OMV Exploration & Production

Philosophy
for
Emergency Generator and Switchboard
Onshore

Document Number

TO-HQ-02-013-00

00

Final Issue

JS

31/5/05

JEA

31/5/05

A2

Client Comments Incorporated

JS

28/5/05

A1

Issued for Comment /Approval

RH

22/12/04

JS

31/12/04

Issue
Rev

Issue or Revision Description

Origin
By

Date

Chkd
By

Date

PZ

03/6/05

MF

03/6/05

Appd By

Date

Appd
By

Date

OMV Exploration & Production GmbH

Revision

Description of revision

A1

For Comment/Approval

A2

Client Comments Incorporated

00

Final Issue

Philosophy for Emergency Generator and Switchboard

Document Number

Rev

Page

Onshore

TO-HQ-02-013

00

2 of 22

OMV Exploration & Production GmbH

Contents
1.0 PREFACE .......................................................................................................................4
2.0 DEFINITIONS .................................................................................................................4
3.0 ABBREVIATIONS...........................................................................................................4
4.0 INTRODUCTION.............................................................................................................4
5.0 APPLICABLE CODES, STANDARDS AND REGULATIONS........................................5
5.1
5.2

Codes and Standards list.......................................................................................................... 5


References ................................................................................................................................. 6

6.0 SYSTEM GOAL ..............................................................................................................6


7.0 SYSTEM BOUNDARIES ................................................................................................7
8.0 DESIGN PHILOSOPHY ..................................................................................................7
9.0 DESIGN CONSIDERATIONS .........................................................................................8
9.1
9.2
9.3
9.4
9.5
9.6

General ....................................................................................................................................... 9
Prime Mover ............................................................................................................................. 10
Starting Methods ..................................................................................................................... 11
Generator.................................................................................................................................. 12
Generator control panel .......................................................................................................... 14
Emergency Switchboard......................................................................................................... 16

10.0 DESIGN CRITERIA.......................................................................................................20


11.0 DOCUMENTATION REQUIREMENTS.........................................................................20
12.0 REGULATORY AUTHORITY REVIEW REQUIREMENTS ..........................................20

Philosophy for Emergency Generator and Switchboard

Document Number

Rev

Page

Onshore

TO-HQ-02-013

00

3 of 22

OMV Exploration & Production GmbH

1.0

PREFACE
This Philosophy defines the OMV Exploration & Production GmbH corporate
policy on the design of Emergency Generators and Switchboards for
onshore hydrocarbon production and processing facilities. The document
specifies basic requirements and criteria, defines the appropriate codes and
standards, and assists in the standardisation of facilities design across all
onshore operations.
The design process needs to consider project specific factors such as the
location, production composition, production rates and pressures, the
process selected and the size of the plant. This philosophy aims to address
a wide range of the above variables, however it is recognised that not all
circumstances can be covered. In situations where project specific
considerations may justify deviation from this philosophy, a document
supporting the request for deviation shall be submitted to OMV E&P for
approval.
Reference should be made to the parent of this philosophy, document
number TO-HQ-02-001 for information on deviation procedures and
Technical Authorities, general requirements and definitions and
abbreviations not specific to this document

2.0

DEFINITIONS
There are no definitions with particular relevance to this document.

3.0

ABBREVIATIONS
The following abbreviations are relevant to this document:

4.0

AVR

Automatic Voltage Regulator

UL

Underwriters Laboratory

INTRODUCTION
The tenets of this philosophy are enshrined in the belief that upon loss of
mains supply the following requirements must be secured by the transfer from
mains supply to emergency supply.

Safety of Personnel.
Security of the surrounding environment.

Philosophy for Emergency Generator and Switchboard

Document Number

Rev

Page

Onshore

TO-HQ-02-013

00

4 of 22

OMV Exploration & Production GmbH

Mitigation of the destruction of equipment.

Services necessary to secure these requirements shall be identified in


Document No TO-HQ-02-011 - Philosophy for Electrical Design Onshore and
plant-specific risk analyses.
5.0

APPLICABLE CODES, STANDARDS AND REGULATIONS


Codes, standards and regulations referred to in this philosophy shall be of the
latest edition and shall be applied in the following order of precedence:

Local Regulations,

The provision of this document,

International standards (e.g. ISO, IEC etc),

National standards.

