THE DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA

MINISTRY OF TECHNOLOGY & RESEARCH

ARTHUR C CLARKE INSTITUTE FOR MODERN


TECHNOLOGIES

BIDDING DOCUMENT
FOR
Proposed Extension for Existing Laboratory Building at
Arthur C Clarke Institute for Modern Technologies,
Katubedda, Moratuwa

Issued To

Date

:............................................

........................................

............................................

Executive Secretary

:.............................................

Bid No.: AC/WS/CON/PNB/2009

Non-refundable Fee Receipt No. & Date: ..................................................

INDEX

PAGE NO
-

INVITATION FOR BIDS

I 01
VOLUME I
SECTION 1

INSTRUCTIONS TO BIDDERS

S01 1 to 2

SECTION 2

STANDARD FORMS

S02 1 to 7

SECTION 3

CONDITIONS OF CONTRACT

S03 1 to 2

SECTION 4

FORM OF BID AND QUALIFICATION


INFORMATION

S04 1 to 5

SECTION 5

BIDDING DATA AND CONTRACT DATA

S05 1 to 13

SECTION 6

SPECIFICATIONS

S06 1 to 2

SECTION 7

BILL OF QUANTITIES

S07 1 to 113

SECTION 8

DRAWINGS

S08 1 to 3

SECTION 9

STANDARD FORM [BID]

S09 1 to 2

SECTION 10

VAT FORM

S10 1 to 2

SECTION 11

CHECK LIST

S11 1 to 2

VOLUME II

MINISTRY OF TECHNOLOGY & RESEARCH

ARTHUR C CLARKE INSTITUTE


FOR MODERN TECHNOLOGIES
INVITATION FOR BIDS
PROPOSED EXTENSION FOR EXISTING LABORATORY BUILDING AT ARTHUR C
CLARKE INSTITUTE FOR MODERN TECHNOLOGIES, KATUBEDDA, MORATUWA
1. The Chairperson, Ministry Procurement Committee, on behalf of the Arthur C Clarke
Institute for Modern Technologies (ACCIMT) hereby invites sealed bids from eligible and
qualified bidders for Construction of Proposed Extension for Existing Laboratory Building at
Arthur C Clarke Institute for Modern Technologies, Katubedda, Moratuwa as described below
and estimated to cost Rs.40.00 million.
The construction period is 273 Days.
2. Bidding will be conducted through National Competitive Bidding Procedure.
3. To be eligible for contract award, the successful bidder shall not have been blacklisted and shall
be registered in the field of building construction for Grade C5 or above with the Institute for
Construction Training and Development (ICTAD), valid at the time of closing of the bids.
Further the registration should be valid at the date of award.
4. A complete set of Bidding Documents in English language could be collected by the interested
bidders from the Administrative Officer (Admin) on submission of a written request on a business
letter head addressed to the Executive Secretary, Arthur C Clarke Institute for Modern
Technologies, 272, Bandaranayake Mawatha, Katubedda, Moratuwa along with the receipt of
payment made in cash of non-refundable fee of Rs.2500.00 to the Finance Division of the
ACCIMT during working days from 9.00 a.m. to 3.30 p.m. from 15th November 2011 to 05th
December 2011 or by downloading the documents from the web sites of www.pfd.gov.lk,
www.motr.gov.lk or www.accimt.ac.lk Please note that if bids are submitted on documents that
are downloaded, a payment of Rs. 1500.00 is required to be paid when the bid is submitted and no
alteration should be made to the documents.
Contact numbers are: Phone: 011-5677391, 011-2650838/2650569 Ext-110, Facsimile: 0112650462
5. Bids should be submitted in duplicate under sealed cover to the address below on or before
2.00 p.m. on 06th December 2011, either by registered post or be deposited in the tender box
available at the office of the Executive Secretary of ACCIMT. Bidders are advised to enter the
ACCIMT premises at least 30 minutes before the scheduled time for Bid closing.
6. Bids will be opened soon after the closing of bids at the Mini Auditorium, ACCIMT in presence
of the bidders representatives who choose to attend.
7. Bids shall be valid for a period of 91 Days from the last date fixed for receiving of Bids or any
extended period.
8. All Bids shall be accompanied by a Bid Security which shall be;

in the form included in Section 09 of the bidding document


for an amount of Rs. 800,000.00
valid up to 91 days from the date of closing of bids
issued by one of the agencies indicated in the clause 16.2 of the Bidding Data.

9. A Pre-Bid meeting will be held at 10.00 a.m. on 01st December 2011 at ACCIMT
10. The ACCIMT will not be responsible for any cost or expenses incurred by bidders in connection
with the preparation or delivery of bids.
Director & CEO
Arthur C Clarke Institute for Modern Technologies
272, Bandaranayake Mawatha,
Katubedda, Moratuwa
I 01

VOLUME I

CONTENTS

SECTION

DESCRIPTION

PAGE NO

SECTION 1

INSTRUCTIONS TO BIDDERS

S01 1 to 2

SECTION 2

STANDARD FORMS (CONTRACT)

S02 1 to 7

SECTION 3

CONDITIONS OF CONTRACT

S03 1 to 2

Section 1 Instructions to Bidders


________________________________________________________________________________________________________________

SECTION I
INSTRUCTIONS TO BIDDERS

S01-1

Section 1 Instructions to Bidders


________________________________________________________________________________________________________________

SECTION I
INSTRUCTIONS TO BIDDERS
1.

The Instructions to Bidders for this work are contained in Section 01 of the Standard
Bidding Document, Procurement of Works, ICTAD Publication No.
ICTAD/SBD/01, Second Edition January 2007. The Bidder may purchase this
document from Institute for Construction Training and Development, No. 123,
Wijerama Mawatha, Sawsiripaya, Colombo-07.

Note:

1. Instructions to Bidders shall be read in conjunction with


Section 05 Bidding and Contract Data Volume II.
2. Instructions to Bidders will not be a part of the Contract
and will cease to have effect once the Contract is signed.

S01-2

Section 2 -Stranded Forms (Contract)


_______________________________________________________________________________________________________________

SECTION 2
STANDARD FORMS [CONTRACT]
1.
2.
3.
4.
5.

FORM OF LETTER OF ACCEPTANCE


AGREEMENT
FORM OF PERFORMANCE SECURITY
FORM OF ADVANCE PAYMENT SECURITY
FORM OF RETENTION MONEY GUARANTEE

S02-1

Section 2 -Stranded Forms (Contract)


_______________________________________________________________________________________________________________

Form of Letter of Acceptance


.[date]
[LETTER HEADING PAPER OF THE PROCURING ENTITY]
To
[name and address of the Contractor]
I have the honour to notify you that your bid dated .[insert date] for the
construction and remedying defects of the [name of the Contract and
identification number] for the Contract price of .[name of
currency] [amount in figures and words ] as corrected in accordance
with Instructions to Bidders and/ or modified by a Memorandum of Understanding, is here by
accepted.
You are hereby instructed to proceed with the execution of the said Works in accordance with
the Contract Document.
The number allotted to this Contract is ..........................[Contract Number], which should be
quoted in all future correspondence of this project.
You are hereby instructed to call over at the office of the ...........................[Officer &
Address], to sign the formal agreement along with a performance security as stated below
within ........days on receipt of this Letter of Acceptance. The performance security shall be
in any one of the following forms in item 52.1 (page no. S05-12) for
...............................................................
( amount in figures and words) in favour of the Director & CEO, Arthur C Clarke Institute
for Modern Technologies and shall be valid till .........................[Date].
..................................................................................... [Name of Institutions]
The Start Date of the Works shall be ....................Days from the date of this Letter of
Acceptance. Stipulated deadline or the actual date of commencement which falls earlier will
be reckoned as the start date of the works. The Contract Period shall be .................................
[Contract Period] starting from the Start Date. You may contact .............................
..............................., .................., ..............., ..............................[Officer & Address] to make
arrangements for taking over the site in order to commence the Works.
You are hereby instructed to submit insurance covers from an insurance company approved
by the Treasury in accordance with the ...........................[Clause No.].
An advance payment of Rs......................... [Amount] may be paid in accordance with
.........................[Clause No.]on submission of an unconditional guarantee.
This Letter of Acceptance and your Bid will form a binding contract until the formal
agreement is signed.
Authorized Signature: ..............
Name and title of Signatory: .

Name of Agency: .

S02-2

Section 2 -Stranded Forms (Contract)


_______________________________________________________________________________________________________________

AGREEMENT
This

Agreement,

made

the

day

of

..-...-20.

between

holding the office of the Director & CEO of


Arthur C Clarke Institute for Modern Technologies in the Government of the Democratic
Socialist Republic of Sri Lanka (hereinafter called the Employer) for himself and his
successors in the said office for the time being, acting for and on behalf of The Arthur C
Clarke Institute for Modern Technologies (ACCIMT) (hereinafter sometimes referred to as
ACCIMT) of the one part and of
...trading under the name, firm and style of Messrs
a Company duly incorporated and having its
registered office at ..(hereinafter designated "the
Contractor" which expressions shall include his or their heirs, executors, administrators and
legal representatives or where the context so admits, include its successors and permitted
assigns) of the other part.

WHEREAS

the

Employer

desires

execute..

that

the

Contractor
.

...(hereinafter called the Works)and the


Employer has accepted the Bid by the Contractor for the execution and completion of such
Works and the remedying of any defects therein.

NOW THIS AGREEMENT WITNESSETH as follows:

1.

In this Agreement, words and expressions shall have the same meanings
as are respectively assigned to them in the Conditions of Contract
hereinafter referred to, and they shall be deemed to form and be read and
construed as part of this Agreement.

2.

In consideration of the payments to be made by the Employer to the


Contractor as hereinafter mentioned, the Contractor hereby covenants
with the Employer to execute and complete the Works and remedy any
defects therein in conformity in all respects with the provisions of the
Contract.

S02-3

Section 2 -Stranded Forms (Contract)


_______________________________________________________________________________________________________________

3.

The Employer hereby covenants to pay the Contractor in consideration


of the execution and completion of the Works and the remedying of
defects wherein the Contract Price or such other sum as may become
payable under the provisions of the Contract at the times and in the
manner prescribed by the Contract.

IN WITNESS whereof the parties thereto have caused this Agreement to be executed the day
and year aforementioned in accordance with laws of Republic of Sri Lanka.

Director & CEO, ACCIMT

WITNESSES:

1. Signature.................

2. Signature............

Designation :

Designation:

Signature of the Contractor/Director of the Company


Name : ...................................................

Common Seal

NIC No..

Signature of the Contractor/Director of the Company


Name : ...................................................
NIC No..

WITNESSES:
1. Signature.................

2. Signature..........

NIC No

NIC No...

Name & Address

Name & Address

...

...

S02-4

Section 2 -Stranded Forms (Contract)


_______________________________________________________________________________________________________________

Form of Performance Security


(Unconditional)
Issuing Agency: ---------------------------------------------------------------------------------------------------------------------------------------------- [Issuing Agencys Name and Address of Issuing Branch or Office]
Beneficiary: Director & CEO
Arthur C Clarke Institute for Modern Technologies
272, Bandaranayake Mawatha,
Katubedda, Moratuwa
Date:--------------------------------PERFORMANCE GUARANTEE No:-------------------------------------------We have been informed that .. .. [name of the
Company] (hereinafter called the Contractor) has entered into Contract No.
[reference number of the contract] with you, in the year ..........................,
for the... [name of
the Contract] (hereinafter called the Contract);

Furthermore, we understand that, according to the conditions of the Contract, a performance


guarantee is required.

At the request of the Contractor, we .. [name of


Agency] hereby irrevocably undertake to pay you any sum or sums not exceeding in total an
amount
of

[amount
in
words]
(....) [amount in figures], upon receipt by us of your
first demand in writing accompanied by a written statement stating that the Contractor is in
breach of its obligation(s) under the Contract, without your needing to prove or to show
grounds for your demand or the sum specified therein.

This guarantee shall expire, no later than the . day of . 20. [insert
date, 28 days beyond the intended completion date]and any demand for payment under it
must be received by us at this office on or before that date.

..
[signature(s)]

S02-5

Section 2 -Stranded Forms (Contract)


_______________________________________________________________________________________________________________

Form of Advance Payment Security


Issuing Agency: ------------------------------------------------------------------------------------------------------------- [Name an
Address of Agency, and Address of Issuing Branch or Office]
Beneficiary: Director & CEO
Arthur C Clarke Institute for Modern Technologies
272, Bandaranayake Mawatha,
Katubedda, Moratuwa
Date:--------------------------------ADVANCE PAYMENT GUARANTEE No:-------------------------------------------We have been informed that .. .. [name of
Contractor] (hereinafter called the Contractor) has entered into Contract No.
[reference number of the contract] with you, in the year ..........................,
for the... [name of the
contract] (hereinafter called the Contract);
Furthermore, we understand that, according to the conditions of the Contract, an advance
payment in the sum [amount in words] (
)[amount in figures] is to be made against an advance payment guarantee.
At the request of the Contractor, we .. [name of
Issuing agency] hereby irrevocably undertake to pay you any sum or sums not exceeding in
total
an
amount
of

[amount
in
words]
(....) [amount in figures], upon receipt by us of your
first demand in writing accompanied by a written statement stating that the Contractor is in
breach of its obligation(s) in repayment of the Advance payment under the Contract
The maximum amount of this guarantee shall be progressively reduced by the amount of the
advance payment repaid by the Contractor.
This guarantee shall expire on [insert date, 28 days beyond the Intended
Completion Date]
Consequently, any demand for payment under this guarantee must be received by us at this
office on or before that date.

..
[signature(s)]

S02-6

Section 2 -Stranded Forms (Contract)


_______________________________________________________________________________________________________________

Form of Retention Money Guarantee


Issuing Agency: ---------------------------------------------------------------------------------------------------------------------------------------------- [Issuing Agencys Name and Address of Issuing Branch or Office]
Beneficiary: Director & CEO
Arthur C Clarke Institute for Modern Technologies
272, Bandaranayake Mawatha,
Katubedda, Moratuwa
Date:--------------------------------RETENTION MONEY GUARANTEE No:-------------------------------------------We have been informed that .. .. [name of
Contractor] (hereinafter called the Contractor) has entered into Contract No.
[reference number of the contract] with you, in the year ..........................,
for the execution of ...
[name of the Contract and brief descriptions of Works] (hereinafter called the
Contract);

Furthermore, we understand that, according to the conditions of the Contract, when the works
have being taken over and the first half of the Retention Money has been certified for the
payment, payment of the second half of the Retention Money may be made against a
Retention Money guarantee.

At the request of the Contractor, we .. [name of


Agency] hereby irrevocably undertake to pay you any sum or sums not exceeding in total an
amount
of

[amount
in
words]
(....) [amount in figures], upon receipt by us of your
first demand in writing accompanied by a written statement stating that the Contractor is in
breach of its obligation under the Contract, because the contractor has not attended to the
defects in accordance with the Contract.

This guarantee shall expire, at the latest, ..[insert date, 28 Days after
the end of the Defects Liability Period] Consequently, any demand for payment under this
guarantee must be received by us at this office on or before that date.

..
[signature(s)]

S02-7

Section 3 Conditions of Contract


_______________________________________________________________________________________________________________

SECTION - 3
CONDITIONS OF CONTRACT

S03-1

Section 3 Conditions of Contract


_______________________________________________________________________________________________________________

CONDITIONS OF CONTRACT
PART I - GENERAL CONDITIONS OF CONTRACT

1.

The General Conditions for this work are contained in Section 03 of the Standard
Bidding Document, Procurement of Works, ICTAD Publication No.
ICTAD/SBD/01, Second Edition January 2007. The Bidder may purchase this
document from ICTAD, No. 123, Wijerama Mawatha, Sawsiripaya, Colombo-07.

Note:

Conditions of Contract shall be read in conjunction with Section


05 Bidding and Contract Data in volume II, which shall take
precedence over the Conditions of Contract.

S03-2

Section 4-Form of Bid and Qualification Information


_______________________________________________________________________________________________________________

VOLUME II

CONTENTS

SECTION

DESCRIPTION

SECTION 4

FORM OF BID AND QUALIFICATION


INFORMATION

S04-1 to 5

SECTION 5

BIDDING DATA AND CONTRACT DATA

S05-1 to 13

SECTION 6

SPECIFICATIONS

S06-1 to 2

SECTION 7

BILL OF QUANTITIES

S07-1 to 113

SECTION 8

DRAWINGS

S08-01 to 3

SECTION 9

STANDARD FORM [BID]

S09-1 to 2

SECTION 10

VAT FORM

S10-1 to 2

SECTION 11

CHECK LIST

S11-1 to 2

VII-01

PAGE NO

Section 4-Form of Bid and Qualification Information


_______________________________________________________________________________________________________________

SECTION 4
FORM OF BID
AND
QUALIFICATION INFORMATION

S04-1

Section 4-Form of Bid and Qualification Information


_______________________________________________________________________________________________________________

FORM OF BID
Name of the Contract: Proposed Extension for Existing Laboratory Building at Arthur
C Clarke Institute for Modern Technologies, Katubedda, Moratuwa

To:

Director & CEO


Arthur C Clarke Institute for Modern Technologies
272, Bandaranayake Mawatha,
Katubedda, Moratuwa

Gentleman,
1.

Having examined the Standard Bidding Document - Procurement of Works


(ICTAD/SBD/01,-Second Edition - January 2007), Specifications, Drawings and Bill of
Quantities and Addenda, if any, for the execution of the above named Works, we the
undersigned, offer to execute and complete such Works and remedy any defect therein
in conformity with the aforesaid Conditions of Contract, Specifications, Drawings, Bill
of Quantities and Addenda, if any, for the sum of Sri Lankan Rupees ... ............
..
.............................................................................................................................................
........................(LKR .................) or such other sums as may be ascertained in
accordance with the said Conditions.

2.

We acknowledge that the Contract Data forms part of our Bid.

3.

We undertake, if our Bid is accepted, to commence the works as stipulated in the


Contract Data, and to complete the whole of the Works comprised in the Contract
within the time stated in the Contract Data.

4.

We agree to abide by this Bid for the period of 91 Days from the last date fixed for
receiving or any extended period and it shall remain binding upon us and may be
accepted at any time before the expiration of that period.

5.

Unless and until a formal Agreement is prepared and executed, this Bid, together with
your written acceptance thereof, shall constitute a binding contract between us.

6.

We understand that you are not bound to accept the lowest or any Bid you may receive.

S04-2

Section 4-Form of Bid and Qualification Information


_______________________________________________________________________________________________________________

Dated this ........................... day of .. Two Thousand and .......... in


the capacity of.(Designation) duly authorised as - sole proprietor /
power of attorney holder / person authorized by board resolution- (Delete whichever is not
applicable) to sign bids for and on behalf of

(IN BLOCK CAPITALS)

Signature
Name
Address

: .
: .
: .
..

Seal

..
..
Witnesses
1. Signature
Name
Address

:
: .
: .
..
..
..

2. Signature :
Name
:
Address :

S04-3

Section 4-Form of Bid and Qualification Information


_______________________________________________________________________________________________________________

Qualification Information
[To be completed by the Bidder and submitted with the Bid.]
ICTAD Registration:
Eligibility Requirement
Registration No
Grade C5 or above
Attach copies of relevant
Speciality Building Construction
pages from the registration
Validity Valid at the time of closing of
book to confirm your details
bids and also at the time of
(attach as annex I).
award.
Have you been declared as a defaulted contractor by NPA or any
Blacklisted Contactors
other Agency?

(Yes/No)
If yes provide details (attach as annex II).
Construction Programme

(attach as annex III)

Legal Status

Status: Sole Proprietor

Partnership

Public Company

Privet Company

Business Address :

Telephone Number : Land :Mobile


Facsimile Number :........
E-mail Address

:.........

(Power of attorney of signatory of Bidder (if applicable)


(attach relevant status copies, as annex IV)
Signatory of Bid

Sole Proprietor

Power of Attorney holder

Person authorized by Board of resolution


(attach relevant documents as annex IV, if applicable)

Details of Annual Volume


of the Construction works
requested as in the
Bidding Data Cl. 4.4;
Details of Construction
works requested as in the
Bidding Data Cl. 4.4;
Details of construction
equipment proposed for
the project.
Qualification and
experience of key staff

(attach copies of certificates of completion of the projects etc,


and/or financial statement audited by a Charted Accountant as
annex VI)

(attach copies of cliental certificates of completion of the projects


etc, as annex VI)
(attach as annex VII)

Eligibility Requirements
Category, Experience and Qualification

S04-4

Bidders Qualification
Required
Proposed by bidder
Nos
(Name, experience

Section 4-Form of Bid and Qualification Information


_______________________________________________________________________________________________________________

required as in the Bidding


data Cl. 4.4

and Qualification)
Chartered (Civil) Engineer, over 10 years
of post charter experience in Building
Construction Visiting 10 hours per week

01

B.Sc. (Civil) Engineering over 05 years


experience in Building Construction - Full
time

01

Technical Officer NDT (Civil) or


equivalent over 05 years experience in
Building Construction - Full time

01

(attach copies of certificates of academic qualification, experience,


appointment letter or consent letter etc as annex VIII)
Details of work plan and
method
Details of Credit Facilities
requested as in the
Bidding Data Cl. 4.4;
Details of work in hand as
in the Bidding Data Cl.
4.4(f)

(attach as annex IX)

Working capital for the


work in hand as in the
Bidding Data Cl. 4.4(g)

(attach relevant document as annex XI)

Furnish relevant documents for Rs.8.0 million.


(attach as annex X)
(attach relevant document as annex XI)

.....................................
Signature of the Bidder
Name:
Date:

Seal

S04-5

Section 5 Bidding Data and Contract Data


________________________________________________________________________________________________________________

SECTION 5
BIDDING DATA AND CONTRACT DATA

S05-1

Section 5 Bidding Data and Contract Data


________________________________________________________________________________________________________________

Bidding Data
A. GENERAL
Instructions
to Bidders
Clause
Reference

1.1

The Employer is
Name: Director & CEO, ACCIMT
Address: Arthur C Clarke Institute for Modern

SCOPE OF BID

Technologies

272,
Bandaranayake
Moratuwa

Mawatha,

Katubedda,

The Works consists of Construction of R.C.C. framed


four storied Building with one part rises up to five
storied, with services such as water supply & sewerage
disposal system, electricity, storm water drainage system,
landscaping fire fighting, lighting arresters.
Located at 272, Bandaranayake Mawatha Katubedda,
Moratuwa.
1.2

Intended Completion Date is Two hundred and seventy


three (273) Days from the Start Date.

1.3

The office for collection of bid forms is


Name : Administrative Officer
Address: Supplies Division, Arthur C Clarke Institute for
Modern
Technologies,
272,
Bandaranayake
Mawatha,
Katubedda, Moratuwa
The non-refundable fee is Rupees two thousand five
hundred (Rs. 2500.00)
The Bid documents will be issued until 15.30hrs on 5th
December 2011

2.1

The source of funds is Consolidated Fund of


Government of Sri Lanka.

SOURCE OF
FUNDS

4.2

The registration required

ELIGIBILITY
AND
QUALIFICATION
OF THE BIDDER

Speciality: Building Construction


Grade: ICTAD Grade C5 or above
Validity: valid at the time of closing of the Bids and
also at the time of award.
4.3

The following Information shall be provided in section 4


ICTAD Registration;
Registration Number
Grade
Specialty
Validity
S05-2

Section 5 Bidding Data and Contract Data


________________________________________________________________________________________________________________

4.4

VAT registration number


Attach Construction Program
Details of Company Registration/Incorporation of
the Company/Business Registration for Sole
Proprietor or Partnership
Attach Documents (Power of Attorney or Board
Resolution) authorizing the signatory of the Bid
to commit the Bidder.
Total Turnover from construction work
performed for each of the last five years to be
confirmed by submission of Audited Financial
statements as proof for item 4.4(b) below.
Experience in works of a similar nature and size
for each of the last five years as documentary
proof for item 4.4(c) below.
Construction Equipment.
Qualification and experience of key Site
Management, Project Management and Technical
Personal proposed for the Contract as per 4.4(d)
below.
Attach Work plan and methods;
Details of Credit Facilities as per 4.4 (e) below.
Documentary proof for item 4.4(f) below.
Documentary proof for item 4.4(g) below.

The Bidders Qualification Criteria:


a) Bidders must be registered with the Institution for
Construction Training and Development (ICTAD)
for Building Construction Grade C5 or above.
To be eligible for contract award, the successful
bidder shall not have been blacklisted and the
registration with ICTAD shall be valid until the date
of closing of the bid and also at the date of award.
b) Average of the annual value of Turnover of
construction work performed in last five (05) years
shall be at least Sri Lankan Rupees sixty (60.0)
million.
c) Successful completion of one project of minimum of
three storied of similar nature and complexity and
costing not less than SLR. thirty (30.0) million
completed within 6 months or a higher value project
within proportionate time period as a main
contractor during last five years. Documentary
evidence obtained from Employer shall be attached
as proof for the above which shall include project
cost, time duration taken to complete the project,
number of storeys and date of completion.

S05-3

Section 5 Bidding Data and Contract Data


________________________________________________________________________________________________________________

d) A Charted Civil Engineer with minimum of 10 years


post charter experience in building construction (on
visiting basis, minimum 10 hrs per week) and one
graduate Civil Engineer with 03 years experience in
building construction (full time ) and one technical
officer with NDT (Civil) or equivalent with
minimum 07 years of experience in building
construction(full Time) should be assigned to the
project an addition to the other technical staff
needed by the bidder for satisfactory execution of
the project.
e) Minimum amount of liquid assets and /or credit
facilities (after setting apart for other contractual
commitments) and exclusive of any advance
payments which may be made under this contract
shall be not less than SLR eight (8.0) million.
f) Details of work in hand of the bidder duly attested in
the form of an affidavit shall be provided with
separate statements showing the contract value,
percentage of work completed, value of balance
work to be done and target date of completion of
each of the works listed shall be countersigned by
the Engineer/Employer or Consultant.
g) Documentary proof of to establish the availability of
working capital requirement for the work in hand
shall be furnished. (Generally working capital
required for the work in hand is considered as 20%
of value of work in hand).
h) Even though the bidder meet the above qualifying
criteria, they are subjected to be disqualified if they
have misleading or false statements in proof of the
qualification requirements.
i) Non submission or partial submission of the
documents listed above shall lead to rejection of the
bid.
5.0

Add
Only who purchased the Bidding documents shall be
eligible to Bid

8.1

ONE BID PER


BIDDER

Delete and Add


The set of bidding documents comprises the documents
listed below and addenda issued in accordance with
Clause 10:

S05-4

CONTENT OF
BIDDING
DOCUMENT

Section 5 Bidding Data and Contract Data


________________________________________________________________________________________________________________

Invitation for Bids


Volume 1 :
Section 1

Instructions to Bidders

Section 2

Standard Forms (Contract)

Section 3

Conditions of Contract

Volume 2 :
Section 4 Form of Bid and Qualification
Information
Section 5 Bidding Data and Contract Data
Section 6

Specification

Section 7 Bill of Quantities


Section 8 Drawings
Section 9 Standard Form/ (Bid Security)
Section 10 VAT Form
Section 11 Check List

Drawings in the Section 8 are not issued with the


documents. However they are available at the
Office of the Chief Engineer (Colombo
Construction) for reference.
The Drawings could be purchased in the Chief
Engineers Office (Colombo Construction) at
the rate of Rs.300.00 per Drawing.

