You are on page 1of 179

Joint Operating Body

Pertamina Medco E&P Tomori


Sulawesi

JOB NO.
9608
SU2573

DOC. NO

REV.

SNO - S - CC - 05 - 010

SHEET 1-15
SENORO GAS DEVELOPMENT PROJECT
CIVIL / CIVIL
CALCULATION

CONTRACT NO. : K0498R/JOBT/MDP

CALCULATION OF PIPE RACK STRUCTURE


# 10

23-Jun-13

Issued for COMPANY Review

REV

DATE

DESCRIPTION

AMP

HDY

SN

PREP'D REV'D CHK'D

FMM

JHH

END'
APP'D
D

BY
DATE
CLIENT

CALCULATION OF PIPE RACK STRUCTURE


10
SENORO GAS DEVELOPMENT PROJECT

# Doc. No.

SNO-S-CC-05-010

REV.

DATE.

23-Jun-13

TABULATION OF REVISED PAGES


SHEET

REVISION
B

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

X
X
X
X
X
X
X
X
X
X
X
X
x
X
X

Attach. A
Attach. B
Attach. C
Attach. D
Attach. E
Attach. F
Attach. G
Attach. H
Attach. I
Attach .J
Attach .K

X
X
X
X
X
X
X
X
X
X
X

SHEET

REVISION
B

Page 2 of 15

CALCULATION OF PIPE RACK STRUCTURE Doc. No.


# 10
REV.
SENORO GAS DEVELOPMENT PROJECT

DATE.

SNO-S-CC-05-010
B
23-Jun-13

REVISION SUMMARY

REV.
B

DATE

DESCRIPTIONOFCHANGE

23-Jun-2013 Issued for Company Review

Page 3 of 15

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

Doc. No.
REV
REV.
DATE.

SNO-S-CC-05-010
B
23-Jun-13

TABLE OF CONTENTS
1. GENERAL
5
1.1 Scope
5
1.2 Codes, Standards, and References
5
1.3 Units 5
1.4 Quality of Material
5
1.5 Unit Weight of Material
6
1.6 Abbreviation
6
2. ANALYSIS METHOD
7
2.1 Design
g Concept
p
7
2.2 Design Criteria
7
2.3 Design Loading
7
2.4 Load Combination
9
2.5 Allowable Deflection
11
3 STRUCTURAL MODELING
12
4 STEEL STRUCTURE CHECKING 12
g
4.1 Steel Stress Checking
4.2 Deflection Checking
5. FOUNDATION CHECKING

12
13
15

ATTACHMENT
A. PIPE RACK PLAN VIEW & SECTION
B. PIPES, CABLE TRAY AND EQUIPMENT LOADING DATA
C. STRUCTURAL MODELLING
D. DESIGN LOAD
E. STAAD INPUT DATA
F. STRESS RATIO
G. DEFLECTION DATA
H. CONNECTION CHECK
ANCHOR BOLT CAPACITY
I.
J
FOUNDATION DESIGN
K. STEEL & FOUNDATION MATERIAL TAKE OFF (MTO)

Page 4 of 15

CALCULATION OF PIPE RACK STRUCTURE Doc. No.


# 10
REV.

SENORO GAS DEVELOPMENT PROJECT

DATE.

SNO-S-CC-05-010

B
23-Jun-13

1. General
1.1 Scope
This document presents calculation of foundation and steel structure for pipe rack structure PR08.
1.2 Codes, Standards, and References
1
2

SNO-S-DB-001 Design Basis Tripatra-Samsung " Civil/Structural Design Criteria


SNO-S-DB-001,
Criteria."
Job No 2894, Geotechnical Investigation For Senoro Gas Processing Plant Senoro-Central
Sulawesi Indonesia,Rev 03 by Soilens,PT on March, 21st 2013.

3
4

ACI 318-08 " Building Code Requirements for Structural Concrete and Commentary."
ASCE 7-10 " American Society of Civil Engineers - Minimum Design Loads for Buildings
and Other Structures."

5
6
7

AISC-ASD " Manual of Steel Construction ", volume 2, 9th Edition


UBC - 1997
1997, " Uniform Building Code
Code."
SNO-C-TS-101, Tripatra-Samsung " Earthquake Loads Calculation Procedure for
Structures and Foundations. "

8
9

SNO-C-TC-102, Tripatra-Samsung " Wind Data Evaluation Report."


SNO-S-TS-001, Tripatra-Samsung Specification " Spesification For Structural Steel
Material. "

10 SNO-C-CC-001, " Calculation For Piling Capacity Design."


1.3 Units
All Units are in SI Unit unless noted otherwise
1.4 Quality of Material
Material
Structural Steel, ASTM A 36 or JIS G3101 Grade SS400

Strength
fy =
fu =
Ft all =
Fv all =

Material
Structural Concrete
Levelling Concrete
Reinforcing Bar :
d 60 or BDeformed
D f
dB
ASTM A615 grade
Bar
Material
Anchor Bolt ASTM A 307 Grade C

HS Bolt, ASTM A 325


Weld Electrode (AWS D
D.1.1,
1 1 E60xx)

fc' =
fc' =
f =
fy
fy =
ft all =
fv all =
fy =
fu =
Fu =
Fv all =

235 00
235.00
MPa
400.00
MPa
MPa
141.00
MPa
94.00
Strength
28.00
MPa
17.50
MPa
390 00
MP
390.00
MPa
Strength
240.00
MPa
137.30
MPa
MPa
68.60
550.00
MPa
720.00
MPa
413.7
413 7 MPa
124.11
MPa

Page 5 of 15

CALCULATION OF PIPE RACK STRUCTURE Doc. No.


# 10
REV.

SENORO GAS DEVELOPMENT PROJECT

DATE.

SNO-S-CC-05-010

B
23-Jun-13

1.5 Unit Weight of Material


Material
Reinforced Concrete (c)
Lean Concrete (pc)
Steel (s)
Soil (so)
Operating Liquid (L(o))
Water (L)
Sand Gravel (g)

Unit Weight
kN/m3
23.54
kN/m3
21.58
kN/m3
78.50
kN/m3
16.50
3
kN/m
10.60
kN/m3
10.00
3
kN/m
17.65

1.6 Abbreviation
BCD :
Ca :
Cf :
D :
db :
E :
E :
e :
F :
ft :
fv :
fy :
G :
h :
I
:
ID :
Kd :
Kz :
Kzt :
LC1 :
LC2 :
Le :
Mu :
:
n1 :
PE :
PO :
PT :

bolt circle diameter


seismic coefficient
force coefficient
dead load
diameter bolt
young modulus
earthquake Load (E)
excentricity
minimum bolt pitch
bolt tensile strength
bolt shear strength
yield strength of reinforce steel
gust effect factor
height of structure from ground level
importance factor
inside diameter
wind directionaly factor
velocity pressure exposure coefficient
topographic factor
factored load combination
unfactored load combination
minim
m bolt embedment
minimum
moment ultimate
coefficient of friction
number of bolt
weight of pipe in empty condition
piping load (operating condition)
piping load (testing condition)

Page 6 of 15

CALCULATION OF PIPE RACK STRUCTURE Doc. No.


# 10
REV.

SENORO GAS DEVELOPMENT PROJECT

DATE.

SNO-S-CC-05-010

B
23-Jun-13

QE :

weight of machinery incl. appurtenances and it is clasiffied as empty load (erection)

Qo :
QT :

equipment weight (operating condition)


equipment weight (testing condition)

qz

wind pressure

T
TF

:
:

tensile force
thermal force

V
Vs
Vp
W
Wt
Z

:
:
:
:
:
:

shear force
base shear
shear of plate
wind load
weight of equipment and/or structure
modulus section

2. Analysis Method
2.1 Design Concept
- Loads to be considered in calculation consist of dead loads, live loads, pipe loads, equipment
loads and environmental loads.
- Stability :-

in transverse direction, structure are designed as reinforced steel frame with


fixed connection
in longitudinal direction, structure are designed as reinforced steel frame with
pinned connection

Horizontal and vertical bracing is designed as truss member


- Types of support is pinned connection in all direction.
- Allowable Stress Design shall be used in the design of steel structure member conforming to
AISC ASD.
- The structure will be analyzed with STAADPro V8i structural analysis computer programming
and as space frame analysis.
2.2 Design Criteria
2.2.1 Allowable Ratio
- Allowable ratio for permanent is 1.00 with apply unfactored combination.
- Allowable ratio for temporary is 1.33 with apply unfactored combination.
2.2.1 Allowable Deflection
- Allowable ratio for vertical is L/240 with apply unfactored combination.
- Allowable ratio for horizontal is L/200 with apply unfactored combination.
2.3 Design Loading
2.3.1 Primary Load
The following loads and forces are considered in the design of Structure :
2.3.1.1. Dead Load (D)
Selfweight of Steel Structure exclude plate connection, bolt & fireproofing.
2.3.1.2. Live Load (L)
Any load not permanently fixed to the structure e.g loading caused by personnel, tools during
maintenance.
Live Load shall be applied on platform in the top level of rack, as servicing cooling tower access.
Live Load in operating or maintenance platform are 2.50 kN/m2
Live Load =
2.5 x 3 = 7.5 kN/m ---> span 3 m

Page 7 of 15

CALCULATION OF PIPE RACK STRUCTURE Doc. No.


# 10
REV.
SENORO GAS DEVELOPMENT PROJECT

SNO-S-CC-05-010

DATE.

23-Jun-13

2.3.1.3. Equipment Load (Q)


Weight of equipment or machinery (ACHE) including appurtenances and it is classified as an
empty (erection) load QE, an operating load Qo or a testing load QT.
Dynamic load due to fan rotation has considered as additional static load that was determined
based on the fan size.
2.3.1.4. Piping Load (P)
Weight of pipe including appurtenances and it is classified as an empty (erection) load PE, an
operating load PO or a testing load PT.
Miscellaneous piping support attached on main structure that were not modeled on structure
model, will be provided by piping. The miscellaneous piping loading at any position on platform
were assumed that have been covered as live load on platform (170 kg/m2)
2.3.1.5. Cable Tray Load
Weight of cable tray is included according to Electrical and Instrument information.
Weight of cable tray is calculated as follow :
- cable tray (900 mm = 150 kg,m; 600 mm = 100 kg/m; 300 mm = 50 kg/m)
2.3.1.6. Wind Load (W)
Based on , 'Senoro Gas Development Project, SNO-C-TC-102, "Wind Data Evaluation Report"',
wind load will be calculated by following formula :
Wind Velocity (v)
Wind Pressure (qz)
( )

=
=
=
=
=
=
=
=

32.080
0.540
0.570
0.590
0.620
0.660
0.690
0.710

m/s Risk Category III & IV


2
kN/m
kN/
h = 4,6 m
kN/m2
h = 6,1 m
kN/m2
h = 7,6 m
2
kN/m
h = 9,1 m
kN/m2
h = 12,2 m
kN/m2
h = 15,2 m
kN/m2
h = 18 m

2.3.1.7. Earthquake Load ( E)


Based on, 'Senoro Gas Development Project, SNO-C-TS-101, "Earthquake Loads Calculation
Procedure For Structure And Foundation "'', earthquake load will be calculated in accordance
with UBC-97 as :
Vs
Vs
Vs

= Cs x
= 0.260
= 0.210

Wt
x
x

Wt
Wt

,with

Cs
Cs

=
=

0.260
0.210

Transv
Longit

Page 8 of 15

CALCULATION OF PIPE RACK STRUCTURE Doc. No.


# 10
REV.

SENORO GAS DEVELOPMENT PROJECT

DATE.

SNO-S-CC-05-010

B
23-Jun-13

2.3.1.8. Thermal Load ( TF)


a. Thermal Load due to Material Friction
In design of pipe supports, horizontal friction forces due to thermal expansion or contraction of
flare lines and stream lines, etc shall be applied at the support bearing surfaces.
Thermal friction loads are calculated by estimating piping load by friction coeffficients ()
as follows:

= 0.3 ( steel to steel )


TF = x gravity pipe operation load

(Design Criteria)

Pipe Weight (Wp)

Tf

NOTE :

The derived thermal forces based on normal and friction as described above is
not used when thermal force from pipe stress analysis is given from piping.
b. Thermal Load due to Pipe anchorage/ Supporting system
Anchor and guide load is resulted from pipe stress analysis (PSA) which be generated from
piping software analysis
analysis.
The PSA result were plotted on piping loading data number
2.3.1.9. Platform Load
Weight of Platform
= 0.25
Bar 6
= 0.03 x
Serrated

d2 x
78.5 x
11
0.01 x 1 x 78.5 x
35
Total
Accessories + 10%
Total

(Attachment B)

=
=
=
=
=

0.024
0.343
0 368
0.368
0.037
0.405

kN/m2
kN/m2
kN/m2
kN/m2
kN/m2

2.4 Load Combination


2.4.1 The following factored load combination is used to design concrete reinforcement by Load and
Resistance Factored Design method:
Empty Condition:
LC 1-11 1.4(D + PE + QE )
LC 1-21
LC 1-22
LC 1-23
LC 1-24
LC 1-31
LC 1-32
LC 1-33
LC 1-34

1.2(D + PE + QE) + 1.6 W in Z(+)


1.2(D + PE + QE) + 1.6 W in Z(-)
1.2(D + PE + QE) + 1.6 W in X(+)
1.2(D + PE + QE) + 1.6 W in X(-)
1.2(D + PE + QE) + E in Z(+)
1.2(D
1 2(D + PE + QE) + E in Z(-)
1.2(D + PE + QE) + E in X(+)
1.2(D + PE + QE) + E in X(-)

Operating Condition:
LC 1-41 1.4(D + PO + QO + TF(+))
LC 1-42 1.2(D + PO + QO + TF(+)) + 1.6 L

Page 9 of 15

CALCULATION OF PIPE RACK STRUCTURE Doc. No.


# 10
REV.
SENORO GAS DEVELOPMENT PROJECT

DATE.

SNO-S-CC-05-010

B
23-Jun-13

LC 1-43 1.4(D + PO + QO + TF(-))


LC 1-44 1.2(D + PO + QO + TF(-)) + 1.6 L
Operating Condition + Wind (on positive thermal):
LC 1-51 1.2(D + PO + QO + TF(+)) + L + 1.6 W in Z(+)
LC 1-52 1.2(D + PO + QO + TF(+)) + L + 1.6 W in Z(-)
LC 1-53 1.2(D + PO + QO + TF(+)) + L + 1.6 W in X(+)
LC 1-54 1.2(D + PO + QO + TF(+)) + L + 1.6 W in X(-)
Operating Condition + Earthquake (on positive thermal):
LC 1-61 1.2(D + PO + QO + TF(+)) + L + E in Z(+)
LC 1-62 1.2(D + PO + QO + TF(+)) + L + E in Z(-)
LC 1-63 1.2(D + PO + QO + TF(+)) + L + E in X(+)
LC 1-64 1.2(D + PO + QO + TF(+)) + L + E in X(-)
Operating Condition + Wind (on negative thermal):
LC 1-71 1.2(D + PO + QO + TF(-)) + L + 1.6 W in Z(+)
LC 1-72 1.2(D + PO + QO + TF(-)) + L + 1.6 W in Z(-)
LC 1-73 1.2(D + PO + QO + TF(-)) + L + 1.6 W in X(+)
LC 1-74 1.2(D + PO + QO + TF(-)) + L + 1.6 W in X(-)
Operating Condition + Earthquake (on negative thermal):
LC 1-91 1.2(D + PO + QO + TF(-)) + L + E in Z(+)
LC 1-92 1.2(D + PO + QO + TF(-)) + L + E in Z(-)
LC 1-93 1.2(D + PO + QO + TF(-)) + L + E in X(+)
LC 1-94 1.2(D + PO + QO + TF(-)) + L + E in X(-)
Test Condition:
LC 1-80 1.2(D + PT + QT) + 1.6 (L/2)
LC 1-81 0.9(D + PT + QT) + 1.6 (W/3) in Z(+)
LC 1-82 0.9(D + PT + QT) + 1.6 (W/3) in Z(-)
LC 1-83 0.9(D + PT + QT) + 1.6 (W/3) in X(+)
LC 1-84 0.9(D + PT + QT) + 1.6 (W/3) in X(-)
2.4.2 The following unfactored load combination is used to steel structure design by Allowable Stress
Design.
Empty Condition:
LC 2-11 D + PE + QE
LC 2-21 D + PE + QE + W in Z(+)
LC 2-22 D + PE + QE + W in Z(-)
LC 2-23 D + PE + QE + W in X(+)
LC 2-24 D + PE + QE + W in X(-)
LC 2-31 D + PE + QE + E in Z(+)/1,4
LC 2-32 D + PE + QE + E in Z(-)/1,4
LC 2-33 D + PE + QE + E in X(+)/1,4
LC 2-34 D + PE + QE + E in X(-)/1,4

Increase in Allowable Stress


1.00
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33

Page 10 of 15

CALCULATION OF PIPE RACK STRUCTURE Doc. No.


# 10
REV.
SENORO GAS DEVELOPMENT PROJECT

DATE.

Operating Condition:
LC 2-41 D + PO + QO + TF(+)
LC 2-42 D + PO + QO + TF(-)

1.00
1.00

Operating Condition + Wind (on positive thermal):


LC 2-51 D + PO + QO + TF(+) + L + W in Z(+)
LC 2-52 D + PO + QO + TF(+) + L + W in Z(-)
53 D + PO + QO + TF(+) + L + W in X(+)
LC 2
2-53
LC 2-54 D + PO + QO + TF(+) + L + W in X(-)

1.33
1.33
1 33
1.33
1.33

Operating Condition + Earthquake (on positive thermal):


LC 2-61 D + PO + QO + TF(+) + L + E in Z(+)/1,4
LC 2-62 D + PO + QO + TF(+) + L + E in Z(-)/1,4
LC 2-63 D + PO + QO + TF(+) + L + E in X(+)/1,4
LC 2-64 D + PO + QO + TF(+) + L + E in X(-)/1,4

1.33
1.33
1.33
1.33

Operating Condition + Wind (on negative thermal):


LC 2-71 D + PO + QO + TF(-) + L + W in Z(+)
LC 2-72 D + PO + QO + TF(-) + L + W in Z(-)
LC 2-73 D + PO + QO + TF(-) + L + W in X(+)
LC 2-74 D + PO + QO + TF(-) + L + W in X(-)

1.33
1.33
1.33
1.33

Operating Condition + Earthquake (on negative thermal):


LC 2-81 D + PO + QO + TF(-) + L + E in Z(+)/1,4
( ) + L + E in Z(-)/1,4
() ,
LC 2-82
2 82 D + PO + QO + TF(-)
LC 2-83 D + PO + QO + TF(-) + L + E in X(+)/1,4
LC 2-84 D + PO + QO + TF(-) + L + E in X(-)/1,4

1.33
1.33
1.33
1.33

Test Condition:
LC 2-90 D + PT + QT
LC 2-91 D + PT + QT + W in Z(+)
LC 2-92 D + PT + QT + W in Z(-)
LC 2-93 D + PT + QT + W in X(+)
LC 2-94 D + PT + QT + W in X(-)
LC 2-95 D + PT + QT + E in Z(+)/1,4
LC 2-96 D + PT + QT + E in Z(-)/1,4
LC 2-97 D + PT + QT + E in X(+)/1,4
LC 2-98 D + PT+ QT + E in X(-)/1,4

1.00
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33

SNO-S-CC-05-010

B
23-Jun-13

2.5 Allowable Deflection


2.5.1 The limiting permissible vertical deflection for structural steel members shall be as
specified below :
- Beam for Structural componen: L/240
2.5.2 The limiting permissible horizontal displacement of structures :
- Steel Structure
: H/200
where :
L
=
Theoretical span of beam
H
=
Total Height of structures

Page 11 of 15

CALCULATION OF PIPE RACK STRUCTURE Doc. No.


# 10
REV.
SENORO GAS DEVELOPMENT PROJECT

SNO-S-CC-05-010

DATE.

B
23-Jun-13

3.
3 Structural
St
t
l Modeling
M d li
Structural modeling at the pipe rack is applied three dimensional with seismic analysis.

4. Steel Structure Checking


4.1 Steel Stress Checking
Steel member stresses are checked in accordance with AISC by STAAD Pro V8i which
presents the actual stress to the allowable Stress Ratio as SR.
Pipe Rack PR-08
Elevation
Profiles
m
H-588X300X12
H-588X300X12
EL+0,00 H-300x150x6,5
to
H-300x150x6
H
300x150x6,5
5
EL+5,00 H-200x100x5,5
T-150x150
T-200x200
H-588X300X12
H-588X300X12
EL+5,00 H-300x150x6,5
to
H
300x150x6,5
H-300x150x6,5
EL+7,00 H-200x100x5,5
T-150x150
T-200x200
H-588X300X12
H-588X300X12
EL+7,00 H-300x150x6,5
to
H-300x150x6,5
,
EL+10,00H-200x100x5,5
T-150x150
T-200x200
H-588X300X12
H-588X300X12
EL+10,00H-300x150x6,5
to
H-300x150x6,5
EL+13,00H-200x100x5,5
T-150x150
T-200x200
H-588X300X12
H-588X300X12
EL+13,00H-400x200x8
to
H-400x200x8
EL+16,00H-200x100x5,5
T-150x150
T-200x200

Steel Stress Ratio


Permanent Temporary
0.357
0.857
0.640
0.369
0.244
0.243
0 361
0.361
0 374
0.374
0.089
0.093
0.092
0.120
0.306
0.582
0.214
0.417
0.155
0.417
0.465
0.467
0.210
0.278
0.074
0.083
0.106
0.121
0.101
0.218
0.189
0.329
0.094
0.354
0.274
0.277
0.154
0.212
0.069
0.088
0.057
0.076
0.105
0.243
0.163
0.277
0.127
0.333
0.414
0.420
0.437
0.749
0.032
0.065
0.030
0.110
0.117
0.253
0.476
0.570
0.848
0.922
0.558
0.561
0.471
0.479
0.166
0.264
0.159
0.305
0.184
0.285

Remarks
Column
Main beam
Secondary beam
Longitudinal beam
Secondary longitudinal beam
Horizontal Bracing
Vertical Bracing
Column
Main beam
Secondary beam
Longitudinal beam
Secondary longitudinal beam
Horizontal Bracing
Vertical Bracing
Column
Main beam
Secondary beam
Longitudinal
g
beam
Secondary longitudinal beam
Horizontal Bracing
Vertical Bracing
Column
Main beam
Secondary beam
Longitudinal
beam
g
Secondary longitudinal beam
Horizontal Bracing
Vertical Bracing
Column
Main beam
Secondary beam
Longitudinal beam
Secondary longitudinal beam
Horizontal Bracing
Vertical Bracing

Page 12 of 15

CALCULATION OF PIPE RACK STRUCTURE Doc. No.


# 10
REV.
SENORO GAS DEVELOPMENT PROJECT

For Permanent condition,


Max ratio

0.848

<

1.00

OK

For Temporary condition,


Max ratio

0.922

<

1.33

OK

DATE.

SNO-S-CC-05-010

B
23-Jun-13

4.2 Deflection Checking


Deflection check for steel structures is performed based on the unfactored load combinations.
(1). Vertical deflection (dv) Check.
dv allowed = L / 240
(2). Horizontal Deflection (dh) Check:
dh allowed = H / 200
Where, L = horizontal span length of the structure member
H = height of structure member (column)
The following tables present summary of the results.
Beam Deflection Permanent Load Condition
all
Elevation Properties
L
(m)
H-588X300X12
H-300x150x6,5
EL+5,00 H-300x150x6,5
H-200x100x5,5
H 200x100x5 5
T-150x150
T-200x200
H-588X300X12
H-300x150x6,5
EL+7,00 H-300x150x6,5
H-200x100x5,5
T-150x150
T-200x200
H-588X300X12
H-300x150x6,5
EL+10,00H-300x150x6,5
H-200x100x5,5
T-150x150
T-200x200
T
200x200
H-588X300X12
H-300x150x6,5
EL+13,00H-300x150x6,5
H-200x100x5,5
T-150x150
T-200x200
H
588X300X12
H-588X300X12
H-300x150x6,5
EL+16,00H-300x150x6,5
H-200x100x5,5
T-150x150
T-200x200

(mm)
8000
8000
6000
3000
5000
5830
8000
8000
6000
3000
5000
3606
8000
8000
6000
3000
5000
4243
8000
8000
6000
3000
5000
4243
8000
8000
6000
3000
5000
4243

(mm)
33.333
33.333
25.000
12.500
12 500
20.833
24.292
33.333
33.333
25.000
12.500
20 833
20.833
15.025
33.333
33.333
25.000
12.500
20.833
17 679
17.679
33.333
33.333
25.000
12.500
20.833
17.679
33.333
33.333
25.000
12.500
20.833
17.679

(mm)
1.983
1.449
1.453
0.058
0 058
0.003
0.003
0.985
2.536
0.715
0.058
0 003
0.003
0.003
0.760
1.596
0.630
0.058
0.003
0 003
0.003
0.700
2.354
2.516
0.058
0.003
0.003
4.449
2.575
1.290
0.058
0.003
0.003

check
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK

Remarks
Main beam
Secondary beam
Longitudinal beam
Secondary longitudinal beam
Horizontal Bracing
Vertical Bracing
Main beam
Secondary beam
Longitudinal beam
Secondary longitudinal beam
Horizontal Bracing
Vertical Bracing
Main beam
Secondary beam
Longitudinal beam
Secondary longitudinal beam
Horizontal Bracing
Vertical Bracing
Main beam
Secondary beam
Longitudinal beam
Secondary longitudinal beam
Horizontal Bracing
Vertical Bracing
Main beam
Secondary beam
Longitudinal beam
Secondary longitudinal beam
Horizontal Bracing
Vertical Bracing

Page 13 of 15

CALCULATION OF PIPE RACK STRUCTURE Doc. No.


# 10
REV.
SENORO GAS DEVELOPMENT PROJECT

Column Deflection Permanent Load Condition


Elevation Properties
L
all
x
(m)
(mm)
(mm)
(mm)
EL+5,00 H-588X300X12
5000
25.000
4.365
EL+7,00 H-588X300X12
7000
35.000
4.911
EL+10,00H-588X300X12 10000
50.000
5.315
EL+13,00H-588X300X12 13000
65.000
5.705
EL+16,00H-588X300X12 16000
80.000
6.293

Beam Deflection Temporary Load Condition


all
L
Elevation Properties
(m)
H-588X300X12
H
588X300X12
H-300x150x6,5
EL+5,00 H-300x150x6,5
H-300x150x6,5
T-150x150
T-200x200
H-588X300X12
H-300x150x6,5
H 300 150 6 5
EL+7,00 H-300x150x6,5
H-300x150x6,5
T-150x150
T-200x200
H-588X300X12
H-300x150x6,5
EL+10 00H 300x150x6 5
EL+10,00H-300x150x6,5
H-300x150x6,5
T-150x150
T-200x200
H-588X300X12
H-300x150x6,5
EL+13,00H-300x150x6,5
H 300x150x6 5
H-300x150x6,5
T-150x150
T-200x200
H-588X300X12
H-300x150x6,5
EL+16,00H-300x150x6,5
H-300x150x6,5
T-150x150
T-200x200

(mm)
8000
8000
6000
3000
5000
5830
8000
8000
6000
3000
5000
3606
8000
8000
6000
3000
5000
4243
8000
8000
6000
3000
5000
4243
8000
8000
6000
3000
5000
4243

(mm)
33 333
33.333
33.333
25.000
12.500
20.833
24.292
33.333
33.333
33 333
25.000
12.500
20.833
15.025
33.333
33.333
25 000
25.000
12.500
20.833
17.679
33.333
33.333
25.000
12 500
12.500
20.833
17.679
33.333
33.333
25.000
12.500
20.833
20 833
17.679

(mm)
2 285
2.285
1.462
1.454
0.058
0.003
0.003
4.070
2.981
2 981
0.595
0.058
0.003
0.003
1.996
3.153
0 620
0.620
0.058
0.003
0.003
0.357
2.232
0.955
0 058
0.058
0.003
0.003
4.829
1.995
1.384
0.058
0.003
0 003
0.003

check
OK
OK
OK
OK
OK

check
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK

SNO-S-CC-05-010

DATE.

z
(mm)
1.105
1.129
1.585
1.881
2.107

B
23-Jun-13

check
OK
OK
OK
OK
OK

Remarks
AA - HA
AA - HA
AA - HA
AA - HA
AA - HA

Remarks
Main
M
i b
beam
Secondary beam
Longitudinal beam
Secondary longitudinal beam
Horizontal Bracing
Vertical Bracing
Main beam
Secondary
beam
S
d
b
Longitudinal beam
Secondary longitudinal beam
Horizontal Bracing
Vertical Bracing
Main beam
Secondary beam
Longitudinal beam
Secondary longitudinal beam
Horizontal Bracing
Vertical Bracing
Main beam
Secondary beam
Longitudinal beam
Secondary longitudinal beam
Horizontal Bracing
Vertical Bracing
Main beam
Secondary beam
Longitudinal beam
Secondary longitudinal beam
Horizontal Bracing
Vertical Bracing

Page 14 of 15

CALCULATION OF PIPE RACK STRUCTURE Doc. No.


# 10
REV.

check
OK
OK
OK
OK
OK

DATE.

SENORO GAS DEVELOPMENT PROJECT


Column Deflection Temporary Load Condition
Elevation Properties
L
all
x
(m)
(mm)
(mm)
(mm)
EL+5,00 H-588X300X12
5000
25.000
21.654
EL+7,00 H-588X300X12
7000
35.000
25.557
EL+10,00H-588X300X12 10000
50.000
30.298
EL+13,00H-588X300X12 13000
65.000
34.463
EL+16,00H-588X300X12 16000
80.000
37.950

SNO-S-CC-05-010

z
(mm)
2.118
2.760
3.731
4.703
5.611

23-Jun-13

check
OK
OK
OK
OK
OK

Remarks
AA - HA
AA - HA
AA - HA
AA - HA
AA - HA

5. Foundation Checking
- Summary of pile foundation design
Pile Compression

Pile Tension

Pile Lateral

Pile
D-L (m)

Forces
(kN)

Allowable
(kN)

Forces
(kN)

Allowable
(kN)

Forces
(kN)

Allowable
(kN)

Row Permanent 0.3 - 18


AA-HA
zone 4 Temporary 0.3 - 18

206.94

355.80

0.00

-175.00

11.57

39.00

308.47

475.00

0.00

-233.30

28.26

39.00

Pile
Loc.

