Submitted to:
Project co-ordination:
Chakghat Town
DISTRICT REWA
POPULATION- 10676
8167.2
City Profile
CompanyName
ULB Name
Town Brief
Population
Historic importance
Population Year 1981 (under Municipal
boundary only)
Population Year 1991 (under Municipal
boundary only)
Population Year 2001 (under Municipal
boundary only)
Population Year 2011 (under Municipal
boundary only)
In one or two
sentences
NA
4,637
6,576
9,105
10,676
Town level
12,133
16,399
22,163
Land Use
Land Use
25 degree 80'
81 degree 41'
1100 mm
390 m
5.21 sqkm
5.21 sqkm
5.21 sqkm
NA
Latitude
Longitude
MM
Mts
Sq kms
Sq kms
Sq kms
Date
Residential
Commercial
Public - semi public
Industrial
Roads
Recreational
Sensitive
Water bodies
Total Developed area
Agriculture / Undeveloped area
Total Municipal Area
0.221
0.048
0.044
0.003
0.104
NA
NA
0.553
0.972
4.237
5.208
22.74
4.93
4.49
0.35
10.65
NA
NA
56.85
100.00
81.35
Ward 1
Ward 3
Ward 4
Ward 5
Ward 6
Ward 7
Ward 8
Ward 9
Ward 10
Ward 11
Ward 12
Ward 13
Rajiv gandhi
ward
Ward 14
Dr.
Rammanohar
lohia ward
Ward 15
Total
NA
Tilak ward
Ramlila ward
NA
NA
NA
NA
NA
NA
Tamsa word
Bhagat singh
ward
NA
NA
667
784
588
445
347
426
643
665
689
810
589
675
597
505
675
0.06
11600
0.07
11089
0.16
3641
0.23
1919
0.05
6414
0.04
10416
0.07
8619
0.92
724
0.12
5704
1.33
611
0.05
11687
0.48
1394
1.04
572
0.23
2154
0.34
1988
9105
5.2081
1748
4820
4285
1702
1736
1924
889
0.6256
3
Name of ward
Ward Population (2001)
Area (sq kms)
Density (PPSqkm) 2001
Male
Female
SC
ST
BPL (year 2012)
Sex ratio
Literacy rate (%)
No. of Primary schools
No. of Primary Health
Centre
No. of Households
Primary occupation
(Majority)
Ward 2
409
309
234
175
229
340
341
373
438
318
361
314
264
352
304
NA
NA
NA
837
NA
NA
375
NA
NA
NA
917
NA
NA
279
NA
NA
NA
903
NA
NA
211
NA
NA
NA
902
NA
NA
172
NA
NA
NA
983
NA
NA
197
NA
NA
NA
860
NA
NA
303
NA
NA
NA
891
NA
NA
324
NA
NA
NA
950
NA
NA
316
NA
NA
NA
847
NA
NA
372
NA
NA
NA
849
NA
NA
271
NA
NA
NA
852
NA
NA
314
NA
NA
NA
870
NA
NA
283
NA
NA
NA
901
NA
NA
241
NA
NA
NA
913
NA
NA
323
NA
NA
NA
918
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
1494
Manufacturing
Manufacturing
Manufacturing
Manufacturing
Manufacturing
Manufacturing
Manufacturing
Manufacturing
Manufacturing
Manufacturing
Manufacturing
Agriculture
Agriculture
Manufacturing
Manufacturing
Manufacturing
Seconday occupation
Agriculture
Commerce and
Trade
Agriculture
NA
Commerce and
Trade
NA
Commerce and
Trade
Agriculture
Agriculture
Agriculture
Commerce and
Trade
Manufacturing
NA
Agriculture
Agriculture
Agriculture
Tertiary occupation
Commerce and
Trade
Agriculture
Commerce and
Trade
NA
Agriculture
NA
Agriculture
Commerce and
Trade
Commerce and
Trade
Commerce and
Trade
Agriculture
Commerce and
Trade
Manufacturing
Commerce and
Trade
Commerce and
Trade
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
Commerce and
Trade
Small scale
industries
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
3207
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
421
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
No. of Handpumps
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
No. of OHTs
% Coverage of piped water
supply
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
9
400 private & 92
municipal
handpump
3
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
374 HHs
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
% of population NA Open
defecation
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
1120 HHs
NA
363
189
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
four to six
180.25
186
125.75
820
101
181.25
199.5
172.25
259.75
136.5
206.75
262.5
146.25
240.25
3407
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
daily
Ward 1
Ward 2
Ward 3
Ward 4
Ward 5
Ward 6
Ward 7
Ward 8
Ward 9
Ward 10
Ward 11
Ward 12
Ward 13
Rajiv gandhi
ward
Ward 14
Dr.
Rammanohar
lohia ward
Ward 15
Total
NA
NA
NA
Tilak ward
Ramlila ward
NA
NA
NA
NA
NA
NA
Tamsa word
Bhagat singh
ward
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
14000 mts
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
5900 mts
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
3770 mts
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
560
200
400
120
60
200
50
400
200
150
100
200
300
800
3740
10
40
900
600
1550
No. of Streetlights
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
597
No. of Electricity
connections
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
1241
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
Name of ward
Total no. of sanitary
workers in the ward
Length of National
Highway
Length of Road side drains
Pucca (Mts)
Note: Population data has been given as per the Census-2001. As per the discussion with RGI Census Data for 2011 has not published, which will publish by July 2013.
Sectoral Analysis
Source
Sewerage
Drainage
SWM
Physical Infrastructure
Water Supply
Existing Source
Tubewell/Ha
Well
ndpump
9 Tube wells /
492
Handpump
River/Lake/Talab
Tamas river
NA
0.19 MLD (River: 0.09 MLD & Ground
water: 0.1 MLD)
17.8 lpcd
Rs. 60/32%
Yes, WTP with 2 chambers each of capacity
45,000 L
NA
0.15 MLD
No
374
NA
NA
NA
NA
Khakkha nallah and Senarwar gram nallah
NA
Tamas river
NA
NA
Either in low lying area or in Tamas river
No
~70 gram per capita per day
34.07 Tons
NA
25%
No
No
No
No
No
No
1 Tractor / 1 Trolley / 4-6 Dust bins / 7
Handpull cart /4 Tricycle
Yes
NH-27
NA
NA
NA
CC
WBM
Total (kms)
14 km
NA
14 km
(kms)
5.90 km
(kms)
Galla mandi
Vegitable & fruit market, Grain market
Old Chauraha
NA
597
597
450
125
15
Location of Substation
http://www.mptransco.nic.in
Power
Physical Infrastructure
Roads
Sectoral Analysis
33/11KV
1241 HH
NA
NA
NA
Sectoral Analysis
Name of Heritage site/s
Ownership/agency
Prevailing Heritage Act/s
Name of Tourist site/s
Ownership/agency
NA
-
NA
Tamas river
NA
water bodies
NA
Beds
Private
Beds
NA
NA
NA
Health
No. of Hospitals
Education
Allahabad
~50 km
3
No. of Colleges
No. of ITI
2
0
Social Infrastructure
NA
NA
NA
NA
NA
NA
The social security pension scheme for old
age, physically challenged and widows etc.
Sectoral Analysis
Slums & Urban Poor
Name of Slum
Slum
Individual
No. of
No. of
No. of
No. of
Ward
pocket/
Notified/ UnWard
population
Slum
water
Communit Handpump Individual Communit
No
reference
notified
population of Notified population
connections
y taps
s
toilets
y toilets
name
slums
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Total
Ward no. 1
Ward no. 2
Ward no. 3
Ward no. 4
Ward no. 5
Ward no. 6
Ward no. 7
Ward no. 8
Ward no. 9
Ward no. 10
Ward no. 11
Ward no. 12
Ward no. 13
Ward no. 14
Ward no. 15
Note:
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
667
784
588
445
347
426
643
665
689
810
589
675
597
505
675
9105
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
3207
Box shows ward having slum population
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
No. of
Pucca
houses
No. of Semi
pucca
houses
No. of
Kuccha
houses
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
No. of
No. of
Permanent Temporary
pattas
pattas
distributed distributed
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
No. of
Primary
school in
the slum
pocket
No. of
Primary
Health
centres in
the slum
pocket
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
Beneficiari
Any
es under interventio
social
ns under
security
IHSDP
schemes
(Y/N)
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
SECTORIAL GOALS
YEAR
PHYSICAL INFRASTRUCTURE
DRAINAGE
WATER SUPPLY
Components
2015
2025
2035
40%
100%
100%
135
135
135
40%
Quality of water
As
per
Standards
100%
100%
WHO As
per
Standards
WHO As
per
Standards
25%
15%
5%
80%
100%
100%
Cost recovery
100%
100%
100%
40%
80%
100%
10%
70%
100%
80%
100%
100%
100%
100%
100%
100%
100%
100%
100%
Implementing agency
Contract basis
Contract basis
Preparation of master
plan, rehabilitation and 246 Lakhs Including
improvement
slum area
programmes.
PPP
PPP
PPP
PPP
PPP
PPP
CNP
PPP
100%
PPP
100%
100%
100%
100%
CNP
CNP
100%
100%
100%
Partial
Partial
Partial
80%
70%
Full
Full
Full
100%
100%
Full
Full
Full
100%
100%
60%
100%
100%
80%
100%
100%
60%
As
per
Standards
80%
100%
80%
100%
80%
WHO As
per
Standards
100%
WHO As
per
Standards
To provide 100%
sewerage system with
low cost sanitation
projects, proper
338 Lakhs
treatment before
Including slum area
WHO disposal with Root zone
treatment system and
DEWATS.
Implementation of
245 Lakhs Including
Integrated waste
slum area
management system.
CNP
CNP
CNP
CNP
CNP
CNP, PWD
PPP
ENVIRONMENT
FIRE
FIGH
TING
POWER
STREET
LIGHTNING
PHYSICAL INFRAST
HEREITAGE & TOURISM
100%
100%
CNP, PWD
BOOT
Road upgradations
50%
100%
100%
CNP, PWD
PPP
Widening/ strengthening
50%
100%
100%
CNP, PWD
PPP
ROBs/flyovers
60%
100%
100%
70%
100%
100%
100%
100%
100%
30%
60%
100%
CNP, PWD
BOOT
Parking facilities
New Installation
Upgradation
Underground cabling
100%
30%
100%
-
100%
70%
100%
70%
100%
100%
100%
100%
CNP, PWD
CNP
CNP
CNP
Contract
Contract
Contract
Contract
Energy savings
70%
100%
100%
CNP
Contract
100% *
100% *
100%
100%
100%
100%
100%
100%
100% *
100% *
100% *
100% *
NA
NA
Eco-friendly vehicles
NA
NA
Desilting of nallahs
NA
NA
NA
1925 Lakhs
Including slum area
Installation of solar
street lights with CFL &
LED lights to save
energy.
Development of
underground cabling.
393 Lakhs
Including slum area
CNP, PWD
BOOT
CNP, PWD
BOOT
CNP, PWD
PPP
CNP
CNP
provision of well
equipped fire station.
Development of
Chakghat as transit
point for surrounding
tourist points,
development of water
fronts, improvement of
connectivity of tourist
places.
CNP, PWD
435 Lakhs
State dovt.
CNP
PPP
CNP
CNP
CNP
PPP
PPP
PPP
CNP
PPP
Development of water
bodies, plantation,
checking of pollution
level, use of ecofriendly vehicles,
treatment facilities for
wastes etc.
CNP, GoMP
PPP
CNP
NA
CNP
PPP
CNP
PPP
CNP
CNP
HEALTH
EDUCATION
RECREATIONAL
SOCIAL INFRASTRUCTURE
100% *
100% *
100% *
100% *
Literacy rates
100% *
100% *
100% *
100% *
100% *
100% *
Playing facilities
Provision for green-belts in future development
plans
100% *
100% *
100% *
Strenthening
infrastructures in health
275 Lakhs Including
centers and to run
slum area
health initiative
programs.
Development of water
bodies, mini-stadium,
exibition ground,
community halls, public
library etc.
100% *
Included in tourism
Contract
Contract
Recruitment
PPP
CNP
Contract / PPP
CNP
CNP
CNP
NA
4000 Lakhs
100% *
contract
100% *
100% *
100% *
100% *
PPP
CNP
100% *
Education facilities
Community halls etc.
Adequate health facilities
Security of tenure for urban poor
Note:
MPHB, CNP
Recruitment
Contract
CNP
Provision of Land
ownership,
improvement schemes,
relocation of hazardous
slums, pucca drain
network, financial
support for the
construction of houses
included in other
sectors
100% *
100% *
100% *
100% *
* Marks - project has to be done till year 2035 by CNP, depending upon city need and available resources.
CNP
Contract / PPP
CNP
Contract / PPP
CNP
PPP
CNP
PPP
CNP
PPP
CNP
CNP
CNP
MPHB, CNP
PPP
PPP
PPP
10
Capital Expenditures
Revenue Expenditure
Capital
Receipts
Revenue Income
Municipal Finance (Should be filled carefully and it should be checked whether the capital income is factual or based on assumption
Year
Rates and Tax Revenue
Assigned Revenues & Compensation
Rental Income from Municipal Properties
Fees & User Charges
Sale & Hire Charges
Revenue Grants, Contribution and Subsidies
Income from Investments
Interest Earned
Tax
Non-Tax
Other Income
Total - Revenue Income
Grants, Contribution for specific purposes
Secured Loans
Unsecured Loans
Deposits
Deposit works
Total Capital Receipts
Establishment Expenses
Administrative Expenses
Operations & Maintenance
Interest & Finance Charges
Programme Expenses
Revenue Grants, Contribution and Subsidies
Miscellaneous Expenses
Transfer to Fund
Other
Total - Revenue Expenditure
Fixed Assets
Capital Work-in-Progress
Investments -General Fund
Investments-Other Funds
Stocks/Inventory
Loans, Advances and Deposits
Other Assets
Miscellaneous Expenditure
Total Capital Expenditure
Total Income
Total Expenditure
2005-06
-
2006-07
-
2007-08
-
2008-09
364165
4689514
2782376
7836055
8984968
263337
1315533
10563838
-
2009-10
1473313
4029878
6616183
12119374
5187511
4181738
590422
9959671
-
2010-11
8815183
6959783
686207
16461173
10062985
2628174
541772
13232931
-
Note: Refer Madhya Pradesh Municipal Accounting Manual for further details. Can be downloaded from "Download" Section of www.mpurban.gov.in.
11
Achieved (Y/N)
2012-13
N
N
2013-14
2014-15
Preliminary
estimate (if any)
for
implementation
Implementing
agency
2015-16
25%
50%
75%
100%
No
Not Available
UADD
25%
50%
75%
100%
No
Not Available
Nagar Parishad
25%
50%
75%
100%
No
Not Available
Nagar Parishad
25%
50%
75%
100%
No
Not Available
67%
33%
100%
No
30 lakh
50%
75%
100%
No
Not Available
N
N
N
25%
12
i|Page
Sub Engineer
Chakghat
TABLE OF CONTENTS
LIST OF TABLES --------------------------------------------------------------------------------------------------------------IX
LIST OF FIGURES ------------------------------------------------------------------------------------------------------------ X
LIST OF GRAPHS----------------------------------------------------------------------------------------------------------- XIV
LIST OF MAPS --------------------------------------------------------------------------------------------------------------XV
1.
INTRODUCTION --------------------------------------------------------------------------------------------- 12
1.1
1.2
1.3
1.4
1.5
1.6
BACKGROUND ----------------------------------------------------------------------------------------------------------- 12
CONCEPT AND PRINCIPLE OF CITY DEVELOPMENT PLAN ------------------------------------------------------------- 12
OBJECTIVE OF THE ASSIGNMENT --------------------------------------------------------------------------------------- 13
UNDERSTANDING OF TERMS OF REFERENCE VIS A VIS METHODOLOGY OF THE STUDY --------------------------- 13
APPROACH AND METHODOLOGY FOR PREPARATION OF CDP ------------------------------------------------------ 14
SCOPE OF WORK -------------------------------------------------------------------------------------------------------- 15
2.
2.1
2.2
2.3
2.4
2.4.1
2.4.2
2.5
2.6
3.
3.1
3.2
3.3
3.4
3.5
3.5.1
3.5.2
3.5.3
3.6
3.7
3.8
3.9
3.10
BACKGROUND ----------------------------------------------------------------------------------------------------------- 31
POPULATION TREND AND URBANIZATION ---------------------------------------------------------------------------- 31
POPULATION DENSITY -------------------------------------------------------------------------------------------------- 33
POPULATION PROJECTIONS --------------------------------------------------------------------------------------------- 34
METHODOLOGY ADOPTED TO ESTIMATE POPULATION -------------------------------------------------------------- 35
ARITHMETIC PROGRESSION METHOD --------------------------------------------------------------------------------- 35
GEOMETRICAL PROGRESSION METHOD ------------------------------------------------------------------------------- 36
INCREMENTAL INCREASE METHOD ------------------------------------------------------------------------------------- 36
SUMMARY OF POPULATION PROJECTION THROUGH VARIOUS METHODS ----------------------------------------- 37
SCHEDULE CASTE & SCHEDULE TRIBE POPULATION ------------------------------------------------------------------ 38
LITERACY RATE----------------------------------------------------------------------------------------------------------- 38
SEX RATIO ---------------------------------------------------------------------------------------------------------------- 40
SWOT ANALYSIS -------------------------------------------------------------------------------------------------------- 42
ii | P a g e
4.1
4.2
4.3
4.4
4.5
4.6
4.7
4.8
4.8.1
4.8.2
4.9
4.10
BACKGROUND ----------------------------------------------------------------------------------------------------------- 44
SEX RATIO ---------------------------------------------------------------------------------------------------------------- 44
LITERACY RATE----------------------------------------------------------------------------------------------------------- 44
AVERAGE HOUSEHOLD SIZE -------------------------------------------------------------------------------------------- 44
WORKFORCE PARTICIPATION ------------------------------------------------------------------------------------------- 45
WORKFORCE DISTRIBUTION -------------------------------------------------------------------------------------------- 45
DEPENDENCY RATIO----------------------------------------------------------------------------------------------------- 46
INDUSTRIAL ACTIVITIES ------------------------------------------------------------------------------------------------- 48
INFORMAL BUSINESS AND LOCAL ECONOMY (TRADE & COMMERCE) ---------------------------------------------- 49
WHOLESALE TRADE ----------------------------------------------------------------------------------------------------- 49
ISSUES -------------------------------------------------------------------------------------------------------------------- 51
HERITAGE AND TOURISM ----------------------------------------------------------------------------------------------- 51
5.
5.1
BACKGROUND ----------------------------------------------------------------------------------------------------------- 55
5.2
SPATIAL GROWTH TRENDS --------------------------------------------------------------------------------------------- 55
5.3
SPATIAL DISTRIBUTION OF POPULATION ------------------------------------------------------------------------------ 55
5.4
LANDUSE ANALYSIS ----------------------------------------------------------------------------------------------------- 57
5.5
MASTER PLAN PROVISION ---------------------------------------------------------------------------------------------- 59
5.5.1
REVIEW OF PROPOSED DRAFT MASTER PLAN-2021----------------------------------------------------------------- 61
5.6
HOUSING SCENARIO----------------------------------------------------------------------------------------------------- 61
5.6.1
INTRODUCTION ---------------------------------------------------------------------------------------------------------- 61
HOUSING STOCK-------------------------------------------------------------------------------------------------------------------------- 62
DISTRIBUTION OF HOUSES BY TYPES ----------------------------------------------------------------------------------------- 62
CATEGORIES OF HOUSING STRUCUTRE -------------------------------------------------------------------------------------- 62
DISTRIBUTION OF HOUSES BY USE ------------------------------------------------------------------------------------------- 64
OWNERSHIP STATUS ---------------------------------------------------------------------------------------------------------- 64
5.6.2
PRESENT AND FUTURE HOUSING DEMAND --------------------------------------------------------------------------- 64
5.6.3
HOUSING GAP ASSESSMENT ------------------------------------------------------------------------------------------- 66
5.7
FUTURE GROWTH POSSIBILITIES --------------------------------------------------------------------------------------- 66
5.8
SWOT ANALYSIS -------------------------------------------------------------------------------------------------------- 67
5.9
CITY SPECIFIC STRATEGIES AND ACTION PLAN ------------------------------------------------------------------------ 68
URBAN INFRASTRUCUTRE SERVICES -------------------------------------------------------------------- 70
6.
6.1
6.2
6.2.1
INTRODUCTION ---------------------------------------------------------------------------------------------------------- 70
PHYSICAL INFRASTRUCUTRE -------------------------------------------------------------------------------------------- 70
WATER SUPPLY ---------------------------------------------------------------------------------------------------------- 70
SOURCES OF WATER SUPPLY ------------------------------------------------------------------------------------------------- 70
WATER DISTRIBUTION SYSTEM----------------------------------------------------------------------------------------------- 70
OTHER SOURCES --------------------------------------------------------------------------------------------------------------- 71
WATER DISTRIBUTION ARRANGEMENTS ------------------------------------------------------------------------------------ 71
iii | P a g e
6.2.2
6.2.3
6.2.4
iv | P a g e
6.2.5
6.2.6
6.2.7
v|Page
6.3
6.3.1
6.3.2
6.3.3
6.3.4
6.3.5
6.3.6
6.3.7
6.3.8
6.3.9
6.3.10
6.3.11
6.3.12
6.3.13
vi | P a g e
7.
7.1
7.2
7.3
7.4
7.5
7.6
7.7
7.8
7.9
7.10
7.11
7.12
7.13
7.14
7.15
7.16
7.17
8.
8.1
8.2
8.3
8.4
8.1
8.5
8.6
8.7
vii | P a g e
9.
9.1
9.1.1
9.1.2
9.2
9.3
9.4
9.5
9.5.1
9.5.2
9.6
9.6.1
9.6.2
9.7
9.7.1
9.8
9.9
10.
10.1
10.2
10.3.1
10.3.2
10.3.3
10.3.4
10.3.5
10.3.6
10.3
10.4.1
10.4.2
10.4.3
10.4.4
10.4
10.5
10.6
10.7
10.8
10.9.1
viii | P a g e
10.9.2
10.10
10.10.1
10.10.2
10.10.3
10.10.4
10.10.5
10.11
11.
11.1
11.2
11.3
11.4
11.5
11.6
11.7
11.8
11.9
12.