9.1

Employers address for the purpose of clarification is;


Name : Executive Secretary
Address: Arthur C Clarke Institute for Modern Technologies
272, Bandaranayake Mawatha, Katubedda, Moratuwa
Fax No.:011-2650462
E- mail : panduka@accmt.ac.lk

CLARIFICATION
OF BIDDING
DOCUMENTS

11.1

The language of the bidding document shall be English

LANGUAGE OF
BID

12.1

Delete and Add


The Bid submitted by the bidder shall comprise the
following duly filled and completed in two copies
marked Original and Copy.
Invitation for Bids
Volume 1 :
Section 1 Instructions to Bidders
Section 2 Standard Forms

S05-5

DOCUMENTS
COMPRISING
THE BID

Section 5 Bidding Data and Contract Data


________________________________________________________________________________________________________________

Section 3 Conditions of Contract


Volume 2 :
Section 4 Form of Bid and Qualification
Information
Section 5 Schedule
Section 6 Specification
Section 7 Bill of Quantities
Section 8 Drawings
Section 9 Standard Forms (Bid Security)
Section 10 VAT Form
Section 11 Check List
BID PRICES

13.3

Delete
. at the space provided in the B.O.Q.
Add
..in the Section 10.

13.4

The Contract is subjected to price adjustment in


accordance with clause 47 of conditions of contract.

15.1

Bids shall be valid for the period of 91 Days from the


last date fixed for receiving of Bids or any extended
period.

BID VALIDITY

16.1

Bid shall include a Bid Security using the forms included


in section 09

BID SECURITY

16.2

Bid security shall be submitted by Bidder


Bid security shall be;
Issued by an agency acceptable to Employer
using the form for bid security (unconditional
guarantee) included in section 09 Standard
Forms.
- In favour of Director & CEO
- for an amount Rs.800,000.00
- Valid until 100 Days from the date of
closing of the bids
The agencies acceptable to Employer are:
a commercial bank operating in Sri Lanka
approved by the Central Bank of Sri Lanka ; or
a bank based in another country but the guarantee
confirmed by a bank operating in Sri Lanka
approved by the Central Bank of Sri Lanka;
Construction Guarantee Fund

S05-6

Section 5 Bidding Data and Contract Data


________________________________________________________________________________________________________________

17.0

Pre bid meeting Venue: Arthur C Clarke Institute for


Modern Technologies,

272, Bandaranayake Mawatha,

Katubedda, Moratuwa
Date 1st December 2011
19.2

PRE-BID
MEETING

Time 10.00 a.m.

(a) The Employers address for the purpose of Bid


submission is
Director & CEO
Arthur C Clarke Institute for Modern
Technologies
272, Bandaranayake Mawatha,
Katubedda, Moratuwa

SEALING AND
MARKING OF
BIDS

(b) Contract Name: Proposed Extension for Existing


Laboratory Building at Arthur C Clarke Institute for
Modern Technologies, Katubedda, Moratuwa
20.1

29.2(a)

34.1

The deadline for submission of bids shall be at 14.00 hrs


on 06th December 2011

DEADLINE FOR
SUBMISSION OF
BIDS

Delete
..but
competitively.

EVALUATION
AND
COMPARISON
OF BIDS

including

Dayworks

where

priced

The amount of performance Security is five (5%)percent


of the Initial Contract Price
Performance security shall be issued by an
agency acceptable to Employer using the
form for Performance security
(unconditional guarantee) included in
section 02 Standard Forms and it shall be
in favour of Director of Arthur C Clarke
Institute for Modern Technologies

PERFORMANCE
SECURITY

The agencies acceptable to Employer are:


a commercial bank operating in Sri Lanka
approved by the Central Bank of Sri Lanka; or
a bank based in another country but the guarantee
confirmed by a bank operating in Sri Lanka
approved by the Central Bank of Sri Lanka
Construction Guarantee Fund
35.1

Add

ADVANCE
PAYMENT AND
SECURITY

Advance payment security shall be issued by an


agency acceptable to Employer using the form
for Advance Payment security (unconditional
guarantee) included in section 02 Standard Forms
and it should be valid for 28 Days beyond the
Intended Completion Date and shall be in favour
of Director General of Buildings.

S05-7

Section 5 Bidding Data and Contract Data


________________________________________________________________________________________________________________

The agencies acceptable to Employer are:


a commercial bank operating in Sri Lanka
approved by the Central Bank of Sri Lanka ;

36.0

a bank based in another country but the guarantee


confirmed by a bank operating in Sri Lanka
approved by the Central Bank of Sri Lanka;
Construction Guarantee Fund.

The Adjudicator shall be appointed by Employer and


Contractor with mutual consent of both parties
Person appointed as the Adjudicator shall not be
associated with the project directly and he should be
in his position to demonstrate impartiality and
independence in his functions.
Fees and types of reimbursable expenses to be paid
to the Adjudicator shall be on a case to case basis
and shall be shared by the contractor and the
Employer.

S05-8

ADJUDICATOR

Section 5 Bidding Data and Contract Data


________________________________________________________________________________________________________________

Contract Data
(Please note that the clause nos. given hereunder are that of Conditions of Contract)

A. GENERAL
Clause No. The Employer is
1.1
Name: Director & CEO
Address: Arthur C Clarke Institute for Modern
Technologies
272, Bandaranayake Mawatha,
Katubedda, Moratuwa

DEFINITIONS

The Engineer is
Name: Director General of Buildings
Address: Department of Buildings,
2nd Floor, Sethsiripaya,
Battaramulla.
The Engineers representative is
Name: Chief Engineer (Colombo Construction)
Address: Chief Engineers Office,
Department of Buildings
213, Torrington Avenue,
Colombo -07.
The Works consists of Construction of Reinforced Cement
Concrete (R.C.C.) framed four storied Building with one part
rises up to five storied, with services such as water supply &
sewerage disposal system, electricity, storm water drainage
system, landscaping, fire fighting and lightning arresters.
The Site is located at 272, Bandaranayake Mawatha,
Katubedda, Moratuwa.
The Start Date shall be within 14 Days from the date of the
Letter of Acceptance.
The following document also shall be a part of Contract.
(i)VAT Form

INTERPRETATION

8.1

Schedule of other contractors: None

9.1

Schedule of Key Personnel:

OTHER
CONTRACTORS
PERSONNEL

2.3(10)

Category
Chartered
Civil
Engineer
Engineer

Technical
Officer

Required Qualification and Working


arrangement
Chartered BSc (Civil) Engineer, over

10 years post charter experience


(in Building Construction) Visiting
10 hours per week
B.Sc. (Civil) Engineering over 03
years
experience
in
building
construction - Full time.
NDT (Civil) or equivalent over 07
years
experience
in
building
construction -- Full time

S05-9

Amount to be
recovered
Rs.3000/- per
hour

Rs. 50,000/per month


Rs.30,000/per month

Section 5 Bidding Data and Contract Data


________________________________________________________________________________________________________________

Add
Attendance, certified by the Engineers Representative
shall be attached to interim claims. If the Contractor fails
to employ such personnel, the amounts mentioned in the
above table in respect to each personnel shall be deducted
from payments due to the contractor and further action
shall be taken to terminate the Contract after deducting the
fine for 07 days.
17.1

The Intended Completion Date for the whole of works shall


be two hundred and seventy three (273) Days from the
Start Date.

INTENDED
COMPLETION
DATE

21.1

The Site Possession Date shall be within 14Days from the


date of the Letter of Acceptance.

POSSESSION OF
THE SITE

24.1

Add
The Adjudicator shall be appointed by Employer and the
Contractor with mutual consent of both parties.

DISPUTE
RESOLUTION

27.1

The Contractor shall submit a Programme for the Works


within 14 Days of delivery of the Letter of Acceptance

27.3

The period between Program update is 02Months.

27.4

The amount to be withheld for late submission of a program


is two percent (2%) of the Contract Price.

PROGRAMME

Action shall be taken to terminate the contract after


withholding the said fine for 14 days.
35.1

The Defects Liability Period is 365 Days.

CORRECTION OF
DEFECTS

39.2

Engineer should obtain prior approval from the Employer for


any variation order.

VARIATIONS

40.2

Add at the end of the sub clause

PAYMENTS OF
VARIATIONS

Engineer should obtain prior approval from the


Employer for any variation order.
In fixing the appropriate new rates, mark up for
overheads and profits shall be limited to maximum of
16.0% of the Basic Cost of such items. The Basic
Cost means cost of materials, labour and equipment.
In fixing such Basic Cost, the Engineer shall use
the rates for labour, which are used in preparing the
Building Schedule of Rates and
prices for
Materials and Equipment shall be used the prevailing
market prices.

S05-10

Section 5 Bidding Data and Contract Data


________________________________________________________________________________________________________________

Building Schedule of Rates means the Schedule of


Rates per unit of work item. The said rates are
determined by the employer for the year in which the
services are requested.

The following events shall also be Compensation Events:


None

COMPENSATION
EVENTS

46.1

Not Applicable

CURRENCIES

47.1

The Contract Price is subjected to price adjustment


Weightings of inputs

PRICE
ADJUSTMENT

44.1m

Indices No

M4
M7
M8
M9
M12
M13
M26
M32
M36
M38
L1
L3
P1

Input Name

Input Percentage
(%)

Cement
Metal (3/4")
Sand
Brick
Lime
R/f steel
Electrical wiring
Floor tile
Aluminium work
Electrical fittings
Skilled labour
Unskilled labour
Small equipment

9.78
2.68
3.07
4.86
1.28
21.55
1.47
4.49
12.38
3.68
12.94
10.81
1.00

Total

48.1

90.00

Non adjustable element shall be:


BOQ Item Numbers: 1-6, 8-12, 15, 16, 26,27, 31, 32, 38, 39,
3T1, 3T2 1B21
The retention from each payment shall be ten (10%)
percent of the certified work done.
The limit of retention shall be five (5%) percent of the
Initial Contract Price.

S05-11

RETENTION

Section 5 Bidding Data and Contract Data


________________________________________________________________________________________________________________

49.1

The liquidated damages for the whole of the Works shall be


Rs.57,000.00 per Day.

LIQUIDATED
DAMAGES

The maximum amount of liquidated damages for the whole


of the Works shall be five (5%) percent of the Initial
Contract Price.
51.1

Add
Advance Security shall be issued by an agency
acceptable to Employer using the form for Advance
security (unconditional guarantee) included in
Section 02 Standard Form and it should be valid
until a date 28 Days beyond the intended completion
date and shall be in favour of Director & CEO,
Arthur C Clarke Institute for Modern Technologies.

ADVANCE
PAYMENT

The agencies acceptable to Employer are:

52.1

a commercial bank operating in Sri Lanka approved


by the Central Bank of Sri Lanka ; or
a bank based in another country but the guarantee
confirmed by a bank operating in Sri Lanka
approved by the Central Bank of Sri Lanka; or,
Construction Guarantee Fund.

Amount of Performance Security required is 5.00% of the


Initial Contract Price

SECURITIES

Performance security shall be issued by an agency


acceptable to Employer using the form for
Performance Security (unconditional guarantee)
included in Section 02 Standard Form and it shall be
in favour of Director & CEO, Arthur C Clarke
Institute for Modern Technologies.

The agencies acceptable to Employer are:


a commercial bank operating in Sri Lanka approved
by the Central Bank of Sri Lanka ; or
a bank based in another country but the guarantee
confirmed by a bank operating in Sri Lanka
approved by the Central Bank of Sri Lanka; or
Construction Guarantee Fund.
53.0

Deleted

DAYWORKS
SCHEDULE

58.1

Schedule of operation and maintenance manuals: None.


As Built Drawings: Contractor shall supply the same within
14 days from the issue of the practical completion
certificate.

OPERATION AND
MAINTENANCE
MANUALS

58.2

The amount to be withheld for non submission of As Built


Drawings is two (2%) percentage of the contract price.

S05-12

Section 5 Bidding Data and Contract Data


________________________________________________________________________________________________________________

59.2

Add
(a). The Contractor does not employ the required Key
Personal as stated in the Clause 9.1 of the Contract data,
within 07 days after informing him to employ the Personals.

TERMINATION

(b). The Contractor delays the submission of updated


Programme by more than 14 days from the schedule date as
stated in the Clause 27.3 in the Contract data.
60.1

The percentage to apply to the value of the work not


completed, representing the Employers additional cost for
completing the Works, is twenty five (25%) percentage of
value of the Balance work.

PAYMENT UPON
TERMINATION

63.7

The attendance fee payable to the Contractor on nominated


Sub-contractors work shall not exceed eight (08%)
percentage.

ATTENDANCE FEE

S05-13

Section 6 Specifications
_______________________________________________________________________________________________________________

SECTION 6
SPECIFICATIONS

S06-1

Section 6 Specifications
_______________________________________________________________________________________________________________

GENERAL SPECIFICATIONS
01 Specifications for Building Works Volume I
ICTAD Publication No. SCA/4/I
3rd Edition (Revised) July 2004
02 Specifications for Building Works Volume II
ICTAD Publication No. SCA/4/II Sanitary Installations
2nd Edition (Revised) October 2001
03 Specifications for Water Supply Sewerage and Storm Water Drainage Works
ICTAD Publication No. SCA/3/2
2nd Edition (Revised) April 2002
04 Specifications for Electrical and Mechanical Works
Associated with Building and Civil Engineering
ICTAD Publication No. SCA/8
2nd Edition (Revised) August 2000

Copies of above publications shall be purchased from the Institute for Construction, Training and
Development (ICTAD), "Sawsiripaya", 123, WijeramaMawatha, Colombo 07.

S06-2

B.O.Q. No.2011-10-004

Proposed Extension for Existing Laboratory Building


at Arthur C. Clarke Institute for Modern
Technologies(ACCIMT), Katubedda, Moratuwa

BILL OF QUANTITIES

S07 - 1

BOQ NO 2011-10-004

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

CONTENTS
Page No.
GENERAL NOTES

S07-3

PRICING PREAMBLES

S07-5

PRELIMINARIES

S07-22

BILL NO 1 - SUBSTRUCTURE
B - EXCAVATION AND EARTH WORK

S07-28

C - CONCRETE WORK

S07-32

D - MASONRY WORK

S07-36

E - WATER PROOFING

S07-37

COLLECTION - SUBSTRUCTURE -Bill No. 1

S07-38

BILL NO 2 - SUPERSTRUCTURE
C - CONCRETE WORK

S07-39

D - MASONRY WORK

S07-51

E - WATER PROOFING

S07-52

F- STRUCTURAL STEEL WORK

S07-54

G- METALWORK

S07-55

H- CARPENTRY & JOINERY

S07-70

J- ROOFING AND ROOF PLUMBING

S07-71

K- PLUMBING

S07-73

L- WALL, CEILING AND FLOOR FINISHES

S07-81

M- ELECTRICAL INSTALLATION

S07-88

N - PAINTING

S07- 98

COLLECTION - SUBSTRUCTURE -Bill No. 2

S07- 100

BILL NO 3 EXTERNAL WORK


P- EXTERNAL DRAINAGE

S07-101

Q- SEPTIC TANK

S07-103

R - INLET AND OUTLET CHAMBERS

S07-108

S - SOAKAGE PIT

S07-109

T - MISCELLENIOUS

S07-111

COLLECTION - EXTERNAL WORK -Bill No. 3

S07-112

GRAND SUMMARY

S07-113
S07 - 2

BOQ NO. 2011-10-004

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

GENERAL NOTES
Timber :
Unless otherwise specified in the respective Trades / Sections , the timber for all trades shall be
as specified in Carpentry and Joinery.
All timbers under exceptional Circumstances, any equivalent timber to the given Species may be
used with the approval of the Engineer.

(Group-1): Door, Window and Fanlight Frames


Category A

Satin
Halmilla
Kohomba

Category B

Grandis

Palu
Mee

Milla
Hulanhik

Ketakala
Wewarana

Tulang
Valdel.

(Group-2): Door , Window and Fanlight Sashes , Cupboards,


Counters and Shelving
Category A

Satin
Kohomba

Category B

Ginisapu

Tulan
Wewarana

Halmilla
Hulanhik

Milla
Valdel.

Palu
Micro

Mahogany
Sooriya mara

(Group-3): Roof Framework


Category A

Category B

Madan
Mee
Domba

Wewarana
Kolon

Tulang
Etathimbiri

Grandis

(Group-4): Ceiling Framework and Partitions


Category A

Satin
Halmilla
Kohomba

Palu
Mee
Etathimbiri

Category B

Domba

Grandis

Milla
Hulanhik

Ketakala
Wewarana

Tulang
Valdel.

Carried Forward

S07 - 3

BOQ NO. 2011-10-004

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

Brought forward

(Group-5): Valance Board and Valley Boarding


Category A

Kolon
Mahogany

Category B

Ginisapu

Tulang
Satin

Val Del
Hulanhik

Mahogany

Lunumidella

Kohomba
Wewarana

Sooriya mara

(Group-6): Beadings :
Alstonia

(Group-7): Special Timber


Jak

Teak

Trade Names ;
Where trade names , brands and / or catalogue numbers are referred to sole preference to any
material or equipment is not intended . Any other material or equipment may be used, provided
that the characteristics of type, quality, appearance, finish, method of construction and / or
performance is not less than specified and provided also that approval is first obtained.
Method of Measurement
This Bill of Quantities has been prepared generally in accordance with the principles of "Method
of Measurement of Building Works(First Revision) , Sri Lanka Standard 573:1999"
Measurements :
Tenderers are to note that the measurements are taken absolutely net, unless otherwise stated
and they must , therefore, allow in their prices for all straight cutting and waste, laps, etc.
throughout even though not specifically mentioned.

S07 - 4

BOQ NO. 2011-10-004

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

PRICING PREAMBLES
1. GENERAL
a.

The Bidder shall read and be conversant with the full description of workmanship and
materials as described in the Particular Specification and ICTAD Specification for the
respective items of work/ trades prior to the preparation of the Bid.

b.

The Bidder shall refer to the relevant Clauses of Pricing Preamble when pricing composite
item of works.

c.

The rate for each item must be comprehensive and must include for complying in all respects
with the requirements of the aforesaid specifications, these Pricing Preambles, cover all the
obligations under the Contract, and all matters and things necessary for the proper
construction, completion and maintenance of the Works. No claim for additional payment
shall be allowed for any error or misunderstanding by the Contractor of the work involved.

d.

The rate for each item shall also include for all the following i. Labour and all connected costs ;
ii. Materials and goods including all connected costs;
iii. Preparatory works and setting out of particular item ;

iv. Complying with regulations of the Municipal Council and/or any other relevant authority under
which particular item of work is to be executed unless otherwise included in the Preliminaries
;
v. Fitting and fixing materials and goods in position, including hoisting to any height or lowering
to any depth and all temporary works, equipment and small tools ;
vi. Plant and equipment unless otherwise included in Preliminaries ;
vii. Handling of materials and working in situation where there is very restricted working space or
no working space ;
viii. Square cutting and Waste of materials ;
ix. Forming of ends, angles, miters and junctions between straight and raking or curved work;
x. Protecting and cleaning ;
xi. All other incidental works and necessary works which are not described in the B.O.Q. but
described in the aforesaid specifications and or shown in the drawings for the proper
completion of the relevant item of work ;
xii. Establishment charges and overheads( not included in preliminaries or anywhere in the Bill Of
Quantities), and profits.
Carried Forward
S07 - 5

BOQ NO. 2011-10-004

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

Brought forward

e.

In addition to above, the rates for items of work in Substructure shall include for the works at
depths extending below ground water table where applicable including excavation under
water, removal and disposal of mud and sand and preparation of place to a condition suitable
for proper execution of the works.

f.

Spaces required for the construction of buildings to be used as workshops and stores for
perishable materials, workers rest room, canteen, accommodation are not available within the
site premises. Bidders are advised to inspect the site and suburbs area before preparation of
bids (Refer page S07-23, Item 9)
2. EXCAVATION AND EARTHWORK
a.

All works under this section are measured net and no working space is allowed.

b.

The Contractor shall be responsible for the design and execution of the excavation method
which is subject to scrutiny by the Engineer. However, scrutiny by the Engineer shall not in
any way relieve the contractor of his responsibilities and duty of care.

c.

Existing ground levels shown in the Drawings have been taken at the surface of the ground,
with no particular differentiation to indicate buried foundations, pavings etc.

d.

The Contractor shall note that the rate for compacted earth fill and granular fill, stone, gravel
and sand beds shall include for imported materials or materials from borrow areas.

e.

Dewatering has been measured under Bill No. 1(Substructure)

f.

Rates for Excavation & Earthwork shall include for i. Accepting site as found and preparing to condition suitable for proper execution of the Works
ii. Excavating by whatever means are necessary including excavation done manually or by
machine in any type of ground including ground with boulders (except rock) and excavation
around existing RCC. bored piles and jet grout piles ;
iii. Trimming sides, keeping clean and consolidating bottom of basement, sumps, pits
and trenches ;

iv. Backfilling and disposal of surplus excavated materials as specified and directed ;
v. Any necessary additional works required due to
a. Working space required by the Contractor ;
b. Earthworks supports ;
c. Formwork ;
vi. Any additional trimming or appropriate back- filling to provide specified or approved
formations and profiles necessitated by the uneven excavation of the earth, unless otherwise
measured separately ;
g. Rates for compacted earth fill, granular fill and gravel and sand beds shall include for
finishing sub-grade to slopes and falls, depositing in layers, leveling, blinding, and machine or
hand-packing to form vertical or battered or level faces, and for forming sinking where
required under floor slabs or sub-floor layers.
h.

Rates for approved damp-proof membrane shall include for laps, and straight, raking and
circular cutting, and for notching around all obstructions.
S07 - 6

BOQ NO. 2011-10-004

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

3. CONCRETE WORK
a.

Rates for concrete work shall include for i. Mixing as per specification, depositing, handling, hoisting and placing at any height or depth ;

ii. In case of readymix concrete, transporting, admixtures, handling, pumping/hoisting and


placing at any height or depth ;
iii. Packing and tamping around reinforcement, including vibrating ;
iv. Contractor's designed kickers, construction joints and sealants ;
v. Finishing to slopes and falls, and preparing surface ready for screeds or paving, where
necessary, including cutting to sizes and temporary supports to form necessary grooves ;

vi. Curing ;
vii. Preparation of ground surface, grading to slope and falls, if any, and machine or hand
packing to form vertical or battered or level surface and all necessary formwork to edges of
blinding concrete in case of pile caps ground slab/ramps/beams.

FORMWORK
a.

Formwork for similar concrete members are measured together irrespective of the height or
depth and the shape or form.

b.

Extra-over rate for a particular type of high quality formwork should be applied only for the
areas of formwork which requires such high quality type formwork as specified.

c.

Formwork shall be properly designed and strictly as described in the specifications for the
particular type of concrete surface finish and it should be sufficiently strong and grout tight.

d.

Faces of Jet grouting piles, masonry and concrete work which will be formed or used as
formwork shall not be measured as formwork and no payment shall be made for same.

e.

Rate for formwork shall include for i. Fabricating setting up and erection at any height or depth ;

ii. Strutting, supporting through lower floors and supporting at any level, including additional
propping, strutting and supporting decks ;
iii. Coating with shuttering oil and or lining ;
iv. Easing, striking and removing ;
Carried Forward
S07 - 7

BOQ NO. 2011-10-004

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

Brought forward

v. Cleaning, preparing for reuse ;


vi. Removal when no longer required ;
vii. Props, stays, struts, wedges, bolts, incidental items and materials such as nails, screws
anchors hooks etc ;
viii. All overlaps and passing at angles ;
ix. Labour at intersections and narrow widths ;
x. Rubbing down and making concrete surface good after removal of formwork ;
xi. All fillets, to form grooves, rebates and throats, splays or chamfers, raking and circular
cutting, and cutting around all pipes, sleeves, conduits, ducting, metal sections and fittings;
xii. Providing samples as required by the Engineer of the different formed finishes specified.

REINFORCEMENT
a. i. Standard length of reinforcing bar for the purpose of measurement shall be 6.0 m.
ii. Payment for bar reinforcement shall be to be nearest Kilogram.
b.

Rates for reinforcement shall include for i. Rolling margin ;


ii. Preparation of bar bending schedules ;
iii. Straightening as required and cleaning of bars ;
iv. Cutting, bending and binding ;
v. Hoisting and placing in position at any height or depth ;
vi. Binding wires, and cover blocks.
vii. Necessary spacers. (inevitable laps & chairs paid separately)

viii. Aligning and supporting in position during concreting.

S07 - 8

BOQ NO. 2011-10-004

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

PRECAST CONCRETE WORKS


a.

Rates for precast concrete works shall include for i. Moulds and for formwork with the required finish to all exposed surfaces in accordance with
the specifications, hacking surfaces to form key for rendering etc, and hoisting to any height
or depth including providing any lifting holes or other devices to the approval of the Engineer,
building in, including bedding and jointing in mortar as required, and any necessary strutting
and supporting.
ii. The requirements of the Pricing Preamble clauses which refer to Concrete Work,
Reinforcement and Formwork.
iii. Loading, transporting to Site, unloading, handling and stacking.

iv. Hoisting and fixing in position at any height or depth.


4. MASONRY WORK
a.

In the calculation of the volumes of brick wall which are not multiples of the size of standard
bricks, the thickness of such walls shall be taken as the thickness of full bricks from which
they can be cut. The same principle of calculation of volume shall be used for all brickwork of
which the cross-sectional dimensions are not multiple of brick sizes.

b.

Rates for brickwork/Block work shall include for i. Plumbing, angles, straight cutting, forming rebates, reveals and raking out joints for
plastering;
ii. Splay cutting, rough cutting, fair cutting, forming chases or grooves for slabs, partitions,
staircases, roofs and the like, bonding ends of walls, building in or cutting and pinning in and
making goods on lintels, timber and steel works ;
iii. Building at any level or height of slabs or beams, additional labour in kerbs, isolated and
attached piers, all cutting, bonding at angles and intersections, building into or against
adjacent work, wedging and pinning up to soffits;

iv. Supplying and fixing metal clamps, Galvanized, steel boundary ties, and brick reinforcement
etc;
v. Necessary cutting required in walls which are not multiples of brick size ;
vi. Preparing existing walls for raising and pinning new brickwork ;
vii. Bonding new walls to concrete faces and old walls where necessary, and materials to be
used for such bonding.

Carried Forward
S07 - 9

BOQ NO. 2011-10-004

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

Brought forward

c.

Rates for Damp Proof Course shall include for i. Necessary leveling screed and trimming top of rubble/block/brick plinth wall ;
ii. Fair edges, rounded edges, drips and arises, angle fillets ;
iii. Turning nibs of asphalt into grooves ;
iv. Cutting to line and jointing new to old asphalt.

d.

