INFORME FINAL N 1

DATOS DE LA RED

L1:
L2:
L3:
L4:
L5:
L6:

220
220
220
220
220
220

kV,
kV,
kV,
kV,
kV,
kV,

150
200
175
185
180
240

km
km
km
km
km
km

L7: 220 kV, 600


L8: 220 kV, 600
L9: 138 kV, 110
L10: 138 kV,
km
L11: 138 kV,
km
L12: 220 kV,
km

km
km
km
110
130
190

Lneas en 220 kV: r=0.05 ohm/km, x=0.48 ohm/km,


c=9nF/km
Lneas en 138 kV: r=0.15 ohm/km, x=0.52 ohm/km,
c=9nF/km

T1: 220/13.8 kV, 250 MVA, vcc=10%


T2: 220/13.8 kV, 250 MVA, vcc=10%
T3: 220/13.8 kV, 300 MVA, vcc=9%
T4: 220/13.8 kV, 300 MVA, vcc=9%
T5: 220/13.8/23 kV, 300/300/100 MVA, Vps=8% (300
MVA), Vst=9% (300 MVA), Vpt=11% (100 MVA)

T6: 220/138 kV, 300 MVA, vcc=6%


SVC: Vr=220 kV, +?/-? MVar
C1: Compensacin serie 33%

C2: Compensacin serie 33%


C3: 46.7738 mF
R1: 484 ohm
R2: 968 ohm
Auto Transformadores:
AT1: (como transformador) 220/138 kV, 111.81 MVA,
Vcc=13.41%
AT2: (como transformador) 220/138 kV, 111.81 MVA,
Vcc=13.41%
Curva de Capabilidad de los Generadores:
G1: Curva de capabilidad: min 0 MW, max 450 MW,
+50 MVars, -50 MVars
G1: Curva de capabilidad: min 0 MW, max 400 MW,
+80 MVars, -80 MVars
G3: Curva de capabilidad: min 0 MW, max 350 MW,
+50 MVars, -50 MVars
Flujos de potencia y operacin

Load
Load
Load
Load
Load
Load

1
2
3
4
5
6

200
160
150
100
200
100

MW,
MW,
MW,
MW,
MW,
MW,

Datos de los generadores:


G1
G2
G3

360 MW
250 MW
300 MW

50 MVar
20 MVar
30 MVar
10 MVar
50 MVar
0 MVar

1. Obtener las tensiones, ngulos en las barras, y flujos en las


lneas para esta condicin, si es necesario ajuste las tensiones
de los generadores (procure mantener las tensiones de los
generadores en 1.0 pu) y disponga de los equipos de
compensacin para operar de forma adecuada el sistema.
Implica determinar los valores del SVC.

2. Cuntos reactivos entrega el SVC? Qu sucede al desconectar


el SVC?
Cuntos reactivos entrega el banco de capacitores?Qu
sucede al desconectar el banco de capacitores?
El SVC nos entrega un valor de -82.37 MVAR, con lo cual se logra
suministrar la cantidad de reactivos requerido por el sistema.

Al momento de desconectar los SVC se produce una cada de tensin en


las barras 4, 5 y 6.

Al salir los SVC, los generadores operaran entregando mas reactivos de los
que pueden entregar.
Al momento de desconectar los capacitores se puede apreciar los
siguiente:
Que no afecta nada a la red si est conectada a un SVC, solo produce una
pequea cada de tensin en los barras.

3.
que
de
se
le
que
un

Imagine
usted es el
encargado
operar
el
sistema
anterior y
informa
debe darse

mantenimiento correctivo a la lnea L7 lo ms pronto posible,


indique que acciones debe coordinar (en orden cronolgico)
para poder aprobar el mantenimiento. Recuerde que los
equipos no pueden operar sobrecargados y que ante tales
eventos la operacin econmica pasa a un segundo plano.
Para realizar la desconexin de la L7, la desconexin de los reactores
en los extremos de la L7 y regular la tensin del sistema con apoyo del
SVC y elevar la tensin de los Generadores a 1.02 pu.