12.1
12.2
12.3
ix | P a g e
LIST OF TABLES
Table 2-1: Study Area............................................................................................................................ 26
Table 2-2: Average Annual Rainfall in Chakghat ................................................................................... 28
Table 3-1: Comparative Assessment of Urban Population ................................................................... 31
Table 3-2: Population Growth Trends .................................................................................................. 32
Table 3-3: Population Density Trends................................................................................................... 33
Table 3-4: Demographics of the Town - Chakghat ............................................................................... 33
Table 3-5: Trend of Population Growth in Chakghat Town .................................................................. 35
Table 3-6: Projected Population Arithmetic Progression Method .................................................... 35
Table 3-7: Projected Population Geometrical Progression Method.................................................. 36
Table 3-8: Calculation of Population Projection Incremental Increase Method ............................... 37
Table 3-9: Projected Population Incremental Increase Method ....................................................... 37
Table 3-10: Comparative Assessment of Urban SC & ST Population .................................................... 38
Table 3-11: Comparative Assessment of Literacy Rate Chakghat, M.P. ............................................ 38
Table 3-12: Ward Wise Comparative Assessment of Literacy Rate Chakghat, M.P. ......................... 39
Table 3-13: Comparative Assessment of Sex Ratio .............................................................................. 40
Table 3-14: Ward Wise Comparative Assessment of Sex Ratio Chakghat, M.P. ............................... 41
Table 4-1: Comparative Assessment of Household Size ....................................................................... 44
Table 4-2: Comparative Assessment of WFPR ...................................................................................... 45
Table 4-3 Ward Wise Comparative Assessment of WFPR & Work Force Distribution ......................... 46
Table 4-4 Comparative Assessment of Non-working Population ......................................................... 47
Table 4-5: Ward Wiae Comparative Assessment of Dependent Population & Dependency Ratio...... 47
Table 4-6: List of Important Industries in Rewa District and in its surrounding Districts .................... 48
Table 4-7: List of Important Centers/Spots for Tourists in Town and in its Proximity ......................... 51
Table 5-1: Ward Wise Distribution of Population Density.................................................................... 56
Table 5-2: Existing Landuse Distribution; 2011 Chakghat .................................................................. 57
Table 5-3: Comparision between Existing (2011) and Proposed Landuse (2021) Distribution
Chakghat ............................................................................................................................................... 60
Table 5-4: Comparative Assessment of Household Size ....................................................................... 62
Table 5-5: Ward Wise Present Housing Demand and Gap ................................................................... 65
Table 5-6: Present and Future Housing Demand and Gap ................................................................... 65
Table 6-1: Main Sources of Water Supply ............................................................................................ 70
Table 6-2: Silent Feature of Water Supply System in Chakghat ........................................................... 71
Table 6-3: Projected Future demand Water Supply .......................................................................... 74
x|Page
xi | P a g e
xii | P a g e
LIST OF FIGURES
Figure 1.5-1: Specific Objectives of CDP ............................................................................................... 15
Figure 1.6-2: Stage 1: Inception ............................................................................................................ 17
Figure 1.6-1 Kick-off Workshops at Chakghat Nagar Parishad ............................................................. 17
Figure 1.6-3: Stage 2: Sector Assessment and City Profile ................................................................... 18
Figure 1.6-4: Stage 3: City Vision and Development Objectives........................................................... 19
Figure 1.6-5: Stage 4: Draft CDP ........................................................................................................... 20
Figure 1.6-6: Schematic Diagram for Methodology of City Development Plan Preparation ............... 21
Figure 4.8-1: Informal Business Activites along the Major Roads of the Town.................................... 49
Figure 4-4.8-2 Major Market Areas (Chak Bazar) in Town ................................................................... 50
Figure 6.2-1: Water Supply Distribution Arrangements ....................................................................... 72
Figure 6.2-2: Condition of Major Roads in Town ................................................................................ 116
Figure 6.2-3: Unorganised On-street parking in Town ....................................................................... 118
Figure 6.2-4: Street Light at Old Chowk - Chakghat............................................................................ 125
Figure 6.2-5: Slums in Chakghat Town................................................................................................ 132
Figure 6.3-1: Health Facilities at CHC in Chakghat Town .................................................................... 138
Figure 6.3-2: Schools in Chakghat Town ............................................................................................. 139
Figure 6.3-4: NSPG College in Chakghat Town ................................................................................... 140
Figure 6.3-3: Building Structure and Basic Infrastructure Service in Schools - Chakghat Town ......... 140
Figure 6.3-5: Ghats along Tamas River in Chakghat Town ................................................................. 151
Figure 6.4-1 Condition of Major Roads in Town ................................................................................. 167
Figure 6.4-2: Unorganised On-street parking in town ........................................................................ 170
Figure 1-1: Institutional Setup Chakght Nagar Parishad .................................................................. 173
Figure 2-1: Year Wise Total Income, Chakghat Nagar Parishad ......................................................... 180
Figure 4-1: Total Expenditure Chakghat Nagar Parishad ................................................................. 181
Figure 5-1: Income from Various Sources - CNP ................................................................................. 182
Figure 7-1: Year Wise Revenue Income, Expenditure and Surplus - CNP ........................................... 184
xiii | P a g e
LIST OF GRAPHS
Graph 3.1: Population Chakghat, M.P. ---------------------------------------------------------------------------------------- 31
Graph 3.2: Decadal Growth of Population Chakghat, M.P. --------------------------------------------------------------- 32
Graph 4.1: Gender Wise Work Force Distribution in Differrent Sectors of Economy -------------------------------- 46
Graph 6.1: Ward Wise Distribution of Literacy Rate Chakghat, M.P. ------------------------------------------------- 141
Graph 4: Financing Option- Water Supply ------------------------------------------------------------------------------------- 209
Graph 5: Financing Option- Sewerage & Sanitation ------------------------------------------------------------------------- 210
Graph 6 Financing Option- Solid Waste Management ---------------------------------------------------------------------- 210
Graph 7: Financing Option- Strom water Drainage -------------------------------------------------------------------------- 210
Graph 8: Financing Option-Traffic & Transportation ------------------------------------------------------------------------ 211
Graph 9: Financing Option: Street Lighting & Fire Fighting ---------------------------------------------------------------- 211
Graph 10: Financing Option- Urban Poor -------------------------------------------------------------------------------------- 211
Graph 11: Financing Option- Health facility ----------------------------------------------------------------------------------- 212
Graph 12: Financing Option- Education Sector ------------------------------------------------------------------------------- 212
Graph 13: Financing Option- Tourism ------------------------------------------------------------------------------------------- 213
Graph 14: Financing Option- Other Components ---------------------------------------------------------------------------- 213
Graph 15: Financing Option- Urban Reforms & Capacity Building ------------------------------------------------------- 213
xiv | P a g e
LIST OF MAPS
Map: 2-1 Location of Chakghat............................................................................................................. 25
Map: 2-2 Regional Connectivity Chakghat, M.P. .............................................................................. 26
Map: 2-3 Study Area Chakghat Nagar Parishad ................................................................................. 27
Map: 3-1 Ward Wise Population Density Chakghat, M.P. ................................................................. 34
Map: 3-2 Ward Wise Literacy Rate Chakghat, M.P............................................................................ 39
Map: 3-3 Ward Wise Sex Ratio Chakghat, M.P. ................................................................................. 41
Map: 5-1 Urban Growth Scenario Chakghat, M.P. ............................................................................ 56
Map: 5-2 Existing Landuse Map; 2011 Chakghat Nagar Parishad ..................................................... 59
Map: 5-3 Proposed Landuse Map; Draft Master PlanMap; 2011 Chakghat Nagar Parishad ............ 61
Map: 5-4 Chakght: Future Growth Possibilites/Direction with Proposed Sectoral Zones - 2035 ........ 67
Map: 6-1 Existing and proposed water sypply network ....................................................................... 74
Map: 6-2 Drainage Map - Chakgaht ...................................................................................................... 97
Map: 6-3 Road Network of Chakghat Town ....................................................................................... 115
Map: 6-4 Social Infrastructure Map of Chakghat ............................................................................... 142
Map: 6-5 Tourism in and around Chakghat Town .............................................................................. 153
Map: 6-6 Regional Tourism Destination around Chakghat Town....................................................... 156
Map: 6-7 Proposed Tourism Circuits at Regional Level ...................................................................... 158
Map: 7-1 Major Roads in Town .......................................................................................................... 166
xv | P a g e
Executive Summary
Introduction
Government of India (GoI) and Government of Madhya Pradesh (GoMP) have made several
initiatives through various programmes to meet the growing demands of infrastructure and service
delivery. Subsequently, the GoI and GoMP executed various program such as City Development (a)
Urban Infrastructure Development Scheme for Small and Medium Towns (UIDSSMT), (b) Integrated
Housing and Slum Development Programme (IHSDP), (c) the GoMP initiated DFID funded MPUSP
(which is now known as MPUIIP), which links reform with investment in infrastructure for the poor,
etc. Other than this, there are several programmes that have been initiated by the GoI and GoMP.
This is the Phase-II assignment of GoMP where they are preparing City Development plans (CDP) for
258 towns. In the phase-I stage they already done cDPs for 258 towns. In this Phase DMG Consulting
Pvt. Ltd did CDPs for 7 towns out of the 258 towns.
Based on this programme, GoMP launched Mukhyamantri Sahari Adhusanrachna Bikas Yojana,
which is going to be, funded all the projects proposed in the CDPs to the respective ULB.
Objectives and scope of the Assignment
The objective of the assignment is to prepare a CDP with the vision of a desired future perspective
for the city and formulate a strategic framework and interventions through sectoral plans translated
into actions that define on how the ULB, together with other stakeholders, intends to work towards
achieving their long-term vision in the next five years. The above foremost objective is to achieve
and translate into developmental outputs in the form of projects, programme and implementation
process which intend to cover the following:
The CDP will scale up existing urban development and poverty alleviation schemes within a
comprehensive and coherent strategic planning framework in order to ensure optimal
benefit from available resources for the citizens of the Urban Local Body.
The CDP should aim to catalyze new thinking and provoke debate through a consultative
stakeholder driven process and vision.
Strategic thrusts of the CDP will be built around the lessons and findings of a comprehensive
and rigorous stakeholder consultation and documentation process.
It is expected that the CDP will serve the requirements of the UIDSSMT and IHSDP
programmes as well as JNNURM and other development schemes.
The CDP will generate specific priority actions and projects that can be the basis for
mobilizing funding from diverse sources.
The scope of work include: (a) Inception Report covering Current status, systems and procedures,
reconnaissance and kick off workshop, b) Sector Analysis Report on the economic opportunity and
potential for local/regional economic development with special reference to the poor, transport
study with emphasis on low cost public transport and livelihoods, heritage conservation and tourism,
environmental sustainability, access to housing, employment and social and environmental services
DMG Consulting Pvt. Ltd., Noida
Page 1
Page 2
As of 2001 the sex - ratio of Chakghat was 889 females/1000 males which is lower than average
of Madhya Pradesh (920) and India (933)
As of 2011 the Literacy rate in Chakghat was 69.88 per cent (male literacy rate of 75.97 per cent
and female literacy rate of 63.17 per cent) which seem to be much lower than the national
average for urban India for the year 2001.
The total number of Household is 1494 as per the 2001 census. The average household size in
Chakghat works out to be 6.05, which is slightly higher than the average household size of the
state.
As per 2001 census, the Chakghat Nagar Parishad has low Work Force Participation Rate (WFPR),
WFPR is recorded at 31.22% indicating lower dependency ratio than National urban average,
while the National Urban average accounts for 32.25%.
Page 3
Page 4
Page 5
Page 6
Page 7
Income
As per the Budget, the contribution of Municipal Taxes and grants is 46.25 Lakhs and Rs.68.07
Lakhs for the year 2009-10 and 2010-11, respectively. For the same year, the third contributor is
DMG Consulting Pvt. Ltd., Noida
Page 8
Revenue expenditure
The actual income statements suggest a close-to-constant total expenditure between 2006-07 and
2010-11. In the FY 2009-10, total expenditure was less as compare to the previous year but in
FY2010-11 total expenditure of Chakghat Nagar Parishad increases due to Establishment
Expenditure (Salary, Wages, Benefit and allowance).
iii)
The capital account comprises capital income and capital expenditure. Capital income consists of
income earned by the council from loans raised, transfers from revenue surplus and utilization of
funds from sinking funds and grants received for undertaking capital works. The current income of
Chakghat is clearly increasing every year, the income from non tax sources such as rent from
municipal properties and fee charged for various services. The net capita for the financial year 201011 was around 1.6 crore rupees.
iv) Savings / Over-Expenditure: Trend Analysis
The assessment of the income and expenditure statement of CNP, at aggregate level reveals that
from all the years reviewed, in 2008-10 it shows buffer margin but in the year 2010-11 it turns into
deficit margin due to more Capital expenditure. Since the Chakghat region is quite underdeveloped
the surplus income should be spent on the general welfare, maintaining a comfortable margin of
surplus for emergency situations. Chakghat Nagar Parishad is in a comfortable position to invest its
additional resources for the suggested upcoming projects.
Investment Prioritization plan
Project identification
Based on the stakeholder consultation meet, the prioritization of projects was done so that the
views, aspirations and felt needs of the local officials, residents, experts, NGOs, elected
representatives and others are given due cognizance. The sectoral priority to the projects is assigned
on the basis of various consultations and discussions held with the government departments
involved in the implementation of CDP. It also takes into account the aspirations of the residents of
Chakghat expressed in a workshop, informal discussions and meetings held for the purpose. By the
year 2035 the investment of around 7649 lakh rupees will be required in various identified projects.
Investment plan
The projects are to be implemented over the plan period of twenty five years as per following
implementation schedule worked out on the basis of time involved in completing the projects and
the priority decided for the same. It will be done in 5 phases
Phase I (2012-2015)
Phase II (2016-2020)
DMG Consulting Pvt. Ltd., Noida
Page 9
Page 10
CHAPTER 1
INTRODUCTION
Page 11
1.
1.1
INTRODUCTION
Background
Madhya Pradesh is urbanizing at a fast rate and the Urban Local Bodies of the state are facing the
challenge of meeting the requirements of the growing population with limited technical and
financial resources. Governments of India (GoI) as well as Government of Madhya Pradesh (GoMP)
have initiated a number of programmes to meet the growing demands of infrastructure and service
delivery. These are the GoI schemes: Urban Infrastructure Development Scheme for Small and
Medium Towns (UIDSSMT) and Integrated Housing and Slum Development Programme (IHSDP), the
GoMP initiated DFID funded MPUSP, which links reform with investment in infrastructure for the
poor etc. Other than this there are several programmes that have been initiated by the GoI and
GOMP.
1.2
A CDP is a planning process and a vision for future development of the city, which builds and
improves the partnership between various stakeholders group viz. citizens from various social
groups including slum dwellers & senior citizens, trade bodies, citizen forum, professionals, freedom
fighters, journalists, informal business entities etc. and line agencies or government
departments/organizations for efficient and improved delivery & management of various urban
basic services within the city.
The consultative approached based CDP preparation assures realistic demand based infrastructure
production, its spatial distribution and equity in services delivery. This process confirms better assets
management, improved services delivery towards urban poors and good governance. It also
encourages the people to think about the direction and pace of development of their city thereby
evolving and defining the development strategies to translate the vision into strategic plans
incorporating sectoral investment plan that give an impetus to the economic growth and poverty
reduction.
There are ways and means to undertake a consultative process in a given situation in a city.
Therefore, DMG Consulting (P) Ltd. has undertaken a targeted focus group discussion in a cluster
of wards at a centrally located destination so that public views are documented in a structured
manner with a targeted audience. This has brought two aspects into the notice of consultant one is
divergent views from the public and the other is spatial disparity in terms of municipal services
delivery. The consultant has undertaken the process of consultation with various stakeholder
groups like urban poor, women, senior citizens; traders etc. These groups bring their issues, needs,
suggestions and aspirations. Such issues and suggestions are reviewed by the CDP Consultant team
before incorporating and mainstreaming the issues in CDP preparation. This approach will
strengthen inclusive planning process and will be biased towards urban poor, gender-mainstreaming
issues etc. resulting in strategic and sustainable development of the city in the future.
The essence of planning is efficient use of public resources and demand driven services delivery
approach. It establishes a logical and consistent framework for evaluation of investment decisions.
The DMG Consulting (P) Ltd. access, analyze and presents the current stage of the citys
development and sets out the directions of change. It also identifies the thrust areas based on
DMG Consulting Pvt. Ltd., Noida
Page 12
1.3
The following objectives have been framed to achieve the goal of City Development Plan:
1.4
To prepare a perspective and set Vision for the future development of the city.
To improve and strengthen the municipal services including their delivery and management
system and making them self-sustaining.
To suggest policies and programmes those specifically address the issues of urban poor.
It is expected that the CDP will serve the requirements of the UIDSSMT and IHSDP
programmes as well as JNNURM and other development schemes.
To assist the State government to undertake urban sector reforms, which will facilitate flow of
investments into city based infrastructure.
The understanding of terms of reference under city development plan refers to broad contours of
the assignment which includes existing infrastructure status including supply and demand gap
assessment, key issues and concerns of city development, major economic drivers & opportunities,
city vision and positioning of the city, identifying key projects to achieve the city vision and
aspiration of city citizens, preparing city investment plans and phasing of implementation.
Implementation framework including capacity building and reforms to be undertaken to achieve the
city development goals and vision as envisaged.
The methodology will document and bring a stepwise process and sequential arrangement of tasks
and activities. These activities will have a set of process to follow and guidelines to adhere so that
the broad contours and goals of the study are achieved. In other words, methodology is a means &
tools to achieve the targeted goals/objectives under the proposed study. The understanding of
Terms of reference is crucial to derive and plan a proper methodology to achieve broad objectives
DMG Consulting Pvt. Ltd., Noida
Page 13
1.5
The CDP preparation is both a perspective and a vision for the future development of a city captured
through a consultative process. It presents the current stage of the citys development where we
stand now? It sets out the directions of change where do we want to go? It identifies the thrust
areas -- what do we need to address on a priority basis? It also suggests alternative routes,
strategies, and interventions for bringing about the change what interventions do we make in
order to attain the vision? It provides a framework and vision within which projects need to be
identified and implemented. It establishes a logical and consistent framework for the evaluation of
investment decisions.
The CDP clearly defines how the Nagar Parishad Chakghat will serve its citizens, for example how it
intends to guarantee a basic level of urban services to all citizens, make urban planning responsive
to emerging needs, and become responsive to the needs of and improve its services to local
businesses .
The CDP also explains how Nagar Parishad Chakghat will run its business, e.g. how it intends to
manage public finance in a modern and transparent way, execute urban planning and governance in
line with an established framework, become more responsive and cost and time efficient by
integrating technology in its governance and service delivery processes.
Finally, the CDP lays down Nagar Parishad Chakghats strategy to manage its resources, for example
using performance indicators - physical, financial and institutional i.e. it details out the corporations
intensions to increase revenues and expand its tax base to allow for self-sustaining urban service
delivery, improve its creditworthiness and recruit and retain a skilled workforce. This will involve
capacity building and includes Training Needs Assessment (TNA), job holders analysis i.e. who has to
do what? Business Plan Preparation for monitoring implementation will include performance
indicators development Physical, Financial and Institutional.
The process of CDP preparation has been initiated with a Kick Off workshop which reveals the
process, purpose and outcomes including steps of CDP preparation, a public consultation, focused
group meetings with concerned stakeholders and one to one meetings with Nagar Parishads
departmental heads and with line departments of district administration, elected representatives
viz. MP/MLA and business - including trade bodies and professionals. This has formed basis of all
stages of CDP from vision statement, goals and issues identification, strategy for development,
preparation of priority matrix for project identification, sequential phasing of projects including city
investment plan preparation and long term perspective plan upto year 2035.
The diagnostic exercise, inception, city profile and sector analysis includes detailed assessment of
the existing situation of the city. The purpose of this analysis will be to make a realistic assessment
of where the city is, the direction in which it has been moving and its strengths and weaknesses. It
covers the citys demographic, economic, financial, infrastructural (service delivery), physical and
environmental profile. It also considers the citys institutional framework, innovation in management
if any and e-governance initiatives underway and status of e-readiness of Nagar Parishad Chakghat.
The overall objective of the consultation process will be to get the viewpoints of the stakeholders in
the identification of issues as well as vision formulation. Specific objectives are:
DMG Consulting Pvt. Ltd., Noida
Page 14
1.6
Scope of Work
DMG consulting Pvt. Ltd. will carry out a multi-stage exercise to formulate the CDP in close
collaboration with the ULB.
Stage 1: Inception
The purpose of this stage is to review and analyse the current status and unique features of the city
with regard to the state of its development, systems and procedures, as equally its institutional and
financial context. The main activities involve introduction of CDP concept, purpose and outcome to
public representatives like MLA, President, Ward Councilors, citizens forming the city, along with
Chief Municipal Officer - Heads of Nagar Parishad Chakghat, Departmental Heads and other projects
personnel involved. Task involves familiarity visit to city and review of its growth pattern,
identification of growth corridors, collection and collation of information and data from Nagar
Parishad and other line Departments/Agencies/Organizations, reviewing and analyzing the current
status and unique features of the city with regard to the state of its development, systems and
procedures, as equally its institutional and financial context. This stage will identify the strengths,
weaknesses and opportunities in the city for its development and will provide an understanding of
what hampers the service delivery and management within the existing set-up and how can be
better off to contribute efficient and self-sustaining service provision. This stage involves the
following activities.
The assignment commenced with the preliminary meeting with the officials of the Nagar Parishad
Chakghat to understand their requirements from this assignment. Following activities were
undertaken.
Reconnaissance
The CDP consultant has conducted introductory meetings with the President, Chief Municipal
Officer, Head of Departments, Councilors, representatives of ongoing urban programmes, etc. to
understand the dynamics and divergent views about the city and to gather the secondary
information such as - Expansion of the city viz. city boundary including land-use or base map for the
DMG Consulting Pvt. Ltd., Noida
Page 15
Kick-off Workshop
The kickoff workshop is a formal entry level activity to begin the city development plan. The
consultant proposed to have one to one meetings with Mayor, head of Nagar Parishad and its heads
of departments to fix a date, time and venue for a one day kick-off workshop with identified various
stakeholders to familiarize them with the purpose, process and expected outcomes of the CDP and
build enthusiasm, understanding and commitment to the CDP. A one day kick-off workshop with
Nagar Parishad, Chakghats support was organized (Dated-21/11/2011) to familiarize the
stakeholders with the purpose, process, and expected outcomes of the CDP, and build enthusiasm,
understanding and commitment to the CDP.
The kick off workshop helped in deriving a consensus along with the stakeholders firming the
process and agreeing upon a structured programme to take the CDP forward. The formation of the
Steering Group will also be announced as well as the sectors for which detailed analysis will be
carried out.
Page 16
Sector Analysis
Page 17
City/Town Profile
The findings from the sector analysis will be used in preparing the City Profile consisting of the
assessment of the existing situation in all the sectors identified, emerging issues, SWOT analysis and
projection of the present gaps and future requirements.
The framework of parameters relating to demography, economic base, finance, physical and
environmental issues, infrastructure, institutions and universalisation of services especially for the
poor are to be included.
Page 18
DMG consulting Pvt. Ltd. with support from ULB will organize third workshop involving all the
stakeholders, who have been part of the CDP preparation process. The workshop will seek an
endorsement of the City Development Plan from the stakeholder group present and agree on
procedures for performance monitoring.
DMG Consulting Pvt. Ltd., Noida
Page 19
Page 20
Figure 1.6-6: Schematic Diagram for Methodology of City Development Plan Preparation
Page 21
CHAPTER 2
Introduction to Chakghat
Page 22
2.
2.1
INTRODUCTION TO CHAKGHAT
Introduction to Rewa
Rewa district is situated in the north-eastern part of the state of Madhya Pradesh in India. It was a
princely state of Vindhya Pradesh. The city lies about 420 kilometres northeast of the state
capital Bhopal and 130 kilometres south of the city of Allahabad.
It lies between 240 18 and 250 12 north latitudes and 810 2 and 820 18. The district is bounded on
the north by Uttar Pradesh, on the east and southeast by Sidhi on the south by Shahdol and on the
west by Satna.
The district has a varied terrain that includes alluvial plains, hills, ravines, scarp, rivers, and waterfalls. The rain-water of the district flows out along two tributary rivers of the Ganges the Tamas and
the Son.
According to the 2011 census, Rewa District has a population of 2,363,744, roughly equal to the
nation of Latvia or the US state of New Mexico. This gives it a ranking of 191st in India (out of a total
of 640). The district has a population density of 374 inhabitants per square kilometre. Its population
growth rate over the decade 2001-2011 was 19.79%. Rewa has a sex ratio of 930 females for every
1000 males and a literacy rate of 73.42%.
A limestone belt runs through the Rewa district and coal is found in the nearby districts of Shahdol,
Umaria, Sidhi and Singrauli. Cement factories are located in nearby Naubasta, Bela (Satna district)
and Bhagwar (Sidhi district). The Jaypee Group has built a township known as Jaypee Nagar in Rewa.
Asia's biggest cement factory, Prism cement (previously Rasi Cement), operates near Rewa in Satna
district. Various Birla Group Companies, such as Vindhya Tele Links and Birla Ericson Ltd., are also
located there.
In 2006, the Ministry of Panchayati Raj named Rewa one of the country's 250 most backward
districts (out of a total of 640 districts in India). It is one of the 24 districts in Madhya Pradesh
currently receiving funds from the Backward Regions Grant Fund Programme (BRGFP).
2.2
Administrative Boundary
The study area, Chakghat is a small town situated at 80 kms in North-east from Rewa Town (District
Headquarter) in Teonthar Tehsil of Rewa District which is bounded by Allahabad District (U.P) in the
North; Chirtakut (U.P.) in North-West; Satna (M.P.) in South-West; Sidhi (M.P.) in South-East and
Mirzapur (U.P) in North-East. Geographically, the town lies at 2580 north latitude and 8141 east
longitude at an altitude of about 390mts. above mean sea level in Bagelkhand Region.