Rates for Rubble Masonry shall include for i. All joggles, cramps, dowels, ties, templates ;
ii. Plumbing, angles, fair returns, setting, jointing, eaves filling, pointing and fixing in position,
hoisting to any given height or depth ;
iii. Bonding ends of walls, rough cutting and fair cutting ;

iv. Leveling up in walling for Damp Proof Courses, sills, thresholds, string courses, copings and
the like ;
v. Forming straight vertical joints next to dressings, panels, brickwork etc ;
vi. Forming openings and dressed margins ;
vii. Forming chases, throats, rebates, margin flutes, sinking, chamfered and rounded edges, and
all labour connected therewith.

5. WATER PROOFING
a.

Rates for Water Proofing shall include for ;


i. For necessary leveling and trimming top of rubble/block/brick plinth wall ;
ii. Fair edges, rounded edges, drips and arises, angle fillets ;
iii. Forming internal and external angles, bonding bricks/blocks and the like ;

iv. Turning nibs of asphalt into grooves and asphalting around brackets ;
v. Cutting to line and jointing new to old asphalt ;
vi. Temporary screeds, ground and rules.

S07 - 10

BOQ NO. 2011-10-004

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

6. STRUCTURAL STEELWORK
a.

Rate shall include for :


All shop fabrication work, including cutting, drilling, bolting, riveting, welding, grinding,
delivering, unloading, hoisting, erecting and fixing.

7. METAL WORKS
a.

Type and quality of steel to be used for metal work shall be as per drawings and relevant
specification clause and or shall conform to latest British Standards.

b.

Contractor to prepare shop drawings for approval of the Engineer.

c.

Rates for Metal Work shall include for anchors, screws, dissimilar metals and providing
thermal movement and the preamble clauses for Structural Steel Work where relevant and
they shall apply equally to relevant items of this section.

d.

Fabrication & fixing of Aluminum components shall be carried out by experienced tradesman.
The Contractor shall furnish particulars of Aluminum fabricator through the engineer for his
approval.
The Contractor will be required to furnish a guarantee on material and workmanship for a
period of 8 years from the date of handing over of Works in the form required by the
employer, binding the Aluminum manufacturer and the Contractor jointly and severally

e.

Rate for Aluminum doors, windows & partitions shall include for
i. Glass and glazing
ii. All necessary ironmongery
iii. Furnishing shop drawings (materials & workmenship should be accordance with the
specifications given under the aluminium works)

iv. Furnishing guarantee's as required by the employer


v. Sampling and submission of test reports to the engineer as directed

S07 - 11

BOQ NO. 2011-10-004

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

8. ROOF COVERING AND ROOF PLUMBING


a.

Rates for roof covering and roof plumbing shall include for :
i. Hoisting, placing and fixing in position ;
ii. Straight cutting, raking cutting, circular cutting, notching, and working around obstructions
and waste ;
iii. Nails, screws and the like ;

iv. Drilling and making holes or opening and the like;


b.

Rates for flashings shall include for the following in addition to the requirement of "a" above -

i. Bending and cutting to required shape and forming roll edges ;


ii. Angles, edges and ends ;
iii. Notching over roofing ribs or dressing into roof cover/concrete as the case may be ;
iv. Forming and dressing into or around walls at obstructions and the like ;
v. Stepping up ;
vi. Sealing with sealant materials.

S07 - 12

BOQ NO. 2011-10-004

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

9. CARPENTRY(Roof and ceiling frame)


a.

Sizes of all timber given are finished sizes.

b.

All timber shall be well seasoned and treated against insect and termite attack before
fixing in position

c.

Rates for carpentry shall include for i. Any type of cutting required, sawing, notching, drilling, trimming, framing, jointing, splayed
edges and the like, hoisting and fixing in position with nails, spikes, plugs, screws, and gluing
and priming to joints and ends ;
ii. Forming splayed edge, grooves, chamfers, scribed and rounded edge, beveling, molding and
the like ;
iii. Plugging, wedging, nuts and washers with bolts, sprockets and pins and the like ;
iv. Nogging or solid bridging, cut between studs or joints for structural timber.
v. Rebating, singings, grooving, mortising ;
vi. Additional timber lengths required for carpentry jointing ;

vii. Protection and keeping clean for staining, polishing or painting where applicable ;
d.

Rates for roof decking shall include for machine sanding, protecting and preparing in addition
to the requirements c above.

e.

Rates for walls and ceiling lining shall include for jointing and fixing to walls/ ceiling/ eaves
etc. all cover and joint strips, in addition to the requirements c above.

f.

Rates for timber paneling/wall lining shall include for cover moldings, sills, stiles and head
moldings to openings as relevant.

S07 - 13

BOQ NO. 2011-10-004

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

10. JOINERY
a.

Sizes of all timber given are finished sizes.

b.

All timber shall be well seasoned and treated against insect and termite attack before fixing.

c.

Timber used for joinery works shall be well seasoned well treated and in one species of
special class timber recommended for the particular class of Joinery works as specified in the
Specification.

d.

Rates for Joinery shall include for i. Any type of cutting required, sawing, notching, drilling, trimming, planning, forming and
jointing and the like, fixing in position complete with nails, spikes, plugs, screws and gluing
and priming to joints and ends ;
ii. Forming splayed and tongued edges, rebates mortises, grooves, chamfers, scribed and
rounded edges, beveling, moulding, margin and the like and rounded corners, sinkings ;

iii. Working to stated sizes, for all short lengths making mitres, joints and ends ;
iv. Necessary bolts, dowels metal clips, anchors, grips and fixing joinery ;
v. Gluing, dowelling, plugging, wedging pining and the like ;
vi. Punching heads and filling with approved filler if nails or pins are used for fixing ;
vii. Countersinking and filling heads with approved filler, if brass screws are used for fixing ;

viii. Painting rebates of frames before fixing glass ;


ix. Bedding in cement mortar filling and hanging to frame lining ;
x. Keeping clean for staining, polishing or painting;
xi. Painting, Laquering or Varnishing as specified.

e.

Preambles for Glazing section and a, b and c under Painting and Decorating section shall
equally apply to Joinery works.

f.

Ironmongery
i. All cutting, fitting, sinking, boring, mortising ;
ii. Matching screws for ironmongery
iii. Removing during decoration, refixing after decoration, leaving oil and in proper working order
on completion and supplying and labeling all keys and handing over to Employer.
S07 - 14

BOQ NO. 2011-10-004

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

11. WALL,FLOOR AND CEILING FINISHES


i. All works under this trade shall be measured in m2 after deduction for voids, openings, doors
and windows

a.

ii. All other small quantities/panels/narrow widths/ arises/ reveals/ angles/ ends/short lengths
including those of tiling work on door and window jambs and reveals are measured together
with the respective tiling item and labour in such work shall be included in the rate for the
main finishing item and they shall not be measured/paid separately.

b.

Rates for wall, floor, ceiling finishings and wall floor screed and bedding shall include for -

i. All temporary rules, screeds, templates and supports, curing and cleaning off on completion
and exact thickness required to finish ;
ii. Caulked joints and making good and cutting around bolts, pipes conduits, sleeves, ducting,
fittings, sections, obstructions and the like ;
iii. Tamping and compacting ;
iii. Raking out joints of new brickwork/Block work or hacking concrete to form key, including
brushing, cleaning off and dampening ;
iv. Forming internal and external angles and arises ;
v. Any extra thickness required to finish to true levels ;
vi. Any additional dubbing out required to plastered surfaces of brickwork and to the finished
surface of concrete to obtain the requisite standard of finish ;
vii. Samples to be submitted for the approval of the Engineer.

c.

Rates for tile slab or block finishing to floor and wall shall also include for the following in
addition to the above i. Straight raking and circular cutting ;
ii. Dubbing out or packing to concrete surface to correct deviations within specified tolerance ;

iii. Laying or finishing to falls or cross falls ;


iv. Expansion joints at perimeter and between bays where required in case of floor tile paving;

v. Sand blasting, cleaning, waxing and appropriate floor finishings.

Carried Forward
S07 - 15

BOQ NO. 2011-10-004

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

Brought forward

d.

Rates for ceiling lining shall include for the following


i. Working to sides and soffits of attached or isolated beams and soffit of staircases where
relevant;
ii. Additional forming required for lighting and air-conditioning grills ;
iii. Straight, raking and circular cutting ;

iv. Neoprene sealing for air tightness around hatches if any ;


v. Matching edges where cutting occurs and for filling the heads of fixings with approved filler
where relevant ;
vi. Painted mild steel hanging rods.

12. GLAZING
a. i. Type of Glazing shall be as specified.
ii. Thickness of glazing shall be as per the design of the approved specialist contractor who will
be engaged by the Contractor. However, the minimum thickness shall be 6mm.
b.

Rates for Glazing shall include for i. Glazing, fixing, bedding priming and panel pins and other materials and labour for same and
cutting to size ;
ii. Templates, straight cutting, circular cutting, grinding edges or special type of edges required
and sand blasting ;
iii. Glazing beads, washlether or neoprene strip, glazing sealant, weather stripping, caulking joint
silicone joint ;

iv. Replacing cracked or broken glass ;


v. Making holes where necessary ;
vi. Samples to be submitted for the approval of the Engineer.

S07 - 16

BOQ NO. 2011-10-004

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

13. PAINTING AND DECORATING


Note
Colour and the quality of all paint and other painting materials shall be approved by the
Engineer prior to use.
a.

Rates for painting shall include for i. Preparation of surfaces, cleaning down, smoothing, etc ;
ii.

Submission of samples for the approval of the Engineer ;

iii.

Protection of floors, walls and fittings etc ;

iv. Working to returns, painting in any colour, multi- colour works, cutting into line at junctions of
different colours at angles or plain surfaces, painting in small quantities ;
v.

Cleaning down upon completion

b.

Rates for work to isolated general surfaces shall include for working on door frames, linings,
window subframes (where of a differing material to the window), skirting, rails, architrave's,
bars, posts, balusters and the like.

c.

Rates for work to glazed general surfaces, glazed windows and the like (measured both
sides, flat over glass, irrespective of size and panes) shall include for work to edges and
glazing rebates, returns and moldings of frames, mullions, transoms, architaves and the like.

d.

Rates for work to pipes and conduits (which shall include trunking, ducting and the like) shall
include for all work on hangers, supports, brackets and the like.

S07 - 17

BOQ NO. 2011-10-004

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

14. PLUMBING
a.

The rates for Plumbing shall include for :


i. Refer specifications for full description of materials and workmanship.
ii. Screws, nails, sockets, connectors, backnuts, nipples, and standard pipe fixing or supporting
clips, saddles, brackets straps, screws, nails, solder rivets connectors, flanges pipe sleeves,
brackets, made bend holder bats and the like.
iii. Short lengths, joints connections and couplers in running length.

iv. Sealing, fixing and support with holder bats or pipe clips cut and pinned built in wall or slabs.

v. Plugging screwing to walls or ceiling


vi. All laps, straight cutting and waste
vii. The fittings including bends, tees, collars, reducers elbows, valve sockets, junctions, caps
and the like for pipe less than or equal 50mm dia pipe.
viii. Jointing compound, solvent cement and incidental materials and labour.
ix. Connecting pipes to sanitary fixtures and appliances.
x. Standard and special pipe fixing arrangement where necessary fittings, supporting
clips,saddles,brackets, holder bats straps etc.
xi. All builders works such as chasing and forming holes through brick work/ blockwork/
foundations and concrete slabs beams columns floor slabs manholes and like and making
good all damages.
xii. Testing and disaffection after completion.
b.

Rates for sanitary fittings shall include for


i. Fittings such as taps, waste water outlet, flushing cistern, internal overflows and the like and
supporting brackets, incidental materials for fixing.
ii. Assembling, jointing together, fixing components parts and jointing to pipes including
necessary coupling and for leaving perfectly clean undamaged and in perfect working order
as on completion.

S07 - 18

Carried Forward

BOQ NO. 2011-10-004

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

Brought forward

c.

Jointing and or connecting pipes to sanitary fittings.


Any special water supply and drainage fittings such as bends, tees, reducers etc. unless
otherwise specified separately in the Bill of Quantities, shall be deemed to have been
included in the relevant items and such items should accordingly be rated to include for such
specials etc. and for any extra work involved and the satisfactory completion of such items.

Where pipes pass through walls or slabs these shall be wrapped with a layer of inert
materials. For pipes exceeding 50 mm dia sleeve pipes shall be used for the full thickness of
slabs, walls or beams through which the pipes pass.

DRAINAGE WORK
a.

The provisions and the clauses of precedence trades shall equally apply to relevant item of
this trade.

b.

The rates for trench excavation for pipes shall include for depending and widening the trench
as necessary to enable the barrels of pipes of rest on firm and to facilitate jointing.

c.

The rates for rock excavation in trench excavations shall include for importing selected
materials to replace any excavated rock which is unsuitable for back filling and for all
additional rock excavation and appropriate filling beyond the maximum measurable in
accordance with the specification.

d.

The rates for concrete beds and surrounds to pipes shall include for flexible joints and any
necessary formwork where required by the specification.

S07 - 19

BOQ NO. 2011-10-004

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

15. ELECTRICAL INSTALLATIONS


a.

The execution of Electrical Installation shall every respect comply with the current
Regulations of the Institute of Electrical Engineers, London, requirements of Ceylon
Electricity Board and the area Authority.

b.

The rates for equipment and control area, distribution boards, meters, switches, fuses, etc.
shall include for connecting up, fixings and supports for the complete installation and for
suitable mounting boards, frames, supports, housings and cabinets where required.

c.

The rates for cables, tape, bus-bar trunking etc. (except where included in sub circuits or
electrical points) and the like shall include for joints in the running length, all allowances for
sagging snaking, for drawings through conduits, laying in trunking of surface fixing where
retired with cable supports, clears, hangers, channels, insulators and the like.

d.

i. The rates for cables and the like laid in benches shall include for drawing through conduits or
ducts where required.
ii. The rates for cable terminations shall include for all connections point boxes, insulating and
jointing materials, cable terminations glands, lock nuts, bushes and the like.

e.

i. The rates for conduits trunking cable tray etc. (except where included in sub circuits of
electrical points) and the like shall include for all short lengths, joints and couplers in the
running length, and for all fixings and supports with approved saddles, crumpets, clips and
the like cut and pinned, built-in or plugged and screwed to walls or ceilings including
chasing brick work, block work, concrete slab beams walls columns and the like and make
good.
ii. The rates for conduits and the like shall include for all bends, tees, socket and the like,
cutting, screwing, threading, jointing and providing all conduit boxes, junction boxes and the
like.

f.

The rates for the installation of sub main circuits, lighting points switched points, socket
outlets, fused spur outlets, isolators, etc. (other than those applicable to the distribution
switch gear) shall include where applicable, for all conduit, trunking, cable tray, cabling,
terminations, fixings and connections from the distribution
switched gear to and including the point (accessories measured separately) and shall be
deemed to include for any item mentioned in the Electrical installation Specification but not
shown on the drawings and vice-versa.

g.

The rates for lighting fittings, fittings such as ceiling fans and extract fans, and for appliances
such as air- conditioning units shall include for assembly, fixing and connection from the spur
outlet or isolator to the fitting or appliance with all necessary additional wiring earthling and
outlet roses and leaving perfectly clean and undamaged on completion.

h.

The rates for fixing only fittings and appliances provided by the employer should include in
addition to the foregoing for accepting delivery, storing and handling the fittings and providing
any additional materials and internal wiring.

S07 - 20

Carried Forward

BOQ NO. 2011-10-004

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

Brought forward

j.

The rates for connections only to fittings and appliances such as pumps, water heaters, air
conditioning units and extract fans shall include for connection from the isolator or spur outlet
to the fitting or appliance (these being measured separately) , with all necessary additional
wiring, earthling and outlet roses.

k.

The rates for power outlets shall include for mounting boxes and frames.

l.

The rates for power switched with remote outlets shall include for the additional outlet plates
and boxes.

m.

The rates for switched socket outlets shall include for 1 No fused plug top and 4 No fuse
links.

n.

The preceding preambles shall apply equally to auxiliary installations such as TV


installations, telephone installations, and bell signal systems.

o.

Painting of timber work and metal work.

p.

If the items of electrical installation are measured as sub circuit point wiring or in electrical
points, the rates for such items shall include for :
i. The preceding clauses of this trade where relevant.
ii. Preparation of asbuilt drawings to be submitted to Employer at the handing
over/ practical completion.
iii. All items and accessories required for proper installation as per specification and
regulation up to load point and labour connected therewith.

iv. All wiring, conduiting and cables and labour connected therewith if not measured
separately.
v. Items specified in the specification but not shown in the drawings.
vi. Disconnecting and refixing of electrical fitting and appliances as required for the
convenience of other trades.
vii. Painting of timber work metal work executed under this trade.
q.

Rate to include submission of Megar Test report of the building Electrical Installation from
Charted Electrical Engineer

S07 - 21

BOQ NO. 2011-10-004

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

PRELIMINARIES
Note 1 :The Engineer/Consultant may modify or amended any item, or
delete inappropriate item/s or add new item/s, depending the nature of
the proposed work.
Note 2 :Mode of payment are as below
Mode Of Payment
Category
Reimbursement of actual cost on submission of the relevant
document acceptable to the Engineer plus 5% of the actual cost
A
of obtaining the Insurance Policies and Securities.
To be paid on signing of the formal Contract Agreement
B
60% on completion of temporary buildings or structures. 30% in
equal installments over the contract period and balance 10% on
C
dismantling and removal on completion.
Paid on satisfactorily completion of the item.
D
In equal installments over the contract period
E
Mode of payment to be mutually agreed between Contractor and
the Employer at the commencement of contract in relation to the
F
programme of work
On the completion of works
G
Note 3 : The above recommended percentages may be adjusted by the
Employer/ Consultant to suit the particular project.

Serial
No

Mode of
payment
category

Description

Unit

Amount

Insurance and Securities


1

Allow for providing a Performance Security.


A

Provisional
sum

30,000.00

Provisional
sum

120,000.00

Provisional
sum

70,000.00

(a ) Provisional sum for insurance against accidents


and injury to Contractor's personnel as per the
contract

Provisional
sum

30,000.00

( b )Provisional sum for Insurance cover for inquires


and damages to Engineer's personal

Provisional
sum

30,000.00

Allow for providing an Advanced Payment Security.

Provisional sum for insurance of Works, Machinery &


Equipment, Plant, Materials, third party persons &
property and Employer's personnel & property at site
as per the Contract.

Total Carried Forward


S07 - 22

280,000.00

BOQ NO. 2011-10-004

Serial
No

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

Mode of
payment
category

Description

Unit

Brought forward

Amount
280,000.00

Engineer's Facilities
5

Allow sum for constructing, maintaining dismantling


and removal on completion of the Works, a temporary
building for Engineer's requirements , including
necessary furniture and fittings, furnishing , sanitary
facilities and other facilities such as
( a ) Minimum size of the office space as per
Drg.No.2011-SD-044 ( Type-1 )
( b ) Furniture such as 3 No. tables & 6 No. chairs for
staff
( c ) 1 No. computer table with 1 No. chair
( d ) Allow sum for providing safety facility for the
Engineer and his staff during construction. ( Safety
helmets, Boots and other facilities )

Item

100,000.00

Allow sum for providing telephone and facsimile


facilities , electricity and water services for the
engineer's site office for their use in connection with
the Works

Item

30,000.00

Allow sum for maintenance, rental, consumption


charges etc. for telephone and facsimile facilities,
electricity and water services for the engineer's site
office for their use in connection with the Works

Item

100,000.00

Allow sum for constructing, maintaining dismantling


and removal on completion of the Works, a temporary
site office of adequate size including staff rest room
and toilets and other facilities for the contractor's site
management staff in accordance with the plans
prepared by the contractor and concurred by the
Engineer. Site office type -11 as per Drg. No. 2011SD-045

Item

90,000.00

Allow sum for constructing, maintaining off site and


dismantling and removal on completion of the Works,
buildings to be used as workshops and stores for
perishable materials. Buildings shall be constructed in
accordance with the drawings prepared by the
Contractor and concurred by the Engineer. The lump
sum shall also include for altering, modifying or
dismantling and re-erecting off site all temporary
buildings / structures if required.

Item

50,000.00

Contactor's facilities
8

Total Carried Forward


S07 - 23

650,000.00

BOQ NO. 2011-10-004

Serial
No

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

Mode of
payment
category

Description

Unit

Brought forward

10

Allow sum for constructing, maintaining dismantling


and removal on completion of the Works, temporary
buildings on site in accordance with the plans
prepared by the Contractor and concurred by the
Engineer accommodate the following:

Amount
650,000.00

Item

100,000.00

Allow sum for providing accommodation including


sanitary facilities and transport for Contractors staff
and workmen off site

Item

35,000.00

Allow sum for providing telephone and facsimile


facilities , electricity and water services for the
Contractor's site office for their use in connection with
the Works

Item

100,000.00

Allow sum for maintenance, rental, consumption


charges etc. for telephone and facsimile facilities,
electricity and water services for the Contractor's site
office for their use in connection with the Works

Item

100,000.00

Allow sum for Contractor's transport facilities at site


Construction management and supervision

Item

25,000.00

Allow sum for employing suitably qualified and


experienced technical personnel on full time basis for
Construction Management Services at the site

Item

720,000.00

Item

120,000.00

1. Toilet and wash areas


2. Sick / First-Aid room
Facilities to workmen shall conform to the latest public
health and industrial regulations
Note: No accomodation will be allowed inside the
premises
11

12

13

14

15

Category
Qualifications
Monthly
Engineer
B.Sc. Civil
50,000.00
(full time)
(5 Yrs.experience)
Technical Officer NDT Civil or
30,000.00
(full time)
equivalent
(5 Yrs.experience)
16

Allow sum for employing supervisory staff not listed


under item 15 above, on full time basis. Listed below
are the particulars of staff to be engaged
Category
Qualifications
Monthly salary
Chartered Engineer Charter (civil)
80,000.00
(visiting10hrs. Per week)
(10 Yrs. Exp.)
Total Carried Forward
S07 - 24

1,850,000.00

BOQ NO. 2011-10-004

Serial
No

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

Mode of
payment
category

Description

Unit

Brought forward

Amount
1,850,000.00

Setting Out
17

18

Allow sum for employing a licensed land surveyor to


define the building site work etc. , check levels and
carry out such other survey as may be necessary to
establish accurately the placing of forms and pouring
of concrete and all other setting out in both vertical
and horizontal plane

Item

35,000.00

Allow lump sum for setting out of Works in


accordance with drawings and other written
information given by the Engineer

Item

25,000.00

Item

35,000.00

Allow sum for all cost in connection with preparing


samples for Testing, of Materials, Goods etc. as
stipulated in the specification, obtaining test reports
and submitting the same to the Engineer

Item

30,000.00

Allow sum for provision of shop drawing ,bar


schedules etc. for Engineer's approval

Item

35,000.00

Allow sum for provision of 2 sets of (hard copies and


soft copies) as - built drawings of all services, for
Engineers approval

Item

35,000.00

Health Safety and Environment


Allow lump sum for engaging the service of an
adequately trained person to attend to first-aid
medical duties including a provision of a first aid box
and regular supply of medicine ,linen etc

Item

35,000.00

Quality ,Standards and Progress


19

20

21

22

23

24

Allow sum for provision of progress reports including


photographic records and other schedules include in
the ICTAD publication - Guidelines for Effective
Construction Management. (ICTAD/CM/01), relevant
to contract administration as directed by the Engineer

Allow lump sum for the following services throughout


the period of construction for the Engineer's office,
Constractor's site office and workers rest room and
other facilities

Total Carried Forward


S07 - 25

Deleted
E

Item

2,080,000.00

BOQ NO. 2011-10-004

Serial
No

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

Mode of
payment
category

Description

Unit

Brought forward

25

26

27

28

29

30

31

Amount
2,080,000.00

Allow sum for the following services throughout the


period of construction for the Engineer's office,
Contractor's site office and worker's rest room and
other facilities;
a. Employing workmen to clean and maintaining all
areas to be in good hygienic conditions including
toilets , wash areas , kitchen etc.

Item

30,000.00

b. Supplying adequate drinking water , water for


washing purposes, soap, detergent, etc. throughout
the period of construction

Item

25,000.00

Allow sum for providing all necessary safety


measures to workmen at site confirming to the latest
industrial safety regulations and as directed by the
Engineer

Item

60,000.00

Allow sum for making adequate provisions against air


and noise pollution of surrounding areas. Hoarding
and dust screens shall be provided to control dust
escaping to surrounding areas

Item

70,000.00

Allow sum for maintaining the site in a clean and


orderly manner at all times and during the entire
contract period

Item

70,000.00

Allow sum for demobilization , removal of all rubbish


& debris and clearing up site on completion , leaving
all in good order and handing over

Item

60,000.00

Security and Protection


Allow sum for employing an adequate number of
security personnel and security systems on full time
basis throughout the period of construction, and
providing for necessary security lighting and warning
system

Item

130,000.00

Allow sum for providing and maintaining necessary


fencing ,hoarding and gates for safe guarding the
Work , Materials and plant as directed by the
Engineer

Item

25,000.00

Total Carried Forward


S07 - 26

2,550,000.00

BOQ NO. 2011-10-004

Serial
No

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

Mode of
payment
category

Description

Unit

Brought forward

32

33

34

35

36

37

38

39

40

Amount
2,550,000.00

Allow sum for protection of public and private


services at site. The Contractor shall take due care to
protect, water supply and drainage systems,
telephone and overhead / buried electrical cables etc.
whose locations are identified make available to the
bidder at the time of bidding , unless earmarked for
demolition, during the execution of the Works. The
contractor is to make good any damage due to any
cause within this control at his own expenses or pay
any cost and charges in connection therewith
E

Item

50,000.00

Services and Facilities


Allow sum for supply of water for the Works and
paying all charges and other expenses in connection
with the supply from water mains or any other
alternative method of water supply , storage and
reticulation

Item

100,000.00

Allow sum for supplying temporary electricity for the


Works including connection, distribution system for
the works , internal arrangements and all payments to
the authorities for consumption

Item

70,000.00

Allow sum for providing hoisting equipment and other


plant for the use of the Works on site(dry hire)

Item

50,000.00

Allow sum for providing small machinery and


equipment for the use of the Works at site( Hammer
drill, Jack hammer, Compressor etc.)