Condition

- Based on the given condition in structural analysis, the pile capacity of


piperack foundation considered adequate in meeting design criteria.
Row AA-HA
- Number of pile used per foundation = 4 pile
pile, diameter 300 mm,
mm effective length 18 m
m.
- Use 8 ea
1 1/4 inch dia. Anchor bolt.
- Footing shall be 2700 mm length, 2700 mm width and 500 mm thick, with D16-250 flexural
reinforcement.

Page 15 of 15

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

Doc. No.
REV.
DATE.

ATTACHMENT A
PIPE RACK PLAN VIEW & SECTION

SNO-S-CC-05-010

B
23-Jun-13

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

A.1 Pipe Rack PR-08 Plan

PR10

Fig.A.1.1 Pipe Rack PR-10


PR 10 Layout

A.2 Pipe Rack PR-10 Section

Note
Thi picture
i t
iis ffor ttechnical
h i l
This
drawing.
Please see Attachment B
Fig.A.2.1 Section of Pipe Rack PR-10

Attachment A - Page 1 of 1

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

ATTACHMENT B
PIPES, CABLE TRAY AND EQUIPMENT LOADING DATA

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

B.1 PIPING LOADING DATA


B.1.1 Piping Info ( SNO-P-INF-102)
Drawing no : SNO-INF-26A

Attachment B (Pipe Load Data) - Page 1 of 16

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

Drawing no : SNO-INF-26B

Attachment B (Pipe Load Data) - Page 2 of 16

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

Drawing no : SNO-INF-26C

Attachment B (Pipe Load Data) - Page 3 of 16

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

Drawing no : SNO-INF-26D

Attachment B (Pipe Load Data) - Page 4 of 16

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

Drawing no : SNO-INF-26E

Attachment B (Pipe Load Data) - Page 5 of 16

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

Drawing no : SNO-INF-27A

Attachment B (Pipe Load Data) - Page 6 of 16

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

Drawing no : SNO-INF-27B

Attachment B (Pipe Load Data) - Page 7 of 16

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

Drawing no : SNO-INF-27C

Attachment B (Pipe Load Data) - Page 8 of 16

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

Drawing no : SNO-INF-27D

Attachment B (Pipe Load Data) - Page 9 of 16

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

Drawing no : SNO-INF-27E

Attachment B (Pipe Load Data) - Page 10 of 16

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

B.1.2 Piping Load

Attachment B - 11 of 16

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

Attachment B - 12 of 16

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

Attachment B - 13 of 16

CALCULATION OF PIPE RACK STRUCTURE


# 10

SENORO GAS DEVELOPMENT PROJECT

Doc. No.
REV.

SNO-S-CC-05-010

DATE.

23-Jun-13

Piping loads for each bay of PR-10 can be seen on the following table,
DEAD LOAD
GRAVITY DIRECTION (Fy)
Piping Location

Unit

Empty

Operate

Test

PE

PO

PT

Elev. +5.000
Bay 45 - 46
Line <= 10 inch

kN/m

0.55-1.5

Line = 16 inch

x=
Kn

3.60

2.200

Line = 16 inch

x=
kN

2.800

Line = 16 inch

x=
kN

3 325
3.325

Line = 16 inch

x=
kN
x=

0.996

10.00
5.00
10.00
8.00

5.10
0.55-1.5

23.00
2.200

7.00
2.800

18.00
3 325
3.325

8.00
0.996

5.10
0.55-1.5

16.00
2.200

15.00
2.800

18.00
3 325
3.325

10.00
0.996

Elev. +7,000
Bay 45 - 46
Line <= 10 inch

kN/m

1.8-3.3

Line = 12 inch

x=
kN

3.60

1.600

Line = 12 inch

x=
kN

2.500

Line = 12 inch

x=
kN

1.100

Line = 12 inch

x=
kN

3.400

Line = 16 inch

x=
kN
x=

2.425

12.00
13.00
12.00
10.00
6.00

5.10
1.8-3.3

17.00
1.600

15.00
2.500

13.00
1.100

11.00
3.400

12.00
2.425

5.10
1.8-3.3

18.00
1.600

17.00
2.500

17.00
1.100

14.00
3.400

10.00
2.425

Elev. +10,000
Bay 45 - 46
Line <= 10 inch

kN/m

1.5-2.25

Line = 24 inch

x=
kN

3 60
3.60

0.850

Line = 16 inch

x=
kN

2.450

Line = 12 inch

x=
kN
x=

0.800

8.00
5.00
12.00

5 10
5.10
1.5-2.25

8.00
0.850

6.00
2.450

13.00
0.800

5 10
5.10
1.5-2.25

29.00
0.850

14.00
2.450

17.00
0.800

Attachment B - 14 of 16

CALCULATION OF PIPE RACK STRUCTURE


# 10

SENORO GAS DEVELOPMENT PROJECT

Doc. No.
REV.

SNO-S-CC-05-010

DATE.

23-Jun-13

Elev. +16.000
Bay 45 - 46
Line <= 10 inch

kN/m

3-3.5

Line <= 10 inch

x=
kN/m

3.60

1-1.9

Line = 20 inch

x=
kN

1.600

Line = 20 inch

x=
kN
x=

2.800

Unit

Direct.
Fz

3.60
150.00
90.00

5.10
3-3.5

5.10
1-1.9

157.00
1.600

95.00
2.800

5.10
3-3.5

5.10
1-1.9

168.00
1.600

94.00
2.800

THERMAL LOAD
LONGITUDINAL DIRECTION (Fz)
Long.
Piping Location
Elev. +5.000
Bay 45 - 46
Line <= 10 inch

kN/m

0.55-1.5

Line = 16 inch

x=
Kn

1.53

2.200

Line = 16 inch

x=
kN
x=

3.325

35.00
6.00

Elev. +7,000
Bay 45 - 46
Line <= 10 inch

kN/m

1.8-3.3

Line = 12 inch

x=
kN

1.53

1.600

Line = 12 inch

x=
kN

2.500

Line = 12 inch

x=
kN
x=

3.400

15.00
5.00
8.00

Elev. +10,000
Bay 45 - 46
Line <= 10 inch

kN/m

1.5-2.25

Line = 24 inch

x=
kN

1 53
1.53

0.850

Line = 16 inch

x=
kN

2.450

Line = 12 inch

x=
kN
x=

0.800

9.00
2.10
9.00

Elev. +16.000
Bay 45 - 46
Line <= 10 inch

kN/m

3-3.5

Line <= 10 inch

x=
kN/m

1.53

1-1.9

Line = 12 inch

x=
kN
x=

2.800

1.53
97.00

Attachment B - 15 of 16

CALCULATION OF PIPE RACK STRUCTURE


# 10

SENORO GAS DEVELOPMENT PROJECT

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

TRANSVERSE DIRECTION (Fx)


Piping Location

Unit

Trans.
Direct.
Fz

Elev. +5.000
Bay 45 - 46
Line = 16 inch

Kn

2.200

Line = 16 inch

x=
kN

23.00

2.800

Line = 16 inch

x=
kN

3.325

Line = 16 inch

x=
kN
x=

0.996

7.00
18.00
8.00

Elev. +7,000
Bay 45 - 46
Line = 12 inch

kN

1.600

Line = 12 inch

x=
kN

2.00

2.500

Line = 12 inch

x=
kN

1.100

Line = 12 inch

x=
kN

3.400

Line = 16 inch

x=
kN
x=

2.425

1.00
5.00
4.50
2.00

Elev. +10,000
Bay 45 - 46
Line = 24 inch

kN

0.850

Line = 16 inch

x=
kN

1.50

2.450

Line = 12 inch

x=
kN
x=

0.800

3.00
4.00

Elev. +16.000
Bay 45 - 46
Line = 20 inch

kN

1 600
1.600

Line = 20 inch

x=
kN

3.00

x=

2.800

1.50

Attachment B - 16 of 16

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

ATTACHMENT C
STRUCTURAL MODELLING

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

Doc. No.
REV.

SNO-S-CC-05-010

DATE.

23-Jun-13

C.1 STAAD.PRO MODEL

Fig. C.1.1 Piperack 3D view

Fig. C.1.2 Plan EL. +5.000

Fig. C.1.3 Plan EL. +7.000

Attachment C - Page 1 of 3

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

Doc. No.
REV.

SNO-S-CC-05-010

DATE.

23-Jun-13

Fig. C.1.4 Plan EL. +10.000

Fig. C.1.5 Plan EL. +13.000

Fig. C.1.6 Plan EL. +16.000

Attachment C - Page 2 of 3

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

Doc. No.
REV.

SNO-S-CC-05-010

DATE.

23-Jun-13

Fig. C.1.4 Long Section

Fig. C.1.5 Short Section

Attachment C - Page 3 of 3

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

ATTACHMENT D
DESIGN LOAD

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

D. DESIGN LOAD
D.1 STAAD.PRO 2007 MODEL LOAD ASSIGN
D.1.1 Dead load

X
Z

Load 11

Fig. D.1.1.1 Dead Load (Selfweight)

X
Z

Load 17

Fig. D.1.1.2 Dead Load (Cable Tray)

Attachment D - Page 1 of 8

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

X
Z

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

Load 18

Fig. D.1.1.3 Dead Load (Platform)

D.1.2 Live load

X
Z

Load 19

Fig. D.1.2 Live Load

Attachment D - Page 2 of 8

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

D.1.3 Pipe Empty load

X
Z

Fig. D.1.3 Pipe Empty Load

D.1.4 Pipe Operating Load

X
Z

Fig. D.1.4 Pipe Operating Load

Attachment D - Page 3 of 8

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

D.1.5 Pipe Test load

X
Z

Fig. D.1.5 Pipe Test Load

Attachment D - Page 4 of 8

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

D.1.6 Wind Load Z Direction

X
Z

Load 31

Fig. D.1.6 Wind Load Z Direction

D.1.7 Wind Load X Direction

X
Z

Load 21

Fig. D.1.7 Wind Load X Direction

Attachment D - Page 5 of 8

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

D.1.8 Wind Load on pipes

X
Z

Load 22

Fig.
g D.1.8 Wind Load on Pipes
p

D.1.9 Thermal Load Z Direction

X
Z

Fig. D.1.9 Thermal Load Z Direction

Attachment D - Page 6 of 8

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

D.1.10 Thermal Load X Direction

X
Z

Fig. D.1.10 Thermal Load X-Dir

D.1.11 Earthquake Load Z Direction

X
Z

Fig. D.1.11 Earth quake Load Z Direction

Attachment D - Page 7 of 8

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

D.1.12 Earthquake Load X Direction

X
Z

Fig. D.1.12 Earth quake Load X Direction

Attachment D - Page 8 of 8

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

ATTACHMENT E
STAAD INPUT DATA

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

Doc. No.
REV.

SNO-S-CC-05-010

DATE.

23-Jun-13

E. STAAD PRO INPUT


STAAD SPACE
START JOB INFORMATION
ENGINEER DATE 25-Jun-13
JOB NAME SENORO PROJECT
JOB CLIENT JOB PERTAMINA - MEDCO
JOB NO 9608
JOB REV B
JOB REF PIPE RACK PR-10
ENGINEER NAME AMP
END JOB INFORMATION
INPUT WIDTH 79
UNIT METER KN
JOINT COORDINATES
1 0 0.3 0; 2 0 5 0; 3 0 7 0; 4 0 10 0; 5 0 13 0; 6 0 16 0; 7 8 0.3 0; 8 8 5 0;
9 8 7 0; 10 8 10 0; 11 8 13 0; 12 8 16 0; 13 0 0.3 6; 14 0 5 6; 15 0 7 6;
16 0 10 6; 17 0 13 6; 18 0 16 6; 19 8 0.3 6; 20 8 5 6; 21 8 7 6; 22 8 10 6;
23 8 13 6; 24 8 16 6; 25 0 0.3 12; 26 0 5 12; 27 0 7 12; 28 0 10 12;
29 0 13 12; 30 0 16 12; 31 8 0.3 12; 32 8 5 12; 33 8 7 12; 34 8 10 12;
35 8 13 12; 36 8 16 12; 37 0 0.3 18; 38 0 5 18; 39 0 7 18; 40 0 10 18;
41 0 13 18; 42 0 16 18; 43 8 0.3 18; 44 8 5 18; 45 8 7 18; 46 8 10 18;
47 8 13 18; 48 8 16 18; 49 0 0.3 24; 50 0 5 24; 51 0 7 24; 52 0 10 24;
53 0 13 24; 54 0 16 24; 55 8 0.3 24; 56 8 5 24; 57 8 7 24; 58 8 10 24;
59 8 13 24;; 60 8 16 24;; 61 0 0.3 30;; 62 0 5 30;; 63 0 7 30;; 64 0 10 30;;
65 0 13 30; 66 0 16 30; 67 8 0.3 30; 68 8 5 30; 69 8 7 30; 70 8 10 30;
71 8 13 30; 72 8 16 30; 73 0 0.3 36; 74 0 5 36; 75 0 7 36; 76 0 10 36;
77 0 13 36; 78 0 16 36; 79 8 0.3 36; 80 8 5 36; 81 8 7 36; 82 8 10 36;
83 8 13 36; 84 8 16 36; 85 0 0.3 42; 86 0 5 42; 87 0 7 42; 88 0 10 42;
89 0 13 42; 90 0 16 42; 91 8 0.3 42; 92 8 5 42; 93 8 7 42; 94 8 10 42;
95 8 13 42; 96 8 16 42; 97 0 5 3; 98 8 5 3; 99 0 5 9; 100 8 5 9; 101 0 5 15;
102 8 5 15; 103 0 5 21; 104 8 5 21; 105 0 5 27; 106 8 5 27; 107 0 5 33;
108 8 5 33; 109 0 5 39; 110 8 5 39; 111 0 7 3; 112 8 7 3; 113 0 7 9; 114 8 7 9;
115 0 7 15; 116 8 7 15; 117 0 7 21; 118 8 7 21; 119 0 7 27; 120 8 7 27;
121 0 7 33; 122 8 7 33; 123 0 7 39; 124 8 7 39; 125 0 10 3; 126 8 10 3;
127 0 10 9; 128 8 10 9; 129 0 10 15; 130 8 10 15; 131 0 10 21; 132 8 10 21;
133 0 10 27; 134 8 10 27; 135 0 10 33; 136 8 10 33; 137 0 10 39; 138 8 10 39;
139 0 13 3; 140 8 13 3; 141 0 13 9; 142 8 13 9; 143 0 13 15; 144 8 13 15;
145 0 13 21; 146 8 13 21; 147 0 13 27; 148 8 13 27; 149 0 13 33; 150 8 13 33;
151 0 13 39; 152 8 13 39; 153 0 16 3; 154 8 16 3; 155 0 16 9; 156 8 16 9;
157 0 16 15; 158 8 16 15; 159 0 16 21; 160 8 16 21; 161 0 16 27; 162 8 16 27;
163 0 16 33; 164 8 16 33; 165 0 16 39; 166 8 16 39; 167 4 5 0; 168 4 5 3;
169 4 5 6; 170 4 5 9; 171 4 5 12; 172 4 5 15; 173 4 5 18; 174 4 5 21;
175 4 5 24; 176 4 5 27; 177 4 5 30; 178 4 5 33; 179 4 5 36; 180 4 5 39;
181 4 5 42; 182 4 7 0; 183 4 7 3; 184 4 7 6; 185 4 7 9; 186 4 7 12; 187 4 7 15;
188 4 7 18; 189 4 7 21; 190 4 7 24; 191 4 7 27; 192 4 7 30; 193 4 7 33;
194 4 7 36; 195 4 7 39; 196 4 7 42; 197 4 10 0; 198 4 10 3; 199 4 10 6;
200 4 10 9; 201 4 10 12; 202 4 10 15; 203 4 10 18; 204 4 10 21; 205 4 10 24;
206 4 10 27; 207 4 10 30; 208 4 10 33; 209 4 10 36; 210 4 10 39; 211 4 10 42;
212 4 13 0; 213 4 13 3; 214 4 13 6; 215 4 13 9; 216 4 13 12; 217 4 13 15;

Attachment E - Page 1 of 16

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

Doc. No.
REV.

SNO-S-CC-05-010

DATE.

23-Jun-13

218 4 13 18; 219 4 13 21; 220 4 13 24; 221 4 13 27; 222 4 13 30; 223 4 13 33;
224 4 13 36; 225 4 13 39; 226 4 13 42; 227 4 16 0; 228 4 16 3; 229 4 16 6;
230 4 16 9; 231 4 16 12; 232 4 16 15; 233 4 16 18; 234 4 16 21; 235 4 16 24;
236 4 16 27; 237 4 16 30; 238 4 16 33; 239 4 16 36; 240 4 16 39; 241 4 16 42;
242 0 5 -1.5; 243 8 5 -1.5; 245 0 5 43.5; 246 8 5 43.5; 248 0 7 -1.5;
249 8 7 -1.5; 251 0 7 43.5; 252 8 7 43.5; 254 0 10 -1.5; 255 8 10 -1.5;
257 0 10 43.5; 258 8 10 43.5; 260 0 13 -1.5; 261 8 13 -1.5; 263 0 13 43.5;
264 8 13 43.5; 266 0 16 -1.5; 267 8 16 -1.5; 269 0 16 43.5; 270 8 16 43.5;
272 0 3.5 0; 273 0 3.5 42; 274 0 5.5 0; 275 0 5.5 42; 276 0 8.5 0;
277 0 8.5 42; 278 0 11.5 0; 279 0 11.5 42; 280 0 14.5 0; 281 0 14.5 42;
282 8 3.5 0; 283 8 3.5 42; 284 8 5.5 0; 285 8 5.5 42; 286 8 8.5 0;
287 8 8.5 42; 288 8 11.5 0; 289 8 11.5 42; 290 8 14.5 0; 291 8 14.5 42;
292 1.5 5 0; 293 6.5 5 0; 294 1.5 5 42; 295 6.5 5 42; 296 1.5 7 0; 297 6.5 7 0;
298 1.5 10 0; 299 6.5 10 0; 300 1.5 13 0; 301 6.5 13 0; 302 1.5 16 0;
303 6.5 16 0; 304 1.5 7 42; 305 6.5 7 42; 306 1.5 10 42; 307 6.5 10 42;
308 1.5 13 42; 309 6.5 13 42; 310 1.5 16 42; 311 6.5 16 42; 312 4 5 -1.5;
313 4 5 43.5; 314 4 7 -1.5; 315 4 7 43.5; 316 4 10 -1.5; 317 4 10 43.5;
318 4 13 -1.5; 319 4 13 43.5; 320 4 16 -1.5; 321 4 16 43.5;
MEMBER INCIDENCES
1 1 272; 2 2 274; 3 3 276; 4 4 278; 5 5 280; 6 7 282; 7 8 284; 8 9 286;
9 10 288; 10 11 290; 11 2 292; 12 3 296; 13 4 298; 14 5 300; 15 6 302; 16 2 97;
17 3 111; 18 4 125; 19 5 139; 20 6 153; 21 8 98; 22 9 112; 23 10 126;
24 11 140; 25 12 154; 26 13 14; 27 14 15; 28 15 16; 29 16 17; 30 17 18;
31 19 20; 32 20 21; 33 21 22; 34 22 23; 35 23 24; 36 14 169; 37 15 184;
38 16 199; 39 17 214; 40 18 229; 41 14 99; 42 15 113; 43 16 127; 44 17 141;
45 18 155; 46 20 100; 47 21 114; 48 22 128; 49 23 142; 50 24 156; 51 25 26;
52 26 27; 53 27 28; 54 28 29; 55 29 30; 56 31 32; 57 32 33; 58 33 34; 59 34 35;
60 35 36; 61 26 171; 62 27 186; 63 28 201; 64 29 216; 65 30 231; 66 26 101;
67 27 115; 68 28 129; 69 29 143; 70 30 157; 71 32 102; 72 33 116; 73 34 130;
74 35 144; 75 36 158; 76 37 38; 77 38 39; 78 39 40; 79 40 41; 80 41 42;
81 43 44; 82 44 45; 83 45 46; 84 46 47; 85 47 48; 86 38 173; 87 39 188;
88 40 203; 89 41 218; 90 42 233; 91 38 103; 92 39 117; 93 40 131; 94 41 145;
95 42 159; 96 44 104; 97 45 118; 98 46 132; 99 47 146; 100 48 160; 101 49 50;
102 50 51; 103 51 52; 104 52 53; 105 53 54; 106 55 56; 107 56 57; 108 57 58;
109 58 59; 110 59 60; 111 50 175; 112 51 190; 113 52 205; 114 53 220;
115 54 235; 116 50 105; 117 51 119; 118 52 133; 119 53 147; 120 54 161;
121 56 106; 122 57 120; 123 58 134; 124 59 148; 125 60 162; 126 61 62;
127 62 63; 128 63 64; 129 64 65; 130 65 66; 131 67 68; 132 68 69; 133 69 70;
134 70 71; 135 71 72; 136 62 177; 137 63 192; 138 64 207; 139 65 222;
140 66 237; 141 62 107; 142 63 121; 143 64 135; 144 65 149; 145 66 163;
146 68 108; 147 69 122; 148 70 136; 149 71 150; 150 72 164; 151 73 74;
152 74 75; 153 75 76; 154 76 77; 155 77 78; 156 79 80; 157 80 81; 158 81 82;
159 82 83; 160 83 84; 161 74 179; 162 75 194; 163 76 209; 164 77 224;
165 78 239; 166 74 109; 167 75 123; 168 76 137; 169 77 151; 170 78 165;
171 80 110; 172 81 124; 173 82 138; 174 83 152; 175 84 166; 176 85 273;
177 86 275; 178 87 277; 179 88 279; 180 89 281; 181 91 283; 182 92 285;
183 93 287; 184 94 289; 185 95 291; 186 86 294; 187 87 304; 188 88 306;
189 89 308; 190 90 310; 191 97 14; 192 98 20; 193 97 168; 194 99 26;
195 100 32; 196 99 170; 197 101 38; 198 102 44; 199 101 172; 200 103 50;
201 104 56; 202 103 174; 203 105 62; 204 106 68; 205 105 176; 206 107 74;
207 108 80; 208 107 178; 209 109 86; 210 110 92; 211 109 180; 212 111 15;

Attachment E - Page 2 of 16

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

Doc. No.
REV.

SNO-S-CC-05-010

DATE.

23-Jun-13

213 112 21; 214 113 27; 215 114 33; 216 115 39; 217 116 45; 218 117 51;
219 118 57; 220 119 63; 221 120 69; 222 121 75; 223 122 81; 224 123 87;
225 124 93; 226 111 183; 227 113 185; 228 115 187; 229 117 189; 230 119 191;
231 121 193; 232 123 195; 233 125 16; 234 126 22; 235 127 28; 236 128 34;
237 129 40; 238 130 46; 239 131 52; 240 132 58; 241 133 64; 242 134 70;
243 135 76; 244 136 82; 245 137 88; 246 138 94; 247 125 198; 248 127 200;
249 129 202; 250 131 204; 251 133 206; 252 135 208; 253 137 210; 254 139 17;
255 140 23; 256 141 29; 257 142 35; 258 143 41; 259 144 47; 260 145 53;
261 146 59; 262 147 65; 263 148 71; 264 149 77; 265 150 83; 266 151 89;
267 152 95; 268 139 213; 269 141 215; 270 143 217; 271 145 219; 272 147 221;
273 149 223; 274 151 225; 275 153 18; 276 154 24; 277 155 30; 278 156 36;
279 157 42; 280 158 48; 281 159 54; 282 160 60; 283 161 66; 284 162 72;
285 163 78; 286 164 84; 287 165 90; 288 166 96; 289 153 228; 290 155 230;
291 157 232; 292 159 234; 293 161 236; 294 163 238; 295 165 240; 296 167 293;
297 168 98; 298 167 168; 299 169 20; 300 170 100; 301 169 170; 302 171 32;
303 172 102; 304 171 172; 305 173 44; 306 174 104; 307 173 174; 308 175 56;
309 176 106; 310 175 176; 311 177 68; 312 178 108; 313 177 178; 314 179 80;
315 180 110; 316 179 180; 317 181 295; 318 168 169; 319 170 171; 320 172 173;
321 174 175; 322 176 177; 323 178 179; 324 180 181; 325 182 297; 326 183 112;
327 184 21; 328 185 114; 329 186 33; 330 187 116; 331 188 45; 332 189 118;
333 190 57; 334 191 120; 335 192 69; 336 193 122; 337 194 81; 338 195 124;
339 196 305; 340 182 183; 341 184 185; 342 186 187; 343 188 189; 344 190 191;
345 192 193; 346 194 195; 347 183 184; 348 185 186; 349 187 188; 350 189 190;
351 191 192; 352 193 194; 353 195 196; 354 197 299; 355 198 126; 356 199 22;
357 200 128; 358 201 34; 359 202 130; 360 203 46; 361 204 132; 362 205 58;
363 206 134; 364 207 70; 365 208 136; 366 209 82; 367 210 138; 368 211 307;
369 197 198; 370 199 200; 371 201 202; 372 203 204; 373 205 206; 374 207 208;
375 209 210; 376 198 199; 377 200 201; 378 202 203; 379 204 205; 380 206 207;
381 208 209; 382 210 211; 383 212 301; 384 213 140; 385 214 23; 386 215 142;
387 216 35; 388 217 144; 389 218 47; 390 219 146; 391 220 59; 392 221 148;
393 222 71; 394 223 150; 395 224 83; 396 225 152; 397 226 309; 398 212 213;
399 214 215; 400 216 217; 401 218 219; 402 220 221; 403 222 223; 404 224 225;
405 213 214; 406 215 216; 407 217 218; 408 219 220; 409 221 222; 410 223 224;
411 225 226; 412 227 303; 413 228 154; 414 229 24; 415 230 156; 416 231 36;
417 232 158; 418 233 48; 419 234 160; 420 235 60; 421 236 162; 422 237 72;
423 238 164; 424 239 84; 425 240 166; 426 241 311; 427 227 228; 428 229 230;
429 231 232; 430 233 234; 431 235 236; 432 237 238; 433 239 240; 434 228 229;
435 230 231; 436 232 233; 437 234 235; 438 236 237; 439 238 239; 440 240 241;
441 2 168; 442 168 20; 443 14 168; 444 168 8; 449 74 180; 450 180 92;
451 86 180; 452 180 80; 453 3 183; 454 183 21; 455 15 183; 456 183 9;
461 75 195; 462 195 93; 463 87 195; 464 195 81; 465 4 198; 466 198 22;
467 16 198; 468 198 10; 473 76 210; 474 210 94; 475 88 210; 476 210 82;
477 5 213; 478 213 23; 479 17 213; 480 213 11; 485 77 225; 486 225 95;
487 89 225; 488 225 83; 489 6 228; 490 228 24; 491 18 228; 492 228 12;
497 78 240; 498 240 96; 499 90 240; 500 240 84; 501 1 97; 502 97 13;
505 73 109; 506 109 85; 507 7 98; 508 98 19; 511 79 110; 512 110 91; 513 2 111;
514 111 14; 517 74 123; 518 123 86; 519 8 112; 520 112 20; 523 80 124;
524 124 92; 525 3 125; 526 125 15; 529 75 137; 530 137 87; 531 9 126;
532 126 21; 535 81 138; 536 138 93; 537 4 139; 538 139 16; 541 76 151;
542 151 88; 543 10 140; 544 140 22; 547 82 152; 548 152 94; 549 5 153;
550 153 17; 553 77 165; 554 165 89; 555 11 154; 556 154 23; 559 83 166;

Attachment E - Page 3 of 16

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

Doc. No.
REV.

SNO-S-CC-05-010

DATE.

