Professional Documents
Culture Documents
Project Location:
Drawing No. :
City:
Design Areas
Design Area
Name
BODEGA
Calc. Mode
(Model)
Demand (HW)
Occupancy
Area of
Total Water Pressure @
Application
Source
Min.
Density
Min.
Pressure
Min.
Flow
Calculated
Heads
Hose
Streams
Margin To
Source
(ft)
(gpm)
(psi)
(gpm/ft)
(psi)
(gpm)
(gpm)
(psi)
1536
353,3
142,9
0,154
29,6
100
111,8
Page 1
HYDRAULIC CALCULATIONS
for
Job Information
Project Name : Job Name
Contract No. :
City:
Project Location:
Date: 26/09/2014
Contractor Information
Name of Contractor:
Address:
City:
Phone Number:
E-mail:
Name of Designer:
Authority Having Jurisdiction:
Design
Remote Area Name
BODEGA
HTMC
Occupancy Classification
Density (gpm/ft)
0,154
1536
192
Special Heads
Hose Streams (gpm)
100
353,3
25,1
Type of System
Wet
291,2 gal
26/09/2014
Location
BODEGA
Source
W1
Notes
Page 2
Node Labels:
Pipe Labels:
Off
Off
Page 3
Demand
Hazen-Williams
Water @ 60F (15.6C)
N/A for Hazen-Williams calculation.
N/A for Hazen-Williams calculation.
Supply 1 : W1
Pressure (psi)
150
125
Hoses
Inside Hose Flow / Standpipe Demand (gpm)
Outside Hose Flow (gpm)
Additional Outside Hose Flow (gpm)
100
100
Sprinklers
Ovehead Sprinkler Flow (gpm)
253,3
253,3
W1 - Pressure (psi)
25,1
W1 - Flow (gpm)
253,3
N/A
Other
Page 4
Page 5
Values
Description
S1
S2
D1
Elevation Pressure
D2
D3
Flow (gpm)
Pressure (psi)
150
500
125
6,5
System Demand
253,3
25,1
353,3
25,1
Curve Name
Supply
Safety Margin
Pressure (psi)
Flow (gpm)
Pressure (psi)
@ Flow (gpm)
110,3
642,1
111,8
353,3
Open Heads
Head Ref.
Head Type
Required
Coverage
Calculated
K-Factor
Density
Flow
Pressure
Density
Flow
Pressure
(ft)
(gpm/psi)
(gpm/ft)
(gpm)
(psi)
(gpm/ft)
(gpm)
(psi)
S65
Overhead
Sprinkler
192
11,2
0,15
28,8
0,178
34,2
9,3
S66
Overhead
Sprinkler
192
11,2
0,15
28,8
0,178
34,2
9,3
S67
Overhead
Sprinkler
192
11,2
0,15
28,8
0,159
30,6
7,5
S68
Overhead
Sprinkler
192
11,2
0,15
28,8
0,166
31,8
8,1
S69
Overhead
Sprinkler
192
11,2
0,15
28,8
0,154
29,6
S70
Overhead
Sprinkler
192
11,2
0,15
28,8
0,165
31,7
S71
Overhead
Sprinkler
192
11,2
0,15
28,8
0,159
30,6
7,4
S72
Overhead
Sprinkler
192
11,2
0,15
28,8
0,16
30,6
7,5
Page 6
Node Data
Node#
Elev
Type
Hgroup
K-Fact.
Discharge
Coverage Tot. Pres.
Req. Pres.
