You are on page 1of 6

Power Plant Capacity

Estimated Steam consumption


Total Water Requirement
Re-circulation water quantity

25
4
100
450

MW
t per MW
TPH
Cu.m

Eff.
13.09
95%

Clarifier
12.44

95%

MGF
11.82

90%

UF
10.63

70%

RO
7.44

75%

RO
3.33

90%

MB
3.00

Boiler Blowdown
Cooling Tower Losses
Cooling Tower Blowdown

3.00
6.75
2.25

Total Effluent CPP

8.50

Total Effluent Cement Plant

4.50
Eff.
13.00
95%

Clarifier
12.35

95%

MGF

11.73
90%

UF
10.56

60%

RO
6.33

1100
200
20

to EWT

to STP

0.65

0.62

1.18

3.19

1.11

0.33

3.00

Reject

0.65

0.62

TDS

3200

TDS

1280

1.17

4.22

TDS

2900

Capacity of RO Plant
Operating hours

74.89
20
Eff.

m/hr
hrs
ETP

STP

107.02
95%

Clarifier

5.35

101.67
95%

MGF/PSF

5.08

87.59
95%

UF

4.38

83.21
Filter Wtr

75%

9.00

RO

20.80

TDS
3500

62.41
75%

RO

TDS
1140

1.85

5.56
90%

MB

0.56

5.00
Effluents From Plant
Cooling Tower Blow Down-CMP
Cooling Tower Blow Down-CPP
TOTAL

11.87
3.00
4.50
19.37

90%

MGF

26.15

1.94

17.43
90%

ACF

1.74

ETP
15.69
60%

RO

6.28

9.41
9.96

TDS
2400

Input Parameters
m/hr
12.00
3.50
14.00
10.00
39.50
1.00

Raw mill
Coal Mill
Clinker Cooler
Cement Mill
Usage Factor
Cooling Tower Cement Plant
Cooling Tower Power Plant
Blow down from CT

300
450

Drinking Water

0.5

Sanitary Water-Cement Plant


Sanitary Water-CPP
Sanitary Water-Colony
Dust Suppression Water
Power Generation
Steam per MW
Steam Requirement
Steam Losses

Evp. Losses
2%
2%
1%

1
1
3
4
25
MW
4
t
100 Tph
5.00%

WATER QUALITY
TDS
Turbidity
Hardness

ppm
NTU
ppm

1100
4.52
550

RO-I output TDS


RO-II output TDS

ppm
ppm

300
20

You might also like