Forming a gateway to the pilgrimage center Allahabad, the Chakghat town constitutes a total area
of about 5.21 Sq. Km. under the jurisdiction of Chakghat Nagar Parishad and is divided into 15 no. of
wards for management of civil services/civic amenities and administration. Fig. 2.1 & 2.3 delineates
the location of study area and its administrative boundary respectively.
Page 23
2.3
Located in the North-eastern part of Rewa District near to the States Border of Madhya Pradesh and
Uttar Pradesh, the Chakghat town is well connected to the rest of the towns of M.P. and U.P. by
Road, Rail and Airways.
Roadways: Road plays an important role in connecting Chakghat town to other towns and cities of
the country. The National Highway No. 27 connects the town to its District Headquarter Rewa,
World famous pilgrimage center Prayag and Class - I Town Allahabad. The town is also well
connected to rest of the towns of by State Highways and Major District Roads at regional level.
Railway Linkage: As town is not directly linked with Indian Railway System, the nearest railway
station is Naini Junction in Uttar Pradesh at a distance of 40 kms followed by Allahabad (50 kms) and
Rewa the District Headquarter (80 km).
Airways: The nearest airport is at Bamrauli (Defense Air Base) in Uttar Pradesh which is
approximately 65 kms from Chakghat via Allahabad through N.H. 27 followed by Satna
(approximately 120 kms.) which has an airstrip, however not in use for regular fights. The Varanasi a
holy city is the nearest airport for civil aviation (approximately 165 kms.) from the Chakghat via
Allahabad through N.H. 27 & N.H. 2.
Page 24
Page 25
2.4
Study Area
The study area Chakghat Town covers an area of about 5.21 Sq. km. under the jurisdiction of
Chakghat Nagar Parishad (CNP). For the administration and management of civic needs & services
for a total population of about 10676 (as per Census - 2011), the town is divided into 15 no. of wards
represented by ward councilors elected by the citizens. Figure 2.3 describe the Study Area: Chakghat
Nagar Parishad.
Table 2-1: Study Area
Administrative Body
Area (HA)
Remarks
5.21
520.83
Semi-Urban Area
Most of the area under CNP is agricultural.
Development rate is slow but have lots of
potentials
Page 26
2.5
Physical Characteristics
Page 27
2.5.2 Climate
The climate of this zone can be divided into three distinct seasons, viz.
The area enjoys tropical type climatic conditions. The climate of the town is characterized by hot and
dry summers and mild winters. Summer nights are mainly cool and pleasant. The maximum average
temperature has been recorded in the month of May & June at 42C, whereas minimum average
recorded temperature is 5.5C. The rainy season starts from the mid June and end in the month of
September. The average annual rainfall is about 1100 mm. During monsoon months the relative
humidity remains more than 60% normally. The month of October witnesses the transition from
monsoon to winter.
Table 2-2: Average Annual Rainfall in Chakghat
Sl. No.
Year
1999
1484
2000
1478
2001
1478
2002
1015
2003
1492
2004
1774
2005
780
2006
1063
2007
1063
The rainfall distribution pattern is irregular. Approximately 90% of all rainfall in the region caused by
the monsoon falling from June to October accounts for average annual rainfall of about 950-1100
mm but most of gets lost due to runoff. July and August are the months of maximum rainfall. April is
the driest months of the year, the scant winter rainfall is useful for the cultivation of Rabi crops but it
is usually inadequate without access to supplementary irrigation purposes.
2.6
The chief means of subsistence of the people in this region is agriculture. It is indeed regarded as the
best occupation and a proverb runs. "Agriculture is the best (occupation), trade and commerce
stands next, while (domestic) service is the lowest and alms begging the last resource". Two seasons
are recognized the kharif lasting from May to Oct, in which jowar, kodon etc are cultivated and the
Rabi lasting from Oct to March in which Soyabean, wheat, grains and masoor are sown.
The town has small scale manufacturing industries. As such there are not many big or large scale
industries inside Chakghat town producing industrial effluent and discharging into the Tamas River.
DMG Consulting Pvt. Ltd., Noida
Page 28
2.7
SWOT Analysis
STRENGTH
WEAKNESS
OPPORTUNITY
THREAT
Page 29
CHAPTER 3
Demographic Profile of the Town
Page 30
3.
3.1
Background
A demographic profile has been prepared based on analysis of census data, data from CNP and other
secondary sources and discussion with CNP. The analysis covers apart from the population growth
and trends in the town, an assessment of the other social characteristics of the population including
literacy, education, gender etc. These analyses, together with the economic base will form the basis
for working out the growth scenarios for the town.
3.2
As per the Census of India, 1961 the total population of Chakghat town was about 1899 which has
been continuously increased throughout the various year and has been registered to about 10676 in
2011 with a population of density of 20.50 persons per hectare. In the year 2001, as per the Census
of India, the total population of Chakghat Nagar Parishad was 9,105 with a density of 17.48 persons
per hectare. In the year 1991 as per the Census the total population of Chakghat town was 6,576.
The decadal growth rate for the year 1991-2001 was registered as 38.46%. At present, as per the
Census 2011, Chakghat Nagar Parishad has registered a total population of 10,676 with a decadal
growth rate of 17.25%. A comparative assessment of the total Urban Population indicates that the
total urban population of Rewa District constituted 1.97% total Madhya Pradesh Urban Population
while CNP constitutes 2.60% of Districts total Urban Population.
Table 3-1: Comparative Assessment of Urban Population
Area
Total Population
Urban
Population
Urban India
Madhya Pradesh (Urban)
Rewa District (Urban)
Chakghat Nagar Parishad
Male
Female
Decadal Growth
Rate 2001-2011
37,71,05,760
19,58,07,196
18,12,98,564
31.80%
2,00,59,666
1,04,70,511
95,89,155
25.63%
3,95,487
2,07,771
1,87,716
23.40%
10,676
5,593
5,083
17.25%
POPULATION OF CHAKGAHT
Population
15000
10000
5000
0
1951-1961
1961-1971
1971-1981
1981-1991
1991-2001
2001-2011
Decades
Graph 3.1: Population Chakghat, M.P.
Page 31
Year
Population
CNP
Rewa District
CNP
Rewa District
1951 - 1961
1,899
7,72,925
1961 - 1971
3,312
9,77,782
74.41
26.50
1971 - 1981
4,637
12,07,598
40.01
23.50
1981 - 1991
6,576
15,54,987
41.82
28.77
1991 - 2001
9,105
19,72,333
38.46
26.84
2001 - 2011
10,676
23,63,744
17.25
19.85
While at district level the decadal population growth rate is also highly skewed during the period
1961-2011. The average decadal growth rate during 1961-1971 was 26.5% which declines to 23.50%
in 1971-1981 and increased to 28.77% in 1981-1991 and subsequently declined to 26.84% during
1991-2001 and 19.85% in 2001-2011. This is because of out migration in search of livelihood as the
Rewa District itself does not have much potential in terms of education & health facilities, economic
opportunities to cater the growing population.
80.00
70.00
60.00
50.00
40.00
30.00
20.00
10.00
0.00
1961-1971
1971-1981
Rewa District
1981-1991
Decades
1991-2001
2001-2011
Chakghat Town
Page 32
3.3
Population Density
As per the Census of 2011, the gross density of Chakghat town is 20.50 persons per ha. which is
increasing continuously since 1981.
Table 3-3: Population Density Trends
Year
Population
Area in Hectare
Density (pph)
1981
4637
520.83
5.21
890
1991
6576
520.83
5.21
13
1263
2001
9105
520.83
5.21
18
1748
2011
10676
520.83
5.21
20
2049
As far as, distribution of population within the town is concerned, the ward nos. 1, 2, 3, 7, 8, 9, 10,
12, 13 and 15 have the maximum concentration of population as per Census 2011. Only ward no. 10,
12, 13 and 15 accounts for more than 36% of total population of CNP. As far as population density is
concerned, the core and old areas of the town including some outer areas are densely populated.
The lowest is 7.84 persons per hectare in ward no. 10 while the highest is 131.38 persons per
hectare in ward no. 1. Ward No. 1, 2 and 11 have high population density with more than 100
persons per hectare followed by 51 - 99 persons per hectare as moderate density in ward no. 5, 6, 7
and 9. Other wards have population density of less than 51 persons per hectare which mainly
includes the periphery area and area along the river side. According to the UDPFI guidelines, a small
town should have an average population density of 75-125 population per hectare. But in this town
population density is only 20 persons per hectare.
The average household size for the town is 5.35 persons in 2011 which has declined from 6.05
persons in 2001. At ward level, the average household size is less than the towns average in all the
wards except ward no. 4, 5, 6, 8, 9 and 10. The average household size is lowest in ward no. 7 i.e.
4.87 persons while ward no. 5 have the highest i.e. 7.63. The Ward Wise Demographics of the town
is given below.
Table 3-4: Demographics of the Town - Chakghat
Ward No.
No. of
HH
Population
Male
Female
Total
Avg.
HH Size
Area
(in ha.)
Population
Density (pph)
Ward No.1
148
401
355
756
5.11
5.75
132
Ward No.2
136
396
325
721
5.30
7.07
102
Ward No.3
142
393
351
744
5.24
16.15
46
Ward No.4
82
266
237
503
6.13
23.19
22
Ward No.5
43
172
156
328
7.63
5.41
61
Ward No.6
75
218
186
404
5.39
4.09
99
Ward No.7
149
377
348
725
4.87
7.46
97
Ward No.8
145
415
383
798
5.50
91.91
Page 33
127
373
316
689
5.43
12.08
57
Ward No.10
173
556
483
1039
6.01
132.53
Ward No.11
103
279
267
546
5.30
5.04
108
Ward No.12
167
409
418
827
4.95
48.43
17
Ward No.13
205
533
517
1050
5.12
104.29
10
Ward No.14
111
309
276
585
5.27
23.45
25
Ward No.15
191
496
465
961
5.03
33.96
28
1997
5593
5083
10676
5.35
520.83
20
Total
3.4
Population Projections
The population growth rate of the town is starts declining since 1991 as per Census of India. The
average decadal growth rate of Chakghat town for past 3 decades is 32.51%. The design populations
for the next 25 years have been forecasted for Chakghat. The exercise has been done taking into
DMG Consulting Pvt. Ltd., Noida
Page 34
3.5
For populations projection Plan Period three methods i.e. Arithmetic Progression Method,
Geometric Progression Method and Incremental Progression Method were adopted.
Years
Population
1981
4637
1991
6576
2001
9105
2011
10676
TOTAL: 6039
Average increase per decade
= 2013
= 1006.5
= 201.3
Formula = (Recent year population + Average increase per five year) Taking this into consideration
the future population will be:
Table 3-6: Projected Population Arithmetic Progression Method
Years
Population
10676
2012
10877
2013
11079
Page 35
11280
2015
11481
2020
12488
2025
13494
2030
14501
2035
15507
= 17.25%
(9105 6576)*100/6576
= 38.46%
(6576 4637)*100/4637
=41.82%
TOTAL: 97.53%
Average increase per decade
= 32.51%
= 3.25%
Formula: (Recent year population + (Recent year population * Average increase per five year)
Table 3-7: Projected Population Geometrical Progression Method
Years
Population
10676
2012
11023
2013
11381
2014
11751
2015
12133
2020
14106
2025
16399
2030
19064
2035
22163
Page 36
Year
Population
1981
4637
---
---
1991
6576
1939
---
2001
9105
2529
590
2011
10676
1571
-958
TOTAL
6039
-368
2013
-184
1006.5
-92
201
-18.4
915
183
Incremental Increase
Years
Population
10676
2012
10859
2013
11042
2014
11225
2015
11408
2020
12322
2025
13237
2030
14151
2035
15066
3.6
From the population projection done for Chakghat Town it is calculated that;
Incremental Increase method followed by Arithmetic Progression Method has given very less
population and are not the suitable method for the town like Chakghat which have very
good prospects of growth in near future
Page 37
Thus the population has been taken as calculated by Geometric Progression Method.
3.7
As per 2001 Census, out of the total population the Chakghat Nagar Parishad had 18.69% (1,702) of
Schedule Caste (SC) Population which is more than the National Average and District Average.
19.07% of total population accounts for Schedule Tribe (ST) Population in the town.
Table 3-10: Comparative Assessment of Urban SC & ST Population
Area
% of ST
Population
Urban Population
SC
Population
Urban India
286,119,689
3,36,24,822
69,87,643
11.75
2.44
Madhya Pradesh
1,59,67,145
37,87,827
7,87,026
23.72
4.93
3,20,563
37,413
19,836
11.67
6.19
9,105
1,702
1,736
18.69
19.07
Rewa District
Chakghat
Parishad
Nagar
ST
Population
% of SC
Population
3.8
Literacy Rate
Literacy, being an important indicator of social development, affects the demographic characteristics
and participation in labour. As per 2001 Census, the average literacy rate of Chakghat town was
62.56% which has increased to 69.88% as per 2011 Census but it is lower as compared to the District
Average of 73.42%. The male literacy rate as per census 2011 is high as 75.97% while female literacy
rate is a significant 63.17%. The status of women in terms of literacy has been significantly low at
town level (Refer to Table: 3.11 & 3.12), due to the backwardness of the area and absence of social
awareness. While as compare to District Level the female literacy rate of Chakghat is higher than the
District Average.
Table 3-11: Comparative Assessment of Literacy Rate Chakghat, M.P.
Area
Male
Female
2001
2011
2001
2011
2001
2011
Urban India
79.92
84.98
86.27
89.67
72.86
79.92
Madhya Pradesh
79.39
84.90
87.39
90.24
70.47
77.39
Rewa District
62.01
73.42
75.65
83.67
47.58
62.49
62.56
69.88
70.64
75.97
53.47
63.17
Chakghat
Parishad
Nagar
Source: Census of India, 2001 & Provisional Figure, Census of India 2011.
Page 38
Ward No.
Male
Female
Ward No.1
67.20
71.32
62.54
Ward No.2
66.30
70.96
60.62
Ward No.3
63.31
68.19
57.83
Ward No.4
75.75
81.58
69.20
Ward No.5
80.18
79.65
80.77
Ward No.6
83.66
87.61
79.03
Ward No.7
76.28
80.64
71.55
Page 39
71.80
75.90
67.36
Ward No.9
78.08
81.50
74.05
Ward No.10
67.66
75.18
59.01
Ward No.11
78.02
82.44
73.41
Ward No.12
55.62
68.46
43.06
Ward No.13
70.57
79.74
61.12
Ward No.14
69.23
77.35
60.14
Ward No.15
64.72
71.37
57.63
Average
69.88
75.97
63.17
3.9
Sex Ratio
The ratio between the number of males and the number of females is expressed in number of
females per 1000 males. The sex ratio measures the extent of prevailing equity between males and
females in the project area. There is a significant improvement in the sex ratio of Chakghat Town
from 889 in 2001 to 909 in 2011, while at district level the ratio has declined from 941 in 2001 to 930
in 2011, but its still higher as compare to the Chakghat Town. The sex ratio among the 0-6 age
groups has declined to 870 females per thousand males in 2011 from 894 in 2001 for Chakghat
Town. With regards to Sex ratio among 0-6 age group in Rewa District, it stood at 883 females per
thousand male in 2011 compared to 2001 Census figure of 926 females per thousand males. The
town has a lower sex ratio as compared to the national and state averages as per census 2011.
Table 3-13: Comparative Assessment of Sex Ratio
Area
Sex Ratio
Sex Ratio
2011
2001
2011
2001
2011
2001
2011
Urban India
900
926
906
902
923
944
Madhya Pradesh
898
916
907
895
907
912
Rewa District
941
930
926
883
939
924
Chakghat
Parishad
889
909
894
870
908
863
Nagar
Source: Census of India, 2001 & Provisional Figure, Census of India 2011.
Page 40
At town level, as per 2011 Census, ward no. 12 has the highest sex ratio i.e. 1022 females per 1000
males while the lowest is 821 females per 1000 males in ward no 2. Wards with more than 900
females per 1000 males are 5, 7, 8, 11, 12, 13 and 15 (Refer to Table: 3.14). The sex ratio among
children (0-6 age group) is very low i.e. 535 females per 1000 males, discouraging girl child birth in
the town.
Table 3-14: Ward Wise Comparative Assessment of Sex Ratio Chakghat, M.P.
Ward No.
Sex Ratio
Ward No.1
885
537
Ward No.2
821
591
Ward No.3
893
536
Ward No.4
891
613
Ward No.5
907
500
Page 41
853
535
Ward No.7
923
476
Ward No.8
923
602
Ward No.9
847
533
Ward No.10
869
557
Ward No.11
957
500
Ward No.12
1022
434
Ward No.13
970
514
Ward No.14
893
531
Ward No.15
938
586
Average
906
536
WEAKNESS
OPPORTUNITY
THREAT
Page 42
CHAPTER 4
Socio - Economic Profile of the Town
Page 43
4.
4.1
Socio-economic profile reflects the sociological and economical characteristics of the city, which may
include sex-ratio, literacy rate, household characteristics, workforce participation rate, industrial
activities, trade and commerce, tourism etc. In this section, an analysis has been done to identify the
socio-economic profile of Chakghat and addressing the major issues. No data assessment of the
economic base of the city is possible as, essential town-wise economic information is not readily
available. It can, however, be conjectured that the dominant sector of the economy of Chakghat is
the primary sector followed by tertiary and secondary sectors.
4.2
Sex Ratio
The ratio between the number of males and the number of females is expressed in number of
females per 1000 males. The sex ratio measures the extent of prevailing equity between males and
females in the project area. As per the Census 2011, the sex ratio in the Chakghat Town has
increased at 909 females per 1000 males as compared to 2001 Census figure of 889. The average
national sex ratio for urban India, Madhya Pradesh and Rewa District are 926, 916 and 930 female
per 1000 males respectively as per the Census 2011. (Refer to Table: 3.13).
4.3
Literacy Rate
Literacy, being an important indicator of social development, affects the demographic characteristics
and participation in labour. As per the Census 2011, the average literacy rate of Chakghat town has
been increased to 69.88% from 62.56 % in 2001 Census. The status of women in terms of literacy has
been significantly low. The male literacy rate as per 2011 Census is high as 75.97% while female
literacy rate is significant at 63.17%. (For detail please refer to table: 3.11 and 3.12).
4.4
The total number of households in Chakgaht Town as per Census 2011 is 1997. The average
household size in Chakghat Town is 5.35 persons. A comparative assessment of urban population
indicates that the average household size of the town is higher than the district average of 5.44;
national average of 5.12 while the state average is also higher at 7.27 persons per house.
Table 4-1: Comparative Assessment of Household Size
Area
Total Population
Urban India
Madhya Pradesh (Urban)
Rewa District
Chakghat Nagar Parishad
Household
Average HH Size
28,61,19,689
5,58,32,570
5.12
1,59,67,145
21,95,725
7.27
19,73,306
3,62,657
5.44
9,105
1,505
6.05
*10,676
1997
5.35
Page 44
4.5
Workforce Participation
As per the 2001 Census, the Chakghat Nagar Parishad has lower Work Force Participation Rate
(WFPR) is recorded at 31.22% indicating high dependency ratio, while the National Urban average
accounts for 32.25%.
Table 4-2: Comparative Assessment of WFPR
Area
Urban India
Madhya Pradesh (Urban)
Total
population
Workers
WFPR (%)
Total
Male
28,61,19,689
9,22,78,654
7,61,75,323
16,103,331
32.25
1,59,67,145
48,93,293
39,88,452
9,04,841
30.65
19,73,306
8,62,959
5,02,107
3,60,852
43.73
9,105
2,843
2,274
569
31.22
Rewa District
Chakghat Nagar Parishad
Female
The WFPR within the town indicates that Ward Nos. 2, 3, 4, 10, 12 and 13 have 30% or more
population engaged in various types of economic activity. (Refer table 4.3)
4.6
Workforce Distribution
Work force distribution indicates the economic base of any city or town. There are a total of 2843
workers in the town as per the 2001 Census of India and majority of workers are engaged in tertiary
activities such as trade & commerce. The share of work force involved in trade & commerce (tertiary
sector) is 72.99%. The primary sector (including cultivators & agricultural laborers) and secondary
sector (small scale house hold or manufacturing industries) constitutes for 23.39% and 3.62% of total
work force respectively.
8.30%
15.09%
Cultivators
Agricultural Laborers
3.62%
Others
72.99%
Page 45
In Percentage
100.00
80.00
60.00
40.00
20.00
0.00
Total WFPR
Primary
Secondary
Tertiary
Male
79.99
58.35
54.37
88.19
Female
20.01
41.65
45.63
11.81
Graph 4.2: Gender Wise Work Force Distribution in Differrent Sectors of Economy
Table 4-3 Ward Wise Comparative Assessment of WFPR & Work Force Distribution
Ward No.
Total
Population
Male
Female
Total
WFPR (%)
Secondary
Tertiary
667
181
155
26
27.14
26.52
2.76
70.72
784
333
208
125
42.47
13.21
14.11
72.67
588
206
178
28
35.03
16.99
2.43
80.58
445
147
136
11
33.03
0.00
0.00
100.00
347
100
87
13
28.82
1.00
4.00
95.00
426
120
108
12
28.17
0.00
0.00
100.00
643
182
158
24
28.30
0.55
6.04
93.41
665
150
133
17
22.56
4.00
3.33
92.67
689
187
162
25
27.14
3.74
1.07
95.19
10
810
309
219
90
38.15
38.83
0.97
60.19
11
589
155
149
26.32
1.29
1.94
96.77
12
675
228
171
57
33.78
67.98
7.46
24.56
13
597
227
155
72
38.02
61.23
0.00
38.77
14
505
120
105
15
23.76
35.00
0.83
64.17
15
675
198
150
48
29.33
32.83
0.00
67.17
Chakghat
9105
2843
2274
569
31.22
23.39
3.62
72.99
4.7
Dependency Ratio
The average dependency ratio for Chakghat Town is 68.78% which indicates that CNP has higher
level of dependent population in comparison to National Urban and District Average. Like most of
the cities or town, females constitute higher proportion of dependent population of more than 59%
of total number of non-working population.
Page 46
Area
Total
population
Urban India
Madhya
(Urban)
Pradesh
Rewa District
Chakghat
Parishad
Non-Workers
Total
Male
Dependency
Ratio (in %)
Female
286119689
193841035
74378775
119462260
67.74
15967145
11073852
4424107
6649745
69.35
1973306
862959
502107
360852
56.27
9105
6262
2546
3716
68.78
Nagar
The dependency ratio within the town indicates that Ward Nos. 1, 5, 6, 7, 8, 9, 11, 14 and 15 have
70% or more dependent population. (Refer table 4.5)
40.66%
Male
Female
59.34%
Ward No.
Total
Population
Male
Female
Male
Female
667
486
208
278
72.86
42.80
57.20
784
451
201
250
57.53
44.57
55.43
588
382
131
251
64.97
34.29
65.71
445
298
98
200
66.97
32.89
67.11
347
247
88
159
71.18
35.63
64.37
426
306
121
185
71.83
39.54
60.46
643
461
182
279
71.70
39.48
60.52
665
515
208
307
77.44
40.39
59.61
689
502
211
291
72.86
42.03
57.97
10
810
501
219
282
61.85
43.71
56.29
11
589
434
169
265
73.68
38.94
61.06
12
675
447
190
257
66.22
42.51
57.49
Page 47
597
370
159
211
61.98
42.97
57.03
14
505
385
159
226
76.24
41.30
58.70
15
675
477
202
275
70.67
42.35
57.65
Chakghat
9105
6262
2546
3716
68.78
40.66
59.34
4.8
Industrial Activities
The town has no major industries within its vicinity; however there are industrial units within the
Rewa District and in surrounding districts which provides direct and indirect employment to resident
of the town apart from Small Scale Household Industries within town. The important industries
found in and around Rewa Districts includesTable 4-6: List of Important Industries in Rewa District and in its surrounding Districts
District/Town
Important Industries
Rewa
Satna
Mining Industries
Cement, Tiles and Stone Manufacturing Industries
Agricultural Produce and Agro-based industries Flour, Oilseed milling,
pulses, rice etc.