Design of the emergency generator system shall comply with the standards listed
within this philosophy, however, for instances where local standards are more
onerous local standards shall apply.
5.1

Codes and Standards list


NFPA 70

National Electrical Code

API RP 540

Electrical Installations in Petroleum Processing Plants


Institute of Petroleum Model Code Of Safe Practice, Part
1, Electrical Safety Code

NEMA MG1

Motors and Generators

NEMA MG2

Safety Standard for Construction and Guide for


Selection, Installation, and Use of Electric Motors and
Generators

IEC 60034-1

Rotating electrical machines Part 1: Rating and


performance

IEC 60204-1

Electrical equipment of industrial machines Part 1:


General rules

IEC 60439-1

Low-voltage switchgear and control gear assemblies Part 1: Type-tested and partially type-tested assemblies

IEC 60947-1

Low-voltage switchgear and control gear - Part 1:


General rules

IEC 60947-4-1

Low-voltage switchgear and control gear - Part 4-1:


Contactors and motor-starters - Electromechanical

Philosophy for Emergency Generator and Switchboard

Document Number

Rev

Page

Onshore

TO-HQ-02-013

00

5 of 22

OMV Exploration & Production GmbH

contactors and motor-starters

5.2

6.0

IEEE C37.20.1

IEEE Standard for Metal-Enclosed Low-Voltage Power


Circuit Breaker Switchgear

UL 891

Dead-Front Switchboards

UL 1558

Metal-Enclosed Low-Voltage Power Circuit Breaker


Switchgear

ISO 3046-1

Reciprocating
internal
combustion
engines
-Performance -- Part 1: Declarations of power, fuel and
lubricating oil consumptions, and test methods -Additional requirements for engines for general use

BS 5514-3

Reciprocating
internal
combustion
engines:
performance. Specification for test measurements

ISO 3046-4

Reciprocating
internal
combustion
Performance -- Part 4: Speed governing

engines

--

ISO 3046-5

Reciprocating
internal
combustion
engines
Performance -- Part 5: Torsional vibrations

--

BS 5000-11

Specification for rotating electrical machines of


particular types or for particular applications. Smallpower electric motors and generators

BS 5000-3

Specification for rotating electrical machines of


particular types or for particular applications.
Generators to be driven by reciprocating internal
combustion engines

References
TO-HQ-02-011

Philosophy for Electrical Design Onshore

TO-HQ-02-012

Philosophy for Main Generators and Switchboard


Onshore

TO-HQ-02-039

Philosophy for Rotating and Reciprocating Equipment


Onshore

SYSTEM GOAL
The emergency generator and switchboard are intended to provide a secure
electrical supply, independent of any external supply and the main generation

Philosophy for Emergency Generator and Switchboard

Document Number

Rev

Page

Onshore

TO-HQ-02-013

00

6 of 22

OMV Exploration & Production GmbH

system for the installation, for vital services for which a short break in supply is
tolerable.
Typically, the services will be those that present a load of a magnitude such that
a no-break battery UPS would not be practicable, or economically justified by the
risk mitigated by the provision of such a system, such as emergency lighting or
HVAC for buildings housing equipment essential for the restoration of normal
conditions following a power failure.
Alternatively, the emergency system will act as a back-up for systems which
have a no-break supply, but for which it would not be practicable to install
batteries having a capacity sufficient to maintain power autonomously for the
duration of all foreseeable power outages, such as fire fighting systems, plant
control systems, aircraft warning systems, etc.
The analysis of which services which will require an emergency supply, and for
what duration, is dealt with in more depth in Document No TO-HQ-02-011 Philosophy for Electrical Design Onshore.
7.0

SYSTEM BOUNDARIES
The boundaries of the emergency generator and switchboard system are the:

8.0

interface to the main electrical system

Interface to the PCS and HMI

connections for power supplies to emergency services

DESIGN PHILOSOPHY
The emergency generator set and switchboard shall be of types accepted as
providing a high degree of reliability, within the capabilities of normal industrial
equipment: It is not envisaged that any system requiring a higher level of integrity
should be reliant solely upon an emergency generator.
The emergency switchboard shall be supplied, by an interconnector circuit, from
the main power distribution system, to reduce the running hours required of the
emergency generator. Nevertheless, the arrangements should facilitate regular
on-load testing.
In normal operation, the emergency generator shall start automatically, then be
connected automatically to the emergency switchboard, on detection of loss of
voltage at the main switchboard from which the emergency switchboard is
normally fed.

