Professional Documents
Culture Documents
Revision: 0
Date: 03-05-2002
Page 1 of 4
NHB
Compiled by : _____________________________________
LSS
Checked by : _____________________________________
GSS
Approved by :_____________________________________
Section: OP-3-40
Revision: 0
Date: 03-05-2002
Page 2 of 4
40.0
CHECKLIST ITEMS
Checked
By
Engineer
Pile Diameter
_______________________________
Concreting Method
Injected
Reinforcement
2.0
3.0
Temporary Casing
Remarks
Section: OP-3-40
Revision: 0
Date: 03-05-2002
Page 3 of 4
4.0
Stability Of Borehole
Make sure the hose is at the base of the pile (not suspended
half-way).
Reinforcement Cage
CONCRETING
Test Cube :
o at least 6 Nos.
o achieve design strength (within 28 days)
Section: OP-3-40
Revision: 0
Date: 03-05-2002
Page 4 of 4
6.0
Record :
o Number of trucks
o Discharge amount per trucks
PROOF DRILLING
Core drilling to be carried out through piles to check the qualities
of
7.0
Concrete
8.0
Sonic Logging
POST-INSTALLATION
Penetration length
COMPUTATION
Estimate the amount of concrete and materials for each piles.
Signature by Engineer