Handloom Weaving Industries
Cable Manufacturing Industries
Steel Fabricators & Transformer Repairing Industries
Automobile Industries
Engineering Industries
Other Manufacturing Industries
Sidhi
Singrauli
Allahabad
Chitrakut
Mirzapur
Page 48
Figure 4.8-1: Informal Business Activites along the Major Roads of the Town
Page 49
Chakghat Bazar
(Old Chowk)
Galla Mandi
Krishi Upaj
Mandi
Figure 4-1: Major Markets/Commercial and Wholesale Trading Areas of the Town
Page 50
4.9
Issues
The overall population of Chakghat is increasing but the rate of decadal population growth is
decreasing in the last three decade because of lack of economic activities in the town which causes
migration of people to other cities. So under economic boost in the city, the negative trend in rate of
population growth can also be controlled.
Chakghat market
Centrally located
Very congested
Unorganized.
The development of other commercial activities (both formal and informal) is also observed
along the major roads of the town, Bus Stand and NH-27.
The informal markets / shops predominantly include vegetables, fruits, cloths and garments,
hardware, groceries items etc.
Tourist Spot
Location
Distance from
Town
Specialty
40-45 Km
Rewa
80 Km
Chakghat
100 Km
Gurh
110 Km
45 km
Varanasi
165 Km
Page 52
The overall economy of the town is highly localized and confined to only low economic activities of
the hinterland. Tourism is also not contributing too much to the economic development of the town,
it is concluded that tourism development and industrial development forwarded contribute to
development of region.
Page 53
CHAPTER 5
Physical Planning and Growth
Management
Page 54
5.
5.1
An urban landuse planning, attempts to achieve an optimal spatial coordination of different human
activities for the enhancement of the quality of life. It plans for community growth and development
based on optimal land use planning, urban design, economic and environmental planning principles.
This chapter highlights the analysis of general spatial growth pattern, directions and land-use
distribution of the town.
5.2
The total area of Chakghat Nagar Parishad is about 520.83 Ha. with a population of about 10676 as
per 2011 Census. Out of the total area, the town has approximately 19% developed area and 81%
undeveloped area or agricultural land. The spatial growth pattern suggests that the town is
predominantly developing along the N.H. 27 and Major District Roads (Chandrapur Road, Goura
Road and Satpura Road) in the form of ribbon development. Chakgaht Bazar is the major commercial
area in the town where all major commercial and trade related activities are concentrated (Refer
Figure 5.1). These areas have high density with mixed landuse of residential and commercial
development. Consequently, any new development impending in the city heed directly to the
existing commercial centers to achieve bigger econmies of scale. The impact is vivid in the existing
spatial development.
5.3
As per Census 2001, Chakghat had a total population of 9105 which has increase to 10676 in 2011
with a decadal growth rate of 17.25% is unevenly distributed in the municipal area. The overall
population density has increased from 17.48 persons per hectare in 2001 to 20.50 persons per
hectare in 2011. The development pattern is apparent in the density pattern of the municipal area.
Density varies from one ward to other and the core or inner areas of the town including some outer
areas are densely populated. It is evident that the pressure of development is more along the N.H.
27 and other major roads of the town. High density is observed in the core and old areas of town
including some periphery area. Ward No. 1, 2 and 11 have high population density with more than
100 persons per hectare followed by 51 - 99 persons per hectare as moderate density in ward no. 5,
6, 7 and 9 (Refer Figure 3.1). Other wards have population density of less than 51 persons per
hectare which mainly includes the periphery are with more agricultural land and area along the river
side.
Page 55
Ward No.
Area in
Hectare
% to Total Area
Total Population
Ward No.1
5.75
1.10
756
131.38
Ward No.2
7.07
1.36
721
101.97
Ward No.3
16.15
3.10
744
46.07
Ward No.4
23.19
4.45
503
21.69
Ward No.5
5.41
1.04
328
60.62
Ward No.6
4.09
0.79
404
98.67
Ward No.7
7.46
1.43
725
97.13
Page 56
91.91
17.65
798
8.68
Ward No.9
12.08
2.32
689
57.01
Ward No.10
132.53
25.45
1039
7.84
Ward No.11
5.04
0.97
546
108.25
Ward No.12
48.43
9.30
827
17.08
Ward No.13
104.29
20.02
1050
10.07
Ward No.14
23.45
4.50
585
24.94
Ward No.15
33.96
6.52
961
28.30
520.83
100.00
10676
20.50
Total
5.4
Landuse Analysis
The study of the land-use would enable us to understand the city as envisaged in the past and the
direction of its future growth and development. A change in land-use is inevitable over time and
reflects the needs and demands of the residents of the city. This section deals with the existing
landuse of the town. Chakghat Nagar Parishad has master plan under draft stage as on today. At
present the total municipal area for chakghat town is 520.83 Ha. Out of which current developed
area is 97.15 Ha. (18.65%) and 423.68 Ha. (81.35%) area is undeveloped or agricultural land. This
indicates towards a low growth pattern and agrarian economy of town. The table below highlights
the existing landuse pattern of the municipal area which has been tentatively carried out by DMG
based on google image, town map provided by the Nagar Parishad followed by survey in due
consultation with officials of Chakgaht Nagar Parishad.
Table 5-2: Existing Landuse Distribution; 2011 Chakghat
Landuse
Area in
Hectare
Percentage
Residential
22.10
22.75
Commercial
4.79
4.93
Industrial
0.33
0.34
4.36
4.49
Recreational
0.00
0.00
Transportation
10.33
10.63
Water Body
55.24
56.86
97.15
18.65
423.68
81.35
520.83
100.00
Remarks
% out of the Total
Developed Area
With existing developed area, 23.34% of the total landuse is residential. A large area (58.30% of the
total landuse) is under water body followed by 10.83% under circulation, 4.80% as commercial, and
2.38% as public and semi-public area while 0.35%area is under industrial use.
DMG Consulting Pvt. Ltd., Noida
Page 57
18.65%
Undeveloped Area/
Agricultural Land
81.35%
22.75%
4.93%
0.34%
56.86%
10.63%
4.49%
Residential
Commercial
Industrial
Transportation
Water Body
Page 58
5.5
As per 2021 Draft Master Plan out of the total 632.54 hectare a total of 319.58 hectare planning area
has been proposed for development. The table below highlights the proposed landuse of the
municipal planning area.
Page 59
Landuse
Proposed Landuse,
2021
Existing Landuse,
2011
Additional
land
Required by
2021
Remarks
% out of the
Total
Developed
Area
Area in
(Ha.)
Percentage
Area in
(Ha.)
Percentage
Residential
92.00
28.79
22.10
22.75
69.90
Commercial
36.00
11.26
4.79
4.93
31.21
Industrial
27.00
8.45
0.33
0.34
26.67
Public/Semi
public
and
public Utilities
20.00
6.26
4.36
4.49
15.64
Recreational
27.00
8.45
0.00
0.00
27.00
Transportation
53.00
16.58
10.33
10.63
42.67
Water Body
64.58
20.21
55.24
56.86
9.34
Total Developed
Area
319.58
50.52
97.15
18.65
222.43
Undeveloped
Area/
Agricultural
Land
312.96
49.48
423.68
81.35
-110.72
Total Planning/
Municipal Area
632.54
100.00
520.83
100.00
111.71
% out of the
Total
Municipal
Area
Source: Chakghat Draft Master Plan 2021, DMG Assessment for Existing Landuse - 2011
20.21%
49.48%
50.52%
28.79%
Commercial
Industrial
16.58%
8.45%
Residential
11.26%
6.26%
8.45%
Water Body
Graph: 5-3 Proposed Landuse Distribution (Planning Area and Development Area); Draft Master PlanMap; 2011
Chakghat Nagar Parishad
Comparing with the existing landuse, an additional area of 222.43 hectare will be required by 2021.
The figure 5.5 shows the proposed landuse distribution, 2021 for Chakghat town.
Page 60
Map: 5-3 Proposed Landuse Map; Draft Master PlanMap; 2011 Chakghat Nagar Parishad
5.6
Housing Scenario
5.6.1 Introduction
Housing is a basic social need of each and every individual. It is an important determinant of the
quality of life of the people thus needs to be addressed. Adequacy of housing stock, construction
quality, the number of occupants in proportion to the number of rooms and the provision of basic
amenities are all important determinants of development. Hence, fulfilling the need for housing and
tackling housing needs is an important component of any city Development Plan.
In Chakghat housing development is done by Madhya Pradesh Housing Board as well as by private
contarctors/ builders.
DMG Consulting Pvt. Ltd., Noida
Page 61
Housing Stock
As per 2001 Census of India, there are 1494 households in Chakghat Nagar Parishad (CNP) with an
average household size of 6.05 persons which is higher as compared to average national urban
household sizes. At present, as per the census of 2011 the average household size in Chakghat is
decline to 5.35 persons with 1997 total no. of households. There was a total of 1819 number of
Census houses as per 2001 in Chakghat town.
Table 5-4: Comparative Assessment of Household Size
Area
Total Population
Urban India
Madhya Pradesh (Urban)
Rewa District
Household
Average HH Size
28,61,19,689
5,58,32,570
5.12
1,59,67,145
21,95,725
7.27
9,105
1,505
6.05
*10,676
1997
5.35
1973306
Temporary
5.09%
Permanent
68.14%
Page 62
1.10%
0.16% 0.11%
2.09%
0.11%
24.24%
Wood
G.I., Metal, Asbestos Sheets
70.04%
Burnt brick
Stone
0.11%
Concrete
Any other material
6.43%
0.55%
5.77%
0.27%
Grass, Thatch, Bamboo, Mud, Wood etc.
Plastic, Polythene
26.99%
Tiles
Slate
G.I., Metal, Asbestos sheets
54.65%
Brick
Stone
Concrete
Any other material
4.07%
0.27%
Page 63
2.09%
0.05%
Mud
Wood, Bamboo
30.73%
52.01%
Brick
Stone
Cement
Mosaic, Floor tiles
3.41%
10.78%
Ownership Status
In town, 84% houses are owned, 9.57% are rented and remaining fall into other types of ownership
status. Thus indicating about most of the people residing in the town has their own land.
Rented
9.57%
Others
5.69%
Owned
84.74%
Page 64
Ward No.
Total No. of
HH
Total
Population
Avg.
HH Size
Housing
Demand
Housing Gap
Ward No.1
148
756
5.11
151.2
Ward No.2
136
721
5.30
144.2
Ward No.3
142
744
5.24
148.8
Ward No.4
82
503
6.13
100.6
19
Ward No.5
43
328
7.63
65.6
23
Ward No.6
75
404
5.39
80.8
Ward No.7
149
725
4.87
145.0
-4
Ward No.8
145
798
5.50
159.6
15
Ward No.9
127
689
5.43
137.8
11
Ward No.10
173
1039
6.01
207.8
35
Ward No.11
103
546
5.30
109.2
Ward No.12
167
827
4.95
165.4
-2
Ward No.13
205
1050
5.12
210.0
Ward No.14
111
585
5.27
117.0
Ward No.15
191
961
5.03
192.2
1997
10676
5.35
2135.2
138
Total
Based on the above assumptions, at present there is a gap for housing of 138 houses. This indicates
that there is a demand for housing. The demand gap is highest in ward no. 10 followed by ward no.
5, 4, 8 and 9 located in periphery and core areas of the town.
Table 5-6: Present and Future Housing Demand and Gap
Year
Total Population
Existing Supply
Housing Demand
Housing Gap
Total
Demand
Total
Gap
Non-Slum
Slum
Non-Slum
Slum
Non-Slum
Slum
Non-Slum
Slum
2011
7469
3207
1400
597
1494
641
94
44
2135
138
2012
7712
3311
1400
597
1542
662
142
65
2205
208
2013
7962
3419
1400
597
1592
684
192
87
2276
279
2014
8221
3530
1400
597
1644
706
244
109
2350
353
2015
8488
3645
1400
597
1698
729
298
132
2427
430
2020
9869
4237
1400
597
1974
847
574
250
2821
824
2025
11473
4926
1400
597
2295
985
895
388
3280
1283
2030
13337
5727
1400
597
2667
1145
1267
548
3813
1816
2035
15505
6658
1400
597
3101
1332
1701
735
4433
2436
Page 65
5.7
=
=
=
=
=
=
4433
3101
1332
2436
1701
735
The future growth possibilities have been envisaged based on the existing growth pattern and the
population projection of 22163. The past trend of development shows growth in north and west
directions due to the presence of suitable land mainly along the transportation lines i.e. NH 27 and
Goura Road in the form of ribbon development. Since the town is semi-urban in nature, there is
abundant of agricultural land near by the existing development in all directions. The growth
potential is also there towards the east and north side of the town along the major transportation
line, but the development is quite slow. This is due to the presence of Tamas River a natural physical
barrier flowing in south to east direction which keeps apart this side of the town from its major
commercial areas.
The future growth possibilities have been proposed in zones which are identified below. These zones
will be developed in a sector wise. A total of 4 Zones have been proposed towards the north-east,
north-west, south-east and south-west.
The slum or the squatter which contributes to 30.04% of total population are mainly concentrated in
ward nos. 2, 3, 5, 7 and 9 which are in outskirts and core areas. The proposed landuse has been
identified taking into consideration the growth of the urban poor. The sectoral zones will further
identify the space for development of LIG and EWS zones for the urban poor/squatters.
Also several industrial/commercial activities has been proposed in the study area along the major
roads in south-eastern side that are likely to give boost to urban growth in these areas. The future
growth possibilities and directions has been discussed with respect to five aspects that includes
existing urban growth, the transportation lines, availability abundant agricultural land in CNP,
natural and the proposed economic activities. Municipal body should ensure the future
development of town in planned manner as per these identified zones along with detailed layout
master/development plans prepared by TCP Dept., Rewa.
Page 66
Map: 5-4 Chakght: Future Growth Possibilites/Direction with Proposed Sectoral Zones - 2035
5.8
SWOT Analysis
STRENGTH
WEAKNESS
Page 67
THREAT
5.9
S. No.
Issues
1.
Spatial Growth
of
commercial
Only linear growth Along the NH Development
centres in the town, especially in
27 and arterial road from
southern part like in wards
Chandrapur to Goura
11,12,13,14 and 15
Uniform development in all the
areas
specially
in
wards
8,9,10,11,12,13,14 and 15
2.
Density Pattern
3.
Landuse
Distribution
4.
Housing
Low and slow growth pattern due The future growth possibilities
have been proposed in 3 sect oral
to the organic growth along the
zones in outer wards like 12,13
major connectivity, arterial rod
and 15
and NH-27
Scope
of
mix
land
use
Commercialization is only on the
development
in
wards
intersection of the major roads
5,6,7,9,11,14
which is growing towards wards
12 to 2 along the arterial road
towards west of the town.
Average household size (6.05) is HIG and LIG housing can be
developed in wards with major
higher than the national urban
population
and
commercial
average i.e. 5.12
corridors
like
in
2.3.4.5.9
and LIG
The urban poor/ slums are mainly
and
EWS
can
be
developed
in
concentrated in the core area
wards 8,11,12,14,15 etc.
especially along the NH-27 in
ward no. 2, 3, 7 and 9.
Page 68
CHAPTER 6
Urban Infrastructure Services
Page 69
6.
6.1
The infrastructure profile of a town makes a direct reference on the quality of life within it. Its one
of the crucial considerations for towns economic development and its investment climate.
Infrastructure services and its adequacy require an assessment be made of its coverage, quantity
and quality, as also the demand supply gap. This chapter presents the existing status, estimates the
present and future gaps by the year 2035. It includes all the major sectors/aspects including Water
Supply; Sewerage and Sanitation; Solid Waste Management; Drainage; Urban Transport; Community
Facilities covered under both the Physical and the Social Infrastructure.
6.2
Physical Infrastrucutre
Water Sources
Capacity (MLD)
River Tamas
0.09 MLD
Ground Water
0.1 MLD
Page 70
Other Sources
In addition to the main sources, a significant volume of ground water is also extracted through hand
pumps and wells installed at various locations, which helps in meeting the demand of the weaker
sections of the society.
Description
Details
9 Nos.
2 Chamber
0.45 LL each
Capacity in Lakh Liters
3 OHT
Not known
Distribution Network.
Length in Km
Page 71
Nos. of Connections
Residential
421
Commercial
Nil
Total Connections
421
92 Nos. (Municipal)
400 Nos. (Private)
1.27%
8.43%
2.54%
Tap
51.94%
32.93%
Handpump
Tubewell
Well
River, Canal
Any other
Graph 6-1: Distribution of Houses by Sources of Water
Page 72
Away
22.42%
Within Premises
41.11%
Near Premises
36.47%
This shows that half of the total households in town are dependent other means/sources of water
supply such hand pumps, own tube wells and wells, River canal etc.
Page 73
S.
No.
Years
Population
Present Supply
(MLD)
Supply (@
LPCD)
Water Required
(MLD)
2011
10676
0.19
135
1.44
2012
11023
0.19
135
1.48
2013
11381
0.19
135
1.54
2014
11751
0.19
135
1.59
2015
12133
0.19
135
1.64
2020
14106
0.19
135
1.90
2025
16399
0.19
135
2.21
2030
19064
0.19
135
2.57
2035
22163
0.19
135
2.99
Page 74
Sr.
No.
Years
Population
Fire
Demand
(1%) (MLD)
Industrial
Demand
(3%)
Consideri
ng Losses
(5%)
2011
Total
Demand
(MLD)
Supply Gaps
(MLD)
10676
0.014
0.043
0.072
1.57
-1.38
2012
11023
0.014
0.044
0.074
1.61
-1.42
2013
11381
0.015
0.046
0.077
1.68
-1.49
2014
11751
0.016
0.047
0.080
1.73
-1.54
2015
12133
0.016
0.049
0.082
1.79
-1.60
2020
14106
0.019
0.057
0.095
2.07
-1.88
2025
16399
0.022
0.066
0.111
2.41
-2.22
2030
19064
0.025
0.077
0.129
2.80
-2.61
2035
22163
0.029
0.090
0.150
3.26
-3.07
S.
No.
Indicators
Unit
Current
Status
Normative
Standard
Liters
16.39
135
Percent
0.00
100
0.00
100
Percent
37.89
100
Percent
31.86
85
Percent
>5
Source: Computed based on the data collected from Chakghat Nagar Parishd
Page 75
WEAKNESS
OPPORTUNITY
THREAT
Issues
Page 76
About 15,000 liters of water remain unaccounted indicating distribution loss of 8% of the
total supply.
There is lack of technical/ skilled man power to handle the system.
The distribution system has limited coverage. Pipelines are mainly laid along the major
roads, is a major constraint in distributing water to the end user in internal areas.
There is a large scale of demand and supply gap, which is likely to be increase drastically in
future with respect to increase in population if no measures were taken to augment the
water supply system.
Per capita supply is low (16.39 lpcd) against the standard norm of 135 lpcd.
Though the tapped water facility is about 50% in the town but out of total household only
31.86% houses have tapped water facility within premises. This indicates that majority of
household draw water from community stand post, hand pumps, wells and other means.
The tariff collection efficiency of water charges is low.
S. No.
Components
Horizon Period
2015
2035
100%
100%
135
135
40%
100%
100%
Quality of Water
25%
15%
5%
Consumer Metering
80%
100%
100%
Cost Recovery
100%
100%
100%
40%
80%
100%
10%
70%
100%
40%
2025
Page 77
To address the problem of water scarcity and meet the future demand in Chakghat, an
augmentation scheme under centrally sponsored Urban Water Supply Augmentation
Programme has been prepared in 1997 for horizon of 2027 with an estimated cost of Rs.
52.43 lakhs which has not been implemented yet in the town. It is therefore proposed to
prepare a fresh Detailed Project Report (DPR) for the development of Water Supply System
in Chakghat Nagar Parishad.
Up-gradation and extension of water treatment plant with an enhanced capacity as per the
future demand based on projected population.
Leakage detection studies; repair, replacement or rehabilitation of old/defunct system
including 3 OHTs should be under taken to enhance the present water distribution system.
Extension of water pipeline to un-served/ internal areas, thereby ensuring 100% water
supply network coverage.
Implementation of 100% consumer metering system via monitoring and checkout illegal
water connections.
Awareness programme for judicious use of water, recycling and recharging to prevalent
water loss, thereby, encouraging Rain water harvesting at household level.
Use of recycled water for meeting agricultural and cooling demands.
Widespread investments in the water supply sector without sufficient attention to human
resource development results in poor sustainability of system. Recognizing the urgent need
for capacity building at different levels in water supply sector, CNP should propose to
develop human resources in their organization.
Page 78
Page 79
Page 80
Figure 6-4 typical rapid sand filter water treatment with components
Page 81
Projects proposed
Project Cost
(in Lakh)
WS 1
5.00
WS 2
60.00
Govt. of M.P.
WS 3
74.00
Govt. of M.P.
WS 4
300.00
Govt. of M.P.
WS 5
235.00
Govt. of M.P.
WS 6
200.00
Govt. of M.P.
Department
874.00
Page 82
Pit Toilet
3.13%
No Toilet
74.69%
Other
Latrines
2.03%
Public Toilets
The Chakghat Nagar Parishad is responsible
for the provision of public toilets in town.
But in Chakghat there is very less effort from
the civic body in providing public toilets and
public urinals. As on today there is only one
public toilet near petrol pump on NH 27
which is not in good condition. Public toilets
are very much required in the town.
Figure 6-5: Status of Public Urinal in Chakgaht
As per the city sanitation survey conducted in 2008, mostly people (about 81% of households)
demands for individual toilets but only about 20% and 41% of households are willing to pay for
development and operation & maintenance of toilet and urinal services.
Public
18.87%
No Toilet
0.57%
Individiual
80.57%
Yes
19.72%
No
80.28%
Page 83
Yes
41.05%
No
58.95%
Table 6-7: Present and Future Demand and Supply Gaps Sewerage System
COMPONENTS
YEARS
2012
2013
2014
2015
2020
2025
2030
2035
1.57
1.61
1.68
1.73
1.79
2.07
2.41
2.80
3.26
Chakghat
Generation
Sewage 1.26
1.29
1.34
1.39
1.43
1.66
1.93
2.24
2.61
Existing
Collection
Sewage 0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
Gaps
-1.26
-1.29
-1.34
-1.39
-1.43
-1.66
-1.93
-2.24
-2.61
2011
2012
2013
2014
2015
2020
2025
2030
2035
Sewage 1.26
1.29
1.34
1.39
1.43
1.66
1.93
2.24
2.61
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
1.29
1.34
1.39
1.43
1.66
1.93
2.24
2.61
Gaps
-1.26
-1.29
-1.34
-1.39
-1.43
-1.66
-1.93
-2.24
-2.61
(in 2011
2012
2013
2014
2015
2020
2025
2030
2035
2205
2276
2350
2427
2821
3280
3813
4433
Chakghat
Generation
Existing Capacity
Treatment Plant
Sewer
Nos.)
Connection
Existing Connections
Demand
for
Connections
of 0.0
Sewer 2135
Page 84
-2135
-2205
-2276
-2350
-2427
-2821
-3280
-3813
-4433
2011
2012
2013
2014
2015
2020
2025
2030
2035
16.01
16.53
17.07
17.63
18.20
21.16
24.60
28.60
33.24
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
16.01
16.53
17.07
17.63
18.20
21.16
24.60
28.60
33.24
16.01
16.53
17.07
17.63
18.20
21.16
24.60
28.60
33.24
Existing
Network
Sewerage
Demand
Gap
Sewerage 0.0
Network
As there is complete absence of underground Sewerage Network, the sewage flows through open
drains which ultimately flow into River Tamas. There is no form of treatment before or after
disposal. Only 25 % percent of households are commonly using septic tanks, pit for sewage disposal
while rest do not have in-house toilet facilities. They either use public toilet or go for open
defecation in town. Thus, town requires immediate actions regarding provision of sewerage and
sanitation facility (Low Cost Sanitation Projects) with 100% network coverage.
S. No.
Performance Indicator
Benchmark
Status
Coverage of Toilets
100%
24.30%
100%
0%
100%
0%
100%
0%
100%
0%
20%
0%
Extent of Cost
Management
100%
0%
80%
0%
90%
0%
Recovery
in
Wastewater
Page 85
SWOT Analysis
Based on the existing situational analysis and extensive participatory consultation with primary and
secondary stakeholders, Citys strengths, weaknesses, opportunities and threats have been assessed.