Philosophy for Emergency Generator and Switchboard

Document Number

Rev

Page

Onshore

TO-HQ-02-013

00

7 of 22

OMV Exploration & Production GmbH

The starting and control arrangements shall be totally independent of the main
power system, as should be the fuel supply. The capacity of the emergency fuel
supply shall be determined following consideration of the duration for which the
emergency supply is required to be available.
The emergency generator and switchboard shall be located outside any
hazardous area or high fire risk location. Consideration should also be given to
locating the equipment so as to enhance the likelihood of it remaining operational
in the event of a major incident, where the normal hazardous area classification
boundaries no longer apply.
Consideration should also be given to the benefits of configuring the emergency
power distribution network as a non-earthed (IT) system, so that a single earth
fault does not result in loss of services on the faulted circuit.
The Philosophy is structured on the basis of the elements shown below, each of
which shall be allocated to a specific sub-section. Within each sub-section, the
reader shall be directed to the associated clause within the NEC for core
philosophy information and be provided with detail on specific issues.

9.0

General Design Considerations and Placement

Prime Mover

Starting Method

Generator

Generator Control Panel

Alarms and Shutdowns

Emergency Switchboard

Busbars

Circuit Breakers

Generator incomer

Interconnector Circuit

Feeder Circuits

DESIGN CONSIDERATIONS
The ratings of the generator set and switchboard depend upon the loads
determined by the risk analyses and system design studies, and the applicable
regulations, as requiring an emergency supply. It is expected that these would
not fall into a band where High Voltage generation would be appropriate: the

Philosophy for Emergency Generator and Switchboard

Document Number

Rev

Page

Onshore

TO-HQ-02-013

00

8 of 22

OMV Exploration & Production GmbH

detailed references within this document to equipment design and standards


relate, then, to Low Voltage systems.
The emergency switchboard should be supplied from the main power supply
system by an interconnecting feeder during normal operation.
The emergency switchboard should, preferably, supply only emergency loads.
However, when non-emergency loads are supplied from this switchboard,
arrangements are to be made for their disconnection to prevent overloading of
the generator.
9.1

General
For core Philosophy guidance, refer NEC, Articles 700 and 705.
Specific Issues:
This philosophy considers that:
The generator set shall consist of a diesel reciprocating engine prime mover,
mounted on a bedplate with, and directly coupled to, an a.c. generator.
The maximum voltage delivered by the generator shall be below 1000V at
50/60Hz and is, subject to compliance with regulatory requirements, regulatory
requirements and in accordance with the system design philosophy (see
Document No TQ-HQ-01-011 Philosophy for General Electrical Design
Onshore), ungrounded or grounded (earthed).
The Interconnector feeder shall be protected against short-circuit and overload at
the point of connection to the main system, and as a minimum, short-circuit at the
emergency board.
The Interconnector feeder shall be disconnected automatically at the emergency
switch board upon loss of mains power.
Upon loss of mains supply the emergency Generator shall start and shall be
connected to emergency switch board when its output voltage has reached
between 85% and 95% of its nominal value: this operation shall be completed
within 10 to 45 seconds.
All non-emergency loads shall have been automatically disconnected from the
emergency switch board.
The rating of the emergency generator shall be based on continuous operation
with no diversity factor assumed.
The Emergency Generator and Switchboard shall be housed in a building or
Enclosure having passive fire protection to a level determined by a previously
conducted risk assessment. The design of the building or enclosure shall take
into account blast overpressure, so that the risk of loss of the emergency supply,

Philosophy for Emergency Generator and Switchboard

Document Number

Rev

Page

Onshore

TO-HQ-02-013

00

9 of 22

OMV Exploration & Production GmbH

as a result of explosion, is reduced to a level which is as low as is reasonably


practicable.
A fuel-oil tank, having a capacity sufficient to support the emergency generator
set for the period of autonomous operation required for the installation, shall be
located within the building or close to it: if externally located, it should have the
same level of passive fire protection as the emergency generator building.
Building and equipment design should allow for earthquake protection in areas of
known high risk.
9.2