23-Jun-13

560 166 95; 561 242 312; 563 245 313; 565 243 8; 567 242 2; 568 92 246;
570 86 245; 611 272 2; 612 273 86; 613 272 242; 614 273 245; 615 274 3;
616 275 87; 617 274 248; 618 275 251; 619 276 4; 620 277 88; 621 276 254;
622 277 257; 623 278 5; 624 279 89; 625 278 260; 626 279 263; 627 280 6;
628 281 90; 629 280 266; 630 281 269; 631 282 8; 632 283 92; 633 284 9;
634 285 93; 635 286 10; 636 287 94; 637 288 11; 638 289 95; 639 290 12;
640 291 96; 641 282 243; 642 283 246; 643 284 249; 644 285 252; 645 286 255;
646 287 258; 647 288 261; 648 289 264; 649 290 267; 650 291 270; 651 292 167;
652 293 8; 653 242 292; 654 293 243; 655 294 181; 656 295 92; 657 245 294;
658 295 246; 659 296 182; 660 297 9; 661 248 296; 662 297 249; 663 298 197;
664 299 10; 665 254 298; 666 299 255; 667 300 212; 668 301 11; 669 260 300;
670 301 261; 671 302 227; 672 303 12; 673 266 302; 674 303 267; 675 304 196;
676 305 93; 677 251 304; 678 305 252; 679 306 211; 680 307 94; 681 257 306;
682 307 258; 683 308 226; 684 309 95; 685 263 308; 686 309 264; 687 310 241;
688 311 96; 689 269 310; 690 311 270; 691 26 172; 692 172 44; 693 38 172;
694 172 32; 695 25 101; 696 101 37; 697 31 102; 698 102 43; 699 50 176;
700 176 68; 701 62 176; 702 176 56; 703 49 105; 704 105 61; 705 55 106;
706 106 67; 707 27 187; 708 187 45; 709 39 187; 710 187 33; 711 26 115;
712 115 38; 713 32 116; 714 116 44; 715 51 191; 716 191 69; 717 63 191;
718 191 57; 719 50 119; 720 119 62; 721 56 120; 722 120 68; 723 28 202;
724 202 46; 725 40 202; 726 202 34; 727 27 129; 728 129 39; 729 33 130;
730 130 45; 731 52 206; 732 206 70; 733 64 206; 734 206 58; 735 51 133;
736 133 63; 737 57 134; 738 134 69; 739 29 217; 740 217 47; 741 41 217;
742 217 35; 743 28 143; 744 143 40; 745 34 144; 746 144 46; 747 53 221;
748 221 71; 749 65 221; 750 221 59; 751 52 147; 752 147 64; 753 58 148;
754 148 70; 755 30 232; 756 232 48; 757 42 232; 758 232 36; 759 29 157;
760 157 41; 761 35 158; 762 158 47; 763 54 236; 764 236 72; 765 66 236;
766 236 60; 767 53 161; 768 161 65; 769 59 162; 770 162 71; 803 42 234;
804 234 60; 805 54 234; 806 234 48; 807 18 230; 808 230 36; 809 30 230;
810 230 24; 811 66 238; 812 238 84; 813 78 238; 814 238 72; 815 38 174;
816 174 56; 817 50 174; 818 174 44; 819 14 170; 820 170 32; 821 26 170;
822 170 20; 823 62 178; 824 178 80; 825 74 178; 826 178 68; 827 312 243;
828 312 167; 829 313 246; 830 181 313; 831 248 314; 832 251 315; 833 249 9;
834 248 3; 835 93 252; 836 87 251; 837 314 249; 838 314 182; 839 315 252;
840 196 315; 841 254 316; 842 257 317; 843 255 10; 844 254 4; 845 94 258;
846 88 257; 847 316 255; 848 316 197; 849 317 258; 850 211 317; 851 260 318;
852 263 319; 853 261 11; 854 260 5; 855 95 264; 856 89 263; 857 318 261;
858 318 212; 859 319 264; 860 226 319; 861 266 320; 862 269 321; 863 267 12;
864 266 6; 865 96 270; 866 90 269; 867 320 267; 868 320 227; 869 321 270;
870 241 321;
START GROUP DEFINITION
MEMBER
_C-EL.5 1 6 26 31 51 56 76 81 101 106 126 131 151 156 176 181 611 612 631 632
_MB-EL.5 11 36 61 86 111 136 161 186 296 299 302 305 308 311 314 317 651 652 655 656
_SB-EL.5 193 196 199 202 205 208 211 297 300 303 306 309 312 315
_LB-EL.5 16 21 41 46 66 71 91 96 116 121 141 146 166 171 191 192 194 195 197 198 200 201 203 204 206 207 209 210
_SLB-EL.5 298 301 304 307 310 313 316 318 TO 324
_HB-EL.5 441 TO 444 449 TO 452 691 TO 694 699 TO 702
_VB-EL.5 501 502 505 TO 508 511 512 695 TO 698 703 TO 706

Attachment E - Page 4 of 16

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

Doc. No.
REV.

SNO-S-CC-05-010

DATE.

23-Jun-13

_C-EL.7 27 32 52 57 77 82 102 107 127 132 152 157 615 616 633 634
_MB-EL.7 12 37 62 87 112 137 162 187 325 327 329 331 333 335 337 339 659 660 675 676
_SB-EL.7 226 TO 232 326 328 330 332 334 336 338
_LB-EL.7 17 22 42 47 67 72 92 97 117 122 142 147 167 172 212 TO 225
_SLB=EL.7 340 TO 353
_HB-EL.7 453 TO 456 461 TO 464 707 TO 710 715 TO 718
_VB-EL.7 513 514 517 TO 520 523 524 711 TO 714 719 TO 722
_C-EL.10 3 8 28 33 53 58 78 83 103 108 128 133 153 158 178 183 619 620 635 636
_MB-EL.10 13 38 63 88 113 138 163 188 354 356 358 360 362 364 366 368 663 664 679 680
_SB-EL.10 247 TO 253 355 357 359 361 363 365 367
_LB-EL.10 18 23 43 48 68 73 93 98 118 123 143 148 168 173 233 TO 246
_SLB-EL.10 369 TO 382
_HB-EL.10 465 TO 468 473 TO 476 723 TO 726 731 TO 734
_VB-EL.10 525 526 529 TO 532 535 536 727 TO 730 735 TO 738
_C-EL.13 4 9 29 34 54 59 79 84 104 109 129 134 154 159 179 184 623 624 637 638
_MB-EL.13 14 39 64 89 114 139 164 189 383 385 387 389 391 393 395 397 667 668 683 684
_SB=EL.13 268 TO 274 384 386 388 390 392 394 396
_LB-EL.13 19 24 44 49 69 74 94 99 119 124 144 149 169 174 254 TO 267
_SLB-EL.13 398 TO 411
_HB-EL.13 477 TO 480 485 TO 488 739 TO 742 747 TO 750
_VB-EL.13 537 538 541 TO 544 547 548 743 TO 746 751 TO 754
_C-EL.16 5 10 30 35 55 60 80 85 105 110 130 135 155 160 180 185 627 628 639 640
_MB-EL.16 15 40 65 90 115 140 165 190 412 414 416 418 420 422 424 426 671 672 687 688
_SB=EL.16 289 TO 295 413 415 417 419 421 423 425
_LB-EL.16 20 25 45 50 70 75 95 100 120 125 145 150 170 175 275 TO 288
_SLB-EL.16 427 TO 440
_HB-EL.16 489 TO 492 497 TO 500 755 TO 758 763 TO 766 803 TO 826
_VB-EL.16 549 550 553 TO 556 559 560 759 TO 762 767 TO 770
END GROUP DEFINITION
DEFINE MATERIAL START
ISOTROPIC STEEL
E 2.05e+008
POISSON 0.3
DENSITY 76.8195
ALPHA 1.2e-005
DAMP 0.03
END DEFINE MATERIAL
MEMBER PROPERTY JAPANESE
1 TO 10 26 TO 35 51 TO 60 76 TO 85 101 TO 110 126 TO 135 151 TO 160 176 TO 185 611 612 615 616 619 620 623 624 627 628 631 TO 639 640 TABLE ST H588X300X12
11 TO 15 36 TO 40 61 TO 65 86 TO 90 111 TO 115 136 TO 140 161 TO 165 186 TO 190 296 299 302 305 308 311 314 317 325 327 329 331 333 335 337 339 354 356 358 360 362 364 366 368 383 385 387 389 391 393 395 397 412 414 416 418 420 422 424 426 651 652 655 656 659 660 663 664 667 668 671 672 675 676 679 680 683 684 687 688 TABLE ST H588X300X12
16 TO 19 21 TO 24 41 TO 44 46 TO 49 66 TO 69 71 TO 74 91 TO 94 96 TO 99 116 -

Attachment E - Page 5 of 16

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

Doc. No.
REV.

SNO-S-CC-05-010

DATE.

23-Jun-13

117 TO 119 121 TO 124 141 TO 144 146 TO 149 166 TO 169 171 TO 174 191 TO 274 297 300 303 306 309 312 315 326 328 330 332 334 336 338 355 357 359 361 363 365 367 384 386 388 390 392 394 396 561 563 565 567 568 570 827 829 831 TO 837 839 841 TO 847 849 851 TO 857 859 861 TO 867 869 TABLE ST H300X150X6.5
613 614 617 618 621 622 625 626 629 630 641 TO 650 653 654 657 658 661 662 665 666 669 670 673 674 677 678 681 682 685 686 689 690 TABLE ST H200X100X5.5
441 TO 444 449 TO 456 461 TO 468 473 TO 480 485 TO 492 497 TO 500 691 TO 694 699 TO 702 707 TO 710 715 TO 718 723 TO 726 731 TO 734 739 TO 742 747 TO 750 755 TO 758 763 TO 766 803 TO 826 TABLE ST T150X150
501 502 505 TO 508 511 TO 514 517 TO 520 523 TO 526 529 TO 532 535 TO 538 541 TO 544 547 TO 550 553 TO 556 559 560 695 TO 698 703 TO 706 711 TO 714 719 TO 722 727 TO 730 735 TO 738 743 TO 746 751 TO 754 759 TO 762 767 TO 770 TABLE ST T200X200
298 301 304 307 310 313 316 318 TO 324 340 TO 353 369 TO 382 398 TO 411 427 428 TO 440 828 830 838 840 848 850 858 860 868 870 TABLE ST H200X100X5.5
20 25 45 50 70 75 95 100 120 125 145 150 170 175 275 TO 295 413 415 417 419 421 423 425 TABLE ST H400X200X8
CONSTANTS
BETA 90 MEMB 501 502 505 TO 508 511 TO 514 517 TO 520 523 TO 526 529 TO 532 535 TO 538 541 TO 544 547 TO 550 553 TO 556 559 560 695 TO 698 703 TO 706 711 TO 714 719 TO 722 727 TO 730 735 TO 738 743 TO 746 751 TO 754 759 TO 762 767 TO 770
MATERIAL STEEL ALL
SUPPORTS
1 7 13 19 25 31 37 43 49 55 61 67 73 79 85 91 PINNED
MEMBER RELEASE
16 TO 25 41 TO 50 66 TO 75 91 TO 100 116 TO 125 141 TO 150 166 TO 175 193 196 199 202 205 208 211 226 TO 232 247 TO 253 268 TO 274 289 TO 295 298 301 304 307 310 313 316 318 TO 324 340 TO 353 369 TO 382 398 TO 411 427 TO 440 568 570 830 835 836 840 845 846 850 855 856 860 865 866 870 START MY MZ
191 192 194 195 197 198 200 201 203 204 206 207 209 210 212 TO 225 233 TO 246 254 TO 267 275 TO 288 297 298 300 301 303 304 306 307 309 310 312 313 315 316 318 TO 324 326 328 330 332 334 336 338 340 TO 353 355 357 359 361 363 365 367 369 TO 382 384 386 388 390 392 394 396 398 TO 411 413 415 417 419 421 423 425 427 TO 440 565 567 828 833 834 838 843 844 848 853 854 858 863 864 868 END MY MZ
MEMBER TRUSS
441 TO 444 449 TO 456 461 TO 468 473 TO 480 485 TO 492 497 TO 502 505 TO 508 511 TO 514 517 TO 520 523 TO 526 529 TO 532 535 TO 538 541 TO 544 547 TO 550 553 TO 556 559 560 613 614 617 618 621 622 625 626 629 630 641 642 TO 650 653 654 657 658 661 662 665 666 669 670 673 674 677 678 681 682 685 686 689 TO 770 803 TO 826
DEFINE WIND LOAD
TYPE 1
INT 0.54 0.57 0.59 0.62 0.66 0.69 0.71 HEIG 4.6 6.1 7.6 9.1 12.2 15.2 18
EXP 1 JOINT 1 TO 243 245 246 248 249 251 252 254 255 257 258 260 261 263 264 266 267 269 270 272 TO 321
DEFINE UBC LOAD
ZONE 0.4 I 1.25 RWX 4.5 RWZ 5.6 STYP 5 NA 1.04 NV 0.99

Attachment E - Page 6 of 16

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

Doc. No.
REV.

SNO-S-CC-05-010

DATE.

23-Jun-13

SELFWEIGHT 1
MEMBER WEIGHT
***********************************************************************************
* WEIGHT OF OPERATING PIPE
***********************************************************************************
296 299 302 305 308 311 314 317 CON 23 2.2
299 302 305 308 CON 7 2.8
652 CON 7 0.3
299 302 305 308 311 314 CON 18 3.325
652 656 CON 18 0.825
141 146 CON 8 0.996
11 36 61 86 111 136 161 186 193 196 199 202 205 208 211 UNI 5.1 0.55 1.5
333 335 337 339 CON 17 1.6
331 333 CON 15 2.5
339 CON 13 1.1
327 329 331 CON 11 3.4
660 CON 11 0.9
339 CON 12 2.425
37 62 87 112 137 162 226 TO 232 UNI 5.1 1.8 3.3
659 675 UNI 5.1 0.3 1.8
13 38 63 88 113 138 163 188 CON 8 0.85
366 368 CON 6 2.45
356 358 360 362 364 CON 13 0.8
38 63 88 113 138 163 UNI 5.1 1.5 2.25
663 679 UNI 5.1 0 0.75
14 39 64 89 114 139 164 189 CON 12 0.75
14 39 64 89 114 139 164 189 268 TO 274 UNI 5.1 1.25 1.5
412 414 416 418 420 CON 157 1.6
414 416 CON 95 2.8
40 65 289 TO 291 UNI 5.1 3 3.5
424 TO 426 UNI 5.1 1 1.9
70 CON 0.6 0.3
70 CON 0.6 0.65
70 CON 0.2 1.5
279 CON 0.2 1.05
279 CON 0.6 1.55
95 CON 0.8 0.1
95 CON 0.8 1.25
281 CON 2.5 0.8
281 CON 2.5 1.95
120 CON 0.2 1.3
120 CON 0.2 2.55
283 CON 0.2 0.45
283 CON 0.1 1.6
283 CON 0.1 1.95
287 CON 1 0.95
***********************************************************************************
* WEIGHT OF TRAY LOAD
***********************************************************************************
14 39 64 89 114 139 164 189 268 TO 274 667 683 CON 13.5 1
383 TO 397 668 684 CON 6 3.5

Attachment E - Page 7 of 16

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

Doc. No.
REV.

SNO-S-CC-05-010

DATE.

23-Jun-13

383 TO 397 668 684 CON 3 2.3


***********************************************************************************
*WEIGHT OF PLATFORM LOAD
***********************************************************************************
15 40 65 90 115 140 165 190 289 TO 295 412 TO 426 671 672 687 688 861 862 867 869 UNI 1.215
***********************************************************************************
*WEIGHT OF LIVE LOAD
***********************************************************************************
15 40 65 90 115 140 165 190 289 TO 295 412 TO 426 671 672 687 688 861 862 867 869 UNI 3.75
***********************************************************************************
LOAD 1 LOADTYPE Seismic TITLE EQ +X DIR
UBC LOAD X 1
PERFORM ANALYSIS
CHANGE
LOAD 2 LOADTYPE Seismic TITLE EQ +Z DIR
UBC LOAD Z 1
PERFORM ANALYSIS
CHANGE
LOAD 11 LOADTYPE Dead TITLE SELF WEIGHT
SELFWEIGHT Y -1 LIST 1 TO 444 449 TO 456 461 TO 468 473 TO 480 485 TO 492 497 TO 502 505 TO 508 511 TO 514 517 TO 520 523 TO 526 529 TO 532 535 TO 538 541 TO 544 547 TO 550 553 TO 556 559 TO 561 563 565 567 568 570 611 TO 770 803 TO 870
***********************************************************************************
LOAD 12 LOADTYPE Dead TITLE EMPTY PIPE
***********************************************************************************
MEMBER LOAD
296 299 302 305 308 311 314 317 CON GY -10 2.2
299 302 305 308 CON GY -5 2.8
652 CON GY -5 0.3
299 302 305 308 311 314 CON GY -10 3.325
652 656 CON GY -10 0.825
141 146 CON GY -8 0.996
11 36 61 86 111 136 161 186 193 196 199 202 205 208 211 UNI GY -3.6 0.55 1.5
333 335 337 339 CON GY -12 1.6
331 333 CON GY -13 2.5
339 CON GY -12 1.1
327 329 331 CON GY -10 3.4
660 CON GY -10 0.9
339 CON GY -6 2.425
37 62 87 112 137 162 226 TO 232 UNI GY -3.6 1.8 3.3
659 675 UNI GY -3.6 0.3 1.8
13 38 63 88 113 138 163 188 CON GY -8 0.85
366 368 CON GY -5 2.45
356 358 360 362 364 CON GY -12 0.8
38 63 88 113 138 163 247 TO 253 UNI GY -3.6 1.5 2.25
663 679 UNI GY -3.6 0 0.75
14 39 64 89 114 139 164 189 CON GY -12 0.75
14 39 64 89 114 139 164 189 268 TO 274 UNI GY -3.6 1.25 1.5

Attachment E - Page 8 of 16

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

Doc. No.
REV.

SNO-S-CC-05-010

DATE.

23-Jun-13

412 414 416 418 420 CON GY -150 1.6


414 416 CON GY -90 2.8
40 65 289 TO 291 UNI GY -3.6 3 3.5
424 TO 426 UNI GY -3.6 1 1.9
70 CON GY -1 0.3
70 CON GY -1 0.65
70 CON GY -1 1.5
279 CON GY -1 1.05
279 CON GY -2 1.55
95 CON GY -1.5 0.1
95 CON GY -1.5 1.25
281 CON GY -2 0.8
281 CON GY -2 1.95
120 CON GY -1 1.3
120 CON GY -1 2.55
283 CON GY -1 0.45
283 CON GY -1 1.6
283 CON GY -1 1.95
287 CON GY -0.5 0.95
***********************************************************************************
LOAD 13 LOADTYPE Dead TITLE OPERATING PIPE
***********************************************************************************
MEMBER LOAD
296 299 302 305 308 311 314 317 CON GY -23 2.2
299 302 305 308 CON GY -7 2.8
652 CON GY -7 0.3
299 302 305 308 311 314 CON GY -18 3.325
652 656 CON GY -18 0.825
141 146 CON GY -8 0.996
11 36 61 86 111 136 161 186 193 196 199 202 205 208 211 UNI GY -5.1 0.55 1.5
333 335 337 339 CON GY -17 1.6
331 333 CON GY -15 2.5
339 CON GY -13 1.1
327 329 331 CON GY -11 3.4
660 CON GY -11 0.9
339 CON GY -12 2.425
37 62 87 112 137 162 226 TO 232 UNI GY -5.1 1.8 3.3
659 675 UNI GY -5.1 0.3 1.8
13 38 63 88 113 138 163 188 CON GY -8 0.85
366 368 CON GY -6 2.45
356 358 360 362 364 CON GY -13 0.8
38 63 88 113 138 163 247 TO 253 UNI GY -5.1 1.5 2.25
663 679 UNI GY -5.1 0 0.75
14 39 64 89 114 139 164 189 CON GY -12 0.75
14 39 64 89 114 139 164 189 268 TO 274 UNI GY -5.1 1.25 1.5
412 414 416 418 420 CON GY -157 1.6
414 416 CON GY -95 2.8
40 65 289 TO 291 UNI GY -5.1 3 3.5
424 TO 426 UNI GY -5.1 1 1.9
70 CON GY 0.6 0.3
70 CON GY 0.6 0.65

Attachment E - Page 9 of 16

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

70 CON GY 0.2 1.5


279 CON GY 0.2 1.05
279 CON GY 0.6 1.55
95 CON GY 0.8 0.1
95 CON GY 0.8 1.25
281 CON GY 2.5 0.8
281 CON GY 2.5 1.95
120 CON GY 0.2 1.3
120 CON GY 0.2 2.55
283 CON GY 0.2 0.45
283 CON GY 0.1 1.6
283 CON GY 0.1 1.95
287 CON GY 1 0.95
***********************************************************************************
LOAD 14 LOADTYPE Dead TITLE TEST PIPE
***********************************************************************************
MEMBER LOAD
296 299 302 305 308 311 314 317 CON GY -16 2.2
299 302 305 308 CON GY -5 2.8
652 CON GY -15 0.3
299 302 305 308 311 314 CON GY -18 3.325
652 656 CON GY -18 0.825
141 146 CON GY -19 0.996
11 36 61 86 111 136 161 186 193 196 199 202 205 208 211 UNI GY -5.1 0.55 1.5
333 335 337 339 CON GY -18 1.6
331 333 CON GY -17 2.5
339 CON GY -17 1.1
327 329 331 CON GY -14 3.4
660 CON GY -14 0.9
339 CON GY -10 2.425
37 62 87 112 137 162 226 TO 232 UNI GY -5.1 1.8 3.3
659 675 UNI GY -5.1 0.3 1.8
13 38 63 88 113 138 163 188 CON GY -29 0.85
366 368 CON GY -14 2.45
356 358 360 362 364 CON GY -17 0.8
38 63 88 113 138 163 247 TO 253 UNI GY -5.1 1.5 2.25
663 679 UNI GY -5.1 0 0.75
14 39 64 89 114 139 164 189 CON GY -33 0.75
14 39 64 89 114 139 164 189 268 TO 274 UNI GY -5.1 1.25 1.5
412 414 416 418 420 CON GY -168 1.6
414 416 CON GY -94 2.8
40 65 289 TO 291 UNI GY -5.1 3 3.5
424 TO 426 UNI GY -5.1 1 1.9
70 CON GY -2.5 0.3
70 CON GY -2.5 0.65
70 CON GY -2.5 1.5
279 CON GY -2.5 1.05
279 CON GY -3 1.55
95 CON GY -2.5 0.1
95 CON GY -2.5 1.25
281 CON GY -3 0.8

Attachment E - Page 10 of 16

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

281 CON GY -3 1.95


120 CON GY -1.5 1.3
120 CON GY -1.5 2.55
283 CON GY -1.5 0.45
283 CON GY -1.5 1.6
283 CON GY -1.5 1.95
287 CON GY -1 0.95
***********************************************************************************
LOAD 15 LOADTYPE None TITLE THERMAL PIPE (FZ)
***********************************************************************************
MEMBER LOAD
296 302 308 314 CON GZ 35 2.2
302 308 314 CON GZ 6 3.325
652 CON GZ 6 0.825
11 36 61 86 111 136 161 186 193 196 199 202 205 208 211 UNI GZ 1.53 0.55 1.5
335 339 CON GZ 15 1.6
331 CON GZ 5 2.5
327 331 CON GZ 8 3.4
37 62 87 112 137 162 226 TO 232 UNI GZ 1.53 1.8 3.3
659 675 UNI GZ 1.53 0.3 1.8
13 63 113 163 CON GZ 9 0.85
368 CON GZ 2.1 2.45
358 362 CON GZ 9 0.8
38 63 88 113 138 163 247 TO 253 UNI GZ 1.53 1.5 2.25
663 679 UNI GZ 1.53 0 0.75
14 64 114 164 CON GZ 10 0.75
14 39 64 89 114 139 164 189 268 TO 274 UNI GZ 1.53 1.25 1.5
414 CON GZ 97 2.8
40 65 289 TO 291 UNI GZ 1.53 3 3.5
424 TO 426 UNI GZ 1.53 1 1.9
70 CON GZ 0.3 0.3
70 CON GZ 0.3 0.65
70 CON GZ 0.1 1.5
279 CON GZ 0.1 1.05
279 CON GZ 0.3 1.55
95 CON GZ 0.5 0.1
95 CON GZ 0.5 1.25
281 CON GZ 1 0.8
281 CON GZ 1 1.95
120 CON GZ 0.2 1.3
120 CON GZ 0.2 2.55
283 CON GZ 0.2 0.45
283 CON GZ 0.1 1.6
283 CON GZ 0.1 1.95
287 CON GZ 0.2 0.95
***********************************************************************************
LOAD 16 LOADTYPE None TITLE THERMAL PIPE (FX)
***********************************************************************************
MEMBER LOAD
296 302 308 314 CON GX 11 2.2
302 308 CON GX 1 2.8

Attachment E - Page 11 of 16

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

302 308 314 CON GX 3 3.325


652 656 CON GX 30 0.825
146 CON GX 2 0.996
335 339 CON GX 2 1.6
331 CON GX 1 2.5
339 CON GX 5 1.1
327 331 CON GX 4.5 3.4
339 CON GX 2 2.425
38 88 138 188 CON GX 1.5 0.85
368 CON GX 3 2.45
358 362 CON GX 4 0.8
14 64 114 164 CON GX 4 0.75
412 416 420 CON GX 3 1.6
414 CON GX 1.5 2.8
70 CON GX 1.4 0.3
70 CON GX 1.4 0.65
70 CON GX 0.4 1.5
279 CON GX 0.4 1.05
279 CON GY 0.3 1.55
95 CON GX 2.2 0.1
95 CON GX 2.2 1.25
281 CON GX 6.8 0.8
281 CON GX 6.8 1.95
120 CON GX 0.4 1.3
120 CON GX 0.2 2.55
283 CON GX 0.2 0.45
283 CON GX 0.1 1.6
283 CON GX 0.1 1.95
287 CON GX 0.2 0.95
***********************************************************************************
LOAD 17 LOADTYPE None TITLE TRAY LOAD
MEMBER LOAD
14 39 64 89 114 139 164 189 268 TO 274 CON GY -13.5 1
668 684 CON GY -6 1
384 TO 396 CON GY -6 3.5
383 TO 397 CON GY -3 2.3
LOAD 18 LOADTYPE Dead TITLE PLATFORM LOAD
MEMBER LOAD
15 40 65 90 115 140 165 190 289 TO 295 412 TO 426 671 672 687 688 861 862 867 869 UNI GY -1.215
LOAD 19 LOADTYPE Live REDUCIBLE TITLE LIVE LOAD
MEMBER LOAD
15 40 65 90 115 140 165 190 289 TO 295 412 TO 426 671 672 687 688 UNI GY -7.5
LOAD 21 LOADTYPE Wind TITLE WIND +X DIR
WIND LOAD X 1 TYPE 1 XR 0 1 YR 0 17 ZR -2 44 OPEN
WIND LOAD X 1 TYPE 1 XR 7 9 YR 0 17 ZR -2 44 OPEN
LOAD 22 LOADTYPE None TITLE WIND ON PIPES +X DIR
JOINT LOAD
2 TO 6 8 14 TO 18 26 TO 30 38 TO 42 50 TO 54 62 TO 66 74 TO 78 86 TO 90 FX 1.34
3 15 27 39 51 63 75 87 FX 1.41
4 16 28 40 52 64 76 88 FX 2.34

Attachment E - Page 12 of 16

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

6 14 TO 18 26 TO 30 38 TO 42 50 TO 54 62 TO 66 74 TO 78 90 FX 2.13
LOAD 31 LOADTYPE Wind TITLE WIND +Z DIR
WIND LOAD Z 1 TYPE 1 XR 0 9 YR 0 17 ZR 0 1 OPEN
WIND LOAD Z 1 TYPE 1 XR 0 9 YR 0 17 ZR 5 7 OPEN
WIND LOAD Z 1 TYPE 1 XR 0 9 YR 0 17 ZR 11 13 OPEN
WIND LOAD Z 1 TYPE 1 XR 0 9 YR 0 17 ZR 17 19 OPEN
WIND LOAD Z 1 TYPE 1 XR 0 9 YR 0 17 ZR 23 25 OPEN
WIND LOAD Z 1 TYPE 1 XR 0 9 YR 0 17 ZR 29 31 OPEN
WIND LOAD Z 1 TYPE 1 XR 0 9 YR 0 17 ZR 35 37 OPEN
WIND LOAD Z 1 TYPE 1 XR 0 9 YR 0 17 ZR 41 43 OPEN
******************************************************************************
*PERMANENT LOAD
******************************************************************************
LOAD COMB 101 LC : EMPTY
11 1.0 12 1.0 17 1.0 18 1.0 19 1.0
LOAD COMB 102 LC : OPERATING + THERMAL
11 1.0 13 1.0 15 1.0 16 1.0 17 1.0 18 1.0 19 1.0
LOAD COMB 103 LC : OPERATING - THERMAL
11 1.0 13 1.0 15 -1.0 16 -1.0 17 1.0 18 1.0 19 1.0
LOAD COMB 104 LC : TEST
11 1.0 14 1.0 17 1.0 18 1.0 19 1.0
******************************************************************************
*TEMPORARY LOAD
******************************************************************************
LOAD COMB 105 LC : OPERATING + THERMAL + WIND X
11 1.0 13 1.0 15 1.0 16 1.0 17 1.0 18 1.0 19 0.75 21 0.75 22 0.75
LOAD COMB 106 LC : OPERATING + THERMAL - WIND X
11 1.0 13 1.0 15 1.0 16 1.0 17 1.0 18 1.0 19 0.75 21 -0.75 22 -0.75
LOAD COMB 107 LC : OPERATING - THERMAL - WIND X
11 1.0 13 1.0 15 -1.0 16 -1.0 17 1.0 18 1.0 19 0.75 21 -0.75 22 -0.75
LOAD COMB 108 LC : OPERATING - THERMAL + WIND X
11 1.0 13 1.0 15 -1.0 16 -1.0 17 1.0 18 1.0 19 0.75 21 0.75 22 0.75
LOAD COMB 109 LC : OPERATING + THERMAL + WIND Z
11 1.0 13 1.0 15 1.0 16 1.0 17 1.0 18 1.0 19 0.75 31 0.75
LOAD COMB 110 LC : OPERATING + THERMAL - WIND Z
11 1.0 13 1.0 15 1.0 16 1.0 17 1.0 18 1.0 19 0.75 31 -0.75
LOAD COMB 111 LC : OPERATING - THERMAL - WIND Z
11 1.0 13 1.0 15 -1.0 16 -1.0 17 1.0 18 1.0 19 0.75 31 -0.75
LOAD COMB 112 LC : OPERATING - THERMAL + WIND Z
11 1.0 13 1.0 15 -1.0 16 -1.0 17 1.0 18 1.0 19 0.75 31 0.75
LOAD COMB 113 LC : OPERATING + THERMAL + (EQ-X / 1.4)
1 0.525 11 1.0 13 1.0 15 1.0 16 1.0 17 1.0 18 1.0 19 0.75
LOAD COMB 114 LC : OPERATING + THERMAL - (EQ-X / 1.4)
1 -0.525 11 1.0 13 1.0 15 1.0 16 1.0 17 1.0 18 1.0 19 1.0
LOAD COMB 115 LC : OPERATING - THERMAL - (EQ-X / 1.4)
1 -0.525 11 1.0 13 1.0 15 -1.0 16 -1.0 17 1.0 18 1.0 19 1.0
LOAD COMB 116 LC : OPERATING - THERMAL + (EQ-X / 1.4)
1 0.525 11 1.0 13 1.0 15 -1.0 16 -1.0 17 1.0 18 1.0 19 1.0
LOAD COMB 117 LC : OPERATING + THERMAL + (EQ-Z / 1.4)
2 0.525 11 1.0 13 1.0 15 1.0 16 1.0 17 1.0 18 1.0 19 1.0
LOAD COMB 118 LC : OPERATING + THERMAL - (EQ-Z / 1.4)