Item

35,000.00

Allow sum for erecting and maintaining scaffolding


and/or self climbing platforms. Such scaffolding etc.
shall be removal on completion and all Works
disturbed shall be made good

Item

50,000.00

Miscellaneous
Allow sum for stamp duty in accordance with the
prevailing regulations of the Government

Item

60,000.00

Allow sum for providing and maintaining a name


board to the specifications and/or as directed by the
Engineer

Item

40,000.00

Allow sum for excavation for trial pits / trial trenches


as specified or as directed by the Engineer as for
locating services etc. and rein staining the ground and
making good disturbed work to the satisfaction of the
Engineer

Item

60,000.00

S07 - 27

Total

3,065,000.00

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION
BILL NO 1 - SUBSTRUCTURE

QTY

UNIT

RATE

Item

5,000.00

5,000.00

150,000.00

150,000.00

AMOUNT

B - EXCAVATION & EARTH WORK


Refer pricing Preambles
1.B.1

1.B.2

1.B.3

Clearing site including removal of roots and


growth of every description, removing topsoil
upto a depth of 150mm extended upto 3.0m
beyond the outer walls of the proposed
building and carting away the waste material
from
the
site
where
directed.
2
(Approx.800.00 m )

1.00

Demolition of existing building including


clearing all construction debris from the site

1.00

Item

Cutting & leveling the land to required levels


of existing building

1.00

Item

116.50
17.60

25,000.00

25,000.00

m3

560.00

65,240.00

560.00

9,856.00

Excavation
commencing from existing
ground level, not exceeding 1.0 M deep in
any material except rock requiring blasting,
part return fill in ram and surplus disposed as
directed.
1.B.4

For combine footings

1.B.5

For raft footings

1.B.6

For staircase footings

0.81

m3

560.00

453.60

1.B.7

For wall trenches

6.00

m3

560.00

3,360.00

14.10

m3

700.00

9,870.00

33.00

m3

1,700.00

56,100.00

Excavation
commencing from existing
ground level, exceeding 1.0 M but not
exceeding 2.0M deep in any material except
rock requiring blasting, part return fill in ram
and surplus disposed as directed.
1.B.8

For raft footings


Filling under floors

1.B.9

Filling under floors including leveling,


watering & compacting (well rammed and
consolidated) in 150mm layers with imported,
selected earth.
Total Carried Forward
S07 - 28

324,879.60

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY

UNIT

RATE

Brought forward

AMOUNT
324,879.60

Earthwork Supports
Refer pricing Preambles
Earthwork supports, (Planking & Strutting )
total depth of excavation not exceeding 1.0m
and distance
between vertical sides
(opposing faces) of not exceeding 2.0m,
(Payment will be made only if actually
executed on the order of the Engineer)
1.B.10 For combine footings

20.00

m2

1,100.00

22,000.00

1.B.11 For staircase footings

4.35

1,100.00

4,785.00

22.60

m2

1,100.00

24,860.00

83.00

m2

1,400.00

116,200.00

9.50

m2

1,400.00

13,300.00

7.50

m2

1,700.00

12,750.00

9.00

m2

2,000.00

18,000.00
536,774.60

1.B.12 For wall trenches

Earthwork supports, (Planking & Strutting)


total depth of excavation not exceeding 1.0m
and distance between
vertical sides
(opposing faces) of exceeding 2.0m but not
exceeding 4.0m (Payment will be made only
if actually executed on the order of the
Engineer )
1.B.13 For combine footings
1.B.14 For raft footings
Earthwork supports, (Planking & Strutting)
total depth of excavation not exceeding 1.0m
and distance between
vertical sides
(opposing faces) of exceeding 4.0m but not
exceeding 6.0m (Payment will be made only
if actually executed on the order of the
Engineer )
1.B.15 For raft footings
Earthwork supports, (Planking & Strutting)
total depth of excavation not exceeding 1.0m
and distance between
vertical sides
(opposing faces) of exceeding 8.0m but not
exceeding 10.0m (Payment will be made
only if actually executed on the order of the
Engineer )
1.B.16 For combine footings
Total Carried Forward
S07 - 29

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY

UNIT

RATE

Brought forward

AMOUNT
536,774.60

Earthwork supports, (Planking & Strutting)


total depth of excavation not exceeding 1.0m
and distance between
vertical sides
(opposing faces) of exceeding 14.0m but
not exceeding 16.0m (Payment will be made
only if actually executed on the order of the
Engineer )
1.B.17 For combine footings

9.50

2,800.00

26,600.00

8.00

m2

1,100.00

8,800.00

6.00

m2

1,400.00

8,400.00

1.00

Item

Earthwork supports, (Planking & Strutting)


total depth of excavation exceeding 1.0m but
not exceeding 2.0m and distance between
vertical sides (opposing faces) of exceeding
2.0m but not exceeding 4.0m (Payment will
be made only if actually executed on the
order of the Engineer )
1.B.18 For raft footings

Earthwork supports, (Planking & Strutting)


total depth of excavation exceeding 1.0m but
not exceeding 2.0m and distance between
vertical sides (opposing faces) of exceeding
4.0m but not exceeding 6.0m (Payment will
be made only if actually executed on the
order of the Engineer )
1.B.19 For raft footings

Dewatering
1.B.20 Allow for dewatering, in the manner approved
by the engineer to keep all excavation dry
until all works in substructure are completed
(payment will be made only if actually
executed on the order of the engineer )

Total Carried Forward


S07 - 30

10,000.00

10,000.00

590,574.60

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY

UNIT

RATE

Brought forward

AMOUNT
590,574.60

Anti Termite Treatment


1.B.21 Allow for anti treatment for barrier and colony
elimination at preconstruction stage. The
service provider should hold a valid license
for termite treatment issued from register
Department of Agriculture. Rate to include for
a
complete
treatment
with
1.Treatment before placing the foundation.
2. Treatment after placing floor concrete
3. Treatment along the periphery of the
building. The service provider should give
minimum 10 years warranty against termite
treatment. the service provider should submit
the list of Termiticide intended to use for
Engineer's approval. the following minimum
requirements
to
be
maintained.
1.Application
rate
5l/m2
2.Termiticide Concentration : 12.5ml/L
3. Termite pump pressure rate : 250 psi

Provisional sum

TOTAL CARRIED TO COLLECTION ON PAGE NO S07- 38

S07 - 31

300,000.00
890,574.60

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION
C - CONCRETE WORK
Refer pricing Preambles

QTY

UNIT

RATE

AMOUNT

Lean Concrete
75mm thick lean concrete 1:3:6 (40mm)
aggregate in the following ;
1.C.1

Under combine footings

1.C.2

Under raft slab

1.C.3

Under staircase footing

116.50

17.60

0.06

820.00

95,530.00

820.00

14,432.00

820.00

49.20

Mass Concrete
Mass Concrete 1:3:6( 40mm) in the
following.
1.C.4

150mm thick under wall foundations

10.00

m2

1,630.00

16,300.00

1.C.5

75 mm thick ground floor concrete

165.50

m2

820.00

135,710.00

16.50

m3

12,500.00

206,250.00

1.00

m3

12,500.00

12,500.00

Reinforced Concrete
Reinforced cement concrete Grade 'C - 25'
in the following
1.C.6

In combine footings

1.C.7

In column shafts

1.C.8

In foundation beams

10.00

m3

12,500.00

125,000.00

1.C.9

In raft slab

49.00

m3

12,500.00

612,500.00

1.C.10 In raft beams

8.50

m3

12,500.00

106,250.00

1.C.11 In staircase footing

0.17

m3

12,500.00

2,125.00

1.C.12 In staircase shaft

0.21

m3

12,500.00

2,625.00

1.C.13 In plinth beams

1.90

m3

12,500.00

23,750.00

1.C.14 In 225mm thick lift wall

9.70

m2

2,800.00

27,160.00

Total Carried Forward


S07 - 32

1,380,181.20

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY

UNIT

RATE

Brought forward

AMOUNT
1,380,181.20

Formwork
Note :Refer pricing preambles
Formwork is measured as the net contact
surface measurement between concrete and
formwork From work for columns and beams
is given as a girth measurement.
Refer section 5.2 in specification for full
description of materials and workmen ship.
Formwork shall provide a finish to concrete
surface to receive plaster as per section
5.4.8.11 in Specification.
Formwork as described to
1.C.15 Vertical sides of combine footings

52.30

m2

1,200.00

62,760.00

1.C.16 Vertical sides of column shafts

12.00

m2

1,200.00

14,400.00

1,200.00

24,600.00

1.C.17 Vertical sides of foundation beam <300mm


high

20.50

1.C.18 Vertical sides of foundation beams

33.80

m2

1,200.00

40,560.00

1.C.19 Vertical sides of raft slab

5.10

m2

1,200.00

6,120.00

1.C.20 Vertical sides of raft beams

8.70

m2

1,200.00

10,440.00

1.03

m2

1,200.00

1,236.00

1.C.22 Vertical sides of plinth beam <300mm high

26.00

1,200.00

31,200.00

1.C.23 Vertical sides of plinth beam

15.00

1,200.00

18,000.00

1.C.24 Vertical sides of lift wall

19.50

m2

1,200.00

23,400.00

1.C.21 Vertical sides of staircase shaft

Total Carried Forward


S07 - 33

1,612,897.20

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY

UNIT

RATE

Brought forward

AMOUNT
1,612,897.20

Reinforcements
Refer pricing Preambles
Tor steel rod reinforcement including bends,
hooks, tying wire, distance blocks and
ordinary spacers (Inevitable laps and chairs
included in Quantities) fy = 460 N/mm2

In combine footings
1.C.25 10mm dia.

0.40

MT

145,000.00

58,000.00

1.C.26 25 mm dia.

0.50

MT

145,000.00

72,500.00

1.C.27 20 mm dia.

0.55

MT

145,000.00

79,750.00

1.C.28 10mm dia links

0.35

MT

145,000.00

50,750.00

1.C.29 25 mm dia.

1.50

MT

145,000.00

217,500.00

1.C.30 20 mm dia.

0.09

MT

145,000.00

13,050.00

1.C.31 16 mm dia.

0.25

MT

145,000.00

36,250.00

1.C.32 10mm dia stirrups

0.50

MT

145,000.00

72,500.00

1.C.33 10mm dia.

1.70

MT

145,000.00

246,500.00

1.C.34 12 mm dia.

0.80

MT

145,000.00

116,000.00

1.C.35 25mm dia

1.70

MT

145,000.00

246,500.00

1.C.36 20 mm dia.

0.10

MT

145,000.00

14,500.00

1.C.37 16mm dia

0.27

MT

145,000.00

39,150.00

1.C.38 10mm dia stirrups

0.70

MT

145,000.00

101,500.00

0.02

MT

145,000.00

2,900.00

In column shafts

In foundation beams

In raft slab

In raft beams

In staircase footing & shaft


1.C.39 10mm dia
Total Carried Forward
S07 - 34

2,980,247.20

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY

UNIT

RATE

Brought forward

AMOUNT
2,980,247.20

In Plinth beam
1.C.40 16mm dia

0.15

MT

145,000.00

21,750.00

0.05

MT

145,000.00

7,250.00

1.C.42 12mm dia.

0.35

MT

145,000.00

50,750.00

1.C.43 10mm dia.

0.15

MT

145,000.00

21,750.00

1.C.41 12mm dia

In lift wall

Mild Steel Rod Reinforcement


1.C.44 6mm dia as links in column shaft

0.01

MT

145,000.00

1,450.00

1.C.45 6mm dia as stirrups in plinth beams

0.08

MT

145,000.00

11,600.00

TOTAL CARRIED TO COLLECTION ON PAGE NO S07- 38

S07 - 35

3,094,797.20

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION
D - MASONRY WORK
Refer pricing Preambles

QTY

UNIT

RATE

AMOUNT

Rubble Work
Random rubble masonry in cement and sand
1:5 in wall foundation.
1.D.1

350mm thick

13.50

m3

8,000.00

108,000.00

1.D.2

300mm thick

0.50

8,000.00

4,000.00

23.70

m2

700.00

16,590.00

Damp Proof Course


1.D.3

20mm thick horizontal damp proof course in


cement & sand 1:2 mix and finished with the
application of two thick coats of hot tar
blinded with sand.

TOTAL CARRIED TO COLLECTION ON PAGE NO S07-38

S07 - 36

128,590.00

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION
E - WATER PROOFING
Refer pricing Preambles

QTY

UNIT

RATE

m2

1,800.00

AMOUNT

Water proofing system, shall consist of two


(2) coats of water proofing concrete slurry
coats.
Surface preparation, mixing, application and
curing shall be strictly in accordance with the
manufacture's instructions.
The Contractor may use any system of water
proofing concrete by crystallization, with the
prior approval of the Engineer.
Rate shall include for chipping, removing and
cleaning all loose materials on the surfaces to
be water proof.
Rate shall include for sealing around gullies,
pipe protrusions with non shrink high strength
cementation grout Master flow 98 or
equivalent
Water proofing to be used approved product
such as" Barallastic "or equivalent
1.E.1

Water proofing to inner side of lift well up to


ground floor level

11.80

TOTAL CARRIED TO COLLECTION ON PAGE NO S07- 38

S07 - 37

21,240.00

21,240.00

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION
BILL NO 1 - SUB STRUCTURE

QTY

UNIT

RATE

AMOUNT

COLLECTION

B - EXCAVATION AND EARTH WORK

Rs.

890,574.60

C - CONCRETE WORK

Rs.

3,094,797.20

D - MASONRY WORK

Rs.

128,590.00

E - WATER PROOFING

Rs.

21,240.00

TOTAL CARRIED TO SUMMARY ON PAGE S 07 - 113

Rs.

4,135,201.80

S07 - 38

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION
BILL NO 2 - SUPERSTRUCTURE

QTY

UNIT

RATE

AMOUNT

C - CONCRETE WORK
Note:
Refer Pricing Preambles
Reinforced Concrete
Reinforced cement concrete Grade 'C- 25' in
the following ;
In Columns
2.C.1

From ground floor level to first floor level

5.60

2.C.2

From first floor level to second floor level

6.10

2.C.3

From second floor level to third floor level

6.10

2.C.4

From third floor level to fourth floor level

2.C.5

From fourth floor level to water tank roof slab


level / Machine room floor level

2.C.6

From Machine room floor level to machine


room roof level

12,500.00

70,000.00

12,500.00

76,250.00

m3

12,500.00

76,250.00

6.60

m3

12,500.00

82,500.00

5.50

m3

12,500.00

68,750.00

1.50

m3

12,500.00

18,750.00

In Beams
2.C.7

At first floor level

17.50

m3

12,500.00

218,750.00

2.C.8

At second floor level

19.39

m3

12,500.00

242,375.00

2.C.9

At third floor level

19.24

m3

12,500.00

240,500.00

14.77

m3

12,500.00

184,625.00

2.C.11 At machine room floor level

4.87

12,500.00

60,875.00

2.C.12 At water tank room roof level

1.35

m3

12,500.00

16,875.00

2.C.13 At machine room roof level

1.81

m3

12,500.00

22,625.00

2.C.10 At fourth floor level

Total Carried Forward


S07 - 39

1,379,125.00

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY

UNIT

RATE

Brought forward

AMOUNT
1,379,125.00

In Landing beams at staircase


2.C.14 Between ground floor and first floor

0.15

m3

12,500.00

1,897.50

2.C.15 Between first floor and second floor

0.15

m3

12,500.00

1,875.00

2.C.16 Between second floor and third floor

0.15

m3

12,500.00

1,875.00

2.C.17 Between third floor and fourth floor

0.15

12,500.00

1,875.00

2.C.18 Between fourth floor and Machine room floor

0.15

m3

12,500.00

1,875.00

2.C.19 Between ground floor and first floor (staircase


A & B)

1.56

m3

12,500.00

19,500.00

2.C.20 Between first


(staircase & B)

1.72

m3

12,500.00

21,450.00

2.C.21 Between second floor and third floor

1.72

m3

12,500.00

21,450.00

2.C.22 Between third floor and fourth floor

2.06

m3

12,500.00

25,740.00

2.06

12,500.00

25,740.00

2.C.24 At first floor level

141.20

m2

1,600.00

225,920.00

2.C.25 At second floor level

180.00

m2

1,600.00

288,000.00

2.C.26 At third floor level

140.00

m2

1,600.00

224,000.00

2.C.27 At fourth floor level

131.00

m2

1,600.00

209,600.00

2.C.28 At Machine room floor level

11.00

1,600.00

17,600.00

2.C.29 At Machine room roof level

45.00

m2

1,600.00

72,000.00

2.C.30 At Water tank room roof level

22.00

m2

1,600.00

35,200.00

In Steps and waist of staircase

floor

and

second

floor

2.C.23 Between fourth floor and Machine room floor


3

Note:
Grade 25 ready mix concrete use for slab.
Rate to include for ready-mix pump

In 125mm thick suspended slab

Total Carried Forward


S07 - 40

2,574,722.50

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY

UNIT

RATE

Brought forward

AMOUNT
2,574,722.50

In 150mm thick suspended slab


2.C.31 At fourth floor level

21.00

2,000.00

42,000.00

40.30

2,500.00

100,750.00

2.C.33 Between ground floor and first floor

2.30

2,500.00

5,750.00

2.C.34 Between first floor and second floor

2.30

m2

2,500.00

5,750.00

2.C.35 Between second floor and third floor

2.30

m2

2,500.00

5,750.00

2.C.36 Between third floor and fourth floor

2.30

m2

2,500.00

5,750.00

2.C.37 Between fourth floor and Machine room floor

2.30

m2

2,500.00

5,750.00

2.C.38 At ground floor lintol level

7.60

m2

1,300.00

9,880.00

2.C.39 At first floor lintol level

7.60

m2

1,300.00

9,880.00

2.C.40 At second floor lintol level

8.00

m2

1,300.00

10,400.00

11.00

m2

1,300.00

14,300.00

2.C.42 At fourth floor lintol level

4.50

m2

1,300.00

5,850.00

2.C.43 At machine room floor lintol level

1.00

m2

1,300.00

1,300.00

0.76

m2

1,600.00

1,216.00

0.54

m2

1,300.00

702.00

175mm thick suspended slab


2.C.32 At third floor level

In 175mm thick landing slab at staircase

100mm thick weather shade above windows

2.C.41 At third floor lintol level

125mm thick gutter base slab


2.C.44 At fourth floor slab level

100mm thick gutter side walls


2.C.45 At fourth floor slab level

Total Carried Forward


S07 - 41

2,799,750.50

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY

UNIT

RATE

Brought forward

AMOUNT
2,799,750.50

Form work
Refer Pricing Preamble
Refer section 5.2 in specification for full
description of materials and workmen ship.
Form work shall provide a finish to concrete
surface to receive plaster as per section
5.3.8.11 in Specification.

Vertical sides of column shafts


2.C.46 From ground floor level to first floor level

70.70

m2

1,200.00

84,840.00

2.C.47 From first floor level to second floor level

77.50

m2

1,250.00

96,875.00

2.C.48 From second floor level to third floor level

77.50

m2

1,300.00

100,750.00

2.C.49 From third floor level to fourth floor level

88.70

m2

1,350.00

119,745.00

2.C.50 From fourth floor level to water tank roof slab


level / Machine room floor level

77.00

1,400.00

107,800.00

24.10

m2

1,400.00

33,740.00

2.C.52 At first floor level

163.00

m2

1,200.00

195,600.00

2.C.53 At second floor level

179.70

m2

1,250.00

224,625.00

2.C.54 At third floor level

177.50

m2

1,300.00

230,750.00

2.C.55 At fourth floor level

136.60

m2

1,350.00

184,410.00

2.C.56 At Machine room floor level

54.30

m2

1,400.00

76,020.00

2.C.57 At Water tank room roof level

14.50

m2

1,400.00

20,300.00

2.C.58 At Machine room roof level

18.50

m2

1,400.00

25,900.00

2.C.51 From Machine room floor level to machine


room roof slab level

Sides and soffit of beams

Total Carried Forward


S07 - 42

4,301,105.50

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY

UNIT

RATE

Brought forward

AMOUNT
4,301,105.50

Sides and soffit of landing beams at staircase

2.C.59 Between ground floor and first floor

1.50

1,200.00

1,800.00

2.C.60 Between first floor and second floor

1.50

1,250.00

1,875.00

2.C.61 Between second floor and third floor

1.50

1,300.00

1,950.00

2.C.62 Between third floor and fourth floor

1.50

1,350.00

2,025.00

2.C.63 Between fourth floor and Machine room floor

1.50

m2

1,400.00

2,100.00

2.C.64 Between ground floor and first floor

1.56

m2

1,200.00

1,872.00

2.C.65 Between first floor and second floor

1.72

m2

1,250.00

2,145.00

2.C.66 Between second floor and third floor

1.72

m2

1,300.00

2,230.80

2.C.67 Between third floor and fourth floor

2.06

m2

1,350.00

2,779.92

2.C.68 Between fourth floor and Machine room floor

2.06

m2

1,400.00

2,882.88

2.C.69 Between ground floor and first floor

7.20

m2

1,200.00

8,640.00

2.C.70 Between first floor and second floor

7.70

m2

1,250.00

9,625.00

2.C.71 Between second floor and third floor

7.70

m2

1,300.00

10,010.00

2.C.72 Between third floor and fourth floor

8.20

m2

1,350.00

11,070.00

2.C.73 Between fourth floor and Machine room floor

8.20

m2

1,400.00

11,480.00

2.C.74 Between ground floor and first floor

21.00

130.00

2,730.00

2.C.75 Between first floor and second floor

25.00

140.00

3,500.00

2.C.76 Between second floor and third floor

25.00

150.00

3,750.00

Sides of steps and waist of staircase

Sloping soffit of staircase

150mm high risers of staircase

Total Carried Forward


S07 - 43

4,383,571.10

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY

UNIT

RATE

Brought forward

AMOUNT
4,383,571.10

175mm high risers of staircase


2.C.77 Between third floor and fourth floor

25.00

150.00

3,750.00

2.C.78 Between fourth floor and Machine room floor

25.00

150.00

3,750.00

2.C.79 At first floor level

141.20

m2

1,200.00

169,440.00

2.C.80 At second floor level

180.00

m2

1,250.00

225,000.00

2.C.81 At third floor level

180.30

1,300.00

234,390.00

2.C.82 At fourth floor level

152.00

1,350.00

205,200.00

2.C.83 At machine room floor level

11.00

m2

1,400.00

15,400.00

2.C.84 At machine room roof level

45.00

m2

1,400.00

63,000.00

2.C.85 At water tank room roof level

22.00

m2

1,400.00

30,800.00

2.C.86 Between ground floor and first floor

2.20

m2

1,200.00

2,640.00

2.C.87 Between first floor and second floor

2.20

m2

1,250.00

2,750.00

2.C.88 Between second floor and third floor

2.20

m2

1,300.00

2,860.00

2.C.89 Between third floor and fourth floor

2.20

1,350.00

2,970.00

2.C.90 Between fourth floor and Machine room floor

2.20

m2

1,400.00

3,080.00

2.C.91 At ground floor lintol level

7.60

m2

1,200.00

9,120.00

2.C.92 At first floor lintol level

7.60

1,250.00

9,500.00

2.C.93 At second floor lintol level

8.00

m2

1,300.00

10,400.00

11.00

m2

1,350.00

14,850.00

2.C.95 At fourth floor lintol level

4.50

m2

1,400.00

6,300.00

2.C.96 At machine room floor lintol level

1.00

m2

1,400.00

1,400.00

Soffit of suspended slab

Soffit of landing slab in staircase

Soffit of weather shade above windows

2.C.94 At third floor lintol level

Total Carried Forward


S07 - 44

5,400,171.10

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY

UNIT

RATE

Brought forward

AMOUNT
5,400,171.10

100mm high to edge of weather shade


2.C.97 At ground floor lintol level

14.00

110.00

1,540.00

2.C.98 At first floor lintol level

14.00

110.00

1,540.00

2.C.99 At second floor lintol level

15.00

120.00

1,800.00

2.C.100 At third floor lintol level

19.50

130.00

2,535.00

2.C.101 At fourth floor lintol level

8.50

140.00

1,190.00

2.C.102 At machine room floor lintol level

3.00

150.00

450.00

11.70

m2

1,400.00

16,380.00

0.75

MT

145,000.00

108,750.00

2.C.105 From ground floor level to first floor level

0.90

MT

145,000.00

130,500.00

2.C.106 From first floor level to second floor level

1.15

MT

145,000.00

166,750.00

2.C.107 From second floor level to third floor level

1.15

MT

145,000.00

166,750.00

2.C.108 From third floor level to fourth floor level

1.00

MT

145,000.00

145,000.00

2.C.109 From fourth floor level to water tank roof slab


level / Machine room floor level

0.45

MT

145,000.00

65,250.00

Soffit & sides of gutter


2.C.103 At machine room roof level

Reinforcement
Note: Refer Pricing Preambles
No allowance have been made for rolling
margin
Tor steel rod reinforcement including bends,
hooks, tying wire, distance blocks and
ordinary spacers (Inevitable laps and chairs
included in Quantities) fy = 460 N/mm2

25 mm dia. in Columns.
2.C.104 From ground floor level to first floor level
20 mm dia. in columns.

