BIDDING DOCUMENT
FOR
Proposed Extension for Existing Laboratory Building at
Arthur C Clarke Institute for Modern Technologies,
Katubedda, Moratuwa
Issued To
Date
:............................................
........................................
............................................
Executive Secretary
:.............................................
INDEX
PAGE NO
-
I 01
VOLUME I
SECTION 1
INSTRUCTIONS TO BIDDERS
S01 1 to 2
SECTION 2
STANDARD FORMS
S02 1 to 7
SECTION 3
CONDITIONS OF CONTRACT
S03 1 to 2
SECTION 4
S04 1 to 5
SECTION 5
S05 1 to 13
SECTION 6
SPECIFICATIONS
S06 1 to 2
SECTION 7
BILL OF QUANTITIES
S07 1 to 113
SECTION 8
DRAWINGS
S08 1 to 3
SECTION 9
S09 1 to 2
SECTION 10
VAT FORM
S10 1 to 2
SECTION 11
CHECK LIST
S11 1 to 2
VOLUME II
9. A Pre-Bid meeting will be held at 10.00 a.m. on 01st December 2011 at ACCIMT
10. The ACCIMT will not be responsible for any cost or expenses incurred by bidders in connection
with the preparation or delivery of bids.
Director & CEO
Arthur C Clarke Institute for Modern Technologies
272, Bandaranayake Mawatha,
Katubedda, Moratuwa
I 01
VOLUME I
CONTENTS
SECTION
DESCRIPTION
PAGE NO
SECTION 1
INSTRUCTIONS TO BIDDERS
S01 1 to 2
SECTION 2
S02 1 to 7
SECTION 3
CONDITIONS OF CONTRACT
S03 1 to 2
SECTION I
INSTRUCTIONS TO BIDDERS
S01-1
SECTION I
INSTRUCTIONS TO BIDDERS
1.
The Instructions to Bidders for this work are contained in Section 01 of the Standard
Bidding Document, Procurement of Works, ICTAD Publication No.
ICTAD/SBD/01, Second Edition January 2007. The Bidder may purchase this
document from Institute for Construction Training and Development, No. 123,
Wijerama Mawatha, Sawsiripaya, Colombo-07.
Note:
S01-2
SECTION 2
STANDARD FORMS [CONTRACT]
1.
2.
3.
4.
5.
S02-1
Name of Agency: .
S02-2
AGREEMENT
This
Agreement,
made
the
day
of
..-...-20.
between
WHEREAS
the
Employer
desires
execute..
that
the
Contractor
.
1.
In this Agreement, words and expressions shall have the same meanings
as are respectively assigned to them in the Conditions of Contract
hereinafter referred to, and they shall be deemed to form and be read and
construed as part of this Agreement.
2.
S02-3
3.
IN WITNESS whereof the parties thereto have caused this Agreement to be executed the day
and year aforementioned in accordance with laws of Republic of Sri Lanka.
WITNESSES:
1. Signature.................
2. Signature............
Designation :
Designation:
Common Seal
NIC No..
WITNESSES:
1. Signature.................
2. Signature..........
NIC No
NIC No...
...
...
S02-4
[amount
in
words]
(....) [amount in figures], upon receipt by us of your
first demand in writing accompanied by a written statement stating that the Contractor is in
breach of its obligation(s) under the Contract, without your needing to prove or to show
grounds for your demand or the sum specified therein.
This guarantee shall expire, no later than the . day of . 20. [insert
date, 28 days beyond the intended completion date]and any demand for payment under it
must be received by us at this office on or before that date.
..
[signature(s)]
S02-5
[amount
in
words]
(....) [amount in figures], upon receipt by us of your
first demand in writing accompanied by a written statement stating that the Contractor is in
breach of its obligation(s) in repayment of the Advance payment under the Contract
The maximum amount of this guarantee shall be progressively reduced by the amount of the
advance payment repaid by the Contractor.
This guarantee shall expire on [insert date, 28 days beyond the Intended
Completion Date]
Consequently, any demand for payment under this guarantee must be received by us at this
office on or before that date.
..
[signature(s)]
S02-6
Furthermore, we understand that, according to the conditions of the Contract, when the works
have being taken over and the first half of the Retention Money has been certified for the
payment, payment of the second half of the Retention Money may be made against a
Retention Money guarantee.
[amount
in
words]
(....) [amount in figures], upon receipt by us of your
first demand in writing accompanied by a written statement stating that the Contractor is in
breach of its obligation under the Contract, because the contractor has not attended to the
defects in accordance with the Contract.
This guarantee shall expire, at the latest, ..[insert date, 28 Days after
the end of the Defects Liability Period] Consequently, any demand for payment under this
guarantee must be received by us at this office on or before that date.
..
[signature(s)]
S02-7
SECTION - 3
CONDITIONS OF CONTRACT
S03-1
CONDITIONS OF CONTRACT
PART I - GENERAL CONDITIONS OF CONTRACT
1.
The General Conditions for this work are contained in Section 03 of the Standard
Bidding Document, Procurement of Works, ICTAD Publication No.
ICTAD/SBD/01, Second Edition January 2007. The Bidder may purchase this
document from ICTAD, No. 123, Wijerama Mawatha, Sawsiripaya, Colombo-07.
Note:
S03-2
VOLUME II
CONTENTS
SECTION
DESCRIPTION
SECTION 4
S04-1 to 5
SECTION 5
S05-1 to 13
SECTION 6
SPECIFICATIONS
S06-1 to 2
SECTION 7
BILL OF QUANTITIES
S07-1 to 113
SECTION 8
DRAWINGS
S08-01 to 3
SECTION 9
S09-1 to 2
SECTION 10
VAT FORM
S10-1 to 2
SECTION 11
CHECK LIST
S11-1 to 2
VII-01
PAGE NO
SECTION 4
FORM OF BID
AND
QUALIFICATION INFORMATION
S04-1
FORM OF BID
Name of the Contract: Proposed Extension for Existing Laboratory Building at Arthur
C Clarke Institute for Modern Technologies, Katubedda, Moratuwa
To:
Gentleman,
1.
2.
3.
4.
We agree to abide by this Bid for the period of 91 Days from the last date fixed for
receiving or any extended period and it shall remain binding upon us and may be
accepted at any time before the expiration of that period.
5.
Unless and until a formal Agreement is prepared and executed, this Bid, together with
your written acceptance thereof, shall constitute a binding contract between us.
6.
We understand that you are not bound to accept the lowest or any Bid you may receive.
S04-2
Signature
Name
Address
: .
: .
: .
..
Seal
..
..
Witnesses
1. Signature
Name
Address
:
: .
: .
..
..
..
2. Signature :
Name
:
Address :
S04-3
Qualification Information
[To be completed by the Bidder and submitted with the Bid.]
ICTAD Registration:
Eligibility Requirement
Registration No
Grade C5 or above
Attach copies of relevant
Speciality Building Construction
pages from the registration
Validity Valid at the time of closing of
book to confirm your details
bids and also at the time of
(attach as annex I).
award.
Have you been declared as a defaulted contractor by NPA or any
Blacklisted Contactors
other Agency?
(Yes/No)
If yes provide details (attach as annex II).
Construction Programme
Legal Status
Partnership
Public Company
Privet Company
Business Address :
:.........
Sole Proprietor
Eligibility Requirements
Category, Experience and Qualification
S04-4
Bidders Qualification
Required
Proposed by bidder
Nos
(Name, experience
and Qualification)
Chartered (Civil) Engineer, over 10 years
of post charter experience in Building
Construction Visiting 10 hours per week
01
01
01
.....................................
Signature of the Bidder
Name:
Date:
Seal
S04-5
SECTION 5
BIDDING DATA AND CONTRACT DATA
S05-1
Bidding Data
A. GENERAL
Instructions
to Bidders
Clause
Reference
1.1
The Employer is
Name: Director & CEO, ACCIMT
Address: Arthur C Clarke Institute for Modern
SCOPE OF BID
Technologies
272,
Bandaranayake
Moratuwa
Mawatha,
Katubedda,
1.3
2.1
SOURCE OF
FUNDS
4.2
ELIGIBILITY
AND
QUALIFICATION
OF THE BIDDER
4.4
S05-3
Add
Only who purchased the Bidding documents shall be
eligible to Bid
8.1
S05-4
CONTENT OF
BIDDING
DOCUMENT
Instructions to Bidders
Section 2
Section 3
Conditions of Contract
Volume 2 :
Section 4 Form of Bid and Qualification
Information
Section 5 Bidding Data and Contract Data
Section 6
Specification
9.1
CLARIFICATION
OF BIDDING
DOCUMENTS
11.1
LANGUAGE OF
BID
12.1
S05-5
DOCUMENTS
COMPRISING
THE BID
13.3
Delete
. at the space provided in the B.O.Q.
Add
..in the Section 10.
13.4
15.1
BID VALIDITY
16.1
BID SECURITY
16.2
S05-6
17.0
Katubedda, Moratuwa
Date 1st December 2011
19.2
PRE-BID
MEETING
SEALING AND
MARKING OF
BIDS
29.2(a)
34.1
DEADLINE FOR
SUBMISSION OF
BIDS
Delete
..but
competitively.
EVALUATION
AND
COMPARISON
OF BIDS
including
Dayworks
where
priced
PERFORMANCE
SECURITY
Add
ADVANCE
PAYMENT AND
SECURITY
S05-7
36.0
S05-8
ADJUDICATOR
Contract Data
(Please note that the clause nos. given hereunder are that of Conditions of Contract)
A. GENERAL
Clause No. The Employer is
1.1
Name: Director & CEO
Address: Arthur C Clarke Institute for Modern
Technologies
272, Bandaranayake Mawatha,
Katubedda, Moratuwa
DEFINITIONS
The Engineer is
Name: Director General of Buildings
Address: Department of Buildings,
2nd Floor, Sethsiripaya,
Battaramulla.
The Engineers representative is
Name: Chief Engineer (Colombo Construction)
Address: Chief Engineers Office,
Department of Buildings
213, Torrington Avenue,
Colombo -07.
The Works consists of Construction of Reinforced Cement
Concrete (R.C.C.) framed four storied Building with one part
rises up to five storied, with services such as water supply &
sewerage disposal system, electricity, storm water drainage
system, landscaping, fire fighting and lightning arresters.
The Site is located at 272, Bandaranayake Mawatha,
Katubedda, Moratuwa.
The Start Date shall be within 14 Days from the date of the
Letter of Acceptance.
The following document also shall be a part of Contract.
(i)VAT Form
INTERPRETATION
8.1
9.1
OTHER
CONTRACTORS
PERSONNEL
2.3(10)
Category
Chartered
Civil
Engineer
Engineer
Technical
Officer
S05-9
Amount to be
recovered
Rs.3000/- per
hour
Add
Attendance, certified by the Engineers Representative
shall be attached to interim claims. If the Contractor fails
to employ such personnel, the amounts mentioned in the
above table in respect to each personnel shall be deducted
from payments due to the contractor and further action
shall be taken to terminate the Contract after deducting the
fine for 07 days.
17.1
INTENDED
COMPLETION
DATE
21.1
POSSESSION OF
THE SITE
24.1
Add
The Adjudicator shall be appointed by Employer and the
Contractor with mutual consent of both parties.
DISPUTE
RESOLUTION
27.1
27.3
27.4
PROGRAMME
CORRECTION OF
DEFECTS
39.2
VARIATIONS
40.2
PAYMENTS OF
VARIATIONS
S05-10
COMPENSATION
EVENTS
46.1
Not Applicable
CURRENCIES
47.1
PRICE
ADJUSTMENT
44.1m
Indices No
M4
M7
M8
M9
M12
M13
M26
M32
M36
M38
L1
L3
P1
Input Name
Input Percentage
(%)
Cement
Metal (3/4")
Sand
Brick
Lime
R/f steel
Electrical wiring
Floor tile
Aluminium work
Electrical fittings
Skilled labour
Unskilled labour
Small equipment
9.78
2.68
3.07
4.86
1.28
21.55
1.47
4.49
12.38
3.68
12.94
10.81
1.00
Total
48.1
90.00
S05-11
RETENTION
49.1
LIQUIDATED
DAMAGES
Add
Advance Security shall be issued by an agency
acceptable to Employer using the form for Advance
security (unconditional guarantee) included in
Section 02 Standard Form and it should be valid
until a date 28 Days beyond the intended completion
date and shall be in favour of Director & CEO,
Arthur C Clarke Institute for Modern Technologies.
ADVANCE
PAYMENT
52.1
SECURITIES
Deleted
DAYWORKS
SCHEDULE
58.1
OPERATION AND
MAINTENANCE
MANUALS
58.2
S05-12
59.2
Add
(a). The Contractor does not employ the required Key
Personal as stated in the Clause 9.1 of the Contract data,
within 07 days after informing him to employ the Personals.