Prime Mover
For core Philosophy guidance, refer NEC Article 700-12. Account is also to be
taken of the relevant requirements of Document No TO-HQ-02-039 Philosophy for Rotating and Reciprocating Equipment Onshore
Specific Issues:
This philosophy considers that:
The engine should be selected from the Manufacturers standard range, and
should be of a type, rating and method of manufacture for which satisfactory
service experience can be confirmed.
The engine should generally be of the water cooled type, with a water to air heat
exchanger (radiator), although consideration could be given to the use of direct
air cooled engines for small installations. For either type of engine, an electric
sump heater shall be provided where necessary to ensure reliable starting under
the coldest conditions encountered at the site. Water cooled engines shall also
be provided with a jacket heater in order to ensure rapid starting and acceptance
of load under these conditions.
Coolant radiators mounted externally or in the wall of the generator building shall
be provided with suitable louvres or shutters for weather protection. Where the
generator building is required to provide a given level of passive fire protection,
this should be maintained by the provision of fire dampers and suitable insulation
for the radiators. Externally mounted radiators shall also be protected similarly.
The rated power of the engine, for continuous operation and overload conditions,
determined in accordance with ISO 3046-1, shall be sufficient to meet the duty
required of the emergency generator set as determined by the system design
studies. Any likely deterioration under the proposed maintenance regime for the
installation should be taken into account in determining the rating.
The prime mover ratings shall be adjusted for the highest expected ambient
temperatures and derated, where necessary, for total system inlet and exhaust
pressure losses.

Philosophy for Emergency Generator and Switchboard

Document Number

Rev

Page

Onshore

TO-HQ-02-013

00

10 of 22

OMV Exploration & Production GmbH

Special consideration should be given, when sizing the prime mover, for service
where large motors are to be started across the line.
Drive belts for auxiliary equipment shall be guarded appropriately, with full
allowance being made for adjustment throughout the life of the belt.
Combustion air filtration shall be provided as required by local conditions and the
point from which air is drawn. Provision shall be made, by means of a blow-in
door or similar, for the engine to be able to continue running if the intake filter
should become blocked. Where the generator building is required to provide a
given level of passive fire protection, this should be maintained by the provision
of fire dampers and suitable insulation for the ventilation air intakes for the
building and the combustion air intake for the engine, if ducted through the wall of
the building.
The engine should be provided with an aspiration air intake valve, activated
under emergency shutdown conditions, to ensure safe shutdown in the event of
a major release of flammable gas.
Means should be provided, if the engine is turbo-charged, for automatically
draining, or preventing the formation of, condensate within the inlet manifold.
9.3

Starting Methods
For core Philosophy guidance, refer NEC Article 700.
Specific Issues:
This philosophy considers that:
Compressed air, hydraulic, or electric start methods are acceptable, provided
that the engine manufacturer can confirm satisfactory field experience for the
arrangement offered.
Where justified by the economic or safety consequences of failure to start,
consideration should be given to the provision of redundant starting
arrangements, preferably of different types.
Whichever system or combination of systems is employed, two independent
sources of stored energy, each sufficient for at least three consecutive start
attempts, shall be provided. The electrical supplies for the necessary pumps,
compressors and battery chargers shall be taken from the emergency
switchboard.
The pumps, compressors or battery chargers should be rated so as to be
capable of recharging one of the sources of stored energy to a level sufficient to
provide a further three start attempts within an acceptable period. 15 minutes
would be appropriate for hydraulic and compressed air systems, and one hour,

Philosophy for Emergency Generator and Switchboard

Document Number

Rev

Page

Onshore

TO-HQ-02-013

00

11 of 22

OMV Exploration & Production GmbH

or as short a period as permitted by the battery type employed, would be


appropriate for battery start arrangements.
Air start systems shall be of the air driven starting motor type, rather than cylinder
air injection, and shall be provided with an electrically driven air compressor, one
or two air receives with all necessary valves and drains, pressure gauges and
control arrangements. Provision should be made for connecting an external
compressed air supply for initial start.
Hydraulic start systems shall include one or two accumulators, provided with a
pressure gauges and automatically charged by an electrically driven pump.
Provision should be made for charging the accumulator by a manually operated
pump, or other means, for initial start.
Electric start systems shall be provided with batteries of a type specifically
recognised as suitable for float charging, preferably without need for regular
equalising, and deep discharge. Nickel-Cadmium batteries are generally
preferred, although suitably specified Leadacid batteries (Lead Calcium or
Lead Selenium) may also be accepted.
The batteries should be housed in suitably robust battery boxes of nonconducting material, with ventilation openings sized so as to prevent the
accumulation of an explosive atmosphere during charging. It may be assumed
that openings at top and bottom of the box, each having a total area of 50 cm2 for
each 1 m3 of battery box volume would suffice.
9.4

