiqiang.Coallevelcontrolforcoalpulverizerusingpower
(current)method[J].EastChinaElectricPower,2001,29(7):4849.
(inChinese)
[2] KOLACZJ.Measurementsystemofthemillchargeingrindingball
mill circuits[J]. Mineral Engineering, 1997, 10 (12): 1 329 1
338.
[3] KANG E S, GUO Yugang, DU Yuyuan, et al. Acoustic vibration
signal processing and analysis in ball mill[C]//Proceedings of the
World Conference on Intelligent Control and Automation, Dalian,
China,June2123,2006: 6 6906 693.
[4] SHA Yi, CAO Yingyu, GUO Yugang. Analysis of acoustic signal
and BP neural networkbased recognition of level of coal in ball
mill[J].JournalofNortheasternUniversity,2006,27(12): 1 319 1
323. (inChinese)
[5] XING Zhihao. Supervision and control of ball mill level indication
realized by audio frequency signals[J]. Jiangsu Electrical
Engineering,2004,23(4): 5557. (inChinese)
[6] BEHERA B, MISHRA B K, MAURTY C V R. Experimental
analysisofchargedynamicsintumblingmillsbyvibrationsignature
technique [J].MineralsEngineering,2007,20(1): 8491.
[7] LIZunji,WANGJunrui,TANGXinxi.Anintelligentmeasuringand
testing system of ball mill loading[J]. Electric Power, 2001, 34(3):
4547. (inChinese)
Biographicalnotes
HUANG Peng,born in 1981,iscurrently a lecturerin School of
Mechanical Engineering, Southeast University, China. He
received his PhD degree from Southeast University, China, in
2010. His research interests include signal processing and soft
measurement.
Tel:+862552090512Email: feihonghp@163.com
JIA Minping, born in 1960, is currently a professor and a PhD
candidate supervisor in School of Mechanical Engineering,
Southeast University, China. He received his PhD degree from
SoutheastUniversity,China,in1991.Hismainresearchinterests
include vibration analysis, fault diagnosis, nonlinear dynamic
systemidentification,artificialintelligencetheoryandapplication.
Tel:+862552090512Email: mpjia@seu.edu.cn
ZHONGBinglin,bornin1951,iscurrentlyaprofessoranda PhD
candidate supervisor in School of Mechanical Engineering,
Southeast University, China. He received his PhD degree from
University of Wales, England, in 1994. His main research
interests include dynamic system modeling and prediction,
equipmentconditionmonitoringandfault diagnosis.
Tel: +862552090512