TERMINATION
PAYMENT UPON
TERMINATION
63.7
ATTENDANCE FEE
S05-13
Section 6 Specifications
_______________________________________________________________________________________________________________
SECTION 6
SPECIFICATIONS
S06-1
Section 6 Specifications
_______________________________________________________________________________________________________________
GENERAL SPECIFICATIONS
01 Specifications for Building Works Volume I
ICTAD Publication No. SCA/4/I
3rd Edition (Revised) July 2004
02 Specifications for Building Works Volume II
ICTAD Publication No. SCA/4/II Sanitary Installations
2nd Edition (Revised) October 2001
03 Specifications for Water Supply Sewerage and Storm Water Drainage Works
ICTAD Publication No. SCA/3/2
2nd Edition (Revised) April 2002
04 Specifications for Electrical and Mechanical Works
Associated with Building and Civil Engineering
ICTAD Publication No. SCA/8
2nd Edition (Revised) August 2000
Copies of above publications shall be purchased from the Institute for Construction, Training and
Development (ICTAD), "Sawsiripaya", 123, WijeramaMawatha, Colombo 07.
S06-2
B.O.Q. No.2011-10-004
BILL OF QUANTITIES
S07 - 1
BOQ NO 2011-10-004
CONTENTS
Page No.
GENERAL NOTES
S07-3
PRICING PREAMBLES
S07-5
PRELIMINARIES
S07-22
BILL NO 1 - SUBSTRUCTURE
B - EXCAVATION AND EARTH WORK
S07-28
C - CONCRETE WORK
S07-32
D - MASONRY WORK
S07-36
E - WATER PROOFING
S07-37
S07-38
BILL NO 2 - SUPERSTRUCTURE
C - CONCRETE WORK
S07-39
D - MASONRY WORK
S07-51
E - WATER PROOFING
S07-52
S07-54
G- METALWORK
S07-55
S07-70
S07-71
K- PLUMBING
S07-73
S07-81
M- ELECTRICAL INSTALLATION
S07-88
N - PAINTING
S07- 98
S07- 100
S07-101
Q- SEPTIC TANK
S07-103
S07-108
S - SOAKAGE PIT
S07-109
T - MISCELLENIOUS
S07-111
S07-112
GRAND SUMMARY
S07-113
S07 - 2
GENERAL NOTES
Timber :
Unless otherwise specified in the respective Trades / Sections , the timber for all trades shall be
as specified in Carpentry and Joinery.
All timbers under exceptional Circumstances, any equivalent timber to the given Species may be
used with the approval of the Engineer.
Satin
Halmilla
Kohomba
Category B
Grandis
Palu
Mee
Milla
Hulanhik
Ketakala
Wewarana
Tulang
Valdel.
Satin
Kohomba
Category B
Ginisapu
Tulan
Wewarana
Halmilla
Hulanhik
Milla
Valdel.
Palu
Micro
Mahogany
Sooriya mara
Category B
Madan
Mee
Domba
Wewarana
Kolon
Tulang
Etathimbiri
Grandis
Satin
Halmilla
Kohomba
Palu
Mee
Etathimbiri
Category B
Domba
Grandis
Milla
Hulanhik
Ketakala
Wewarana
Tulang
Valdel.
Carried Forward
S07 - 3
Brought forward
Kolon
Mahogany
Category B
Ginisapu
Tulang
Satin
Val Del
Hulanhik
Mahogany
Lunumidella
Kohomba
Wewarana
Sooriya mara
(Group-6): Beadings :
Alstonia
Teak
Trade Names ;
Where trade names , brands and / or catalogue numbers are referred to sole preference to any
material or equipment is not intended . Any other material or equipment may be used, provided
that the characteristics of type, quality, appearance, finish, method of construction and / or
performance is not less than specified and provided also that approval is first obtained.
Method of Measurement
This Bill of Quantities has been prepared generally in accordance with the principles of "Method
of Measurement of Building Works(First Revision) , Sri Lanka Standard 573:1999"
Measurements :
Tenderers are to note that the measurements are taken absolutely net, unless otherwise stated
and they must , therefore, allow in their prices for all straight cutting and waste, laps, etc.
throughout even though not specifically mentioned.
S07 - 4
PRICING PREAMBLES
1. GENERAL
a.
The Bidder shall read and be conversant with the full description of workmanship and
materials as described in the Particular Specification and ICTAD Specification for the
respective items of work/ trades prior to the preparation of the Bid.
b.
The Bidder shall refer to the relevant Clauses of Pricing Preamble when pricing composite
item of works.
c.
The rate for each item must be comprehensive and must include for complying in all respects
with the requirements of the aforesaid specifications, these Pricing Preambles, cover all the
obligations under the Contract, and all matters and things necessary for the proper
construction, completion and maintenance of the Works. No claim for additional payment
shall be allowed for any error or misunderstanding by the Contractor of the work involved.
d.
The rate for each item shall also include for all the following i. Labour and all connected costs ;
ii. Materials and goods including all connected costs;
iii. Preparatory works and setting out of particular item ;
iv. Complying with regulations of the Municipal Council and/or any other relevant authority under
which particular item of work is to be executed unless otherwise included in the Preliminaries
;
v. Fitting and fixing materials and goods in position, including hoisting to any height or lowering
to any depth and all temporary works, equipment and small tools ;
vi. Plant and equipment unless otherwise included in Preliminaries ;
vii. Handling of materials and working in situation where there is very restricted working space or
no working space ;
viii. Square cutting and Waste of materials ;
ix. Forming of ends, angles, miters and junctions between straight and raking or curved work;
x. Protecting and cleaning ;
xi. All other incidental works and necessary works which are not described in the B.O.Q. but
described in the aforesaid specifications and or shown in the drawings for the proper
completion of the relevant item of work ;
xii. Establishment charges and overheads( not included in preliminaries or anywhere in the Bill Of
Quantities), and profits.
Carried Forward
S07 - 5
Brought forward
e.
In addition to above, the rates for items of work in Substructure shall include for the works at
depths extending below ground water table where applicable including excavation under
water, removal and disposal of mud and sand and preparation of place to a condition suitable
for proper execution of the works.
f.
Spaces required for the construction of buildings to be used as workshops and stores for
perishable materials, workers rest room, canteen, accommodation are not available within the
site premises. Bidders are advised to inspect the site and suburbs area before preparation of
bids (Refer page S07-23, Item 9)
2. EXCAVATION AND EARTHWORK
a.
All works under this section are measured net and no working space is allowed.
b.
The Contractor shall be responsible for the design and execution of the excavation method
which is subject to scrutiny by the Engineer. However, scrutiny by the Engineer shall not in
any way relieve the contractor of his responsibilities and duty of care.
c.
Existing ground levels shown in the Drawings have been taken at the surface of the ground,
with no particular differentiation to indicate buried foundations, pavings etc.
d.
The Contractor shall note that the rate for compacted earth fill and granular fill, stone, gravel
and sand beds shall include for imported materials or materials from borrow areas.
e.
f.
Rates for Excavation & Earthwork shall include for i. Accepting site as found and preparing to condition suitable for proper execution of the Works
ii. Excavating by whatever means are necessary including excavation done manually or by
machine in any type of ground including ground with boulders (except rock) and excavation
around existing RCC. bored piles and jet grout piles ;
iii. Trimming sides, keeping clean and consolidating bottom of basement, sumps, pits
and trenches ;
iv. Backfilling and disposal of surplus excavated materials as specified and directed ;
v. Any necessary additional works required due to
a. Working space required by the Contractor ;
b. Earthworks supports ;
c. Formwork ;
vi. Any additional trimming or appropriate back- filling to provide specified or approved
formations and profiles necessitated by the uneven excavation of the earth, unless otherwise
measured separately ;
g. Rates for compacted earth fill, granular fill and gravel and sand beds shall include for
finishing sub-grade to slopes and falls, depositing in layers, leveling, blinding, and machine or
hand-packing to form vertical or battered or level faces, and for forming sinking where
required under floor slabs or sub-floor layers.
h.
Rates for approved damp-proof membrane shall include for laps, and straight, raking and
circular cutting, and for notching around all obstructions.
S07 - 6
3. CONCRETE WORK
a.
Rates for concrete work shall include for i. Mixing as per specification, depositing, handling, hoisting and placing at any height or depth ;
vi. Curing ;
vii. Preparation of ground surface, grading to slope and falls, if any, and machine or hand
packing to form vertical or battered or level surface and all necessary formwork to edges of
blinding concrete in case of pile caps ground slab/ramps/beams.
FORMWORK
a.
Formwork for similar concrete members are measured together irrespective of the height or
depth and the shape or form.
b.
Extra-over rate for a particular type of high quality formwork should be applied only for the
areas of formwork which requires such high quality type formwork as specified.
c.
Formwork shall be properly designed and strictly as described in the specifications for the
particular type of concrete surface finish and it should be sufficiently strong and grout tight.
d.
Faces of Jet grouting piles, masonry and concrete work which will be formed or used as
formwork shall not be measured as formwork and no payment shall be made for same.
e.
Rate for formwork shall include for i. Fabricating setting up and erection at any height or depth ;
ii. Strutting, supporting through lower floors and supporting at any level, including additional
propping, strutting and supporting decks ;
iii. Coating with shuttering oil and or lining ;
iv. Easing, striking and removing ;
Carried Forward
S07 - 7
Brought forward
REINFORCEMENT
a. i. Standard length of reinforcing bar for the purpose of measurement shall be 6.0 m.
ii. Payment for bar reinforcement shall be to be nearest Kilogram.
b.
S07 - 8
Rates for precast concrete works shall include for i. Moulds and for formwork with the required finish to all exposed surfaces in accordance with
the specifications, hacking surfaces to form key for rendering etc, and hoisting to any height
or depth including providing any lifting holes or other devices to the approval of the Engineer,
building in, including bedding and jointing in mortar as required, and any necessary strutting
and supporting.
ii. The requirements of the Pricing Preamble clauses which refer to Concrete Work,
Reinforcement and Formwork.
iii. Loading, transporting to Site, unloading, handling and stacking.
In the calculation of the volumes of brick wall which are not multiples of the size of standard
bricks, the thickness of such walls shall be taken as the thickness of full bricks from which
they can be cut. The same principle of calculation of volume shall be used for all brickwork of
which the cross-sectional dimensions are not multiple of brick sizes.
b.
Rates for brickwork/Block work shall include for i. Plumbing, angles, straight cutting, forming rebates, reveals and raking out joints for
plastering;
ii. Splay cutting, rough cutting, fair cutting, forming chases or grooves for slabs, partitions,
staircases, roofs and the like, bonding ends of walls, building in or cutting and pinning in and
making goods on lintels, timber and steel works ;
iii. Building at any level or height of slabs or beams, additional labour in kerbs, isolated and
attached piers, all cutting, bonding at angles and intersections, building into or against
adjacent work, wedging and pinning up to soffits;
iv. Supplying and fixing metal clamps, Galvanized, steel boundary ties, and brick reinforcement
etc;
v. Necessary cutting required in walls which are not multiples of brick size ;
vi. Preparing existing walls for raising and pinning new brickwork ;
vii. Bonding new walls to concrete faces and old walls where necessary, and materials to be
used for such bonding.
Carried Forward
S07 - 9
Brought forward
c.
Rates for Damp Proof Course shall include for i. Necessary leveling screed and trimming top of rubble/block/brick plinth wall ;
ii. Fair edges, rounded edges, drips and arises, angle fillets ;
iii. Turning nibs of asphalt into grooves ;
iv. Cutting to line and jointing new to old asphalt.
d.
Rates for Rubble Masonry shall include for i. All joggles, cramps, dowels, ties, templates ;
ii. Plumbing, angles, fair returns, setting, jointing, eaves filling, pointing and fixing in position,
hoisting to any given height or depth ;
iii. Bonding ends of walls, rough cutting and fair cutting ;
iv. Leveling up in walling for Damp Proof Courses, sills, thresholds, string courses, copings and
the like ;
v. Forming straight vertical joints next to dressings, panels, brickwork etc ;
vi. Forming openings and dressed margins ;
vii. Forming chases, throats, rebates, margin flutes, sinking, chamfered and rounded edges, and
all labour connected therewith.
5. WATER PROOFING
a.
iv. Turning nibs of asphalt into grooves and asphalting around brackets ;
v. Cutting to line and jointing new to old asphalt ;
vi. Temporary screeds, ground and rules.
S07 - 10
6. STRUCTURAL STEELWORK
a.
7. METAL WORKS
a.
Type and quality of steel to be used for metal work shall be as per drawings and relevant
specification clause and or shall conform to latest British Standards.
b.
c.
Rates for Metal Work shall include for anchors, screws, dissimilar metals and providing
thermal movement and the preamble clauses for Structural Steel Work where relevant and
they shall apply equally to relevant items of this section.
d.
Fabrication & fixing of Aluminum components shall be carried out by experienced tradesman.
The Contractor shall furnish particulars of Aluminum fabricator through the engineer for his
approval.
The Contractor will be required to furnish a guarantee on material and workmanship for a
period of 8 years from the date of handing over of Works in the form required by the
employer, binding the Aluminum manufacturer and the Contractor jointly and severally
e.
Rate for Aluminum doors, windows & partitions shall include for
i. Glass and glazing
ii. All necessary ironmongery
iii. Furnishing shop drawings (materials & workmenship should be accordance with the
specifications given under the aluminium works)
S07 - 11
Rates for roof covering and roof plumbing shall include for :
i. Hoisting, placing and fixing in position ;
ii. Straight cutting, raking cutting, circular cutting, notching, and working around obstructions
and waste ;
iii. Nails, screws and the like ;
Rates for flashings shall include for the following in addition to the requirement of "a" above -
S07 - 12
b.