Generator
For core Philosophy guidance, refer NEC Articles:- 445, 700.
Specific Issues:
This philosophy considers that:
The generator shall be designed to perform in accordance with NEMA Standards
Publication MG1 or an equivalent IEC or national standard.
The generator should be of the revolving field, brushless, type, so as to eliminate
all arcing contacts and to reduce maintenance requirements. The use of a
permanent magnet exciter is the preferred method, to avoid risk of failure, to
achieve excitation after a lengthy period out of service.
The generator should have a design temperature rise of 80C, by resistance,
(NEMA Class B), but be constructed with a minimum of NEMA Class F insulation
to provide optimum balance between initial cost and long-life operations. The
generator shall be derated in accordance with manufacturers recommendations
if operated in a higher ambient temperature than for which its rating has been
determined (normally 40C).

Philosophy for Emergency Generator and Switchboard

Document Number

Rev

Page

Onshore

TO-HQ-02-013

00

12 of 22

OMV Exploration & Production GmbH

The generator shall be capable of an overload power of not less than 10 per cent
at its rated power factor for a period of 15 minutes without injurious heating. It
shall also be capable of withstanding on test, without injury, the following
momentary overload: an excess current of 50 per cent for 15 seconds after
attaining the temperature rise corresponding to rated load, the terminal voltage
being maintained as near the rated value as possible. This does not apply to the
overload torque capacity of the prime mover.
The Enclosure of the generator may be of the open, drip-proof, type, provided
that the generator set is housed in a building, as recommended. However, if the
building has a water spray or water mist fire extinguishing system, an enhanced
degree of protection, sufficient to allow the generator to continue to function in
the event of spurious operation of the fire extinguishing system, shall be
specified. For optimum protection of the windings of a generator installed
outdoors, a totally enclosed type of construction would be required.
Anti-condensation heaters should be provided to keep windings dry when the
generator is not operating.
The lubrication arrangements for bearings shall include effective means to
ensure that lubricant does not reach the machine windings or other conductors
and insulators.
Where the shaft voltage of the generator, measured between shaft ends, may
exceed a value acceptable for the type of bearing employed (250 mV for rolling
element bearings), suitable bearing insulation arrangements shall be provided,
with a single, disconnectable, earth connection for equipotential bonding
purposes.
The generator shall be constructed such that, under any operating conditions, it
is capable of withstanding the effects of a sudden short-circuit at its terminals
without damage.
The generator shall be provided with automatic means of voltage regulation;
voltage build-up is not to require an external source of power. Provision shall be
made to safeguard the distribution system should there be a failure of the voltage
regulating system resulting in a High Voltage. Solid state voltage regulators are
preferred for high reliability, long life, fast response and stable regulation. The
voltage regulators for machines rated in excess of 200kVA should be protected
by the provision of under-frequency and overvoltage sensors.
The voltage regulator should have an adjustable droop characteristic, or be
otherwise arranged, to allow parallel operation with the main power system.
Consideration may also be given to automatic power factor control, if extended
periods of parallel operation are anticipated.
Philosophy for Emergency Generator and Switchboard

Document Number

Rev

Page

Onshore

TO-HQ-02-013

00

13 of 22

OMV Exploration & Production GmbH

If necessary for operation of protective devices under short-circuit conditions, the


regulator should be equipped with series boost support equipment, or should be
provided with a separate source of power such as a permanent magnet
generator. Similar measures may be desirable for coordinating protective devices
or starting large motors. The generator and its voltage regulation system shall be
capable of maintaining, under steady state short-circuit conditions, a current of at
least three times the full load rated current for a duration of at least two seconds
or, where precise data is available, for the duration of any longer time delay
which may be provided by a tripping device for discrimination purposes.
The voltage regulation of the generator, with its regulating equipment, shall be
such that, at all loads, from zero to full load at rated power factor, the rated
voltage is maintained within 2,5 per cent under steady conditions. There is to be
provision at the voltage regulator to adjust the generator no load voltage.
The generator and excitation system, when operating at rated speed and voltage
on no-load, shall be capable of absorbing the suddenly switched, balanced,
current demand of the largest motor or load at a power factor not greater than 0,4
with a transient voltage dip which does not exceed 15 per cent of rated voltage.
The voltage shall recover to rated voltage within a time not exceeding 1,5
seconds.
The transient voltage rise at the terminals of the generator is not to exceed 20
per cent of rated voltage when rated kVA, at a power factor not greater than 0,8,
is thrown off.
9.5