Total Carried Forward


S07 - 45

6,208,606.10

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY

UNIT

RATE

Brought forward

AMOUNT
6,208,606.10

16 mm dia. in columns
2.C.110 From first floor level to second floor level

0.20

MT

145,000.00

29,000.00

2.C.111 From second floor level to third floor level

0.20

MT

145,000.00

29,000.00

2.C.112 From third floor level to fourth floor level

0.55

MT

145,000.00

79,750.00

2.C.113 From fourth floor level to water tank roof slab


level / Machine room floor level

0.30

MT

145,000.00

43,500.00

2.C.114 From Machine room floor level to machine


room roof slab level

0.15

MT

145,000.00

21,750.00

0.05

MT

145,000.00

7,250.00

0.12

MT

145,000.00

17,400.00

12 mm dia. in columns
2.C.115 From Machine room floor level to machine
room roof slab level

10 mm dia.links in columns
2.C.116 From ground floor level to first floor level

25mm dia In beams


2.C.117 At first floor level

0.17

MT

145,000.00

24,650.00

2.C.118 At second floor level

0.17

MT

145,000.00

24,650.00

2.C.119 At third floor level

0.17

MT

145,000.00

24,650.00

2.C.120 At first floor level

1.08

MT

145,000.00

156,600.00

2.C.121 At second floor level

1.30

MT

145,000.00

188,500.00

2.C122 At third floor level

1.35

MT

145,000.00

195,750.00

2.C.123 At fourth floor level

1.30

MT

145,000.00

188,500.00

2.C.124 At machine room floor level

0.11

MT

145,000.00

15,950.00

2.C.125 At Machine room roof level

0.02

MT

145,000.00

2,900.00

20mm dia In beams

Total Carried Forward


S07 - 46

7,258,406.10

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY

UNIT

RATE

Brought forward

AMOUNT
7,258,406.10

16 mm dia. in beams
2.C.126 At first floor level

0.51

MT

145,000.00

73,950.00

2.C127 At second floor level

0.64

MT

145,000.00

92,800.00

2.C.128 At third floor level

0.65

MT

145,000.00

94,250.00

2.C.129 At fourth floor level

0.59

MT

145,000.00

85,550.00

2.C.130 At machine room floor level

0.34

MT

145,000.00

49,300.00

2.C.131 At Water tank roof level

0.11

MT

145,000.00

15,950.00

2.C.132 At Machine room roof level

0.17

MT

145,000.00

24,650.00

2.C.133 At first floor level

0.06

MT

145,000.00

8,700.00

2.C.134 At second floor level

0.03

MT

145,000.00

4,350.00

2.C.135 At third floor level

0.04

MT

145,000.00

5,800.00

2.C.136 At fourth floor level

0.01

MT

145,000.00

1,450.00

2.C.137 At machine room floor level

0.04

MT

145,000.00

5,800.00

2.C.138 At Water tank roof level

0.03

MT

145,000.00

4,350.00

2.C.139 At Machine room roof level

0.02

MT

145,000.00

2,900.00

2.C.140 At first floor level

0.50

MT

145,000.00

72,500.00

2.C141 At second floor level

0.61

MT

145,000.00

88,450.00

2.C.142 At third floor level

0.60

MT

145,000.00

87,000.00

2.C.143 At fourth floor level

0.56

MT

145,000.00

81,200.00

2.C.144 At machine room floor level

0.13

MT

145,000.00

18,850.00

2.C.145 At Water tank roof level

0.06

MT

145,000.00

8,700.00

2.C.146 At Machine room roof level

0.05

MT

145,000.00

7,250.00

12mm dia In beams

10mm dia stirrups in beams

Total Carried Forward


S07 - 47

8,092,156.10

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY

UNIT

RATE

Brought forward

AMOUNT
8,092,156.10

16mm dia in landing beam in staircase


2.C.147 Between ground floor and first floor

0.01

MT

145,000.00

1,145.50

2.C.148 Between first floor and second floor

0.01

MT

145,000.00

1,145.50

2.C.149 Between second floor and third floor

0.01

MT

145,000.00

1,145.50

2.C.150 Between third floor and fourth floor

0.01

MT

145,000.00

1,145.50

2.C.151 Between fourth floor and Machine room floor

0.01

MT

145,000.00

1,145.50

2.C.152 Between ground floor and first floor

3.10

Kg

145.00

449.50

2.C.153 Between first floor and second floor

3.10

Kg

145.00

449.50

2.C.154 Between second floor and third floor

3.10

Kg

145.00

449.50

2.C.155 Between third floor and fourth floor

3.10

Kg

145.00

449.50

2.C.156 Between fourth floor and Machine room floor

3.10

Kg

145.00

449.50

2.C.157 Between ground floor and first floor

0.09

MT

145,000.00

13,050.00

2.C.158 Between first floor and second floor

0.11

MT

145,000.00

15,950.00

2.C.159 Between second floor and third floor

0.11

MT

145,000.00

15,950.00

2.C.160 Between third floor and fourth floor

0.11

MT

145,000.00

15,950.00

2.C.161 Between fourth floor and Machine room floor

0.11

MT

145,000.00

15,950.00

12mm dia in landing beam in staircase

10mm dia in steps, waist and landing of


staircase

Total Carried Forward


S07 - 48

8,176,981.10

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY

UNIT

RATE

Brought forward

AMOUNT
8,176,981.10

10mm dia in suspended floor slab


2.C.162 At first floor level

1.55

MT

145,000.00

224,750.00

2.C.163 At second floor level

1.90

MT

145,000.00

275,500.00

2.C.164 At third floor level

2.05

MT

145,000.00

297,250.00

2.C.165 At fourth floor level

1.55

MT

145,000.00

224,750.00

2.C.166 At machine room floor level

0.06

MT

145,000.00

8,700.00

2.C.167 At Machine room roof level

0.32

MT

145,000.00

46,400.00

2.C.168 At Water tank room roof level

0.20

MT

145,000.00

29,000.00

10mm dia. in weather shades above


windows
2.C.169 At ground floor lintol level

0.07

MT

145,000.00

10,788.00

2.C.170 At first floor lintol level

0.07

MT

145,000.00

10,788.00

2.C.171 At second floor lintol level

0.08

MT

145,000.00

11,327.40

2.C.172 At third floor lintol level

0.11

MT

145,000.00

15,283.00

2.C.173 At fourth floor lintol level

0.04

MT

145,000.00

5,933.40

2.C.174 At machine room floor lintol level

0.01

MT

145,000.00

1,438.40

MT

145,000.00

18,609.30

10mm dia. in Gutter


2.C.175 At machine room roof level

0.13

Mild Steel Rod Reinforcement


(fy=250N/mm2)
6mm dia as links in column shaft
2.C.176 From ground floor level to first floor level

0.05

MT

145,000.00

7,250.00

2.C.177 From first floor level to second floor level

0.15

MT

145,000.00

21,750.00

2.C.178 From second floor level to third floor level

0.15

MT

145,000.00

21,750.00

2.C.179 From third floor level to fourth floor level

0.15

MT

145,000.00

21,750.00

Total Carried Forward


S07 - 49

9,429,998.60

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY

UNIT

RATE

Brought forward

AMOUNT
9,429,998.60

2.C.180 From fourth floor level to water tank roof slab


level / Machine room & water tank floor level

0.15

MT

145,000.00

21,750.00

2.C.181 From Machine room floor level to machine

0.05

MT

145,000.00

7,250.00

2.C.182 Between ground floor and first floor

4.50

Kg

145.00

652.50

2.C.183 Between first floor and second floor

4.50

Kg

145.00

652.50

2.C.184 Between second floor and third floor

4.50

Kg

145.00

652.50

2.C.185 Between third floor and fourth floor

4.50

Kg

145.00

652.50

2.C.186 Between fourth floor and Machine room floor

4.50

Kg

145.00

652.50

Nr.

7,000.00

49,000.00

6mm dia. stirrups in landing beams

Corbel Stone
150mm thick x 475mm long x 225mm wide
corbel stone embedded in wall, reinforced
with 2 No.12mm dia. tor steel bars and 3 No.
6mm dia.bars
2.C.187 At fourth floor level

7.00

225x150 high lintols including 2 No. 10mm


dia tor steel bars at bottom & 2 No. 10mm
dia tor steel bars at top & 6mm dia mild steel
stirrups at 125mm centres and necessary
form work.
2.C.188 At ground floor lintol level

15.00

1,400.00

21,000.00

2.C.189 At first floor lintol level

10.00

1,400.00

14,000.00

2.C.190 At second floor lintol level

12.00

1,400.00

16,800.00

2.C.191 At third floor lintol level

8.00

1,400.00

11,200.00

2.C.192 At fourth floor lintol level

2.50

1,400.00

3,500.00

2.C.193 At machine room floor lintol level

1.50

1,400.00

2,100.00

TOTAL CARRIED TO COLLECTION ON PAGE S 07 - 100

S07 - 50

9,579,861.10

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION
D - MASONRY WORK

QTY

UNIT

RATE

AMOUNT

Refer Pricing Preambles


Brick Work
Brick work in common bricks in cement
and sand 1:5 mortar
One brick thick (225mm) walls
2.D.1

From ground floor level to first floor level

209.30

2,000.00

418,600.00

2.D.2

From first floor level to second floor level

222.39

2,100.00

467,019.00

2.D.3

From second floor level to third floor level

220.23

m2

2,200.00

484,506.00

2.D.4

From third floor level to fourth floor level

232.09

m2

2,300.00

533,807.00

2.D.5

From fourth floor level to roof level / Machine


room & water tank roof level

250.38

m2

2,400.00

600,912.00

From Machine room floor level to machine


room roof slab level

41.69

m2

2,500.00

104,225.00

2.D.6

Brick work in common bricks in cement


and sand 1:5 mortar
Half brick thick (112.5mm) wall
2.D.7

From ground floor level to first floor level

20.59

m2

1,200.00

24,708.00

2.D.8

From first floor level to second floor level

25.29

m2

1,300.00

32,877.00

2.D.9

From second floor level to third floor level

48.37

m2

1,400.00

67,718.00

61.36

m2

1,500.00

92,040.00

6.46

m2

1,500.00

9,690.00

2.D.10 From third floor level to fourth floor level


2.D.11 From Machine room floor level to machine
room roof slab level

TOTAL CARRIED TO COLLECTION ON PAGE S 07 - 100

S07 - 51

2,836,102.00

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION
E - WATER PROOFING
Refer pricing Preambles

QTY

UNIT

RATE

AMOUNT

Water proofing system, shall consist of two


(2) coats of water proofing concrete slurry
coats.
Surface preparation, mixing, application and
curing shall be strictly in accordance with the
manufacture's instructions.
The Contractor may use any system of water
proofing concrete by crystallization, with the
prior approval of the Engineer.
Rate shall include for chipping, removing and
cleaning all loose materials on the surfaces to
be water proof.
Rate shall include for sealing around gullies,
pipe protrusions with non shrink high strength
cementation grout Master flow 98 or
equivalent
Rate shall include for forming 1:3 cement and
sand 25 x 25mm angle fillets at all right
angled edges and mixing, laying of plastering
(1: 5 ) upto 300mm in toilet area and
1500mm high from finished floor level in
shower area
Supplying and laying of Glass fibre
reinforcement strip, Glascote 60 or equivalent
to vertical/ horizontal intersections as per
manufacture instruction & working order.

Water proofing to be used approved product


such as" Barallastic "or equivalent
Water proofing to walls of toilets up to a
height of 300mm
2.E.1

In ground floor

7.50

m2

1,800.00

13,500.00

2.E.2

In first floor

2.55

m2

1,800.00

4,590.00

2.E.3

In second floor

5.52

m2

1,800.00

9,936.00

2.E.4

In third floor

6.99

m2

1,800.00

12,582.00
40,608.00

Total Carried Forward


S07 - 52

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY

UNIT

RATE

Brought forward

AMOUNT
40,608.00

Water proofing to top of concrete slab


2.E.5

In first floor toilet area

7.00

1,800.00

12,600.00

2.E.6

In second floor toilet area

9.80

1,800.00

17,640.00

2.E.7

In third floor toilet area

12.50

1,800.00

22,500.00

2.E.8

In water tank room floor slab

15.90

1,800.00

28,620.00

2.E.9

In water tank room roof slab

25.40

1,800.00

45,720.00

30.00

m2

1,800.00

54,000.00

2.E.11 At ground floor lintol level

7.60

m2

1,800.00

13,680.00

2.E.12 At first floor lintol level

7.60

1,800.00

13,680.00

2.E.13 At second floor lintol level

8.00

m2

1,800.00

14,400.00

11.00

m2

1,800.00

19,800.00

2.E.15 At fourth floor lintol level

4.50

m2

1,800.00

8,100.00

2.E.16 At machine room floor lintol level

1.00

m2

1,800.00

1,800.00

10.50

m2

1,800.00

18,900.00

2.E.10 On machine room roof slab

Water proofing to top of weather shades

2.E.14 At third floor lintol level

Inner sides of concrete gutter


2.E.17 At machine room roof level

TOTAL CARRIED TO COLLECTION ON PAGE S 07 - 100

S07 - 53

312,048.00

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION
F- STRUCTURAL STEEL WORK

QTY

UNIT

RATE

AMOUNT

5,700.00

369,360.00

Refer Pricing Preambles


Mild steel channel purlins 152 x 72 x 17.88
kg/m fixed as per detail Drg. No. 2011 10004-ST 04 . Rate to include for 80 x 80 x 8
cleats and rag bolts.
2.F.1

At fourth floor roof level

64.80

TOTAL CARRIED TO COLLECTION ON PAGE NO S07- 100

S07 - 54

369,360.00

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION
G- METAL WORK

QTY

Refer Pricing Preambles


Aluminium Pannels

Material
All Aluminium sections shall be fully treated
extruded Aluminium alloy sections in
accordance with BS 1470,1471, 1473, 1474
or latest relevant EN standard
All Aluminium sections to be locally
manufactured ( "Alumex" or similar products
of equivalent technical parameters)
All Aluminium sections shall present clear,
straight and sharply defined lines. They shall
be free from defects impairing strength,
appearance and durability.
Finish
All members shall be finished either by
( a ) Anodizing or
( b ) Powder coating ( What ever specified in
Aluminium Items )
Anodizing -Exposed surface of all members
shall be anodized using two steps. Anodising
process to an anodic thickness of not less
than 10-15 microns and shall be free of any
defects.
Powder coating - Powder coating shall be
carried out using polyester coating with
proper and appropriate pre- treatment to a
thickness of not less than 60-80 microns,
measured on all significant surfaces.
Screws and Hardware Items
Concealed screws, nuts, bolts, rivets and
other fastening devices shall be of
Aluminium, non-magnetic stainless steel or
other approved corrosive resistant materials.
If visible, they shall blend with the finish of the
framing Aluminium sections.
Hardware items such as Hinges, Handles,
Catches, fixtures etc., shall be minimum of
grade 304 stainless steel.

Total Carried Forward


S07 - 55

UNIT

RATE

AMOUNT

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY
Brought forward

Glass
Glazing shall be minimum of 5mm thick clear
float glass. Glass shall be secured at all
edges with compression gaskets and glazing
beads. When fixing glass, all glazing sealant
shall be carefully applied and cleaned off
properly.
Workmanship
The fabrication and installation of all
Aluminium work must be carried out by
specialist tradesmen.
All dimensions shown on the drawings and
the shop drawings must be verified by actual
site measurement before fabrication and
installation. Any cutting to enlarge the size of
openings and approved practical method to
fill the excess void behind frames required
after installation shall be executed by the
Contractor at his own expenses.
All Aluminium members shall be factory
fabricated to the best standard of
workmanship under experienced factory
supervision and control.
Materials, method of fabrication, assembly,
installation, fastenings, supports, braces,
operating parts and the like shall be in
accordance with the approved shop
drawings.
All joints in frames at corners, junctions and
intersections shall be mechanically jointed
and be such that when assembled they are
as strong and rigid as adjoining sections. Due
care must be taken to ensure that all joints
are water tight and leak-proof. Joint lines
should not be visible.
Provisions must be made for expansion and
contraction in horizontal and vertical
members which are exposed to the weather
or environments. Any distortion of members
or any glass cracked or broken as a result of
inadequate provisions must be rectified by
the Contractor at his own expenses.
Total Carried Forward
S07 - 56

UNIT

RATE

AMOUNT

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY
Brought forward

All works shall be securely installed and


anchored in position, set plumb, square and
level in accurate alignment with other work,
all in accordance with the approved shop
drawings to the Engineer's satisfaction.( The
allowable tolerance in terms of specified
dimensions shall be plus/minus 1.5mm.)
Submissions
The Contractor shall submit shop
drawings showing the following
information where appropriate to the item ;
layout (Sectional plan and elevation) of
complete assembly
- full size sections of members
- methods of assembly
- methods of glazing
- methods of installation, including
fixings caulking, flashing
- provisions for vertical and horizontal
expansion
- junctions and trim to adjoining surfaces
- fittings and accessories
The Contractor shall submit certificates from
the Aluminium manufacture and/or an
approved testing laboratory which attest that
the coating thickness offered is as specified.

Doors & Windows


Frame and/or sash sections shall be of
extruded EN-AW 6063-T5 Aluminium Alloy
having a normal thickness of 1.5mm
(Accepted commercial tolerance of tolerance
of 0.15mm shall apply)
Aluminium Louvers
Fixed louvers shall be of the weather proof
type, suitable for overcoming water carriedover by wind and the fixed louvers shall have
free areas of not less than 50%
The Contractor shall provide a guarantee in
respect of the weatherproof properties of the
fixed louvers.

Total Carried Forward


S07 - 57

UNIT

RATE

AMOUNT

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY
Brought forward

All powder coatings shall match the windows.


Panels shall be so constructed as to be
completely weather proof at junctions with
adjoin structures .
Louver members shall be 1.2mm thick & Y
type.
Partitions
The frames shall be properly machined no
permit easy assembly and to form weathertight joints when caulked.
Partition members shall be 76mm in depth
and the thickness of 1.2mm.
Following dimensions are applied for the
frame members of each assembly units
Assembly

Unit
Door
Sliding door/
Window
Casement
Window,
Fanlight
Fixed glass
Window,

Minimum Member Minimum Member

depth (mm )
100
80

thickness(mm)
1.5
1.5

70

1.5

100

1.5

Rates shall include for all necessary hinges,


screws, rubber beadings, skelton bolts,
Aluminium louvers, pinhead stickers, etc.
(Locks paid separately)
Locks- (Union or equivalent )
Mortice lock Without handle- 4225/= ( excluding VAT )
With powder coated handle (Black/ White )
5375/= ( excluding VAT)
Hinges-(Union or equivalent )
102 x76 x 2mm
1850/= per pair
102 x76 x 3mm
( excluding VAT)
Handle-Grade 304 stainless steel
5275/= per pair( excluding VAT)
Door closer
60kg ( Maximum) - 4025/= ( excluding VAT)
80kg ( Maximum) - 4680/= ( excluding VAT)
Total Carried Forward
S07 - 58

UNIT

RATE

AMOUNT

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY

UNIT

RATE

AMOUNT

Brought forward

Refer drawing No.


2011-10-004 AR15

2011-10-004 AR14 &

Doors, Windows & Fanlights


Fabricating & fixing of Aluminium door type
D1FG, 5500 x 2700 mm high overall with
colour white , matt finished Powder coated
aluminium frame consisting of 2 No. glazed
aluminium door sashes and 6 No. 600x1200
fixed glass on both sides at middle and 6 No.
600x800 fixed glass on both sides at bottom
and 8 No. fixed glass on top, as per drawing
2
and Engineers approval (each door 14.85m )

2.G.1

In ground floor

1.00

Nr.

190,680.00

190,680.00

Fabricating & fixing of Aluminium door type


D2, 1500 x 2100 mm high overall with white
colour, matt finished Powder coated
aluminium frame consisting of 2 No. glazed
aluminium door sashes including 2 No. glass
panes, as per drawing and Engineers
2
approval (each door 3.15m )
2.G.2

In first floor

1.00

Nr.

40,450.00

40,450.00

2.G.3

In second floor

1.00

Nr.

40,450.00

40,450.00

Fabricating & fixing of Aluminium door type


D3, 900 x 2100 mm high overall with white
colour, matt finished Powder coated
aluminium frame consisting of 2 No. glazed
aluminium door sashes including 2 No. glass
panes, as per drawing and Engineers
approval (each door 1.89m2)
2.G.4

In ground floor

1.00

Nr.

24,270.00

24,270.00

2.G.5

In second floor

2.00

Nr.

24,270.00

48,540.00

2.G.6

In machine room floor

1.00

Nr.

24,270.00

24,270.00

Total Carried Forward


S07 - 59

368,660.00

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY

UNIT

RATE

Brought forward

AMOUNT
368,660.00

Fabricating & fixing of Aluminium sliding


window type W1, 6000 x 2700 mm high
overall with white colour, matt finished
Powder coated aluminium frame with 8 No.
glazed aluminium sliding window sashes and
2 No. fixed glass panes at middle & 2 No.
fixed glass panes at middle & 10 No. 800
high fixed glass panes at bottom & 10 No.
500 high fixed glass panes on top, as per
drawing and Engineers approval (each
2
window 16.20m )
2.G.7

In ground floor

1.00

Nr.

186,300.00

186,300.00

2.G.8

In first floor

1.00

Nr.

186,300.00

186,300.00

2.G.9

In second floor

1.00

Nr.

186,300.00

186,300.00

2.G.10 In ground floor

1.00

Nr.

186,300.00

186,300.00

2.G.11 In first floor

2.00

Nr.

186,300.00

372,600.00

2.G.12 In second floor

2.00

Nr.

186,300.00

372,600.00

2.G.13 In third floor

2.00

Nr.

186,300.00

372,600.00

2.G.14 In third floor

1.00

Nr.

227,700.00

227,700.00

2.G.15 In fourth floor

1.00

Nr.

227,700.00

227,700.00

Fabricating & fixing of Aluminium sliding


window type W2, 1200 x 1800 mm high
overall with white colour, mat finished Powder
coated aluminium frame with 2 No. glazed
aluminium sliding window sashes and
including 600mm high white colour, mat
finished Powder coated aluminium louvers on
top, as per drawing and Engineers approval
(each window 16.20m2)

Fabricating & fixing of Aluminium window


type W3, 5500 x 3600 mm high overall with
white colour, mat finished Powder coated
aluminium frame with 2 No. glazed aluminium
sliding window sashes and including 600mm
high white colour, mat finished Powder
coated aluminium louvers on top, as per
drawing and Engineers approval (each
window 19.80m2)

Total Carried Forward


S07 - 60

2,687,060.00

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY

UNIT

RATE

Brought forward

AMOUNT
2,687,060.00

Fabricating & fixing of Aluminium sliding


window type W4, 600 x 1800 mm high overall
with white colour, mat finished Powder coated
aluminium frame with 2 No. glazed aluminium
sliding window sashes and including 600mm
high white colour, mat finished Powder
coated aluminium louvers on top, as per
drawing and Engineers approval (each
2
window 1.08m )
2.G.16 In ground floor

2.00

Nr.

12,420.00

24,840.00

2.G.17 In first floor

2.00

Nr.

12,420.00

24,840.00

1.00

Nr.

200,100.00

200,100.00

2.G.19 In ground floor

2.00

Nr.

7,920.00

15,840.00

2.G.20 In first floor

2.00

Nr.

7,920.00

15,840.00

2.G.21 In second floor

3.00

Nr.

7,920.00

23,760.00

2.G.22 In third floor

2.00

Nr.

7,920.00

15,840.00

2.G.23 In fourth floor

3.00

Nr.

7,920.00

23,760.00

Fabricating & fixing of Aluminium sliding


window type W5, 6450 x 2700 mm high
overall with white colour, mat finished Powder
coated aluminium frame with 2 No. glazed
aluminium sliding window sashes and
including 600mm high white colour, mat
finished Powder coated aluminium louvers on
top, as per drawing and Engineers approval
(each window 17.40m2)
2.G.18 In third floor

Fabricating & fixing of Aluminium fanlight


type F1 , 600 x 1200mm high overall with
White colour mat finished Powder coated
aluminium frame with 1No. top hung glazed
aluminium fanlight sash all complete as per
Drawing and Engineers approval. (each
fanlight 0.72m2 )

Total Carried Forward


S07 - 61

3,031,880.00

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY

UNIT

RATE

Brought forward

AMOUNT
3,031,880.00

Fabricating & fixing of Aluminium fixed glass


type FG1, 5500 x 2700mm high overall with
White colour mat finished Powder coated
aluminium frame and glass panes fixed to
frame and including 600mm high white
colour, mat finished Powder coated
aluminium louvers on top all complete as per
Drawing and Engineers approval. (each
fixed glass 14.85m2 )
2.G.24 In first floor

1.00

Nr.

155,925.00

155,925.00

Fabricating & fixing of Aluminium fixed glass


type FG2, 600 x 675mm high overall with
White colour mat finished Powder coated
aluminium frame and glass pane fixed to
frame all complete as per Drawing and
Engineers approval. (each fixed glass
2
0.41m )
2.G.25 In ground floor

1.00

Nr.

42,525.00

42,525.00

2.G.26 In first floor

1.00

Nr.

42,525.00

42,525.00

2.G.27 In second floor

1.00

Nr.

42,525.00

42,525.00

2.G.28 In third floor

1.00

Nr.

42,525.00

42,525.00

2.G.29 In fourth floor

1.00

Nr.

42,525.00

42,525.00

2.G.30 In machine room floor

1.00

Nr.

42,525.00

42,525.00

1.00

Nr.

174,750.00

174,750.00

Fabricating & fixing of Aluminium fixed glass


type FG3, 5500 x 3025mm high overall with
White colour mat finished Powder coated
aluminium frame and glass panes fixed to
frame and including 600mm high white
colour, mat finished Powder coated
aluminium louvers on top all complete as per
Drawing and Engineers approval. (each
fixed glass 16.64m2 )
2.G.31 In machine room floor

Total Carried Forward


S07 - 62

3,617,705.00

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY

UNIT

RATE

Brought forward

AMOUNT
3,617,705.00

Louver type LI, 600 x 675 mm high overall


with mat finished powder coated aluminium
frame with aluminium louvers, 2 No. fixed
glass on top all complete as per drawing and
Engineers approval. (each louver 0.41m2 )

2.G.32 In ground floor

1.00

Nr.

5,515.00

5,515.00

2.G.33 In first floor

1.00

Nr.

5,515.00

5,515.00

2.G.34 In second floor

1.00

Nr.

5,515.00

5,515.00

2.G.35 In third floor

1.00

Nr.

5,515.00

5,515.00

2.G.36 In fourth floor

1.00

Nr.

5,515.00

5,515.00

2.G.37 In machine room floor

1.00

Nr.

5,515.00

5,515.00

17.22

m2

6,200.00

106,764.00

6.24

m2

6,200.00

38,688.00

Aluminium Partition
Aluminium framed glazed partition type- P1,
5738 x 3000mm high overall with powder
coated aluminium frame, top and second
panell consisting of 5mm thick clear glass,
middle panell consisting of 5mm thick clear
glass with sand blast stickers and aluminium
composite panell at bottom( both sides ), all
as per detail Drg. No 2011-10-004AR15(
Door type D2 measured separately.)
2.G.38 In first floor ( 1 No. )

Aluminium framed glazed partition type- P2,


2088 x 3000mm high overall with powder
coated aluminium frame, top and second
panell consisting of 5mm thick clear glass,
middle panell consisting of 5mm thick clear
glass with sand blast stickers and aluminium
composite panell at bottom( both sides ), all
as per detail Drg. No 2011-10-004AR15
2.G.39 In first floor ( 1 No. )

Total Carried Forward


S07 - 63

3,796,247.00

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY

UNIT

RATE

Brought forward

AMOUNT
3,796,247.00

Aluminium framed glazed partition type- P3,


400 x 3000mm high overall with powder
coated aluminium frame, top and second
panell consisting of 5mm thick clear glass,
middle panell consisting of 5mm thick clear
glass with sand blast stickers and aluminium
composite panell at bottom( both sides ), all
as per detail Drg. No 2011-10-004AR15
2.G.40 In first floor ( 1 No. )

1.20

6,200.00

7,440.00

2.16

m2

6,200.00

13,392.00

10.80

m2

9,500.00

102,600.00

9.72

m2

7,490.00

72,802.80

Aluminium framed glazed partition type- P4,


1595 x 1350mm high overall with powder
coated aluminium frame, top panells
consisting of 5mm thick clear glass with sand
blast stickers and aluminium composite
panells at bottom( both sides ), all as per
detail Drg. No 2011-10-004AR15
2.G.41 In first floor ( 1 No. )

Aluminium framed glazed partition type- P4',


3600 x 3000mm high overall with powder
coated aluminium frame, top and second
panells consisting of 5mm thick clear glass,
middle panells consisting of 5mm thick clear
glass with sand blast stickers and aluminium
composite panells at bottom( both sides
),including 900 x 2100mm high door all as
per detail Drg. No 2011-10-004AR15

2.G.42 In first floor ( 1 No. )

Aluminium framed glazed partition type- P5,


2700 x 3600mm high overall with powder
coated aluminium frame, top and second
panells consisting of 5mm thick clear glass,
middle panells consisting of 5mm thick clear
glass with sand blast stickers and aluminium
composite panells at bottom( both sides
),including 900 x 2100mm high door all as
per detail Drg. No 2011-10-004AR15

2.G.43 In first floor ( 1 No. )


Total Carried Forward
S07 - 64

3,992,481.80

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY

UNIT

RATE

Brought forward

AMOUNT
3,992,481.80

Aluminium framed glazed partition type- P6,


1260 x 2100mm high overall with powder
coated aluminium frame, top panells
consisting of 5mm thick clear glass, middle
panells consisting of 5mm thick clear glass
with sand blast stickers and aluminium
composite panells at bottom( both sides ), all
as per detail Drg. No 2011-10-004AR15
2.G.44 In first floor ( 1 No. )

2.65

m2

6,200.00

16,430.00

11.50

m2

6,200.00

71,300.00

4.32

m2

6,200.00

26,784.00

4.32

m2

6,200.00

26,784.00

Aluminium framed glazed partition type- P7,


5470 x 2100mm high overall with powder
coated aluminium frame, top panells
consisting of 5mm thick clear glass, middle
panells consisting of 5mm thick clear glass
with sand blast stickers and aluminium
composite panells at bottom( both sides ), all
as per detail Drg. No 2011-10-004AR15
2.G.45 In first floor ( 1 No. )

Aluminium framed glazed partition type- P8,


1200 x 3600mm high overall with powder
coated aluminium frame, top and second
panells consisting of 5mm thick clear glass,
middle panells consisting of 5mm thick clear
glass with sand blast stickers and aluminium
composite panells at bottom( both sides ), all
as per detail Drg. No 2011-10-004AR16
2.G.46 In second floor ( 1 No. )

Aluminium framed glazed partition type- P9,


1200 x 3600mm high overall with powder
coated aluminium frame, top and second
panells consisting of 5mm thick clear glass,
middle panells consisting of 5mm thick clear
glass with sand blast stickers and aluminium
composite panells at bottom( both sides ), all
as per detail Drg. No 2011-10-004AR16

2.G.47 In second floor ( 1 No. )


Total Carried Forward
S07 - 65

4,133,779.80

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY

UNIT

RATE

Brought forward

AMOUNT
4,133,779.80

Aluminium framed glazed partition type- P10,


4730 x 3000mm high overall with powder
coated aluminium frame, top and second
panell consisting of 5mm thick clear glass,
middle panell consisting of 5mm thick clear
glass with sand blast stickers and aluminium
composite panell at bottom( both sides ), all
as per detail Drg. No 2011-10-004AR15(
Door type D2 measured separately.)