Attachment E - Page 13 of 16

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

2 -0.525 11 1.0 13 1.0 15 1.0 16 1.0 17 1.0 18 1.0 19 1.0


LOAD COMB 119 LC : OPERATING - THERMAL - (EQ-Z / 1.4)
2 -0.525 11 1.0 13 1.0 15 -1.0 16 -1.0 17 1.0 18 1.0 19 1.0
LOAD COMB 120 LC : OPERATING - THERMAL + (EQ-Z / 1.4)
2 0.525 11 1.0 13 1.0 15 -1.0 16 -1.0 17 1.0 18 1.0 19 1.0
LOAD COMB 121 LC : (0.9*OPERATING) + THERMAL + (EQ-X / 1.4)
1 0.7 11 0.9 13 0.9 15 0.9 16 0.9 17 0.9 18 0.9
LOAD COMB 122 LC : (0.9*OPERATING) + THERMAL - (EQ-X / 1.4)
1 -0.7 11 0.9 13 0.9 15 0.9 16 0.9 17 0.9 18 0.9
LOAD COMB 123 LC : (0.9*OPERATING) - THERMAL - (EQ-X / 1.4)
1 -0.7 11 0.9 13 0.9 15 -0.9 16 -0.9 17 0.9 18 0.9
LOAD COMB 124 LC : (0.9*OPERATING) - THERMAL + (EQ-X / 1.4)
1 0.7 11 0.9 13 0.9 15 -0.9 16 -0.9 17 0.9 18 0.9
LOAD COMB 125 LC : (0.9*OPERATING) + THE1RMAL + (EQ-Z / 1.4)
2 0.7 11 0.9 13 0.9 15 0.9 16 0.9 17 0.9 18 0.9
LOAD COMB 126 LC : (0.9*OPERATING) + THERMAL - (EQ-Z / 1.4)
2 -0.7 11 0.9 13 0.9 15 0.9 16 0.9 17 0.9 18 0.9
LOAD COMB 127 LC : (0.9*OPERATING) - THERMAL - (EQ-Z / 1.4)
2 -0.7 11 1.0 13 1.0 15 -0.9 16 -0.9 17 0.9 18 0.9
LOAD COMB 128 LC : (0.9*OPERATING) - THERMAL + (EQ-Z / 1.4)
2 0.7 11 0.9 13 0.9 15 -0.9 16 -0.9 17 0.9 18 0.9
******************************************************************************
LOAD COMB 129 EMPTY + WIND X
11 1.0 12 1.0 17 1.0 18 1.0 19 0.75 21 0.75 22 0.75
LOAD COMB 130 EMPTY - WIND X
11 1.0 12 1.0 17 1.0 18 1.0 19 0.75 21 -0.75 22 -0.75
LOAD COMB 131 EMPTY + WIND Z
11 1.0 12 1.0 17 1.0 18 1.0 19 0.75 31 0.75
LOAD COMB 132 EMPTY - WIND Z
11 1.0 12 1.0 17 1.0 18 1.0 19 0.75 31 -0.75
LOAD COMB 133 EMPTY + (EQ-X / 1.4)
1 0.525 11 1.0 12 1.0 17 1.0 18 1.0 19 0.75
LOAD COMB 134 EMPTY - (EQ-X / 1.4)
1 -0.525 11 1.0 12 1.0 17 1.0 18 1.0 19 0.75
LOAD COMB 135 EMPTY + (EQ-Z / 1.4)
2 0.525 11 1.0 12 1.0 17 1.0 18 1.0 19 0.75
LOAD COMB 136 EMPTY - (EQ-Z / 1.4)
2 -0.525 11 1.0 12 1.0 17 1.0 18 1.0 19 0.75
LOAD COMB 137 (0.9*EMPTY) + (EQ-X / 1.4)
1 0.7 11 0.9 12 0.9 17 0.9 18 0.9
LOAD COMB 138 (0.9*EMPTY) - (EQ-X / 1.4)
1 -0.7 11 0.9 12 0.9 17 0.9 18 0.9
LOAD COMB 139 (0.9*EMPTY) + (EQ-Z / 1.4)
2 0.7 11 0.9 12 0.9 17 0.9 18 0.9
LOAD COMB 140 (0.9*EMPTY) - (EQ-Z / 1.4)
2 -0.7 11 0.9 12 0.9 17 0.9 18 0.9
******************************************************************************
LOAD COMB 141 TEST + WIND X
11 1.0 14 1.0 17 1.0 18 1.0 19 0.75 21 0.75 22 0.75
LOAD COMB 142 TEST - WIND X
11 1.0 14 1.0 17 1.0 18 1.0 19 0.75 21 -0.75 22 -0.75

Attachment E - Page 14 of 16

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

LOAD COMB 143 TEST + WIND Z


11 1.0 14 1.0 17 1.0 18 1.0 19 0.75 31 0.75
LOAD COMB 144 TEST - WIND Z
11 1.0 14 1.0 17 1.0 18 1.0 19 0.75 31 -0.75
LOAD COMB 145 TEST + (EQ-X / 1.4)
1 0.525 11 1.0 14 1.0 17 1.0 18 1.0 19 0.75
LOAD COMB 146 TEST - (EQ-X / 1.4)
1 -0.525 11 1.0 14 1.0 17 1.0 18 1.0 19 0.75
LOAD COMB 147 TEST + (EQ-Z / 1.4)
2 0.525 11 1.0 14 1.0 17 1.0 18 1.0 19 0.75
LOAD COMB 148 TEST - (EQ-Z / 1.4)
2 -0.525 11 1.0 14 1.0 17 1.0 18 1.0 19 0.75
LOAD COMB 149 (0.9*TEST) + (EQ-X / 1.4)
1 0.7 11 0.9 14 0.9 17 0.9 18 0.9
LOAD COMB 150 (0.9*TEST) - (EQ-X / 1.4)
1 -0.7 11 0.9 14 0.9 17 0.9 18 0.9
LOAD COMB 151 (0.9*TEST) + (EQ-Z / 1.4)
2 0.7 11 0.9 14 0.9 17 0.9 18 0.9
LOAD COMB 152 (0.9*TEST) - (EQ-Z / 1.4)
2 -0.7 11 0.9 14 0.9 17 0.9 18 0.9
PERFORM ANALYSIS PRINT ALL
******************************************************************************
LOAD LIST 101 TO 104
******************************************************************************
PARAMETER 1
CODE AISC
FU 400000 ALL
FYLD 235000 ALL
LZ 6 MEMB 41 TO 50 66 TO 75 116 TO 125 141 TO 150 194 195 197 198 203 204 206 207 214 TO 217 220 TO 223 235 TO 238 241 TO 244 256 TO 259 262 TO 265 277 TO 280 283 TO 286
LZ 8 MEMB 11 TO 15 36 TO 40 61 TO 65 86 TO 90 111 TO 115 136 TO 140 161 TO 165 186 TO 190 193 196 199 202 205 208 211 226 TO 232 247 TO 253 268 269 TO 274 289 TO 297 299 300 302 303 305 306 308 309 311 312 314 315 317 325 TO 339 354 TO 368 383 TO 397 412 TO 426 561 563 651 652 655 656 659 660 663 664 667 668 671 672 675 676 679 680 683 684 687 688 827 829 831 832 837 839 841 842 847 849 851 852 857 859 861 862 867 869
RATIO 1 ALL
CHECK CODE ALL
******************************************************************************
LOAD LIST 105 TO 152
******************************************************************************
PARAMETER 2
CODE AISC
FU 400000 ALL
FYLD 235000 ALL
LZ 6 MEMB 41 TO 50 66 TO 75 116 TO 125 141 TO 150 194 195 197 198 203 204 206 207 214 TO 217 220 TO 223 235 TO 238 241 TO 244 256 TO 259 262 TO 265 277 TO 280 283 TO 286
LZ 8 MEMB 11 TO 15 36 TO 40 61 TO 65 86 TO 90 111 TO 115 136 TO 140 161 TO 165 186 TO 190 193 196 199 202 205 208 211 226 TO 232 247 TO 253 268 -

Attachment E - Page 15 of 16

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

269 TO 274 289 TO 297 299 300 302 303 305 306 308 309 311 312 314 315 317 325 TO 339 354 TO 368 383 TO 397 412 TO 426 561 563 651 652 655 656 659 660 663 664 667 668 671 672 675 676 679 680 683 684 687 688 827 829 831 832 837 839 841 842 847 849 851 852 857 859 861 862 867 869
RATIO 1.33 ALL
CHECK CODE ALL
STEEL MEMBER TAKE OFF LIST 1 TO 444 449 TO 456 461 TO 468 473 TO 480 485 TO 492 497 TO 502 505 TO 508 511 TO 514 517 TO 520 523 TO 526 529 TO 532 535 TO 538 541 TO 544 547 TO 550 553 TO 556 559 TO 561 563 565 567 568 570 611 TO 770 803 TO 870
FINISH

Attachment E - Page 16 of 16

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

ATTACHMENT F
STRESS RATIO

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

F. Stress Ratio
Ratio of structure Pipe Rack PR-10 can be seen in the following table.
F.1. Stress Ratio Permanent Condition
Beam No.

Design Property

Actual Ratio

Allow. Ratio

L/C

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46

H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H300X150X6.5
H300X150X6 5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H400X200X8
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H400X200X8
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H400X200X8
H300X150X6.5

0.255
0.146
0.115
0.105
0.154
0.259
0.225
0.13
0.107
0.234
0.198
0.076
0.071
0.103
0.255
0.076
0 049
0.049
0.062
0.052
0.026
0.145
0.05
0.064
0.07
0.017
0.267
0.164
0.15
0.128
0.332
0.357
0.211
0.189
0.161
0.477
0.152
0.093
0.082
0.12
0.542
0.208
0.207
0.154
0.437
0.388
0.109

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

103
104
103
104
104
102
104
104
104
102
103
103
103
103
104
103
104
103
103
103
103
104
103
103
102
103
104
104
104
103
102
102
104
104
102
103
103
104
103
103
102
104
104
102
104
103
Attachment F - Page 1 of 29

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100

H300X150X6.5
H300X150X6.5
H300X150X6.5
H400X200X8
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H400X200X8
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H400X200X8
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H400X200X8
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H400X200X8

0.138
0.097
0.348
0.429
0.29
0.184
0.157
0.133
0.333
0.313
0.214
0.177
0.163
0.478
0.159
0.087
0.094
0.127
0.34
0.07
0.044
0.051
0.044
0.047
0.139
0.06
0.055
0.053
0.058
0.25
0.158
0.152
0.127
0.283
0.323
0.205
0.167
0.13
0.358
0.141
0.099
0.085
0.109
0.283
0.211
0.21
0.154
0.435
0.471
0.109
0.146
0.108
0.353
0.39

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

103
104
103
102
103
103
104
104
104
102
102
104
104
104
103
103
104
103
102
103
103
103
103
102
103
103
103
104
102
103
104
104
104
104
102
102
104
104
104
103
103
104
103
104
102
102
104
102
102
103
103
104
103
103
Attachment F - Page 2 of 29

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

Doc. No.
REV.
DATE.

101
102
103

H588X300X12
H588X300X12
H588X300X12

0.268
0.184
0.151

1
1
1

103
103
104

104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153

H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H400X200X8
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6 5
H300X150X6.5
H400X200X8
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H400X200X8
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H400X200X8
H588X300X12
H588X300X12
H588X300X12

0.118
0.274
0.269
0.185
0.153
0.13
0.366
0.161
0.109
0.093
0.11
0.275
0.07
0.039
0.045
0.038
0.03
0.134
0.074
0.06
0 039
0.039
0.033
0.234
0.14
0.13
0.1
0.111
0.26
0.15
0.115
0.083
0.105
0.131
0.098
0.077
0.086
0.099
0.361
0.208
0.154
0.436
0.373
0.313
0.149
0.111
0.349
0.385
0.266
0.163
0.121

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

104
104
102
102
104
104
104
103
103
104
103
104
102
102
102
102
102
102
103
103
103
102
103
103
103
104
103
102
102
102
104
102
103
103
103
103
103
103
103
102
102
104
104
103
103
104
103
103
103
103

SNO-S-CC-05-010

B
23-Jun-13

Attachment F - Page 3 of 29

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206

H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H400X200X8
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H400X200X8
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5

0.09
0.107
0.232
0.143
0.099
0.082
0.111
0.158
0.094
0.074
0.086
0.095
0.083
0.04
0.044
0.038
0.025
0.119
0.057
0.042
0.045
0.034
0.18
0 15
0.15
0.114
0.078
0.085
0.221
0.13
0.109
0.072
0.089
0.119
0.106
0.064
0.085
0.084
0.081
0.093
0.239
0.206
0.109
0.24
0.095
0.089
0.238
0.208
0.109
0.24
0.095
0.074
0.238
0.361

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

104
103
102
102
102
104
102
103
103
103
103
102
103
103
103
103
103
102
103
103
103
103
103
102
104
104
103
102
103
104
104
102
103
103
103
103
103
102
102
103
102
103
102
103
102
102
102
103
102
103
102
102
103
Attachment F - Page 4 of 29

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260

H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5

0.274
0.24
0.077
0.069
0.238
0.052
0.046
0.205
0.137
0.054
0.054
0.208
0.146
0.047
0.048
0.207
0.148
0.049
0.051
0.464
0.414
0.464
0.414
0.465
0.415
0.465
0.043
0.039
0.152
0.097
0.048
0.049
0.153
0.108
0.046
0.045
0.153
0.11
0.042
0.04
0.274
0.236
0.274
0.237
0.274
0.236
0.274
0.034
0.036
0.436
0.348
0.037
0.045
0.435

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

104
102
102
102
103
102
102
104
103
102
102
102
103
102
102
103
103
103
102
102
103
102
102
103
102
102
102
102
104
104
102
102
104
104
102
102
102
103
102
102
104
104
104
104
103
102
102
102
102
102
103
102
102
102
Attachment F - Page 5 of 29

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314

H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H400X200X8
H400X200X8
H400X200X8
H400X200X8
H400X200X8
H400X200X8
H400X200X8
H400X200X8
H400X200X8
H400X200X8
H400X200X8
H400X200X8
H400X200X8
H400X200X8
H400X200X8
H400X200X8
H400X200X8
H400X200X8
H400X200X8
H400X200X8
H400X200X8
H588X300X12
H300X150X6.5
H200X100X5.5
H588X300X12
H300X150X6.5
H200X100X5.5
H588X300X12
H300X150X6.5
H200X100X5.5
H588X300X12
H300X150X6.5
H200X100X5.5
H588X300X12
H300X150X6.5
H200X100X5.5
H588X300X12
H300X150X6.5
H200X100X5.5
H588X300X12

0.353
0.035
0.043
0.435
0.349
0.032
0.036
0.414
0.359
0.413
0.36
0.413
0.36
0.414
0.017
0.046
0.388
0.429
0.037
0.028
0.471
0.39
0.026
0.026
0.373
0.385
0.022
0.021
0.535
0.535
0.538
0.519
0.506
0.505
0.558
0.291
0.239
0.062
0.167
0.24
0.015
0.369
0.238
0.077
0.156
0.24
0.014
0.367
0.238
0.084
0.142
0.243
0.013
0.361

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

103
104
102
102
104
102
102
102
104
102
102
103
103
103
103
103
104
102
102
103
102
103
103
102
104
103
102
102
103
103
103
102
102
102
103
102
102
101
102
103
103
102
103
103
102
103
103
102
103
103
102
103
102
102
Attachment F - Page 6 of 29

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368

H300X150X6.5
H200X100X5.5
H588X300X12
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H588X300X12
H300X150X6.5
H588X300X12
H300X150X6.5
H588X300X12
H300X150X6.5
H588X300X12
H300X150X6.5
H588X300X12
H300X150X6.5
H588X300X12
H300X150X6.5
H588X300X12
H300X150X6.5
H588X300X12
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H588X300X12
H300X150X6.5
H588X300X12
H300X150X6.5
H588X300X12
H300X150X6.5
H588X300X12
H300X150X6.5
H588X300X12
H300X150X6.5
H588X300X12
H300X150X6.5
H588X300X12
H300X150X6.5
H588X300X12

0.238
0.089
0.085
0.016
0.076
0.013
0.077
0.012
0.079
0.021
0.038
0.431
0.084
0.356
0.075
0.43
0.109
0.356
0.117
0.43
0.155
0.355
0.092
0.43
0.15
0.012
0.017
0.019
0.015
0.021
0.023
0.045
0.032
0.015
0.045
0.016
0.074
0.034
0.052
0.046
0.269
0.064
0.194
0.075
0.268
0.069
0.193
0.075
0.268
0.067
0.194
0.049
0.269
0.031

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

102
102
102
102
102
102
102
103
103
103
102
103
102
102
102
103
102
103
102
102
102
102
102
103
102
103
102
103
102
103
102
103
102
102
102
104
103
102
103
103
104
104
102
104
104
104
103
104
102
104
103
104
103
104
Attachment F - Page 7 of 29

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422

H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H588X300X12
H300X150X6.5
H588X300X12
H300X150X6.5
H588X300X12
H300X150X6.5
H588X300X12
H300X150X6.5
H588X300X12
H300X150X6.5
H588X300X12
H300X150X6.5
H588X300X12
H300X150X6.5
H588X300X12
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H588X300X12
H400X200X8
H588X300X12
H400X200X8
H588X300X12
H400X200X8
H588X300X12
H400X200X8
H588X300X12
H400X200X8
H588X300X12

0.012
0.026
0.052
0.018
0.069
0.016
0.04
0.029
0.024
0.02
0.016
0.014
0.018
0.012
0.055
0.414
0.061
0.339
0.064
0.413
0.063
0.339
0.069
0.413
0.051
0.339
0.047
0.414
0.024
0.014
0.013
0.028
0.015
0.032
0.016
0.024
0.012
0.013
0.015
0.015
0.016
0.017
0.012
0.338
0.535
0.848
0.535
0.437
0.537
0.362
0.505
0.36
0.505
0.092

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

101
102
102
103
102
102
102
103
103
103
103
103
102
101
102
102
102
104
102
102
102
102
102
103
102
103
102
103
102
101
104
104
102
102
103
103
104
104
102
102
103
103
101
104
103
102
103
102
102
104
103
104
102
102
Attachment F - Page 8 of 29

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
449
450
451
452
453
454
455
456
461
462
463
464
465
466
467
468
473
474
475
476
477
478
479
480
485
486
487
488
489
490
491
492

H400X200X8
H588X300X12
H400X200X8
H588X300X12
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150

0.505
0.098
0.557
0.083
0.017
0.166
0.086
0.053
0.027
0.023
0.016
0.119
0.082
0.054
0.028
0.023
0.013
0.012
0.013
0.092
0.009
0.077
0.083
0.009
0.089
0.006
0.004
0.06
0.006
0.057
0.106
0.015
0.098
0.024
0.008
0.031
0.013
0.02
0.032
0.008
0.027
0.006
0.03
0.029
0.017
0.02
0.011
0.019
0.017
0.013
0.152
0.104
0.11
0.083

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

102
102
103
102
101
103
102
102
103
103
102
103
103
102
102
103
103
103
102
102
102
103
102
103
103
102
103
102
102
103
103
102
102
103
103
102
102
103
103
102
102
103
102
102
103
103
103
103
102
102
103
103
102
102
Attachment F - Page 9 of 29

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT
497
498
499
500
501
502
505
506
507
508
511
512
513
514
517
518
519
520
523
524
525
526
529
530
531
532
535
536
537
538
541
542
543
544
547
548
549
550
553
554
555
556
559
560
561
563
565
567
568
570
611
612
613
614

T150X150
T150X150
T150X150
T150X150
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H588X300X12
H588X300X12
H200X100X5.5
H200X100X5.5

0.025
0.022
0.02
0.017
0.215
0.191
0.224
0.242
0.306
0.278
0.227
0.245
0.101
0.083
0.087
0.096
0.091
0.062
0.087
0.095
0.105
0.078
0.068
0.078
0.096
0.043
0.072
0.074
0.097
0.072
0.069
0.073
0.117
0.054
0.08
0.069
0.124
0.098
0.098
0.099
0.184
0.124
0.131
0.107
0.132
0.074
0.073
0.068
0.01
0.008
0.294
0.206
0.013
0.013

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

103
102
102
103
103
102
103
102
103
102
103
102
103
102
103
102
103
102
103
102
103
102
103
102
103
102
103
102
103
102
103
102
103
102
103
102
103
102
103
102
103
102
103
102
102
103
103
103
102
102
103
103
101
101
Attachment F - Page 10 of 29

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT
615
616
617
618
619
620
621
622
623
624
625
626
627
628
629
630
631
632
633
634
635
636
637
638
639
640
641
642
643
644
645
646
647
648
649
650
651
652
653
654
655
656
657
658
659
660
661
662
663
664
665
666
667
668

H588X300X12
H588X300X12
H200X100X5.5
H200X100X5.5
H588X300X12
H588X300X12
H200X100X5.5
H200X100X5.5
H588X300X12
H588X300X12
H200X100X5.5
H200X100X5.5
H588X300X12
H588X300X12
H200X100X5.5
H200X100X5.5
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H588X300X12
H588X300X12
H200X100X5.5
H200X100X5.5
H588X300X12
H588X300X12
H200X100X5.5
H200X100X5.5
H588X300X12
H588X300X12
H200X100X5.5
H200X100X5.5
H588X300X12
H588X300X12
H200X100X5.5
H200X100X5.5
H588X300X12
H588X300X12

0.175
0.144
0.013
0.013
0.125
0.112
0.013
0.013
0.106
0.097
0.013
0.013
0.269
0.093
0.041
0.041
0.282
0.253
0.202
0.166
0.129
0.087
0.132
0.082
0.344
0.101
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.041
0.041
0.204
0.236
0.081
0.087
0.058
0.126
0.01
0.01
0.041
0.065
0.006
0.006
0.042
0.047
0.016
0.015
0.061
0.056

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

103
103
101
101
103
103
101
101
103
103
101
101
104
103
101
101
102
102
102
102
102
104
103
102
102
102
101
101
101
101
101
101
101
101
101
101
102
102
102
102
102
102
102
102
102
102
103
103
102
102
102
102
102
102
Attachment F - Page 11 of 29

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT
669
670
671
672
673
674
675
676
677
678
679
680
681
682
683
684
685
686
687
688
689
690
691
692
693
694
695
696
697
698
699
700
701
702
703
704
705
706
707
708
709
710
711
712
713
714
715
716
717
718
719
720
721
722

H200X100X5.5
H200X100X5.5
H588X300X12
H588X300X12
H200X100X5.5
H200X100X5.5
H588X300X12
H588X300X12
H200X100X5.5
H200X100X5.5
H588X300X12
H588X300X12
H200X100X5.5
H200X100X5.5
H588X300X12
H588X300X12
H200X100X5.5
H200X100X5.5
H588X300X12
H588X300X12
H200X100X5.5
H200X100X5.5
T150X150
T150X150
T150X150
T150X150
T200X200
T200X200
T200X200
T200X200
T150X150
T150X150
T150X150
T150X150
T200X200
T200X200
T200X200
T200X200
T150X150
T150X150
T150X150
T150X150
T200X200
T200X200
T200X200
T200X200
T150X150
T150X150
T150X150
T150X150
T200X200
T200X200
T200X200
T200X200

0.014
0.013
0.249
0.302
0.008
0.008
0.089
0.112
0.033
0.035
0.024
0.048
0.008
0.008
0.025
0.045
0.004
0.004
0.082
0.091
0.005
0.005
0.018
0.041
0.028
0.046
0.216
0.208
0.273
0.273
0.041
0.028
0.044
0.022
0.224
0.229
0.243
0.262
0.039
0.042
0.036
0.045
0.093
0.09
0.082
0.09
0.068
0.054
0.067
0.058
0.086
0.091
0.076
0.099

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

102
102
104
102
102
102
102
102
102
102
104
104
103
103
102
102
101
101
102
102
103
103
103
103
103
102
103
102
103
102
102
103
103
103
103
102
103
102
103
102
102
103
103
102
103
102
103
102
102
103
103
102
103
102
Attachment F - Page 12 of 29

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT
723
724
725
726
727
728
729
730
731
732
733
734
735
736
737
738
739
740
741
742
743
744
745
746
747
748
749
750
751
752
753
754
755
756
757
758
759
760
761
762
763
764
765
766
767
768
769
770
803
804
805
806
807
808

T150X150
T150X150
T150X150
T150X150
T200X200
T200X200
T200X200
T200X200
T150X150
T150X150
T150X150
T150X150
T200X200
T200X200
T200X200
T200X200
T150X150
T150X150
T150X150
T150X150
T200X200
T200X200
T200X200
T200X200
T150X150
T150X150
T150X150
T150X150
T200X200
T200X200
T200X200
T200X200
T150X150
T150X150
T150X150
T150X150
T200X200
T200X200
T200X200
T200X200
T150X150
T150X150
T150X150
T150X150
T200X200
T200X200
T200X200
T200X200
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150

0.031
0.057
0.025
0.036
0.087
0.085
0.063
0.081
0.03
0.051
0.027
0.039
0.074
0.084
0.053
0.095
0.017
0.023
0.03
0.027
0.08
0.083
0.064
0.093
0.011
0.02
0.02
0.028
0.069
0.082
0.051
0.1
0.076
0.045
0.122
0.084
0.105
0.116
0.115
0.148
0.027
0.037
0.052
0.069
0.088
0.111
0.094
0.139
0.089
0.081
0.055
0.089
0.133
0.097

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

103
102
102
103
103
102
103
102
103
102
102
103
102
102
103
102
103
103
102
102
103
102
103
102
103
103
102
102
103
102
103
102
102
102
102
103
103
102
104
102
102
102
103
103
103
104
103
102
103
102
103
104
102
102
Attachment F - Page 13 of 29

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT
809
810
811
812
813
814
815
816
817
818
819
820
821
822
823
824
825
826
827
828
829
830
831
832
833
834
835
836
837
838
839
840
841
842
843
844
845
846
847
848
849
850
851
852
853
854
855
856
857
858
859
860
861
862

T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
H300X150X6.5
H200X100X5.5
H300X150X6.5
H200X100X5.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H200X100X5.5
H300X150X6.5
H200X100X5.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H200X100X5.5
H300X150X6.5
H200X100X5.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H200X100X5.5
H300X150X6.5
H200X100X5.5
H300X150X6.5
H300X150X6.5

0.159
0.061
0.007
0.025
0.023
0.008
0.078
0.008
0.064
0.016
0.029
0.046
0.027
0.051
0.127
0.019
0.111
0.019
0.131
0.099
0.075
0.004
0.073
0.096
0.007
0.007
0.025
0.028
0.075
0.005
0.089
0.032
0.08
0.076
0.015
0.017
0.007
0.007
0.083
0.019
0.075
0.004
0.077
0.071
0.015
0.015
0.005
0.005
0.077
0.017
0.071
0.003
0.28
0.275

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

103
103
102
102
103
103
102
102
103
103
103
102
103
103
102
102
103
103
102
102
103
102
102
103
103
103
102
102
102
102
103
103
102
103
103
103
102
102
102
102
103
103
102
101
104
104
102
102
102
101
101
103
102
103
Attachment F - Page 14 of 29

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT
863
864
865
866
867
868
869
870

H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H200X100X5.5
H300X150X6.5
H200X100X5.5

0.013
0.013
0.013
0.012
0.28
0.003
0.274
0.004

Doc. No.
REV.
DATE.

1
1
1
1
1
1
1
1

103
103
102
102
102
102
103
103

SNO-S-CC-05-010

B
23-Jun-13

F.2. Stress Ratio Temporary Condition


Beam No.

Design Property

Actual Ratio

Allow. Ratio

L/C

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40

H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H400X200X8
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H400X200X8
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12

0.585
0.21
0.24
0.21
0.202
0.59
0.253
0.253
0.212
0.261
0.59
0.389
0.321
0.305
0.37
0.144
0.115
0.112
0.099
0.04
0.224
0.127
0.114
0.117
0.044
0.777
0.382
0.309
0.221
0.44
0.857
0.417
0.329
0.277
0.569
0.626
0.417
0.354
0.333
0.554

1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33

123
148
123
150
115
121
121
149
149
113
123
123
123
123
115
127
125
127
119
127
127
125
125
125
118
123
123
150
150
115
121
121
149
145
113
123
123
150
123
115
Attachment F - Page 15 of 29

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94

H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H400X200X8
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H400X200X8
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H400X200X8
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H400X200X8
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5

0.22
0.278
0.211
0.749
0.401
0.121
0.216
0.155
0.668
0.442
0.761
0.368
0.295
0.216
0.441
0.782
0.365
0.312
0.261
0.57
0.595
0.398
0.348
0.332
0.464
0.138
0.114
0.11
0.096
0.067
0.22
0.148
0.138
0.141
0.12
0.708
0.359
0.294
0.212
0.368
0.777
0.386
0.307
0.239
0.427
0.573
0.393
0.324
0.284
0.38
0.224
0.277
0.212
0.74

1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

105
121
149
121
116
107
123
150
123
115
123
123
150
150
115
121
121
149
145
145
123
123
150
123
113
125
125
125
125
125
125
125
125
125
118
123
123
150
150
146
121
121
121
145
145
123
123
150
123
146
105
121
149
121
Attachment F - Page 16 of 29

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

Doc. No.
REV.
DATE.