Generator control panel


For core Philosophy guidance, refer NEC Articles 445 and 700: for matters of
electrical safety, refer NEC Articles 110, 408 and 409, as far as relevant:
otherwise, the panel shall be constructed in accordance with the requirements of
the manufacturer of the generator set.
The control panel shall be supplied either as a free-standing panel or a panel to
be incorporated in the switchboard. The generator should be arranged to
operate in parallel with the main supply, for periods sufficient to facilitate transfer
of load between main and emergency supply. This is to aid testing the
emergency system and restoration of services after a power outage.
The generator control panel should be equipped with:

control logic (preferably utilising hard wired relay logic, for ease of fault
finding and rectification, and predictable operation under all conditions);

Philosophy for Emergency Generator and Switchboard

Document Number

Rev

Page

Onshore

TO-HQ-02-013

00

14 of 22

OMV Exploration & Production GmbH

annunciator panel including audible alarm;

electronic governor and AVR (may be incorporated in skid control unit);

metering;

synchronising equipment;

external control switches;

battery charger (may also be supplied as separate free standing unit).

The following features should be provided on the front of the panel:

annunciator panel, complete with audible alarm and accept/reset/lamp


test

push-buttons (see Alarms and Shutdowns)

auto/manual start selector switch;

start-stop push buttons;

lamp test button;

emergency stop push-button;

controls for manual electric and hydraulic cranking;

synchroscope and synchronising lights;

excitation switches: manual/auto and on/off;

engine tachometer;

generator metering (volts, amps, kW, power factor, frequency, excitation

current);

circuit-breaker trip/neutral/close switches (if required);

hours-run meter;

raise/lower speed switch with spring return to neutral position;

raise/lower volts switch with spring return to neutral position;

battery voltage meter and battery charging ammeter.

The ingress protection of the panel shall be suitable for its location. Drip
proof/NEMA type 2/IP22 shall be suitable if located within the generator room
and not subject to water spray from fire extinguishing system; NEMA Type 3 or
4/IP55 or better, otherwise.
Philosophy for Emergency Generator and Switchboard

Document Number

Rev

Page

Onshore

TO-HQ-02-013

00

15 of 22

OMV Exploration & Production GmbH

The power supply for the panel shall have a battery backup, which should be
separate from the engine start batteries.

Alarms and Shutdowns


The generator set shall shut down automatically upon loss of lubricating oil
pressure, overspeed, or operation of a fixed fire extinguishing system in the
emergency generator room. The overspeed shutdown shall operate
independently of the governor system and should be set at no more than 115%
of rated speed.
Alarms shall be provided for low oil pressure and high cooling water temperature.
Consideration may also be given to the inclusion of the following alarms,
according to the rating of the set and the recommendations of the manufacturer:

9.6

Low lubricating oil level;

Low jacket water level;

Underspeed;

Vibration;

High lubricating oil temperature;

Undervoltage;

Underfrequency;

Loss of excitation;

Generator differential;

Overfrequency;

High Stator Winding Temperature

Fuel System (Low, Low Low, High and High High)

Emergency Switchboard
For core Philosophy guidance, refer NEC Articles:- 110, 480, 700 and 705.
Specific issues are addressed below.