2.G.48 In second floor ( 1 No. )

14.20

6,200.00

88,040.00

22.50

m2

6,200.00

139,500.00

12.40

m2

6,200.00

76,880.00

4.58

m2

6,200.00

28,396.00

Aluminium framed glazed partition type- P11,


7449 ( without column ) x 3000mm high
overall with powder coated aluminium frame,
top and second panell consisting of 5mm
thick clear glass, middle panell consisting of
5mm thick clear glass with sand blast stickers
and aluminium composite panell at bottom(
both sides ), all as per detail Drg. No 2011-10004AR16
( Door type D2 measured
separately.)
2.G.49 In second floor ( 1 No. )
Aluminium framed glazed partition type- P12,
5906 x 2100mm high overall with powder
coated aluminium frame, top panells
consisting of 5mm thick clear glass, middle
panells consisting of 5mm thick clear glass
with sand blast stickers and aluminium
composite panells at bottom( both sides ), all
as per detail Drg. No 2011-10-004AR16
2.G.50 In second floor ( 1 No. )
Aluminium framed glazed partition type- P13,
2181 x 2100mm high overall with powder
coated aluminium frame, top panells
consisting of 5mm thick clear glass, middle
panells consisting of 5mm thick clear glass
with sand blast stickers and aluminium
composite panells at bottom( both sides ), all
as per detail Drg. No 2011-10-004AR16
2.G.51 In second floor ( 1 No. )
Total Carried Forward
S07 - 66

4,466,595.80

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY

UNIT

RATE

Brought forward

AMOUNT
4,466,595.80

Aluminium framed glazed partition type- P14,


9476 x 4200mm high overall with powder
coated aluminium frame, top and second
panell consisting of 5mm thick clear glass,
middle panell consisting of 5mm thick clear
glass with sand blast stickers and aluminium
composite panell at bottom( both sides )
including 3 No. doors 900 x 2100mm high, all
as per detail Drg. No 2011-10-004AR17

2.G.52 In third floor ( 1 No. )

39.82

7,200.00

286,704.00

24.10

6,200.00

149,420.00

24.10

m2

6,200.00

149,420.00

185.00

m2

10,500.00

1,942,500.00

20.00

m2

12,000.00

240,000.00

Aluminium framed glazed partition type- P15,


5732 x 4200mm high overall with powder
coated aluminium frame, top and second
panell consisting of 5mm thick clear glass,
middle panell consisting of 5mm thick clear
glass with sand blast stickers and aluminium
composite panell at bottom( both sides ) , all
as per detail Drg. No 2011-10-004AR17

2.G.53 In third floor ( 1 No. )


Aluminium framed glazed partition type- P16,
5732 x 2100mm high overall with powder
coated aluminium frame, top panells
consisting of 5mm thick clear glass, middle
panells consisting of 5mm thick clear glass
with sand blast stickers and aluminium
composite panells at bottom( both sides ), all
as per detail Drg. No 2011-10-004AR17
2.G.54 In third floor ( 2 No. )
Aluminium cladding
2.G.55 Supply & fixing Aluminium cladding as per
manufacture's detail
Aluminium weather shade
Supply & fixing Polycarbonate weather shade
on powder coated Aluminium frame fixed to
wall with stainless steel cables as per
manufacture's specification
2.G.56 Ground floor entrance lobby
Total Carried Forward
S07 - 67

7,234,639.80

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY

UNIT

RATE

Brought forward

AMOUNT
7,234,639.80

Steel Doors
Steel Collapsible Door type CD, 2125 x 2100
mm high overall all complete as per
Manufacturer's specification and Engineers
2
approval. (each door 4.46m )
2.G.57 In fourth floor

1.00

Nr.

9,800.00

9,800.00

2.G.58 In ground floor

3.00

Nr.

7,260.00

21,780.00

2.G.59 In first floor

3.00

Nr.

7,260.00

21,780.00

2.G.60 In second floor

3.00

Nr.

7,260.00

21,780.00

2.G.61 In third floor

2.00

Nr.

7,260.00

14,520.00

2.G.62 In ground floor

2.00

Nr.

14,540.00

29,080.00

2.G.63 In first floor

1.00

Nr.

14,540.00

14,540.00

2.G.64 In third floor

1.00

Nr.

14,540.00

14,540.00

2.G.65 In ground floor

1.00

Nr.

12,100.00

12,100.00

2.G.66 In first floor

2.00

Nr.

12,100.00

24,200.00

2.G.67 In second floor

3.00

Nr.

12,100.00

36,300.00

2.G.68 In third floor

3.00

Nr.

12,100.00

36,300.00

Steel Door type TD, 500 x 1800 mm high


overall all complete as per Manufacturer's
specification and Engineers approval. (each
door 0.9m2 )

Fiber glass door


Door type D4, 900 x 2100 mm high overall
with white colour, mat finished fiber glass
frame consisting of 1 No. fiber glass door
sash with fiber glass louvers on top, as per
drawing and Engineers approval (each door
1.89m2)

Door type D5, 750 x 2100 mm high overall


with white colour, mat finished fiber glass
frame consisting of 1 No. fiber glass door
sash, as per drawing and Engineers
approval (each door 1.57m2)

Total Carried Forward


S07 - 68

7,491,359.80

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY

UNIT

RATE

Brought forward

AMOUNT
7,491,359.80

Stainless Steel Balustrade at staircase


900mm high Stainless steel balustrade
consisting of 37.5mm dia. balusters , one
end welded to 50x50x6mm M.S. plate and
embedded in concrete step with anchor bolts
and the other end welded to 50mm dia
stainless steel hand rail all complete as per
detail Drawing No. 2011-10-004AR08 and
Engineer's approval.
2.G.69 Between ground floor and first floor

10.00

12,500.00

125,000.00

2.G.70 Between first floor and second floor

11.00

12,500.00

137,500.00

12,500.00

137,500.00

12,500.00

150,000.00

12.00

6,900.00

82,800.00

12.00

10,500.00

126,000.00

2.G.71 Between second floor and third floor


2.G.72 Between third floor and fourth floor

11.00
12.00

G.I. Pipe balustrade


GI Pipe balustrade 900mm high, consisting of
37.5mm dia GI pipe balusters and. 6mm thick
50x50mm MS flat iron plate welded to the
bottom end of baluster and embedded in
steps. Top end to be welded to 50mm dia.
G.I handrail as per Drg. No 2011-10-004AR08 and Engineers' approval. Rate to
include for prepare and apply one coat of
anticorrosive and two coats of approved
colour CIC paint or equivalent enamel paint
2.G.73 Between fourth floor and Machine room floor
Stainless Steel Railing
900mm high Stainless steel railing, consisting
of 18mm dia Stainless steel uprights at
150mm centers. 6mm thick 50 x50 mm M.S.
plate welded to the bottom end of uprights
and embedded in concrete floor, covered with
stainless steel capping and top end welded to
37.5mm dia stainless steel hand rail all
complete as per Drg. No. 2011-10-004AR08
and Engineer's approval.

2.G.74 At first floor level around the void

TOTAL CARRIED TO COLLECTION ON PAGE S 07 - 100


S07 - 69

8,250,159.80

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION
H- CARPENTRY & JOINERY

QTY

UNIT

RATE

AMOUNT

Note: Refer Pricing Preambles


Joinery
Supply and fixing 225x25mm timber valance
board
2.H.1

In fourth floor roof

7.00

TOTAL CARRIED TO COLLECTION ON PAGE S 07 - 100

S07 - 70

750.00

5,250.00
5,250.00

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION
J- ROOFING AND ROOF PLUMBING

QTY

UNIT

RATE

AMOUNT

Note-Refer Pricing Preambles


Colour up corrugated Asbestos roofing
sheets laid on and including steel frame work
.The sheets fixed with G.I hooks, bolts, nuts ,
limpets and bitumestic washers etc. with end
laps not less than 150mm and half
corrugation side laps all complete as per
drawing
No.2010-16-035ST
30
and
Engineers approval. ( Steel frame work
measured separately )
2.J.1

In fourth floor roof

70.00

1,025.00

71,750.00

7.00

1,100.00

7,700.00

4.00

1,100.00

4,400.00

20.00

1,100.00

22,000.00

Roof Plumbing
Note:
All zinc / aluminum down pipes and fittings
shall comply with the latest BSS for Zinc /
Aluminum gutters down pipes and fittings

120x130mm square, zinc / Aluminium eaves


gutter fixed complete as per manufacture's
specification.
2.J.2

At asbestos roof

100 dia. Zinc / Aluminium down pipes fixed


to wall as per manufacture's specification.
2.J.3

From asbestos roof

2.J.4

From water tank roof slab

150 dia. Zinc / Aluminium down pipes fixed


to wall as per manufacture's specification.
2.J.5

From fourth floor roof slab

54.00

1,400.00

75,600.00

2.J.6

From water tank roof slab

20.00

1,400.00

28,000.00

Total Carried Forward


S07 - 71

209,450.00

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY

UNIT

RATE

Brought forward

AMOUNT
209,450.00

Extra over Zinc / Aluminium down pipes &


gutters for the following
2.J.7

150 x125mm moulded center running head

2.J.8

150 x 75mm Shoes

2.J.9

End caps

2.00

Nr.

800.00

1,600.00

11.00

Nr.

700.00

7,700.00

2.00

Nr.

450.00

900.00

18.00

1,400.00

25,200.00

Flashing
2.J.10 Flashing out of No. 22 B. W. G. galvanized
iron sheets 450mm wide at lower roof and the
wall, one edge dressed over the roof to width
not less than 300mm, the other edge turned
in to a height of not less than 150mm and
tucked into chase out in the wall and pointed
in cement and sand1:2.Provide for treating
both faces of the sheet with two thick coat of
hot tar.

TOTAL CARRIED TO COLLECTION ON PAGE S 07 - 100

S07 - 72

244,850.00

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION
K - PLUMBING

QTY

UNIT

RATE

AMOUNT

Refer Pricing Preambles


Sanitary fittings and fixtures
Note :
Unless otherwise stated all sanitary fittings
and fixtures shall be of Imported
Manufacture, or alternate makes of
comparable quality and performance may be
permitted for which prior written approval of
the Engineer will be required.
All wash basins, sinks and urinals are to be
provided with bottle traps to 3943
Supply & fixing Closed coupled European
type low level closet suite white vitreous china
comprising closet with "P" or "S" trap as
directed and double plastic seat cover and ,
6 liter capacity white vitreous china low level
cistern. Rate to include for fixing closet to
floor with necessary screws and water supply
and outlet connection, all complete to working
order.
2.K.1

in ground floor

1.00

Nr.

8,200.00

8,200.00

2.K.2

In first floor

2.00

Nr.

8,200.00

16,400.00

2.K.3

In second floor

3.00

Nr.

8,200.00

24,600.00

2.K.4

In third floor

3.00

Nr.

8,200.00

24,600.00

1.00

Nr.

8,200.00

8,200.00

Supply & fixing Closed coupled European


type low level closet suite white vitreous china
comprising closet with "P" or "S" trap as
directed and double plastic seat cover and ,
6 liter capacity white vitreous china low level
cistern. Rate to include for fixing closet to
floor with necessary screws and water supply
and outlet connection, all complete to working
order.
2.K.5

in ground floor disable toilet

Total Carried Forward


S07 - 73

82,000.00

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY

UNIT

RATE

Brought forward

AMOUNT
82,000.00

Supply & fixing Wash basin 550 x 400mm


overall size white vitreors china 32mm dia.
rubber plug with Chromium plated chain
waste, 12mm dia. Pillar tap. Rate to include
for fixing basin to wall, water connections
respectively all complete to Working order.
(Bottle trap measured separately.)
2.K.6

in ground floor

5.00

Nr.

19,000.00

95,000.00

2.K.7

In first floor

4.00

Nr.

19,000.00

76,000.00

2.K.8

In second floor

5.00

Nr.

19,500.00

97,500.00

2.K.9

In third floor

3.00

Nr.

19,500.00

58,500.00

2.K.10 in ground floor

5.00

Nr.

4,000.00

20,000.00

2.K.11 In first floor

4.00

Nr.

4,000.00

16,000.00

2.K.12 In second floor

5.00

Nr.

4,000.00

20,000.00

2.K.13 In third floor

3.00

Nr.

4,000.00

12,000.00

1.00

Nr.

15,000.00

15,000.00

1.00

Nr.

10,000.00

10,000.00

Supply & fixing Mirror over wash basin shall


be superior quality plate glass beveled mirror
size 500 x 400mm free from ripples and all
blimishes mounted on fibre glass frame with
chromium plated brass screws.

Supply & fixing Stainless steel drop down rail


25mm dia 700mm long including stainless
steel brackets fixed to wall 700mm above
finished floor level at disable toilet
2.K.14 in ground floor

Supply & fixing Stainless steel wall mounted


hand rail 25mm dia 600mm long including
stainless steel brackets fixed to wall 700mm
above finished floor level at disable toilet
2.K.15 in ground floor

Total Carried Forward


S07 - 74

502,000.00

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY

UNIT

RATE

Brought forward

AMOUNT
502,000.00

Ceramic toilet paper holder fixed to wall with


fibre plugs at 600mm above finished floor
level
2.K.16 in ground floor

2.00

Nr.

3,000.00

6,000.00

2.K.17 In first floor

2.00

Nr.

3,000.00

6,000.00

2.K.18 In second floor

3.00

Nr.

3,250.00

9,750.00

2.K.19 In third floor

3.00

Nr.

3,250.00

9,750.00

2.K.20 in Ground floor

1.00

Nr.

3,000.00

3,000.00

2.K.21 In first floor

2.00

Nr

3,300.00

6,600.00

2.K.22 in ground floor

3.00

Nr.

3,100.00

9,300.00

2.K.23 In first floor

2.00

Nr.

3,200.00

6,400.00

2.K.24 In second floor

5.00

Nr.

3,200.00

16,000.00

2.K.25 In third floor

2.00

Nr.

3,400.00

6,800.00

2.K.26 in ground floor

2.00

Nr.

4,100.00

8,200.00

2.K.27 In first floor

2.00

Nr.

4,200.00

8,400.00

2.K.28 In second floor

3.00

Nr.

4,300.00

12,900.00

2.K.29 In third floor

3.00

Nr.

4,300.00

12,900.00

Stainless steel towel rail 25mm dia. and


600mm long fixed to wall with fibre plugs and
chromium plated brass screws.

Ceramic soap tray fixed to wall with fibre


plugs

20mm dia bidet spray tap with flexible


coupling.

Total Carried Forward


S07 - 75

624,000.00

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY

UNIT

RATE

Brought forward

AMOUNT
624,000.00

Supply & fixing 32mm dia. plastic bottle trap


2.K.30 In ground floor

5.00

Nr.

1,200.00

6,000.00

2.K.31 In first floor

4.00

Nr.

1,200.00

4,800.00

2.K.32 In second floor

5.00

Nr.

1,200.00

6,000.00

2.K.33 In third floor

3.00

Nr.

1,200.00

3,600.00

2.K.34 In ground floor

9.00

Nr.

900.00

8,100.00

2.K.35 In first floor

8.00

Nr.

920.00

7,360.00

11.00

Nr.

920.00

10,120.00

9.00

Nr.

920.00

8,280.00

Supply & fixing 20mm dia angle value

2.K.36 In second floor


2.K.37 In third floor
Sanitary Plumbing
Water Supply Pipes
Notes:-All water supply pipe work shall be in
PVC type 1000 to SLS 147:1993 and PVC
fittings to SLS 659:1993
All pipework with less than 600mm of ground
cover and all pipe work under roadways with
less than 900mm of ground cover are to be
encased in concrete
Piping under 50mm dia. include for all
necessary elbows, bends, tees, Junctions,
inspection openings and similar fixtures.
2.K.38 50mm dia water supply main from existing
sump to over head tank laid as directed.

28.00

600.00

16,800.00

2.K.39 50mm dia water supply distribution pipe from


over head tank laid as directed

24.00

600.00

14,400.00

2.K.40 32mm dia water supply distribution pipe from


over head tank laid as directed

15.50

550.00

8,525.00

Total Carried Forward


S07 - 76

717,985.00

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY

UNIT

RATE

Brought forward

AMOUNT
717,985.00

2.K.41 32mm dia distribution pipe as connection to


sanitary fittings fixed to wall or burried in floor
screed as directed.

3.30

550.00

1,815.00

2.K.42 25mm dia distribution pipe as connection to


sanitary fittings fixed to wall or burried in floor
screed as directed.

17.50

500.00

8,750.00

2.K.43 20mm dia distribution pipe as connection to


sanitary fittings fixed to wall or burried in floor
screed as directed.

48.80

460.00

22,448.00

2.K.44 50mm dia bend

7.00

Nr.

275.00

1,925.00

2.K.45 50mm dia tee

10.00

Nr.

275.00

2,750.00

2.K.46 50 x 50 x 32mm dia unequal tee

1.00

Nr.

520.00

520.00

2.K.47 50mm dia Gate valve

8.00

Nr.

2,200.00

17,600.00

2.K.48 40mm dia Gate valve

4.00

Nr.

2,600.00

10,400.00

2.K.49 32mm dia Isolation valve

3.00

Nr.

1,200.00

3,600.00

2.K.50 25mm dia Isolation valve

7.00

Nr.

1,800.00

12,600.00

Extra over for above UPVC pipes in the


following;

Note:
All above ground soil, waste and vent pipe
work shall be in PVC to BS 4514 and BS
5255 or SLS1202 & SLS1210
All under ground drainage pipe work shall be
in UPVC to BS 4660 or SLS1202 & SLS 1210

Total Carried Forward


S07 - 77

800,393.00

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY

UNIT

RATE

Brought forward

AMOUNT
800,393.00

Waste water pipes


Refer pricing Preambles

2.K.51 63mm dia. waste water pipe buried in floor


screed or chased to wall or laid as directed
by Engineer

37.00

900.00

33,300.00

2.K.52 110mm dia. waste water pipes extended from


trap gulley to the nearest waste water
manhole with average invert depth not
exceeding 900mm including excavation and
back filling , bedding on a layer of cement
concrete 1:4:8(38mm) 100mm thick and
100mm wide on each side of the pipe and
subsequently encasing with the same
concrete after inspection of the pipe

9.00

1,200.00

10,800.00

2.K.53 63mm dia vertical waste water pipe carried


450mm above roof level as vent fixed to wall
as directed.

54.00

1,000.00

54,000.00

2.K.54 63mm dia copper wire dome on top of vent


pipes.

3.00

Nr.

1,000.00

3,000.00

30.00

900.00

27,000.00

2.K.56 63mm dia elbow

17.00

Nr.

200.00

3,400.00

2.K.57 63m dia bend

36.00

Nr.

200.00

7,200.00

2.K.58 63mm dia bend with cleaning eye

3.00

Nr.

225.00

675.00

2.K.59 63mm dia equal tee

6.00

Nr.

225.00

1,350.00

2.K.60 63mm dia equal tee with cleaning eye

2.00

Nr.

225.00

450.00

Wash out and over floor


2.K.55 50mm dia wash out and over floor pipe from
over head tank fixed to wall or laid as
directed.

Extra over above UPVC pipes for the


following;

Total Carried Forward


S07 - 78

941,568.00

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY

UNIT

RATE

Brought forward

AMOUNT
941,568.00

Soil and vent pipes


Refer pricing Preambles
2.K.61 110mm dia. soil pipe extended from closets
and upper floor stacks to the nearest
manhole with average invert depth not
exceeding 900mm including excavation and
back filling , bedding on a layer of cement
concrete 1:4:8(38mm) 100mm thick and
100mm wide on each side of the pipe and
subsequently encasing with the same
concrete after inspection of the pipe

3.80

1,200.00

4,560.00

2.K.62 110mm dia. soil pipe buried in floor screed


or laid as directed by Engineer

9.00

1,200.00

10,800.00

2.K.63 110mm dia vertical soil and vent pipe


carried 450mm above roof level fixed 50mm
clear of wall as directed.

37.00

1,200.00

44,400.00

2.K.64 110mm dia copper wire dome on top of vent


pipes.

2.00

Nr.

1,200.00

2,400.00

2.K.65 110mm dia tee with cleaning eye

8.00

Nr.

625.00

5,000.00

2.K.66 110mm dia tee

6.00

Nr.

700.00

4,200.00

2.K.67 110mm dia bend with cleaning eye

5.00

Nr.

725.00

3,625.00

11.00

Nr.

700.00

7,700.00

4.00

Nr.

800.00

3,200.00

2.K.70 In ground floor

4.00

Nr.

800.00

3,200.00

2.K.71 In first floor

4.00

Nr.

800.00

3,200.00

2.K.72 In second floor

6.00

Nr.

800.00

4,800.00

2.K.73 In third floor

7.00

Nr.

800.00

5,600.00

Extra over UPVC pipes for the following;

2.K.68 110mm dia bend


2.K.69 110mm dia 'Y' branch
Accessories
Trapped
floor
gully
to
be
UPVC
(150x150x118) with P.V.C removable grating.
Trapped floor gully to be connected to waist
water line with solvent cement & un
connected opening to be sealed with end
caps with solvent cement.

Total Carried Forward


S07 - 79

1,044,253.00

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY

UNIT

RATE

Brought forward

AMOUNT
1,044,253.00

Trapped gully with cement concrete 1:2:4


(20mm ) based and precast R.C.C cover
on top as per Drawing No W.S.S 1852.00
and Engineers approved.
2.K.74 In ground floor

3.00

Nr.

2,500.00

7,500.00

2.K.75 Supply and fixing 2000 Lit capacity plastic


water tank.

4.00

Nr.

26,000.00

104,000.00

2.K.76 Supply & fixing a pump capable of 3.0 l/sec


against total head of 30m.

1.00

Nr.

50,000.00

50,000.00

37.00

1,600.00

59,200.00

2.K.77 Surface water drain 300mm wide and 450mm


average depth internally built to slope in
cement concrete 1:3:6 ( 25mm ) in 100 mm
thick base and 75mm thick side walls,
complete with 12mm thick cement and sand
1:3 rendering, finished smooth with neat
cement floating to all exposed surfaces and
covered with perforated slab including
excavation and expansion joints around the
building.( Provisional )

TOTAL CARRIED TO COLLECTION ON PAGE S 07 - 100

S07 - 80

1,264,953.00

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION
L - WALL, CEILING AND FLOOR FINISHES

QTY

UNIT

RATE

AMOUNT

Note-Refer Pricing Preambles


Plinth
2.L.1

20mm thick plaster in cement and sand in 1:3


finished smooth with coloured cement floating
to plinth including forming arises

90.00

m2

750.00

67,500.00

Wall finishes
Plaster 16mm thick in cement and sand
(1:5) finished rough including forming
arises (Externally.)
On brick walls, attached columns
2.L.2

From ground floor level to first floor level

140.00

m2

650.00

91,000.00

2.L.3

From first floor level to second floor level

145.50

m2

670.00

97,485.00

2.L.4

From second floor level to third floor level

147.00

m2

690.00

101,430.00

2.L.5

From third floor level to fourth floor level

197.00

m2

710.00

139,870.00

2.L.6

From fourth floor level to machine room floor


level

190.00

m2

710.00

134,900.00

17.00

m2

710.00

12,070.00

2.L.7

From machine room floor level to roof slab


level
Reveals not exceeding 150mm wide

2.L.8

From ground floor level to first floor level

36.00

230.00

8,280.00

2.L.9

From first floor level to second floor level

69.00

240.00

16,560.00

2.L.10 From second floor level to third floor level

53.50

250.00

13,375.00

2.L.11 From third floor level to fourth floor level

62.00

260.00

16,120.00

2.L.12 From fourth floor level to machine room floor


level

30.00

260.00

7,800.00

2.L.13 From machine room floor level to roof slab


level

39.50

300.00

11,850.00

Total Carried Forward


S07 - 81

718,240.00

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY

UNIT

RATE

Brought forward

AMOUNT
718,240.00

Sides & Soffit of weather shade


2.L.14 At ground floor

21.00

500.00

10,500.00

2.L.15 At first floor

21.00

525.00

11,025.00

2.L.16 At second floor

22.50

550.00

12,375.00

2.L.17 At third floor lintol level

30.00

600.00

18,000.00

2.L.18 At fourth floor lintol level

12.50

650.00

8,125.00

3.50

650.00

2,275.00

12.00

m2

650.00

7,800.00

2.L.21 From ground floor level to first floor level

250.00

m2

650.00

162,500.00

2.L.22 From first floor level to second floor level

298.00

m2

670.00

199,660.00

2.L.23 From second floor level to third floor level

309.00

m2

690.00

213,210.00

2.L.24 From third floor level to fourth floor level

332.00

m2

710.00

235,720.00

2.L.25 From fourth floor level to machine room floor


level

269.00

m2

710.00

190,990.00

55.00

m2

710.00

39,050.00

2.L.27 From ground floor level to first floor level

141.00

230.00

32,430.00

2.L.28 From first floor level to second floor level

107.00

240.00

25,680.00

2.L.29 From second floor level to third floor level

91.50

250.00

22,875.00

2.L.19 At machine room floor lintol level


Soffit & sides of gutter
2.L.20 At machine room roof level

Plaster 16mm thick in cement lime and


sand (1:1:5) finished smooth with lime
putty including forming arises (Internally.)

