You are on page 1of 28

DISEO TANQUE IMHOFF

Caudal maxino horario=


Caudal de infiltracion=
Cuadal ilicito=
Caudal total=

SEDIMENTADO
R

DATOS

Agua Infiltracion 5%
Agua Ilicitas 10%
Fact mayoracin.=4

Q diseo=
Poblacion=
Dotacion=
Coef.retorno C=
Tiempo Retencion Hidraulica=
Longitud de re=
Temperatura=

Qdiseo=
Carga superficial.CS=
Area del sedimentador=
Volumen del sedimentador=
[] Pendiente fondo=

IEOSS, pag.351 Lit.d (5.4.2.2)


75 %
Caudal May.(4Qs+Qinf+Qilic)=

565.13 m3/dia

Long.verted[Qmax/Chv]min=

2.26 m

Chv[recomendable 250]=

SEDIMENTADOR

250 m3/(m*dia)

1.83 lt/seg
282
150
0.8
2
2083.24
15C
158.18 m3/dia
6.59 m3/hora
1.00 m3/(m2*hora)
6.59m2
13.18 m3
53.13

(m.)=

1.20 m

()=

0.80 m

SEDIMENTADOR

SEDIMENTADOR

(m.)=

(L/B)=
H sedimentador[m]=
Vel. Horizontal ( cm./seg.)[L / TRH ]=
V

TOR

Q inf=0.10 lt/seg
Q ilic=0.16 lt/seg
Q total=1.83 lt/seg

Tanteo #1

[Vel.horiz <0.508 cm/sg]

Qs=1.570 lt/seg

digestor de lodos

[70*Pob*fcr /1000]=

Factor de Capacidad relativa fcr =


Espesor paredes del sedimentador [e]=
Ancho minimo espacio pared sedimentador al digestor [ A 1]=
Comprobacion de areas=

27.46 m
22.89 m
4.58 m
0.436 cm./sg
19.74 m3
1.00
15 cm
1.00 m
9.60m2

DIGESTOR

[Volumen

=3m3]

min

Altura de lodos minimo h7=


B digest total =
V real lodos=
Borde libre=
Espaciamiento entre sedimentador-digestor=
Frecuencia de extraccion de lodos=
Volumen de lodos=
[] Pendiente fondo=
Altura de lodos=

1.18 m
3.50 m
19.74 m3
0.30 m
0.50 m
55 dias
4.03 m3
29.30
0.28 m

TABLA 1

1.00 m

Factor de Capacidad Relativa fcr


COD
1
2
3
4
5

Temp.
5
10
15
20
>25

15 C

Fact.Capac.Relativ.

Digest. lodo[dias]

2.00
1.40
1.00
0.70
0.50

110.00
76.00
55.00
40.00
30.00

Cod.
1.00 Fcr
55 Tiempo digestion de lodos

0.70 m
3.20 m

METRADOS
H.S. f'c=240 kg/cm2=
Encofrado=
Acero=
Excavacion=

12.22 m3
125.44 m2
kg
58.46 m3

1.70 m

2.5590080757
3.45
3.63
0.43
2.05

0.50 m

O TANQUE IMHOFF
(Segn Normas IEOSS)

Dato( 1.5 -2.5 horas)

Norma IEOSS pag.351, lit.a, cap.5.4.2.2

Norma IEOSS pag.351, lit.d, cap.5.4.2.2


Tanteo #2
Valor inicial impuesto

B Sed.=1.20 m

Revisar
Real Calculado

H sed.=0.70 m

DATOS PARA IMHOFF

L selec=4.80 m
4.0
6.9

Ok
OK

Ok

Ingresar dato de tabla 1


Min.1.0 mts aumentar si el area de ventilacion es menor al 30% del area total

1.05m2

Ok

[ L/ B = 4]
[ L/ H = 5-30 ]

B digest.=3.50 m
H digest.=1.70 m
L digest=4.80 m
Norma IEOSS pag.352, lit.a, cap.5.4.2.4
Ingresar dato de tabla 1
[Fango dirigido hmedo = 0.26 lt / hab*dia]
REVISAR

Inclinacin de 30 a 45 - Normas IEOSS

DATOS DIGESTOR

3.50 m
0.15 m

1.20 m
0.30 m

53.13
0.20 m
0.50 m

0.28 m

29.30
1.25 m

2.50 m

DATOS
COD
1
2
3
4
5

15 C

LECHO DE SECADO DE LODOS


COMUNIDAD
Q max=
158.18 m3/dia
Poblacion=
282 habitantes
Contribuccion percapita = 90.00 gr.SS/hab.dia Poblaciones sin alcantarillado
% solidos contenidos en lodo=
10.00%
Dato varia entre [8-12%]
Temperatura=
15C
Err:504
Profundidad de apliacacion Ha=
0.30 m
Dato varia entre [0.20-0.40m]
Carga de solidos [C]=
25.38 kg SS /dia
Masa de solidos en el lodos ( Msd)=
8.25 kg SS/dia .=((0.5*0.7*0.5)*C+(0.5*0.3)*C
lodos=
1.04 kg/lt
Densidad de los lodos
Volumen diario de lodos digeridos ( Vld)[Msd/%*dens.lodo]=
79.31 m3
Volumen de lodos a extraerse ( Vel )=
4.36 m3
Area del lecho de secado [Vel/ Ha]=
14.54m2
Ancho del lecho de secado=
3.0 m
[Para Instalaciones Grandes >10 v
Longitud del lecho de secado=
4.80 m

Factor de Capacidad Relativa fcr


Temp.
Digest. lodo[dias]
5
110.00
10
76.00
15
55.00
20
40.00
>25
30.00

3.0 m

Cod.