Table below presents the SWOT analysis at city level.
STRENGTH
WEAKNESS
Town has good natural slope towards the 25% of the households have proper toilets.
Tamas River from both north and south ends Open sewerage system in almost all the wards
of the town.
of the town.
.
The income prohibits urban poor to make
capital expenditure on development of toilet
units and their maintenance.
OPPORTUNITY
THREAT
Scope for development of low cost sanitation Sewage flows through open drains, channels &
projects especially in residential area like in
nalas in town and disposes directly into the
wards 3, 4, 5, 6, 7, 8.14.15 along the major
River Tamas.
roads.
New sewerage schemes to increase the
sewerage coverage to 100 %.
Issues
There is absence of hygienic and safe method of sewerage disposal system i.e. underground
Sewerage Disposal System in the town.
The pour flush latrines and toilets blocks are usually connected to a septic tank and then
connected to drains, channels or nalas ultimately falling into the Tamas River causing
contamination to the main sources of water supply.
Ground water contamination is a potential threat which will also affect the drinking water
quality as the underground water as on date is a major source of water supply system.
There is no form of treatment before or after disposal.
Unmaintained limited no. of public urinals
Town lacks public conveniences/ sanitation facilities such as - community or public toilet
which are limited in number.
The service level cost recovery is going to be the major challenge for CNP as most of the
household are not will to pay for development and maintenance of facilities.
Wide spread practice of open defecation as about 74% of household does not have in-house
toilet facilities.
Page 86
Table 6-9: Goals & Services Outcomes for different Horizon Years
S. No.
Components
Horizon Period
2015
Coverage
2025
2035
Sewer Network
Households
to 60%
100%
100%
100%
100%
60 %
80%
100%
100%
100%
Exploring the low cost Technology which requires less land and O&M Costs which are
minimal.
Government intervention should be emphasized in providing toilet facilities in urban
poor areas by developing individual toilet.
Sulabh Comples or public toilets near market places, bus stands area.
Community participation should be encouraged for designing, construction and
maintenance of public toilets.
Cost recovery through collection of well defined user charges.
2. Intercept all drains to flow in Tamas River; including the river front development &
plantation on flood zone. (both sides of the Nala)
3. Comprehensive Sewerage Master Plan:
To meet the current gap and future requirements for Chakghat town, it is proposed to
carry out detailed studies and prepare a comprehensive Sewerage Master Plan
including network lines and STP.
4. Sewerage Quality Studies and Monitoring:
The sewerage quality analysis needs to be undertaken. It is proposed to purchase
latest equipments to establish laboratories for analysis of chemical and heavy metals.
5. Human Resource Development:
Page 87
Best Practices
Box:: Slum Sanitation in Pune
Background:
Pune city, the educational and cultural capital of the State of
Maharashtra has a population of 28 lakhs, of whom about 40%
live in slums. There are 503 slum pockets, out of which only
348 are notified slums in the city. Pune Municipal Corporations
have Conservancy Departments whose duty it is to clean and
maintain toilet blocks in the city. Similar to other city, the
municipal staffs are not performing their duties including
construction and maintenance of toilets and city sanitation.
Since the local community does not have any control over the
sanitation staff, the latter do not respond to their concerns.
Since 1992, only 22 pay and use toilet blocks had been built in the city. In 1992, Municipal
Commissioner himself took initiatives and a massive programme of building toilets in slums through
community participation by giving contracts to non-governmental organizations (NGOs). There were
8 NGOs which were selected to carry out the first phase of the programme. First priority was given
to those settlements with a minimum population of 500 but had no toilet facilities
Key Components of the Project:
Construction: The Slum Sanitation Program was implemented in phased manner which are as
follows;
Phase-1 (1999-2000): In the first phase, it was decided to construct 220 toilet blocks with about
3500 toilet seats through NGOs. The expenditure incurred on the first phase was Rs.22.5 crores.
Phase-11 (2000 -2001): On completion of the second phase (planned for another 220 blocks
between), more than 400 blocks or more than 10,000 toilet seats was supposed to be constructed at
a cost of more than Rs.40 crores and benefiting more than 5 lakh slum dwellers.
Maintenance: In the bid itself, a guarantee was also to be given that the NGOs and the community
would maintain the toilet block for 30 years by collecting contributions from the community. The
programme envisaged the collection of Rs.20 per family per month to fund the appointment of a
caretaker and for cleaning materials. The caretaker is to be accountable to the community and is
supervised by them.
Implementation: During construction, the Municipal Commissioner was himself holding a weekly
meeting to monitor the progress of the work with the highest priority and, as a result, people
worked day and night to complete the programme in a few months.
Lesson Learned: Slum dwellers are not expected to pay anything at all when they use the toilets,
they are expected to pay a general tax for the facilities they are given. However, even if public
sanitation is free, it is not of much use because it is hardly functional.
The relationship between the Corporation, NGOs and communities has been reconfigured. NGOs
and communities are not cast in the roles of clients or supplicants but rather are treated as partners
by the Corporation.
When grassroots democracy is in place, the accountability of institutions is ensured.
Page 88
Page 89
Advantages:
With no use of machinery and associated maintenance, the root zone system provides for
low maintenance cost and negligible attendance for operation and monitoring.
It enhances the landscape and gives the site a green appeal.
It provides natural habitat for birds and after a few years gives an appearance of a Birds
sanctuary.
It is a green zone, it does not have mosquitoes problem.
Salinity may not be a problem for a survival or operations of reed beds.
It is recommended to combine vertical flow and then horizontal flow of sewage with a soil
having impervious bottom.
In the horizontal flow system, the sewage percolates through bed and that has all roots of
the wetland plants spread very thickly nearly with 2500 types of bacteria and 10,000 types
of fungi and aerobically oxidized organic matter of the effluent.
Root zone system gives a very good performance of removing 90% BOD and 63% Nitrogen.
The Root Zone Treatment system (RZTS) also known as the reed bed system or constructed wetland
system is a sealed filter bed consisting of a sand / gravel/ soil system, occasionally with a cohesive
element, planted with vegetation that can grow in wetlands. After removal of coarse and floating
material, the wastewater passes through the filter bed where biodegradation of the wastewater
takes place. The functional mechanisms in the soil matrix that are responsible for the mineralization
of biodegradable matter are characterized by complex physical, chemical and biological processes,
which result from the combined effects of the filter bed material, wetland plants, micro-organisms
and wastewater.
The treatment processes are based essentially on the activity of microorganisms present in the soil.
The oxygen for microbial mineralization of organic substances is supplied through the roots of the
plants, atmospheric diffusion and in case of intermittent wastewater feeding through suction into
soil by the out-flowing wastewater. RZTS contain aerobic, anoxic and anaerobic zones. This causes
the presence of a large number of different strains of microorganisms and consequently a large
DMG Consulting Pvt. Ltd., Noida
Page 90
Thus rootzone systems are not only eco-friendly but have low operational costs, producing high
water quality (up to bathing water standards) suitable for re-use. These features make RZT systems
low-cost, environment-friendly, and reliable in both the short and long term.
DEWATS: Decentralized Wastewater Treatment
Page 91
Figure 6-7 Main DEWATS modules for physical and biological wastewater treatment
DEWATS stands for Decentralized Wastewater Treatment Systems. DEWATS represents a technical
approach rather than merely a technology package.
DEWATS applications are designed to be low-maintenance: most important parts of the system work
without technical energy inputs and cannot be switched off intentionally.
DEWATS applications provide state-of-the-art technology at affordable prices because all of the
materials used for construction are locally available.
o DEWATS applications are designed to be low-maintenance.
o
DEWATS affordable prices because all of the materials used for construction are locally
available.
DEWATS applications provide treatment for both domestic and industrial sources
Systems can be designed to handle organic wastewater flows from 1-1000 m3 per day
DEWATS applications are designed with four basic technical treatment modules
DEWATS applications are designed and dimensioned in such a way that treated water meets
requirements stipulated in environmental laws and regulations.
Advantages of DEWATS technology:
Page 92
DEWATS technology is an effective, efficient and affordable wastewater treatment solution for small
and medium sized towns. At locality level, this system is very efficient.
Benefits of DEWATS
Page 93
Figure 6-9 Pour flush single pit and twin pit toilet
Septic Tanks
Septic tanks are comprised of a sealed tank having both an inlet and an outlet into which excreta are
flushed from a conventional cistern flush toilet or a pour-flush toilet. The tank acts as a settlement
unit in which solids settle out by gravity. The solids undergo a process of anaerobic decomposition
which results in the production of water, gases, sludge and a layer of floating scum.
The use of this system has the requirement for an in-house connection of water supply for the
system to operate.
Page 94
Properly designed and installed septic tanks can function for many years. Annual inspection to
determine sludge depth is desirable to prevent tank solids from overflowing and sealing the soil in
the drain field. Minimize the amount of grease from the kitchen and garbage disposal solids going
into septic tank. Water conservation reduces the loading and saturation of the drain field. To protect
groundwater, many areas increase lot size requirements to reduce septic tank densities. Septic tank
permits may be subject to additional restrictions in groundwater recharge areas.
Projects proposed
Project Cost
(in Lakh)
Department
SS 1
150.00
Govt. of M.P
SS 2
100.00
Govt. of M.P
SS 3
87.00
Chakghat Nagar
Parishad
SS 4
1.00
Chakghat Nagar
Parishad
Page 95
60.20
Chakghat Nagar
Parishad
398.20
network in Chakghat is open and unorganized. Most of the drains do not have capacity to flow the
waste water as they are damaged and remain chocked due to presence of gray matter and disposal
of solid waste in it. This leads to un-channelized flow during the rainy season. In ward 10 and 15, the
waste water from adjoining area spilled over the road and creates unhygienic conditions. The
situation is further aggravated in town due to lack of sewerage system resulting in sewage flow in
the storm water drains which finally get discharged into the River Tamas and in agricultural lands.
Table 6-10: Length of Drains in Town
Ward No.
Kutcha
0.56
0.01
0.20
0.00
0.40
0.04
0.12
0.00
0.06
0.00
0.20
0.00
0.05
0.00
0.40
0.00
Page 96
0.20
0.00
10
0.00
0.00
11
0.15
0.00
12
0.10
0.00
13
0.20
0.00
14
0.30
0.90
15
0.80
0.60
Total
3.74
1.55
At present CNP is responsible for operation and maintenance of drainage system in the town. Major
portions of these drains require de-silting and repairs.
Page 97
S. No.
Tamas River
Khakkha Nallah
Flood-Prone Areas
As the River Tamas passes through the center of the town, all the low lying areas in ward nos. 3, 4,
11 and 12 in the northern side of river and in ward nos. 13 and 14 along the southern side of the
river are major flood prone areas of town.
Ward No.
In all the wards as they do not have sufficient
drainage network and mainly in ward no. 10
where no drains is there of any form.
SWOT Analysis
Based on the existing situational analysis and extensive participatory consultation with primary and
secondary stakeholders, Citys strengths, weaknesses, opportunities and threats have been assessed.
Table below presents the SWOT analysis at city level.
Page 98
WEAKNESS
Favourable natural slope towards the river Absence of the drains inside the wards like in
catchment area from both north and south
wards 9, 14, 15 etc.
ends of the town for development drainage Reduction in flow capacity of existing drains
system which will also help in cost reduction.
due to dumping of solid waste.
OPPORTUNITY
THREAT
Issues
Open drainage system throughout the town which is not functional properly.
Disposal of solid waste in drains has reduced the flow capacity of drains, which are along the
roads within the all wards except ward no. 10
Less capital investment.
Lack of a comprehensive and effective drainage system and facility of treatment plant.
Secondary and tertiary drains are linked with primary drains i.e. nallahs causes mixing of
waste water including sewage directly with the river water. This further aggravated the
problem of pollution to a potential source of water supply to town.
Disposal of solid waste in drains has reduced the flow capacity of drains.
Damaged and chocked drains lead to problem flooding and overspilling in internal areas and
in low lying areas of towns.
S. No.
Components
Horizon Period
2015
2025
2035
100%
100%
100%
100%
100%
100%
100%
100%
100%
Page 99
Projects proposed
Preparation of DPR for Storm Water
Drainage System for entire town
Project Cost
(in Lakh)
5.00
Department
UADD, Govt. of M.P.
and CNP
Page 100
176.00
Govt. of M.P
D3
70.00
Nagar Parishad
251.00
Ward No.
Total Population
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Total
756
721
744
503
328
404
725
798
689
1039
546
827
1050
585
961
10676
Page 101
Page 102
25.65%
17.14%
50 to 100 feet
22.34%
33.39%
Primary collection system is necessary to ensure that waste stored and segregated at source is
collected regularly and it is not disposed on the streets, drains, water bodies etc. However, step has
to synchronize well with the first step i.e. storage of waste at source.
There is no prevailing mechanism in the town for processing or disposal of waste. As the wastes are
not segregated, there is no processing of the collected wastes. There is no provision of incineration
facilities for hospital wastes. There is no area or site is designated for scientific disposal of Municipal
Solid Wastes. All types of wastes whether it is hospital waste or household waste are disposed or
dumped all together at various illegal dumping sites in low-lying areas along the river side near the
old bridge and in outskirts of town.
Resuse and Recycling
Basically the metals and plastics are collected by the slum dweller, which provides as source of
income for them. It is further marketed by scrap dealers. Waste materials like metals and plastics are
transported to nearby cities like Allahabad, Rewa, Jabalpur for further recycle and use.
Vehicles for Solid Waste Collection and Transportation
For proper solid waste management, suitable equipment in sufficient number is necessary for
handling, lifting, and transportations. Loading and unloading of municipal solid waste is done
manually and waste is transported through thela or tricycle pulled by sanitary worker. CNP also has
one tractor with a trolley but is not in working condition. However, the CNP is not properly equipped
with solid waste handling and transportation equipments. The equipment available with CNP for
S.W.M in town is listed below:
DMG Consulting Pvt. Ltd., Noida
Page 103
S. No.
Numbers
Tractor
Trolley
Dust Bins
Hand-pull Cart
Thela/Tricycle
Years
Total
Population
Standard as per
UDPFI
Guidelines
(Grams/Person)
Waste
Generaion
(MT/Day)
Waste
Collection
(MT/Day)
Gaps
(MT/Day)
2011
10676
250
2.67
0.18
-2.49
2012
11023
250
2.76
0.18
-2.58
2013
11381
250
2.85
0.18
-2.67
2014
11751
250
2.94
0.18
-2.76
2015
12133
250
3.03
0.18
-2.85
2020
14106
250
3.53
0.18
-3.35
2025
16399
250
4.10
0.18
-3.92
2030
19064
250
4.77
0.18
-4.59
2035
22163
250
5.54
0.18
-5.36
Page 104
S. No.
Indicators
1.
Grams
69.88
250
2.
Percent
25
100
3.
Door-to-Door
Efficiency
Collection Percent
Nil
100
4.
0.28
5.
Nil
Waste
Units
Current
Status
Normative Standard
SWOT Analysis
Based on the existing situational analysis and extensive participatory consultation with primary and
secondary stakeholders, Citys strengths, weaknesses, opportunities and threats have been assessed.
Table below presents the SWOT analysis at city level.
STRENGTH
Straight access to the all wards through the
major roads which can reduce the effort for
waste collection.
Most of portion of the waste generated is
biodegradable which can be dispose easily in
the open spaces like in north wards 8,10 and
in SE of the town in ward 13 to increase the
fertility of the agricultural land.
WEAKNESS
Presence of urban poor specially in ward 9
suits to dump waste generated along the bank
of Tamas river
Door-to-Door waste collection system is not in
practice and collection efficiency (25%)..
Segregation of waste is not in practice
Lack of dhallows and bins for waste storage.
No incineration unit is available for biomedical
waste.
OPPORTUNITY
THREAT
Page 105
S. No.
Components
Horizon Period
2015
2025
2035
80%
100%
100%
Source Segregation
100%
100%
100%
100%
100%
100%
Partial
Full
Full
Partial
Full
Full
Partial
Full
Full
80%
100%
100%
70%
100%
100%
Page 106
Highest priority has to be accorded for storage, segregation and of waste at sources
irrespective of the area of generation so as to facilitate an organized and
environmentally acceptable waste management measures.
A number of campaigns/ community awareness programmes should be organized for
introducing segregation of wastes at sources.
Segregation of hazardous wastes like bio-medical waste, bio degradable waste etc.
2. Primary Collection of Wastes: The following measures have been recommended for
improving the primary collection practices of Chakghat.
Phased implementation of Door-to-Door collection system through community
organizations on PPP basis by mobilizing, facilitating, organizing and supporting
community activities with the help of local NGOs.
Encourage performance based incentives to enhance efficiency and output.
Installation of Community Storage Bins in all areas where house-house collection cannot
be implemented.
Voluntary Garbage Disposal Scheme should be introduced for number of restaurants/
hotels and commercial establishments.
Placement of containers or bins sufficient in size and no. at markets for ensuring that all
the vendors place the waste in containers.
Bio-medical wastes and other hazardous wastes to be segregated and collected from
municipal solid wastes for separate incineration as per the guidelines of Ministry of
Environment and Forest 1998 and 1989 respectively.
Cost recovery through collection of well defined user charges.
Manual waste handling operation should be minimized. Primary collection system should be
initiated by introducing Multi-bin-carts (Push carts/ tricycles), semi mechanized systems like
refuse collectors. Separate collection vehicles should collect the non-bio-degradable waste
stored in separate bins. Thus, Primary collection should cover all areas of the town with
even innovative but safe transporting arrangements as per the MSW handling rules 2000.
3. Secondary Waste Collection and Transportation: At present, the CNP has inadequate no. of
sanitary workers and equipments for loading, unloading and transportation vehicles
(including bins) for secondary collection and transportation of wastes. Therefore, it is
recommended that CNP should involving private sector participation in secondary collection, transportation
and treatment of MSW facilities.
CNP should purchase sufficient no. of modest equipments including vehicles - such as
loader, unloader, hydraulic closed truck/waste carrier for transportation and disposal of
waste.
Construction or demolition wastes / debris to be separately collected and disposed off
in separate landfill site for future use.
CNP should prepare a Detailed Project Report (DPR) for Municipal Solid Waste
Management for town, ensuring the quantity and quality of required modest
equipments, techniques and vehicles for collecting, processing and transporting MSW.
This will also ensure the Institutional strengthening, human resources development
leading to overall capacity building.
DMG Consulting Pvt. Ltd., Noida
Page 107
4. Processing and Disposal: The characteristics and quality of solid waste generated in the city
primarily influence the disposal options. Considering these aspects, it is recommended to
develop a landfill site for safe disposal of solid waste. The disposal strategy for Chakghat
town for short term at town level will be Compost the organic fraction of the waste.
Encourage aerobic vermin composting at local level.
Sanitary land filling of inorganic fraction of waste and the compost rejects.
Educating the community on 4R strategy (Reuse, Recover, Recycle and Reduce) that can
help ease pressure on compost sites and affords resource recovery.
For the long term, it is further proposed that, Development of Scietific the Chakghat Nagar
Parishad should co-ordinate with State Government for clustering in regional engineered
landfill site for waste disposal involving other neighbouring ULBs. This also ensures the
scale and viability to the private partnership mode.
5. Improved sanitary landfill method
Method of controlled disposal of municipal solid waste (refuse) on land.
Several layers are placed and compacted on top of each other to form a refuse cell
(up to 3 m thick).
At the end of each day the compacted refuse cell is covered with a layer of
compacted soil to prevent odours and windblown debris.
When the landfill is completed, it is capped with a layer of clay or a synthetic liner in order to
prevent water from entering.
A final topsoil cover is placed, compacted, and graded, and various forms of vegetation may
be planted in order to reclaim otherwise useless lande.g., to fill to levels convenient for
building parks, golf courses, or other suitable public projects
In the improved version of the sanitary landfill, bio-gas can be tapped for energy generation
Page 108
Best Practices
Box: Solid waste Management in Surat
Background:
The Surat city is largely recognized for its textile and diamond businesses. Surat is also known for a
complete transformation from one of the filthiest cities to one of the cleanest cities in the country.
In September 1994, the city faced an unprecedented crisis when the killer disease PLAGUE broke
out in the city. However, in May 1995, a new programme was launched by Surat Municipal
Corporation (SMC) to clean the city through waste management. The programme created an
enormous impact on the cleanliness, which resulted in a significant improvement in the health
status and quality of living environment. So much so that Surats image was transformed from one
of the filthiest to the second cleanest city in the country.
Key Components of the program
The SMC adopted multi-pronged strategies to achieve the programme goals, include:
Page 109
Page 110
Projects proposed
Department
SWM 1
5.00
UADD, Govt. of
M.P. and CNP
SWM 2
140.00
Chakghat Nagar
Parishad
SWM 3
30.00
Nagar Parishad
SWM 4
75.00
Nagar Parishad
250.00
Page 111
Vehicle Population
Most of the vehicles are buses, tractors, scooters, jeeps and cars. But there is no availability of data
at city level.
The inter city public transport system for the town can be categorize into two parts i.e.
State Carriage and Private Carriage. State carriage includes buses by the State Government
with fixed routes and fare. The Private Carriage in under purely private domain and includes
buses, jeeps, matadors etc. operated by private operators. While as far as the inter city
transportation of goods is concerned, there are 15 transport agencies together with about
500 no. of trucks as listed below.
Table 6-19: List of Transport Agencies for Inter City Goods Transport
S. No.
No. of Trucks
40
50
25
Yana Motors
35
08
10
40
18
35
10
06
11
11
12
10
13
70
14
R. K. Road Lines
50
15
Others
About 80
Page 112
488
Source: Chakghat Nagar Parishad and Draft Master Plan-2021, Chakghat
At present there is no intra city public transport system exists in Chakghat. As the town is a
very small town all the important places such as major commercial and market areas, bus
stands, hospitals etc. are in the vicinity. Most of the local people generally use cycle, scooter,
motorcycle and walking etc. as mode of travel for short trips or intra zone trips.
Travel Characteristics
The travel characteristic of a town generally depends on the social status of citizens, types and
location of economic activities which give rise to diverse traffic modes. The predominant mode of
travel in town is cycles (700-800) followed by motorized vehicles such as two- wheeler (Scooter &
Motorcycle) about 600 in nos. and private transport which includes Three Wheelers (4-5 nos.), four
wheelers (Tempo, Matadoors, Jeeps, cars etc.) about 50 in nos. A town in semi-urban in nature all
the important place are in vicinity. Thus, only major working population uses their own means of
transport such as cycles, scooters, motorcycle, and cars etc. for their workplace and other places for
day to day needs. Rest of the population prefers to walk for various purposes. About 116 no. of
buses apart from jeeps, matador, and tempos enters the town per day out of which 66 are of
Allahabad Rewa route. (Draft Master Plan, Chakghat 2021.Additionaly, there are other large and
small commercial vehicles coming from the adjoining areas for the commercial purpose to the
market or commercial areas of the town.
Page 113
S. No.
Type of Roads
1.
3.77
2.
6.02
3.
4.21
4.
5.90
Total
19.89
Ward wise breakup of the above discussed road length and its indicators are shown in below in table
6.21. The town has overall per capita road length 1.86 meters and a road density of 10.68 km per sq.
km.
Table 6-21: Ward Wise Detail of Road Length in Chakghat Town
Ward
No.
Total
Length
of
Roads
(in
kms.)
Total
Population
2011
Area
in Sq.
Km.
Road
Density
(per sq.
km.)
Per
Capita
Road
Length
(in mts.)
Pucca
Road
(within
Ward)
Kutcha
Road
(within
Ward)
Major
District
Roads
N.H.
- 27
1.
0.22
0.15
0.27
0.00
0.64
756
0.06
0.76
0.84
2.
0.21
0.10
0.21
0.00
0.52
721
0.07
0.72
0.72
3.
0.35
0.15
0.01
0.00
0.51
744
0.16
0.74
0.68
4.
0.28
0.00
0.05
0.00
0.33
503
0.23
0.50
0.66
5.
0.30
0.00
0.08
0.00
0.38
328
0.05
0.33
1.17
6.
0.25
0.20
0.33
0.00
0.78
404
0.04
0.40
1.94
7.