Open/Closed Overdischarge Density Elev. Pres. Req. Discharge
gpm
gpm
gpm/psi
ft
ft
gpm/ft
psi
psi
psi
gpm
S65
15
34,2
5,4
192
0,178
9,3
-6,5
7
28,8
S66
15
34,2
5,4
192
0,178
9,3
-6,5
7
28,8
S67
15
30,6
1,8
192
0,159
7,5
-6,5
7
28,8
S68
15
31,8
3
192
0,166
8,1
-6,5
7
28,8
S69
15
29,6
0,8
192
0,154
7
-6,5
7
28,8
S70
15
31,7
2,9
192
0,165
8
-6,5
7
28,8
S71
15
30,6
1,8
192
0,159
7,4
-6,5
7
28,8
S72
15
30,6
1,8
192
0,16
7,5
-6,5
7
28,8
001
15
Node
NODE
9,8
-6,5
013
14
Node
NODE
16,4
-6,1
015
14
Node
NODE
16,4
-6,1
016
14
Node
NODE
16,4
-6,1
017
14
Node
NODE
16,4
-6,1
022
14
Node
NODE
15,3
-6,1
023
14
Node
NODE
16,6
-6,1
024
14
Node
NODE
16,7
-6,1
025
14
Node
NODE
16,8
-6,1
026
14
Node
NODE
17
-6,1
027
14
Node
NODE
17,2
-6,1
028
14
Node
NODE
17,7
-6,1
029
14
Node
NODE
17,7
-6,1
030
14
Node
NODE
17,7
-6,1
032
14
Node
NODE
15,3
-6,1
035
14
Node
NODE
15,3
-6,1
036
14
Node
NODE
15,3
-6,1
File: C:\Users\Hidraulico\Desktop\Planos\HTCM B.dwg
Date 26/09/2014
Page 7
Node Data
Node#
Elev
Type
Hgroup
K-Fact.
Discharge
Coverage Tot. Pres.
Req. Pres.
Open/Closed Overdischarge Density Elev. Pres. Req. Discharge
gpm/psi
ft
gpm
gpm
ft
gpm/ft
psi
psi
041
14
Node
NODE
15,4
-6,1
042
14
Node
NODE
15,4
-6,1
043
14
Node
NODE
15,4
-6,1
044
14
Node
NODE
15,4
-6,1
045
14
Node
NODE
15,4
-6,1
046
14
Node
NODE
15,3
-6,1
047
14
Node
NODE
15,3
-6,1
061
15
Node
NODE
9,9
-6,5
062
15
Node
NODE
9,2
-6,5
065
15
Node
NODE
9,2
-6,5
079
15
Node
NODE
11,4
-6,5
080
15
Node
NODE
11,4
-6,5
169
15
Node
NODE
9,2
-6,5
170
15
Node
NODE
9,2
-6,5
W1
0
Supply
SUPPLY
-253,3
psi
gpm
25,1
0
Page 8
Sheet number:___________________
PIPE INFORMATION
Node 1
Node 2
Elev 1
Elev 2
(ft)
S69
065
15
15
065
047
(gpm/psi)
(gpm)
11,2
(in)
(ft)
L
F
T
C Factor
Pf per ft
total (Pt)
elev (Pe)
frict (Pf)
(ft)
(psi)
(psi)
29,6
29,6
1 1x(us.Tee-Br)=5
1,049
3,28
5
8,28
120
0,2686
7
0
2,2
15
14
4,7
34,3
1.25 1x(us.Tee-Br)=6
1,38 3x(us.90)=9
46,22
15
61,22
120
0,0926
9,2
0,4
5,7
047
046
14
14
7,4
41,7
4
4,026
14,27
0
14,27
120
0,0007
15,3
0
0,0
046
045
14
14
28,2
69,9
4
4,026
14,27
0
14,27
120
0,0019
15,3
0
0,0
045
044
14
14
-12,2
57,7
4
4,026
15,42
0
15,42
120
0,0013
15,4
0
0,0
044
043
14
14
-12,5
45,3
4
4,026
13,29
0
13,29
120
0,0008
15,4
0
0,0
043
042
14
14
-13,7
31,6
4
4,026
14,27
0
14,27
120