95
96
97
98
99
100
101
102
103

H400X200X8
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H400X200X8
H588X300X12
H588X300X12
H588X300X12

0.477
0.122
0.22
0.166
0.665
0.409
0.686
0.341
0.262

1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33

117
107
123
150
123
115
123
123
150

104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147

H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H300X150X6.5
H300X150X6.5
H300X150X6 5
H300X150X6.5
H300X150X6.5
H400X200X8
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H400X200X8
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H400X200X8
H300X150X6.5
H300X150X6.5

0.188
0.364
0.695
0.327
0.252
0.207
0.44
0.539
0.374
0.303
0.277
0.377
0.144
0.116
0 108
0.108
0.094
0.053
0.214
0.16
0.144
0.134
0.084
0.639
0.315
0.249
0.188
0.174
0.675
0.323
0.235
0.181
0.151
0.511
0.348
0.271
0.205
0.165
0.374
0.277
0.212
0.743
0.379
0.321
0.223

1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1 33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33

146
146
121
121
149
145
145
123
123
150
123
146
125
125
125
125
125
125
125
125
125
125
123
123
123
123
115
121
121
121
121
113
123
123
123
123
115
105
115
121
122
118
142
115

SNO-S-CC-05-010

B
23-Jun-13

Attachment F - Page 17 of 29

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200

H300X150X6.5
H300X150X6.5
H400X200X8
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H400X200X8
H300X150X6 5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H400X200X8
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5

0.169
0.665
0.394
0.618
0.298
0.213
0.169
0.172
0.627
0.262
0.185
0.153
0.17
0.486
0.322
0.239
0.197
0.163
0.16
0.118
0.1
0.083
0.039
0 199
0.199
0.139
0.109
0.088
0.053
0.437
0.175
0.172
0.121
0.103
0.452
0.17
0.167
0.115
0.107
0.42
0.295
0.198
0.158
0.137
0.159
0.182
0.242
0.218
0.121
0.241
0.173
0.172
0.241
0.221

1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1 33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

123
149
119
123
123
123
123
115
121
121
121
121
116
123
123
123
123
115
125
125
125
125
119
125
125
125
125
119
123
117
146
146
115
121
121
149
145
116
123
123
123
123
115
127
127
108
105
107
105
127
127
105
105
Attachment F - Page 18 of 29

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254

H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5

0.122
0.241
0.174
0.16
0.241
0.374
0.287
0.241
0.156
0.159
0.241
0.129
0.13
0.276
0.215
0.133
0.119
0.276
0.22
0.127
0.112
0.276
0.223
0.124
0.136
0.467
0.414
0.467
0.415
0.467
0.415
0.467
0.11
0.117
0.21
0.155
0.11
0.091
0.211
0.166
0.102
0.086
0.211
0.168
0.094
0.107
0.277
0.237
0.277
0.237
0.277
0.237
0.277
0.087

1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

107
105
127
127
105
107
142
105
127
127
108
127
127
121
123
127
127
121
123
127
127
115
115
127
127
113
115
105
114
108
118
105
127
127
149
150
127
127
149
150
125
127
121
123
127
127
145
146
145
146
108
114
105
127
Attachment F - Page 19 of 29

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308

H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H400X200X8
H400X200X8
H400X200X8
H400X200X8
H400X200X8
H400X200X8
H400X200X8
H400X200X8
H400X200X8
H400X200X8
H400X200X8
H400X200X8
H400X200X8
H400X200X8
H400X200X8
H400X200X8
H400X200X8
H400X200X8
H400X200X8
H400X200X8
H400X200X8
H588X300X12
H300X150X6.5
H200X100X5.5
H588X300X12
H300X150X6.5
H200X100X5.5
H588X300X12
H300X150X6.5
H200X100X5.5
H588X300X12
H300X150X6.5
H200X100X5.5
H588X300X12

0.109
0.748
0.668
0.08
0.077
0.74
0.665
0.068
0.072
0.742
0.665
0.076
0.087
0.42
0.36
0.42
0.36
0.42
0.361
0.42
0.035
0.079
0.401
0.442
0.056
0.06
0.479
0.411
0.032
0.032
0.379
0.396
0.03
0.028
0.54
0.539
0.542
0.522
0.509
0.508
0.561
0.523
0.242
0.066
0.64
0.241
0.017
0.608
0.241
0.081
0.588
0.241
0.015
0.573

1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

127
121
123
152
127
121
123
117
117
122
149
127
127
113
146
113
114
116
146
116
127
127
116
115
121
123
117
115
115
113
118
119
117
117
119
119
119
117
117
116
116
121
106
127
121
107
119
121
106
119
121
106
119
121
Attachment F - Page 20 of 29

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362

H300X150X6.5
H200X100X5.5
H588X300X12
H300X150X6.5
H200X100X5.5
H588X300X12
H300X150X6.5
H200X100X5.5
H588X300X12
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H588X300X12
H300X150X6.5
H588X300X12
H300X150X6.5
H588X300X12
H300X150X6.5
H588X300X12
H300X150X6.5
H588X300X12
H300X150X6.5
H588X300X12
H300X150X6.5
H588X300X12
H300X150X6.5
H588X300X12
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H588X300X12
H300X150X6.5
H588X300X12
H300X150X6.5
H588X300X12
H300X150X6.5
H588X300X12
H300X150X6.5
H588X300X12

0.241
0.088
0.522
0.244
0.016
0.539
0.241
0.093
0.269
0.017
0.08
0.014
0.082
0.013
0.083
0.025
0.236
0.433
0.404
0.357
0.387
0.433
0.391
0.357
0.38
0.432
0.341
0.356
0.32
0.432
0.219
0.015
0.018
0.023
0.016
0.035
0.024
0.057
0.041
0.015
0.056
0.016
0.083
0.037
0.061
0.214
0.272
0.338
0.194
0.336
0.271
0.309
0.194
0.296

1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

107
119
121
107
125
121
106
109
121
109
109
109
109
111
111
111
121
115
121
113
121
107
121
119
121
106
121
113
121
107
121
109
117
109
117
125
110
125
111
109
127
147
127
118
119
123
142
149
113
149
142
149
116
149
Attachment F - Page 21 of 29

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416

H300X150X6.5
H588X300X12
H300X150X6.5
H588X300X12
H300X150X6.5
H588X300X12
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H588X300X12
H300X150X6.5
H588X300X12
H300X150X6.5
H588X300X12
H300X150X6.5
H588X300X12
H300X150X6.5
H588X300X12
H300X150X6.5
H588X300X12
H300X150X6.5
H588X300X12
H300X150X6.5
H588X300X12
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H588X300X12
H400X200X8
H588X300X12
H400X200X8
H588X300X12

0.271
0.262
0.195
0.232
0.272
0.109
0.013
0.027
0.067
0.02
0.088
0.023
0.057
0.044
0.024
0.026
0.019
0.018
0.029
0.013
0.192
0.418
0.279
0.341
0.278
0.418
0.242
0.341
0.246
0.418
0.188
0.341
0.183
0.418
0.08
0.028
0.017
0.057
0.026
0.065
0.018
0.055
0.022
0.026
0.022
0.035
0.019
0.025
0.023
0.387
0.54
0.922
0.539
0.528

1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

106
149
116
149
107
150
128
117
125
119
125
125
125
127
119
127
125
127
125
127
121
114
121
145
121
114
121
113
121
115
121
145
121
115
121
151
128
128
125
125
119
125
127
128
110
125
112
119
127
117
119
113
119
145
Attachment F - Page 22 of 29

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
449
450
451
452
453
454
455
456
461
462
463
464
465
466
467
468
473
474
475
476
477
478
479
480
485
486

H400X200X8
H588X300X12
H400X200X8
H588X300X12
H400X200X8
H588X300X12
H400X200X8
H588X300X12
H400X200X8
H588X300X12
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150

0.541
0.408
0.508
0.422
0.509
0.143
0.508
0.161
0.561
0.107
0.13
0.264
0.207
0.171
0.161
0.089
0.043
0.183
0.135
0.078
0.042
0.057
0.015
0.052
0.025
0.114
0.034
0.095
0.106
0.023
0.12
0.029
0.006
0.071
0.018
0.068
0.121
0.034
0.114
0.04
0.011
0.045
0.023
0.036
0.044
0.025
0.045
0.015
0.038
0.034
0.023
0.028
0.034
0.044

1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

117
145
119
145
117
113
114
113
115
118
128
128
125
125
125
128
125
127
127
126
126
128
127
127
124
122
122
107
124
121
122
123
107
121
125
107
119
125
125
119
127
125
117
127
127
125
125
127
123
118
119
115
126
125
Attachment F - Page 23 of 29

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT
487
488
489
490
491
492
497
498
499
500
501
502
505
506
507
508
511
512
513
514
517
518
519
520
523
524
525
526
529
530
531
532
535
536
537
538
541
542
543
544
547
548
549
550
553
554
555
556
559
560
561
563
565
567

T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
T200X200
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5

0.04
0.036
0.301
0.206
0.258
0.189
0.09
0.077
0.096
0.061
0.465
0.444
0.479
0.488
0.582
0.559
0.508
0.519
0.213
0.198
0.204
0.206
0.215
0.189
0.212
0.213
0.238
0.221
0.211
0.209
0.243
0.201
0.22
0.211
0.214
0.204
0.195
0.183
0.253
0.206
0.21
0.184
0.197
0.171
0.158
0.159
0.285
0.226
0.198
0.174
0.135
0.077
0.076
0.071

1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

128
127
123
128
125
126
127
125
125
127
127
125
127
125
127
125
127
125
127
125
127
125
127
125
127
125
127
125
127
125
127
125
127
125
127
125
127
125
127
125
127
125
119
117
119
117
119
117
119
117
117
119
108
108
Attachment F - Page 24 of 29

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT
568
570
611
612
613
614
615
616
617
618
619
620
621
622
623
624
625
626
627
628
629
630
631
632
633
634
635
636
637
638
639
640
641
642
643
644
645
646
647
648
649
650
651
652
653
654
655
656
657
658
659
660
661
662

H300X150X6.5
H300X150X6.5
H588X300X12
H588X300X12
H200X100X5.5
H200X100X5.5
H588X300X12
H588X300X12
H200X100X5.5
H200X100X5.5
H588X300X12
H588X300X12
H200X100X5.5
H200X100X5.5
H588X300X12
H588X300X12
H200X100X5.5
H200X100X5.5
H588X300X12
H588X300X12
H200X100X5.5
H200X100X5.5
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H588X300X12
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H200X100X5.5
H588X300X12
H588X300X12
H200X100X5.5
H200X100X5.5
H588X300X12
H588X300X12
H200X100X5.5
H200X100X5.5
H588X300X12
H588X300X12
H200X100X5.5
H200X100X5.5

0.013
0.011
0.777
0.564
0.013
0.013
0.388
0.295
0.013
0.013
0.292
0.211
0.013
0.013
0.249
0.175
0.013
0.013
0.382
0.145
0.041
0.041
0.763
0.598
0.365
0.315
0.286
0.188
0.266
0.161
0.441
0.15
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.013
0.041
0.041
0.473
0.606
0.085
0.091
0.249
0.425
0.015
0.015
0.234
0.378
0.008
0.008

1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

117
117
123
123
107
107
123
123
115
105
123
123
105
105
123
123
105
105
115
115
105
105
121
121
121
121
121
149
121
121
113
116
105
105
105
105
105
105
105
105
105
105
121
121
125
125
121
121
117
117
121
121
111
111
Attachment F - Page 25 of 29

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT
663
664
665
666
667
668
669
670
671
672
673
674
675
676
677
678
679
680
681
682
683
684
685
686
687
688
689
690
691
692
693
694
695
696
697
698
699
700
701
702
703
704
705
706
707
708
709
710
711
712
713
714
715
716

H588X300X12
H588X300X12
H200X100X5.5
H200X100X5.5
H588X300X12
H588X300X12
H200X100X5.5
H200X100X5.5
H588X300X12
H588X300X12
H200X100X5.5
H200X100X5.5
H588X300X12
H588X300X12
H200X100X5.5
H200X100X5.5
H588X300X12
H588X300X12
H200X100X5.5
H200X100X5.5
H588X300X12
H588X300X12
H200X100X5.5
H200X100X5.5
H588X300X12
H588X300X12
H200X100X5.5
H200X100X5.5
T150X150
T150X150
T150X150
T150X150
T200X200
T200X200
T200X200
T200X200
T150X150
T150X150
T150X150
T150X150
T200X200
T200X200
T200X200
T200X200
T150X150
T150X150
T150X150
T150X150
T200X200
T200X200
T200X200
T200X200
T150X150
T150X150

0.21
0.308
0.02
0.019
0.191
0.265
0.03
0.029
0.259
0.405
0.077
0.08
0.206
0.3
0.04
0.042
0.11
0.194
0.014
0.014
0.09
0.147
0.02
0.019
0.1
0.14
0.033
0.033
0.061
0.091
0.081
0.091
0.467
0.459
0.552
0.551
0.094
0.089
0.104
0.078
0.477
0.478
0.523
0.537
0.053
0.066
0.061
0.059
0.208
0.203
0.205
0.212
0.087
0.086

1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

121
121
127
127
121
121
152
152
145
113
127
127
121
121
117
117
123
149
125
125
121
121
125
125
116
116
125
125
124
121
122
123
127
125
127
125
124
121
122
123
127
125
127
125
127
121
122
127
127
125
127
125
124
121
Attachment F - Page 26 of 29

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT
717
718
719
720
721
722
723
724
725
726
727
728
729
730
731
732
733
734
735
736
737
738
739
740
741
742
743
744
745
746
747
748
749
750
751
752
753
754
755
756
757
758
759
760
761
762
763
764
765
766
767
768
769
770

T150X150
T150X150
T200X200
T200X200
T200X200
T200X200
T150X150
T150X150
T150X150
T150X150
T200X200
T200X200
T200X200
T200X200
T150X150
T150X150
T150X150
T150X150
T200X200
T200X200
T200X200
T200X200
T150X150
T150X150
T150X150
T150X150
T200X200
T200X200
T200X200
T200X200
T150X150
T150X150
T150X150
T150X150
T200X200
T200X200
T200X200
T200X200
T150X150
T150X150
T150X150
T150X150
T200X200
T200X200
T200X200
T200X200
T150X150
T150X150
T150X150
T150X150
T200X200
T200X200
T200X200
T200X200

0.098
0.079
0.201
0.203
0.199
0.218
0.045
0.076
0.044
0.052
0.224
0.222
0.211
0.228
0.046
0.071
0.049
0.054
0.213
0.219
0.199
0.236
0.022
0.049
0.042
0.03
0.203
0.205
0.2
0.227
0.035
0.11
0.043
0.034
0.19
0.2
0.179
0.224
0.207
0.178
0.273
0.144
0.178
0.188
0.211
0.244
0.138
0.236
0.251
0.184
0.154
0.178
0.172
0.218

1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

122
123
127
125
127
125
127
125
125
127
127
125
127
125
127
125
125
127
127
125
127
125
116
119
118
117
127
125
127
125
115
121
123
123
127
125
127
125
127
125
125
127
119
117
119
117
121
121
123
123
119
117
119
117
Attachment F - Page 27 of 29

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT
803
804
805
806
807
808
809
810
811
812
813
814
815
816
817
818
819
820
821
822
823
824
825
826
827
828
829
830
831
832
833
834
835
836
837
838
839
840
841
842
843
844
845
846
847
848
849
850
851
852
853
854
855
856

T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
T150X150
H300X150X6.5
H200X100X5.5
H300X150X6.5
H200X100X5.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H200X100X5.5
H300X150X6.5
H200X100X5.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H200X100X5.5
H300X150X6.5
H200X100X5.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5

0.203
0.262
0.251
0.195
0.275
0.19
0.305
0.15
0.075
0.146
0.145
0.05
0.167
0.109
0.161
0.112
0.076
0.097
0.08
0.098
0.191
0.102
0.186
0.095
0.134
0.103
0.077
0.007
0.075
0.102
0.01
0.009
0.029
0.032
0.077
0.006
0.093
0.036
0.082
0.079
0.018
0.019
0.01
0.011
0.086
0.021
0.079
0.005
0.084
0.079
0.022
0.02
0.013
0.011

1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

124
121
123
127
126
125
128
127
121
121
123
127
121
121
123
123
121
121
122
123
121
121
123
123
117
128
119
119
109
119
107
107
117
117
109
113
119
117
117
127
127
127
125
125
117
125
127
127
117
127
127
127
125
125
Attachment F - Page 28 of 29

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT
857
858
859
860
861
862
863
864
865
866
867
868
869
870

H300X150X6.5
H200X100X5.5
H300X150X6.5
H200X100X5.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H300X150X6.5
H200X100X5.5
H300X150X6.5
H200X100X5.5

0.085
0.022
0.082
0.008
0.324
0.288
0.052
0.064
0.032
0.035
0.309
0.066
0.286
0.037

1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33
1.33

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

117
128
127
127
117
119
127
127
122
124
117
128
119
124

Attachment F - Page 29 of 29

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

ATTACHMENT G
DEFLECTION DATA

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

G. Deflection Data
G.1. Permanent Condition
Maximum Node Displacement at Level + 5.00

Maximum Node Displacement at Level + 7.00

Maximum Node Displacement at Level + 10.00

Attachment G - Page 1 of 4

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

Maximum Node Displacement at Level + 13.00

Maximum Node Displacement at Level + 16.00

G.2. Temporary Condition


Maximum Node Displacement at Level + 5.00

Attachment G - Page 2 of 4

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

Maximum Node Displacement at Level + 7.00

Maximum Node Displacement at Level + 10.00

Maximum Node Displacement at Level + 13.00

Attachment G - Page 3 of 4

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23-Jun-13

Maximum Node Displacement at Level + 16.00

Attachment G - Page 4 of 4

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

ATTACHMENT H
CONNECTION CHECK

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23 Juni 2013

Doc. No.

CALCULATION OF PIPE RACK STRUCTURE


# 10

SNO-S-CC-05-010

REV.

SENORO GAS DEVELOPMENT PROJECT

DATE.

23 Juni 2013

H. CONNECTION CHECK
H.1

Typical Connection of Pipe Rack PR-10


g document:
Connection detail calculation shall refer to the following
1. SNO-S-SD-100-001
Standard Drawing Member Designation For Steel Structure
2. SNO-S-SD-100-002
Standard Drawing Column Base Plate
3. SNO-S-SD-100-003
Standard Drawing Steel Beam Fixed End Plate Moment
4. SNO-S-SD-100-004
Standard Drawing Steel Beam Pinned Connection
5. SNO-S-SD-100-005
Standard Drawing Column Splice
6. SNO-S-SD-100-006
Standard Drawing Vertical Bracing Connection
7. SNO-S-SD-100-007
Standard Drawing Horizontal Bracing Connection
8. SNO-S-SD-100-008
Standard Drawing Anchor Bolts

R3

R3

R3

R3

R3

R3

R3

R4 R2
R3

R5

R3

R5

R2

R5

R3

R5

C5

R2

R3

C2
R5

R3

R5

C1
R2

R5

R3

C3
R3

R3

C1
R2

R5

R3

R5

R3

R3

R3

R3

R3

R5

C5R2

R5

R3

R5

R2

R5

R3

R5

R2
R7

R7

R7

R7

R7

R7

R7

R7

R7

R7

C3
R5

R3

R5

R2

R5

R3

R5

R2

R5

R3

R5

R7

R7

R7

R7

R7

C3

R2

R5

R3

R5

R2

R7
R2

R5

R3

R5

R2

R5

R3

R5

R2

R5

R3

R5

R4 R2
R3

R3
R2

R2
R3

R3
R2 R4

C2

R3
R2 R4

R3

R3

R3

R3

C5

R3

R3

C1

R3

C2

C3

C1

R3

R3

R3

C2

C5

R3

R3

R3

R3

R3

R3

R3

Fig. H.1.1 Plan EL. +5.000

R3

R3

R3

R3

R3

R3

R3

R4 R2
R3

R5

R3

R5

R2

C5

R3

R2

R5

R3

R3

R5

R3

C3

C2C1

R2

R3

C1

R3

R3

C2

R2

R3

R3

R5

R3

R5

C5

R2

R3

R2

R5

R3

R5

R2
R7

R7

R7

R7

R7

R7

R7

R7

R7

R5

R3

R5

R2

R3

R2

R5

R3

R5

R7

R7

R7

R7

R7

R7

C3

C3
R2

R3

R2

R7
R2

R5

R3

R5

R2

R3

R2

R5

R3

R5

R4 R2
R3

R3
R2

R2
R3

R3
R2 R4

R3
R2 R4

R3

R3

R3

R3

C5

R3

R3

C1

R3

C2

R3

C3

C1
C2

R3

R3

C5

R3

R3

R3

R3

R3

Fig. H.1.2 Plan EL. +7.000

Fig. H.1.3 Plan EL. +10.000

Attachment H - Page 1 of 63

Doc. No.

CALCULATION OF PIPE RACK STRUCTURE


# 10

SNO-S-CC-05-010

REV.

SENORO GAS DEVELOPMENT PROJECT

DATE.

23 Juni 2013

Fig. H.1.2 Plan EL. +13.000

R3

R8

R8

R8

R8

R8

R8

R4 R2
R3

R5

R8

R5

R2

R5

R8

R5

C5

R2

R5

R8

R8

C2 C1

R5

R8

C3

R2

R5

R8

R5

R8

C1

R8

R2

R8

R8

R8

R8

R5

R8

R5

C5

R2

R5

R8

R5

R2

R5

R8

R5

R2
R7

R7

R7

R7

R7

R7

R7

R7

R7

C3
R5

R8

R5

R2

R5

R8

R5

R2

R5

R8

R5

R2

R7

R7

R7

R7

R7

R7

C3
R5

R8

R5

R2

R7
R2

R5

R8

R5

R2

R5

R8

R5

R2

R5

R8

R5

R4 R2
R3

R3
R2

R2
R3

R3
R2 R4

C2

R3
R2 R4

R8

R8

R8

R8

C5

R8

R8

C1

R8

C2

C3

R8

C1
C2

R8

R8

R8

C5

R8

R8

R8

R3

Fig. H.1.2 Plan EL. +16.000


R3

R8

R8

R8

R8

R8

R8

R8

R8

R8

R8

R8

R8

R8

R8

R4 R1
R6: 90.00

R6: 90.00
R1

R3

R3

R1

R6: 90.00

R6: 90.00
R1

R3

R3

R1

R6: 90.00

R6: 90.00
R1

R3

R3

R1

R6: 90.00

R6: 90.00

R3

R3

R1
R3

R1
R3

R3

R3

R3

R3

R3

R4 R1
R6: 90.00

R6: 90.00
R1

R3

R3

R1

R6: 90.00

R6: 90.00
R1

R3

R3

R1

R6: 90.00

R6: 90.00
R1

R3

R3

R1

R6: 90.00

R6: 90.00

R3

R3

R1
R3

R3

R3

R3

R3

R3

R4 R1

R4 R1
R3

R1

R3
R1 R4

R6: 90.00

R6: 90.00
R1

R3

R3

R6: 90.00

R6: 90.00
R1

R3

R3

R1

R6: 90.00

R6: 90.00
R1

R3

R3

R6: 90.00

R6: 90.00
R1

R3

R3

R1

R6: 90.00

R6: 90.00
R1

R3

R3

R6: 90.00

R6: 90.00
R1

R3

R3

R1

R6: 90.00

R6: 90.00

R3

R3

R6: 90.00

R1 R4
R6: 90.00

R3

R3

R1
R3

R3
R1 R4

R1
R3

R3
R1 R4

R1

R4 R1

R3

R3
R1

R3

R3

C2
R6: 90.00

R6: 90.00
R1

R1

R3

C4 C4

R6: 90.00

R1
R3

C2
R6: 90.00
R1

R3

R3

C2
R1

C4 C4

R6: 90.00

R3

R3
R1

R3

R3

R6: 90.00
R1

R1

R3

R1 R4

C2

R1

R3

R1

R6: 90.00

R6: 90.00
R1

C6

C6

C6

C6

Fig. H.1.4 Longitudinal Section

Attachment H - Page 2 of 63

CALCULATION OF PIPE RACK STRUCTURE


# 10

SENORO GAS DEVELOPMENT PROJECT

C1

C1

C1

C1

C6

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23 Juni 2013

C6

Fig. H.1.6 Transversal Section

List of Property
No. Symbol
1
R1
2
R2
3
R3
4
R4
5
R5
6
R6
7
R7
8
R8
9
10
11
12
13
14

Steel Property
MH 588
MH 588
SH 300
SH 200
CT 150
CT 200
SH 200
SH 400

List of Connection
Connection Type
No. Symbol
1
C1
Beam to Column Moment Connection
2
C2
Beam to Column Pinned Connection
3
Beam to Beam Pinned Connection
C3
4
Vertical bracing connection
C4
5
C5
Horizontal bracing connection
6
C6
Base Plate Pinned Connection

Attachment H - Page 3 of 63

CALCULATION OF PIPE RACK STRUCTURE


# 10

SENORO GAS DEVELOPMENT PROJECT

H.2

Doc. No.

SNO-S-CC-05-010

REV.
DATE.

23 Juni 2013

Beam to Column Moment Connection (C1)


H.2.1 Beam to Column Moment Connection ((C1)) between El. + 5.00 and Column
Main Beam El.+5.00
MH 588
Column
MH 588
To accommodate the combination of tension force and moment, the inner force of
the member shall conform the formula below
- Combination of tension and moment
M
Mall

Where :
M
=
T
=
Mall
=
Tall
=

T
Tall

Moment
Tension force
Allowable moment capacity
Allowable tension capacity

H.2.1.1 Permanent Condition


From STAAD Pro Result, summary of inner Force maximum for MH 588 are shown below
Beam
Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

296
296
11
652
296
296
86
86
296
296
652
296

L/C Node
103
102
103
102
102
103
103
102
103
102
102
103

167
167
2
8
293
293
38
38
293
293
8
293

Fx
kN
20.61
-40.17
6.31
16.25
-29.17
9.61
-10.69
-11.56
9.61
-29.17
16 25
16.25
9.61

Fy
kN
19.41
-7.79
30.68
-61.76
-34.38
-7.19
28.93
5.08
-7.19
-34.38
-61.76
61 76
-7.19

Fz
kN
12.17
-11.93
-8.75
13.66
23.07
-22.83
1.09
-1.07
-22.83
23.07
13 66
13.66
-22.83

Mx
kNm
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0 00
0.00
0.00

My
kNm
-4.27
3.86
0.07
0.09
-15.45
15.66
-0.01
0.01
15.66
-15.45
0 09
0.09
15.66

Mz
kNm
-14.84
-15.42
81.44
89.52
15.45
-51.96
74.59
-20.63
-51.96
15.45
89 52
89.52
-51.96

Attachment H - Page 4 of 63

CALCULATION OF PIPE RACK STRUCTURE


# 10

SENORO GAS DEVELOPMENT PROJECT

Capacity Check
Force
M
V
(kN.m)
(kN)

M
V
T

T
(kN)

p
y
Allowable Capacity
Mall
Vall
Tall
(kN.m)
(kN)
(kN)

89.52
30.68 No Tension
346.99
573.02
89.52
-61.76 No Tension
346.99
573.02
-15.42
-7.79
-40.17
346.99
573.02
: Moment force or Mz in STAAD Pro
: Shear force or Fy in STAAD Pro
: Tension force or Fx in (-) value in STAAD Pro

Doc. No.

SNO-S-CC-05-010

REV.
DATE.

23 Juni 2013

Check
M + T
Mall Tall

Remarks

0.258 < 1...OK


0.258 < 1...OK
0.066 < 1...OK

1895.04
1895.04
1895.04

H.2.1.2 Temporary Condition


From Staad Pro Result, summary of inner Force maximum for MH 588 are shown below
Beam
Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

651
651
11
652
296
296
186
186
296
296
652
11

L/C Node
115
113
123
121
118
120
123
121
119
117
121
121

292
292
2
8
293
293
86
86
293
293
8
2

Fx
(kN)
21.466
-41.036
7.781
16.23
-28.771
9.215
3.408
-32.947
10.003
-29.559
16.23
-25.182

Fy
(kN)
75.855
-56.121
97.47
-125.436
-33.222
-8.35
71.985
-42.063
-6.027
-35.544
-125.436
-66.714

Fz
(kN)
3.74
-3.983
-7.779
12.218
23.395
-23.148
0.169
-0.12
-22.506
22.753
12.218
7.888

Mx
(kNm)
0.002
-0.002
0.003
-0.003
0
0
0.003
-0.003
0
0
-0.003
-0.003

My
(kNm)
-13.628
13.836
0.062
0.086
-14.706
14.917
-0.019
0.017
16.407
-16.196
0.086
-0.061

Mz
(kNm)
170.311
-160.216
352.717
359.975
12.552
-49.064
251.75
-204.697
-54.856
18.344
359.975
-304.55

Attachment H - Page 5 of 63

CALCULATION OF PIPE RACK STRUCTURE


# 10

SENORO GAS DEVELOPMENT PROJECT

Capacity Check
Force
M
V
(kN.m)
(kN)

T
(kN)

p
y*
Allowable Capacity
Mall
Vall
Tall
(kN.m)
(kN)
(kN)

Doc. No.
REV.
DATE.

Check
M + T
Mall Tall

SNO-S-CC-05-010

B
23 Juni 2013

Remarks

359.98
97.47 No Tension
461.50
762.12
2520.40
0.780 < 1...OK
359.98
-125.44 No Tension
461.50
762.12
2520.40
0.780 < 1...OK
-160.22
-56.12
-41.04
461.50
762.12
2520.40
0.363 < 1...OK
*) For temporary load the allowable value can be increased by 33%
M
: Moment force or Mz in STAAD Pro
V
: Shear force or Fy in STAAD Pro
T
: Tension force or Fx in (-) value in STAAD Pro
From table, the inner force has been conform to the allowable combination of tension and moment
so for detail connection are shall be refer to :
Detail :
TYPE-B

Attachment H - Page 6 of 63

CALCULATION OF PIPE RACK STRUCTURE


# 10

SENORO GAS DEVELOPMENT PROJECT

Doc. No.

SNO-S-CC-05-010

REV.
DATE.

23 Juni 2013

H.2.2 Beam to Column Moment Connection (C1) between El. + 7.00 and Column
Main Beam El.+7.00
MH 588
Column
MH 588
To accommodate the combination of tension force and moment, the inner force of
the member shall conform the formula below
- Combination of tension and moment
M
Mall

Where :
M
=
T
=
Mall
=
Tall
=

T
Tall

Moment
Tension force
Allowable moment capacity
Allowable tension capacity

H.2.2.1 Permanent Condition


From STAAD Pro Result, summary of inner Force maximum for MH 588 are shown below
Beam
Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

187
187
187
676
335
335
659
12
137
137
676
675

L/C Node
103
102
103
102
103
102
102
103
102
103
102
104

87
87
87
93
192
192
296
3
192
192
93
196

Fx
kN
19.88
-0.44
19.88
8.33
12.41
0.79
8.36
8.81
0.79
12.41
8.33
6 25
6.25

Fy
y
kN
27.30
18.28
27.30
-43.77
8.43
-3.11
4.85
18.84
-2.50
9.04
-43.77
10 14
10.14

Fz
kN
-3.62
3.31
-3.62
1.68
10.45
-10.47
-1.59
0.32
2.96
-2.94
1.68
0 18
0.18

Mx
kNm
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0 00
0.00

y
My
kNm
0.04
-0.03
0.04
0.04
-5.88
5.96
0.14
-0.06
5.96
-5.88
0.04
0 26
0.26

Mz
kNm
58.78
22.28
58.78
64.75
-16.56
-16.45
-13.29
43.02
-16.45
-16.56
64.75
-29.82
29 82

Attachment H - Page 7 of 63

CALCULATION OF PIPE RACK STRUCTURE


# 10

SENORO GAS DEVELOPMENT PROJECT

Capacity Check
Force
M
V
(kN.m)
(kN)

M
V
T

T
(kN)

p
y
Allowable Capacity
Mall
Vall
Tall
(kN.m)
(kN)
(kN)

64.75
27.30 No Tension
346.99
573.02
64.75
-43.77 No Tension
346.99
573.02
22.28
18.28
-0.44
346.99
573.02
: Moment force or Mz in STAAD Pro
: Shear force or Fy in STAAD Pro
: Tension force or Fx in (-) value in STAAD Pro

Doc. No.