Philosophy for Emergency Generator and Switchboard

Document Number

Rev

Page

Onshore

TO-HQ-02-013

00

16 of 22

OMV Exploration & Production GmbH

General requirements
The switchboard should be arranged to provide convenient and safe access to
qualified personnel to operate and perform maintenance on the equipment. An
unobstructed space not less than 1 m wide shall be provided in front of the
switchboard.
Where the switchboard contains withdrawable equipment, the unobstructed
space shall not be less than 0,4 m wide with this equipment in its fully withdrawn
position.
Where necessary, the space at the rear of the switchboard is to be ample to
permit maintenance and in general not less than 0,7 m. In any event, the
arrangements are to comply with the relevant statutory requirements, e.g.
those of the NEC, Art.110.
The spaces required for access shall have non-slip surfaces, electrically
insulated, or provided with insulating mats.
The switchboard should, preferably, meet the requirements of ANSI C37.20.1 or
UL 1558 for Low Voltage metal enclosed power circuit breaker switchgear.
Consideration may also be given to the use of a switchboard compliant with UL
Std 891 for dead-front switchboards or international standards such as IEC
60439, Low Voltage switchgear and control gear assemblies.
The ingress protection (IP) of the switchboard shall be suitable for its location.
Drip proof/NEMA type 2/IP22 shall be suitable if located within the generator
room and not subject to water spray from fire extinguishing system; NEMA Type
3 or 4/IP55 or better, otherwise.
The short-circuit ratings of the switchboard busbar system shall be adequate for
the prospective fault level at the switchboard. The rated short-circuit making and
breaking capacity of every protective device shall be adequate for the
prospective fault level at its point of installation.
The construction of the switchboard should be of a type that confines an internal
fault in a busbar dropper, feeder or starter compartment to the affected unit, so
that other parts of the switchboard remain fit for service.
Consideration should be given to the provision of windows or removable panels
to allow safe on-load thermographic examination of the internal load current
carrying parts of the switchboard.

Philosophy for Emergency Generator and Switchboard

Document Number

Rev

Page

Onshore

TO-HQ-02-013

00

17 of 22

OMV Exploration & Production GmbH

Where the emergency generation and distribution system is to operate as an


insulated or high resistance grounded system, ground fault indication and alarm
should be provided.
Busbars
Busbars and their connections shall be of copper or aluminium, all connections
being so made as to inhibit corrosion/oxidization between current-carrying mating
faces, which may result in poor electrical contact giving rise to overheating.
Busbars and their supports shall be designed to withstand the mechanical
stresses which may arise during short-circuits.
For bare conductors, where no precautions are taken against surface oxidization,
the temperature rise limit at rated normal current shall not to exceed 45C.
Where suitable precautions are taken against surface oxidization, e.g. by using
silver, nickel or tin coated terminations, a temperature rise limit not exceeding
60C is permitted. Where the busbar temperature rises are above 45C it is to be
ensured that there is no adverse effect on equipment adjacent to and/or
connected to the busbars and that the temperature rise limits of any materials in
contact with the busbars are not exceeded.
Circuit-breakers
Circuit-breakers shall comply with one of the following Standards, amended
where necessary for ambient temperature: ANSI C37.13 (air power circuit
breakers); UL489 (moulded case circuit breakers) or international standards such
as IEC 60947-2: Low Voltage switchgear and Control gear, Pt 2: Circuit-breakers;
the devices and the standards with which they comply shall be compatible with
the standards for construction of the switchboard and the applicable regulatory
requirements.
Generator incomer
The generator incomer circuit shall be provided with a circuit-breaker arranged to
open simultaneously, in the event of a short-circuit, an overload or an undervoltage condition. This circuit-breaker shall be provided with reverse power
protection with time delay, selected or set within the limits of 2 per cent to 15 per
cent of full load to a value fixed in accordance with the characteristics of the
prime mover.

Philosophy for Emergency Generator and Switchboard

Document Number

Rev

Page

Onshore

TO-HQ-02-013

00

18 of 22

OMV Exploration & Production GmbH

The generator circuit-breaker short-circuit and overload tripping arrangements, or


fuse characteristics, shall be such that the machine's thermal withstand capability
is not exceeded.
A synchronising relay should be provided in the breaker closing circuit or
undervoltage release circuit of generator and interconnector circuit breakers to
prevent out-of-phase paralleling. Consideration should be given to the installation
of automatic synchronising controls, particularly where the rating of the unit is
greater than 300kVA.
Interconnector circuit
The interconnector circuit shall be provided with a circuit breaker offering, at
least, short-circuit protection.
Interlocking controls should be provided to ensure that the circuit breaker is open
when the generator breaker is closed onto a dead bus.
Feeder circuits
Isolation and protection of each feeder circuit shall be ensured by a multipole
circuit-breaker or linked switch with a fuse in each insulated conductor. Protection
against short-circuit currents shall be provided by circuit-breakers or fuses.
The rated short-circuit making and breaking capacity of every protective device
shall be adequate for the prospective fault level at its point of installation.
Motors shall be protected individually against overload and short-circuit. Every
electric motor shall be provided with efficient means for starting and stopping so
placed as to be easily operated by the person controlling the motor. Every motor
above 0,5 kW shall be provided with the following control apparatus:
means to prevent undesired restarting after a stoppage due to low volts or
complete loss of volts, except where a dangerous condition might result
from the failure to restart automatically;
means for automatic disconnection of the supply in the event of excess
current due to mechanical overloading of the motor.
Where fuses are used to protect polyphase motor circuits, means shall be
provided to protect the motor from unacceptable overcurrent in the case of single
phasing.
The motor control gear shall be suitable for the starting current and for the full
load rated current of the motor.
Philosophy for Emergency Generator and Switchboard