0,0004
15,4
0
0
042
041
14
14
-15,5
16
4 1x(us.Tee-Br)=20
4,026
14,27
20
34,27
120
0,0001
15,4
0
0
041
030
14
14
0
16
88,38
12
100,38
120
0,0226
15,4
0
2,3
030
029
14
14
0
16
4
4,026
14,27
0
14,27
120
0,0001
17,7
0
0
029
028
14
14
15,5
31,6
4 1x(us.Tee-Br)=20
4,026
3,52
20
23,52
120
0,0004
17,7
0
0,0
028
W1
14
0
221,7
253,3
4 2x(us.90)=20
4,026
44,57
20
64,57
120
0,0204
17,7
6,1
1,3
S71
170
15
15
1
5
6
120
0,2844
7,4
0
1,7
170
001
15
15
-6
24,6
1.25
1,38
13,32
0
13,32
120
0,0499
9,2
0
0,7
001
017
15
14
31,7
56,2
1.25 1x(us.Tee-Br)=6
1,38 1x(us.90)=3
17,43
9
26,43
120
0,2315
9,8
0,4
6,1
017
023
14
14
29,3
85,5
4 5x(us.90)=50
4,026
16,38
50
66,38
120
0,0027
16,4
0
0,2
023
024
14
14
57,7
143,3
4
4,026
14,27
0
14,27
120
0,0071
16,6
0
0,1
024
025
14
14
40,1
183,4
4
4,026
14,27
0
14,27
120
0,0112
16,7
0
0,2
11,2
30,6
30,6
1.25 1x(us.Tee-Br)=6
1,38 2x(us.90)=6
1 1x(us.Tee-Br)=5
1,049
NOTES
Page 9
Sheet number:___________________
PIPE INFORMATION
Node 1
Node 2
Elev 1
Elev 2
(ft)
(gpm/psi)
(gpm)
(in)
(ft)
L
F
T
C Factor
Pf per ft
total (Pt)
elev (Pe)
frict (Pf)
(ft)
(psi)
(psi)
025
026
14
14
12,2
195,6
4
4,026
14,44
0
14,44
120
0,0127
16,8
0
0,2
026
027
14
14
12,5
208
4
4,026
14,27
0
14,27
120
0,0142
17
0
0,2
027
028
14
14
13,7
221,7
4 1x(us.Tee-Br)=20
4,026
10,75
20
30,75
120
0,016
17,2
0
0,5
S67
062
15
15
0,98
5
5,98
120
0,2852
7,5
0
1,7
062
061
15
15
-4,7
25,9
1.25
1,38
13,01
0
13,01
120
0,0552
9,2
0
0,7
061
023
15
14
31,8
57,7
1.25 1x(us.Tee-Br)=6
1,38 1x(us.90)=3
16,6
9
25,6
120
0,243
9,9
0,4
6,2
S72
169
15
15
30,6
30,6
1 1x(us.Tee-Br)=5
1,049
1
5
6
120
0,2858
7,5
0
1,7
169
036
15
14
6
36,6
1.25 1x(us.Tee-Br)=6
1,38 1x(us.90)=3
45,39
9
54,39
120
0,1046
9,2
0,4
5,7
036
035
14
14
-7,4
29,3
4
4,026
10,82
0
10,82
120
0,0004
15,3
0
0
035
032
14
14
-10,1
19,2
4 2x(us.90)=20
4,026
15,73
20
35,73
120
0,0002
15,3
0
0
032
015
14
14
-9,1
10,1
88,54
18
106,54
120
0,0096
15,3
0
1
015
016
14
14
9,1
19,2
4
4,026
14,73
0
14,73
120
0,0002
16,4
0
0
016
017
14
14
10,1
29,3
4
4,026
10,83
0
10,83
120
0,0004
16,4
0
0
S70
001
15
15
11,2
31,7
31,7
1 1x(us.Tee-Br)=5
1,049
0,98
5
5,98
120
0,3039
8
0
1,8
S68
061
15
15
11,2
31,8
31,8
1 1x(us.Tee-Br)=5
1,049
0,99
5
5,99
120
0,3061
8,1
0
1,8
S66
080
15
15
11,2
34,2
34,2
1 1x(us.Tee-Br)=5
1,049
0,99
5
5,99