All timber shall be well seasoned and treated against insect and termite attack before
fixing in position
c.
Rates for carpentry shall include for i. Any type of cutting required, sawing, notching, drilling, trimming, framing, jointing, splayed
edges and the like, hoisting and fixing in position with nails, spikes, plugs, screws, and gluing
and priming to joints and ends ;
ii. Forming splayed edge, grooves, chamfers, scribed and rounded edge, beveling, molding and
the like ;
iii. Plugging, wedging, nuts and washers with bolts, sprockets and pins and the like ;
iv. Nogging or solid bridging, cut between studs or joints for structural timber.
v. Rebating, singings, grooving, mortising ;
vi. Additional timber lengths required for carpentry jointing ;
vii. Protection and keeping clean for staining, polishing or painting where applicable ;
d.
Rates for roof decking shall include for machine sanding, protecting and preparing in addition
to the requirements c above.
e.
Rates for walls and ceiling lining shall include for jointing and fixing to walls/ ceiling/ eaves
etc. all cover and joint strips, in addition to the requirements c above.
f.
Rates for timber paneling/wall lining shall include for cover moldings, sills, stiles and head
moldings to openings as relevant.
S07 - 13
10. JOINERY
a.
b.
All timber shall be well seasoned and treated against insect and termite attack before fixing.
c.
Timber used for joinery works shall be well seasoned well treated and in one species of
special class timber recommended for the particular class of Joinery works as specified in the
Specification.
d.
Rates for Joinery shall include for i. Any type of cutting required, sawing, notching, drilling, trimming, planning, forming and
jointing and the like, fixing in position complete with nails, spikes, plugs, screws and gluing
and priming to joints and ends ;
ii. Forming splayed and tongued edges, rebates mortises, grooves, chamfers, scribed and
rounded edges, beveling, moulding, margin and the like and rounded corners, sinkings ;
iii. Working to stated sizes, for all short lengths making mitres, joints and ends ;
iv. Necessary bolts, dowels metal clips, anchors, grips and fixing joinery ;
v. Gluing, dowelling, plugging, wedging pining and the like ;
vi. Punching heads and filling with approved filler if nails or pins are used for fixing ;
vii. Countersinking and filling heads with approved filler, if brass screws are used for fixing ;
e.
Preambles for Glazing section and a, b and c under Painting and Decorating section shall
equally apply to Joinery works.
f.
Ironmongery
i. All cutting, fitting, sinking, boring, mortising ;
ii. Matching screws for ironmongery
iii. Removing during decoration, refixing after decoration, leaving oil and in proper working order
on completion and supplying and labeling all keys and handing over to Employer.
S07 - 14
a.
ii. All other small quantities/panels/narrow widths/ arises/ reveals/ angles/ ends/short lengths
including those of tiling work on door and window jambs and reveals are measured together
with the respective tiling item and labour in such work shall be included in the rate for the
main finishing item and they shall not be measured/paid separately.
b.
Rates for wall, floor, ceiling finishings and wall floor screed and bedding shall include for -
i. All temporary rules, screeds, templates and supports, curing and cleaning off on completion
and exact thickness required to finish ;
ii. Caulked joints and making good and cutting around bolts, pipes conduits, sleeves, ducting,
fittings, sections, obstructions and the like ;
iii. Tamping and compacting ;
iii. Raking out joints of new brickwork/Block work or hacking concrete to form key, including
brushing, cleaning off and dampening ;
iv. Forming internal and external angles and arises ;
v. Any extra thickness required to finish to true levels ;
vi. Any additional dubbing out required to plastered surfaces of brickwork and to the finished
surface of concrete to obtain the requisite standard of finish ;
vii. Samples to be submitted for the approval of the Engineer.
c.
Rates for tile slab or block finishing to floor and wall shall also include for the following in
addition to the above i. Straight raking and circular cutting ;
ii. Dubbing out or packing to concrete surface to correct deviations within specified tolerance ;
Carried Forward
S07 - 15
Brought forward
d.
12. GLAZING
a. i. Type of Glazing shall be as specified.
ii. Thickness of glazing shall be as per the design of the approved specialist contractor who will
be engaged by the Contractor. However, the minimum thickness shall be 6mm.
b.
Rates for Glazing shall include for i. Glazing, fixing, bedding priming and panel pins and other materials and labour for same and
cutting to size ;
ii. Templates, straight cutting, circular cutting, grinding edges or special type of edges required
and sand blasting ;
iii. Glazing beads, washlether or neoprene strip, glazing sealant, weather stripping, caulking joint
silicone joint ;
S07 - 16
Rates for painting shall include for i. Preparation of surfaces, cleaning down, smoothing, etc ;
ii.
iii.
iv. Working to returns, painting in any colour, multi- colour works, cutting into line at junctions of
different colours at angles or plain surfaces, painting in small quantities ;
v.
b.
Rates for work to isolated general surfaces shall include for working on door frames, linings,
window subframes (where of a differing material to the window), skirting, rails, architrave's,
bars, posts, balusters and the like.
c.
Rates for work to glazed general surfaces, glazed windows and the like (measured both
sides, flat over glass, irrespective of size and panes) shall include for work to edges and
glazing rebates, returns and moldings of frames, mullions, transoms, architaves and the like.
d.
Rates for work to pipes and conduits (which shall include trunking, ducting and the like) shall
include for all work on hangers, supports, brackets and the like.
S07 - 17
14. PLUMBING
a.
iv. Sealing, fixing and support with holder bats or pipe clips cut and pinned built in wall or slabs.
S07 - 18
Carried Forward
Brought forward
c.
Where pipes pass through walls or slabs these shall be wrapped with a layer of inert
materials. For pipes exceeding 50 mm dia sleeve pipes shall be used for the full thickness of
slabs, walls or beams through which the pipes pass.
DRAINAGE WORK
a.
The provisions and the clauses of precedence trades shall equally apply to relevant item of
this trade.
b.
The rates for trench excavation for pipes shall include for depending and widening the trench
as necessary to enable the barrels of pipes of rest on firm and to facilitate jointing.
c.
The rates for rock excavation in trench excavations shall include for importing selected
materials to replace any excavated rock which is unsuitable for back filling and for all
additional rock excavation and appropriate filling beyond the maximum measurable in
accordance with the specification.
d.
The rates for concrete beds and surrounds to pipes shall include for flexible joints and any
necessary formwork where required by the specification.
S07 - 19
The execution of Electrical Installation shall every respect comply with the current
Regulations of the Institute of Electrical Engineers, London, requirements of Ceylon
Electricity Board and the area Authority.
b.
The rates for equipment and control area, distribution boards, meters, switches, fuses, etc.
shall include for connecting up, fixings and supports for the complete installation and for
suitable mounting boards, frames, supports, housings and cabinets where required.
c.
The rates for cables, tape, bus-bar trunking etc. (except where included in sub circuits or
electrical points) and the like shall include for joints in the running length, all allowances for
sagging snaking, for drawings through conduits, laying in trunking of surface fixing where
retired with cable supports, clears, hangers, channels, insulators and the like.
d.
i. The rates for cables and the like laid in benches shall include for drawing through conduits or
ducts where required.
ii. The rates for cable terminations shall include for all connections point boxes, insulating and
jointing materials, cable terminations glands, lock nuts, bushes and the like.
e.
i. The rates for conduits trunking cable tray etc. (except where included in sub circuits of
electrical points) and the like shall include for all short lengths, joints and couplers in the
running length, and for all fixings and supports with approved saddles, crumpets, clips and
the like cut and pinned, built-in or plugged and screwed to walls or ceilings including
chasing brick work, block work, concrete slab beams walls columns and the like and make
good.
ii. The rates for conduits and the like shall include for all bends, tees, socket and the like,
cutting, screwing, threading, jointing and providing all conduit boxes, junction boxes and the
like.
f.
The rates for the installation of sub main circuits, lighting points switched points, socket
outlets, fused spur outlets, isolators, etc. (other than those applicable to the distribution
switch gear) shall include where applicable, for all conduit, trunking, cable tray, cabling,
terminations, fixings and connections from the distribution
switched gear to and including the point (accessories measured separately) and shall be
deemed to include for any item mentioned in the Electrical installation Specification but not
shown on the drawings and vice-versa.
g.
The rates for lighting fittings, fittings such as ceiling fans and extract fans, and for appliances
such as air- conditioning units shall include for assembly, fixing and connection from the spur
outlet or isolator to the fitting or appliance with all necessary additional wiring earthling and
outlet roses and leaving perfectly clean and undamaged on completion.
h.
The rates for fixing only fittings and appliances provided by the employer should include in
addition to the foregoing for accepting delivery, storing and handling the fittings and providing
any additional materials and internal wiring.
S07 - 20
Carried Forward
Brought forward
j.
The rates for connections only to fittings and appliances such as pumps, water heaters, air
conditioning units and extract fans shall include for connection from the isolator or spur outlet
to the fitting or appliance (these being measured separately) , with all necessary additional
wiring, earthling and outlet roses.
k.
The rates for power outlets shall include for mounting boxes and frames.
l.
The rates for power switched with remote outlets shall include for the additional outlet plates
and boxes.
m.
The rates for switched socket outlets shall include for 1 No fused plug top and 4 No fuse
links.
n.
o.
p.
If the items of electrical installation are measured as sub circuit point wiring or in electrical
points, the rates for such items shall include for :
i. The preceding clauses of this trade where relevant.
ii. Preparation of asbuilt drawings to be submitted to Employer at the handing
over/ practical completion.
iii. All items and accessories required for proper installation as per specification and
regulation up to load point and labour connected therewith.
iv. All wiring, conduiting and cables and labour connected therewith if not measured
separately.
v. Items specified in the specification but not shown in the drawings.
vi. Disconnecting and refixing of electrical fitting and appliances as required for the
convenience of other trades.
vii. Painting of timber work metal work executed under this trade.
q.
Rate to include submission of Megar Test report of the building Electrical Installation from
Charted Electrical Engineer
S07 - 21
PRELIMINARIES
Note 1 :The Engineer/Consultant may modify or amended any item, or
delete inappropriate item/s or add new item/s, depending the nature of
the proposed work.
Note 2 :Mode of payment are as below
Mode Of Payment
Category
Reimbursement of actual cost on submission of the relevant
document acceptable to the Engineer plus 5% of the actual cost
A
of obtaining the Insurance Policies and Securities.
To be paid on signing of the formal Contract Agreement
B
60% on completion of temporary buildings or structures. 30% in
equal installments over the contract period and balance 10% on
C
dismantling and removal on completion.
Paid on satisfactorily completion of the item.
D
In equal installments over the contract period
E
Mode of payment to be mutually agreed between Contractor and
the Employer at the commencement of contract in relation to the
F
programme of work
On the completion of works
G
Note 3 : The above recommended percentages may be adjusted by the
Employer/ Consultant to suit the particular project.
Serial
No
Mode of
payment
category
Description
Unit
Amount
Provisional
sum
30,000.00
Provisional
sum
120,000.00
Provisional
sum
70,000.00
Provisional
sum
30,000.00
Provisional
sum
30,000.00
280,000.00
Serial
No
Mode of
payment
category
Description
Unit
Brought forward
Amount
280,000.00
Engineer's Facilities
5
Item
100,000.00
Item
30,000.00
Item
100,000.00
Item
90,000.00
Item
50,000.00
Contactor's facilities
8
650,000.00
Serial
No
Mode of
payment
category
Description
Unit
Brought forward
10
Amount
650,000.00
Item
100,000.00
Item
35,000.00
Item
100,000.00
Item
100,000.00
Item
25,000.00
Item
720,000.00
Item
120,000.00
12
13
14
15
Category
Qualifications
Monthly
Engineer
B.Sc. Civil
50,000.00
(full time)
(5 Yrs.experience)
Technical Officer NDT Civil or
30,000.00
(full time)
equivalent
(5 Yrs.experience)
16
1,850,000.00
Serial
No
Mode of
payment
category
Description
Unit
Brought forward
Amount
1,850,000.00
Setting Out
17
18
Item
35,000.00
Item
25,000.00
Item
35,000.00
Item
30,000.00
Item
35,000.00
Item
35,000.00
Item
35,000.00
20
21
22
23
24
Deleted
E
Item
2,080,000.00
Serial
No
Mode of
payment
category
Description
Unit
Brought forward
25
26
27
28
29
30
31
Amount
2,080,000.00
Item
30,000.00
Item
25,000.00
Item
60,000.00
Item
70,000.00
Item
70,000.00
Item
60,000.00
Item
130,000.00
Item
25,000.00
2,550,000.00
Serial
No
Mode of
payment
category
Description
Unit
Brought forward
32
33
34
35
36
37
38
39
40
Amount
2,550,000.00
Item
50,000.00
Item
100,000.00
Item
70,000.00
Item
50,000.00
Item
35,000.00
Item
50,000.00
Miscellaneous
Allow sum for stamp duty in accordance with the
prevailing regulations of the Government
Item
60,000.00
Item
40,000.00
Item
60,000.00
S07 - 27
Total
3,065,000.00
ITEM
DESCRIPTION
BILL NO 1 - SUBSTRUCTURE
QTY
UNIT
RATE
Item
5,000.00
5,000.00
150,000.00
150,000.00
AMOUNT
1.B.2
1.B.3
1.00
1.00
Item
1.00
Item
116.50
17.60
25,000.00
25,000.00
m3
560.00
65,240.00
560.00
9,856.00
Excavation
commencing from existing
ground level, not exceeding 1.0 M deep in
any material except rock requiring blasting,
part return fill in ram and surplus disposed as
directed.
