Objective
Understand how to read P&ID properly, so every discipline can do selfcheck data given by process and do self-check conformity of P&ID with
their works.
Predecessor of P&ID
Predecessor
Line sizing
Line number
Piping spec
PFD & UFD
HMB
Process description/philosophy
Material selection
Equipment sizing :
- Slug catcher/separator
- Column
- Pump
- Tank
- Heat exchanger
- Compressor
- Air cooled exchanger
- Knock Out Drum
- Flare/Vent stack
Process:
ICT:
Electrical:
P&ID Piping/Pipeline:
Mechanical Static:
Successor
- Process control philosophy
- S.A.F.E Chart
- HAZOP/HAZID
- Cause & Effect
- MTO
- Hazardous area
classification
- Load list
- MTO
- Tie-in list
- Plant/Equipment Lay-out
- MTO
- Package equipment
- MTO
- MTO
Offshore:
- MTO
- Weight list
Other Discipline
P&ID Content
P & I should be included not limited to :
All process equipment identified by equipment number
All pipes identified by a line number. Pipe size and material of construction should be shown
(material may include as a part of the identification number)
All valves with an identification no. along with their type & size should be shown
Ancillary fittings that are part of piping system such as inline sight glasses, strainers and stream
traps with an identification no.
Pumps identified by a suitable code no.
All control loops and instruments with identification
P&ID Content
P&ID do not show:
Scale to equipment dimension (NTS)
Nozzle elevation and orientation
Inlet Cooling
Ps = 335-830 psi
Ts = 115F
Pd = 1250 psi
Dew Point
Control
Separation
Inlet Header
Train 1
Inlet Cooling
Amine
Separation
Train 2
Inlet Cooling
Separation
Train 3
Inlet Cooling
Separation
Train 4
Inlet Cooling
Separation
Compression
Amine
Amine
Amine
TP (1 nos)
Residue Compressor
Suction Header
20MBD-101
TP (5 nos)
Note 5
20HAL-201A/B
Raw Gas
(Existing Well)
20HAL-401A/B
26-NBD101
215-E-101
215-V-101
215-V-102
225-C-101
Dew Point
Control
Residue
Gas Comp
215-E-201
215-V-201
215-V-202
225-C-201
Dew Point
Control
Residue
Gas Comp
Dew Point
Control
20MBD-201
23MBF101/201/
301/401
/501
20HAL-301A/B
215-E4101
23CAE101/201/
301/401/501
23HAL-101/201/
301/401/501
Residue Compressor
Discharge Header
Sales Gas
20MBD-301
20MBD-401
Note:
1. Yellow: New Equipment
2. White Rectangle: Existing Equipment
3. Red Line: New Header and Piping
4. Black Line: Existing Header and Piping
5. 5 x 25% or 3 x 50% Compressor Train
215-E-301
215-V-301
215-V-302
225-C-301
Dew Point
Control
Residue
Gas Comp
215-E-401
215-V-401
215-V-402
225-C-401
Dew Point
Control
Residue
Gas Comp
Sample PFD
Sample P&ID
Sample P&ID
Sample P&ID