4. Imagine que usted es el encargado de operar el sistema


anterior, y de pronto recibe una alarma en donde sali fuera de
servicio el SVC por falla, como consecuencia la tensin empieza
a disminuir de forma lenta permitiendo tomar acciones rpidas
al coordinador. Es necesario rechazar carga, Por qu?
Recuerde que el ltimo recurso del operador es rechazar carga.
Elevar la tensin de las Centrales a un tensin de 1.02, y realizar un
rechazo de carga igual a 56 MW en la barra 6 con el fin de mantener las
tensiones dentro de los lmites exigidos por la NTCSE para un escenario
de contingencia.
5. Imagine que usted es el encargado de operar el sistema
anterior, y la demanda Load 2 estuvo 20 MW ms alta de lo
pronosticado. De pronto recibe una alarma en donde salio fuera
de servicio el SVC, como consecuencia la tensin empieza a
disminuir de forma lenta permitiendo tomar acciones rpidas al
coordinador. Es necesario rechazar carga, Por qu? Recuerde
que el ltimo recurso del operador es rechazar carga.
Si ser necesario realizar rechazo de carga para evitar el colapso de
tensin en las barras 6 y 7.
6. Imagine que usted es el encargado de operar el sistema
anterior, y se encuentra en la madrugada con una demanda
sumamente menos a la de la hora punta tal y como se muestra
en la tabla.
Load 1
Load 2
Load 3
Load 4
Load 5
Load 6

120 MW, 15 MVar


100 MW, 10 MVar
100 MW, 10 MVar
70 MW, 5 MVar
120 MW, 20 MVar
100 MW, 0 MVar

G1
G2
G3

260 MW
250 MW
300 MW

G3

~
G

Carga 4

300.00
-49.40
85.93

Barra 12

G1

~
G

T7

43.92
4.37
16.82

T2

T1

Barra 3

-43.92
-3.66
16.82

-38.13
-26.82
11.98

23.57
-4.68
8.73

-105.44
16.51
29.03

141.57
1.03
20.90

71.98
-27.32
31.40

71.98
-27.32
31.40

Barra 13

T6

L4

279.54
1.27
2.75

L2

Barra 15

-100.00
-10.00
33.74

SVS
13.75
1.00
-7.75

Barra 8
Barra 6
100.00
10.00

Carga 3

Terminal(5)

Barra 16

307.65
1.40
2.73

Barra 10

146.22
1.06
8.33

67.25
-35.96
64.37

0.00
100.37

67.25
-35.96
64.37

-0.35
91.00
33.24

AT1

0.00
0.00
17.08

3.42
-139.66
33.24

Barra 9
125.00
-3.76
41.69

13.80
1.00
9.56

125.00
-3.76
41.69

-10.55
-31.24
7.85

-67.25
42.17
64.37

-67.25
42.17
64.37

242.63
1.10
4.37

-0.00
60.82

120.00
20.00

21.63
5.75
11.37

L12
250.00
-7.52
61.31

G
~
G2

100.00
-0.00

Carga 6

-67.25
35.96
31.40

Shunt/Filter1

100.00
10.00

Carga 2

-125.00
8.45
41.69

23.53
1.02
-6.03

-0.00
49.92

Static Va..

11.53
-79.04
20.92

0.35
-91.00
17.08

T4

0.00
-29.28
-0.00
29.28
33.74

220.00
1.00
-6.03

-125.00
8.45
41.69

T3

L6

T5

220.40
1.00
7.42

Shunt/Filter

Barra 7

107.67
-26.18
29.03

-67.25
35.96
31.40

L 13

130.80
-12.05
34.41

100.00
-15.57
33.74

-100.00
-59.92
30.59

Barra 5

L7

-127.63
12.88
34.41

Terminal

100.00
59.92
30.59

232.60
1.06
2.61

10.58
-28.78
7.85

L14

L8

L5

Barra 14

0.35
-82.68
17.08

-0.35
82.68
17.08

C2

244.12
1.11
5.82

-78.54
40.49
27.86

AT2

L3

220.00
1.00
-6.03

78.54
-39.09
27.86

L10

L9
-10.58
28.78
7.25

-23.46
-23.56
8.73

144.86
1.05
3.42

C1

38.38
2.80
11.98

L1

-48.91
-33.66
15.58

-78.54
39.09
36.23

L11

10.58
-30.28
7.25

230.66
1.05
-0.91
49.47
4.52
15.58

Barra 4

86.05
-22.11
36.23

-10.58
30.28
20.92

Barra 2

224.61
1.02
-3.84

Barra 11

255.36
1.16
4.90

-43.92
-3.66
16.82

-230.00
76.74
94.54

120.00
15.00

43.92
4.37
16.82

Terminal(1)

