Road Construction Begins March 2010

West Stadium Blvd


(Suffolk Ave to Hutchins Ave)

Project Overview
Ways to keep In March 2010 through approximately November
informed about 2010, construction will take place on the West
Please Join Us!
this project: Stadium (Suffolk to Hutchins) Improvement
Informational Open
Website: Iproject. Funded in
have inserted a part
textthrough the Street can be added by coping and
box here…more House
Resurfacing Millage, this is a continuation of the
www.a2gov.org pasting or pulling down the insert menu
work completed at and west of Pauline Blvd.
and selecting insert a text
/wstadiumroad box
This letter is intended to inform you about Wednesday
project planned street improvements in the area where February 3, 2010
you live or work, project timeline and how you 7:00 p.m. – 8:30 p.m.
can access more information. Trinity Lutheran Church
Subscribe:
Project updates The project will include: 1400 W. Stadium Blvd
are available by
○ Complete reconstruction of the street; There will be a short
signing up for
project e-mails.
○ 4 to 3 lane conversion (between Suffolk and presentation at 7:15 p.m. to
Visit Franklin) with on-street bike lanes on both sides; explain the project.
www.a2gov.org, ○ New large-capacity storm sewer pipes to Afterward the project team
click on the red provide detention and improved water quality will be available to answer
envelope in the downstream; questions.
top right corner of ○ Removal and replacement of the existing
the screen and street trees;
select West ○ New water main to replace the existing water
Stadium (Suffolk distribution pipes
to Hutchins) ○ New sidewalk ramps and LED energy efficient
Road Project. street lights.

Email or Call: Detour Route Questions/Comments?


Contact the
City’s Project www.a2gov.org/wstad
Manager for One lane of westbound traffic will be
maintained through the construction zone. iumroadproject
project details:
Elizabeth Rolla, Please visit the website for
(734) 794-6410 Eastbound traffic will be detoured westbound the project background,
x43636. on Pauline Blvd to southbound on Maple Rd to summaries of public
erolla@a2gov.org eastbound on Scio Church Rd to northbound meetings, funding
on Main Street. information, project
At the Project
schedule, detour maps, and
Site: Look for the Seventh Street will remain open for the more.
City van and
majority of the project. From mid-July to
request to speak And always feel free to
to the City September 2010, part width construction at
the intersection will require various traffic contact the project manager,
inspector who will
control switches. For detour maps, visit the Elizabeth Rolla:
be on site during
website: www.wsb.org erolla@a2gov.org
construction.
734-794-6410 x43636