0.10
0.10
0.09
0.00
0.29
725
0.07
0.73
0.41
8.
0.60
0.20
0.51
1.66
1.31
798
1.00
0.80
1.64
9.
0.25
0.10
0.18
0.53
689
0.04
0.69
0.78
10.
0.30
0.90
1.43
4.29
1039
1.33
1.04
4.13
11.
0.30
0.05
0.16
0.51
546
0.05
0.55
0.93
12.
0.20
0.74
0.00
1.43
827
0.48
0.83
1.72
13.
0.00
0.35
1.35
3.32
1050
1.04
1.05
3.16
14.
0.35
1.92
1.34
3.61
585
0.23
0.59
6.17
0.49
1.62
Page 114
0.50
0.94
Total
4.21
5.90
6.02
3.77
1.44
961
0.34
0.96
1.50
19.89
10676
5.21
10.68
1.86
Source: Area and Road Length Computed from Chakghat Digitized Map by DMG Consultant and Population as
per Census 2011.
Proper road width and spacing are important in reducing traffic on roads. Unfortunately many of the
important roads in town have become so narrow to facilitate the increasing flow of vehicles. The
unauthorized encroachment along both the sides of roads has covered all the available shoulders
thereby reducing ROW from 20m to 6m further decreased the carrying capacity of roads. The table
6.24 presented shows the important roads of the town and their existing width. There are 7
important roads in the town. The Main town road (old NH-27), chandrapur Road and Gaura Road are
most important roads as most of the residential, commercial and other activities are concentrated
here.
S.
No.
1.
60
2.
18 - 30
Page 115
4.
Chandrapur Road
Gaura Road
8 20
9 20
6 - 15
5 -10
5.
Community Health
Center Road
15 24
6.
Satpura Road
9 25
7.
Sanauri Raod
12 - 35
Source: Chakghat Nagar Parishad and Draft Master Plan Chakghat 2021
The overall condition of these existing roads is not good having pot holes in many places, no proper
drainage, no road furniture for guidance of movers etc. On the contrary, the electric poles situated
on both side of the roads at some places does not permit the traffic to use shoulders and further
reduces effective width of road.
At present both the sides of road is full of ribbon development. However, with increasing
concentration of activities in and around the core area of the town, pressure of traffic is increasing
on all the major roads of the town.
Primarily, the traffic and congestion is greatest in the wide junction (Old Chauraha near market area)
formed by the two major roads i.e. old NH-27 road and Chandrapur Road. This NH-27 (Allahabad
DMG Consulting Pvt. Ltd., Noida
Page 116
Chandrapur Road
Gaura Raod from Chak/Gola Bazar or Market to NH-27
Community Health Center
Nehru College
Boys and Girls Higher Secondary School
Core Area of the Town
The core area of the town are predominately consisting of narrow roads due to irregular
vehicle parking; encroachment by informal shops, thela; vegetable and fruit market; presence
of important centers etc. This leads to traffic congestion or regular basis.
Accident Zones
Accident zones are those areas where collisions, ramming and hit-and-run mishaps usually
take place. The heavy and speedy traffic flow on NH, informal commercial developments,
unavailability of transport nagar and unavailability organized parking spaces etc. has increases
the possibilities of accidents in the town. The junctions on national Highway 27 are the most
prominent accident zones in the town due to the heavy and speedy traffic flow. These
junction includes Y junction at old NH-27 (main road) and new NH-27, New Chauraha, Old
Chauraha.
Page 117
Parking Requirement
There is no provision have been made for organized on-street parking and off-street parking at
major commercial centers of the town. Most of the core market area of the town is characterized by
narrow roads with slow moving traffic. Unorganized on-street parking and informal shops leads to
encroachment on the ROW and absence of footpath force the pedestrians to walk on the
carriageway.
Thus, the capacity of the road is further reduced resulting in conflict between pedestrians and
vehicular traffic. Therefore, there is urgent need/requirement of authorized parking as per the
standards for major commercial areas and in other important areas such as along NH-27,
institutional areas etc. of the town.
Page 118
COMPONENTS
YEARS
2011
2012
2013
2014
2015
2020
2025
2030
2035
Projected Population 10676 11023 11381 11751 12133 14106 16399 19064 22163
for Chakgaht
Raod Network (in Km)
2011
2012
2013
2014
2015
2020
2025
2030
2035
Existing
Network
19.89
19.89
19.89
19.89
19.89
19.89
19.89
19.89
19.89
16.01
16.53
17.07
17.63
18.20
21.16
24.60
28.60
33.24
Gaps
-3.88
-3.36
-2.28
-2.26
-1.69
1.27
4.71
8.71
13.35
Up-gradation of Roads
(in Km)
2011
2012
2013
2014
2015
2020
2025
2030
2035
Road
Up-gradation
Kutcha
Roads
Pucca Roads
of
to
5.90
Widening
Important roads
of
6.02
Improvement
of
Junctions
and
accident area (Nos.)
Other Infrastructure
Facilities (in nos.)
2011
2012
2013
2014
2015
2020
2025
2030
2035
Development
of
Transport
Nagar
(Truck Terminal)
Development of Bus
Stand
Page 119
Footpath
in km
19.57
(Sidewalk)
Source: Population Projection & DMG Assessment as per IRC and UDPFI Guidelines
Type of Roads
Norms
Current Status
ROW
Carriage Way
ROW
Carriage Way
Arterial Road
50 60 m
21 m
60 m
60 m
Sub-Arterial
Road
30 40 m
14 m
10 25 m
58m
Collector Road
20 30 m
10.5 m
46m
3m
Local Street
10 20 m
7.5 m
34m
3m
Footpath (Sidewalk)
The minimum width of footpath should be 1.5 m. The width should be increased by 1m in major
commercial or market areas to allow for dead width. Footpath adjoining shopping frontage should
be at least 3.5 m.
Table 6-25: Desirable of Footpaths
Capacity (Persons)
All in one Direction
1220
2400
3600
4800
6000
In both Directions
800
1600
2400
3200
4000
1.5
2.0
2.5
3.0
4.0
SWOT Analysis
Based on the existing situational analysis and extensive participatory consultation with primary and
secondary stakeholders, Citys strengths, weaknesses, opportunities and threats have been assessed.
Table below presents the SWOT analysis at city level.
DMG Consulting Pvt. Ltd., Noida
Page 120
WEAKNESS
THREAT
In the absence of adequate public transportation
systems in town, individual and personalized
modes of transport would increase
Fund unavailability for road construction and
maintenance.
Issues
Page 121
There is a need to provide traffic lights and signals at junctions which are heavily loaded and
causes accidents. These junctions include New Chauraha (Gaura Road and NH-27), Hospital
Road and NH-27 junction, Old Chauraha etc.
S. No.
Components
Horizon Period
2015
2025
2035
100%
100%
100%
100%
60%
100%
100%
100%
100%
100%
100%
100%
30%
60%
100%
Parking Facilities
100%
100%
100%
Page 122
Projects proposed
Project Cost
(in Lakh)
Department
TT 1
500.00
TT 2
500.00
TT 3
675.00
TT 4
50.00
Page 123
50.00
TT 6
90.00
PWD
TT 7
60.00
1925.00
S. No.
Equipment
Total Number
Percentage to Total
1.
450
75.38%
2.
150
20.94%
3.
15
2.51%
4.
0.50%
5.
0.67%
597
100.00%
Total
Source: Chakghat Nagar Parishad
As per the survey out of the total almost 25 % of street light to serve the citizen at ward level are not
working while around 10% are not working along the major roads of town. Though the street light
has been provided to urban poor residing in ward no. 2, 3, 5, 7 and 9 but level of provision is low as
compared to other areas of the town.
DMG Consulting Pvt. Ltd., Noida
Page 124
Fire Service
As has been explained earlier, unorganized on-street parking and economic activities in town has led
to increase congestion, rampant encroachment and more importantly development of potential fire
generating points in the core area of the town. There is no separate office for the fire fighting
operations in the town. The responsibility of fire service has been delegated to the municipality,
among other tasks but there is no formal fire fighting services is available in the town. In such
anthropogenic hazards situation few water tankers being used and CNP ask help from Theonther
and District Headquarter Rewa.
Operational System
At present there is no formal fire fighting services is available in the town. In such anthropogenic
hazards situation few water tankers being used and CNP ask help from theonther and District
Headquarter Rewa.
Thus, the ULB urgently needs a fully fledged fire fighting department equipped with latest
firefighting vehicles (including operation and maintenance of assets) and well trained manpower to
control the anthropogenic hazard and fire mishap for Chakghat Nagar Parishad.
Page 125
COMPONENTS
YEARS
2011
2012
2013
2014
2015
2020
2025
2030
2035
386
386
386
386
386
386
386
386
386
Road Length Demand (in 16.01 16.53 17.07 17.63 18.20 21.16 24.60 28.60 33.24
km)
Street Light Demand @ 1
light per 40 m spacing on
one side of road (within
wards)
400
413
427
441
455
529
615
715
831
14
27
41
55
69
143
229
329
445
196
196
196
196
196
196
196
196
196
9.78
9.78
9.78
9.78
9.78
9.78
9.78
9.78
9.78
391
391
391
391
391
391
391
391
391
195
195
195
195
195
195
195
195
195
209
222
236
250
264
338
424
524
640
As per the UDPFI Guidelines, Chakghat Nagar Parishad at present does not sufficient number of
street light with a gap of 209 for year 2011. To make Chakghat a safe and secure town, the demand
for street light poles for the horizon period 2035 is 1222 and the total gap is 640 poles.
At present the street lighting poles within wards have irregular spacing which needs to place as per
the standard of 40m spacing.
S. No.
1.
2.
Page 126
3 Fire Men
18,000
6,48,000
4.
3 Helper
10,000
3,60,000
5.
3 Driver
12,000
4,32,000
40,000
14,40,000
Total
Source: Population Projection & DMG Assessment
Hence for operating two fire fighting vehicles and one electric pole vehicle there will be a
requirement of 11 mens with a total annual salary of Rs. 14,40,000/- to deliver the service
effectively as and when required in the town.
S.
No.
Indicator
Unit
Current
Status
Norms/
Standards
1.
Meters
irregular
30 - 40
2.
Meters
50
40 - 50
3.
Percentage
75.36
60 - 70
4.
Percentage
21.00
100
Source: Field Survey, UDPFI Guidelines and * certain experience and thumb rules.
SWOT Analysis
Based on the existing situational analysis and extensive participatory consultation with primary and
secondary stakeholders, Citys strengths, weaknesses, opportunities and threats have been assessed.
Table below presents the SWOT analysis at city level.
STRENGTH
WEAKNESS
Around 597 street poles are existed along the NH- Out of total 1494 households, 253
27, Goura road, Satpura road Chandrapur road
households have no connection and relies
which are covering almost all the wards of the
on other sources specially in slums wards
town.
1,2,7 and 9
Adopting energy efficient products like CFL, LED Around one-fourth of the street lights are
etc. around 20% of the total along the major
not functioning along the roads. (wards
roads and NH-27 specially in wards with
1,2,7,8,10)
population like in wards 1,2,3,4,5,6,14,15 etc
OPPORTUNITY
THREAT
Page 127
Total
households
Sources of Lighting
Electricity
Kerosene
Solar Energy
Other Oil
Any Other
No Lighting
1241
237
10
1494
No. of Households
Firewood
1000
Crop Residue
25
23
Coal
16
Kerosene
147
LPG
277
Electricity
Biogas
No Cooking
Total
1494
Out of total 1494 households, majority of households (1000) use firewood as a fuel for cooking
purpose followed by the LPG (277) and Kerosene (147) for domestic cooking. This shows a strain on
forest/wood resources which is a concern and a threat to environment, depletion of natural
resources.
Issues
Almost 25 % of street light to serve the citizen at ward level are not working while around
10% are not working along the major roads of town. Though the street light has been
Page 128
provided to urban poor residing in ward no. 2, 3, 5, 7 and 9 but level of provision is low as
compared to other areas of the town.
Irregular spacing of street light poles in the residential areas of town.
Inadequacy in number of street lights in the town.
Lack of firefighting service facilities and staff.
S. No.
Components
Horizon Period
2015
2025
2035
30%
70%
100%
Up-gradation of existing
100%
100%
100%
Underground Cabling
70%
100%
Energy Saving
70%
100%
100%
100%
100%
100%
100%
100%
100%
Page 129
Installation of high Mast Light at important junctions, rotary and entry point of the
town.
Alternate Street Light options (Solar, energy saver like CFL, LED etc.) and installation
of automated control lights.
Installation of solar based electric poles in public gathering places and recreational
spaces like river site.
Installation of solar panels for generating solar power/electricity in institutions (such
as ULB, CHC etc.) and on identified government land within the municipal limit.
Disaster Management Plan for fire-fighting.
Institutional strengthening, human resources development leading to overall
capacity building of ULB for both the sector Street Lighting and Fire Fighting including assets required for the operation and maintenance.
Projects proposed
Project Cost
(in Lakh)
Department
SL 1
148.00
SL 2
90.00
SL 3
25.00
SL 4
125.00
SL 5
5.00
393.00
Page 130
S. No.
Slum
Population
No. of
Households
% of BPL Population
to Slum Population
721
136
64.35
3; Tilak Ward
744
142
62.28
328
43
80.49
725
149
58.24
9;
689
127
45.12
3207
597
60.01
Total
S. No.
Level
2
3
Total
Population
% to total
Population
10676
1997
100.00
Slum
3207
597
30.04
BPL
1924
18.03
Page 131
Page 132
Page 133
Year
Total Population
Non-Slum
Slum
Existing Supply
Non-Slum
Slum
Housing Demand
Non-Slum
Slum
Housing Gap
Non-Slum
Slum
Page 134
7469
3207
1400
597
1494
641
94
44
2012
7712
3311
1400
597
1542
662
142
65
2013
7962
3419
1400
597
1592
684
192
87
2014
8221
3530
1400
597
1644
706
244
109
2015
8488
3645
1400
597
1698
729
298
132
2020
9869
4237
1400
597
1974
847
574
250
2025
11473
4926
1400
597
2295
985
895
388
2030
13337
5727
1400
597
2667
1145
1267
548
2035
15505
6658
1400
597
3101
1332
1701
735
Based on the above assumptions, at present there is a gap for slum housing of 44 houses. This
indicates that there is a demand for housing.
Housing Gap Assessment
Present Housing Demand for EWS/Slum
597
44
1332
735
Page 135
SWOT Analysis
Based on the existing situational analysis and extensive participatory consultation with primary and
secondary stakeholders, Citys strengths, weaknesses, opportunities and threats have been assessed.
Table below presents the SWOT analysis at city level.
STRENGTH
Cheap and abundant availability of lands
around the populated area in wards,
8,10,12,14, and 15 which can be suitable for
the EWS housing for urban poor and for other
development as well.
WEAKNESS
Access routs to these slums in 2,3,5,,7 is
difficult in rainy season due to water logging.
All the collector roads are kutcha roads in
wards 2,3,5,9 within the slum area.
OPPORTUNITY
THREAT
Page 136
Encouraging slum improvement schemes like improvement of physical i.e. water supply,
drainage, sanitation facilities as well as social infrastructure like education, health facilities in
the slums.
Construction of underground sewage system in the town including slum areas.
Solid waste bins must be provided to all the wards and ensure the primary and secondary
collection including segregation of waste at source level.
Pucca drains and culverts must be provided in all wards including slum areas.
Providing land ownership to the slum dwellers that are located in non-hazardous govt. land,
so that the people can invest of their own houses.
For skill up gradation and economic up-liftment various schemes should introduce, so that
people can spare for proper housing.
Involvement of NGOs should be encouraged for improvement of slums.
Government should act as a facilitator rather than provider for the improvement of the
housing condition of the slums.
Community participation should be emphasized in any of the schemes launched by the govt.
or NGOs.
Relocation of slums from hazardous/flood prone areas.
Projects proposed
UP 1
2041.00
Department
MPHB; CNP
2041.00
Page 137
6.3
Social Infrastrucutre
6.3.1 Health
Overall Health Facilities
There is general awareness among the residents about environment protection and cleanliness in
the town. The parishadt is actively engaged in maintaining cleanliness and hygiene of the town in
general. At present, there is one Community Health Centre (CHC) with 30 beds and clinics including
Allopathic, Ayurvedic / Homeopathic in town and three Primary Health Centres (PHCs) in
surrounding Gram Panchyats. Apparently, the existing health systems seem to be adequate to meet
the local requirements of existing population. However, the demand for health services is bound to
increase along with growth in population and there is a need for creating a specialty hospital for the
growing population. There is one vehicle provided by family planning/Mahila Bal Vikas for carrying
pregnant women to the CHC. The ambulance services have to be made available to handle
transportation of patients who are seriously ill.
Page 138
6.3.2 Education
Overall Educational Facilities and Teachers in the Town
Altogether there are 6 Nos. of schools in chakghat. Out of this 3 are primary, 1 high school for boys
and 1 higher secondary school for girls provided by government. 1 Saraswati Shishu Mandir School
located in ward no. 12 is a private higher secondary school in the town. The schools are located in
busy market area and lacks conducive environment for good education. The physical conditions of
the schools are not good. During rainy season it becomes very difficult to carry out the educational
activities due to seepage/leakage problem. More over the schools are not having basic requirement
of drinking water and sanitation facilities for students, except private school.
In addition, Chakghat also has 1 Pharmacy College, and 1 Arts & Science College for higher
education. The location of these schools & colleges are marked in the map provided below.
Page 139
Area
Male
Female
Urban India
84.98
89.67
79.92
Madhya Pradesh
84.90
90.24
77.39
Rewa District
73.42
83.67
62.49
69.88
75.97
63.17
Ward No.
Ward No.1
Male
Female
67.20
71.32
62.54
Page 140
66.30
70.96
60.62
Ward No.3
63.31
68.19
57.83
Ward No.4
75.75
81.58
69.20
Ward No.5
80.18
79.65
80.77
Ward No.6
83.66
87.61
79.03
Ward No.7
76.28
80.64
71.55
Ward No.8
71.80
75.90
67.36
Ward No.9
78.08
81.50
74.05
Ward No.10
67.66
75.18
59.01
Ward No.11
78.02
82.44
73.41
Ward No.12
55.62
68.46
43.06
Ward No.13
70.57
79.74
61.12
Ward No.14
69.23
77.35
60.14
Ward No.15
64.72
71.37
57.63
Average
69.88
75.97
63.17
Total
Male
Female
The above figure shows the ward wise distribution of literate population in Chakghat. Most of wards
have higher literate population; ward no. 6 raking the highest followed by ward no. 5 & 9. Overall
there is a highe literate population in the town dominated by male.
Page 141
Sports Facilities
Presently there is no formal provision of stadium facility in Chakghat town for sports by the
municipal body for the citizens of town.
Page 142
Particulars
Standards/Norms
Current Status
College
Intermediate Hospital
Included in CHC
Dispensary
Community room
Recreational Club
Police station
Police post
Educational Facilities
Socio-cultural Facilities
Police
Fire
1 fire station or sub fire station within 1 - 3km
Table 6-39: Present and Future Demand and Supply Gaps Social Infrastructure
COMPONENTS
Particulars
Chakghat
YEARS
2011
2012
2013
2014
2015
2020
2025
2030
2035
Projected 10676 11023 11381 11751 12133 14106 16399 19064 22163
Page 143
2011
2012
2013
2014
2015
2020
2025
2030
2035
Intermediate Hospital 1
Demand
Intermediate Hospital 1
Existing
Intermediate Hospital 1
Gaps
Poly-clinic Gaps
No. of Dispensaries 1
Required
No. of Dispensaries 0
Existing
Dispensaries Gap
30
30
30
30
30
30
30
30
22
23
24
24
28
33
38
44
10
10
10
10
10
10
10
10
Page 144
30
30
30
30
30
30
30
30
Bed
Gaps
32
33
34
34
38
43
48
54
Requirement 31
-1
Integrated
School 1
with Hostel Facility
Demand
Integrated
School 0
with Hostel Facility
Existing
Existing Colleges
Colleges Gap
-1
-1
-1
-1
-1
-1
-1
-1
-1
Existing
Institute
Technical 0
Gap
Technical 1
for
Page 145
13.52
15.69
18.20
21.11
38.35
44.83
52.90
62.50
Parks in
Existing
13.52
15.69
18.20
21.11
38.35
44.83
52.90
62.50
Gap
Hectares 0
11.66
Community
Demand
Room 2
Community
Existing
Room 0
WEAKNESS
Health
Health
Education
Education
Page 146
Plenty of land is available for the development of Town does not have any designated place as park
or playground as recreational area for the citizens.
recreational area such as park and playground in
Absence of community room, community halls and
the town.
public library in town for the citizens.
Absence of tourist of facility or picnic spots.
OPPORTUNITY
Health
THREAT
Health
There is scope for private and low cost health Government programmes are more focused on
Family Planning, RCH and Immunization etc.
infrastructure entry in Chakghat.
There is population without proper medical Government referral and medical facilities are not
properly used because of lack of doctors.
facilities.
State government commitment for health and The infrastructures in Government hospitals are
inadequate to handle the number of patients.
education services.
High cost of health facilities by private sector may
hinder health service to poor.
Education
Education
6.3.7 Issues
1. Health Sector
Town has insufficient facilities for hospital, poly-clinic and dispensary and doctors.
Town has no intermediate/specialty hospital and specialized health care facilities for
which it depends on nearest town Allahabad.
2. Education Sector
DMG Consulting Pvt. Ltd., Noida
Page 147
Page 148
Municipal body shall initiate the awareness programmes related to Right to Education
especially for girls and its importance to all citizens to increase the literacy rate among
the female.
3. Recreational and Entertainment Sector
Municipal body shall identify the place and initiate the development of community
room, Rain Basera, community halls and public library in town for the citizens as per the
norms.
River front development can be done on PPP basis along both the side of River Tamas
which can be use and conserved as major tourist site, picnic spot or recreational area
for the citizens as well as for domestic tourism.
Municipal body shall identify place and designate the same as parks and play grounds
for the resident coped with present and future development of town.
Municipal body shall identify the site for the development of Stadium/play ground for
the town.
Health Facilities
Most of the population is not served by this because of poor medical infrastructure facilities in terms
of hospital beds and doctors. So the following projects are identified for the overall development of
the sector
Code No.
Projects proposed
Project Cost
(in Lakh)
H1
150.00
Health Department,
Chakght
H2
Construction of 1 Multi-specialty /
intermediate hospital with 44 no. of beds
@1 bed per 500 person for 2035 in ward no.
10 or 13
75.00
Health Department,
Chakghat
H3
50.00
Health Department,
Chakghat
Department
275.00
Educational Facilities
Considering the emerging issues and potentials in the sector, the following projects are identified in
the education sector:
DMG Consulting Pvt. Ltd., Noida
Page 149
Projects proposed
Project Cost
(in Lakh)
E1
300.00
Education Department,
Govt. of M.P.
E2
100.00
Education Department,
Govt. of M.P.
E3
500.00
Education Department,
Govt. of M.P.
E4
10.00
Education Department,
Govt. of M.P.
E5
100.00
Education Department,
Govt. of M.P.
E6
50.00
Education Department,
Govt. of M.P.
E7
10.00
E8
70.00
Department
1140.00
Environment
Page 150
Page 151
6.3.13 Issues
6.4
Page 152
Tourist Spot
River Tamas
Location
Flowing through the center of the town River Tamas
touches the ward boundary of Ward No. 3 Tilak
Ward; Ward No. 4 Ramlila Ward; Ward No. 11
Tamsa Ward; and Ward No. 12 Bhagat Singh
Ward in the northern side of the town and Ward
No. 14 Dr. Rammanohar Lohia Ward and Ward
No. 13 Rajiv Gandhi Ward in the southern part of
the town.