120
0,3493
9,3
0
2,1
080
046
15
14
-5,9
28,2
1.25 1x(us.Tee-Br)=6
1,38 1x(us.90)=3
45,41
9
54,41
120
0,0646
11,4
0,4
3,5
S65
079
15
15
34,2
34,2
1 1x(us.Tee-Br)=5
1,049
0,99
5
5,99
120
0,3507
9,3
0
2,1
11,2
11,2
11,2
30,6
30,6
1 1x(us.Tee-Br)=5
1,049
1.25 2x(us.Tee-Br)=12
1,38 2x(us.90)=6
NOTES
Page 10
Sheet number:___________________
PIPE INFORMATION
Node 1
Node 2
Elev 1
Elev 2
(ft)
(gpm/psi)
(gpm)
(in)
(ft)
079
024
15
14
5,9
40,1
1.25 1x(us.Tee-Br)=6
1,38 1x(us.90)=3
045
025
14
14
0
12,2
044
026
14
14
043
027
L
F
T
C Factor
Pf per ft
total (Pt)
elev (Pe)
frict (Pf)
(ft)
(psi)
(psi)
29,61
9
38,61
120
0,1239
11,4
0,4
4,8
1.25 2x(us.Tee-Br)=12
1,38 2x(us.90)=6
88,38
18
106,38
120
0,0136
15,4
0
1,4
0
12,5
1.25 2x(us.Tee-Br)=12
1,38 4x(us.90)=12
89,37
24
113,37
120
0,0142
15,4
0
1,6
14
14
0
13,7
1.25 2x(us.Tee-Br)=12
1,38 2x(us.90)=6
88,38
18
106,38
120
0,0169
15,4
0
1,8
042
029
14
14
0
15,5
1.25 2x(us.Tee-Br)=12
1,38 2x(us.90)=6
88,38
18
106,38
120
0,0214
15,4
0
2,3
170
169
15
15
0
6
1.25
1,38
13,38
0
13,38
120
0,0037
9,2
0
0,0
062
065
15
15
0
4,7
1.25 2x(us.90)=6
1,38
14,21
6
20,21
120
0,0023
9,2
0
0,0
036
047
14
14
0
7,4
14,27
0
14,27
120
0,0000
15,3
0
0
035
016
14
14
0
10,1
1.25 2x(us.Tee-Br)=12
1,38 2x(us.90)=6
89,53
18
107,53
120
0,0096
15,3
0
1
032
022
14
14
0
9,1
4 1x(us.Tee-Br)=20
4,026
9,11
20
29,11
120
0,0000
15,3
0
0
022
013
14
14
0
9,1
1.25 1x(us.Tee-Br)=6
1,38 6x(us.90)=18
106,16
24
130,16
120
0,0079
15,3
0
1
013
015
14
14
0
9,1
4
4,026
14,74
0
14,74
120
0,0000
16,4
0
0
080
079
15
15
0
5,9
1.25
1,38
13,37
0
13,37
120
0,0036
11,4
0
0,0
4
4,026
NOTES
Page 11
Hydraulic Calculations
PIPE INFORMATION
Node 1
Node 2
Elev 1
Elev 2
(ft)
(gpm/psi)
(gpm)
(in)
(ft)
L
F
T
C Factor
Pf per ft
total (Pt)
elev (Pe)
frict (Pf)
(ft)
(psi)
(psi)
NOTES
Path No: 1
S69
065
15
15
065
047
11,2
29,6
29,6
1 1x(us.Tee-Br)=5
1,049
3,28
5
8,28
120
0,2686
7
0
2,2
15
14
4,7
34,3
1.25 1x(us.Tee-Br)=6
1,38 3x(us.90)=9
46,22
15
61,22
120
0,0926
9,2
0,4
5,7
047
046
14
14
7,4
41,7
4
4,026
14,27
0
14,27
120
0,0007
15,3
0
0,0
046
045
14
14
28,2
69,9
4
4,026
14,27
0
14,27
120
0,0019
15,3
0
0,0
045
044
14
14
-12,2
57,7
4
4,026
15,42
0
15,42
120
0,0013
15,4
0
0,0
044
043
14
14
-12,5
45,3
4
4,026
13,29
0
13,29
120
0,0008
15,4
0
0,0
043
042
14
14