1.B.4
1.B.5
1.B.6
0.81
m3
560.00
453.60
1.B.7
6.00
m3
560.00
3,360.00
14.10
m3
700.00
9,870.00
33.00
m3
1,700.00
56,100.00
Excavation
commencing from existing
ground level, exceeding 1.0 M but not
exceeding 2.0M deep in any material except
rock requiring blasting, part return fill in ram
and surplus disposed as directed.
1.B.8
1.B.9
324,879.60
ITEM
DESCRIPTION
QTY
UNIT
RATE
Brought forward
AMOUNT
324,879.60
Earthwork Supports
Refer pricing Preambles
Earthwork supports, (Planking & Strutting )
total depth of excavation not exceeding 1.0m
and distance
between vertical sides
(opposing faces) of not exceeding 2.0m,
(Payment will be made only if actually
executed on the order of the Engineer)
1.B.10 For combine footings
20.00
m2
1,100.00
22,000.00
4.35
1,100.00
4,785.00
22.60
m2
1,100.00
24,860.00
83.00
m2
1,400.00
116,200.00
9.50
m2
1,400.00
13,300.00
7.50
m2
1,700.00
12,750.00
9.00
m2
2,000.00
18,000.00
536,774.60
ITEM
DESCRIPTION
QTY
UNIT
RATE
Brought forward
AMOUNT
536,774.60
9.50
2,800.00
26,600.00
8.00
m2
1,100.00
8,800.00
6.00
m2
1,400.00
8,400.00
1.00
Item
Dewatering
1.B.20 Allow for dewatering, in the manner approved
by the engineer to keep all excavation dry
until all works in substructure are completed
(payment will be made only if actually
executed on the order of the engineer )
10,000.00
10,000.00
590,574.60
ITEM
DESCRIPTION
QTY
UNIT
RATE
Brought forward
AMOUNT
590,574.60
Provisional sum
S07 - 31
300,000.00
890,574.60
ITEM
DESCRIPTION
C - CONCRETE WORK
Refer pricing Preambles
QTY
UNIT
RATE
AMOUNT
Lean Concrete
75mm thick lean concrete 1:3:6 (40mm)
aggregate in the following ;
1.C.1
1.C.2
1.C.3
116.50
17.60
0.06
820.00
95,530.00
820.00
14,432.00
820.00
49.20
Mass Concrete
Mass Concrete 1:3:6( 40mm) in the
following.
1.C.4
10.00
m2
1,630.00
16,300.00
1.C.5
165.50
m2
820.00
135,710.00
16.50
m3
12,500.00
206,250.00
1.00
m3
12,500.00
12,500.00
Reinforced Concrete
Reinforced cement concrete Grade 'C - 25'
in the following
1.C.6
In combine footings
1.C.7
In column shafts
1.C.8
In foundation beams
10.00
m3
12,500.00
125,000.00
1.C.9
In raft slab
49.00
m3
12,500.00
612,500.00
8.50
m3
12,500.00
106,250.00
0.17
m3
12,500.00
2,125.00
0.21
m3
12,500.00
2,625.00
1.90
m3
12,500.00
23,750.00
9.70
m2
2,800.00
27,160.00
1,380,181.20
ITEM
DESCRIPTION
QTY
UNIT
RATE
Brought forward
AMOUNT
1,380,181.20
Formwork
Note :Refer pricing preambles
Formwork is measured as the net contact
surface measurement between concrete and
formwork From work for columns and beams
is given as a girth measurement.
Refer section 5.2 in specification for full
description of materials and workmen ship.
Formwork shall provide a finish to concrete
surface to receive plaster as per section
5.4.8.11 in Specification.
Formwork as described to
1.C.15 Vertical sides of combine footings
52.30
m2
1,200.00
62,760.00
12.00
m2
1,200.00
14,400.00
1,200.00
24,600.00
20.50
33.80
m2
1,200.00
40,560.00
5.10
m2
1,200.00
6,120.00
8.70
m2
1,200.00
10,440.00
1.03
m2
1,200.00
1,236.00
26.00
1,200.00
31,200.00
15.00
1,200.00
18,000.00
19.50
m2
1,200.00
23,400.00
1,612,897.20
ITEM
DESCRIPTION
QTY
UNIT
RATE
Brought forward
AMOUNT
1,612,897.20
Reinforcements
Refer pricing Preambles
Tor steel rod reinforcement including bends,
hooks, tying wire, distance blocks and
ordinary spacers (Inevitable laps and chairs
included in Quantities) fy = 460 N/mm2
In combine footings
1.C.25 10mm dia.
0.40
MT
145,000.00
58,000.00
1.C.26 25 mm dia.
0.50
MT
145,000.00
72,500.00
1.C.27 20 mm dia.
0.55
MT
145,000.00
79,750.00
0.35
MT
145,000.00
50,750.00
1.C.29 25 mm dia.
1.50
MT
145,000.00
217,500.00
1.C.30 20 mm dia.
0.09
MT
145,000.00
13,050.00
1.C.31 16 mm dia.
0.25
MT
145,000.00
36,250.00
0.50
MT
145,000.00
72,500.00
1.70
MT
145,000.00
246,500.00
1.C.34 12 mm dia.
0.80
MT
145,000.00
116,000.00
1.70
MT
145,000.00
246,500.00
1.C.36 20 mm dia.
0.10
MT
145,000.00
14,500.00
0.27
MT
145,000.00
39,150.00
0.70
MT
145,000.00
101,500.00
0.02
MT
145,000.00
2,900.00
In column shafts
In foundation beams
In raft slab
In raft beams
2,980,247.20
ITEM
DESCRIPTION
QTY
UNIT
RATE
Brought forward
AMOUNT
2,980,247.20
In Plinth beam
1.C.40 16mm dia
0.15
MT
145,000.00
21,750.00
0.05
MT
145,000.00
7,250.00
0.35
MT
145,000.00
50,750.00
0.15
MT
145,000.00
21,750.00
In lift wall
0.01
MT
145,000.00
1,450.00
0.08
MT
145,000.00
11,600.00
S07 - 35
3,094,797.20
ITEM
DESCRIPTION
D - MASONRY WORK
Refer pricing Preambles
QTY
UNIT
RATE
AMOUNT
Rubble Work
Random rubble masonry in cement and sand
1:5 in wall foundation.
1.D.1
350mm thick
13.50
m3
8,000.00
108,000.00
1.D.2
300mm thick
0.50
8,000.00
4,000.00
23.70
m2
700.00
16,590.00
S07 - 36
128,590.00
ITEM
DESCRIPTION
E - WATER PROOFING
Refer pricing Preambles
QTY
UNIT
RATE
m2
1,800.00
AMOUNT
11.80
S07 - 37
21,240.00
21,240.00
ITEM
DESCRIPTION
BILL NO 1 - SUB STRUCTURE
QTY
UNIT
RATE
AMOUNT
COLLECTION
Rs.
890,574.60
C - CONCRETE WORK
Rs.
3,094,797.20
D - MASONRY WORK
Rs.
128,590.00
E - WATER PROOFING
Rs.
21,240.00
Rs.
4,135,201.80
S07 - 38
ITEM
DESCRIPTION
BILL NO 2 - SUPERSTRUCTURE
QTY
UNIT
RATE
AMOUNT
C - CONCRETE WORK
Note:
Refer Pricing Preambles
Reinforced Concrete
Reinforced cement concrete Grade 'C- 25' in
the following ;
In Columns
2.C.1
5.60
2.C.2
6.10
2.C.3
6.10
2.C.4
2.C.5
2.C.6
12,500.00
70,000.00
12,500.00
76,250.00
m3
12,500.00
76,250.00
6.60
m3
12,500.00
82,500.00
5.50
m3
12,500.00
68,750.00
1.50
m3
12,500.00
18,750.00
In Beams
2.C.7
17.50
m3
12,500.00
218,750.00
2.C.8
19.39
m3
12,500.00
242,375.00
2.C.9
19.24
m3
12,500.00
240,500.00
14.77
m3
12,500.00
184,625.00
4.87
12,500.00
60,875.00
1.35
m3
12,500.00
16,875.00
1.81
m3
12,500.00
22,625.00
1,379,125.00
ITEM
DESCRIPTION
QTY
UNIT
RATE
Brought forward
AMOUNT
1,379,125.00
0.15
m3
12,500.00
1,897.50
0.15
m3
12,500.00
1,875.00
0.15
m3
12,500.00
1,875.00
0.15
12,500.00
1,875.00
0.15
m3
12,500.00
1,875.00
1.56
m3
12,500.00
19,500.00
1.72
m3
12,500.00
21,450.00
1.72
m3
12,500.00
21,450.00
2.06
m3
12,500.00
25,740.00
2.06
12,500.00
25,740.00
141.20
m2
1,600.00
225,920.00
180.00
m2
1,600.00
288,000.00
140.00
m2
1,600.00
224,000.00
131.00
m2
1,600.00
209,600.00
11.00
1,600.00
17,600.00
45.00
m2
1,600.00
72,000.00
22.00
m2
1,600.00
35,200.00
floor
and
second
floor
Note:
Grade 25 ready mix concrete use for slab.
Rate to include for ready-mix pump
2,574,722.50
ITEM
DESCRIPTION
QTY
UNIT
RATE
Brought forward
AMOUNT
2,574,722.50
21.00
2,000.00
42,000.00
40.30
2,500.00
100,750.00
2.30
2,500.00
5,750.00
2.30
m2
2,500.00
5,750.00
2.30
m2
2,500.00
5,750.00
2.30
m2
2,500.00
5,750.00
2.30
m2
2,500.00
5,750.00
7.60
m2
1,300.00
9,880.00
7.60
m2
1,300.00
9,880.00
8.00
m2
1,300.00
10,400.00
11.00
m2
1,300.00
14,300.00
4.50
m2
1,300.00
5,850.00
1.00
m2
1,300.00
1,300.00
0.76
m2
1,600.00
1,216.00
0.54
m2
1,300.00
702.00
2,799,750.50
ITEM
DESCRIPTION
QTY
UNIT
RATE
Brought forward
AMOUNT
2,799,750.50
Form work
Refer Pricing Preamble
Refer section 5.2 in specification for full
description of materials and workmen ship.
Form work shall provide a finish to concrete
surface to receive plaster as per section
5.3.8.11 in Specification.
70.70
m2
1,200.00
84,840.00
77.50
m2
1,250.00
96,875.00
77.50
m2
1,300.00
100,750.00
88.70
m2
1,350.00
119,745.00
77.00
1,400.00
107,800.00
24.10
m2
1,400.00
33,740.00
163.00
m2
1,200.00
195,600.00
179.70
m2
1,250.00
224,625.00
177.50
m2
1,300.00
230,750.00
136.60
m2
1,350.00
184,410.00
54.30
m2
1,400.00
76,020.00
14.50
m2
1,400.00
20,300.00
18.50
m2
1,400.00
25,900.00
4,301,105.50
ITEM
DESCRIPTION
QTY
UNIT
RATE
Brought forward
AMOUNT
4,301,105.50
1.50
1,200.00
1,800.00
1.50
1,250.00
1,875.00
1.50
1,300.00
1,950.00
1.50
1,350.00
2,025.00
1.50
m2
1,400.00
2,100.00
1.56
m2
1,200.00
1,872.00
1.72
m2
1,250.00
2,145.00
1.72
m2
1,300.00
2,230.80
2.06
m2
1,350.00
2,779.92
2.06
m2
1,400.00
2,882.88
7.20
m2
1,200.00
8,640.00
7.70
m2
1,250.00
9,625.00
7.70
m2
1,300.00
10,010.00
8.20
m2
1,350.00
11,070.00
8.20
m2
1,400.00
11,480.00
21.00
130.00
2,730.00
25.00
140.00
3,500.00
25.00
150.00
3,750.00
4,383,571.10
ITEM
DESCRIPTION
QTY
UNIT
RATE
Brought forward
AMOUNT
4,383,571.10
25.00
150.00
3,750.00
25.00
150.00
3,750.00
141.20
m2
1,200.00
169,440.00
180.00
m2
1,250.00
225,000.00
180.30
1,300.00
234,390.00
152.00
1,350.00
205,200.00
11.00
m2
1,400.00
15,400.00
45.00
m2
1,400.00
63,000.00
22.00
m2
1,400.00
30,800.00
2.20
m2
1,200.00
2,640.00
2.20
m2
1,250.00
2,750.00
2.20
m2
1,300.00
2,860.00
2.20
1,350.00
2,970.00
2.20
m2
1,400.00
3,080.00
7.60
m2
1,200.00
9,120.00
7.60
1,250.00
9,500.00
8.00
m2
1,300.00
10,400.00
11.00
m2
1,350.00
14,850.00
4.50
m2
1,400.00
6,300.00
1.00
m2
1,400.00
1,400.00
5,400,171.10
ITEM
DESCRIPTION
QTY
UNIT
RATE
Brought forward
AMOUNT
5,400,171.10
14.00
110.00
1,540.00
14.00
110.00
1,540.00
15.00
120.00
1,800.00
19.50
130.00
2,535.00
8.50
140.00
1,190.00
3.00
150.00
450.00
11.70
m2
1,400.00
16,380.00
0.75
MT
145,000.00
108,750.00
0.90
MT
145,000.00
130,500.00
1.15
MT
145,000.00
166,750.00
1.15
MT
145,000.00
166,750.00
1.00
MT
145,000.00
145,000.00
0.45
MT
145,000.00
65,250.00
Reinforcement
Note: Refer Pricing Preambles
No allowance have been made for rolling
margin
Tor steel rod reinforcement including bends,
hooks, tying wire, distance blocks and
ordinary spacers (Inevitable laps and chairs
included in Quantities) fy = 460 N/mm2
25 mm dia. in Columns.
