To develop infrastructure and gain know how joining industry and academia
To honour the 80th Anniversary (July 15, 2013) of the flight across the Atlantic by
Lithuanian pilots Steponas Darius and Stasys Girnas.
Septermber 23,
2014
Septermber 23,
2014
from space
To develop and test in space cubesat on board control and data handling sub-system
To take pictures using on-board camera and downlink to the ground station
To test an amateur radio FM voice repeater.
Septermber 23,
2014
Septermber 23,
2014
Very optimistic!
Septermber 23,
2014
10
Septermber 23,
2014
11
Septermber 23,
2014
12
Septermber 23,
2014
13
Septermber 23,
2014
14
Septermber 23,
2014
15
Septermber 23,
2014
16
2W RF output power
Septermber 23,
2014
17
Septermber 23,
2014
18
FM Voice Repeater
Sheet Metal Frame
7075 TO
ARM CortexM4,
Arduino Atmega 2560v
VGA camera and Radio Beacon
PMAC
UHF
EPS
Si Solar Array
VHF
UHF/VHF tranceiver
He-100
Mother Board
Septermber 23,
2014
19
Main requirements:
Low mass, low power consumption, image processing, convenient interface,
compatibility with Arduino controllers.
Selected option is LinkSprite JPEG Color Camera:
Size 32X32mm
Considered options:
Septermber 23,
2014
20
Septermber 23,
2014
21
Septermber 23,
2014
22
Septermber 23,
2014
23
Septermber 23,
2014
24
Septermber 23,
2014
25
Septermber 23,
2014
26
FM beacon signal heard by DK3WN on 28/02/2014 08:45:00 UTC, 3 deg elevation pass:
LY5N.....83 C021 0112 TN05 S63
Septermber 23,
2014
27
Battery Voltage
8400
8300
8200
8100
Voltage, mV
8000
7900
7800
7700
7600
7500
7400
7300
2014-02-28
2014-02-28
2014-03-01
2014-03-01
2014-03-02
2014-03-02
2014-03-03
Time
Septermber 23,
2014
28
Abnormally low photo current from solar panels identified as the root cause of the
failure
Vnormal
7.4
Vsafe
7.2
Vcritical
6.5
Septermber 23,
2014
29
Uplink budget proved to be less favorable than estimated during design (reliable
uplinks were possible only using RF amplifier with 100W of output power)
Septermber 23,
2014
30
Septermber 23,
2014
31
Septermber 23,
2014
32
Septermber 23,
2014
33
Septermber 23,
2014
34
Septermber 23,
2014
35
Septermber 23,
2014
36
Software integration and testing will take more time than you expect
Most of the problems in orbit can be avoided by thorough testing on ground
Keep your documentation up to date and use it
Septermber 23,
2014
37
Mission Objectives:
Project status:
Flight Accepted;