-13,7
31,6
4
4,026
14,27
0
14,27
120
0,0004
15,4
0
0
042
041
14
14
-15,5
16
4 1x(us.Tee-Br)=20
4,026
14,27
20
34,27
120
0,0001
15,4
0
0
041
030
14
14
0
16
88,38
12
100,38
120
0,0226
15,4
0
2,3
030
029
14
14
0
16
4
4,026
14,27
0
14,27
120
0,0001
17,7
0
0
029
028
14
14
15,5
31,6
4 1x(us.Tee-Br)=20
4,026
3,52
20
23,52
120
0,0004
17,7
0
0,0
028
W1
14
0
221,7
253,3
4 2x(us.90)=20
4,026
44,57
20
64,57
120
0,0204
17,7
6,1
1,3
1.25 1x(us.Tee-Br)=6
1,38 2x(us.90)=6
W1
25,1
Page 12
Hydraulic Calculations
PIPE INFORMATION
Path No: 2
11,2
S71
170
15
15
30,6
30,6
170
001
15
15
-6
24,6
001
017
15
14
31,7
56,2
017
023
14
14
29,3
85,5
023
024
14
14
024
025
1 1x(us.Tee-Br)=5
1,049
1
5
6
120
0,2844
7,4
0
1,7
1.25
1,38
13,32
0
13,32
120
0,0499
9,2
0
0,7
1.25 1x(us.Tee-Br)=6
1,38 1x(us.90)=3
17,43
9
26,43
120
0,2315
9,8
0,4
6,1
4 5x(us.90)=50
4,026
16,38
50
66,38
120
0,0027
16,4
0
0,2
57,7
143,3
4
4,026
14,27
0
14,27
120
0,0071
16,6
0
0,1
14
14
40,1
183,4
4
4,026
14,27
0
14,27
120
0,0112
16,7
0
0,2
025
026
14
14
12,2
195,6
4
4,026
14,44
0
14,44
120
0,0127
16,8
0
0,2
026
027
14
14
12,5
208
4
4,026
14,27
0
14,27
120
0,0142
17
0
0,2
027
028
14
14
13,7
221,7
4 1x(us.Tee-Br)=20
4,026
10,75
20
30,75
120
0,016
17,2
0
0,5
028
17,7
Path No: 3
11,2
S67
062
15
15
30,6
30,6
1 1x(us.Tee-Br)=5
1,049
062
061
15
15
-4,7
25,9
1.25
1,38
061
023
15
14
31,8
57,7
1.25 1x(us.Tee-Br)=6
1,38 1x(us.90)=3
023
0,98
5
5,98
120
0,2852
7,5
0
1,7
13,01
0
13,01
120
0,0552
9,2
0
0,7
16,6
9
25,6
120
0,243
9,9
0,4
6,2
16,6
Page 13
Hydraulic Calculations
PIPE INFORMATION
Path No: 4
S72
169
15
15
169
036
11,2
30,6
30,6
1 1x(us.Tee-Br)=5
1,049
1
5
6
120
0,2858
7,5
0
1,7
15
14
6
36,6
1.25 1x(us.Tee-Br)=6
1,38 1x(us.90)=3
45,39
9
54,39
120
0,1046
9,2
0,4
5,7
036
035
14
14
-7,4
29,3
4
4,026
10,82
0
10,82
120
0,0004
15,3
0
0
035
032
14
14
-10,1
19,2
4 2x(us.90)=20
4,026
15,73
20
35,73
120
0,0002
15,3
0
0
032
015
14
14
-9,1
10,1
88,54
18
106,54
120
0,0096
15,3
0
1
015
016
14
14
9,1
19,2
4
4,026
14,73
0
14,73
120
0,0002
16,4
0
0
016
017
14
14
10,1
29,3
4
4,026
10,83
0
10,83
120
0,0004
16,4
0
0
1.25 2x(us.Tee-Br)=12
1,38 2x(us.90)=6
017
16,4
Path No: 5
S70
001
15
15
11,2
31,7
31,7
1 1x(us.Tee-Br)=5
1,049
0,98
5
5,98
120
0,3039
001
8
0
1,8
9,8
Path No: 6
S68
061
15
15
11,2
31,8
31,8