2.C.104 From ground floor level to first floor level
20 mm dia. in columns.
6,208,606.10
ITEM
DESCRIPTION
QTY
UNIT
RATE
Brought forward
AMOUNT
6,208,606.10
16 mm dia. in columns
2.C.110 From first floor level to second floor level
0.20
MT
145,000.00
29,000.00
0.20
MT
145,000.00
29,000.00
0.55
MT
145,000.00
79,750.00
0.30
MT
145,000.00
43,500.00
0.15
MT
145,000.00
21,750.00
0.05
MT
145,000.00
7,250.00
0.12
MT
145,000.00
17,400.00
12 mm dia. in columns
2.C.115 From Machine room floor level to machine
room roof slab level
10 mm dia.links in columns
2.C.116 From ground floor level to first floor level
0.17
MT
145,000.00
24,650.00
0.17
MT
145,000.00
24,650.00
0.17
MT
145,000.00
24,650.00
1.08
MT
145,000.00
156,600.00
1.30
MT
145,000.00
188,500.00
1.35
MT
145,000.00
195,750.00
1.30
MT
145,000.00
188,500.00
0.11
MT
145,000.00
15,950.00
0.02
MT
145,000.00
2,900.00
7,258,406.10
ITEM
DESCRIPTION
QTY
UNIT
RATE
Brought forward
AMOUNT
7,258,406.10
16 mm dia. in beams
2.C.126 At first floor level
0.51
MT
145,000.00
73,950.00
0.64
MT
145,000.00
92,800.00
0.65
MT
145,000.00
94,250.00
0.59
MT
145,000.00
85,550.00
0.34
MT
145,000.00
49,300.00
0.11
MT
145,000.00
15,950.00
0.17
MT
145,000.00
24,650.00
0.06
MT
145,000.00
8,700.00
0.03
MT
145,000.00
4,350.00
0.04
MT
145,000.00
5,800.00
0.01
MT
145,000.00
1,450.00
0.04
MT
145,000.00
5,800.00
0.03
MT
145,000.00
4,350.00
0.02
MT
145,000.00
2,900.00
0.50
MT
145,000.00
72,500.00
0.61
MT
145,000.00
88,450.00
0.60
MT
145,000.00
87,000.00
0.56
MT
145,000.00
81,200.00
0.13
MT
145,000.00
18,850.00
0.06
MT
145,000.00
8,700.00
0.05
MT
145,000.00
7,250.00
8,092,156.10
ITEM
DESCRIPTION
QTY
UNIT
RATE
Brought forward
AMOUNT
8,092,156.10
0.01
MT
145,000.00
1,145.50
0.01
MT
145,000.00
1,145.50
0.01
MT
145,000.00
1,145.50
0.01
MT
145,000.00
1,145.50
0.01
MT
145,000.00
1,145.50
3.10
Kg
145.00
449.50
3.10
Kg
145.00
449.50
3.10
Kg
145.00
449.50
3.10
Kg
145.00
449.50
3.10
Kg
145.00
449.50
0.09
MT
145,000.00
13,050.00
0.11
MT
145,000.00
15,950.00
0.11
MT
145,000.00
15,950.00
0.11
MT
145,000.00
15,950.00
0.11
MT
145,000.00
15,950.00
8,176,981.10
ITEM
DESCRIPTION
QTY
UNIT
RATE
Brought forward
AMOUNT
8,176,981.10
1.55
MT
145,000.00
224,750.00
1.90
MT
145,000.00
275,500.00
2.05
MT
145,000.00
297,250.00
1.55
MT
145,000.00
224,750.00
0.06
MT
145,000.00
8,700.00
0.32
MT
145,000.00
46,400.00
0.20
MT
145,000.00
29,000.00
0.07
MT
145,000.00
10,788.00
0.07
MT
145,000.00
10,788.00
0.08
MT
145,000.00
11,327.40
0.11
MT
145,000.00
15,283.00
0.04
MT
145,000.00
5,933.40
0.01
MT
145,000.00
1,438.40
MT
145,000.00
18,609.30
0.13
0.05
MT
145,000.00
7,250.00
0.15
MT
145,000.00
21,750.00
0.15
MT
145,000.00
21,750.00
0.15
MT
145,000.00
21,750.00
9,429,998.60
ITEM
DESCRIPTION
QTY
UNIT
RATE
Brought forward
AMOUNT
9,429,998.60
0.15
MT
145,000.00
21,750.00
0.05
MT
145,000.00
7,250.00
4.50
Kg
145.00
652.50
4.50
Kg
145.00
652.50
4.50
Kg
145.00
652.50
4.50
Kg
145.00
652.50
4.50
Kg
145.00
652.50
Nr.
7,000.00
49,000.00
Corbel Stone
150mm thick x 475mm long x 225mm wide
corbel stone embedded in wall, reinforced
with 2 No.12mm dia. tor steel bars and 3 No.
6mm dia.bars
2.C.187 At fourth floor level
7.00
15.00
1,400.00
21,000.00
10.00
1,400.00
14,000.00
12.00
1,400.00
16,800.00
8.00
1,400.00
11,200.00
2.50
1,400.00
3,500.00
1.50
1,400.00
2,100.00
S07 - 50
9,579,861.10
ITEM
DESCRIPTION
D - MASONRY WORK
QTY
UNIT
RATE
AMOUNT
209.30
2,000.00
418,600.00
2.D.2
222.39
2,100.00
467,019.00
2.D.3
220.23
m2
2,200.00
484,506.00
2.D.4
232.09
m2
2,300.00
533,807.00
2.D.5
250.38
m2
2,400.00
600,912.00
41.69
m2
2,500.00
104,225.00
2.D.6
20.59
m2
1,200.00
24,708.00
2.D.8
25.29
m2
1,300.00
32,877.00
2.D.9
48.37
m2
1,400.00
67,718.00
61.36
m2
1,500.00
92,040.00
6.46
m2
1,500.00
9,690.00
S07 - 51
2,836,102.00
ITEM
DESCRIPTION
E - WATER PROOFING
Refer pricing Preambles
QTY
UNIT
RATE
AMOUNT
In ground floor
7.50
m2
1,800.00
13,500.00
2.E.2
In first floor
2.55
m2
1,800.00
4,590.00
2.E.3
In second floor
5.52
m2
1,800.00
9,936.00
2.E.4
In third floor
6.99
m2
1,800.00
12,582.00
40,608.00
ITEM
DESCRIPTION
QTY
UNIT
RATE
Brought forward
AMOUNT
40,608.00
7.00
1,800.00
12,600.00
2.E.6
9.80
1,800.00
17,640.00
2.E.7
12.50
1,800.00
22,500.00
2.E.8
15.90
1,800.00
28,620.00
2.E.9
25.40
1,800.00
45,720.00
30.00
m2
1,800.00
54,000.00
7.60
m2
1,800.00
13,680.00
7.60
1,800.00
13,680.00
8.00
m2
1,800.00
14,400.00
11.00
m2
1,800.00
19,800.00
4.50
m2
1,800.00
8,100.00
1.00
m2
1,800.00
1,800.00
10.50
m2
1,800.00
18,900.00
S07 - 53
312,048.00
ITEM
DESCRIPTION
F- STRUCTURAL STEEL WORK
QTY
UNIT
RATE
AMOUNT
5,700.00
369,360.00
64.80
S07 - 54
369,360.00
ITEM
DESCRIPTION
G- METAL WORK
QTY
Material
All Aluminium sections shall be fully treated
extruded Aluminium alloy sections in
accordance with BS 1470,1471, 1473, 1474
or latest relevant EN standard
All Aluminium sections to be locally
manufactured ( "Alumex" or similar products
of equivalent technical parameters)
All Aluminium sections shall present clear,
straight and sharply defined lines. They shall
be free from defects impairing strength,
appearance and durability.
Finish
All members shall be finished either by
( a ) Anodizing or
( b ) Powder coating ( What ever specified in
Aluminium Items )
Anodizing -Exposed surface of all members
shall be anodized using two steps. Anodising
process to an anodic thickness of not less
than 10-15 microns and shall be free of any
defects.
Powder coating - Powder coating shall be
carried out using polyester coating with
proper and appropriate pre- treatment to a
thickness of not less than 60-80 microns,
measured on all significant surfaces.
Screws and Hardware Items
Concealed screws, nuts, bolts, rivets and
other fastening devices shall be of
Aluminium, non-magnetic stainless steel or
other approved corrosive resistant materials.
If visible, they shall blend with the finish of the
framing Aluminium sections.
Hardware items such as Hinges, Handles,
Catches, fixtures etc., shall be minimum of
grade 304 stainless steel.
UNIT
RATE
AMOUNT
ITEM
DESCRIPTION
QTY
Brought forward
Glass
Glazing shall be minimum of 5mm thick clear
float glass. Glass shall be secured at all
edges with compression gaskets and glazing
beads. When fixing glass, all glazing sealant
shall be carefully applied and cleaned off
properly.
Workmanship
The fabrication and installation of all
Aluminium work must be carried out by
specialist tradesmen.
All dimensions shown on the drawings and
the shop drawings must be verified by actual
site measurement before fabrication and
installation. Any cutting to enlarge the size of
openings and approved practical method to
fill the excess void behind frames required
after installation shall be executed by the
Contractor at his own expenses.
All Aluminium members shall be factory
fabricated to the best standard of
workmanship under experienced factory
supervision and control.
Materials, method of fabrication, assembly,
installation, fastenings, supports, braces,
operating parts and the like shall be in
accordance with the approved shop
drawings.
All joints in frames at corners, junctions and
intersections shall be mechanically jointed
and be such that when assembled they are
as strong and rigid as adjoining sections. Due
care must be taken to ensure that all joints
are water tight and leak-proof. Joint lines
should not be visible.
Provisions must be made for expansion and
contraction in horizontal and vertical
members which are exposed to the weather
or environments. Any distortion of members
or any glass cracked or broken as a result of
inadequate provisions must be rectified by
the Contractor at his own expenses.
Total Carried Forward
S07 - 56
UNIT
RATE
AMOUNT
ITEM
DESCRIPTION
QTY
Brought forward
UNIT
RATE
AMOUNT
ITEM
DESCRIPTION
QTY
Brought forward
Unit
Door
Sliding door/
Window
Casement
Window,
Fanlight
Fixed glass
Window,
depth (mm )
100
80
thickness(mm)
1.5
1.5
70
1.5
100
1.5
UNIT
RATE
AMOUNT
ITEM
DESCRIPTION
QTY
UNIT
RATE
AMOUNT
Brought forward
2.G.1
In ground floor
1.00
Nr.
190,680.00
190,680.00
In first floor
1.00
Nr.
40,450.00
40,450.00
2.G.3
In second floor
1.00
Nr.
40,450.00
40,450.00
In ground floor
1.00
Nr.
24,270.00
24,270.00
2.G.5
In second floor
2.00
Nr.
24,270.00
48,540.00
2.G.6
1.00
Nr.
24,270.00
24,270.00
368,660.00
ITEM
DESCRIPTION
QTY
UNIT
RATE
Brought forward
AMOUNT
368,660.00
In ground floor
1.00
Nr.
186,300.00
186,300.00
2.G.8
In first floor
1.00
Nr.
186,300.00
186,300.00
2.G.9
In second floor
1.00
Nr.
186,300.00
186,300.00
1.00
Nr.
186,300.00
186,300.00
2.00
Nr.
186,300.00
372,600.00
2.00
Nr.
186,300.00
372,600.00
2.00
Nr.
186,300.00
372,600.00
1.00
Nr.
227,700.00
227,700.00
1.00
Nr.
227,700.00
227,700.00
2,687,060.00
ITEM
DESCRIPTION
QTY
UNIT
RATE
Brought forward
AMOUNT
2,687,060.00
2.00
Nr.
12,420.00
24,840.00
2.00
Nr.
12,420.00
24,840.00
1.00
Nr.
200,100.00
200,100.00
2.00
Nr.
7,920.00
15,840.00
2.00
Nr.
7,920.00
15,840.00
3.00
Nr.
7,920.00
23,760.00
2.00
Nr.
7,920.00
15,840.00
3.00
Nr.
7,920.00
23,760.00
3,031,880.00
ITEM
DESCRIPTION
QTY
UNIT
RATE
Brought forward
AMOUNT
3,031,880.00
1.00
Nr.
