You are on page 1of 17

Site Specifics

Hydrological Data

TOTAL SITE
AREA (ha)
2.6

PUBLIC OPEN DRAINED AREA


SPACE (ha)
(ha)
0
2.6

SAAR (mm)

M5-60 (mm)

r' Ratio

612

17

0.4

IH24 method

SOIL
4

SPR
0.47

RP

Growth factors

1
30
100

0.87
2.45
3.56

FEH Method

RP
1
30
100

Growth
factors
0.87
2.45
3.56

Qbar (l/s)

BFI / BFIHOST

Qmed (l/s)

REGION
5
Cr
Factor

FEH/FSR
Factor

Region Factor

Climate
Change Factor

1.3

0.74

1.3

Qbar (l/s)

Qbar (l/s/ha)

Q50 (l/s)

10.73

4.13

9.34
26.29
38.20

3.59
10.11
14.69

Q1
Q30
Q100

Qbar /
Qmed
factor

12.92
36.38
52.86

SOIL
1
2
3
4
5

SPR
0.1
0.3
0.37
0.47
0.53

modified rational method


Surface
Greenfield Open Space
Road
Residential
Other
Total

Return Period

1 in

Area (ha)

Cv

0.00
0.40
0.35
0.00
0.75

0.00
0.90
0.90
0.00

1
FEH rainfall
Depth

Storm Duration
15
30
60
120
240
360
480
600
840
1440
2880
mins

5.41
7.07
9.21
11.97
15.54
18.08
20.13
21.88
24.48
28.55
34.79
mm

Weighted Cv
0.00
0.48
0.42
0.00
0.90

Years
Intensity
(mm/hr)
21.64
14.14
9.21
5.99
3.89
3.01
2.52
2.19
1.75
1.19
0.72
mm/hr

Peak Flow
Rate
0.053
0.034
0.022
0.015
0.009
0.007
0.006
0.005
0.004
0.003
0.002
cumecs

Post Development Peak Runoffs and Volumes from Greenfield Areas ONLY
Post Development Greenfield
1.85
Area

4.13

Return
Period
1
3.59

7.64

6.64

QBAR
Greenfield Runoff Rate
Greenfield Runoff from Open
Space (l/s)

Storm Duration
15
30

Permitted
Runoff
0.0093
0.0093

Post Development
Runoff Rate
0.059
0.041

60
120
240
360
480
600
840
1440
2880
mins

0.0093
0.0093
0.0093
0.0093
0.0093
0.0093
0.0093
0.0093
0.0093
cumecs

0.029
0.021
0.016
0.014
0.013
0.012
0.011
0.010
0.008
cumecs

Volume of
Runoff
36.52
47.72
62.17
80.80
104.90
122.04
135.88
147.69
165.24
192.71
234.83
cu.m

Factored
Volume
(CC/FEH)
64
84
109
142
184
214
239
259
290
339
413
cu.m

d Areas ONLY

Permited
Outflow
Volume
8.40
16.80

Post Development
Runoff Volume

Storage
Required

70
96

62
79

33.61
67.22
134.43
201.65
268.87
336.08
470.51
806.60
1613.19
cu.m

133
190
280
358
430
499
625
912
1560
cu.m

100
123
145
156
161
163
155
106
-53
cu.m

modified rational method


Surface
Greenfield Open Space
Road
Residential
Other
Total

Return Period

1 in

Storm Duration
15
30
60
120
240
360
480
600
840
1440
2880
mins

Area (ha)

Cv

0.00
0.40
0.35
0.00
0.75

0.00
0.90
0.90
0.00

30

Weighted Cv
0.00
0.48
0.42
0.00
0.90

Years

FEH rainfall
Depth
23.91
28.93
34.91
42.03
50.5
56.2
60.63
64.27
69.3
76.12
85.9
mm

Intensity
(mm/hr)
95.64
57.86
34.91
21.02
12.63
9.37
7.58
6.43
4.95
3.17
1.79
mm/hr

Peak Flow
Rate
0.233
0.141
0.085
0.051
0.031
0.023
0.018
0.016
0.012
0.008
0.004
cumecs

Post Development Peak Runoffs and Volumes from Greenfield Areas ONLY
Post Development Greenfield
Area

1.85

4.13

Return
Period
30
10.11

7.64

18.71

QBAR
Greenfield Runoff Rate
Greenfield Runoff from Open
Space (l/s)

Storm Duration
15
30

Permitted
Runoff
0.0263
0.0263

Post Development
Runoff Rate
0.252
0.160

60
120
240
360
480
600
840
1440
2880
mins

0.0263
0.0263
0.0263
0.0263
0.0263
0.0263
0.0263
0.0263
0.0263
cumecs

0.104
0.070
0.049
0.042
0.037
0.034
0.031
0.026
0.023
cumecs

Volume of
Runoff
161.39
195.28
235.64
283.70
340.88
379.35
409.25
433.82
467.78
513.81
579.83
cu.m

Factored
Volume
(CC/FEH)
284
343
414
498
599
666
719
762
822
903
1019
cu.m

d Areas ONLY

Permited
Outflow
Volume
23.66
47.32

Post Development
Runoff Volume

Storage
Required

300
377

277
329

94.64
189.29
378.58
567.86
757.15
946.44
1325.01
2271.45
4542.90
cu.m

481
633
868
1070
1258
1436
1765
2519
4251
cu.m

387
444
490
503
501
489
440
247
-292
cu.m

modified rational method


Surface

Area (ha)

Cv

Greenfield Open Space


Road
Residential
Other
Total

0.00
0.40
0.35
0.00
0.75

0.00
0.90
0.90
0.00

Return Period

100

1 in

Storm Duration
15
30
60
120
240
360
480
600
840
1440
2880
mins

Weighted Cv
0.00
0.48
0.42
0.00
0.90

Years

FEH rainfall
Depth
36.54
43.26
51.07
60.15
70.72
77.71
83.04
87.42
93.22
100.71
111.18
mm

Intensity
(mm/hr)
146.16
86.52
51.07
30.08
17.68
12.95
10.38
8.74
6.66
4.20
2.32
mm/hr

Peak Flow
Rate
0.356
0.211
0.124
0.073
0.043
0.032
0.025
0.021
0.016
0.010
0.006
cumecs

Post Development Peak Runoffs and Volumes from Greenfield Areas ONLY
Post Development Greenfield
Area

1.85

4.13

Return
Period
1
14.69

7.64

27.18

QBAR
Greenfield Runoff Rate
Greenfield Runoff from Open
Space (l/s)

Storm Duration
15
30

Permitted
Runoff
0.0382
0.0382

Post Development
Runoff Rate
0.383
0.238

60
120
240
360
480
600
840
1440
2880
mins

0.0382
0.0382
0.0382
0.0382
0.0382
0.0382
0.0382
0.0382
0.0382
cumecs

0.152
0.100
0.070
0.059
0.052
0.048
0.043
0.037
0.033
cumecs

Volume of
Runoff
246.65
292.01
344.72
406.01
477.36
524.54
560.52
590.09
629.24
679.79
750.47
cu.m

Factored
Volume
(CC/FEH)
433
513
606
713
839
921
985
1037
1105
1194
1318
cu.m

d Areas ONLY

Permited
Outflow
Volume
34.38
68.76

Post Development
Runoff Volume

Storage
Required

458
562

423
493

137.52
275.05
550.09
825.14
1100.19
1375.23
1925.32
3300.56
6601.11
cu.m

703
909
1230
1509
1768
2015
2475
3543
6015
cu.m

566
634
680
683
667
640
550
242
-586
cu.m

You might also like