1 1x(us.Tee-Br)=5
1,049
0,99
5
5,99
120
0,3061
061
8,1
0
1,8
9,9
Path No: 7
S66
080
15
15
080
046
15
14
11,2
34,2
34,2
1 1x(us.Tee-Br)=5
1,049
0,99
5
5,99
120
0,3493
9,3
0
2,1
-5,9
28,2
1.25 1x(us.Tee-Br)=6
1,38 1x(us.90)=3
45,41
9
54,41
120
0,0646
11,4
0,4
3,5
046
15,3
Path No: 8
S65
079
15
15
079
024
15
14
11,2
34,2
34,2
1 1x(us.Tee-Br)=5
1,049
0,99
5
5,99
120
0,3507
9,3
0
2,1
5,9
40,1
1.25 1x(us.Tee-Br)=6
1,38 1x(us.90)=3
29,61
9
38,61
120
0,1239
11,4
0,4
4,8
024
16,7
File: C:\Users\Hidraulico\Desktop\Planos\HTCM B.dwg
Date 26/09/2014
Page 14
Hydraulic Calculations
PIPE INFORMATION
Node 1
Node 2
Elev 1
Elev 2
(ft)
(gpm/psi)
(gpm)
(in)
(ft)
L
F
T
C Factor
Pf per ft
total (Pt)
elev (Pe)
frict (Pf)
(ft)
(psi)
(psi)
NOTES
Path No: 9
045
025
14
14
0
12,2
1.25 2x(us.Tee-Br)=12
1,38 2x(us.90)=6
88,38
18
106,38
120
0,0136
025
15,4
0
1,4
16,8
Path No: 10
044
026
14
14
0
12,5
1.25 2x(us.Tee-Br)=12
1,38 4x(us.90)=12
89,37
24
113,37
120
0,0142
026
15,4
0
1,6
17
Path No: 11
043
027
14
14
0
13,7
1.25 2x(us.Tee-Br)=12
1,38 2x(us.90)=6
88,38
18
106,38
120
0,0169
027
15,4
0
1,8
17,2
Path No: 12
042
029
14
14
0
15,5
1.25 2x(us.Tee-Br)=12
1,38 2x(us.90)=6
88,38
18
106,38
120
0,0214
029
15,4
0
2,3
17,7
Path No: 13
170
169
15
15
0
6
1.25
1,38
13,38
0
13,38
120
0,0037
169
9,2
0
0,0
9,2
Path No: 14
062
065
15
15
0
4,7
1.25 2x(us.90)=6
1,38
14,21
6
20,21
120
0,0023
065
9,2
0
0,0
9,2
Path No: 15
036
047
14
14
0
7,4
4
4,026
14,27
0
14,27
120
0,0000
047
15,3
0
0
15,3
Path No: 16
035
016
14
14
0
10,1
1.25 2x(us.Tee-Br)=12
1,38 2x(us.90)=6
016
89,53
18
107,53
120
0,0096
15,3
0
1
16,4
Page 15
Hydraulic Calculations
PIPE INFORMATION
Node 1
Node 2
Elev 1
Elev 2
(ft)
(gpm/psi)
(gpm)
(in)
(ft)
L
F
T
C Factor
Pf per ft
total (Pt)
elev (Pe)
frict (Pf)
(ft)
(psi)
(psi)
NOTES
Path No: 17
032
022
14
14
0
9,1
4 1x(us.Tee-Br)=20
4,026
022
013
14
14
0
9,1
1.25 1x(us.Tee-Br)=6
1,38 6x(us.90)=18
013
015
14
14
0
9,1
4
4,026
9,11
20
29,11
120
0,0000
15,3
0
0
106,16
24
130,16
120
0,0079
15,3
0
1
14,74
0
14,74
120
0,0000
16,4
0
0
015
16,4
Path No: 18
080
079
15
15
0
5,9
1.25
1,38
13,37
0
13,37
120
0,0036
079
11,4
0
0,0
11,4
Pressures are balanced to a high degree of accuracy. Values may vary by 0.1 psi due to display rounding.
(079-S65)
Page 16
Device Graphs
Page 17