Page 153
Tourist
Place/Destination
Distance
from Town
Specialty
Category
Cave
under 8-9 Km
Vindhyahal
Mountain Range
Deorkothar
(Tyonthar tehsil)
25-30 Km
40-45 Km
Rewa
80 Km
Religious,
Cultural,
Heritage &
Archeological
Chakghat
100 Km
Adventure,
Cultural,
Heritage &
Archeological
Gurh
110 Km
Prayag
Allahbad
and 45 km
Religious
called "Bhairom
"Shiv Ji & Alliad
"Kudia"; Famous
& Maharua Ka
Varanasi
165 Km
Cultural &
Archeological
Adventure
Religious
Religious,
Cultural,
Heritage &
Archeological
Religious
Page 154
135 Km
Religious,
Cultural &
Archeological
Heritage &
Religious
Maihar
175 Km
Religious
Khajuraho
250 Km
Religious,
Cultural &
Archeological
The above listed tourist spots such as Buddha Stupas & Roack Painting at Deorkothar, Big statue of
God Shiva called "Bhairom BaBa" at Gurh, Kyunti Water Fall etc. are in un-developed stage as they
lacks sufficient and efficient modes of transportation, infrastructure services - street lights, public
drinking water, public toilets, eating places etc.
Page 155
Page 156
As of now there is no any such heritage structure in the town; hence, there is lack of proper
guidelines for identification, conservation and maintenance of heritage structures.
Poor awareness among the local people about the heritage values of the structures.
Poor tourism infrastructure.
Chakghat-Allahabad- Varanasi-Gaya
Chakghat-Allahabad-Lucknow
Chakghat-Chitrakoot-Jhansi-Gwalior
Chakghat-Rewa-Gurh & Chakghat -Maihar-Satna-Khajuraho
Chakghat-Amarkantak
Chakghat-Renukoot
Adventure/Nature Tourism:
Page 157
WEAKNESS
Page 158
THREAT
6.4.10 Issues
No significant historical or heritage monument recognized but has potential for tourism
development as the Tamas river which passes through the town, River Tamas touches ward
boundary of Ward No. 3 Tilak Ward; Ward No. 4 Ramlila Ward; Ward No. 11 Tamsa
Ward; and Ward No. 12 Bhagat Singh Ward in the northern side of the town and Ward
No. 14 Dr. Rammanohar Lohia Ward and Ward No. 13 Rajiv Gandhi Ward in the southern
part of the town.
NH-27 connects holy city Prayag / Allahabad following straight to Orchha or Khajuraho,
Maihar, Panna National Park, Bandhavgarh National Park, thus the town Chakghat falls
under KhajurahoPannaBandhavgarh-Chitrakoot-Allahabad tourist circuit.
Lack of public transport (poor frequency, bad condition of buses) and poor condition of
roads affecting the movement of the tourist into the town.
Town has not identified its heritage and tourism potential.
There is no active recreation facility like river front development etc. in town.
There are lacks of infrastructure support in the development of tourism.
Excessive encroachment on river side and discharge of waste water along with municipal
waste in Tamas River.
River front development on PPP basis along with lake/river based activities like water sports,
theme park and boating etc. to encourage tourism.
Facilitating infrastructure in terms of good means of transport, hotels and resorts to attract
tourists.
Chakghat can be developed as a rural tourist centre.
Promoting Chakghat as a transit point for the surrounding tourist destination like pilgrimage
center Prayag & Allahabad and Chakghat, Gurh, Orchha or Khajuraho, Maihar, Panna
National Park, Bandhavgarh National Park.
Page 159
Projects proposed
Project Cost
(in Lakh)
Department
T1
200.00
T2
100.00
T3
50.00
T4
50.00
T5
35.00
Page 160
CHAPTER 7
Special Paper:
TRAFFIC AND TRANSPORTATION
SYSTEM
Page 161
7.
7.1 Background
The transportation profile of a town makes a direct reference on the quality of life within it. Its one
of the crucial considerations for towns economic development and its investment climate. Urban
economy is seen to improve with urban transport infrastructure. Roads and circulation is an
important city land-use allowing efficient function of any city or towns activities. Conversely, it can
drag drown and prove detrimental to its GDP. The objective of the studying town level
transportation is to understand and analyze the present level travel scenario of the town and to
focus on existing potentials and scope of development.
Page 162
The inter city public transport system for the town can be categorize into two parts i.e.
State Carriage and Private Carriage. State carriage includes buses by the State Government
with fixed routes and fare. The Private Carriage in under purely private domain and includes
buses, jeeps, matadors etc. operated by private operators. While as far as the inter city
transportation of goods is concerned, there are 15 transport agencies together with about
500 no. of trucks as listed below:
Table 7-1 List of Transport Agencies for Inter City Goods Transport
S. No.
No. of Trucks
40
50
25
Yana Motors
35
08
10
40
18
35
10
06
11
11
12
10
13
70
14
R. K. Road Lines
50
15
Others
About 80
Total
488
At present there is no intra city public transport system exists in Chakghat. As the town is a
very small town all the important places such as major commercial and market areas, bus
stands, hospitals etc. are in the vicinity. Most of the local people generally use cycle, scooter,
motorcycle and walking etc. as mode of travel for short trips or intra zone trips.
Page 163
Sr. No.
Type of Roads
1.
3.77
2.
6.02
3.
4.21
Page 164
5.90
Total
19.90
Ward wise breakup of the above discussed road length and its indicators are shown in below in table
6.21. The town has overall per capita road length 1.86 meters and a road density of 10.68 km per sq.
km.
Table 7-3: Ward Wise Detail of Road Length in Chakghat Town
Ward
No.
Total
Length
of
Roads
(in
kms.)
Total
Population
2011
Area
in Sq.
Km.
Road
Density
(per sq.
km.)
Per
Capita
Road
Length
(in mts.)
Pucca
Road
(within
Ward)
Kutcha
Road
(within
Ward)
Major
District
Roads
N.H.
- 27
1.
0.22
0.15
0.27
0.00
0.64
756
0.06
0.76
0.84
2.
0.21
0.10
0.21
0.00
0.52
721
0.07
0.72
0.72
3.
0.35
0.15
0.01
0.00
0.51
744
0.16
0.74
0.68
4.
0.28
0.00
0.05
0.00
0.33
503
0.23
0.50
0.66
5.
0.30
0.00
0.08
0.00
0.38
328
0.05
0.33
1.17
6.
0.25
0.20
0.33
0.00
0.78
404
0.04
0.40
1.94
7.
0.10
0.10
0.09
0.00
0.29
725
0.07
0.73
0.41
8.
0.60
0.20
0.51
1.66
1.31
798
1.00
0.80
1.64
9.
0.25
0.10
0.18
0.53
689
0.04
0.69
0.78
10.
0.30
0.90
1.43
4.29
1039
1.33
1.04
4.13
11.
0.30
0.05
0.16
0.51
546
0.05
0.55
0.93
12.
0.20
0.74
0.00
1.43
827
0.48
0.83
1.72
13.
0.00
0.35
1.35
3.32
1050
1.04
1.05
3.16
14.
0.35
1.92
1.34
3.61
585
0.23
0.59
6.17
15.
0.50
0.94
1.44
961
0.34
0.96
1.50
Total
4.21
5.90
19.89
10676
5.21
10.68
1.86
6.02
0.49
1.62
3.77
Source: Area and Road Length Computed from Chakghat Digitized Map by DMG Consultant and Population as
per Census 2011.
Proper road width and spacing are important in reducing traffic on roads. Unfortunately many of the
important roads in town have become so narrow to facilitate the increasing flow of vehicles. The
unauthorized encroachment along both the sides of roads has covered all the available shoulders
thereby reducing ROW from 20m to 6m further decreased the carrying capacity of roads. The table
6.24 presented shows the important roads of the town and their existing width. There are 7
important roads in the town. The Main town road (old NH-27), Chandrapur Road and Gaura Road
Page 165
S.
No.
Existing Width
(in mt.)
1.
60
2.
18 - 30
3.
Chandrapur Road
8 20
9 20
6 - 15
5 -10
4.
Gaura Road
5.
15 24
6.
Satpura Road
9 25
7.
Sanauri Road
12 - 35
Source: Chakghat Nagar Parishad and Draft Master Plan Chakghat 2021
Page 166
Page 167
Chandrapur Road.
Gaura Road from Chak/Gola Bazaar or Market to NH-27.
Community Health Centre.
Nehru College.
Boys and Girls Higher Secondary School.
Page 168
Page 169
COMPONENTS
YEARS
2011
2012
2013
2014
2015
2020
2025
2030
2035
Projected Population 10676 11023 11381 11751 12133 14106 16399 19064 22163
for Chakghat
Raod Network (in Km)
2011
2012
2013
2014
2015
2020
2025
2030
2035
Existing
Network
19.89
19.89
19.89
19.89
19.89
19.89
19.89
19.89
19.89
16.01
16.53
17.07
17.63
18.20
21.16
24.60
28.60
33.24
Gaps
-3.88
-3.36
-2.28
-2.26
-1.69
1.27
4.71
8.71
13.35
Up-gradation of Roads
(in Km)
2011
2012
2013
2014
2015
2020
2025
2030
2035
Road
Up-gradation
Kutcha
Roads
Pucca Roads
of
to
5.90
Widening
Important roads
of
6.02
Improvement
of
Junctions
and
accident area (Nos.)
Other Infrastructure
Facilities (in nos.)
2011
2012
2013
2014
2015
2020
2025
2030
2035
Development
of
Transport
Nagar
(Truck Terminal)
Page 170
On-street
Parking
Provision
with
pavement on major
roads
Footpath
in km
19.57
(Sidewalk)
Source: Population Projection & DMG Assessment as per IRC and UDPFI Guidelines
Type of Roads
Norms
Current Status
ROW
Carriage Way
ROW
Carriage Way
Arterial Road
50 60 m
21 m
60 m
60 m
Sub-Arterial
Road
30 40 m
14 m
10 25 m
58m
Collector Road
20 30 m
10.5 m
46m
3m
Local Street
10 20 m
7.5 m
34m
3m
Footpath (Sidewalk)
The minimum width of footpath should be 1.5 m. The width should be increased by 1m in major
commercial or market areas to allow for dead width. Footpath adjoining shopping frontage should
be at least 3.5 m.
Table 7-7: Desirable of Footpaths
Capacity (Persons)
All in one Direction
1220
2400
3600
4800
6000
In both Directions
800
1600
2400
3200
4000
1.5
2.0
2.5
3.0
4.0
Page 171
WEAKNESS
OPPORTUNITY
THREAT
Land availability for major projects like In the absence of adequate public
development of Bus Terminal, Transport Nagar
transportation systems in town, individual and
for goods carriers and parking facilities.
personalized modes of transport would
increase and that would pose a serious
PPP participation for development and
problem in terms of traffic jams on major
maintenance of Bus Terminal, Transport Nagar
roads, in addition to parking problems, at a
and Parking facilities.
later date.
Fund unavailability for road construction and
maintenance.
7.14 Issues
Page 172
Rampant encroachment, on-street parking on all major roads led to congestion thereby
reduced the ROW and carriageway resulting in slow movement of traffic in core area.
The town lacks transport proper utility/infrastructure systems such as Bus Terminal,
Transport Nagar (Truck Terminal), organized and adequate parking spaces in important areas
to properly facilitate movement of vehicles in the town and improve the traffic situation.
Currently the existing bus terminal is very small; it is not being used by bus operators
because of paucity of space in making entry and exit due to informal development,
inefficient road width. Hence, its being used as taxi stand.
Narrow streets in the core areas of the town need to be widened through proper planning
and addressing the encroachment problems.
There is a need to provide traffic lights and signals at junctions which are heavily loaded and
causes accidents. These junctions include New Chauraha (Gaura Road and NH-27), Hospital
Road and NH-27 junction, Old Chauraha etc.
S. No.
Components
Horizon Period
2015
2025
2035
100%
100%
50%
100%
100%
60%
100%
100%
70%
100%
100%
100%
100%
100%
30%
60%
100%
Parking Facilities
100%
100%
100%
In order to address the above discussed issues and achieve the above outcomes in each of the
components of traffic and transportation in the town, strategies categories under short term
measures, medium term and long term action plans are elaborated below:
4. Short Term Measures: Short term measures includes immediate trouble shooting actions
and traffic management actions such as Intersection or junction improvement in the core areas and accident prone areas to
town.
DMG Consulting Pvt. Ltd., Noida
Page 173
Page 174
Roads and
Transportation
Proposed Projects
Projects proposed
Development of new Bus Stand with proper
ISBT on BOOT basis in ward no. 10
Project Cost
(in Lakh)
500.00
Department
Chakghat Nagar Parishad
Page 175
500.00
TT 3
675.00
TT 4
50.00
TT 5
50.00
TT 6
90.00
PWD
TT 7
60.00
1925.00
Page 176
CHAPTER 8
Existing Institutional Framework for
Development
Page 172
8.
8.1
The main organization in the town is the Chakghat Nagar Parishad which provides all the civic
services, levies local taxes and maintains registers of births and deaths. The municipality is primarily
funded by local grants and levy of property tax.
Page 173
Administrative Authority
Executive Authority
Functions
Administrative Powers
Revenue Powers
Limitations on powers
Constraints Identified
8.2
The main function and activity of Town & Country planning are governed under MP Nagar Thata
Gram Nivesh Adhiniyam 1973 and rules prepared there under e.g. MP Nagar Tatha Gram Nivesh
Niyam 1975 and MP Bhumi Vikas Niyam 1984.
The main functions are: preparation of Town Development Plan, Review Evaluation and Modification
of existing Development Plan, Preparation of Regional Development Plan, Monitoring and
Enforcement of various schemes such as Integrated Development Plan of Small and Medium Towns
(IDSMT) and Urban Infrastructure Development scheme for Small & Medium Towns (UIDSSMT),
DMG Consulting Pvt. Ltd., Noida
Page 174
8.3
Development Authority
8.4
Public Health Engineering Department (PHED) is one of the major departments of the state of
Madhya Pradesh as it is not only responsible for the provision of the public health but also carries
the water supply and sewerage and sanitation projects in entire state. Major infrastructure projects
under urban infrastructure are implemented by public health engineering department both in the
urban and rural areas.
To construct houses for the various sections of the society that is the low, middle, and the
high income groups
To make various schemes that provide financial help to the high and middle income groups
in the purchase of houses
To select the sites where houses are to be constructed and to decide the various facilities
that are to be provided in the houses
Page 175
8.5
Madhya Pradesh Pollution Control Board (MPCCB) - The Board has been vested with considerable
authority and responsibility under various environment legislation to prevent the pollution. M.P.
Pollution Control Board presently looks after the implementation of following Acts:
The main objective of Board is to maintain water, air and soil in healthy and usable condition for
various purposes. There are 10 Regional Offices, 4 Sub Regional, 3 Single Window System, 2
Monitoring Centre equipped with trained personnel and sophisticated instruments, are constantly
keeping watch on environmental activities in the state to attain the objectives.
Major functions of the boards are to reduce, control and monitor the state environmental pollution
in terms of air, water and soil. It also provides several consents for industries to establish and
operate in order to maintain the environmental compliance within the state.
8.6
8.7
8.8
Issues
Inadequate staff in Chakghat Nagar Parishad.
Lack of co-ordination between different departments of state and Chakght Nagar Parishad
for administration and regulation of functions and services.
Absence of training and capacity building for staff in order to improve the service delivery to
the citizens.
Absence of private sector roles in provision of infrastructure service and in their delivery
mechanism.
Page 176
Page 177
CHAPTER 9
Investment Plan and Financing
Strategies
Page 178
9.
9.1
Revenue Accounts
The revenue account comprises two components - revenue income and revenue expenditure.
Revenue income comprises internal sources and external sources of income of Chak Ghat. Internal
sources of income, also referred to as own sources of income, comprise tax and non-tax items. The
external resources come in the form of shared taxes/ transfers and revenue grants from the State
and Central Governments and loans from the Financial Institutions. Revenue expenditure comprises
expenditures incurred on salaries, operation & maintenance cost, contribution & donations and debt
servicing.
9.2
Water supply
Rents
Sale of properties.
Penalties
Interest rate
Revenue Income
Based on the Accounts procured from Chakghat, the information in respect of Revenue Income is as
under:
From the figure 8.1, it can be clearly observed that the income is increasing every year with a very
high growth rate. Total income of Chakghat Nagar Parishad (CNP) in the financial year 2009-10 was
Page 179
18000000
16000000
14000000
12000000
10000000
8000000
6000000
4000000
2000000
0
2008-09
2009-10
2010-11
Financial Years
Figure 2-1: Year Wise Total Income, Chakghat Nagar Parishad
9.3
Growth in Income
As per the Budget, the contribution of Municipal Taxes and grants is 46.25 Lakhs and Rs.68.07
Lakhs for the year 2009-10 and 2010-11, respectively. For the same year, the third contributor is
income from non taxes sources which has a contributing of Rs60.34 Lakhs and 105.15 Lakhs in the
FY2009-10 and 2010-11, respectively. This source has a very high growth rate in comparison of other
sources.
9.4
Revenue Expenditure
In the FY 2009-10, total expenditure was less as compare to the previous year but in FY2010-11 total
expenditure of Chakghat Nagar Parishad increases due to Establishment Expenditure (Salary, Wages,
Benefit and allowance).
Page 180
12000000
10000000
8000000
6000000
4000000
2000000
0
2008-09
2009-10
2010-11
Financial Years
Figure 4-1: Total Expenditure Chakghat Nagar Parishad
9.5
Capital Account
The capital account comprises capital income and capital expenditure. Capital income consists of
income earned by the Nagar Parishad from loans raised, transfers from revenue surplus and
utilization of funds from sinking funds and grants received for undertaking capital works. Capital
expenditure largely comprises expenses incurred for creation of civic infrastructure and towards
debt servicing (principal repayments).
Table 9-1: Year Wise Income of Chakghat Nagar Parishad from Various Sources
Financial Year
Tax
Non-Tax
Total
2008-09
4689514
2782376
364165
7836055
2009-10
4029878
6616183
1473313
12119374
2010-11
6959783
686207
8815183
16461173
Source: Income and Expenditure Statement (2008 - 2011) - Chakghat Nagar Parishad
From above table it can be clearly observed that the income is increasing every year with a very high
growth rate. The income of CNP is driven by three main sources i.e. income from taxes (Property tax,
Water tax, Pilgrimage tax, Sewerage tax, conservancy tax) non taxes sources such as (Rental from
Municipal Properties, sale and other charge, fees) and the grant allocations received under various
DMG Consulting Pvt. Ltd., Noida
Page 181
6000000
2008-09
5000000
2009-10
4000000
2010-11
3000000
2000000
1000000
0
Tax
Non Tax
Financial
Year
Operation and
Maintenance
Payment
Interest
Others
Total
2008-09
8984968
263337
1315533
10563838
2009-10
5187511
4181738
590422
9959671
2010-11
10062985
2628174
541772
13232931
Source: Income and Expenditure Statement (2008 - 2011) - Chakghat Nagar Parishad
9.6
Own sources revenue to Total revenue: Higher the percentage of own sources better is the
financial health of the municipality and less dependent on the Government.
Taxes and non-taxes to own revenue: It is good to have own taxes revenue sources
increasing in trend which shows elasticity and increase of tax revenue in municipal budget.
Increase in non-tax sources indicate municipal services are charged and increased as services
consumption also increased. Therefore, both indicators are independently monitored in
municipal finance.
Page 182
Capital revenue to Total revenue: This source of revenue indicates fund availability of capital
work as well as resources available from the higher level of government and better credit
worthiness of municipalities to access loan from market and financial institutions.
9.7
For the financial assessment, three year financial data pertaining to the years 2008 09 to 2010-11
have been used. At present, CNP follows a cash-based single entry accounting system, where income
and expenditure heads are maintained on a cash inflow and outflow basis. In order to gauge the
correct financial picture of Chak Ghat, it is critical to recast accounts in a standard accounting format
with appropriate heads. CNP accounts have, therefore, been recast appropriately. The financial
assessment is then done by looking at the annual growths of various components of income and
expenditure, the sectoral makeup of the finances, the extent of CNP dependence on the State and
Central government grants and reimbursements, the status of debt servicing, performance
indicators and so on.
In this exercise, all the revenues earned by CNP from the taxes, fees, shared income etc. have been
treated as revenue income and the income from loans and revenue grants has been treated as a
capital income. Similarly, all expenses towards regular maintenance are treated as revenue
expenses, while expenses on any asset creation have been treated as capital expenses. The financial
assessment thus undertaken is discussed in the following sections.
Financial Year
Revenue Income
Revenue Expenditure
2008-09
11113545
9925488
1188057
2009-10
12119374
10665844
1453530
2010-11
16461173
17606752
-1145579
Source: Income and Expenditure Statement (2008 - 2011) - Chakghat Nagar Parishad
Page 183
17606752
16461173
18000000
16000000
Incomein Rupees
14000000
12000000
11113545
9925488
12119374
10665844
10000000
8000000
6000000
4000000
2000000
11881
145353
0
-2000000
2008-09
2009-10
2010-11
-1145579
Financial Years
Revenue Income
Revenue Expenditure
Figure 7-1: Year Wise Revenue Income, Expenditure and Surplus - CNP
From the table of income and expenditure it can be analysed that there is a balance between
income and expenditure of CNP. Only in the financial year 2010-11, there was more expenditure in
comparison of income. The analysis has been conducted, keeping in mind the limitation arising out
of limited total income in general, and internal revenue generation in particular. The spending
pattern of Chak Ghat suggests a high spending, as compared to the total income, leaving a very small
buffer margin. However, a buffer margin is maintained as Closing Balance (CB) with a major help of
grants & aids. Generating internal resources is a must to sustain the development activities for a
longer time.
Since the job of any CNP happens to be a non-commercial one, its not expected and right to have a
much lower total expenditure as compared to the total income. The income is generated to fulfil the
requirements of society and community by spending as much as possible on the development front.
However, a buffer margin should always be kept for any contingency and emergency situation. This
buffer margin takes care of any unplanned project, which at times crops-up as urgent due to
uncertainties in the life. Hence, if the income is good then a relatively narrow buffer margin can also
be kept. Therefore its desirable to increase the spending by increasing the income first as higher
income is important for high spending.
9.8
The key issues and conclusion drawn on the basis of above financial analysis are as follows:
The income and expenditure of CNP runs neck to neck, which creates limitations.
The potential sources of internal revenue generation should be spruced-up and larger
accruals should be made.
There is a need to properly account all the properties and tax them with adequate rates.
Page 184
9.9
Income from Water Tax & Charges also needs to be augmented with increasing number of
built-in area and increase in population and households.
The expenditure should be made proportionate to the internal revenue generation capacity
of CNP.
Page 185
CHAPTER 10
Investment Prioritization Plan
Page 186
Proposed Projects
- Water Supply / Renewal
Works.
- Water Supply Distribution
Network.
- Replacement of older OHT
and construction of newer
ones.
- Up-gradation and extension
of WTP with an enhanced
capacity as per the future
demand.
- Water Metered Connection
in all Dwelling Units 2135 by
2035
- Employing skilled man power
for the water supply and
maintenance works.
- Preparation of fresh DPR for
Water Supply System for the
town.
10.3.2 Drainage
Sector
Drainage
Proposed Projects
-
Channelization of nallahs
and major drains by desilting, lining and repair
works.
Converting the Kutcha
Nallahs to pucca one by
De-silting,
lining
and
Page 187
There is no underground
sewerage system in the town.
Proposed Projects
-
Proposed Projects
-
Formation
of
ward
samiti/committee
to
ensure
the
primary
collection and disposal of
waste on PPP basis.
Provision of vehicles and
sweepers
in
the
Page 188
and dustbins.
No designated sanitary land fill
site.
The present waste generation
is 0.75 MT per day which will
be increased to 5.54 MT by
2035
considering
the
population growth.
municipality.
Identification of proper
dumping
yard
and
working out management
plan.
Provision of dustbins and
construction of waste
depots in all wards.
Preparation of a Detailed
Project Report (DPR) for
Municipal Solid Waste
Management for town,
ensuring the design, size
and type of Land fill site
and quantity & quality of
required
modest
equipments, techniques
and vehicles for collecting,
transporting, processing
and dumping of MSW.
Development of scientific
Waste disposal site.
Proposed Projects
-
Establishment of Traffic
Police Station and Traffic
Management Center.
Constructions of new bus
stand to a newer location
with proper ISBT on BOOT
basis.
Construction of Truck
Terminal/Transport Nagar
on BOOT basis
Removal
of
encroachment,
Road
Widening & Junction
improvement in core area
and accident prone areas.
Development
of
footpath/pedestrian along
the major roads.