Document Number

Rev

Page

Onshore

TO-HQ-02-013

00

19 of 22

OMV Exploration & Production GmbH

In order to ensure the ready availability of the emergency source of electrical


power to supply emergency circuits, arrangements shall be made for the
disconnection of any non-emergency loads to prevent overloading of the
generator. The arrangements may, when the generator is overloaded,
automatically disconnect sufficient non-emergency circuits from the emergency
switchboard to ensure its continued safe operation. Additionally or alternatively,
the arrangements may include automatic disconnection of non-emergency loads
from the emergency switchboard upon loss of the main supply.
10.0

DESIGN CRITERIA
The essential design criteria are referenced in Sections 8 and 9. It is
recommended, however, that the ratings of emergency generator and
switchboard and the design of the switchboard should allow for the expansion of
the plant and additional or enhanced loads.

11.0

DOCUMENTATION REQUIREMENTS
Technical manuals including the following information shall be provided:

12.0

Drawings and leading particulars, including data sheets giving


performance data, operating parameters, etc., for all items.

Installation information, sufficient to enable correct installation of the


equipment.

Commissioning information, sufficient to allow initial putting into service


and re-commissioning after a major overhaul.

Operating particulars, such that operators not having familiarity with the
equipment can operate it safely.

Maintenance data and procedures.

REGULATORY AUTHORITY REVIEW REQUIREMENTS


Generally, works test certificates showing compliance with the relevant
constructional and performance standard(s) shall be required for all major items
of equipment.
Engine and Mechanical Arrangements

Philosophy for Emergency Generator and Switchboard

Document Number

Rev

Page

Onshore

TO-HQ-02-013

00

20 of 22

OMV Exploration & Production GmbH

It is preferable that the engine be constructed under a quality assurance scheme


approved by the relevant authority. In this case, details of manufacturer, type and
rating of the engine may suffice. Otherwise, full constructional details may be
required.
Apart from drawings and details of the engine itself, the following is required:

Schematic drawings of starting air or hydraulic system

Schematic drawings of oil fuel system

Schematic drawings of lubricating oil system

Schematic drawings of cooling water system

Torsional vibration calculations for the generator set, demonstrating that


natural frequencies of vibration are removed from firing impulse
frequencies, vibration stresses in shafting and coupling do not exceed
acceptable values and that generator rotor vibratory torques and
amplitudes do not exceed acceptable values.

Control and Alarm Arrangements

Description of operation with explanatory diagrams.

Line diagrams of control circuits.

List of monitored points.

List of control points.

List of alarm points.

Test schedules (for both works testing and commissioning)

Switchboard and Power Distribution


Single line diagram of emergency power and lighting systems which is to include:

ratings of
converters;

all feeders connected to the emergency switchboard;

make, type and rating of circuit-breakers and fuses.

Simplified diagrams of generator circuits, interconnector circuits and


feeder circuits showing:

machines,

transformers,

batteries

and

semiconductor

Philosophy for Emergency Generator and Switchboard

Document Number

Rev

Page

Onshore

TO-HQ-02-013

00

21 of 22

OMV Exploration & Production GmbH

protective devices, e.g. short-circuit, overload, reverse power


protection;
instrumentation and synchronising devices;
load shedding arrangements;
remote stops;
earth fault indication/protection arrangements.

Calculations of the minimum and maximum value of short-circuit currents


at the emergency switchboard, when fed from the emergency generator
and when fed from the main power system;

Details of circuit-breaker and fuse operating times and discrimination


curves demonstrating co-ordination of the protective device
characteristics.

Arrangement plans of the emergency switchboard.

Schedule of normal and emergency operating loads on the system


estimated for the different operating conditions expected.

The following may also be required:


A test report or calculation to verify the short-circuit withstand strength of
the busbar system;
A test report or calculations to verify the rated current assigned to the
busbar system;
Documentation confirming that protection systems have been developed
using a systematic design procedure incorporating verification and
validation methods

Philosophy for Emergency Generator and Switchboard