SNO-S-CC-05-010

REV.
DATE.

23 Juni 2013

Check
M + T
Mall Tall

Remarks

0.187 < 1...OK


0.187 < 1...OK
0.064 < 1...OK

1895.04
1895.04
1895.04

H.2.2.2 Temporary Condition


From Staad Pro Result, summary of inner Force maximum for MH 588 are shown below
Beam
Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

187
187
12
331
335
335
12
12
137
137
12
660

L/C Node
115
121
123
121
111
109
122
124
109
111
123
123

87
87
3
45
192
192
3
3
192
192
3
9

Fx
(kN)
22.265
-3.71
9.479
6.645
13.106
0.018
10.552
6.115
0.018
13.106
9.479
6.824

Fy
(kN)
49.616
-13.299
65.021
-75.194
8.425
-3.112
54.571
-31.111
-2.498
9.04
65.021
37.074

Fz
(kN)
-3.722
3.13
0.414
8.23
11.082
-11.1
0.179
0.139
3.585
-3.567
0.414
0.61

Mx
(kNm)
0.002
-0.002
0.001
-0.002
0
0
0.003
-0.003
0
0
0.001
0.001

My
(kNm)
0.036
-0.03
-0.05
0.049
-6.314
6.387
0.048
-0.05
6.387
-6.314
-0.05
0.078

Mz
(kNm)
148.032
-98.946
231.008
211.799
-16.567
-16.438
188.633
-153.553
-16.438
-16.568
231.008
-201.046

Attachment H - Page 8 of 63

CALCULATION OF PIPE RACK STRUCTURE


# 10

SENORO GAS DEVELOPMENT PROJECT

Capacity Check
Force
M
V
(kN.m)
(kN)

T
(kN)

p
y*
Allowable Capacity
Mall
Vall
Tall
(kN.m)
(kN)
(kN)

Doc. No.
REV.
DATE.

Check
M + T
Mall Tall

SNO-S-CC-05-010

B
23 Juni 2013

Remarks

231.01
-13.30
-3.71
461.50
762.12
2520.40
0.502 < 1...OK
211.80
-75.19 No Tension
461.50
762.12
2520.40
0.459 < 1...OK
-98.95
-13.30
-3.71
461.50
762.12
2520.40
0.216 < 1...OK
*) For temporary load the allowable value can be increased by 33%
M
: Moment force or Mz in STAAD Pro
V
: Shear force or Fy in STAAD Pro
T
: Tension force or Fx in (-) value in STAAD Pro
From table, the inner force has been conform to the allowable combination of tension and moment
so for detail connection are shall be refer to :
Detail :
TYPE-B

Attachment H - Page 9 of 63

CALCULATION OF PIPE RACK STRUCTURE


# 10

SENORO GAS DEVELOPMENT PROJECT

Doc. No.

SNO-S-CC-05-010

REV.
DATE.

23 Juni 2013

H.2.3 Beam to Column Moment Connection (C1) between El. + 10.00 and Column
Main Beam El.+10.00
MH 588
Column
MH 588
To accommodate the combination of tension force and moment, the inner force of
the member shall conform the formula below
- Combination of tension and moment
M
Mall

Where :
M
=
T
=
Mall
=
Tall
=

T
Tall

Moment
Tension force
Allowable moment capacity
Allowable tension capacity

H.2.3.1 Permanent Condition


From STAAD Pro Result, summary of inner Force maximum for MH 588 are shown below
Beam
Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

362
138
38
680
358
358
163
188
63
63
63
38

L/C Node
102
102
104
104
103
102
103
102
102
103
103
104

58
64
16
94
201
201
76
88
201
201
28
199

Fx
kN
13.31
-1.37
4.69
6.35
4.31
7.54
0.99
2.72
7.54
4.31
4.31
4 69
4.69

Fy
y
kN
-18.84
18.31
43.20
-21.13
8.45
0.16
20.31
16.22
0.78
9.07
26.64
4 62
4.62

Fz
kN
0.73
-0.57
0.00
0.19
8.30
-8.28
7.20
0.23
3.53
-3.55
6.60
0 00
0.00

Mx
kNm
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0 00
0.00

y
My
kNm
0.01
0.01
0.00
0.00
-4.41
4.33
-0.02
0.01
4.33
-4.41
-0.01
0 02
0.02

Mz
kNm
37.32
12.03
40.41
27.20
-16.58
-16.53
28.54
12.11
-16.53
-16.58
45.17
-21.40
21 40

Attachment H - Page 10 of 63

CALCULATION OF PIPE RACK STRUCTURE


# 10

SENORO GAS DEVELOPMENT PROJECT

Capacity Check
Force
M
V
(kN.m)
(kN)

M
V
T

T
(kN)

p
y
Allowable Capacity
Mall
Vall
Tall
(kN.m)
(kN)
(kN)

45.17
9.07 No Tension
346.99
573.02
40.41
43.20
-1.37
346.99
573.02
12.03
18.31
-1.37
346.99
573.02
: Moment force or Mz in STAAD Pro
: Shear force or Fy in STAAD Pro
: Tension force or Fx in (-) value in STAAD Pro

Doc. No.

SNO-S-CC-05-010

REV.
DATE.

23 Juni 2013

Check
M + T
Mall Tall

Remarks

0.130 < 1...OK


0.117 < 1...OK
0.035 < 1...OK

1895.04
1895.04
1895.04

H.2.3.2 Temporary Condition


From Staad Pro Result, summary of inner Force maximum for MH 588 are shown below
Beam
Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

362
138
38
356
358
358
163
188
63
63
13
664

L/C Node
105
125
150
149
111
109
123
121
109
111
123
123

58
64
16
22
201
201
76
88
201
201
4
10

Fx
(kN)
15.058
-4.295
4.228
5.427
3.108
8.163
0.544
-0.553
8.163
3.108
3.18
-0.046

Fy
(kN)
-25.147
17.017
77.068
-55.064
8.453
0.162
44.033
-7.958
0.777
9.067
59.771
37.967

Fz
(kN)
0.726
-0.557
0.007
-0.007
9.002
-8.982
6.48
0.427
4.234
-4.254
5.446
1.767

Mx
(kNm)
0
0
0.002
-0.002
0
0
0.002
-0.002
0
0
0.002
0.002

My
(kNm)
0.014
0.008
-0.001
0
-4.896
4.816
-0.013
0.01
4.816
-4.896
-0.011
0.005

Mz
(kNm)
62.547
13.028
189.187
178.402
-16.569
-16.529
128.756
-79.332
-16.529
-16.57
192.294
-168.66

Attachment H - Page 11 of 63

CALCULATION OF PIPE RACK STRUCTURE


# 10

SENORO GAS DEVELOPMENT PROJECT

Capacity Check
Force
M
V
(kN.m)
(kN)

T
(kN)

p
y*
Allowable Capacity
Mall
Vall
Tall
(kN.m)
(kN)
(kN)

Doc. No.
REV.
DATE.

Check
M + T
Mall Tall

SNO-S-CC-05-010

B
23 Juni 2013

Remarks

192.29
9.07 No Tension
461.50
762.12
2520.40
0.417 < 1...OK
189.19
77.07
-4.30
461.50
762.12
2520.40
0.412 < 1...OK
13.03
17.02
-4.30
461.50
762.12
2520.40
0.030 < 1...OK
*) For temporary load the allowable value can be increased by 33%
M
: Moment force or Mz in STAAD Pro
V
: Shear force or Fy in STAAD Pro
T
: Tension force or Fx in (-) value in STAAD Pro
From table, the inner force has been conform to the allowable combination of tension and moment
so for detail connection are shall be refer to :
Detail :
TYPE-B

Attachment H - Page 12 of 63

CALCULATION OF PIPE RACK STRUCTURE


# 10

SENORO GAS DEVELOPMENT PROJECT

Doc. No.

SNO-S-CC-05-010

REV.
DATE.

23 Juni 2013

H.2.4 Beam to Column Moment Connection (C1) between El. + 13.00 and Column
Main Beam El.+13.00
MH 588
Column
MH 588
To accommodate the combination of tension force and moment, the inner force of
the member shall conform the formula below
- Combination of tension and moment
M
Mall

Where :
M
=
T
=
Mall
=
Tall
=

T
Tall

Moment
Tension force
Allowable moment capacity
Allowable tension capacity

H.2.4.1 Permanent Condition


From STAAD Pro Result, summary of inner Force maximum for MH 588 are shown below
Beam
Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

139
64
39
684
114
164
39
39
667
667
64
189

L/C Node
104
103
104
104
103
102
103
102
103
102
103
104

65
216
17
95
53
77
17
17
300
300
29
308

Fx
kN
-7.45
-67.78
-66.34
-10.53
-49.82
-14.82
-65.18
-66.50
-50.62
-52.04
-63.78
-10.53
10 53

Fy
y
kN
51.48
5.08
54.47
-18.28
35.94
30.44
36.96
32.86
7.81
2.51
37.61
0 96
0.96

Fz
kN
0.04
-2.47
0.02
0.18
7.93
-7.96
0.25
-0.22
-1.21
1.12
7.91
-0.18
0 18

Mx
kNm
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0 00
0.00

y
My
kNm
0.00
-1.88
0.00
0.00
-0.02
0.02
-0.04
0.04
2.45
-2.60
-0.02
-0.27
0 27

Mz
kNm
34.65
-2.13
52.05
24.54
45.86
20.11
51.42
35.05
11.42
-1.92
53.94
-11.27
11 27

Attachment H - Page 13 of 63

CALCULATION OF PIPE RACK STRUCTURE


# 10

SENORO GAS DEVELOPMENT PROJECT

Capacity Check
Force
M
V
(kN.m)
(kN)

M
V
T

T
(kN)

p
y
Allowable Capacity
Mall
Vall
Tall
(kN.m)
(kN)
(kN)

53.94
2.51
-52.04
346.99
573.02
52.05
54.47
-67.78
346.99
573.02
-2.13
5.08
-67.78
346.99
573.02
: Moment force or Mz in STAAD Pro
: Shear force or Fy in STAAD Pro
: Tension force or Fx in (-) value in STAAD Pro

Doc. No.

SNO-S-CC-05-010

REV.
DATE.

23 Juni 2013

Check
M + T
Mall Tall

Remarks

0.183 < 1...OK


0.186 < 1...OK
0.042 < 1...OK

1895.04
1895.04
1895.04

H.2.4.2 Temporary Condition


From Staad Pro Result, summary of inner Force maximum for MH 588 are shown below

Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

Beam

L/C Node

139
387
14
668
114
164
114
39
14
667
14
668

152 65
115 216
150
5
121 11
111 53
109 77
123 53
121 17
119 300
125 300
123
5
123 11

Fx
(kN)
6.333
-69.365
-32.656
-30.324
-47.978
-11.324
-34.547
-50.638
-54.408
-38.249
-29.473
-43.142

Fy
(kN)
45.91
27.765
81.809
-48.226
35.938
30.438
58.389
-1.914
9.001
0.964
66.625
23.266

Fz
(kN)
0.091
0.474
0.12
-1.536
8.421
-8.435
7.157
-0.212
-2.969
1.774
6.178
1.773

Mx
(kNm)
0.001
0.002
0.001
-0.002
0.001
0
0.003
-0.002
0.001
-0.001
0.002
0.002

My
(kNm)
0
-1.883
0.016
0.011
-0.02
0.018
-0.018
0.036
3.542
-3.909
0.005
-0.005

Mz
(kNm)
28.443
-2.233
174.917
152.67
45.562
19.829
144.354
-95.299
13.871
-6.015
176.746
-133.364

Attachment H - Page 14 of 63

CALCULATION OF PIPE RACK STRUCTURE


# 10

SENORO GAS DEVELOPMENT PROJECT

Capacity Check
Force
M
V
(kN.m)
(kN)

T
(kN)

p
y*
Allowable Capacity
Mall
Vall
Tall
(kN.m)
(kN)
(kN)

Doc. No.
REV.
DATE.

Check
M + T
Mall Tall

SNO-S-CC-05-010

B
23 Juni 2013

Remarks

176.75
0.96
-38.25
461.50
762.12
2520.40
0.398 < 1...OK
174.92
81.81
-69.37
461.50
762.12
2520.40
0.407 < 1...OK
-2.23
27.77
-69.37
461.50
762.12
2520.40
0.032 < 1...OK
*) For temporary load the allowable value can be increased by 33%
M
: Moment force or Mz in STAAD Pro
V
: Shear force or Fy in STAAD Pro
T
: Tension force or Fx in (-) value in STAAD Pro
From table, the inner force has been conform to the allowable combination of tension and moment
so for detail connection are shall be refer to :
Detail :
TYPE-B

Attachment H - Page 15 of 63

CALCULATION OF PIPE RACK STRUCTURE


# 10

SENORO GAS DEVELOPMENT PROJECT

Doc. No.

SNO-S-CC-05-010

REV.
DATE.

23 Juni 2013

H.2.5 Beam to Column Moment Connection (C1) between El. + 16.00 and Column
Main Beam El.+16.00
MH 588
Column
MH 588
To accommodate the combination of tension force and moment, the inner force of
the member shall conform the formula below
- Combination of tension and moment
M
Mall

Where :
M
=
T
=
Mall
=
Tall
=

T
Tall

Moment
Tension force
Allowable moment capacity
Allowable tension capacity

H.2.5.1 Permanent Condition


From STAAD Pro Result, summary of inner Force maximum for MH 588 are shown below

Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

Beam

L/C Node

65
140
40
416
414
414
40
40
40
40
416
40

103 30
102 66
104 18
104 36
102 24
103 24
103 18
102 18
102 229
103 229
104 36
104 229

Fx
kN
70.24
16.25
67.94
67.84
63.97
65.70
67.20
62.47
62.47
67.20
67.84
67 94
67.94

Fy
y
kN
99.55
40.13
100.72
-245.79
-239.47
-237.16
99.23
96.92
53.75
56.07
-245.79
57 55
57.55

Fz
kN
0.15
-0.03
0.01
0.00
61.52
-61.54
-6.28
6.30
7.06
-7.05
0.00
0 01
0.01

Mx
kNm
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0 00
0.00

y
My
kNm
0.02
0.00
0.00
0.00
0.21
-0.21
0.04
-0.04
25.73
-25.66
0.00
0 03
0.03

Mz
kNm
168.09
40.01
167.25
217.49
212.65
203.34
166.91
157.71
-146.82
-146.88
217.49
-152.47
152 47

Attachment H - Page 16 of 63

CALCULATION OF PIPE RACK STRUCTURE


# 10

SENORO GAS DEVELOPMENT PROJECT

Capacity Check
Force
M
V
(kN.m)
(kN)

T
(kN)

p
y
Allowable Capacity
Mall
Vall
Tall
(kN.m)
(kN)
(kN)

217.49
100.72 No Tension
346.99
573.02
217.49
-245.79 No Tension
346.99
573.02
#N/A
#N/A No Tension
346.99
573.02
M
: Moment force or Mz in STAAD Pro
V
: Shear force or Fy in STAAD Pro
T
: Tension force or Fx in (-) value in STAAD Pro

Doc. No.

SNO-S-CC-05-010

REV.
DATE.

23 Juni 2013

Check
M + T
Mall Tall

Remarks

0.627 < 1...OK


0.627 < 1...OK
#N/A
#N/A

1895.04
1895.04
1895.04

H.2.5.2 Temporary Condition


From Staad Pro Result, summary of inner Force maximum for MH 588 are shown below
Beam
Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

65
688
65
416
414
414
115
40
40
40
416
65

L/C Node
115
122
115
145
109
111
123
121
118
120
145
115

30
311
30
36
24
24
54
18
229
229
36
231

Fx
(kN)
95.622
-4.843
95.622
68.944
61.31
63.082
60.379
12.746
63.507
66.164
68.944
95.622

Fy
(kN)
114.918
0.131
114.918
-253.666
-231.974
-229.659
67.443
39.668
53.943
55.878
-253.666
71.755

Fz
(kN)
0.148
-3.182
0.148
0.003
62.004
-62.021
-0.004
5.667
7.271
-7.255
0.003
-0.617

Mx
(kNm)
0.002
0.001
0.002
-0.001
-0.001
0.001
0.003
-0.003
-0.001
0
-0.001
0.002

My
(kNm)
0.014
4.762
0.014
-0.001
0.206
-0.206
0.014
-0.037
26.552
-26.487
-0.001
0.032

Mz
(kNm)
229.359
-26.071
229.359
271.421
204.867
195.577
163.77
32.021
-146.808
-146.887
271.421
-147.174

Attachment H - Page 17 of 63

CALCULATION OF PIPE RACK STRUCTURE


# 10

SENORO GAS DEVELOPMENT PROJECT

Capacity Check
Force
M
V
(kN.m)
(kN)

T
(kN)

p
y*
Allowable Capacity
Mall
Vall
Tall
(kN.m)
(kN)
(kN)

Doc. No.
REV.
DATE.

Check
M + T
Mall Tall

SNO-S-CC-05-010

B
23 Juni 2013

Remarks

271.42
114.92 No Tension
461.50
762.12
2520.40
0.588 < 1...OK
271.42
-253.67 No Tension
461.50
762.12
2520.40
0.588 < 1...OK
-26.07
0.13
-4.84
461.50
762.12
2520.40
0.058 < 1...OK
*) For temporary load the allowable value can be increased by 33%
M
: Moment force or Mz in STAAD Pro
V
: Shear force or Fy in STAAD Pro
T
: Tension force or Fx in (-) value in STAAD Pro
From table, the inner force has been conform to the allowable combination of tension and moment
so for detail connection are shall be refer to :
Detail :
TYPE-B

Attachment H - Page 18 of 63

CALCULATION OF PIPE RACK STRUCTURE


# 10

SENORO GAS DEVELOPMENT PROJECT

H.3

Doc. No.

SNO-S-CC-05-010

REV.
DATE.

23 Juni 2013

Beam to Column Pinned Connection (C2)


H.3.1 Beam to Column Pinned Connection (C2) between El. +5.00 and Column
Longitudinal Beam El.+5.00
Column

SH 300
MH 588

To accommodate the combination of tension force and shear, the inner force of
the member shall conform the formula below
- Combination of tension and shear
V
Vall
With :
V
T
Vall
Tall

=
=
=
=

T
Tall

Shear force
Tension force
Allowable shear capacity
Allowable tension capacity

H.3.1.1 Permanent Condition


From Staad Pro Result,, summaryy of inner Force maximum for SH 300 are shown below
Beam
Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

21
21
141
206
146
146
46
46
146
146
71
206

L/C Node
102
103
104
104
102
103
103
102
103
102
102
104

8
8
62
74
68
68
20
20
108
108
102
107

Fx
kN
43.653
-58.217
1.645
1.645
2.836
3.482
-2.233
-2.191
3.482
2 836
2.836
40.603
1.645

Fy
kN
-0.320
-0.215
20.358
-7.666
9.382
9.382
2.710
2.710
0.304
0 304
0.304
-1.436
-6.588

Fz
kN
-0.004
0.002
0.001
-0.001
1.188
-1.191
0.000
-0.001
0.809
-0.812
0 812
-0.004
-0.001

Mx
kNm
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0 000
0.000
0.000
0.000

My
kNm
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.435
-0.445
0 445
-0.011
0.003

Mz
kNm
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
-10.498
-10.498
10 498
2.690
-21.381

Attachment H - Page 19 of 63

Doc. No.

CALCULATION OF PIPE RACK STRUCTURE


# 10

p
y
Allowable Capacity
Vall
Tall
(kN)
(kN)

Check
V + T
Vall Tall

20.358
-58.217
138.28
165.17
0.500
-0.215
-58.217
138.28
165.17
0.354
V
: Shear force or Fy in STAAD Pro
T
: Tension force or Fx in (-) value in STAAD Pro

REV.

SENORO GAS DEVELOPMENT PROJECT

Capacity Check
Force
V
T
(kN)
(kN)

SNO-S-CC-05-010

DATE.

23 Juni 2013

Remarks
< 1...OK
< 1...OK

H.3.1.2 Temporary Condition


From Staad Pro Result, summary of inner Force maximum for SH 300 are shown below
Beam
Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

21
21
141
206
146
146
96
96
146
146
198
141

L/C Node
125
127
145
145
105
107
123
121
107
105
113
145

8
8
62
74
68
68
44
44
108
108
102
107

Fx
kN
83 766
83.766
-96.229
0.489
0.489
2.433
4.146
0.924
-0.839
4.146
2.433
-46.445
0.489

Fy
kN
-0.206
0 206
-0.106
20.358
-7.666
9.382
9.382
2.439
2.439
0.304
0.304
1.677
0.280

Fz
kN
-0.004
0 004
0.001
0.001
-0.001
1.333
-1.336
-0.001
-0.001
1.049
-1.052
0.003
0.001

Mx
kNm
0 000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

My
kNm
0 000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.576
-0.586
-0.008
0.004

Mz
kNm
0 000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
-10.498
-10.498
3.414
-21.381

Attachment H - Page 20 of 63

CALCULATION OF PIPE RACK STRUCTURE


# 10

SENORO GAS DEVELOPMENT PROJECT

Capacity Check
Force
V
T
(kN)
(kN)

p
y
Allowable Capacity*
Vall
Tall
(kN)
(kN)

Check
V + T
Vall Tall

Doc. No.

SNO-S-CC-05-010

REV.
DATE.

23 Juni 2013

Remarks

20.358
-96.229
183.91
219.68
0.549
< 1...OK
-0.106
-96.229
183.91
219.68
0.439
< 1...OK
*) For temporary load the allowable value can be increased by 33%
V
: Shear force or Fy in STAAD Pro
T
: Tension force or Fx in (-) value in STAAD Pro
From table, the inner force has been conform to the allowable combination of tension and shear
so for detail connection are shall be refer to :
Detail :
TYPE-I for d > 150

Attachment H - Page 21 of 63

CALCULATION OF PIPE RACK STRUCTURE


# 10

SENORO GAS DEVELOPMENT PROJECT

Doc. No.

SNO-S-CC-05-010

REV.
DATE.

23 Juni 2013

H.3.2 Beam to Column Pinned Connection (C2) between El. +7.00 and Column
Longitudinal Beam El.+7.00
Column

SH 300
MH 588

To accommodate the combination of tension force and shear, the inner force of
the member shall conform the formula below
- Combination of tension and shear
V
Vall
With :
V
T
Vall
Tall

=
=
=
=

T
Tall

Shear force
Tension force
Allowable shear capacity
Allowable tension capacity

H.3.2.1 Permanent Condition


From Staad Pro Result, summary of inner Force maximum for SH 300 are shown below
Beam
Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

122
22
42
214
220
117
22
172
72
117
72
42

L/C Node
102
103
102
102
102
102
102
102
103
102
102
102

57
9
15
27
119
51
9
81
116
119
116
113

Fx
kN
25.143
-28.117
-4.135
-3.503
-26.904
12.231
7.862
19.315
-27.534
12.231
18 156
18.156
-4.135

Fy
kN
0.229
0.371
4.556
-4.556
0.651
0.427
0.174
0.291
-0.721
-0.651
-0.905
0 905
3.478

Fz
kN
0.000
0.001
-0.001
0.001
0.002
-0.002
0.001
0.001
0.002
-0.002
0 000
0.000
-0.001

Mx
kNm
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0 000
0.000
0.000

My
kNm
0.000
0.000
0.000
0.000
-0.006
0.000
0.000
0.000
0.006
-0.006
0 000
0.000
-0.002

Mz
kNm
0.000
0.000
0.000
0.000
0.336
0.000
0.000
0.000
0.546
0.336
1 099
1.099
-12.051

Attachment H - Page 22 of 63

Doc. No.

CALCULATION OF PIPE RACK STRUCTURE


# 10

p
y
Allowable Capacity
Vall
Tall
(kN)
(kN)

Check
V + T
Vall Tall

-4.556
-4.135
138.28
165.17
0.058
0.371
-28.117
138.28
165.17
0.173
V
: Shear force or Fy in STAAD Pro
T
: Tension force or Fx in (-) value in STAAD Pro

REV.

SENORO GAS DEVELOPMENT PROJECT

Capacity Check
Force
V
T
(kN)
(kN)

SNO-S-CC-05-010

DATE.

23 Juni 2013

Remarks
< 1...OK
< 1...OK

H.3.2.2 Temporary Condition


From Staad Pro Result, summary of inner Force maximum for SH 300 are shown below
Beam
Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

122
22
42
214
97
219
92
97
97
92
213
42

L/C Node
125
127
113
113
108
108
123
121
124
123
113
113

57
9
15
27
45
57
39
45
118
117
112
113

Fx
kN
64 262
64.262
-65.782
-1.921
-1.289
-9.953
-9.755
2.503
4.842
-9.091
2.503
-26.726
-1.921

Fy
kN
0 242
0.242
0.406
4.556
-4.556
3.170
-3.170
4.101
2.853
1.882
3.130
0.962
3.478

Fz
kN
-0.001
0 001
0.001
0.251
-0.251
0.399
-0.399
-0.336
0.336
0.336
-0.336
-0.002
0.251

Mx
kNm
0 000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

My
kNm
0 000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
1.008
-1.009
0.005
0.752

Mz
kNm
0 000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
-7.103
-10.846
1.269
-12.052

Attachment H - Page 23 of 63

CALCULATION OF PIPE RACK STRUCTURE


# 10

SENORO GAS DEVELOPMENT PROJECT

Capacity Check
Force
V
T
(kN)
(kN)

p
y
Allowable Capacity*
Vall
Tall
(kN)
(kN)

Check
V + T
Vall Tall

Doc. No.

SNO-S-CC-05-010

REV.
DATE.

23 Juni 2013

Remarks

-4.556
-1.921
183.91
219.68
0.034
< 1...OK
0.406
-65.782
183.91
219.68
0.302
< 1...OK
*) For temporary load the allowable value can be increased by 33%
V
: Shear force or Fy in STAAD Pro
T
: Tension force or Fx in (-) value in STAAD Pro
From table, the inner force has been conform to the allowable combination of tension and shear
so for detail connection are shall be refer to :
Detail :
TYPE-I for d > 150

Attachment H - Page 24 of 63

CALCULATION OF PIPE RACK STRUCTURE


# 10

SENORO GAS DEVELOPMENT PROJECT

Doc. No.

SNO-S-CC-05-010

REV.
DATE.

23 Juni 2013

H.3.3 Beam to Column Pinned Connection (C2) between El. +10.00 and Column
Longitudinal Beam El.+10.00
Column

SH 300
MH 588

To accommodate the combination of tension force and shear, the inner force of
the member shall conform the formula below
- Combination of tension and shear
V
Vall
With :
V
T
Vall
Tall

=
=
=
=

T
Tall

Shear force
Tension force
Allowable shear capacity
Allowable tension capacity

H.3.3.1 Permanent Condition


From Staad Pro Result, summary of inner Force maximum for SH 300 are shown below
Beam
Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

123
18
93
235
241
118
148
143
73
118
73
93

L/C Node
102
103
102
102
102
102
103
102
103
102
102
102

58
4
40
28
133
52
70
64
130
133
130
131

Fx
kN
18.704
-31.191
-1.289
-1.110
-22.670
7.830
-2.497
-1.157
-24.674
7.830
12 418
12.418
-1.289

Fy
kN
0.194
0.219
3.415
-3.415
0.798
0.280
2.399
3.415
-0.936
-0.798
-0.982
0 982
2.337

Fz
kN
0.000
-0.001
-0.001
0.001
0.002
-0.002
0.000
0.000
0.002
-0.002
0 000
0.000
-0.001

Mx
kNm
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0 000
0.000
0.000

My
kNm
0.000
0.000
0.000
0.000
-0.005
0.000
0.000
0.000
0.005
-0.005
0 000
0.000
-0.002

Mz
kNm
0.000
0.000
0.000
0.000
0.777
0.000
0.000
0.000
1.190
0.777
1 329
1.329
-8.627

Attachment H - Page 25 of 63

Doc. No.

CALCULATION OF PIPE RACK STRUCTURE


# 10

p
y
Allowable Capacity
Vall
Tall
(kN)
(kN)

Check
V + T
Vall Tall

-3.415
-1.289
138.28
165.17
0.033
0.219
-31.191
138.28
165.17
0.190
V
: Shear force or Fy in STAAD Pro
T
: Tension force or Fx in (-) value in STAAD Pro

REV.

SENORO GAS DEVELOPMENT PROJECT

Capacity Check
Force
V
T
(kN)
(kN)

SNO-S-CC-05-010

DATE.

23 Juni 2013

Remarks
< 1...OK
< 1...OK

H.3.3.2 Temporary Condition


From Staad Pro Result, summary of inner Force maximum for SH 300 are shown below
Beam
Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

123
23
43
235
98
240
148
143
98
93
238
43

L/C Node
125
127
113
113
108
108
123
121
108
107
113
113

58
10
16
28
46
58
70
64
132
131
130
127

Fx
kN
56 792
56.792
-65.442
1.121
1.632
-5.982
-5.884
-2.451
-1.202
-5.982
3.760
-27.460
1.121

Fy
kN
0 230
0.230
0.216
3.415
-3.415
2.399
-2.399
2.159
3.073
1.321
2.337
1.031
2.337

Fz
kN
-0.001
0 001
0.001
0.154
-0.154
0.447
-0.447
-0.206
0.206
0.001
-0.001
-0.001
0.154

Mx
kNm
0 000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

My
kNm
0 000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.672
-0.670
0.004
0.461

Mz
kNm
0 000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
-5.579
-8.627
1.477
-8.627

Attachment H - Page 26 of 63

CALCULATION OF PIPE RACK STRUCTURE


# 10

SENORO GAS DEVELOPMENT PROJECT

Capacity Check
Force
V
T
(kN)
(kN)

p
y
Allowable Capacity*
Vall
Tall
(kN)
(kN)

Check
V + T
Vall Tall

Doc. No.