Lodo
0.150

0.100

0.2

Areana Te=0.3-1.3 mm , Cu= 2 y 5


Grava graduada 1.6-51 mm

ECHO DE SECADO DE LODOS


COMUNIDAD

Poblaciones sin alcantarillado


Dato varia entre [8-12%]
0
Dato varia entre [0.20-0.40m]
.=((0.5*0.7*0.5)*C+(0.5*0.3)*C
Densidad de los lodos

[Para Instalaciones Grandes >10 valores entre 3-6m]

0.15
0.30 m

Tuberia de recoleccion

METRADOS
HS FC=240 KG/CM2
ACERO=
ENCOFRADO=
EXCAVAC.=

5.44
297.30
36.48
7.20

PLANILLA DE HIERROS
Marca

Tipo

[mm]

PAREDES Y VIGA DE APOYO


100
C
12
101
C
12
102
C
16
103
O
10
300
L
16
301
L
16
302
L
16
303
L
16
304
C
14
PISO
104
C
16
105
U
14
106
U
14
SEDIMENTADOR
107
C
10
108
V
14
109
M
14
110
M
14
111
V
14
VERTEDERO
200
C
12
201
C
12
LECHO SECADOS DE LODOS
400
I
12
401
C
12
402
U
12
403
L
12
404
C
12

Longitud [ m ]
a

5.04
5.04
5.04
0.44
3.90
3.80
3.90
4.47
3.73

1.00
1.00
0.15
0.44
0.15
0.15
0.60
0.60
1.00

7.04
7.04
5.34
1.76
4.05
3.95
4.50
5.07
5.73

5.04
3.85
3.85

1.00
0.20
0.20

7.04
4.25
4.25

5.04
0.86
0.86
0.60
0.60

0.60
0.60
0.56
0.56

5.04
1.46
1.56
1.26
1.16

1.20
1.70

0.80
0.80

2.80
3.30

0.23

2.90
3.00
0.86
1.12
3.00

1.00
0.20
0.50
0.32
0.32
0.32
0.32
0.32
0.32
0.32
0.32
0.32

25.72
3.90
2.80
23.89
21.37
18.86
16.35
13.83
11.32
8.81
6.29
3.78

2.90
3.00
0.40
1.12
3.00

FILTRO ANAEROBIO DE FLUJO ASCENDENTE


500
O
10
11.86
501
L
10
3.70
502
L
10
2.30
503
O
8
11.62
504
O
8
10.37
505
O
8
9.11
506
O
8
7.85
507
O
8
6.60
508
O
8
5.34
509
O
8
4.08
510
O
8
2.83
511
O
8
1.57

11 8 U
156 10 U
109 12 U
92 14 U
95 16 U

VIENE
QQ

1
26
26
29
40

RESUMEN DE ACERO DE REFUERZO


IMHOFF
LECHO DE SECADOS
F.AF.A

Total

0.05
0.05

NECESIDAD EN OBRA
UNIDADES

COSTO
* UNID

UNIDAD

30

1.63

10

5.18

12
14
16

6
4
3

4243.87
297.30
956.06

8.35
12.78
16.67

PURUHAFERRET

Costo total=

Peso
total
[ kg ]

Diametro
[ mm ]
Peso [kg]

8
49.18

10
1161.48

12
1159.11

25.60
156
46.62

25.60
108 1/2
50.1

$ 1,193.47

$ 1,282.56

5497.22

# quintales

# Varillas de 12.0 [m]

5497.2

Fecha del anlisis de costo

Costo $ c/qq

1.10
21
49

Mar-12
$ 6,013.45

Costo $

$ 53.90

Kilos de Acero correcto

LLA DE HIERROS

Longitud
Total ( m )

Peso c/varilla
( kg / m )

Peso
Total ( kg )