155,925.00
155,925.00
1.00
Nr.
42,525.00
42,525.00
1.00
Nr.
42,525.00
42,525.00
1.00
Nr.
42,525.00
42,525.00
1.00
Nr.
42,525.00
42,525.00
1.00
Nr.
42,525.00
42,525.00
1.00
Nr.
42,525.00
42,525.00
1.00
Nr.
174,750.00
174,750.00
3,617,705.00
ITEM
DESCRIPTION
QTY
UNIT
RATE
Brought forward
AMOUNT
3,617,705.00
1.00
Nr.
5,515.00
5,515.00
1.00
Nr.
5,515.00
5,515.00
1.00
Nr.
5,515.00
5,515.00
1.00
Nr.
5,515.00
5,515.00
1.00
Nr.
5,515.00
5,515.00
1.00
Nr.
5,515.00
5,515.00
17.22
m2
6,200.00
106,764.00
6.24
m2
6,200.00
38,688.00
Aluminium Partition
Aluminium framed glazed partition type- P1,
5738 x 3000mm high overall with powder
coated aluminium frame, top and second
panell consisting of 5mm thick clear glass,
middle panell consisting of 5mm thick clear
glass with sand blast stickers and aluminium
composite panell at bottom( both sides ), all
as per detail Drg. No 2011-10-004AR15(
Door type D2 measured separately.)
2.G.38 In first floor ( 1 No. )
3,796,247.00
ITEM
DESCRIPTION
QTY
UNIT
RATE
Brought forward
AMOUNT
3,796,247.00
1.20
6,200.00
7,440.00
2.16
m2
6,200.00
13,392.00
10.80
m2
9,500.00
102,600.00
9.72
m2
7,490.00
72,802.80
3,992,481.80
ITEM
DESCRIPTION
QTY
UNIT
RATE
Brought forward
AMOUNT
3,992,481.80
2.65
m2
6,200.00
16,430.00
11.50
m2
6,200.00
71,300.00
4.32
m2
6,200.00
26,784.00
4.32
m2
6,200.00
26,784.00
4,133,779.80
ITEM
DESCRIPTION
QTY
UNIT
RATE
Brought forward
AMOUNT
4,133,779.80
14.20
6,200.00
88,040.00
22.50
m2
6,200.00
139,500.00
12.40
m2
6,200.00
76,880.00
4.58
m2
6,200.00
28,396.00
4,466,595.80
ITEM
DESCRIPTION
QTY
UNIT
RATE
Brought forward
AMOUNT
4,466,595.80
39.82
7,200.00
286,704.00
24.10
6,200.00
149,420.00
24.10
m2
6,200.00
149,420.00
185.00
m2
10,500.00
1,942,500.00
20.00
m2
12,000.00
240,000.00
7,234,639.80
ITEM
DESCRIPTION
QTY
UNIT
RATE
Brought forward
AMOUNT
7,234,639.80
Steel Doors
Steel Collapsible Door type CD, 2125 x 2100
mm high overall all complete as per
Manufacturer's specification and Engineers
2
approval. (each door 4.46m )
2.G.57 In fourth floor
1.00
Nr.
9,800.00
9,800.00
3.00
Nr.
7,260.00
21,780.00
3.00
Nr.
7,260.00
21,780.00
3.00
Nr.
7,260.00
21,780.00
2.00
Nr.
7,260.00
14,520.00
2.00
Nr.
14,540.00
29,080.00
1.00
Nr.
14,540.00
14,540.00
1.00
Nr.
14,540.00
14,540.00
1.00
Nr.
12,100.00
12,100.00
2.00
Nr.
12,100.00
24,200.00
3.00
Nr.
12,100.00
36,300.00
3.00
Nr.
12,100.00
36,300.00
7,491,359.80
ITEM
DESCRIPTION
QTY
UNIT
RATE
Brought forward
AMOUNT
7,491,359.80
10.00
12,500.00
125,000.00
11.00
12,500.00
137,500.00
12,500.00
137,500.00
12,500.00
150,000.00
12.00
6,900.00
82,800.00
12.00
10,500.00
126,000.00
11.00
12.00
8,250,159.80
ITEM
DESCRIPTION
H- CARPENTRY & JOINERY
QTY
UNIT
RATE
AMOUNT
7.00
S07 - 70
750.00
5,250.00
5,250.00
ITEM
DESCRIPTION
J- ROOFING AND ROOF PLUMBING
QTY
UNIT
RATE
AMOUNT
70.00
1,025.00
71,750.00
7.00
1,100.00
7,700.00
4.00
1,100.00
4,400.00
20.00
1,100.00
22,000.00
Roof Plumbing
Note:
All zinc / aluminum down pipes and fittings
shall comply with the latest BSS for Zinc /
Aluminum gutters down pipes and fittings
At asbestos roof
2.J.4
54.00
1,400.00
75,600.00
2.J.6
20.00
1,400.00
28,000.00
209,450.00
ITEM
DESCRIPTION
QTY
UNIT
RATE
Brought forward
AMOUNT
209,450.00
2.J.8
2.J.9
End caps
2.00
Nr.
800.00
1,600.00
11.00
Nr.
700.00
7,700.00
2.00
Nr.
450.00
900.00
18.00
1,400.00
25,200.00
Flashing
2.J.10 Flashing out of No. 22 B. W. G. galvanized
iron sheets 450mm wide at lower roof and the
wall, one edge dressed over the roof to width
not less than 300mm, the other edge turned
in to a height of not less than 150mm and
tucked into chase out in the wall and pointed
in cement and sand1:2.Provide for treating
both faces of the sheet with two thick coat of
hot tar.
S07 - 72
244,850.00
ITEM
DESCRIPTION
K - PLUMBING
QTY
UNIT
RATE
AMOUNT
in ground floor
1.00
Nr.
8,200.00
8,200.00
2.K.2
In first floor
2.00
Nr.
8,200.00
16,400.00
2.K.3
In second floor
3.00
Nr.
8,200.00
24,600.00
2.K.4
In third floor
3.00
Nr.
8,200.00
24,600.00
1.00
Nr.
8,200.00
8,200.00
82,000.00
ITEM
DESCRIPTION
QTY
UNIT
RATE
Brought forward
AMOUNT
82,000.00
in ground floor
5.00
Nr.
19,000.00
95,000.00
2.K.7
In first floor
4.00
Nr.
19,000.00
76,000.00
2.K.8
In second floor
5.00
Nr.
19,500.00
97,500.00
2.K.9
In third floor
3.00
Nr.
19,500.00
58,500.00
5.00
Nr.
4,000.00
20,000.00
4.00
Nr.
4,000.00
16,000.00
5.00
Nr.
4,000.00
20,000.00
3.00
Nr.
4,000.00
12,000.00
1.00
Nr.
15,000.00
15,000.00
1.00
Nr.
10,000.00
10,000.00
502,000.00
ITEM
DESCRIPTION
QTY
UNIT
RATE
Brought forward
AMOUNT
502,000.00
2.00
Nr.
3,000.00
6,000.00
2.00
Nr.
3,000.00
6,000.00
3.00
Nr.
3,250.00
9,750.00
3.00
Nr.
3,250.00
9,750.00
1.00
Nr.
3,000.00
3,000.00
2.00
Nr
3,300.00
6,600.00
3.00
Nr.
3,100.00
9,300.00
2.00
Nr.
3,200.00
6,400.00
5.00
Nr.
3,200.00
16,000.00
2.00
Nr.
3,400.00
6,800.00
2.00
Nr.
4,100.00
8,200.00
2.00
Nr.
4,200.00
8,400.00
3.00
Nr.
4,300.00
12,900.00
3.00
Nr.
4,300.00
12,900.00
624,000.00
ITEM
DESCRIPTION
QTY
UNIT
RATE
Brought forward
AMOUNT
624,000.00
5.00
Nr.
1,200.00
6,000.00
4.00
Nr.
1,200.00
4,800.00
5.00
Nr.
1,200.00
6,000.00
3.00
Nr.
1,200.00
3,600.00
9.00
Nr.
900.00
8,100.00
8.00
Nr.
920.00
7,360.00
11.00
Nr.
920.00
10,120.00
9.00
Nr.
920.00
8,280.00
28.00
600.00
16,800.00
24.00
600.00
14,400.00
15.50
550.00
8,525.00
717,985.00
ITEM
DESCRIPTION
QTY
UNIT
RATE
Brought forward
AMOUNT
717,985.00
3.30
550.00
1,815.00
17.50
500.00
8,750.00
48.80
460.00
22,448.00
7.00
Nr.
275.00
1,925.00
10.00
Nr.
275.00
2,750.00
1.00
Nr.
520.00
520.00
8.00
Nr.
2,200.00
17,600.00
4.00
Nr.
2,600.00
10,400.00
3.00
Nr.
1,200.00
3,600.00
7.00
Nr.
1,800.00
12,600.00
Note:
All above ground soil, waste and vent pipe
work shall be in PVC to BS 4514 and BS
5255 or SLS1202 & SLS1210
All under ground drainage pipe work shall be
in UPVC to BS 4660 or SLS1202 & SLS 1210
800,393.00
ITEM
DESCRIPTION
QTY
UNIT
RATE
Brought forward
AMOUNT
800,393.00
37.00
900.00
33,300.00
9.00
1,200.00
10,800.00
54.00
1,000.00
54,000.00
3.00
Nr.
1,000.00
3,000.00
30.00
900.00
27,000.00
17.00
Nr.
200.00
3,400.00
36.00
Nr.
200.00
7,200.00
3.00
Nr.
225.00
675.00
6.00
Nr.
225.00
1,350.00
2.00
Nr.
225.00
450.00
941,568.00
ITEM
DESCRIPTION
QTY
UNIT
RATE
Brought forward
AMOUNT
941,568.00
3.80
1,200.00
4,560.00
9.00
1,200.00
10,800.00
37.00
1,200.00
44,400.00
2.00
Nr.
1,200.00
2,400.00
8.00
Nr.
625.00
5,000.00
6.00
Nr.
700.00
4,200.00
5.00
Nr.
725.00
3,625.00
11.00
Nr.
700.00
7,700.00
4.00
Nr.
800.00
3,200.00
4.00
Nr.
800.00
3,200.00
4.00
Nr.
800.00
3,200.00
6.00
Nr.
800.00
4,800.00
7.00
Nr.
800.00
5,600.00
1,044,253.00
ITEM
DESCRIPTION
QTY
UNIT
RATE
Brought forward
AMOUNT
1,044,253.00
3.00
Nr.
2,500.00
7,500.00
4.00
Nr.
26,000.00
104,000.00
1.00
Nr.
50,000.00
50,000.00
37.00
1,600.00
59,200.00
S07 - 80
1,264,953.00
ITEM
DESCRIPTION
L - WALL, CEILING AND FLOOR FINISHES
QTY
UNIT
RATE
AMOUNT
90.00
m2
750.00
67,500.00
Wall finishes
Plaster 16mm thick in cement and sand
(1:5) finished rough including forming
arises (Externally.)
On brick walls, attached columns
2.L.2
140.00
m2
650.00
91,000.00
2.L.3
145.50
m2
670.00
97,485.00
2.L.4
147.00
m2
690.00
101,430.00
2.L.5
197.00
m2
710.00
139,870.00
2.L.6
190.00
m2
710.00
134,900.00
17.00
m2
710.00
12,070.00
2.L.7
2.L.8
36.00
230.00
8,280.00
2.L.9
69.00
240.00
16,560.00
53.50
250.00
13,375.00
62.00
260.00
16,120.00
30.00
260.00
7,800.00
39.50
300.00
11,850.00
718,240.00
ITEM
DESCRIPTION
QTY
UNIT
RATE
Brought forward
AMOUNT
718,240.00
21.00
500.00
10,500.00
21.00
525.00
11,025.00
22.50
550.00
12,375.00
30.00
600.00
18,000.00
12.50
650.00
8,125.00
3.50
650.00
2,275.00
12.00
m2
650.00
7,800.00
250.00
m2
650.00
162,500.00
298.00
m2
670.00
199,660.00
309.00
m2
690.00
213,210.00
332.00
m2
710.00
235,720.00
269.00
m2
710.00
190,990.00
55.00
m2
710.00
39,050.00
141.00
230.00
32,430.00
107.00
240.00
25,680.00
91.50
250.00
22,875.00
1,910,455.00
ITEM
DESCRIPTION
QTY
80.00
UNIT
.
m
30.00
Brought forward
RATE
AMOUNT
1,910,455.00
260.00
20,800.00
260.00
7,800.00
16.00
300.00
4,800.00
141.20
700.00
98,840.00
180.00
715.00
128,700.00
180.30
m2
730.00
131,619.00
152.00
m2
750.00
114,000.00
11.00
m2
750.00
8,250.00
45.00
m2
760.00
34,200.00
22.00
m2
760.00
16,720.00
20.00
m2
500.00
10,000.00
21.50
m2
525.00
11,287.50
23.00
m2
550.00
12,650.00
22.00
m2
600.00
13,200.00
2.00
m2
650.00
1,300.00
4.00
m2
650.00
2,600.00
2,527,221.50
ITEM
DESCRIPTION
QTY
UNIT
RATE
Brought forward
AMOUNT
2,527,221.50
7.20
750.00
5,400.00
7.70
750.00
5,775.00
7.70
760.00
5,852.00
8.20
m2
760.00
6,232.00
8.20
m2
760.00
6,232.00
35.50
m2
2,800.00
99,400.00
15.00
m2
2,900.00
43,500.00
30.00
m2
3,000.00
90,000.00
35.00
m2
3,000.00
105,000.00
16.50
3,450.00
56,925.00
9.00
m2
3,500.00
31,500.00
13.50
m2
3,550.00
47,925.00
27.00
m2
3,600.00
Wall tiles
200 x 300mm glazed vitreous ceramic wall
tiles lining up to height of 1500mm from
finished floor level, of an approved colour set
in cement and sand (1:3) screed backing
and pointed with tile grout to match the colour
of tiles and forming neat uniform between
tiles including fixing corner and edge tiles.