14.49
1.05
0.00

230.00
-54.40
94.54

Carga 1

87.85
8.73
19.50

Barra 1

13.80
1.00
26.05

70.00
5.00

Carga 5
Shunt/Filter2

-21.46
-40.49
11.37

Barras

Nom.L-L Volt.
Magnitud kV
kV

Magnitud
p.u

angulo de
fase

Barra
Barra
Barra
Barra
Barra
Barra
Barra
Barra

1
10
11
12
13
14
15
16

13.8
138
138
13.8
138
220
220
220

14.49
146.2159
141.5733
13.8
144.862
232.6014
244.1188
307.654

1.05
1.059536
1.025893
1
1.049725
1.057279
1.109631
1.398427

Barra 2

220

230.6633

1.04847

Barra 3
Barra 4
Barra 5
Barra 6
Barra 7
Barra 8
Barra 9
Terminal
Terminal(
1)
Terminal(
5)

220
220
220
13.8
220
13.8
220
23

224.607
220
220
13.7522
220.4025
13.8
242.6308
23.5267

1.020941
1
1
0.9965363
1.001829
1
1.102867
1.0229

0
8.329387
20.90211
26.04719
3.417288
2.606338
5.822415
2.7296
0.9144444
-3.836179
-6.028292
-6.028292
-7.7534
7.418989
9.564159
4.371236
-6.028292

220

255.3555

1.160707

4.898294

220

279.5428

1.270649

2.751984

7. Responda las siguientes preguntas


A. Cuntos reactivos entrega el SVC? Qu sucede al desconectar el SVC?
Cuntos reactivos entrega el banco de capacitores? Los reactivos entregados por el banco
son los mismos que su potencia nominal? Qu sucede al desconectar el banco de capacitores?
El SVC entrega -0 MVAR, en el caso de desconectar el SVC la tensin en la barra 6 se reduce a 0.98 pu, no
obstante el sistema ser capaz de operar satisfactoriamente.
8. Imagine que usted es el encargado de operar el sistema anterior y se le informa que debe
darse un mantenimiento correctivo a la lnea L7 lo ms pronto posible, indique que acciones
debe coordinar (en orden cronolgico) para poder aprobar el mantenimiento. Recuerde que
los equipos no pueden operar sobrecargados y que ante tales eventos la operacin econmica
pasa a un segundo plano.
Para realizar la desconexin de la L7, la desconexin de los reactores en los extremos de la L7 y regular la
tensin del sistema con apoyo del SVC y elevar la tensin de los Generadores a 1.02 pu.

9. Seguridad de Sistemas de Potencia


Para el sistema de potencia de la parte 1. Analice cuales son las contingencias que ocasionen
sobrecargas en el sistema para la hora punta y para la madrugada. Listar el nmero de
contingencias que ocasionen sobrecargas y proponer acciones correctivas ante tales
contingencias.
Contingencias Mxima demanda
Salida de L10, provocara sobrecarga en la L9 y L11, estas sobrecargas se pueden evitar disminuyendo el
despacho del G3 a 260 MW.
Salida de L11, provocara sobrecarga en la L9 y L10, estas sobrecargas se pueden evitar disminuyendo el
despacho del G3 a 250 MW.
Salida de L12, provocara sobrecarga en la L11, estas sobrecarga se pueden evitar realizando rechazo de
carga en la carga load6 reduciendo su demanda a 74 MW.
Contingencias Mxima demanda
Salida de L10, provocara sobrecarga en la L9 y L11, estas sobrecargas se pueden evitar disminuyendo el
despacho del G3 a 220 MW.
Salida de L11, provocara sobrecarga en la L9 y L10, estas sobrecargas se pueden evitar disminuyendo el
despacho del G3 a 230 MW.
Salida de L12, provocara sobrecarga en la L11, estas sobrecarga se pueden evitar realizando rechazo de
carga en la carga load6 reduciendo su demanda a 71 MW.