SNO-S-CC-05-010

REV.
DATE.

23 Juni 2013

Remarks

-3.415 No Tension 183.91


219.68
0.019
< 1...OK
0.216
-65.442
183.91
219.68
0.299
< 1...OK
*) For temporary load the allowable value can be increased by 33%
V
: Shear force or Fy in STAAD Pro
T
: Tension force or Fx in (-) value in STAAD Pro
From table, the inner force has been conform to the allowable combination of tension and shear
so for detail connection are shall be refer to :
Detail :
TYPE-I for d > 150

Attachment H - Page 27 of 63

CALCULATION OF PIPE RACK STRUCTURE


# 10

SENORO GAS DEVELOPMENT PROJECT

Doc. No.

SNO-S-CC-05-010

REV.
DATE.

23 Juni 2013

H.3.4 Beam to Column Pinned Connection (C2) between El. +13.00 and Column
Longitudinal Beam El.+13.00
Column

SH 300
MH 588

To accommodate the combination of tension force and shear, the inner force of
the member shall conform the formula below
- Combination of tension and shear
V
Vall
With :
V
T
Vall
Tall

=
=
=
=

T
Tall

Shear force
Tension force
Allowable shear capacity
Allowable tension capacity

H.3.4.1 Permanent Condition


From Staad Pro Result, summary of inner Force maximum for SH 300 are shown below
Beam
Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

99
24
94
264
44
49
119
124
44
49
74
144

L/C Node
102
103
102
104
103
103
103
102
103
103
102
102

47
11
41
77
17
23
53
59
141
142
144
149

Fx
kN
14.133
-36.881
5.157
6.763
7.180
-4.183
-20.434
11.041
7.180
-4.183
9 226
9.226
4.526

Fy
kN
6.898
0.268
8.891
-8.891
8.891
6.898
0.403
0.313
7.813
5.820
-0.870
0 870
7.813

Fz
kN
-0.006
-0.007
0.006
-0.001
0.008
-0.008
0.004
-0.004
0.008
-0.008
-0.007
0 007
0.001

Mx
kNm
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0 000
0.000
0.000

My
kNm
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.024
-0.024
-0.022
0 022
0.004

Mz
kNm
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
-25.055
-19.076
0 992
0.992
-25.055

Attachment H - Page 28 of 63

Doc. No.

CALCULATION OF PIPE RACK STRUCTURE


# 10

p
y
Allowable Capacity
Vall
Tall
(kN)
(kN)

Check
V + T
Vall Tall

-8.891 No Tension 138.28


165.17
0.064
0.268
-36.881
138.28
165.17
0.225
V
: Shear force or Fy in STAAD Pro
T
: Tension force or Fx in (-) value in STAAD Pro

REV.

SENORO GAS DEVELOPMENT PROJECT

Capacity Check
Force
V
T
(kN)
(kN)

SNO-S-CC-05-010

DATE.

23 Juni 2013

Remarks
< 1...OK
< 1...OK

H.3.4.2 Temporary Condition


From Staad Pro Result, summary of inner Force maximum for SH 300 are shown below
Beam
Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

74
24
44
256
44
256
119
124
44
49
259
44

L/C Node
125
119
113
113
124
124
123
121
124
123
113
113

35
11
17
29
17
141
53
59
141
142
144
141

Fx
kN
55 103
55.103
-65.696
6.560
6.783
7.593
7.393
-2.813
25.500
7.593
-2.834
-27.470
6.560

Fy
kN
0 233
0.233
0.274
8.891
-8.891
8.002
-7.032
0.381
0.300
7.032
5.238
0.886
7.813

Fz
kN
-0.006
0 006
-0.006
1.062
-1.062
1.412
-1.412
-0.002
0.002
1.412
-1.412
0.003
1.062

Mx
kNm
0 000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

My
kNm
0 000
0.000
0.000
0.000
0.000
0.000
4.236
0.000
0.000
4.236
-4.236
-0.009
3.186

Mz
kNm
0 000
0.000
0.000
0.000
0.000
0.000
-22.550
0.000
0.000
-22.550
-17.168
1.040
-25.056

Attachment H - Page 29 of 63

CALCULATION OF PIPE RACK STRUCTURE


# 10

SENORO GAS DEVELOPMENT PROJECT

Capacity Check
Force
V
T
(kN)
(kN)

p
y
Allowable Capacity*
Vall
Tall
(kN)
(kN)

Check
V + T
Vall Tall

Doc. No.

SNO-S-CC-05-010

REV.
DATE.

23 Juni 2013

Remarks

-8.891 No Tension 183.91


219.68
0.048
< 1...OK
0.274
-65.696
183.91
219.68
0.301
< 1...OK
*) For temporary load the allowable value can be increased by 33%
V
: Shear force or Fy in STAAD Pro
T
: Tension force or Fx in (-) value in STAAD Pro
From table, the inner force has been conform to the allowable combination of tension and shear
so for detail connection are shall be refer to :
Detail :
TYPE-I for d > 150

Attachment H - Page 30 of 63

CALCULATION OF PIPE RACK STRUCTURE


# 10

SENORO GAS DEVELOPMENT PROJECT

Doc. No.

SNO-S-CC-05-010

REV.
DATE.

23 Juni 2013

H.3.5 Beam to Column Pinned Connection (C2) between El. +16.00 and Column
Longitudinal Beam El.+16.00
Column

SH 300
MH 588

To accommodate the combination of tension force and shear, the inner force of
the member shall conform the formula below
- Combination of tension and shear
V
Vall
With :
V
T
Vall
Tall

=
=
=
=

T
Tall

Shear force
Tension force
Allowable shear capacity
Allowable tension capacity

H.3.5.1 Permanent Condition


From Staad Pro Result, summary of inner Force maximum for SH 300 are shown below
Beam
Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

75
75
95
281
281
281
125
120
95
95
279
95

L/C Node
102
103
104
104
102
103
104
104
103
102
104
104

36
36
42
54
159
159
60
54
159
159
157
159

Fx
kN
47.953
-30.743
-3.405
-3.403
4.381
-11.045
1.078
-0.732
-11.044
4.376
-4.896
4 896
-3.405

Fy
kN
1.003
1.229
27.298
-26.173
-20.488
-20.488
1.422
2.268
18.140
18.140
4 198
4.198
20.376

Fz
kN
0.016
0.027
-0.024
0.024
8.664
-8.619
0.015
-0.015
2.242
-2.287
0 027
0.027
-0.024

Mx
kNm
0.001
0.001
0.000
0.000
0.000
0.000
0.003
-0.002
0.000
0.000
0 000
0.000
0.000

My
kNm
0.000
0.000
0.000
0.000
-3.891
3.757
0.000
0.000
3.757
-3.891
-0.082
0 082
-0.071

Mz
kNm
0.000
0.000
0.000
0.000
-56.221
-56.221
0.000
0.000
-56.221
-56.221
0 486
0.486
-67.386

Attachment H - Page 31 of 63

Doc. No.

CALCULATION OF PIPE RACK STRUCTURE


# 10

p
y
Allowable Capacity
Vall
Tall
(kN)
(kN)

Check
V + T
Vall Tall

27.298
-30.743
138.28
165.17
0.384
1.229
-30.743
138.28
165.17
0.195
V
: Shear force or Fy in STAAD Pro
T
: Tension force or Fx in (-) value in STAAD Pro

REV.

SENORO GAS DEVELOPMENT PROJECT

Capacity Check
Force
V
T
(kN)
(kN)

SNO-S-CC-05-010

DATE.

23 Juni 2013

Remarks
< 1...OK
< 1...OK

H.3.5.2 Temporary Condition


From Staad Pro Result, summary of inner Force maximum for SH 300 are shown below
Beam
Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

75
75
95
281
281
281
125
120
95
95
279
45

L/C Node
125
127
145
146
105
107
146
145
107
105
151
116

36
36
42
54
159
159
60
54
159
159
157
155

Fx
kN
99 439
99.439
-81.221
3.265
-9.409
6.617
-12.619
-7.332
-9.109
-12.617
6.613
-18.952
9.480

Fy
kN
0 217
0.217
0.642
23.548
-22.423
-16.738
-16.738
1.287
2.134
14.390
14.390
4.389
20.071

Fz
kN
0 004
0.004
0.029
0.002
0.048
9.058
-9.015
-0.003
0.006
2.639
-2.681
0.025
0.008

Mx
kNm
0 001
0.001
0.001
0.000
0.000
0.000
0.000
0.004
-0.002
0.000
0.000
0.000
0.000

My
kNm
0 000
0.000
0.000
0.000
0.000
-4.115
3.988
0.000
0.000
3.988
-4.115
-0.075
0.025

Mz
kNm
0 000
0.000
0.000
0.000
0.000
-44.971
-44.971
0.000
0.000
-44.971
-44.971
2.271
-63.095

Attachment H - Page 32 of 63

CALCULATION OF PIPE RACK STRUCTURE


# 10

SENORO GAS DEVELOPMENT PROJECT

Capacity Check
Force
V
T
(kN)
(kN)

p
y
Allowable Capacity*
Vall
Tall
(kN)
(kN)

Check
V + T
Vall Tall

Doc. No.

SNO-S-CC-05-010

REV.
DATE.

23 Juni 2013

Remarks

23.548
-81.221
183.91
219.68
0.498
< 1...OK
0.642
-81.221
183.91
219.68
0.373
< 1...OK
*) For temporary load the allowable value can be increased by 33%
V
: Shear force or Fy in STAAD Pro
T
: Tension force or Fx in (-) value in STAAD Pro
From table, the inner force has been conform to the allowable combination of tension and shear
so for detail connection are shall be refer to :
Detail :
TYPE-I for d > 150

Attachment H - Page 33 of 63

CALCULATION OF PIPE RACK STRUCTURE


# 10

SENORO GAS DEVELOPMENT PROJECT

H.4

Doc. No.

SNO-S-CC-05-010

REV.
DATE.

23 Juni 2013

Beam to Beam Pinned Connection (C3)


H.4.1 Beam to Beam Pinned Connection (C3) between Secondary Beam El. +5.00 To El.+13.00 and
Longitudinal Beam El. +5.00 To El.+13.00
Secondary Beam El. +5.00 To El.+13.00
Longitudinal Beam El. +5.00 To El.+13.00

SH 300
SH 300

To accommodate the combination of tension force and shear, the inner force of
the member shall conform the formula below
- Combination of tension and shear
V
Vall

With :

V
T
Vall
Tall

T
Tall

=
=
=
=

Shear force
Tension force
Allowable shear capacity
Allowable tension capacity

H.4.1.1 Permanent Condition


From Staad Pro Result,, summaryy of inner Force maximum for SH 300 are shown below
Beam
Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

230
334
226
338
227
227
230
226
227
227
226
338

L/C Node
102
102
102
103
102
103
103
102
102
103
101
103

119
191
111
124
185
185
119
111
185
185
111
195

Fx
kN
0.004
-0.001
0.002
0.002
0.002
0.002
0.000
0.002
0.002
0 002
0.002
0.001
0.002

Fy
kN
7.855
-3.645
7.855
-5.082
-2.131
-2.131
7.855
7.855
-2.131
-2.131
2 131
6.322
-3.645

Fz
kN
-0.637
-0.195
-0.633
0.195
1.662
-1.663
0.636
-0.633
1.662
-1.663
1 663
0.000
0.195

Mx
kNm
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0 000
0.000
0.000
0.000

My
kNm
0.000
0.781
0.000
0.000
0.797
-0.799
0.000
0.000
0.797
-0.799
0 799
0.000
-0.781

Mz
kNm
0.000
-17.453
0.000
0.000
-13.858
-13.857
0.000
0.000
-13.858
-13.857
13 857
0.000
-17.453

Attachment H - Page 34 of 63

Doc. No.

CALCULATION OF PIPE RACK STRUCTURE


# 10

p
y
Allowable Capacity
Vall
Tall
(kN)
(kN)

Check
V + T
Vall Tall

7.855
-0.001
144.77
187.26
0.054
-3.645
-0.001
144.77
187.26
0.025
V
: Shear force or Fy in STAAD Pro
T
: Tension force or Fx in (-) value in STAAD Pro

REV.

SENORO GAS DEVELOPMENT PROJECT

Capacity Check
Force
V
T
(kN)
(kN)

SNO-S-CC-05-010

DATE.

23 Juni 2013

Remarks
< 1...OK
< 1...OK

H.4.1.2 Temporary Condition


From STAAD Pro Result, summary of inner Force maximum for SH 300 are shown below
Beam
Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

230
334
226
326
226
226
229
231
226
226
226
326

L/C Node
105
105
113
115
118
120
121
123
118
120
105
115

119
191
111
112
183
183
117
121
183
183
111
183

Fx
kN
0 815
0.815
-0.811
0.432
0.224
0.002
0.002
-0.208
0.211
0.002
0.002
0.813
0.224

Fy
kN
7 855
7.855
-3.645
7.855
-5.082
-1.232
-1.232
6.261
6.260
-1.232
-1.232
7.855
-3.645

Fz
kN
-0.637
0 637
-0.195
-0.633
0.198
1.667
-1.667
-0.571
0.573
1.667
-1.667
-0.633
0.198

Mx
kNm
0 000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

My
kNm
0 000
0.000
0.781
0.000
0.000
0.815
-0.815
0.000
0.000
0.815
-0.815
0.000
-0.794

Mz
kNm
0 000
0.000
-17.453
0.000
0.000
-17.453
-17.453
0.000
0.000
-17.453
-17.453
0.000
-17.454

Attachment H - Page 35 of 63

CALCULATION OF PIPE RACK STRUCTURE


# 10

SENORO GAS DEVELOPMENT PROJECT

Capacity Check
Force
V
T
(kN)
(kN)

p
y
Allowable Capacity*
Vall
Tall
(kN)
(kN)

Check
V + T
Vall Tall

Doc. No.

SNO-S-CC-05-010

REV.
DATE.

23 Juni 2013

Remarks

7.855
-0.811
192.54
249.06
0.044
< 1...OK
-3.645
-0.811
192.54
249.06
0.022
< 1...OK
*) For temporary load the allowable value can be increased by 33%
V
: Shear force or Fy in STAAD Pro
T
: Tension force or Fx in (-) value in STAAD Pro
From table, the inner force has been conform to the allowable combination of tension and shear
so for detail connection are shall be refer to :
Detail :
TYPE-I

B
Type I

Attachment H - Page 36 of 63

CALCULATION OF PIPE RACK STRUCTURE


# 10

SENORO GAS DEVELOPMENT PROJECT

Doc. No.

SNO-S-CC-05-010

REV.
DATE.

23 Juni 2013

H.4.1.3 Plate connection checking due to longitudinal force caused by thermal friction.

Top view
Staad Pro Output
Fx max
=
Fy max
=
Fz max
=
a
=
tp
=

0.82
7.86
1.667
8
13

Side view
kN
kN
kN
mm
mm

Mx max
My max
Mz max
LwA
LwB

=
=
=
=
=

0.000
0.815
17.454
374
196

kNm
kNm
kNm
mm (vertical weld)
mm (horizontal weld)

H.4.1.3.1. Welding Check


Case -1

// 1a

=
=
=

// 1b

=
=
=

Fy/2
0.707*a*LwA
3927.5
0.707*8*374
1.86
Mpa

Fx/4
0.707*a*LwB
203.75
0.707*8*196
0.18
Mpa

Attachment H - Page 37 of 63

CALCULATION OF PIPE RACK STRUCTURE


# 10

SENORO GAS DEVELOPMENT PROJECT

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23 Juni 2013

Case -2

2a

2a

=
=
=

2b

2b

=
=
=

=
=
=

1/4*2 * Fz
0.707*a*LwA
589.37
0.707*8 * 374
0.279
Mpa

1/8*2 * Fz
0.707*a*LwB
294.69
0.707*8 * 196
0 266
0.266
Mpa

1/4*2 * Fx
0.707*a*LwA
288.15
0.707*8*374
0.14
Mpa

Attachment H - Page 38 of 63

CALCULATION OF PIPE RACK STRUCTURE


# 10

SENORO GAS DEVELOPMENT PROJECT

M1

=
=
=

Doc. No.

SNO-S-CC-05-010

REV.
DATE.

23 Juni 2013

Fy * e = Fy * (0.5B + 10 + lh)
883.6875 kNmm
1.5*2 *M1
l 4 =
0.707*a*(2*LwA+LwB)2
=
=

1874584
5040265
0.37
Mpa

M2

Fz * e = Fz * (0.5B + 10 + lh)

187.5375 kNmm

=
=
=

1/2*2 * M2
0.707*a*(LwA + LwB)*( s + 1/2.a2)
132609.04
60148.21
2.20 Mpa

Attachment H - Page 39 of 63

CALCULATION OF PIPE RACK STRUCTURE


# 10

SENORO GAS DEVELOPMENT PROJECT


Summary of stress
Case
1
2
3
4
5
Max

//

Stress (Mpa)
l

1.86
1.86

0.279
0.14
0.37
2.20
2.20

0.279
0.14
0.37
2.20
2.20

2 + 3 (// 2 +

SNO-S-CC-05-010

REV.
DATE.

23 Juni 2013

all

5.46

Doc. No.

124.11

OK

H.4.1.3.2 Plate Connection Check

Allowable shear of connection p


plate calculated as follow:
VPall
= M/Z
Where:
VPall
=
M
Z
tg
Hg
e

=
=
=
=
=

VPall

plate allowable stress

0.6 * Fy

moment due to lateral force


modulus section
plate thickness
plate height
eccentricity
Fz * e
1/6 * Hg * tg2

=
=

Fz * e
1/6 * Hg * tg2

10 + 0.5B + lh

=
=
=
=
=

141 MPa
3375
9
250
150

mm3
mm
mm
mm

then
Fz

Stress Ratio :

VPall * 1/6 * Hg * tg2


e
so,
0.525

Fz all

=
=
OK

475.875
150
3.17
kN

Fz all > Fz max

Attachment H - Page 40 of 63

CALCULATION OF PIPE RACK STRUCTURE


# 10

SENORO GAS DEVELOPMENT PROJECT

Doc. No.

SNO-S-CC-05-010

REV.
DATE.

23 Juni 2013

H.4.2 Beam to Beam Pinned Connection (C3) between Secondary Beam El. +16.00 and
Longitudinal Beam El. +16.00
Secondary Beam El. +16.00
Longitudinal Beam El. +16.00

SH 400
SH 400

To accommodate the combination of tension force and shear, the inner force of
the member shall conform the formula below
- Combination of tension and shear
V
Vall

With :

V
T
Vall
Tall

T
Tall

=
=
=
=

Shear force
Tension force
Allowable shear capacity
Allowable tension capacity

H.4.2.1 Permanent Condition


From Staad Pro Result, summary of inner Force maximum for SH 400 are shown below
Beam
Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

292
292
289
425
425
425
293
289
295
295
289
295

L/C Node
102
103
102
103
103
102
104
102
102
103
101
102

159
159
153
166
240
240
161
153
240
240
153
240

Fx
kN
10.951
-10.861
0.046
0.019
0.019
0.016
0.030
0.046
0.187
-0.159
0 050
0.050
0.187

Fy
kN
38.628
38.628
40.142
-41.755
0.257
0.257
38.628
40.142
2.669
2.669
39 697
39.697
2.669

Fz
kN
-0.004
0.001
-0.112
-0.378
0.999
-1.002
-0.004
-0.112
0.124
-0.121
0 003
0.003
0.124

Mx
kNm
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0 000
0.000
0.000

My
kNm
0.000
0.000
0.000
0.000
-0.485
0.495
0.000
0.000
0.495
-0.485
0 000
0.000
0.495

Mz
kNm
0.000
0.000
0.000
0.000
-85.520
-85.520
0.000
0.000
-85.520
-85.520
0 000
0.000
-85.520

Attachment H - Page 41 of 63

Doc. No.

CALCULATION OF PIPE RACK STRUCTURE


# 10

p
y
Allowable Capacity
Vall
Tall
(kN)
(kN)

Check
V + T
Vall Tall

-41.755 No Tension 216.07


360.12
0.193
38.628
-10.861
216.07
360.12
0.209
V
: Shear force or Fy in STAAD Pro
T
: Tension force or Fx in (-) value in STAAD Pro

REV.

SENORO GAS DEVELOPMENT PROJECT

Capacity Check
Force
T
V
(kN)
(kN)

SNO-S-CC-05-010

DATE.

23 Juni 2013

Remarks
< 1...OK
< 1...OK

H.4.2.2 Temporary Condition


From STAAD Pro Result, summary of inner Force maximum for SH 400 are shown below
Beam
Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

292
292
289
425
425
425
293
292
295
295
289
295

L/C Node
113
115
116
115
120
118
150
123
118
120
105
116

159
159
153
166
240
240
161
159
240
240
153
240

Fx
kN
14 024
14.024
-13.937
2.891
3.098
0.016
0.018
-3.787
-13.884
0.188
-0.159
1.277
2.731

Fy
kN
31 128
31.128
38.628
40.142
-41.755
0.257
0.257
7.765
7.765
2.669
2.669
32.642
2.669

Fz
kN
-0.004
0 004
0.001
0.118
-0.378
1.019
-1.021
-0.004
0.001
0.143
-0.141
-0.112
-0.121

Mx
kNm
0 000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

My
kNm
0 000
0.000
0.000
0.000
0.000
-0.563
0.573
0.000
0.000
0.573
-0.563
0.000
-0.485

Mz
kNm
0 000
0.000
0.000
0.000
0.000
-85.520
-85.520
0.000
0.000
-85.520
-85.520
0.000
-85.520

Attachment H - Page 42 of 63

CALCULATION OF PIPE RACK STRUCTURE


# 10

SENORO GAS DEVELOPMENT PROJECT

Capacity Check
Force
V
T
(kN)
(kN)

p
y
Allowable Capacity*
Vall
Tall
(kN)
(kN)

Check
V + T
Vall Tall

Doc. No.

SNO-S-CC-05-010

REV.
DATE.

23 Juni 2013

Remarks

-41.755 No Tension 287.38


478.96
0.145
< 1...OK
38.628
-13.937
287.38
478.96
0.164
< 1...OK
*) For temporary load the allowable value can be increased by 33%
V
: Shear force or Fy in STAAD Pro
T
: Tension force or Fx in (-) value in STAAD Pro
From table, the inner force has been conform to the allowable combination of tension and shear
so for detail connection are shall be refer to :
Detail :
TYPE-I

B
Type I

Attachment H - Page 43 of 63

CALCULATION OF PIPE RACK STRUCTURE


# 10

SENORO GAS DEVELOPMENT PROJECT

Doc. No.

SNO-S-CC-05-010

REV.
DATE.

23 Juni 2013

H.4.2.3 Plate connection checking due to longitudinal force caused by thermal friction.

Top view
Staad Pro Output
Fx max
=
Fy max
=
Fz max
=
a
=
tp
=

14.02
41.76
1.021
8
13

Side view
kN
kN
kN
mm
mm

Mx max
My max
Mz max
LwA
LwB

=
=
=
=
=

0.000
0.573
85.520
374
196

kNm
kNm
kNm
mm (vertical weld)
mm (horizontal weld)

H.4.2.3.1. Welding Check


Case -1

// 1a

=
=
=

// 1b

=
=
=

Fy/2
0.707*a*LwA
20877.5
0.707*8*374
9.87
Mpa

Fx/4
0.707*a*LwB
3506
0.707*8*196
3.16
Mpa

Attachment H - Page 44 of 63

CALCULATION OF PIPE RACK STRUCTURE


# 10

SENORO GAS DEVELOPMENT PROJECT

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23 Juni 2013

Case -2

2a

2a

=
=
=

2b

2b

=
=
=

=
=
=

1/4*2 * Fz
0.707*a*LwA
360.98
0.707*8 * 374
0.171
Mpa

1/8*2 * Fz
0.707*a*LwB
180.49
0.707*8
0
707*8 * 196
0.163
Mpa

1/4*2 * Fx
0.707*a*LwA
4958.23
0.707*8*374
2.34
Mpa

Attachment H - Page 45 of 63

CALCULATION OF PIPE RACK STRUCTURE


# 10

SENORO GAS DEVELOPMENT PROJECT

M1

=
=
=

Doc. No.

SNO-S-CC-05-010

REV.
DATE.

23 Juni 2013

Fy * e = Fy * (0.5B + 10 + lh)
4697.438 kNmm
1.5*2 *M1
l 4 =
0.707*a*(2*LwA+LwB)2
=
=

9964770
5040265
1.98
Mpa

M2

Fz * e = Fz * (0.5B + 10 + lh)

114.8625 kNmm

=
=
=

1/2*2 * M2
0.707*a*(LwA + LwB)*( s + 1/2.a2)
81220.05
60148.21
1.35 Mpa

Attachment H - Page 46 of 63

CALCULATION OF PIPE RACK STRUCTURE


# 10

SENORO GAS DEVELOPMENT PROJECT


Summary of stress
Case
1
2
3
4
5
Max

//

Stress (Mpa)
l

9.87
9.87

0.171
2.34
1.98
1.35
2.34

0.171
2.34
1.98
1.35
2.34

2 + 3 (// 2 +

SNO-S-CC-05-010

REV.
DATE.

23 Juni 2013

all

17.73

Doc. No.

124.11

OK

H.4.2.3.2 Plate Connection Check

Allowable shear of connection p


plate calculated as follow:
VPall
= M/Z
Where:
VPall
=
M
Z
tg
Hg
e

=
=
=
=
=

VPall

plate allowable stress

0.6 * Fy

moment due to lateral force


modulus section
plate thickness
plate height
eccentricity
Fz * e
1/6 * Hg * tg2

=
=

Fz * e
1/6 * Hg * tg2

10 + 0.5B + lh

=
=
=
=
=

141 MPa
4725
9
350
150

mm3
mm
mm
mm

then
Fz

Stress Ratio :

VPall * 1/6 * Hg * tg2


e
so,
0.230

Fz all

=
=
OK

666.225
150
4.44
kN

Fz all > Fz max

Attachment H - Page 47 of 63

Doc. No.

CALCULATION OF PIPE RACK STRUCTURE


# 10

SNO-S-CC-05-010

REV.

SENORO GAS DEVELOPMENT PROJECT

DATE.

23 Juni 2013

H.4.3 Beam to Beam Pinned Connection (C3) between Secondary Longitudinal Beam El.+5.00 To
El.+16.00 and Secondary Beam El.+5.00 To El.+16.00
Secondary Longitudinal Beam El.+5.00 To El.+16.00
Secondary Beam El.+5.00 To El.+16.00

SH 200
SH 400

To accommodate the combination of tension force and shear, the inner force of
the member shall conform the formula below
- Combination of tension and shear
V
Vall

With :

V
T
Vall
Tall

T
Tall

=
=
=
=

Shear force
Tension force
Allowable shear capacity
Allowable tension capacity

H.4.3.1 Permanent Condition


From Staad Pro Result, summary of inner Force maximum for SH 200 are shown below
Beam
Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

428
428
431
431
431
429
434
429
427
427
427
427

L/C Node
102
103
101
101
103
103
104
104
101
101
101
101

229
229
235
236
235
231
228
231
227
227
227
227

Fx
kN
24.528
-25.625
-1.531
-1.531
-5.599
-12.311
-0.623
-0.380
-0.865
-0.865
-0.865
0 865
-0.865

Fy
kN
0.307
0.307
0.307
-0.307
0.307
0.307
0.307
0.307
0.307
0.307
0 307
0.307
0.307

Fz
kN
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0 000
0.000
0.000

Mx
kNm
-0.001
-0.001
0.000
0.000
0.000
-0.001
0.001
-0.001
0.000
0.000
0 000
0.000
0.000

My
kNm
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0 000
0.000
0.000

Mz
kNm
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0 000
0.000
0.000

Attachment H - Page 48 of 63

Doc. No.

CALCULATION OF PIPE RACK STRUCTURE


# 10

-0.307
0.307

-1.531
-25.625

p
y
Allowable Capacity
Vall
Tall
(kN)
(kN)
75.40
216.07

105.64
360.12

REV.

SENORO GAS DEVELOPMENT PROJECT

Capacity Check
Force
V
T
(kN)
(kN)

SNO-S-CC-05-010

DATE.

Check
V + T
Vall Tall

Remarks

0.019
0.073

< 1...OK
< 1...OK

23 Juni 2013

H.4.3.2 Temporary Condition


From Staad Pro Result, summary of inner Force maximum for SH 200 are shown below
Beam
Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max Myy
Min My
Max Mz
Min Mz

428
428
431
431
431
429
435
429
427
427
427
427

L/C Node
125
127
105
105
123
123
123
150
105
105
105
105

229
229
235
236
235
231
230
231
227
227
227
227

Fx
kN
40.138
-40.686
2 556
2.556
2.556
-4.856
-11.137
-10.590
-0.399
-2.576
-2.576
-2.576
-2.576

Fy
kN
0.277
0.307
0 307
0.307
-0.307
0.277
0.277
0.277
0.277
0.307
0.307
0.307
0.307

Fz
kN
0.000
0.000
0 000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

Mx
kNm
0.000
-0.001
0 000
0.000
0.000
-0.001
-0.001
0.001
-0.001
0.000
0.000
0.000
0.000

My
kNm
0.000
0.000
0 000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

Mz
kNm
0.000
0.000
0 000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

Attachment H - Page 49 of 63

CALCULATION OF PIPE RACK STRUCTURE


# 10

SENORO GAS DEVELOPMENT PROJECT


Capacity Check
Force
V
T
(kN)
(kN)

Allowable Capacity*
Vall
Tall
(kN)
(kN)

Check
V + T
Vall Tall

Doc. No.

SNO-S-CC-05-010

REV.
DATE.