(Price range 900-1000Rs. per m2 without
Vat)
Floor Finishes
Floor Tiles
300mm x 300mm coloured vitreous non skid,
ceramic floor tiles paving in approved colour
on 10mm thick cement and sand (1:3) screed
backing and pointed with tile grout to match
the colour of tiles and forming neat uniform
joint between tiles. (Price range 13001500Rs.per m2 without Vat)
97,200.00
3,128,162.50
ITEM
DESCRIPTION
QTY
UNIT
RATE
Brought forward
AMOUNT
3,128,162.50
2.50
3,450.00
8,625.00
2.50
3,500.00
8,750.00
2.50
3,550.00
8,875.00
2.50
m2
3,600.00
9,000.00
2.50
m2
3,650.00
9,125.00
21.00
310.00
6,510.00
25.00
350.00
8,750.00
25.00
390.00
9,750.00
25.00
340.00
8,500.00
25.00
450.00
11,250.00
20.00
600.00
12,000.00
22.00
625.00
13,750.00
22.00
650.00
14,300.00
22.00
675.00
14,850.00
22.00
675.00
14,850.00
3,287,047.50
ITEM
DESCRIPTION
QTY
UNIT
RATE
Brought forward
AMOUNT
3,287,047.50
147.50
3,450.00
508,875.00
108.00
m2
3,500.00
378,000.00
149.00
3,550.00
528,950.00
124.50
m2
3,600.00
448,200.00
59.00
m2
3,650.00
215,350.00
65.00
m2
610.00
39,650.00
8.70
m2
650.00
5,655.00
14.00
280.00
3,920.00
15.00
290.00
4,350.00
15.00
300.00
4,500.00
15.00
310.00
4,650.00
27.00
320.00
8,640.00
Cement rendering
Cement rendering floor, 18mm thick in
cement and sand (1:3) rendering finished
smooth with neat cement floating
2.L.79 In fourth floor free slab area
2.L.80 In machine room floor
Cement skirting
100mm high cement and sand (1:3)
rendering and finished smooth with neat
cement floating.
5,437,787.50
ITEM
DESCRIPTION
QTY
UNIT
RATE
Brought forward
AMOUNT
5,437,787.50
Tile skirting
300x100mm high tile skirting laid on and
including 10mm thick cement and sand (1:3)
screed backing and the joints pointed with
tile grout to match the colour of tiles.
2.L.84 In ground floor
70.00
400.00
28,000.00
57.00
425.00
24,225.00
57.00
450.00
25,650.00
50.00
450.00
22,500.00
35.00
500.00
17,500.00
6.80
m2
2,400.00
16,320.00
13.90
m2
2,800.00
38,920.00
20.00
m2
2,900.00
58,000.00
20.00
3,000.00
60,000.00
13.90
m2
3,100.00
43,090.00
73.00
m2
3,500.00
255,500.00
55.00
m2
3,600.00
198,000.00
58.00
m2
3,700.00
214,600.00
58.00
m2
3,800.00
220,400.00
6,660,492.50
Ceiling finishes
Cement fibre sloped ceiling, hang with roof as
per detail Drg. No.2011-10-004AR04
2.L.89 At fourth floor eave
Cement fibre flat ceiling, hang with roof as
per detail Drg.. No.2011-10-004AR04,
No.2011-10-004AR05, No.2011-10-004AR06
ITEM
DESCRIPTION
M- ELECTRICAL INSTALLATION
Refer Pricing Preambles
Electrical items are to be of the following
makes:
(a) Electrical switches and socket outlets :
MK,Crabtree, PDL Tenby, Clipsal,
Kevilton, Orange or equivalent.
Orange or equivalent.
(b) Distribution boards:
Consumer unit flush mount type or as
specified.
(c) Fans:
KDK.,National-Japanese origins
(d) Switch Gear-MCCB' S:
Merlin Gerine, Terasaki, ABB, or
equivalent.
[e] RCCB, MCB' S:
Merlin Gerine, Legrand, Hager,
Moeller, Crabtree , F &G (Austria ) or
equivalent
[f] Fluorescent Fittings :
The Choke, Starter & Capacitor should
be of good quality, British, French,
German or equivalent & the tube should
preferably, Thorn, Philips, National or
equivalent. Fitting fabricated in 26 SWG
Zinc coated sheet steel painted in white
colour ( Quality of the fitting should be
approved by the Engineer)
[g] Distribution sub panels shall be in
surface mount metal enclosure fabricated
in Zinc coated 1.80mm sheet steel
finished with white colour totally enclosed
with hinged door with protection cover
plate. All the relevant components
mention below, shall be enclosed in the
BOQ
[h] Cable trunking 150mm x 100mm
fabricated in 1.20mm Zinc coated sheet
steel complete with couplers hangers end
caps, bends & tees with powder coating
Total Carried Forward
S07 - 88
QTY
UNIT
RATE
AMOUNT
ITEM
DESCRIPTION
QTY
UNIT
RATE
14.00
Nr.
2,600.00
36,400.00
AMOUNT
Brought forward
[i] Cables:
ACL, or approved equivalent
Wiring type in concealed conduit.
Point wiring with 2x1sq.mm PVC/PVC/CU
cables and 2.5sq.mm protective earth in
PVC conduit including accessories 5A
Switch etc. (without lamp fitting)
In first floor
2.M.2
In second floor
7.00
Nr.
2,700.00
18,900.00
2.M.3
In third floor
6.00
Nr.
2,800.00
16,800.00
In second floor
13.00
Nr.
2,700.00
35,100.00
2.M.5
In third floor
12.00
Nr.
2,800.00
33,600.00
14.00
Nr.
2,600.00
36,400.00
In ground floor
2.M.7
In first floor
3.00
Nr.
2,600.00
7,800.00
2.M.8
In second floor
3.00
Nr.
2,700.00
8,100.00
2.M.9
In third floor
3.00
Nr.
2,800.00
8,400.00
4.00
Nr.
2,600.00
10,400.00
3.00
Nr.
2,600.00
7,800.00
2.00
Nr.
2,700.00
5,400.00
4.00
Nr.
2,800.00
11,200.00
3.00
Nr.
2,900.00
8,700.00
1.00
Nr.
2,900.00
2,900.00
247,900.00
ITEM
DESCRIPTION
QTY
UNIT
RATE
6.00
Nr.
4,000.00
24,000.00
10.00
Nr.
4,000.00
40,000.00
10.00
Nr.
4,000.00
40,000.00
5.00
Nr.
3,500.00
17,500.00
3.00
Nr.
3,500.00
10,500.00
2.00
Nr.
3,600.00
7,200.00
1.00
Nr.
3,700.00
3,700.00
12.00
Nr.
3,500.00
42,000.00
4.00
Nr.
5,000.00
20,000.00
2.00
Nr.
5,100.00
10,200.00
4.00
Nr.
5,200.00
20,800.00
7.00
Nr.
5,300.00
37,100.00
3.00
Nr.
5,400.00
16,200.00
Brought forward
AMOUNT
247,900.00
537,100.00
ITEM
DESCRIPTION
QTY
UNIT
RATE
Brought forward
AMOUNT
537,100.00
1.00
Nr.
5,000.00
5,000.00
1.00
Nr.
5,100.00
5,100.00
2.00
Nr.
5,200.00
10,400.00
1.00
Nr.
5,300.00
5,300.00
2.00
Nr.
8,000.00
16,000.00
2.00
Nr.
8,100.00
16,200.00
3.00
Nr.
8,200.00
24,600.00
2.00
Nr.
8,300.00
16,600.00
2.00
Nr.
8,000.00
16,000.00
9.00
Nr.
4,200.00
37,800.00
13.00
Nr.
4,300.00
55,900.00
14.00
Nr.
4,400.00
61,600.00
16.00
Nr.
4,500.00
72,000.00
8.00
Nr.
4,600.00
36,800.00
2.00
Nr.
4,600.00
9,200.00
1.00
Nr.
4,200.00
4,200.00
Exhaust fan
Wall fan
2.M.37 In second floor
Supply and installation 13 Amp flush mounted
switch socket outlet with 2 x 2.5 mm2
PVC/PVC/Cu and 2.5mm2 protective earth in
PVC conduit.
2.M.38 In ground floor
929,800.00
ITEM
DESCRIPTION
QTY
UNIT
RATE
Brought forward
AMOUNT
929,800.00
1.00
Nr.
4,500.00
4,500.00
1.00
Nr.
4,200.00
4,200.00
2.00
Nr.
4,300.00
8,600.00
3.00
Nr.
4,500.00
13,500.00
14.00
Nr.
1,500.00
21,000.00
7.00
Nr.
1,600.00
11,200.00
6.00
Nr.
1,700.00
10,200.00
13.00
Nr.
1,500.00
19,500.00
12.00
Nr.
1,600.00
19,200.00
2.00
Nr.
1,350.00
2,700.00
3.00
Nr.
1,400.00
4,200.00
3.00
Nr.
1,450.00
4,350.00
3.00
Nr.
1,500.00
4,500.00
1,057,450.00
ITEM
DESCRIPTION
QTY
UNIT
RATE
Brought forward
AMOUNT
1,057,450.00
4.00
Nr.
600.00
2,400.00
3.00
Nr.
600.00
1,800.00
2.00
Nr.
600.00
1,200.00
4.00
Nr.
600.00
2,400.00
3.00
Nr.
600.00
1,800.00
1.00
Nr.
600.00
600.00
10.00
Nr.
5,000.00
50,000.00
10.00
Nr.
5,100.00
51,000.00
6.00
Nr.
5,600.00
33,600.00
5.00
Nr.
4,500.00
22,500.00
3.00
Nr.
3,200.00
9,600.00
2.00
Nr.
3,300.00
6,600.00
1.00
Nr.
3,400.00
3,400.00
1,244,350.00
ITEM
DESCRIPTION
QTY
UNIT
RATE
Brought forward
AMOUNT
1,244,350.00
12.00
Nr.
2,100.00
25,200.00
4.00
Nr.
8,100.00
32,400.00
2.00
Nr.
8,200.00
16,400.00
4.00
Nr.
8,300.00
33,200.00
7.00
Nr.
8,400.00
58,800.00
3.00
Nr.
8,400.00
25,200.00
1.00
Nr.
8,000.00
8,000.00
1.00
Nr.
8,100.00
8,100.00
2.00
Nr.
8,200.00
16,400.00
1.00
Nr.
8,300.00
8,300.00
2.00
Nr.
13,000.00
26,000.00
2.00
Nr.
13,100.00
26,200.00
3.00
Nr.
13,200.00
39,600.00
2.00
Nr.
13,300.00
26,600.00
2.00
Nr.
12,000.00
24,000.00
1,618,750.00
ITEM
DESCRIPTION
QTY
UNIT
RATE
Brought forward
AMOUNT
1,618,750.00
Ground floor
Supply & install Change over panel in
surface
mount
metal
enclosure
as
specified complete to working order.
2.M.86 1 No 100A. 4P.Auto transformer switch
1 No. 100A 4P MCCB
6 No. Indicator lamps transformer type thro
fuse
1.00
Nr.
12,000.00
12,000.00
1.00
Nr.
75,000.00
75,000.00
1.00
Nr.
18,000.00
18,000.00
1.00
Nr.
20,000.00
20,000.00
1.00
Nr.
15,000.00
15,000.00
1,758,750.00
ITEM
DESCRIPTION
QTY
UNIT
RATE
Brought forward
AMOUNT
1,758,750.00
Second floor
2.M.91 DB - 3 (Recessed mount plastic enclosure)
1 No 30A.2P MCB
1 No 40A. 2P RCD (30mA.)
10 way SPN (2x20A + 8x6A)
2.M.92 Supply and install in second floor A/C panel
recessed type complete with the following
component
1 No 15A.3P MCB
3 No 15A.2P MCB
3 No 30A. 2P RCD (30mA.)
1.00
Nr.
20,000.00
20,000.00
1.00
Nr.
20,000.00
20,000.00
1.00
Nr.
20,000.00
20,000.00
1.00
Nr.
20,000.00
20,000.00
1.00
Nr.
22,000.00
22,000.00
1.00
Nr.