On brick walls, attached columns

2.L.26 From machine room floor level to roof slab


level
Reveals not exceeding 150mm wide

Total Carried Forward


S07 - 82

1,910,455.00

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY

2.L.30 From third floor level to fourth floor level

80.00

UNIT
.
m

2.L.31 From fourth floor level to machine room floor


level

30.00

2.L.32 From machine room floor level to roof slab


level

Brought forward

RATE

AMOUNT
1,910,455.00

260.00

20,800.00

260.00

7,800.00

16.00

300.00

4,800.00

2.L.33 At first floor level

141.20

700.00

98,840.00

2.L.34 At second floor level

180.00

715.00

128,700.00

2.L.35 At third floor level

180.30

m2

730.00

131,619.00

2.L.36 At fourth floor level

152.00

m2

750.00

114,000.00

2.L.37 At machine room floor level

11.00

m2

750.00

8,250.00

2.L.38 At machine room roof level

45.00

m2

760.00

34,200.00

2.L.39 At water tank room roof level

22.00

m2

760.00

16,720.00

2.L.40 At first floor level

20.00

m2

500.00

10,000.00

2.L.41 At second floor level

21.50

m2

525.00

11,287.50

2.L.42 At third floor level

23.00

m2

550.00

12,650.00

2.L.43 At fourth floor level

22.00

m2

600.00

13,200.00

2.L.44 At Machine room roof level

2.00

m2

650.00

1,300.00

2.L.45 At Water tank room roof level

4.00

m2

650.00

2,600.00

Soffit of suspended floor slab including


landings

Sides and soffit of beams

Total Carried Forward


S07 - 83

2,527,221.50

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY

UNIT

RATE

Brought forward

AMOUNT
2,527,221.50

Sloping soffit of staircase


2.L.46 Between ground floor and first floor

7.20

750.00

5,400.00

2.L.47 Between first floor and second floor

7.70

750.00

5,775.00

2.L.48 Between second floor and third floor

7.70

760.00

5,852.00

2.L.49 Between third floor and fourth floor

8.20

m2

760.00

6,232.00

2.L.50 Between fourth floor and machine room floor

8.20

m2

760.00

6,232.00

2.L.51 In ground floor toilets

35.50

m2

2,800.00

99,400.00

2.L.52 In first floor toilets

15.00

m2

2,900.00

43,500.00

2.L.53 In second floor toilets

30.00

m2

3,000.00

90,000.00

2.L.54 In third floor toilets

35.00

m2

3,000.00

105,000.00

16.50

3,450.00

56,925.00

9.00

m2

3,500.00

31,500.00

2.L.57 In second floor toilets

13.50

m2

3,550.00

47,925.00

2.L.58 In third floor toilets

27.00

m2

3,600.00

Wall tiles
200 x 300mm glazed vitreous ceramic wall
tiles lining up to height of 1500mm from
finished floor level, of an approved colour set
in cement and sand (1:3) screed backing
and pointed with tile grout to match the colour
of tiles and forming neat uniform between
tiles including fixing corner and edge tiles.
(Price range 900-1000Rs. per m2 without
Vat)

Floor Finishes
Floor Tiles
300mm x 300mm coloured vitreous non skid,
ceramic floor tiles paving in approved colour
on 10mm thick cement and sand (1:3) screed
backing and pointed with tile grout to match
the colour of tiles and forming neat uniform
joint between tiles. (Price range 13001500Rs.per m2 without Vat)

2.L.55 In ground floor toilets


2.L.56 In first floor toilets

Total Carried Forward


S07 - 84

97,200.00
3,128,162.50

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY

UNIT

RATE

Brought forward

AMOUNT
3,128,162.50

300mm x 300mm coloured homogeneous ,


heavy duty floor tiles paving in approved
colour on 10mm thick cement and sand (1:3)
screed backing and pointed with tile grout to
match the colour of tiles and forming neat
uniform joint between tiles. (Price range 13001500Rs.per m2 without Vat)

2.L.59 Between ground floor and first floor landing

2.50

3,450.00

8,625.00

2.L.60 Between first floor and second floor landing

2.50

3,500.00

8,750.00

2.L.61 Between second floor and third floor landing

2.50

3,550.00

8,875.00

2.L.62 Between third floor and fourth floor landing

2.50

m2

3,600.00

9,000.00

2.L.63 Between fourth floor and machine room floor


landing

2.50

m2

3,650.00

9,125.00

2.L.64 Between ground floor and first floor

21.00

310.00

6,510.00

2.L.65 Between first floor and second floor

25.00

350.00

8,750.00

2.L.66 Between second floor and third floor

25.00

390.00

9,750.00

2.L.67 Between third floor and fourth floor

25.00

340.00

8,500.00

2.L.68 Between fourth floor and Machine room floor

25.00

450.00

11,250.00

2.L.69 Between ground floor and first floor

20.00

600.00

12,000.00

2.L.70 Between first floor and second floor

22.00

625.00

13,750.00

2.L.71 Between second floor and third floor

22.00

650.00

14,300.00

2.L.72 Between third floor and fourth floor

22.00

675.00

14,850.00

2.L.73 Between fourth floor and Machine room floor

22.00

675.00

14,850.00

150mm high to risers of staircase

175mm high to risers of staircase

300mm wide to tread of staircase

Total Carried Forward


S07 - 85

3,287,047.50

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY

UNIT

RATE

Brought forward

AMOUNT
3,287,047.50

300mm x 600mm coloured homogeneous


non skid, floor tiles paving in approved
colour on 10mm thick on earlier laid rough
cement rendering for floor and joints filled
with grouting powder to match the tiles. (Price
range 1300-1500Rs. per m2 without taxes )

2.L.74 In ground floor

147.50

3,450.00

508,875.00

2.L.75 In first floor

108.00

m2

3,500.00

378,000.00

2.L.76 In second floor

149.00

3,550.00

528,950.00

2.L.77 In third floor

124.50

m2

3,600.00

448,200.00

59.00

m2

3,650.00

215,350.00

65.00

m2

610.00

39,650.00

8.70

m2

650.00

5,655.00

2.L.81 In ground floor

14.00

280.00

3,920.00

2.L.82 In first floor

15.00

290.00

4,350.00

2.L.81 In second floor

15.00

300.00

4,500.00

2.L.82 In third floor

15.00

310.00

4,650.00

2.L.83 In fourth floor

27.00

320.00

8,640.00

2.L.78 In fourth floor

Cement rendering
Cement rendering floor, 18mm thick in
cement and sand (1:3) rendering finished
smooth with neat cement floating
2.L.79 In fourth floor free slab area
2.L.80 In machine room floor

Cement skirting
100mm high cement and sand (1:3)
rendering and finished smooth with neat
cement floating.

Total Carried Forward


S07 - 86

5,437,787.50

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY

UNIT

RATE

Brought forward

AMOUNT
5,437,787.50

Tile skirting
300x100mm high tile skirting laid on and
including 10mm thick cement and sand (1:3)
screed backing and the joints pointed with
tile grout to match the colour of tiles.
2.L.84 In ground floor

70.00

400.00

28,000.00

2.L.85 In first floor

57.00

425.00

24,225.00

2.L.86 In second floor

57.00

450.00

25,650.00

2.L.87 In third floor

50.00

450.00

22,500.00

2.L.88 In fourth floor

35.00

500.00

17,500.00

6.80

m2

2,400.00

16,320.00

2.L.90 At ground floor toilet area

13.90

m2

2,800.00

38,920.00

2.L.91 At first floor lunch room & toilet area

20.00

m2

2,900.00

58,000.00

2.L.92 At second floor lunch room & toilet area

20.00

3,000.00

60,000.00

2.L.93 At third floor toilet area

13.90

m2

3,100.00

43,090.00

2.L.94 At first floor

73.00

m2

3,500.00

255,500.00

2.L.95 At second floor

55.00

m2

3,600.00

198,000.00

2.L.96 At third floor

58.00

m2

3,700.00

214,600.00

2.L.97 At fourth floor

58.00

m2

3,800.00

220,400.00
6,660,492.50

Ceiling finishes
Cement fibre sloped ceiling, hang with roof as
per detail Drg. No.2011-10-004AR04
2.L.89 At fourth floor eave
Cement fibre flat ceiling, hang with roof as
per detail Drg.. No.2011-10-004AR04,
No.2011-10-004AR05, No.2011-10-004AR06

Suspended metal perforated flat ceiling, fixed


with appropriate aluminium frame as per
detail Drg.. No.2011-10-004AR04, No.201110-004AR05, No.2011-10-004AR06

TOTAL CARRIED TO COLLECTION ON PAGE S 07 - 100


S07 - 87

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION
M- ELECTRICAL INSTALLATION
Refer Pricing Preambles
Electrical items are to be of the following
makes:
(a) Electrical switches and socket outlets :
MK,Crabtree, PDL Tenby, Clipsal,
Kevilton, Orange or equivalent.
Orange or equivalent.
(b) Distribution boards:
Consumer unit flush mount type or as
specified.
(c) Fans:
KDK.,National-Japanese origins
(d) Switch Gear-MCCB' S:
Merlin Gerine, Terasaki, ABB, or
equivalent.
[e] RCCB, MCB' S:
Merlin Gerine, Legrand, Hager,
Moeller, Crabtree , F &G (Austria ) or
equivalent
[f] Fluorescent Fittings :
The Choke, Starter & Capacitor should
be of good quality, British, French,
German or equivalent & the tube should
preferably, Thorn, Philips, National or
equivalent. Fitting fabricated in 26 SWG
Zinc coated sheet steel painted in white
colour ( Quality of the fitting should be
approved by the Engineer)
[g] Distribution sub panels shall be in
surface mount metal enclosure fabricated
in Zinc coated 1.80mm sheet steel
finished with white colour totally enclosed
with hinged door with protection cover
plate. All the relevant components
mention below, shall be enclosed in the
BOQ
[h] Cable trunking 150mm x 100mm
fabricated in 1.20mm Zinc coated sheet
steel complete with couplers hangers end
caps, bends & tees with powder coating
Total Carried Forward
S07 - 88

QTY

UNIT

RATE

AMOUNT

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY

UNIT

RATE

14.00

Nr.

2,600.00

36,400.00

AMOUNT

Brought forward

[i] Cables:
ACL, or approved equivalent
Wiring type in concealed conduit.
Point wiring with 2x1sq.mm PVC/PVC/CU
cables and 2.5sq.mm protective earth in
PVC conduit including accessories 5A
Switch etc. (without lamp fitting)

150mm recessed type down light


2.M.1

In first floor

2.M.2

In second floor

7.00

Nr.

2,700.00

18,900.00

2.M.3

In third floor

6.00

Nr.

2,800.00

16,800.00

150mm Surface mount down light


2.M.4

In second floor

13.00

Nr.

2,700.00

35,100.00

2.M.5

In third floor

12.00

Nr.

2,800.00

33,600.00

14.00

Nr.

2,600.00

36,400.00

Fluorescent lamp 600mm single


2.M.6

In ground floor

2.M.7

In first floor

3.00

Nr.

2,600.00

7,800.00

2.M.8

In second floor

3.00

Nr.

2,700.00

8,100.00

2.M.9

In third floor

3.00

Nr.

2,800.00

8,400.00

2.M.10 In ground floor

4.00

Nr.

2,600.00

10,400.00

2.M.11 In first floor

3.00

Nr.

2,600.00

7,800.00

2.M.12 In second floor

2.00

Nr.

2,700.00

5,400.00

2.M.13 In third floor

4.00

Nr.

2,800.00

11,200.00

2.M.14 In fourth floor

3.00

Nr.

2,900.00

8,700.00

2.M.15 Machine room floor

1.00

Nr.

2,900.00

2,900.00

Fluorescent lamp 1200mm single

Total Carried Forward


S07 - 89

247,900.00

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY

UNIT

RATE

6.00

Nr.

4,000.00

24,000.00

2.M.17 In ground floor

10.00

Nr.

4,000.00

40,000.00

2.M.18 In first floor

10.00

Nr.

4,000.00

40,000.00

5.00

Nr.

3,500.00

17,500.00

2.M.20 In ground floor

3.00

Nr.

3,500.00

10,500.00

2.M.21 In first floor

2.00

Nr.

3,600.00

7,200.00

2.M.22 In second floor

1.00

Nr.

3,700.00

3,700.00

12.00

Nr.

3,500.00

42,000.00

2.M.24 In ground floor

4.00

Nr.

5,000.00

20,000.00

2.M.25 In first floor

2.00

Nr.

5,100.00

10,200.00

2.M.26 In second floor

4.00

Nr.

5,200.00

20,800.00

2.M.27 In third floor

7.00

Nr.

5,300.00

37,100.00

2.M.28 In fourth floor

3.00

Nr.

5,400.00

16,200.00

Brought forward

AMOUNT
247,900.00

Fluorescent lamp fitting 600mm x 600mm


recessed type
2.M.16 In fourth floor

Surface mount Fluorescent lamp fitting


600mm x 600mm

Wall mounted weather proof bracket lamp


2.M.19 In ground floor

Ceiling lamp surface mounted

Wall mounted lamp


2.M.23 In ground floor

Ceiling fan 1400mm dia.

Total Carried Forward


S07 - 90

537,100.00

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY

UNIT

RATE

Brought forward

AMOUNT
537,100.00

Ceiling fan 1200mm dia.


2.M.29 In ground floor

1.00

Nr.

5,000.00

5,000.00

2.M.30 In first floor

1.00

Nr.

5,100.00

5,100.00

2.M.31 In second floor

2.00

Nr.

5,200.00

10,400.00

2.M.32 In third floor

1.00

Nr.

5,300.00

5,300.00

2.M.33 In ground floor

2.00

Nr.

8,000.00

16,000.00

2.M.34 In first floor

2.00

Nr.

8,100.00

16,200.00

2.M.35 In second floor

3.00

Nr.

8,200.00

24,600.00

2.M.36 In third floor

2.00

Nr.

8,300.00

16,600.00

2.00

Nr.

8,000.00

16,000.00

9.00

Nr.

4,200.00

37,800.00

2.M.39 In first floor

13.00

Nr.

4,300.00

55,900.00

2.M.40 In second floor

14.00

Nr.

4,400.00

61,600.00

2.M.41 In third floor

16.00

Nr.

4,500.00

72,000.00

2.M.42 In fourth floor

8.00

Nr.

4,600.00

36,800.00

2.M.43 In Machine room floor

2.00

Nr.

4,600.00

9,200.00

1.00

Nr.

4,200.00

4,200.00

Exhaust fan

Wall fan
2.M.37 In second floor
Supply and installation 13 Amp flush mounted
switch socket outlet with 2 x 2.5 mm2
PVC/PVC/Cu and 2.5mm2 protective earth in
PVC conduit.
2.M.38 In ground floor

Supply and installation 13 Amp flush mounted


switch socket outlet with 2 x 2.5 mm2
PVC/PVC/Cu and 2.5mm2 protective earth in
PVC conduit.fixed in ceiling
2.M.44 In first floor
Total Carried Forward
S07 - 91

929,800.00

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY

UNIT

RATE

Brought forward

AMOUNT
929,800.00

Supply and installation 15 amp . switch


socket outlet flush mounted wired with 2x2.5
mm2 PVC/PVC/Cu and 2.5mm2 protective
earth in PVC conduit.
2.M.45 In Machine room floor

1.00

Nr.

4,500.00

4,500.00

2.M.46 In first floor

1.00

Nr.

4,200.00

4,200.00

2.M.47 In second floor

2.00

Nr.

4,300.00

8,600.00

2.M.48 In third floor

3.00

Nr.

4,500.00

13,500.00

14.00

Nr.

1,500.00

21,000.00

2.M.50 In second floor

7.00

Nr.

1,600.00

11,200.00

2.M.51 In third floor

6.00

Nr.

1,700.00

10,200.00

2.M.52 In second floor

13.00

Nr.

1,500.00

19,500.00

2.M.53 In third floor

12.00

Nr.

1,600.00

19,200.00

2.M.54 In ground floor

2.00

Nr.

1,350.00

2,700.00

2.M.55 In first floor

3.00

Nr.

1,400.00

4,200.00

2.M.56 In second floor

3.00

Nr.

1,450.00

4,350.00

2.M.57 In third floor

3.00

Nr.

1,500.00

4,500.00

Supply and installation 15 amp . switch


socket outlet flush mounted wired with 2x2.5
mm2 PVC/PVC/Cu and 2.5mm2 protective
earth in PVC conduit.for A/C

Supply and fixing following fittings with


switch;
150mm Recessed type down light C/W
polished aluminium reflector & 15W CFL
2.M.49 In first floor

150mm surface mount down light C/W


polished aluminium reflector & 15W CFL

Fluorescent lamp fitting batten type 600mm


single with 1x18W tube

Total Carried Forward


S07 - 92

1,057,450.00

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY

UNIT

RATE

Brought forward

AMOUNT
1,057,450.00

Fluorescent lamp fitting batten type 1200mm


single with 1x36W tube
2.M.58 In ground floor

4.00

Nr.

600.00

2,400.00

2.M.59 In first floor

3.00

Nr.

600.00

1,800.00

2.M.60 In second floor

2.00

Nr.

600.00

1,200.00

2.M.61 In third floor

4.00

Nr.

600.00

2,400.00

2.M.62 In fourth floor

3.00

Nr.

600.00

1,800.00

2.M.63 Machine room floor

1.00

Nr.

600.00

600.00

2.M.64 In ground floor

10.00

Nr.

5,000.00

50,000.00

2.M.65 In first floor

10.00

Nr.

5,100.00

51,000.00

6.00

Nr.

5,600.00

33,600.00

5.00

Nr.

4,500.00

22,500.00

2.M.68 In ground floor

3.00

Nr.

3,200.00

9,600.00

2.M.69 In first floor

2.00

Nr.

3,300.00

6,600.00

2.M.70 In second floor

1.00

Nr.

3,400.00

3,400.00

600mm x 600mm Surface mount Fluorescent


lamp fitting with polished aluminum parabolic
lured mirror reflector & 3 x 18w tubes

600mm x 600mm Recessed type Fluorescent


lamp fitting with polished aluminum parabolic
lured mirror reflector & 3 x 18w tubes
2.M.66 In fourth floor

Wall mounted weather proof bracket lamp


c/w 150mm dia cleat glass globe with 15W
CFL bulb
2.M.67 In ground floor

Ceiling lamp surface mounted c/w 200mm dia


opal white glass globe with 15W CFL bulb

Total Carried Forward


S07 - 93

1,244,350.00

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY

UNIT

RATE

Brought forward

AMOUNT
1,244,350.00

16W 2D Wall mounted lamp fitting with opal


white glass diffuser
2.M.71 In ground floor

12.00

Nr.

2,100.00

25,200.00

2.M.72 In ground floor

4.00

Nr.

8,100.00

32,400.00

2.M.73 In first floor

2.00

Nr.

8,200.00

16,400.00

2.M.74 In second floor

4.00

Nr.

8,300.00

33,200.00

2.M.75 In third floor

7.00

Nr.

8,400.00

58,800.00

2.M.76 In fourth floor

3.00

Nr.

8,400.00

25,200.00

2.M.77 In ground floor

1.00

Nr.

8,000.00

8,000.00

2.M.78 In first floor

1.00

Nr.

8,100.00

8,100.00

2.M.79 In second floor

2.00

Nr.

8,200.00

16,400.00

2.M.80 In third floor

1.00

Nr.

8,300.00

8,300.00

2.M.81 In ground floor

2.00

Nr.

13,000.00

26,000.00

2.M.82 In first floor

2.00

Nr.

13,100.00

26,200.00

2.M.83 In second floor

3.00

Nr.

13,200.00

39,600.00

2.M.84 In third floor

2.00

Nr.

13,300.00

26,600.00

2.00

Nr.

12,000.00

24,000.00

Ceiling fan 1400mm dia. controlled by 5


speed fan regulator & 10A. switch

Ceiling fan 1200mm dia. controlled by 5


speed fan regulator & 10A. switch

Exhaust fan wired thro A 5A. Socket outlet at


high level & controlled by 5A switch

Wall fan wired thro A 5A. Socket outlet at


high level
2.M.85 In second floor

Total Carried Forward


S07 - 94

1,618,750.00

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY

UNIT

RATE

Brought forward

AMOUNT
1,618,750.00

Ground floor
Supply & install Change over panel in
surface
mount
metal
enclosure
as
specified complete to working order.
2.M.86 1 No 100A. 4P.Auto transformer switch
1 No. 100A 4P MCCB
6 No. Indicator lamps transformer type thro
fuse

1.00

Nr.

12,000.00

12,000.00

1.00

Nr.

75,000.00

75,000.00

1.00

Nr.

18,000.00

18,000.00

1.00

Nr.

20,000.00

20,000.00

1.00

Nr.

15,000.00

15,000.00

Main switch board in wall mounted metal


enclosure as specified complete with
following switch gears to be supplied and
installed to working order.
2.M.87 3 Nos. Indicator lamps transformer type thro
fuse
1 No. 100A 4P MCCB
1 No. 0-500 Voltmeter with selector switch
thro fuse
1 No. 0-100A Ammeter with selector switch
1 No. 4 x 1P Surge Arrestor (40KA)
1 No. 150Amp 4P bus bar with earth bar
5 Nos. 40A 2P MCB
4 Nos. 15A 3P MCB
1 No. 40A. 4P.RCD (30mA)
2 Nos. 40A 3P MCCB
1 No. 32A 4P MCCB with only S C
Protection
2.M.88 DB - 1 (Recessed mount plastic enclosure)
1 No 30A.2P MCB
1 No 40A. 2P RCD (30mA.)
10 way SPN (2x20A + 8x6A)
First floor
2.M.89 DB - 2 (Recessed mount plastic enclosure)
1 No 30A.2P MCB
1 No 40A. 2P RCD (30mA.)
10 way SPN (2x20A + 8x6A)
2.M.90 Supply and install in first floor A/C panel
recessed type complete with the following
component
1 No 15A.3P MCB
1 No 30A.4P RCD (30mA.)
Total Carried Forward
S07 - 95

1,758,750.00

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY

UNIT

RATE

Brought forward

AMOUNT
1,758,750.00

Second floor
2.M.91 DB - 3 (Recessed mount plastic enclosure)
1 No 30A.2P MCB
1 No 40A. 2P RCD (30mA.)
10 way SPN (2x20A + 8x6A)
2.M.92 Supply and install in second floor A/C panel
recessed type complete with the following
component
1 No 15A.3P MCB
3 No 15A.2P MCB
3 No 30A. 2P RCD (30mA.)

1.00

Nr.

20,000.00

20,000.00

1.00

Nr.

20,000.00

20,000.00

1.00

Nr.

20,000.00

20,000.00

1.00

Nr.

20,000.00

20,000.00

1.00

Nr.

22,000.00

22,000.00

1.00

Nr.

60,000.00

60,000.00

Third floor
2.M.93 DB - 4 (Recessed mount plastic enclosure)
1 No 30A.2P MCB
1 No 40A. 2P RCD (30mA.)
10 way SPN (2x20A + 8x6A)
2.M.94 Supply and install in third floor A/C panel
recessed type complete with the following
component
1 No 15A.3P MCB
3 No 15A.2P MCB
3 No 30A. 2P RCD (30mA.)
Fourth floor
2.M.95 DB - 5 (Recessed mount plastic enclosure)
1 No 30A.2P MCB
1 No 40A. 2P RCD (30mA.)
6 way SPN (2x20A + 4x6A)

Machine room floor


Supply and install Lift panel surface mount
metal enclosure in machine room complete
with the following component
2.M.96 1 No 40A.4P MCCB
1 No 32A.4P MCCB
1 No 40A. 4P RCD (30mA.)
1 No 20A.3P MCB
3 No 15A.2P MCB
3 No 30A. 2P RCD (30mA.)
6 way SPN (4x10A +1x16A + 1x20A)

Total Carried Forward


S07 - 96

1,920,750.00

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY

UNIT

RATE

Brought forward

AMOUNT
1,920,750.00

2.M.97 4C. 35mm XLPE/SWA/PVC/CU U/G cable

10.00

3,600.00

36,000.00

2.M.98 4 x 10mm PVC/PVC/Cu + 10mm PVC/CU


Earth

85.00

750.00

63,750.00

2.M.99 2x 10mm PVC/PVC/Cu + 10mm PVC/CU


Earth

70.00

720.00

50,400.00

2.M.100 4 x 4mm PVC/PVC/Cu + 4mm PVC/CU


Earth

58.00

750.00

43,500.00

2.M.101 2 x 2.5mm PVC/PVC/Cu + 2.5mm PVC/CU


Earth

90.00

750.00

67,500.00

7.00

3,400.00

23,800.00

10.00

3,850.00

38,500.00

2.00

Nr.

6,000.00

12,000.00

2.M.102 4 x 6mm PVC/PVC/Cu + 6mm PVC/CU


Earth
2.M.103 16mm PVC/CU Earth

Earth Electrode
2.M.104 Supply and install earth electrode G.I. Pipe 2"
dia. 5'-0" long including forming gulley
complete to working order

TOTAL CARRIED TO COLLECTION ON PAGE NO S07- 100

S07 - 97

2,256,200.00

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION
N- PAINTING

QTY

UNIT

RATE

AMOUNT

Note : Refer Pricing Preambles

2.N.1

External
Prepare and apply two coats of approved
colour C.I.C weather shield range or
equivalent to plinth.

42.00

240.00

10,080.00

Prepare and apply one coat of approved


wall primer and two coats of approved
colour C.I.C weather shield range or
equivalent.
On walls ,columns, and weather shades
2.N.2

From ground floor level to first floor level

167.10

m2

240.00

40,104.00

2.N.3

From first floor level to second floor level

177.60

m2

250.00

44,400.00

2.N.4

From second floor level to third floor level

178.00

m2

260.00

46,280.00

2.N.5

From third floor level to fourth floor level

237.00

m2

270.00

63,990.00

2.N.6

From fourth floor level to machine room floor


level

207.50

m2

280.00

58,100.00

27.00

m2

280.00

7,560.00

2.N.7

From machine room floor level to roof slab


level
Internal
Prepare and apply one coat approved
wall primer and two coats of approved
colour
C.I.C emulsion
range
or
equivalent
On brick walls, attached columns

2.N.8

From ground floor level to first floor level

271.25

m2

180.00

48,825.00

2.N.9

From first floor level to second floor level

314.00

m2

190.00

59,660.00

2.N.10 From second floor level to third floor level

323.00

m2

200.00

64,600.00

2.N.11 From third floor level to fourth floor level

344.00

m2

210.00

72,240.00

2.N.12 From fourth floor level to machine room floor


level

273.50

m2

220.00

60,170.00

57.50

m2

220.00

12,650.00

2.N.13 From machine room floor level to roof slab


level
Total Carried Forward
S07 - 98

588,659.00

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY

UNIT

RATE

Brought forward

AMOUNT
588,659.00

Soffit of suspended floor slab & beams


2.N.14 At first floor level

304.20

190.00

57,798.00

2.N.15 At second floor level

359.70

200.00

71,940.00

2.N.16 At third floor level

357.80

m2

210.00

75,138.00

2.N.17 At fourth floor level

288.60

220.00

63,492.00

2.N.18 At machine room floor level

65.30

220.00

14,366.00

2.N.19 At machine room roof level

63.50

220.00

13,970.00

2.N.20 At water tank room roof level

36.50

m2

220.00

8,030.00

2.N.21 Between ground floor and first floor

7.20

m2

180.00

1,296.00

2.N.22 Between first floor and second floor

7.70

190.00

1,463.00

2.N.23 Between second floor and third floor

7.70

m2

200.00

1,540.00

2.N.24 Between third floor and fourth floor

8.20

m2

210.00

1,722.00

2.N.25 Between fourth floor and machine room floor

8.20

m2

220.00

1,804.00

Sloping soffit of staircase

TOTAL CARRIED TO COLLECTION ON PAGE NO S07- 100

S07 - 99

901,218.00

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION
BILL NO 2 - SUPERSTRUCTURE

QTY

UNIT

RATE

AMOUNT

COLLECTION
C - CONCRETE WORK

Rs.