23 Juni 2013

Remarks

-0.307 No Tension 100.28


140.50
0.003
< 1...OK
0.307
-40.686
287.38
478.96
0.086
< 1...OK
*) For temporary load the allowable value can be increased by 33%
V
: Shear force or Fy in STAAD Pro
T
: Tension force or Fx in (-) value in STAAD Pro
From table, the inner force has been conform to the allowable combination of tension and shear
so for detail connection are shall be refer to :
Detail :
TYPE-I

B
Type I

Attachment H - Page 50 of 63

CALCULATION OF PIPE RACK STRUCTURE


# 10

SENORO GAS DEVELOPMENT PROJECT

Doc. No.

SNO-S-CC-05-010

REV.
DATE.

23 Juni 2013

H.4.3.3 Plate connection checking due to longitudinal force caused by thermal friction.

Staad Pro Output


Fx max
=
Fy max
=
Fz max
=
a
=
tp
=

40.69
0.31
0.000
5
7

kN
kN
kN
mm
mm

Mx max
My max
Mz max
LwA
LwB

=
=
=
=
=

0.001
0.000
0.000
136
73

kNm
kNm
kNm
mm (vertical weld)
mm (horizontal weld)

H.4.3.3.1. Welding Check


Case -1

// 1a

=
=
=

// 1b

=
=
=

Fy/2
0.707*a*LwA
153.5
0.707*5*136
0.32
Mpa

Fx/4
0.707*a*LwB
10171.5
0.707*5*72.5
39.69
Mpa

Attachment H - Page 51 of 63

CALCULATION OF PIPE RACK STRUCTURE


# 10

SENORO GAS DEVELOPMENT PROJECT

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23 Juni 2013

Case -2

2a

2a

=
=
=

2b

2b

=
=
=

=
=
=

1/4*2 * Fz
0.707*a*LwA
0.00
0.707*5 * 136
0.000
Mpa

1/8*2 * Fz
0.707*a*LwB
0.00
0.707*5
0
707*5 * 72
72.5
5
0.000
Mpa

1/4*2 * Fx
0.707*a*LwA
14384.67
0.707*5*136
29.92
Mpa

Attachment H - Page 52 of 63

CALCULATION OF PIPE RACK STRUCTURE


# 10

SENORO GAS DEVELOPMENT PROJECT

M1

=
=
=

Doc. No.

SNO-S-CC-05-010

REV.
DATE.

23 Juni 2013

Fy * e = Fy * (0.5B + 10 + lh)
34.5375 kNmm
1.5*2 *M1
l 4 =
0.707*a*(2*LwA+LwB)2
=
=

73265.1
419534.7
419534
7
0.17
Mpa

M2

Fz * e = Fz * (0.5B + 10 + lh)

kNmm

=
=
=

1/2*2 * M2
0.707*a*(LwA + LwB)*( s + 1/2.a2)
0.00
7765.19
0.00 Mpa

Attachment H - Page 53 of 63

CALCULATION OF PIPE RACK STRUCTURE


# 10

SENORO GAS DEVELOPMENT PROJECT


Summary of stress
Case
1
2
3
4
5
Max

//

Stress (Mpa)
l

39.69
39.69

0.000
29.92
0.17
0.00
29.92

0.000
29.92
0.17
0.00
29.92

2 + 3 (// 2 +

SNO-S-CC-05-010

REV.
DATE.

23 Juni 2013

all

91.14

Doc. No.

124.11

OK

H.4.1.3.2 Plate Connection Check

Allowable shear of connection p


plate calculated as follow:
VPall
= M/Z
Where:
VPall
=
M
Z
tg
Hg
e

=
=
=
=
=

VPall

plate allowable stress

0.6 * Fy

moment due to lateral force


modulus section
plate thickness
plate height
eccentricity
Fz * e
1/6 * Hg * tg2

=
=

Fz * e
1/6 * Hg * tg2

10 + 0.5B + lh

=
=
=
=
=

141 MPa
4725
9
350
150

mm3
mm
mm
mm

then
Fz

Stress Ratio :

VPall * 1/6 * Hg * tg2


e
so,
0.000

Fz all

=
=
OK

666.225
150
4.44
kN

Fz all > Fz max

Attachment H - Page 54 of 63

CALCULATION OF PIPE RACK STRUCTURE


# 10

SENORO GAS DEVELOPMENT PROJECT


H.5

Doc. No.

SNO-S-CC-05-010

REV.
DATE.

23 Juni 2013

Horizontal Bracing Connection (C5)


H.5.1 Horizontal Bracing Connection (C5) between Horizontal Bracing El.+5.00 To El.+16.00 and
Main Beam
Horizontal Bracing El.+5.00 To El.+16.00
Main Beam

CT 150
MH 588

H.5.1.1 Permanent Condition


From Staad Pro Result, summary of inner Force maximum for CT 150 are shown below

Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min Myy
Max Mz
Min Mz

Beam

L/C Node

809
823
763
763
489
489
489
489
489
489
489
489

102 30
102 62
101 54
101 236
101
6
101
6
101
6
101
6
101
6
101
6
101
6
101
6

Fx
kN
16.162
-13.574
0.317
0 317
0.317
6.061
6.061
6.061
6.061
6.061
6.061
6.061
6.061

Fy
kN
0.449
0.449
0.449
-0.449
0 449
0.449
0.449
0.449
0.449
0.449
0.449
0.449
0.449

Fz
kN
0.000
0.000
0.000
0 000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

Mx
kNm
0.000
0.000
0.000
0 000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

My
kNm
0.000
0.000
0.000
0 000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

Mz
kNm
0.000
0.000
0.000
0 000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

Attachment H - Page 55 of 63

CALCULATION OF PIPE RACK STRUCTURE


# 10

SENORO GAS DEVELOPMENT PROJECT

Capacity Check
p
y
Force Allowable Capacity
T or Q
Tall (or Qall)
(kN)
(kN)

Check
T
Tall

Doc. No.

SNO-S-CC-05-010

REV.
DATE.

23 Juni 2013

Remarks

-13.574
287.739
0.047
< 1...OK
16.162
287.739
0.056
< 1...OK
T
: Tension force or Fx in (-) value in STAAD Pro
Q
: Compression force or Fx in (+) value in STAAD Pro
H.5.1.2 Temporary Condition
From Staad Pro Result, summary of inner Force maximum for CT 150 are shown below

Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

Beam

L/C Node

809
764
763
763
489
489
489
489
489
489
489
489

125 30
123 236
105 54
105 236
105
6
105
6
105
6
105
6
105
6
105
6
105
6
105
6

Fx
kN
31 071
31.071
-26.012
2.188
2.188
-4.240
-4.240
-4.240
-4.240
-4.240
-4.240
-4.240
-4.240

Fy
kN
0 404
0.404
0.404
0.449
-0.449
0.449
0.449
0.449
0.449
0.449
0.449
0.449
0.449

Fz
kN
0 000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

Mx
kNm
0 000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

My
kNm
0 000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

Mz
kNm
0 000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

Attachment H - Page 56 of 63

CALCULATION OF PIPE RACK STRUCTURE


# 10

SENORO GAS DEVELOPMENT PROJECT

Capacity Check
p
y
Force Allowable Capacity*
T or Q
Tall (or Qall)
(kN)
(kN)

Check
T
Tall

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23 Juni 2013

Remarks

-26.012
382.693
0.068
< 1...OK
31.071
382.693
0.081
< 1...OK
*) For temporary load the allowable value can be increased by 33%
T
: Tension force or Fx in (-) value in STAAD Pro
Q
: Compression force or Fx in (+) value in STAAD Pro
Detail :

Angle Brace

Attachment H - Page 57 of 63

CALCULATION OF PIPE RACK STRUCTURE


# 10

SENORO GAS DEVELOPMENT PROJECT

H.6

Doc. No.

SNO-S-CC-05-010

REV.
DATE.

23 Juni 2013

Vertical Bracing Connection (C4)


H.6.1 Vertical Bracing Connection (C4) between Vertical Bracing Trasverse Dir. El.+0.00 to
EL.+16.00 and Column
Vertical Bracing Trasverse Dir. El.+0.00 to EL.+16.00
Column

CT 200
MH 588

H.6.1.1 Permanent Condition


From Staad Pro Result, summary of inner Force maximum for CT 200 are shown below

Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min Myy
Max Mz
Min Mz

Beam

L/C Node

507
508
501
501
703
703
501
501
501
501
501
501

103
7
103 98
101
1
101
1
101 105
101 49
101
1
101
1
101
1
101
1
101
1
101
1

Fx
kN
81.449
72.389
9.443
9 443
9.443
4.153
5.658
9.443
9.443
9.443
9.443
9.443
9.443

Fy
kN
0.000
0.000
0.000
0 000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

Fz
kN
0.481
0.481
0.481
0 481
0.481
0.481
0.481
0.481
0.481
0.481
0.481
0.481
0.481

Mx
kNm
0.000
0.000
0.000
0 000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

My
kNm
0.000
0.000
0.000
0 000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

Mz
kNm
0.000
0.000
0.000
0 000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

Attachment H - Page 58 of 63

CALCULATION OF PIPE RACK STRUCTURE


# 10

SENORO GAS DEVELOPMENT PROJECT

Capacity Check
p
y
Force Allowable Capacity
T or Q
Tall (or Qall)
(kN)
(kN)

Check
T
Tall

Doc. No.

SNO-S-CC-05-010

REV.
DATE.

23 Juni 2013

Remarks

No tension
496.491
No TensionNo Tension
81.449
496.491
0.164
<1OK
T
: Tension force or Fx in (-) value in STAAD Pro
Q
: Compression force or Fx in (+) value in STAAD Pro
H.6.1.2 Temporary Condition
From Staad Pro Result, summary of inner Force maximum for CT 200 are shown below

Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

Beam

L/C Node

507
508
703
703
703
703
501
501
501
501
501
501

127
7
127 98
106 105
105 105
105 105
105 49
105
1
105
1
105
1
105
1
105
1
105
1

Fx
kN
154 996
154.996
146.195
48.737
47.638
47.638
46.132
37.373
37.373
37.373
37.373
37.373
37.373

Fy
kN
0 000
0.000
0.000
0.228
0.228
0.228
0.226
0.226
0.226
0.226
0.226
0.226
0.226

Fz
kN
0 481
0.481
0.481
0.481
0.481
0.481
0.481
0.481
0.481
0.481
0.481
0.481
0.481

Mx
kNm
0 000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

My
kNm
0 000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

Mz
kNm
0 000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

Attachment H - Page 59 of 63

CALCULATION OF PIPE RACK STRUCTURE


# 10

SENORO GAS DEVELOPMENT PROJECT

Capacity Check
p
y
Force Allowable Capacity
T or Q
Tall (or Qall)
(kN)
(kN)

Check
T
Tall

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23 Juni 2013

Remarks

No tension
660.334
No TensionNo Tension
154.996
660.334
0.235
<1OK
*) For temporary load the allowable value can be increased by 33%
T
: Tension force or Fx in (-) value in STAAD Pro
Q
: Compression force or Fx in (+) value in STAAD Pro
Detail :
Angle-Brace

Attachment H - Page 60 of 63

CALCULATION OF PIPE RACK STRUCTURE


# 10

SENORO GAS DEVELOPMENT PROJECT

H.7

Base Plate Pinned Connection


H.7.1 Column
Column

Doc. No.

SNO-S-CC-05-010

REV.
DATE.

23 Juni 2013

MH 588

To accommodate the combination of tension force and shear, the support reaction shall conform the
formula below
Combination of tension and shear
V
Vall
With :

V
T
Vall
Tall

19

13

T
Tall
=
=
=
=

Shear force (Fx and Fz in Staad Pro)


Tension force (Fy in (-) value in Staad Pro)
Allowable shear capacity
Allowable tension capacity
31

43

55

67

79

91

25

37

49

61

73

85

Fig.
g H.7.1.1 Node Number of SR-02 ((PR-18))
H.7.1.1 Permanent Condition
From Staad Pro Result, summary of Support Reaction maximum for permanent condition are shown
below
Fx
Fy
Fz
Mx
My
Mz
Node
L/C
kN
kN
kN
kNm
kNm
kNm
Node
L/C
Fx kN
Fy kN
Fz kN Mx kN-m My kN-m Mz kN-m
1
103
18.388
388.652
30.074
0.000
0.000
0.000
Max Fx
7
102
-18.865
270.826
-35.067
0.000
0.000
0.000
Min Fx
19
102
-15.711
552.396
-39.585
0.000
0.000
0.000
Max Fy
91
103
10.938
131.759
27.963
0.000
0.000
0.000
Min Fy
7
103
14.063
442.410
43.279
0.000
0.000
0.000
Max Fz
Min Fz
19
102
-15.711
15 711
552 396
552.396
-39.585
39 585
0 000
0.000
0 000
0.000
0 000
0.000
Max Mx
1
101
1.580
263.000
4.288
0.000
0.000
0.000
Min Mx
1
101
1.580
263.000
4.288
0.000
0.000
0.000
Max My
1
101
1.580
263.000
4.288
0.000
0.000
0.000
Min My
1
101
1.580
263.000
4.288
0.000
0.000
0.000
Min Mz
1
101
1.580
263.000
4.288
0.000
0.000
0.000

Attachment H - Page 61 of 63

CALCULATION OF PIPE RACK STRUCTURE


# 10

SENORO GAS DEVELOPMENT PROJECT

Capacity Check:
y)
Axial Force ((Fy)
Tension Force (Fy)
Shear Force (Fx)
V + T
Vall Tall
Shear Force (Fz)
V + T
Vall Tall

=
=
=
=
=
=

Doc. No.

SNO-S-CC-05-010

REV.
DATE.

23 Juni 2013

552.396 kN
0.000 kN
18.865 kN
18.865
+
341.600

< Axial ((Call))


< Tension (Tall)
< Shear (Vall)
0.000
537.106

=
=
=

1227.847 kN
537.106 kN
341.600 kN

0.055

43.279 kN
43.279
+
341.600

< Shear (Vall)


0.000
537.106

341.600 kN

0.127

,,OK
,OK
,OK
<1, OK
,OK
<1,
1, OK

H.7.1.2 Temporary Condition


From Staad Pro Result, summary of Support Reaction maximum for temporary condition are shown below
Fx
Fy
Fz
Mx
My
Mz
Node
L/C
kN
kN
kN
kNm
kNm
kNm
Max Fx
1
123
76.455
468.782
12.069
0.000
0.000
0.000
Min Fx
7
121
-76.903
362.517
-46.575
0.000
0.000
0.000
Max Fy
19
113
-58.882
728.452
-51.024
0.000
0.000
0.000
Min Fy
67
123
55.406 -131.939
44.195
0.000
0.000
0.000
Max Fz
7
127
13.593
577.797
82.851
0.000
0.000
0.000
Min Fz
19
125
-14.898
651.193
-79.832
0.000
0.000
0.000
Max Mx
1
105
-29.346
111.918
-20.947
0.000
0.000
0.000
Min Mx
1
105
-29.346
111.918
-20.947
0.000
0.000
0.000
Max My
1
105
-29.346
111.918
-20.947
0.000
0.000
0.000
Min My
1
105
-29.346
111.918
-20.947
0.000
0.000
0.000
Max Mz
1
105
-29.346
111.918
-20.947
0.000
0.000
0.000
Min Mz
1
105
-29.346
111.918
-20.947
0.000
0.000
0.000

Attachment H - Page 62 of 63

CALCULATION OF PIPE RACK STRUCTURE


# 10

SENORO GAS DEVELOPMENT PROJECT

Capacity Check:
y)
Axial Force ((Fy)
Tension Force (Fy)
Shear Force (Fx)
V + T
Vall Tall
Shear Force (Fz)
V + T
Vall Tall

=
=
=
=
=
=

Doc. No.

SNO-S-CC-05-010

REV.
DATE.

23 Juni 2013

728.452 kN
-131.939 kN
76.903 kN
76.903
+
454.328

< Axial ((Call))


< Tension (Tall)
< Shear (Vall)
-131.939
714.352

=
=
=

1633.037 kN
714.352 kN
454.328 kN

0.354

82.851 kN
82.851
+
454.328

< Shear (Vall)


-131.939
714.352

454.328 kN

0.367

,,OK
,OK
,OK
<1, OK
,OK
<1,
1, OK

*) For temporary load the allowable value can be increased by 33%


From table, the support reaction has been conform to the allowable combination of tension and shear
so for detail connection are shall be refer to :
Detail :
TYPE-C

Attachment H - Page 63 of 63

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

ATTACHMENT
I
C
ANCHOR BOLT CAPACITY

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23 Juni 2013

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

Doc. No.
REV.

SNO-S-CC-05-010

DATE.

23-Jun-13

I. ANCHOR BOLT CAPACITY

Attachment I - Page 1 of 1

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

ATTACHMENT
J
C
FOUNDATION DESIGN

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23 Juni 2013

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT
J.

Doc. No.

SNO-S-CC-05-010

REV.

DATE.

23 Juni 2013

FOUNDATION DESIGN

J.1 Typical Plan of Foundation Design


Row AA-HA
Pedestal and Pilecap
to be used for column

J.1.1.1 Pile Arrangement


g
Row AA-HA
Use Pile : Diameter
Length
Total nos

=
=
=

H588x300x12

Flange
Web
W b
Pedestal Width (BP)
Pedestal Length (LP)
Pilecap Height (HF)
Pilecap Length (LF)
Pilecap Width (BF)
Pedestal Height (HP)
Ground Height (HG)

=
=
=
=
=
=
=
=
=

0.588
0.3
03
0.68
0.74
0.50
2.70
2.70
0.65
0 35
0.35

m
m
m
m
m
m
m
m
m

Concrete Cover
Pile Dia. (DP)
Pile Length (LP)
Pile to pile distance (SZ)

=
=
=
=

0.075
0.30
18.00
0.90

m
m
m
m

n PCD1

300
18 m
4 ea

4.00 ea

mm

Load
Condition

Pile Zone

Pile
Pile
Allowable Capacity (kN)
Diameter Length (m) Qcomp.
Qtens.
Qlat.

Permanent

0.3

18

355.80

175.00

39.00

Temporary

0.3

18

475.00

233.30

39.00

Attachment J - Page 1 of 9

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT
J.1.1.2 Pile Additional Load
c
=
so
=

23.54
16.50

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23 Juni 2013

kN/m3
kN/m3

Weight of column pedestal :


Ppedes = (BP * LP)* HP * c
=
=

(0.68
23.536
(0 68 * 0.74)*0.65
0 74)*0 65 * 23
536
(assigned as point load (CP) to foundation)
7.698 kN

Weight of pilecap :
Pcap
= (BF * LF)* HF * c
=
=

(2.7 * 2.7)*0.5 * 23.536


85.789 kN

(assigned as point load (PC) to foundation)

Weight of soil above foundation:


Psoil
= ((LF * BF)-(BP * LP))* HG * so
=
=

((2.7 * 2.7)-(0.68 * 0.74))*0.35 * 16.5


39.194 kN
(assigned as point load (S) to foundation)

J.1.2
J
1 2 Maximum Support Reaction Data
J.1.2.1 Permanent Condition

Attachment J - Page 2 of 9

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23 Juni 2013

J.1.2.2 Temporary Condition

J.1.3 Piling Design


Pile Capacity Check:

1) Fv

Fy
Qcomp (for Fv in ( ) value)
n

2) Fv

Fy
Qtens (for Fv in (-) value)
n

3) Fh

Where:
Fy
=
Fx
=
Fz
=
Fh =
Fv
=

Fx 2 Fz 2
Qlat
n

Axial support reaction (output STAAD Pro)


Lateral support reaction in X direction (output STAAD Pro)
Lateral support reaction in Z direction (output STAAD Pro)
Lateral reaction of pile
Axial reaction of pile ((+) for compression, and (-) for tension)

Attachment J - Page 3 of 9

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23 Juni 2013

Attachment J - Page 4 of 9

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23 Juni 2013

Attachment J - Page 5 of 9

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

Doc. No.

SNO-S-CC-05-010

REV.

DATE.

23 Juni 2013

J.1.4 Concrete Reinforcement Design


J.1.4.1 Pilecap Reinforcement Design
Pilecap Flexural Reinforcement :

R2 = 572.22 kN
R1 = 333.90 kN
Rect 0.50x2.70

Rect 0.50x2.70

M
Max:
1
150.255
0 2 kN
kNm
75.128 kNm
0 kNm

21.506 kNm
Rect 0.50x2.70

Rect 0.50x2.70

-107.244 kNm

Mu = 1.2 Mmax

Pilecap effective thickness

Ru
m

balanced

max
=

=
0.401 m
=
401 00 mm
401.00
2
= Mu / ( * BF * d )
0.461 MPa
=
= fy / ( 0.85 * fc' )
13.109
=
0.5
= (1/m) * (1 - (1 - 2m Ru/fy) )
0.119%
=
fc *
600
= i * 0.85 fc'
fy
600 + fy
3.93%
=
= 0.75 balanced
2.95%
=
0.35% ( min = 1.4/fy if 1.33 x required > 1.4/fy)
=
0.18% ( min = 0.18% if 1.33 x required < 1.4/fy)
=
=
0.18%
< 2.95%...OK
= * BF * d

min
min
used
As req

180.306 kN.m

1.4/fy

=
Diameter of reinf. bars
As
No.of bars
spacing

=
=
=
=
=

1948.86 mm
16.00 mm
201.06 mm2
As req / As
9.70 ea
BF / no. of wire

=
0.310 m
=
310.34 mm
Use D16 - 250 for top & bottom flexural reinforcement

250

mm

Attachment J - Page 6 of 9

CALCULATION OF PIPE RACK STRUCTURE


# 10

Doc. No.

SNO-S-CC-05-010

REV.

DATE.

SENORO GAS DEVELOPMENT PROJECT

23 Juni 2013

Pilecap Shear Reinforcement:


One Way Shear Check
LF
BF
LP
BP

=
=
=
=

2.70
2.70
0.74
0.68
0 68

m
m
m
m

0.401

Max: 572.220 kN

Rect 0.50x2.70
Max: -333.900 kN

572.220 kN

572.220 kN

Rect 0.50x2.70

-333.900 kN

-333.900 kN

Pu = 1.2 Pmax
Pu
AF

=
=

906.12
BF * LF

=
=

2.7 * 2.7
2
7.29 m
Pu
AF

=
=

906.12
7.29
2
124.30 kN/m
BF * (LF - (0.5 (LF + LP) + d))

=
=
=
=
=

2.7 * (2.7 - (0.5 (2.7 + 0.74) + 0.401))


2
1.563 m
q*A
194.312 kN
2*(f'c)^0.5 * BF * d

Vu
Vc

kN

(tributary area)

= (0.85 * 2 * (35)^0.5 * 2700 * 401)/1000


=
10889.08 kN
Vu < Vc, no need shear reinforcement

Attachment J - Page 7 of 9

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

Doc. No.

SNO-S-CC-05-010

REV.

DATE.

23 Juni 2013

Two way shear check

Punching shear critical area:


BP + d =
1.081 m <
LP + d =
1.141 m <
A
= (BF * LF)-(BF * (LP+d))

=
=
=

=
=

2.700 m,
2.700 m,
(tributary area)

width used:
length used:

1.081
1.141

m
m

2
6 057 m
6.057

=
q
Vu

BF
LF

124.296 kN/m2
q*A
752.810 kN

Shear Capacity:
ratio of long side to short side of load (c) = LP/BP

1.09

constant, (20 for corner, 30 for edge, 40 for interior column) (s)
=
40.00
Effective depth of footing (d)
=
401.00 mm
2*(min(LF,(Lp+d))+min(BF,(Bp+d)))
Length of punching shear critical area (bo) =
=

4,444.00 mm

Vc shall be the smallest of :


4.965 kN/m
4

Vc (2
Vc

=
=

Vc (2
Vc
Vc

=
=
=
=
=

Vc used :

) fc' * bo * d/12

( 2 + 4 / 1.09) * 35^0.5 * 4444 * 401/ 12


4,986.42 kN

s*d
) fc'*bo*d/12
bo
((2+40*401/4444)*
) 35^0.5*4444*401/12
4,928.16 kN
4*f'c^0.5*bo*d/12
4 * 35^0.5 * 4444 * 401 /12
3,514.24 kN
3,514.24 kN

Vc

= x Vc
= 0.75 x 3514.24
=
2,635.68 kN
Vu =
Vu < Vc, no need shear reinforcement

752.81 kN

Attachment J - Page 8 of 9

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

Doc. No.

SNO-S-CC-05-010

REV.
DATE.

B
23 Juni 2013

J.1.4.2 Pedestal Reinforcement

740 mm

680

mm

Pedestal area
As Min (0.5% A bruto)
Total area reinforcement needed
d reinforcement
A reinforcement
n reinforcement needed
Use

=
=
=
=
=
=

503200
2516
2516
16
201.06
12.514

mm2
2
mm
2
mm
mm
2
mm
=

14 nos

14 D16 for vertical reinforcement and


D10 -100 for stirrups

J.1.4.3
J
1 4 3 MAXIMUM CRACK WIDTH ON TENSION AREA OF PILECAP
Row AA-HA
Maximum crack width on tension area shall be calculated based on Gergery-Lutz expression as
follows:

w 1.11 10 6 fs 3 dc A

(Ref.1 Sect. 8.8)


where
w
=

=
fs
=
dc
ds
A
Ae
N
A

crack width (mm)


1.35
height factor (1.2 for beam, 1.35 for slab)
=
reinforcement calculated stress at service load (MPa),
234 MPa
shall be 0.6 fy for maximum crack
=
75 mm
thickness of concrete cover (mm)
=
83.0 mm
cover concrete + 1/2 diameter of rebar
=
effective tension area divided by number of rebar.
Ae/N
effective
ff
tension area off concrete around the rebar layment.
b * 2 * ds
=
166,000 mm2
1000/s+1
=
1000/250 + 1
=
5 nos
Ae/N
=
166000/5
=
33,200 mm2

=
=
=
=
=
=
=
=

b
d
d
ds
ds
so:
w

=
=

1.11e-6 * 1.35 * 234 * (75 * 33200)^(1/3)


0.0475 mm
< 0.33 mm .. OK

Attachment J - Page 9 of 9

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

Doc. No.

SNO-S-CC-05-010

REV.
DATE.

B
23 Juni 2013

ATTACHMENT K
STEEL & FOUNDATION MATERIAL TAKE OFF (MTO)

CALCULATION OF PIPE RACK STRUCTURE


# 10
SENORO GAS DEVELOPMENT PROJECT

Doc. No.
REV.
DATE.

SNO-S-CC-05-010

B
23 Juni 2013

K. Pipe Rack PR-10 Steel & Foundation Material Take Off


K.1. Steel Material Take Off
L
th
Length
m
571.20
670.00
140.00
309.85
520 00
520.00
350.55
TOTAL

Profiles
MH 588
SH 300
SH 400
SH 200
CT 150
CT 200

W i ht
Weight
kN
821.420
240.772
89.662
63.482
93 474
93.474
112.294
1421.104

Ton
82.142
24.077
8.966
6.348
9 347
9.347
11.229

142.110

K.2. Foundation Material Take Off


p Rack
Pipe

PR-10

Tag Number
Number of Row

:
:

PR-10 row AA-HA


wider row
shorter row

=
=

8 lines
2 lines

Concrete Work
Calculation Unit Volume (per foundation and/or per pedestal)
Pile Cap
2.7 m
Length
:
2.7 m
Width
:
0.5 m
0.050 m
Height
:
x
thick of lean concrete =
3.645 m3
0.365 m3
Volume per foundation :
volume lean concrete =
Rebar X
: D
16 250
250
Rebar Y
: D
16 125.156 kg
Number of rebar :
12 ; Length
=
6.61 m ; weight
=
125.156 kg
:
12 ; Length
=
6.61 m ; weight
=

Pedestal
Length
:
Width
:
Height
:
Volume per foundation :
Rebar
:
Stirrups
:
Number of rebar :
:

0.74
0
74 m
0.68 m
x
thick of lean concrete =
0.65 m
volume lean concrete =
0.327 m3
14 D
16
10 100
g
g
14 ; Length
=
1.15 m ; weight
=
8 ; Length
=
2.56 m ; weight
=

0m
0 m3

g
25.411 kg
12.627 kg

Total concrete and Lean concrete is tabulated as following :

No

Description

1 Footing
Type-1
2 Pedestal
Type-1

Unit Volume
Fc' 28
Fc' 17.5

Unit

Unit Number
number Unit

Total Volume (m3)


Fc' 28
Fc' 17.5

3.645

0.365 m3

16 nos

58.320

5.832

0.327

0.000 m3

16 nos

5.233
63.553

0.000
5.832

Total concrete Fc'


Fc 28 MPa for foundation of PR-10 row AA-HA =
Total Lean concrete Fc' 17.5 MPa for foundation of PR-10 row AA-HA =

64 m3
6 m3

Reinforcement Concrete
Total rebar is tabulated as following :

No

Description

1 Footing
Type-1
2 Pedestal
Type-1

Unit Volume
Volume
Unit

Unit Number
number Unit

Total Weight
g
(kg)

250.311 kg

16 nos

4004.984

38.038 kg

16 nos

608.606
4613.590

Total Rebar for foundation of PR-10 row AA-HA


Ratio used rebar
= rebar/concrete

Total concrete Fc' 28 MPa for foundation of PR-10 =


Total Lean concrete Fc'
Fc 17.5 MPa for foundation of PR-10 =
Total Rebar for foundation of PR-08 =

=
=

4.614 Ton
72.087 kg/m3

64.000 m3
6.000 m3
4.614 Ton

PC Pile
Row AA-HA
Diameter
Pile length
Number pile per pile cap
Point
Total length

:
:
:

0.3
18
4
16

1152

m
m
ea
nos

Site Preparation
V l
Volume
off excavation
ti is
i tabulated
t b l t d as following:
f ll i

No

Depth
(m)

Description
1 Footing
Type -1

Excavation
Back fill
Soil Disposal

Length
(m)

1.000

:
:
:

Miscellaneous
Row AA-PA
Anchor bolt dia. :
Type of anchor :
:
Number of
anchor

3.000

186.979
128.659
58.320

m3
m3
m3

1 1/4
in
Type 1 - H

128

nos

Width
(m)

Vol
(m3)

3.000 11.686

Unit number
Total Volume
number unit (m3)
16.000 nos

186.979
186.979