60,000.00
60,000.00
Third floor
2.M.93 DB - 4 (Recessed mount plastic enclosure)
1 No 30A.2P MCB
1 No 40A. 2P RCD (30mA.)
10 way SPN (2x20A + 8x6A)
2.M.94 Supply and install in third floor A/C panel
recessed type complete with the following
component
1 No 15A.3P MCB
3 No 15A.2P MCB
3 No 30A. 2P RCD (30mA.)
Fourth floor
2.M.95 DB - 5 (Recessed mount plastic enclosure)
1 No 30A.2P MCB
1 No 40A. 2P RCD (30mA.)
6 way SPN (2x20A + 4x6A)
1,920,750.00
ITEM
DESCRIPTION
QTY
UNIT
RATE
Brought forward
AMOUNT
1,920,750.00
10.00
3,600.00
36,000.00
85.00
750.00
63,750.00
70.00
720.00
50,400.00
58.00
750.00
43,500.00
90.00
750.00
67,500.00
7.00
3,400.00
23,800.00
10.00
3,850.00
38,500.00
2.00
Nr.
6,000.00
12,000.00
Earth Electrode
2.M.104 Supply and install earth electrode G.I. Pipe 2"
dia. 5'-0" long including forming gulley
complete to working order
S07 - 97
2,256,200.00
ITEM
DESCRIPTION
N- PAINTING
QTY
UNIT
RATE
AMOUNT
2.N.1
External
Prepare and apply two coats of approved
colour C.I.C weather shield range or
equivalent to plinth.
42.00
240.00
10,080.00
167.10
m2
240.00
40,104.00
2.N.3
177.60
m2
250.00
44,400.00
2.N.4
178.00
m2
260.00
46,280.00
2.N.5
237.00
m2
270.00
63,990.00
2.N.6
207.50
m2
280.00
58,100.00
27.00
m2
280.00
7,560.00
2.N.7
2.N.8
271.25
m2
180.00
48,825.00
2.N.9
314.00
m2
190.00
59,660.00
323.00
m2
200.00
64,600.00
344.00
m2
210.00
72,240.00
273.50
m2
220.00
60,170.00
57.50
m2
220.00
12,650.00
588,659.00
ITEM
DESCRIPTION
QTY
UNIT
RATE
Brought forward
AMOUNT
588,659.00
304.20
190.00
57,798.00
359.70
200.00
71,940.00
357.80
m2
210.00
75,138.00
288.60
220.00
63,492.00
65.30
220.00
14,366.00
63.50
220.00
13,970.00
36.50
m2
220.00
8,030.00
7.20
m2
180.00
1,296.00
7.70
190.00
1,463.00
7.70
m2
200.00
1,540.00
8.20
m2
210.00
1,722.00
8.20
m2
220.00
1,804.00
S07 - 99
901,218.00
ITEM
DESCRIPTION
BILL NO 2 - SUPERSTRUCTURE
QTY
UNIT
RATE
AMOUNT
COLLECTION
C - CONCRETE WORK
Rs.
9,579,861.10
D - MASONRY WORK
Rs.
2,836,102.00
E - WATER PROOFING
Rs.
312,048.00
F- STRUCTURAL STEELWORK
Rs.
369,360.00
G- METAL WORK
Rs.
8,250,159.80
Rs.
5,250.00
Rs.
244,850.00
K- PLUMBING
Rs.
1,264,953.00
Rs.
6,660,492.50
M- ELECTRICAL INSTALLATIONS
Rs.
2,256,200.00
N- PAINTING
Rs.
901,218.00
Rs.
32,680,494.40
S07 - 100
ITEM
DESCRIPTION
QTY
UNIT
RATE
AMOUNT
3.P.2
3.P.3
11.00
2,500.00
27,500.00
1.00
Nr.
18,000.00
18,000.00
1.00
Nr.
20,000.00
20,000.00
65,500.00
ITEM
DESCRIPTION
QTY
UNIT
RATE
Brought forward
AMOUNT
65,500.00
3.P.5
10.00
2,800.00
28,000.00
1.00
Nr.
15,000.00
15,000.00
S07 - 102
108,500.00
ITEM
DESCRIPTION
QTY
UNIT
RATE
AMOUNT
3.Q.1
3.Q.2
3.Q.3
30.02
m3
560.00
16,808.40
23.50
560.00
13,160.00
11.75
m3
560.00
6,580.00
0.90
m3
12,500.00
11,250.00
Concrete work
Note
Unless otherwise specified all concrete
shall be 1:2:4(20 mm) mix. Prices are to
include for plant mixing, handling hoisting ,
depositing ,compaction, etc. And curing,
making good after removal of form work
etc
Unless otherwise specified in the items all
form work and reinforcement measured
separately.
3.Q.4
47,798.40
ITEM
DESCRIPTION
QTY
UNIT
RATE
Brought forward
3.Q.5
9.00
AMOUNT
47,798.40
1,400.00
12,600.00
Precast Concrete
3.Q.6
3.Q.7
4.00
Nr
4,000.00
16,000.00
5.00
Nr
5,000.00
25,000.00
0.03
MT
145,000.00
4,350.00
Reinforcement
Prices are to include for provision of
bending cleaning cutting fabricating placing
in positing holding and supporting including
temporary fixing supports, hangers and
binding wire. No allowance has been made
for rolling margin.
3.Q.8
105,748.40
ITEM
DESCRIPTION
QTY
UNIT
RATE
Brought forward
AMOUNT
105,748.40
Form work
Note
(a) Prices are to include for all necessary
boarding supports, erecting, framing, cutting,
angles, removal, cleaning, wetting etc.
10.00
120.00
1,200.00
17.00
120.00
2,040.00
10.00
120.00
1,200.00
4.60
m3
9,000.00
41,400.00
Brick work
Note. Prices are to include for all rough and
fair cutting, plumbing angles forming rebated
reveals rough arches racking out joints for
plastering etc cutting and priming forming or
cutting chases making good and sundry
items of a like nature .
3.Q.12 225mm thick brickwork in cement and sand
1:5 in septic tank
Sanitary plumbing
Note 1:The prices are to include for screws
nails pipe hooks saddles, brackets,
connections, short lengths, backsets nipples
and the like and holes, chasing etc. And
making good in all trades.
Note2: All under ground Drainage pipe work
shall be in UPVC to BS 4660 or SLS 1202
&SLS 1210
Total Carried Forward
S07 - 105
151,588.40
ITEM
DESCRIPTION
QTY
UNIT
RATE
Brought forward
AMOUNT
151,588.40
2.00
Nr
1,100.00
2,200.00
1.00
Nr
1,200.00
1,200.00
1.50
1,000.00
1,500.00
1.50
1,000.00
1,500.00
157,988.40
ITEM
DESCRIPTION
QTY
UNIT
RATE
Brought forward
AMOUNT
157,988.40
Plastering
Note
Prices are to include for all temporary rules,
screeds, grounds, etc. for racking out joints
between new brick work or hacking new
concrete for key, internal and curved angles,
joints between different surfaces and arises
intersections between curved or irregular
surfaces, etc and making good around
pipes, sanitary fittings and similar fixtures.
21.75
m2
800.00
17,400.00
2.70
m2
800.00
2,160.00
24.50
m2
1,800.00
44,100.00
Paving
Note
Prices are to include for all temporary rules,
screeds, grounds, etc. for racking out joints
between new brick work or hacking new
concrete for key, internal and curved angles,
joints between different surfaces and arises
intersections between curved or irregular
surfaces, etc and making good around
pipes, sanitary fittings and similar fixtures.
Water proofing
3.Q.19 Applying 2 coats of shield coat No. 5 or
equivalent approved water proofing to internal
faces of septic tank
S07 - 107
221,648.40
ITEM
DESCRIPTION
R- INLET AND OUTLET CHAMBERS
Refer drawing No WSS 1668.00
QTY
UNIT
RATE
AMOUNT
Excavation
3.R.1
5.70
m3
560.00
3,192.00
7.80
m2
560.00
4,368.00
Concrete work
1:2:4 (20 mm) cement concrete in floors of
chambers including channeling & benching.
Formwork and reinforcement measured
separately.
0.25
m3
12,500.00
3,125.00
6.60
1,300.00
8,580.00
1.30
m2
1,500.00
1,950.00
Form work
Formwork to floors, channels and pads.
1.60
m2
1,200.00
1,920.00
Reinforcements
10 mm tor steel bars at 225 C/C both
ways to floors of chambers.
0.02
Kg
145.00
2.90
Brickwork
225 mm brickwork in 1:5 cement mortar in
chambers
0.75
m3
9,000.00
6,750.00
Plaster
Cement plastering 1:2 (12mm) to floors and
internal walls of chambers floated smooth .
3.40
m2
800.00
2,720.00
3.80
m2
750.00
2,850.00
3.R.2
3.R.3
3.R.4
3.R.5
3.R.6
3.R.7
3.R.8
3.R.9
S07 - 108
35,457.90
ITEM
DESCRIPTION
QTY
S- SOAKAGE PIT ( 2. 0 M internal diameter)
UNIT
RATE
AMOUNT
3.S.2
6,000.00
6,000.00
9.00
m3
560.00
5,040.00
9.00
560.00
5,040.00
3.00
m3
850.00
2,550.00
3.S.5
1.00 Item
10,000.00
10,000.00
3.S.6
0.50
5,400.00
2,700.00
0.85
m3
9,100.00
7,735.00
0.30
m3
12,500.00
3,750.00
2.50
m3
2,400.00
6,000.00
2.50
m3
2,400.00
6,000.00
3.S.3
3.S.4
3.S.7
3.S.8
3.S.9
54,815.00
ITEM
DESCRIPTION
QTY
UNIT
RATE
Brought forward
1.00
4.50
3.S.13 Cement concrete 1:2:4(20mm) base pad 300
x 225 x 150 mm to rest the beam (Rate
include with form work)
AMOUNT
54,815.00
2,400.00
2,400.00
m2
1,600.00
7,200.00
2.00
Nr
2,500.00
5,000.00
2.50
2,800.00
7,000.00
8.00
2,800.00
22,400.00
4.25
m2
700.00
2,975.00
7.00
m2
840.00
5,880.00
2.50
m2
1,200.00
3,000.00
1.00
Nr
980.00
980.00
1.00
Nr
1,100.00
1,100.00
0.30
m3
1,600.00
480.00
113,230.00
ITEM
DESCRIPTION
3.S.3
3.T.1
provisional sum
500,000.00
3.T.2
provisional sum
50,000.00
3.T.3
provisional sum
1,000,000.00
QTY
S07 - 111
UNIT
RATE
AMOUNT
1,550,000.00
ITEM
DESCRIPTION
BILL NO 3 - EXTERNAL WORKS
QTY
UNIT
RATE
AMOUNT
COLLECTION
P- EXTERNAL DRAINAGE
Rs.
108,500.00
Rs.
221,648.40
Rs.
35,457.90
Rs.
113,230.00
T- MISCELLENIOUS
Rs.
1,550,000.00
S07 - 112
2,028,836.30
ITEM
DESCRIPTION
GRAND SUMMARY
QTY
UNIT
ITEM
RATE
AMOUNT
AMOUNT(Rs.)
Rs:
3,100,000.00
Rs:
4,135,201.80
Rs:
32,680,494.40
Rs:
2,028,836.30
Rs:
41,944,532.50
Rs:
2,130,000.00
SUB TOTAL ( 1 ) :
Less
Provisional Sums
SUB TOTAL ( 2 ) :
Rs:
Less
... % Discount ( if any)
SUB TOTAL ( 3 ) :
Add
Provisional Sums
Rs:
Rs:
Rs:
GRAND TOTAL :
Rs:
(Bid Sum carried over to Form of Bid on Page No. S4 -02 )
Date :.
Witness : (1) : .
Address : ..
Witness : (2) : .
Address : ..
S07 - 113
2,130,000.00
Section 8 - Drawings
_____________________________________________________________________________________________________________________
SECTION - 8
DRAWINGS
S08-1
Section 8 - Drawings
_____________________________________________________________________________________________________________________
Architectural :
Structural:
S08-2
Section 8 - Drawings
_____________________________________________________________________________________________________________________
Water Supply :
Electrical:
S08-3
Structural
2011-10-004 ST01 2011-10-004 ST02 2011-10-004 ST03 Water supply
2011-10-004 WSS01- Ground floor plan, first floor plan, secondfloor plan & third
floor plan
2011-10-004 WSS02- Site plan, Floor plan at water tank & Machine room floor &
Detail at E
2011-10-004 WSS03- Detail at - A
2011-10-004 WSS04- Detail at - B
2011-10-004 WSS05- Detail at - C
2011-10-004 WSS06- Detail at - D
Electrical
2011-10-004 EL01 2011-10-004 EL02 2011-10-004 EL03 -
SECTION - 9
STANDARD FORM [BID SECURITY]
S09-1
S09-2
SECTION 10
VAT FORM
S10-1
The bidder is required to show the total amount of V.A.T. for the bid, separately in
the place shown below. The bidder is strictly instructed not to include V.A.T. in
his bid value.
..
Signature of Bidder
Date : ..
S10-2
SECTION 11
CHECK LIST
S11-1
CHECK LIST
YES
(TICK)
FORM OF BID
BID SECURITY
ICTAD Registration
Grade ?
Validity Period ?
4.
QUALIFICATION INFORMATION
5.
ADDENDUM
BID PACKAGE
All the documents given in Clause 12 .1 in
the Bidding Data enclosed in the original
and copy ?
ITB Clause 19 followed before Sealing the
Bid Package ?
S11-2
REFERENCE