9,579,861.10

D - MASONRY WORK

Rs.

2,836,102.00

E - WATER PROOFING

Rs.

312,048.00

F- STRUCTURAL STEELWORK

Rs.

369,360.00

G- METAL WORK

Rs.

8,250,159.80

H- CARPENTRY & JOINERY

Rs.

5,250.00

J- ROOF AND ROOF PLUMBING

Rs.

244,850.00

K- PLUMBING

Rs.

1,264,953.00

L- WALL, CEILING AND FLOOR FINISHES

Rs.

6,660,492.50

M- ELECTRICAL INSTALLATIONS

Rs.

2,256,200.00

N- PAINTING

Rs.

901,218.00

TOTAL CARRIED TO SUMMARY ON PAGE S 07 - 113

Rs.

32,680,494.40

S07 - 100

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY

UNIT

RATE

AMOUNT

BILL NO 3 - EXTERNAL WORK


All External work to be executed according to
the available drawings and as per Engineer's
approval.
P- EXTERNAL DRAINAGE
3.P.1

3.P.2

3.P.3

110mm dia. Soil pipe between manholes and


extended upto the septic tank and soakage
pit laid to necessary falls with average invert
depth not exceeding 900mm including
excavation and back filling , bedding on a
layer of cement concrete 1:4:8(38mm)
100mm thick and 100mm wide on each side
of the pipe and subsequently encasing with
the same concrete after inspection of the pipe

Manhole type MH No.2, 475 x 625mm


internally as per drawing No.W.S.S. 1685.00
with invert depth not exceeding 900mm
including excavation and back filling ,150mm
thick R.C.C. grade 20 foundation including
necessary reinforcement forming channels
and benching in cement and sand 1:6 and
225mm thick brick walls in cement sand 1:5
and cement and sand 1:2 rendering not less
than 12mm to internal walls, channels and
benching, 75mm thick R.C.C. Grade 20 cover
slab reinforced with 10mm dia tor steel lifting
handles, inlet and outlet connections all
complete to approval.
Manhole type MH No.1, 475 x 750mm
internally as per drawing No.W.S.S. 1685.00
with invert depth not exceeding 900mm
including excavation and back filling ,150mm
thick R.C.C. grade 20 foundation including
necessary reinforcement forming channels
and benching in cement and sand 1:6 and
225mm thick brick walls in cement sand 1:5
and cement and sand 1:2 rendering not less
than 12mm to internal walls, channels and
benching, 75mm thick R.C.C. Grade 20 cover
slab reinforced with 10mm dia tor steel lifting
handles, inlet and outlet connections all
complete to approval.

Total Carried Forward


S07 - 101

11.00

2,500.00

27,500.00

1.00

Nr.

18,000.00

18,000.00

1.00

Nr.

20,000.00

20,000.00

65,500.00

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY

UNIT

RATE

Brought forward

AMOUNT
65,500.00

Waste water disposal


3.P.4

3.P.5

100mm dia. Waste water pipe from manholes


& extended upto the soakage pit laid to
necessary falls with average invert depth not
exceeding 900mm including excavation and
back filling , bedding on a layer of cement
concrete 1:4:8(38mm) 100mm thick and
100mm wide on each side of the pipe and
subsequently encasing with the same
concrete after inspection of the pipe

Waste water Manhole type WWMH1, 475 x


750mm internally as per drawing with invert
depth not exceeding 900mm including
excavation excavations and back filling ,
150mm thick R.C.C. grade 20 foundation
including necessary reinforcement forming
channels and benching in cement and sand
1:6 and 225mm thick brick walls in cement
sand 1:5 and cement sand 1:2 rendering not
less than 12mm to internal walls, channels
and benching, 75mm thick R.C.C. Grade 20
cover slab reinforced with 10mm tor steel
lifting handles, inlet and outlet connections all
complete to approval

10.00

2,800.00

28,000.00

1.00

Nr.

15,000.00

15,000.00

TOTAL CARRIED TO COLLECTION ON PAGE S 07 -112

S07 - 102

108,500.00

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY

UNIT

RATE

AMOUNT

Q-TYPE SEPTIC TANK FOR 50 PERSONS


Refer drawing No WSS 1665.02
Excavation
Note
Prices are to include for leveling bottom
of trenches keeping sides plumb, planking
and strutting where necessary, keeping all
excavations free from water, backfiring
,ramming solid, disposal of surplus soil etc.

3.Q.1

3.Q.2

3.Q.3

Allow for clearing site of all growth, roots


and cutting top soil and foundations if any
up to 1.5m beyond outer walls of
proposed septic tank site where directed.

30.02

m3

560.00

16,808.40

Excavation for septic tank in any material


met with except rock requiring blasting
from ground level to a depth of 1.5 m in
an extended width which is 0.75 m beyond
the outer walls, part return fill disposed as
directed

23.50

560.00

13,160.00

Excavation for septic tank in any material


met with except rock requiring blasting
from ground level to a depth of 1.5 m to a
depth of 3.0 m, and extended width which
is 0.75 m beyond the outer walls, part
return fill disposed as directed

11.75

m3

560.00

6,580.00

0.90

m3

12,500.00

11,250.00

Concrete work
Note
Unless otherwise specified all concrete
shall be 1:2:4(20 mm) mix. Prices are to
include for plant mixing, handling hoisting ,
depositing ,compaction, etc. And curing,
making good after removal of form work
etc
Unless otherwise specified in the items all
form work and reinforcement measured
separately.
3.Q.4

Reinforced cement concrete 1:2:4 ( 20 mm)


base slab 150 mm thick in the floor of
septic tank , including form work
Total Carried Forward
S07 - 103

47,798.40

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY

UNIT

RATE

Brought forward

3.Q.5

Cement concrete pad 1:2:4 (20 mm) 225 x


150 mm in section over external walls of
septic tank formed to shape as shown in
drawing with groove to place the precast
concrete slab finished smooth with 12 mm
thick cement and sand 1:2 rendering all
complete to approval .

9.00

AMOUNT
47,798.40

1,400.00

12,600.00

Precast Concrete
3.Q.6

3.Q.7

Precast reinforced cement concrete cover


slab 1:2:4 ( 20 mm) 1050mm long 300 mm
wide (approx.) 75 mm thick with rebate
and over lap joints as per detail reinforced
with 3 Nos. 10 mm dia. Tor. S. bars and
6 mm dia. M.S. Rods at 300 mm centers
and 2 Nos . 10 mm dia M.S. lifting handles
all as per detail in drawing No. W.S.S.
1665 .02. provide for sealing joints with a
mixture of bitumen and sand

4.00

Nr

4,000.00

16,000.00

Precast reinforced cement concrete cover


slab 1:2:4 ( 20 mm) 1050mm long 300 mm
wide (approx.) 75 mm thick with rebate
and overlap joints as per detail reinforced
with 3 Nos. 10 mm dia. Tor. S. bars and
6 mm dia.M.S. Rods at 300 mm centers.
all as per detail in drawing No. W.S.S.
1665 .02. provide for sealing joints with a
mixture of bitumen and sand

5.00

Nr

5,000.00

25,000.00

0.03

MT

145,000.00

4,350.00

Reinforcement
Prices are to include for provision of
bending cleaning cutting fabricating placing
in positing holding and supporting including
temporary fixing supports, hangers and
binding wire. No allowance has been made
for rolling margin.
3.Q.8

Tor steel rod reinforcement 10 mm dia. In


floor septic tank

Total Carried Forward


S07 - 104

105,748.40

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY

UNIT

RATE

Brought forward

AMOUNT
105,748.40

Form work
Note
(a) Prices are to include for all necessary
boarding supports, erecting, framing, cutting,
angles, removal, cleaning, wetting etc.

(b) Form work is measured in the same


order as the concrete items and as the net
contact surface measurement between
concrete and formwork.
3.Q.9

Formwork to pads over 225mm brick work in


100mm wide external side of pad .

10.00

120.00

1,200.00

3.Q.10 Formwork to pads over 225mm brick work in


75mm wide internal rebated sides of cement
concrete pad

17.00

120.00

2,040.00

3.Q.11 Formwork to pads over 225 mm brick


work in 50 mm wide on chamfered portion
of cement concrete pad

10.00

120.00

1,200.00

4.60

m3

9,000.00

41,400.00

Brick work
Note. Prices are to include for all rough and
fair cutting, plumbing angles forming rebated
reveals rough arches racking out joints for
plastering etc cutting and priming forming or
cutting chases making good and sundry
items of a like nature .
3.Q.12 225mm thick brickwork in cement and sand
1:5 in septic tank
Sanitary plumbing
Note 1:The prices are to include for screws
nails pipe hooks saddles, brackets,
connections, short lengths, backsets nipples
and the like and holes, chasing etc. And
making good in all trades.
Note2: All under ground Drainage pipe work
shall be in UPVC to BS 4660 or SLS 1202
&SLS 1210
Total Carried Forward
S07 - 105

151,588.40

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY

UNIT

RATE

Brought forward

AMOUNT
151,588.40

Any special drainage fittings such as bends,


tees, reducers etc. Unless otherwise
specified separately in the Bill of Quantities
should be deemed to have been include in
the relevant items and such items should
accordingly be rated to include for such
specials etc and for any extra work involved
for the satisfactory completion of such items
3.Q.13 110mm P.V.C. Tee fixed to inlet and outlet
ends of septic tank all complete to working
order

2.00

Nr

1,100.00

2,200.00

3.Q.14 150mm P.V.C. Pipe fixed in 225mm thick


partition wall as shown in drawing
W.S.S.1665.02 all complete to working
order.

1.00

Nr

1,200.00

1,200.00

3.Q.15 110mm dia. P.V.C pipes at septic tank with


invert depth not exceeding 450mm below
ground level at inlet and 500mm at outlet
including excavation and refilling cement
concrete 1:3:6 (25mm) bedding 100mm thick
and subsequently completely encasing with
concrete after inspection of pipe ( Provisional
)

1.50

1,000.00

1,500.00

3.Q.16 110mm dia. P.V.C pipes at septic tank with


invert depth not exceeding 450mm below
ground level at inlet and 500mm at outlet
including excavation and refilling cement
concrete 1:3:6 (25mm) bedding 100mm thick
and subsequently completely encasing with
concrete after inspection of pipe ( Provisional
)

1.50

1,000.00

1,500.00

Total Carried Forward


S07 - 106

157,988.40

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY

UNIT

RATE

Brought forward

AMOUNT
157,988.40

Plastering
Note
Prices are to include for all temporary rules,
screeds, grounds, etc. for racking out joints
between new brick work or hacking new
concrete for key, internal and curved angles,
joints between different surfaces and arises
intersections between curved or irregular
surfaces, etc and making good around
pipes, sanitary fittings and similar fixtures.

3.Q.17 Cement and sand 1:2 internal plaster 20mm


thick to side faces of the septic tank finished
smooth

21.75

m2

800.00

17,400.00

2.70

m2

800.00

2,160.00

24.50

m2

1,800.00

44,100.00

Paving
Note
Prices are to include for all temporary rules,
screeds, grounds, etc. for racking out joints
between new brick work or hacking new
concrete for key, internal and curved angles,
joints between different surfaces and arises
intersections between curved or irregular
surfaces, etc and making good around
pipes, sanitary fittings and similar fixtures.

3.Q.18 Cement and sand 1:2 internal plaster 20


mm thick to side faces of the septic tank
finished smooth

Water proofing
3.Q.19 Applying 2 coats of shield coat No. 5 or
equivalent approved water proofing to internal
faces of septic tank

TOTAL CARRIED TO COLLECTION ON PAGE S 07 -112

S07 - 107

221,648.40

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION
R- INLET AND OUTLET CHAMBERS
Refer drawing No WSS 1668.00

QTY

UNIT

RATE

AMOUNT

Excavation
3.R.1

Excavation, depth not exceeding 1.00m a


working space of 0.80m from the outer walls
is allowed.

5.70

m3

560.00

3,192.00

Timbering (Face area including working


space)

7.80

m2

560.00

4,368.00

Concrete work
1:2:4 (20 mm) cement concrete in floors of
chambers including channeling & benching.
Formwork and reinforcement measured
separately.

0.25

m3

12,500.00

3,125.00

6.60

1,300.00

8,580.00

1:2:4(20 mm ) cement concrete in precast


cover slabs 75 mm thick R/F with 10 mm
dia. Tor bars at 125 mm centers both
ways. Rate to allow for moudles /shuttering,
reinforcement lifting handles & bitumen
sand filling.

1.30

m2

1,500.00

1,950.00

Form work
Formwork to floors, channels and pads.

1.60

m2

1,200.00

1,920.00

Reinforcements
10 mm tor steel bars at 225 C/C both
ways to floors of chambers.

0.02

Kg

145.00

2.90

Brickwork
225 mm brickwork in 1:5 cement mortar in
chambers

0.75

m3

9,000.00

6,750.00

Plaster
Cement plastering 1:2 (12mm) to floors and
internal walls of chambers floated smooth .

3.40

m2

800.00

2,720.00

3.R.10 Cement plastering 1:3 to pads finished as


directed. Thickness 12mm. Plaster to be
extended to cover a 75mm width of external
brick work.

3.80

m2

750.00

2,850.00

3.R.2

3.R.3

3.R.4

3.R.5

3.R.6

3.R.7

3.R.8

3.R.9

1:2:4 (20mm ) cement concrete in pads of


chambers. Formwork measured separately.

TOTAL CARRIED TO COLLECTION ON PAGE S 07 -112

S07 - 108

35,457.90

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION
QTY
S- SOAKAGE PIT ( 2. 0 M internal diameter)

UNIT

RATE

AMOUNT

Refer drawing No WSS 1670.03


3.S.1

3.S.2

Allow for clearing site of all growth roots and


cutting top soil up to 1.5m beyond outer walls
of proposed soakage pit and carting away the
waste material from the site where directed.
1.00 Item

6,000.00

6,000.00

Excavation for soakage pit in any material


met with except rock requiring blasting, rate
to include dealing with water, backfilling and
disposal of surplus earth as directed. Depth
G.L. to1.5m

9.00

m3

560.00

5,040.00

Excavation for soakage pit in any material


met with except rock requiring blasting, Rate
to include dealing with water, back filling and
disposal of surplus earth as directed. Depth
1.5m to 3.0m

9.00

560.00

5,040.00

with except rock requiring blasting, Rate to


include with except rock requiring blasting,
Rate to include dealing with water, back filling
and disposal of surplus earth as directed.
Depth 3.0 m to 4.0m

3.00

m3

850.00

2,550.00

3.S.5

Rock blasting if encountered in excavation.

1.00 Item

10,000.00

10,000.00

3.S.6

Alternative R.C.C. concrete 1:2:4 (20)


250x300mm thick ring with 4No. 16mm dia
tor steel with 10mm dia. Stirrups at 200mm
crs. In foundation of brick walls ( Rate to
include with R/F and necessary formwork )

0.50

5,400.00

2,700.00

337.5mm brick in foundation in cement


mortar1:5

0.85

m3

9,100.00

7,735.00

Alternative foundation for hard or cabook soil


225 x150mm thick cement concrete
1:2:4(20mm ) base including formwork.

0.30

m3

12,500.00

3,750.00

225mm brickwork in cement mortar 1:5 in


steining 0 m to 1.5mm with open vertical
hoints at alternate course provided below
150mm from inlet

2.50

m3

2,400.00

6,000.00

3.S.10 225mm brickwork in cement mortar 1:5 in


steining 1.5m to 3.0m with open vertical
joints at alternate course provided below
150mm from inlet.

2.50

m3

2,400.00

6,000.00

3.S.3

3.S.4

3.S.7

3.S.8

3.S.9

Total Carried Forward


S07 - 109

54,815.00

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION

QTY

UNIT

RATE

Brought forward

3.S.11 225mm brickwork in cement mortar 1:5 in


steining 3.0m to 3.5m with open vertical joints
at alternate course provided below 150mm
from inlet.

1.00

4.50
3.S.13 Cement concrete 1:2:4(20mm) base pad 300
x 225 x 150 mm to rest the beam (Rate
include with form work)

AMOUNT
54,815.00

2,400.00

2,400.00

m2

1,600.00

7,200.00

2.00

Nr

2,500.00

5,000.00

3.S.14 150 x 225 mm R. C. C. 1:2:4(20mm) beam


R/F with 4 nos 16mm dia tor steel and 6mm
dia stirrups at 150mm ctrs across pit to
support cover slab (Rate shall include form
work)

2.50

2,800.00

7,000.00

3.S.15 Cement concrete 1:2:4( 20mm) in 225 x


150mm (Section) circular pad over 225mm
wall with rebate to receive top cover.
(shuttering measured separately)

8.00

2,800.00

22,400.00

4.25

m2

700.00

2,975.00

3.S.17 12mm thick external cement plaster in


cement mortar 1:4 over cover slab and
concrete pad including 150mm below ground
level finished as directed.

7.00

m2

840.00

5,880.00

3.S.18 Form work to concrete cover pad over


225mm brick work.

2.50

m2

1,200.00

3,000.00

3.S.19 Supplying and fixing 110mm dia P. V. C. Tee


to outlet at the end of the soakage pit.

1.00

Nr

980.00

980.00

3.S.20 Supplying and fixing 110mm dia P. V. C. pipe


inlet

1.00

Nr

1,100.00

1,100.00

3.S.21 Supplying and packing 12mm to 75mm metal


around subsoil pipe to a length of 0.5m from
soakage pit.

0.30

m3

1,600.00

480.00

3.S.12 75mm thick cement concrete 1:2:4(20mm)


cover slab R/F with a layers of 10mm dia tor
steel at 150mm ctrs both ways cast in 4
sections and complete with 10mm dia lifting
handles set in concrete. (Rate includes
sealing joints with a mixture of bitumen sand)

3.S.16 20mm thick internal plaster in cement mortar


1:3 upto 150mm below inlet pipe finish rough.

TOTAL CARRIED TO COLLECTION ON PAGE S 07 -112


S07 - 110

113,230.00

BOQ NO. 2011-10-004

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

ITEM

DESCRIPTION

3.S.3
3.T.1

Three phase External electricity supply

provisional sum

500,000.00

3.T.2

External water supply

provisional sum

50,000.00

3.T.3

Landscaping including providing rain water


connecting to existing drains & internal road
way.

provisional sum

1,000,000.00

QTY

TOTAL CARRIED TO COLLECTION ON PAGE S 07 - 112

S07 - 111

UNIT

RATE

AMOUNT

1,550,000.00

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION
BILL NO 3 - EXTERNAL WORKS

QTY

UNIT

RATE

AMOUNT

COLLECTION

P- EXTERNAL DRAINAGE

Rs.

108,500.00

Q- SEPTIC TANK FOR 50 PERSON

Rs.

221,648.40

R - INLET AND OUTLET CHAMBERS

Rs.

35,457.90

S - SOAKAGE PIT ( 2.0m internal dia. )

Rs.

113,230.00

T- MISCELLENIOUS

Rs.

1,550,000.00

TOTAL CARRIED TO SUMMARY ON PAGE S 07 -113

S07 - 112

2,028,836.30

BOQ NO. 2011-10-004

ITEM

Proposed Extension for existing Laboratory Building at Arthur C Clarke Institute

DESCRIPTION
GRAND SUMMARY

QTY

UNIT

ITEM

RATE

AMOUNT

AMOUNT(Rs.)

PRELIMINARIES (S07- 22)

Rs:

3,100,000.00

BILL NO : 1 - SUBSTRUCTURE ( S07 - 38 )

Rs:

4,135,201.80

BILL NO : 2 - SUPERSTRUCTURE ( S07 - 100 )

Rs:

32,680,494.40

BILL NO : 3 - EXTERNAL WORKS ( S07 - 112 )

Rs:

2,028,836.30

Rs:

41,944,532.50

Rs:

2,130,000.00

SUB TOTAL ( 1 ) :
Less
Provisional Sums
SUB TOTAL ( 2 ) :

Rs:

Less
... % Discount ( if any)
SUB TOTAL ( 3 ) :
Add
Provisional Sums

Rs:
Rs:

Rs:

GRAND TOTAL :
Rs:
(Bid Sum carried over to Form of Bid on Page No. S4 -02 )
Date :.
Witness : (1) : .
Address : ..
Witness : (2) : .
Address : ..

S07 - 113

2,130,000.00

Section 8 - Drawings
_____________________________________________________________________________________________________________________

SECTION - 8
DRAWINGS

S08-1

Section 8 - Drawings
_____________________________________________________________________________________________________________________

Proposed Extension for Existing Laboratory Building at Arthur C Clarke


Institute for Modern Technologies, Katubedda, Moratuwa
List of Drawings
Drawing No.

Architectural :

Structural:

S08-2

Section 8 - Drawings
_____________________________________________________________________________________________________________________

Water Supply :

Electrical:

S08-3

Proposed Extension for Existing Laboratory Building at Arthur C Clarke Institute


for Modern Technologies
Drawing Numbers
Architectural
2011-10-004 AR01 2011-10-004 AR02 2011-10-004 AR03 2011-10-004 AR04 2011-10-004 AR05 2011-10-004 AR06 2011-10-004 AR07 2011-10-004 AR08 2011-10-004 AR09 2011-10-004 AR10 2011-10-004 AR11 2011-10-004 AR12 2011-10-004 AR13 2011-10-004 AR14 2011-10-004 AR15 2011-10-004 AR16 2011-10-004 AR17 2011-10-004 AR18 -

Ground, first, second, third floor Plans


Fourth floor plan, machine room, water tank room Plans &
Sections
Section, Elevation, roof plan & Site plan
Detail of Roof & Ceiling
Detail of Roof & Ceiling
Detail of Roof & Ceiling
Detail of stairway
Detail of stairway
Detail of stairway
Details of toilets
Details of toilets
Details of toilets
Details of doors & windows
Details of doors & windows
Details of Partitions
Details of Partitions
Details of Partitions
Schedule of finishes

Structural
2011-10-004 ST01 2011-10-004 ST02 2011-10-004 ST03 Water supply
2011-10-004 WSS01- Ground floor plan, first floor plan, secondfloor plan & third
floor plan
2011-10-004 WSS02- Site plan, Floor plan at water tank & Machine room floor &
Detail at E
2011-10-004 WSS03- Detail at - A
2011-10-004 WSS04- Detail at - B
2011-10-004 WSS05- Detail at - C
2011-10-004 WSS06- Detail at - D
Electrical
2011-10-004 EL01 2011-10-004 EL02 2011-10-004 EL03 -

Section 9 Standard form


_____________________________________________________________________________________________________________________

SECTION - 9
STANDARD FORM [BID SECURITY]

S09-1

Section 9 Standard form


_____________________________________________________________________________________________________________________

Form of Bid Security


[this Guarantee form shall be filled in accordance with the instructions indicated in brackets]
Issuing Agency: ----------------------------------------------------------------------------------------------------------------------------------------------[insert issuing agencys name and address of Issuing branch or Office]
Beneficiary: Director & CEO,
Arthur C Clarke Institute for Modern Technologies
272, Bandaranayake Mawatha
Katubedda, Moratuwa
Date:--------------------------------- [insert (by issuing agency) date]
BID GURANTEE No:-------------------------------------------- [insert (by issuing agency) number]We have
been informed that .. .. [insert (by issuing agency)name
of the Bidder] (hereinafter called the Bidder) has submitted to you its bid dated.
[insert (by issuing agency) date] (hereinafter called the Bid) for the execution of
.. [insert name of Contract]
Furthermore, we understand that, according to the conditions, Bids must be supported by a Bid
Guarantee.
At the request of the Bidder, we .. [insert name of issuing
agency] hereby irrevocably undertake to pay you any sum or sums not exceeding in total an
amount of [insert amount in words] ( . .
..) [amount in figures] upon receipt by us of your first demand in writing accompanied
by a written statement stating that the Bidder is in breach of its obligation(s) under the bid
conditions, because the Bidder:
a) has withdrawn its Bid during the period of bid validity specified; or
b) does not accept the correction of errors in accordance with the Instructions to
Bidders(hereinafter the ITB) ; or
c) having been notified of the acceptance of its Bid by the Employer during the period of
bid validity, (i) fails or refuses to execute the Contract Form, if required, or (ii) fails or
refuse to furnish the Performance Security, in accordance with the ITB.
This guarantee will remain in force up to .. (insert date as at Invitation For Bid)
Consequently, any demand for payment under this Guarantee must be received by us at the office
on or before that date.

[signature(s) of authorized representative(s)]

S09-2

Section 10 Vat Form


_____________________________________________________________________________________________________________________

SECTION 10
VAT FORM

S10-1

Section 10 Vat Form


_____________________________________________________________________________________________________________________

Value Added Tax

Service : Proposed Extension for Existing Laboratory Building at Arthur C Clarke


Institute for Modern Technologies, Katubedda, Moratuwa

The bidder is required to show the total amount of V.A.T. for the bid, separately in
the place shown below. The bidder is strictly instructed not to include V.A.T. in
his bid value.

Particulars to be furnished by the bidder :

1. V.A.T. registration No of the bidder :

2. V.A.T. amount for the bid :

..
Signature of Bidder
Date : ..

S10-2

Section 11- Check List


_____________________________________________________________________________________________________________________

SECTION 11
CHECK LIST

S11-1

Section 11- Check List


_____________________________________________________________________________________________________________________

CHECK LIST

(The Bidder are advised to fill the following Table)


ITEM
1.

YES
(TICK)

FORM OF BID

Addressed to the Employer ?


Completed ?
Signed ?
2.

BID SECURITY

Addressed to the Employer ?


Format as required ?
Issuing Agency as specified ?
Amount as requested ?
Validity Period ?
3.

ICTAD Registration
Grade ?
Validity Period ?

4.

QUALIFICATION INFORMATION

All relevant information completed and


submitted?
Signed ?

5.

ADDENDUM

Contents of the addendum (if any) taken in


to account ?
6.

BID PACKAGE
All the documents given in Clause 12 .1 in
the Bidding Data enclosed in the original
and copy ?
ITB Clause 19 followed before Sealing the
Bid Package ?

S11-2

REFERENCE