104
21
16
34
34
34
31
93
125

732.16
147.84
85.44
59.84
137.70
134.30
139.50
471.51
716.25

0.888
0.888
1.578
0.617
1.578
1.578
1.578
1.578
1.208

650.16
131.28
134.82
36.92
217.29
211.93
220.13
744.04
865.23

24
34
34

168.96
144.50
144.50

1.578
1.208
1.208

266.62
174.56
174.56

70
18
18
18
18

352.80
26.28
28.08
22.68
20.88

0.617
1.208
1.208
1.208
1.208

217.68
31.75
33.92
27.40
25.22

17
13

47.60
42.90

0.888
0.888

42.27
38.10

40
39
40
20
15

116.00
117.00
34.40
22.40
45.00

0.888
0.888
0.888
0.888
0.888

103.01
103.90
30.55
19.89
39.96

31
59
158
1
1
1
1
1
1
1
1
1

797.32
230.10
442.40
23.89
21.37
18.86
16.35
13.83
11.32
8.81
6.29
3.78

0.617
0.617
0.617
0.395
0.395
0.395
0.395
0.395
0.395
0.395
0.395
0.395

491.95
141.97
272.96
9.44
8.44
7.45
6.46
5.46
4.47
3.48
2.48
1.49
5497.22

# de Varillas de [m]:
Factor de Peso/metro=

12

Verificacin:
Total kgs correcto


14
1332.63

16
1794.83

29.40
92
51.14

39.60
94 1/2
50

$ 1,503.52

$ 1,980.00

$ 6,013.45

18

0.00
0.00
0
$ 0.00

Considerando lo siguiente :
Cuando la estructura esta Vacio, la estructura se encuentra sometida a la accin del suelo, producie
a.b.-

Cuando el reservorio esta Lleno, la estructura se encuentra sometida a la accin del agua, comport

a.-

Diseo de estructura (Vacio).


Peso especifico del suelo s =
Angulo de friccin interna =
Ecuacion de patrones de carga:

Aplicando el factor de seguridad :


CV*1.5
CM*1.7
Prs*1.5
COMBO1=

La simulacion de cargas se realzio por medio del Software SAP2000 V17, donde se tienen los siguientes resultados pa

Acero requerido cm2

Area acero cm2

30.88

3/4 ''

2.85

11

3/4 ''

2.85

9.11

3/4 ''

2.85

24.54

3/4 ''

2.85

20.5300

3/4 ''

2.85

12.74

3/4 ''

2.85

14

3/4 ''

2.85

17.87

3/4 ''

2.85

8.1

3/4 ''

2.85

5.8

3/4 ''

2.85

14.84

3/4 ''

2.85

7.5

3/4 ''

2.85

12

3/4 ''

2.85

7.3

3/4 ''

2.85

6.7

3/4 ''

2.85

3.5

3/4 ''

2.85

3.63

1m

1.2

0.7

DISEO Y CALCULOS

la accin del suelo, produciendo un empuje lateral; como un anillo sometido a una carga uniforme, repartida en su perimetro.
la accin del agua, comportandose como un portico invertido siendo la junta de fondo empotrada.

el suelo s =

1.80 Tn/m

n interna =

32.00

ones de carga:

CV=

Carga viva

CM=

Carga muerta

Prs=

Presion suelo
CV*1.5 + CM*1.7 + Prs*1.5

n los siguientes resultados para el diseo estructural:

Aumida

Sentido

Cara

3/4 @

Disposicin
9.23

Longitudinal

Exterior

En las esquinas inferiores de lo

3/4 @

25.91

20

Longitudinal

Exterior

Refuerzo long

3/4 @

31.29

30

Transversal

Exterior

Area

3/4 @

11.61

11

Longitudinal

Interior

Refuerzo longotudinal 1m de la

3/4 @

13.88

11

Longitudinal

Interior

3/4 @

22.37

22

Longitudinal

Interior

Una longitud de

3/4 @

20.36

20

Transversal

Interior

Toda la pared tranv

3/4 @

15.95

15

Longitudinal

Exterior

A part

3/4 @

35.19

30

Longitudinal

Exterior

3/4 @

49.14

49

Transversal

Exterior

Tod

3/4 @

19.21

18

Longitudinal

Interior

Tod

3/4 @

38.00

30

Transversal

Interior

Tod

3/4 @

23.75

20

Longitudinal

Exterior

Toda la secc

3/4 @

39.04

30

Transversal

Exterior

Toda la secc

3/4 @

42.54

30

Longitudinal

Interior

Toda la secc

3/4 @

81.44

50

Transversal

Interior

Toda la secc

1m

2.4

1.2

n su perimetro.

Observaciones
En las esquinas inferiores de los lados de mayor area, varillas con 1m de longitud.
Refuerzo longitudinal, toda la altura de la pared.
Area a utilizar horizontalmente.
Refuerzo longotudinal 1m de largo los 2.4 metros de longitud de pared parte central
A 1.2 de cada borde.
Una longitud de 2.4 metros de la pared. Parte central
Toda la pared tranvsersalmente los 4.8 metros de longitud.
A partir de los borde hasta 0.7 m.
Parte central de la pared
Toda la longitud de la pared.
Toda la longitud de la pared.
Toda la longitud de la pared.
Toda la seccion de la pared d elosa de fondo
Toda la seccion de la pared d elosa de fondo
Toda la seccion de la pared d elosa de fondo
Toda la seccion de la pared d elosa de fondo