Page 189
Construction of parking
lots in main roads
including O&M on PPP
basis.
Up-gradation of existing
kutcha roads into pucca
ones.
Construction of new roads
for total length of 13.3 km
by 2035 in different areas
of town.
Introduction
of
ecofriendly Intra-city Public
Transport System
Improved Street Lighting
and covering the whole of
the street length.
High mast lights at entry
points of the City.
Proposed Projects
-
Slum
Improvement
Programmes.
Provision of security of
tenure.
Skill up gradation and
economic
up-liftment
schemes.
Improvement of shelter
Development of EWS and
LIG colonies by MPHB with
a focus or poverty
eradication in identified
sectoral zones especially
for urban poor under
IHSDP.
Relocation of slums from
hazardous areas.
Page 190
Lack of specialty/intermediate
hospitals in the town.
No
specific
government
programmes for health sector
other than Family planning,
RCH and Immunization etc.
Infrastructures
in
govt.
hospitals are inadequate in
terms of facilities and no. of
doctors.
Proposed Projects
-
Proposed Projects
-
programmes related to
Right to Education and
others for urban poor and
other citizens.
Development of Public
Library.
Recreation and
Entertainment
Proposed Projects
-
No notified or designated
place as open space, parks
and play grounds for the
resident of town.
No community gathering halls
or room.
No proper development of
River Front as picnic spot or
recreational area for town.
Development
of
Community Halls and
Rooms.
Development of Rain
Basera.
Development of Parks and
Playgrounds.
Development of Stadium.
River Front Development
along both the side of
river.
River
Front
Development.
Excessive encroachment on
river side in the north and
discharge waste water along
with municipal waste in the
river
through
outfalling
drains.
Proposed Projects
-
NGOs
Govt. and
Municipal
Bodies
Womens
Group
Religious
bodies
Industry
Assoc.
Stakeholder
Group
Prominent
Local
citizen
RWAs
Students
Slum
People
Based on the stakeholder consultation meet, the prioritization of projects was done so that the
views, aspirations and felt needs of the local officials, residents, experts, NGOs, elected
representatives and others are given due cognizance. The sectoral priority to the projects is assigned
on the basis of various consultations and discussions held with the government departments
involved in the implementation of CDP. It also takes into account the aspirations of the residents of
Chakghat expressed in a workshop, informal discussions and meetings held for the purpose.
The sector wise present shortfall and the future problems by the year 2035 are given in the following
tables for each sector. The future requirement of the city is meant to take care by the year 2035 for
DMG Consulting Pvt. Ltd., Noida
Page 193
Preparation of fresh DPR for Water Supply System for the town.
Construction of Water Supply Distribution Network for extension of present distribution
system.
Construction of Water Treatment Plant of capacity of 4 MLD in ward no. 12
Construction of intake well, pump house with pumping machinery electrical in ward no 12.
Construction of 2 OHT each of capacity of 2 MLD (one in northern part of the town and other
one in southern part of the town.
Preparation of DPR/Comprehensive Master Plan for Sewerage and Drainage System for the
entire town.
Construction of one STP with a capacity of 3 MLD in ward no. 13
Construction of underground sewerage network for 35 km to cover the entire town.
Construction of 5 Community/Public Toilets of 20 Seats like Sulabh Complex & 10 Urinals of
5 seats in urban poor areas & commercial/ market areas.
Construction of some Community/Public Toilets especially for women.
Construction of new storm water drainage network to cover the whole town (for 65 Kms including both the sides of raods)
Converting the Kutcha Nallahs to pucca one by De-silting, lining and constructing side walls.
Preparation of a Detailed Project Report for Municipal Solid Waste Management with
required infrastructure and modest equipment.
Provision of dustbins and construction of waste depots in all wards.
Development/construction of Scientific Waste Disposal Site in ward no. 15.
Construction of a new bus stand to a newer location with proper ISBT on BOOT basis in ward
no. 10.
Construction of a Truck Terminal/Transport Nagar on BOOT basis in ward no. 10.
Construction of new roads for total length of 13.3 km by 2035 in different areas of town.
Development of footpath/pedestrian along the major roads (for 20 kms).
Construction of 5 parking lots in main roads/commercial or market areas including O&M on
PPP basis.
Development of EWS and LIG colonies by MPHB with a focus or poverty eradication in
identified sectoral zones especially for urban poor under IHSDP.
Establishment of 6 more no. of primary school by 2035; two in ward no. 8, and one in each
ward no. 10, 13, 14 and 15.
Establishment of 2 more no. Middle/Higher Secondary School (one each in ward no. 15 & 9).
Establishment of 1 no. of Integrated School with Hostel Facility in ward no 8.
Establishment of 2nos. of Informal and adult literacy centers, Aganwadi centers in ward no.
15 & 13.
Establishment of vocational training institutes and ITIs in ward no.13.
Development of 1 Public Library in ward no. 7.
Page 194
Renewal and repairing of Water Supply Networks in ward no. 4, 5, 6, 9 and 11.
Replacement of older OHT
Water Metered Connection in all Dwelling Units 2135 by 2035
Renovation of existing public urinal.
Converting the open drains to covered type
Road Widening & Junction improvement.
Improved Street Lighting and covering the whole of the street length.
Improvement of shelter for urban poor.
Renovation of school buildings which are in bad condition.
Provision of equipments and necessary infrastructure like provision of toilets, safe drinking
water, kitchen shed and electricity etc. in education institutions.
Increase the capacity of bed in the existing hospitals
Development, beautification, plantations along the river.
Development of Entrance Gates to town one towards north side and other towards south on
NH-27.
Provision for special Hawker zone in the ward no- 4.
Water Supply
With a vision to provide adequate amount of treated water to the projected population of 2035, the
following projects are identified to achieve the goal in the sector:
Code No.
Projects proposed
Project Cost
(in Lakh)
Department
Page 195
5.00
WS 2
60.00
Govt. of M.P.
WS 3
74.00
Govt. of M.P.
WS 4
300.00
Govt. of M.P.
WS 5
235.00
Govt. of M.P.
WS 6
200.00
Govt. of M.P.
874.00
Presently there is no sewage disposal system in the city. The in-house sanitation is about 30% for the
city and is limited to many users. Therefore the future efforts should be made to have 100 percent
coverage on the sewerage sector to minimize the sanitation problem of the city. In this regards, the
following projects are identified:
Code No.
Projects proposed
Project Cost
(in Lakh)
Department
SS 1
150.00
Govt. of M.P
SS 2
100.00
Govt. of M.P
SS 3
87.00
Chakghat Nagar
Parishad
SS 4
1.00
Chakghat Nagar
Parishad
SS 5
60.20
Chakghat Nagar
Parishad
Page 196
398.20
Presently there is lack of infrastructure and capital cost for solid waste management in the city. So
the following projects are identified to achieve the future goals for solid waste management in the
city would be:
Code No.
Projects proposed
Project Cost
(in Lakh)
SWM 1
SWM 2
140.00
Chakghat Nagar
Parishad
SWM 3
30.00
Nagar Parishad
SWM 4
75.00
Nagar Parishad
5.00
Department
UADD, Govt. of M.P.
and CNP
250.00
Presently the coverage of the storm water drainage is poor in the city. So the following projects are
identified to minimize the adverse effect of the bad drainage system in the city.
Code No.
Projects proposed
Project Cost
(in Lakh)
D1
5.00
D2
176.00
Department
UADD, Govt. of M.P.
and CNP
Govt. of M.P
Page 197
70.00
Nagar Parishad
251.00
The creation of a reliable, comfortable, attractive and affordable traffic management system is the
long-term solution for solving the traffic problems in the city. Thus, constructions of new bus stand
to provide a high quality transit system. Provisions of parking facilities are envisaged to solve parking
problem and congestion in core areas. To achieve the goals in this sector the following projects are
identified:
Code No.
Projects proposed
Project Cost
(in Lakh)
Department
TT 1
500.00
TT 2
500.00
TT 3
675.00
TT 4
50.00
TT 5
50.00
TT 6
90.00
PWD
TT 7
60.00
1925.00
With a view to cover the whole streets with lighting facilities and to handle and overcome the
anthropogenic hazards like fire in town the following projects are identified:
Code No.
Projects proposed
Project Cost
(in Lakh)
Department
Page 198
148.00
SL 2
90.00
SL 3
25.00
SL 4
125.00
SL 5
5.00
393.00
Urban Poor
Presently slum is covering 9.25% of the city and there is lack of physical and social infrastructure in
most of the slums as well. So to make the city slum free the following projects are identified in this
sector:
Code No.
Projects proposed
UP 1
2041.00
Department
MPHB; CNP
2041.00
Health Facilities
Most of the population is not served by this because of poor medical infrastructure facilities in terms
of hospital beds and doctors. So the following projects are identified for the overall development of
the sector
Code No.
Projects proposed
Project Cost
(in Lakh)
H1
150.00
Department
Health Department,
Chakght
Page 199
Construction of 1 Multi-specialty /
intermediate hospital with 44 no. of beds
@1 bed per 500 person for 2035 in ward no.
10 or 13
75.00
Health Department,
Chakghat
H3
50.00
Health Department,
Chakghat
275.00
Educational Facilities
Considering the emerging issues and potentials in the sector, the following projects are identified in
the education sector:
Code No.
Projects proposed
Project Cost
(in Lakh)
E1
300.00
Education Department,
Govt. of M.P.
E2
100.00
Education Department,
Govt. of M.P.
E3
500.00
Education Department,
Govt. of M.P.
E4
10.00
Education Department,
Govt. of M.P.
E5
100.00
Education Department,
Govt. of M.P.
E6
50.00
Education Department,
Govt. of M.P.
E7
10.00
E8
70.00
Department
1140.00
Page 200
Tourism
Presently the tourism industry is lacking infrastructure facilities and there is lack of active
recreational space in the city. With a goal to enhance the tourism activities in the city the following
projects are identified for improvement of the sector:
Code No.
Projects proposed
Project Cost
(in Lakh)
Department
T1
200.00
T2
100.00
T3
50.00
T4
50.00
T5
35.00
435.00
Other Components
Other than the above stated sectors, there are some other projects are identified for the
development of the city.
Code No.
Projects proposed
Project Cost
(in Lakh)
Department
O1
30.00
O2
15.00
O3
30.00
O4
50.00
O5
30.00
Page 201
155.00
Code No.
Projects proposed
Project Cost
(in Lakh)
Department
UR 1
10.00
Chakghat Nagar
Parishad
UR 2
5.00
Chakghat Nagar
Parishad
UR 3
5.00
Chakghat Nagar
Parishad
UR 4
5.00
Chakghat Nagar
Parishad
UR 5
5.00
Chakghat Nagar
Parishad
30.00
Sectors
Physical Infrastructure
Sub Total Cost (A)
Water Supply
874.00
398.20
250.00
251.00
1925.00
393.00
Urban Poor
2041.00
Health Facilities
275.00
Educational Facilities
1140.00
Tourism
435.00
Other Components
155.00
30.00
Social Infrastructure
Total Cost
8167.20
Page 202
10.10.1
These projects are to be implemented over the plan period for first phase ( 2012- 2015) as per
following implementation schedule worked out on the basis of time involved in completing the
projects and the priority decided for the same.
2013-14
2014-15
Project Code
WS 2
60
50
50
WS 4
300
50
50
WS 5
235
100
WS 6
100
Water Supply
150
13.3
SS 2
100
50
SS 3
87
50
50
SS 4
100
140
SWM 3
30
50
SWM 4
75
30
500
70
TT 2
100
50
Page 203
675
20
TT 4
50
TT 5
50
25
TT 6
90
16.6
20
20
25
148
SL 2
90
16.6
16.6
SL 3
25
100
SL 4
125
SL 5
SL 6
100
2041
20
30
10
20
20
Urban Poor
UP 1
20
Health Facilities
H1
150
33.3
Educational Facilities
E1
300
100
E2
100
E4
50
E5
10
E7
10
100
T3
50
20
T4
50
T5
35
50
20
20
20
50
50
Tourism
50
50
Other Components
O1
30
100
O2
15
100
10
50
UR 2
100
50
Page 204
50
UR 4
100
UR 5
50
10.10.2
50
50
These projects are to be implemented over the plan period for second phase ( 2016- 2020) as per
following implementation schedule worked out on the basis of time involved in completing the
projects and the priority decided for the same.
2016-17
2017-18
2018-19
2019-20
Project Code
74
50
50
SS 1
150
13.3
13.3
13.3
13.3
13.3
SS 2
100
50
SWM 2
140
SWM 3
30
SWM 4
75
Water Supply
WS 3
Sewerage and Sanitation
50
20
30
176
D3
70
25
30
30
30
10
500
15
TT 2
500
50
TT 3
675
20
TT 4
50
TT 5
50
25
TT 6
90
16.6
15
20
20
20
25
16.6
16.6
Page 205
148
SL 2
90
16.6
16.6
16.6
16.6
SL 4
125
SL 5
20
20
10
2040
20
20
20
H1
150
33.3
33.3
H3
50
70
Urban Poor
UP 1
Health Facilities
100
Educational Facilities
E2
100
50
E4
10
20
E6
50
100
E8
70
100
T3
50
20
T4
50
50
20
Tourism
20
20
20
Other Components
O3
30
O4
50
10.10.3
100
100
These projects are to be implemented over the plan period for second phase ( 2021- 2025) as per
following implementation schedule worked out on the basis of time involved in completing the
projects and the priority decided for the same.
2024-25
2023-24
2022-23
2021-22
2020-21
Project Code
Water Supply
Page 206
150
13.3
6.6
140
SWM 4
75
20
176
25
TT 4
50
20
TT 6
90
16.6
16.6
148
35
50
30
100
Tourism
T5
Other Components
O5
10.10.4
These projects are to be implemented over the plan period for second phase ( 2026- 2030) as per
following implementation schedule worked out on the basis of time involved in completing the
projects and the priority decided for the same.
2026-27
2027-28
2028-29
2029-30
2025-26
Project Code
140
176
25
Page 207
675
TT 4
50
TT 5
50
TT 7
60
10
10
20
25
148
25
25
Tourism
T1
200
T2
100
10.10.5
25
25
These projects are to be implemented over the plan period for second phase ( 2026- 2030) as per
following implementation schedule worked out on the basis of time involved in completing the
projects and the priority decided for the same.
176
25
2034-35
2033-34
140
2032-33
2031-32
Project Code
675
TT 4
50
10
TT 5
50
20
148
Health Facilities
H2
75
100
Educational Facilities
Page 208
500
100
Tourism
T1
200
T2
100
25
25
25
25
Central Governments Grants: Under Central Government funding there are many scheme
are sponsored by the Government of India like JNNURM, NUIS, UIDSSMT, Urban Statistics for
HR & Assessment, Rajiv Awas Yojana etc.
State Governments Grants & Loans: State Government also transfers funds to municipal
body based on stamp revenue share, Transport and other funds.
International Funding Agency: International funding agency include multilateral bodies like
World Bank, Asian development Bank etc.
Municipal body: Under domestic funding agency mainly Urban Local Bodies comes.
Private Operator: Under this category mainly private sectors are included.
Based on the availability of funds with each of the above and their willingness to provide
grants/loans, the projects could be funded.
The suggested pattern of funding is as under:
Private Operator
Page 209
Private
Operator
Private Operator
Private Operator
Page 210
20%
35%
State
Governments
Grants
Central
Governments
Grants
Private Operator
45%
Page 211
Private Operator
Private Operator
Page 212
Private Operator
Municipal Council
Private Operator
Central Government
2294.7
30%
State Government
3059.6
40%
Municipal Body
1529.8
20%
Private sector
764.9
10%
TOTAL
7649
100%
Page 213
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2018-19
2019-20
2020-21
2021-22
2022-23
2023-24
2024-25
2025-26
2026-27
2027-28
2028-29
2029-30
2030-31
2031-32
203233
203334
2034
-35
74.72
106.46
76.46
85.64
95.91
107.42
120.31
134.75
150.92
169.03
189.31
212.03
237.47
265.97
297.89
333.63
373.67
418.51
468.73
524.98
587.97
658.53
737.55
826.06
925.1
9
1036.2
1
1160.
56
2008-09
74.72
2009-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2018-19
2019-20
2020-21
2021-22
2022-23
2023-24
2024-25
2025-26
2026-27
2027-28
2028-29
2029-30
2030-31
106.46
76.46
87.16
99.37
113.28
129.14
147.22
167.83
191.32
218.11
248.64
283.45
323.14
368.38
419.95
478.74
545.77
622.17
709.28
808.58
921.78
1050.83
203132
1197.
94
2032
-33
203334
2034
-35
1365.
65
1556.84
1774.
80
As shown in the tables of revenue collection through three scenarios from 2008 to 2035, first is natural growth rate at 12% per annum which is around Rs. 1160.56 lakhs, second is performing growth rate at 14% per annum which is
around Rs. 1774.80 lakhs.
Page 214
CHAPTER 11
Urban Reforms
Page 219
Background
The main thrust of the development strategies is to ensure improvement in urban governance so that
Urban Local Bodies (ULBs) and para-statal agencies become financially sound with enhanced credit rating
and ability to access market capital for undertaking new programmes and expansion of services. In this
improved environment, public-private participation models for provisioning of various services would
also become feasible. To achieve this objective, State Governments, Urban Local Bodies and para-statal
agencies will be required to accept implementation of an agenda of reforms. The proposed reforms shall
broadly fall into two categories:-
Mandatory reforms
Optional reforms
All the mandatory and optional reforms shall be implemented by the State/ULB/Para-Statals within the
Scheme period.
Reform-Linked Investments
o Reform linked assistance to State Governments and ULBs.
o Integrate reform initiatives to catalyze investments in urban infrastructure.
Page 220
Reforms
Mandatory
State
Government
Optional
ULBs &
Para- Statal
State
Government
ULBs &
Para- Statal
Page 221
Mandatory Reforms
1.
i.
ii.
Introduction of system of e-governance using IT applications like GIS Not yet implemented
and MIS for various services provided by ULBs
Page 222
iv.
v.
vi.
Computerized property
tax system is yet to be
introduced.
O&M charges
have been
implemented.
It is implemented.
It is implemented.
2.
i.
It is implemented.
ii.
iii.
It is under consideration.
iv.
It is under consideration.
v.
It is implemented.
Page 223
Optional Reforms
i.
It is implemented.
ii.
It is implemented.
iii.
It is
implemented.
NIC is working
under the Town
& Country
Planning.
iv.
It is under consideration.
v.
vi.
vii.
viii.
It is implemented.
ix.
x.
xi.
Structural reforms
It is under process.
xii.
It is implemented.
11.8 Issues
There have been no mandatory reforms laid down for the town.
The municipal staff lacks in adequate awareness of the reform agenda and technical
advancement.
The Nagar Parishad is not well equipped with the necessary systems for implementing reforms
and improving efficiency. Systems include new methods of register maintenance, data storage
and retrieval, etc. Most of the work happens in an ad-hoc manner without laid out procedures.
Page 224
The Nagar Parishad needs to coordinate with Para-statals such as, Public Health Engineering
Department, Housing Board etc.
It has been found that while the local people have a lots of problems and they want to
participate and bring to the notice to the authorities for their problems, the absence of a proper
grievance redressal system has made it very difficult for the local.
Low Efficiency of service delivery in various aspects such as extent of collection of property tax
and other taxes, poor maintenance of roads, poor sanitary conditions, inappropriate solid waste
management practices, inadequate street light provision, etc.
Lack of data/Information Base which could help in the development of area.
Page 225
CHAPTER 12
Town Vision
Page 226
100 percent
population
coverage of
treated water
Quantity of
supply to be
135
lpcd, Quality
as per
standards
Provision of
community stand
posts in all slum
areas, public
places, parks, temples
100 percent water supply coverage which includes the present as well as the future demand by
2035.
Quality and quantity should be ensured as per the standards for the future population. The
coverage of the water supply system can be enhanced by providing community taps or stand
posts in all slum areas, public places and in recreation areas.
Page 227
100 percent
population
coverage by
sewerage
system
Provision of
community
toilet blocks
near public
places to
ensure
sanitation
Decentralised
waste water
treatment
Presently there is no sewage disposal system in the town or most of the households have their own
arrangements for the disposal. Therefore for future efforts should be made to have 100 percent coverage
for waste water to minimize the sanitation problem of the town. In this regards, the following steps can
considered:
Community toilet blocks should be provided near riverside, market places, in slum areas and core
town areas where there is limited scope of expansion of the dwelling units to have toilet in it.
Page 228
Storm Drainage:
Flood control
measures in low
lying areas
100 percent
coverage of
the city
Considering the present drainage system, the following goals would be set to minimize the adverse effect
of poor drainage system:
100 percent coverage of the town through proper drainage system by 2035.
Converting the kutcha nalas to pucca ones, covering of all open drains and lining of all natural
drains and nalas.
Encroachment on the low lying natural drainage channel should be minimized so that flow of
water will not be blocked.
Page 229
100 percent
coverage of
the city
Sanitary land
fill and virmicomposting
Provision of
of organic
sweepers, vehicles wastes
and equipment as
per standards
Treatment of solid
waste before
disposal
Present solid waste system is not covering all parts of the town. So the future direction for solid waste
management would be as follows:
Covering the whole part of the town including the present as well as the future developments.
Special care should be given to manage wastes that are generated on any auspicious days on
river beds.
Segregation of hazardous wastes like bio medical waste, bio degradable waste etc. and treatment
of solid waste before disposal.
Page 230
Special
lighting at
Lake, rivers
, monumen
ts and
100 percent
coverage of the other
city to ensure public
safety for the places
residents as
well as the
tourists
Use of modern
technology, ener
gy saving
equipments like
solar light.
Considering the present street lighting situation in the town, the future goals for 2035 would be:
Ensure 100 percent coverage in town to ensure safety and security for all the residents and the
tourists coming to the town.
Care should be given to provide street lights in public gathering spaces and recreation spaces like
lake, rivers, monuments and parks.
Page 231
Though there is opportunity for improved transportation system, there is lacking in the present road
networks and transport facilities. To improve the current situation and to address the future demand the
goals would be as follows:
Improvement of the existing road networks in terms of road geometry, road surfacing and traffic
signals etc.
For intra as well as inter-town movement public transport facilities should be improved.
Page 232
Ownership
rights
Skill
development
and economic
upliftment
Slum
Environment
Improvement
As slum is a major problem in the town. So the follows steps can be taken to make the town slum free.
Encouraging slum improvement schemes like improvement of physical i.e water supply, drainage,
sanitation facilities as well as social infrastructure like education, health facilities in the slums.
Community participation should be emphasized in any of the schemes launched by the govt. or
NGOs.
Page 233
Facilitating
specialised
medical care
Promoting
Health
tourism
Increasing the
number of
hospitals by
making available
more land for new
hospitals, thereby
increasing beds
and doctors
Providing land for new hospitals, increase beds and no, of doctors in the existing hospital and
health care centres.
By providing proper health facilities in the town, health tourism can be promoted in the area
which will serve the region and generate economy for the town.
Page 234
Facilitating
Specialised
Facilitating education
vocational opportunitie
s
training
centres for
Facilitating adult skill
provision of impartation
more
for gainful
schools, the employment
reby
/ self
increasing employment
no. of seats
and
improving
literacy
Considering the emerging issues and potentials the following goals would be derived for addressing the
future requirements:
Facilitating provision of more number of schools at the primary and secondary education level
and providing required infrastructure facilities for the sector.
Public awareness programmes should be encouraged in urban poor areas as they are not willing
to educate their children.
Page 235
Facilitating
infrastructure
for specialised
tourist
attractions such
Water
sports, theme as National
parks, boating, Parks, etc.
etc.
Improvement of
sites of
monuments and
other heritage
structures for
attracting
tourists
Having the great potential for tourism development in the town, the following goals can be derived for
future development in the sector:
River front development and lake/river based activities like water sports, theme park and boating
etc. to encourage tourism.
Facilitating infrastructure in terms of good connectivity, hotels and resorts to attract tourists.
Page 236
Forest
based
activities
Tourism
and
Support
economic
activities
Agro Based
commercial
activities, other
economic activities
For the economic up-liftment of the town, the following goals can be set:
As the town is surrounded by large chunk of agricultural land, therefore agricultural based
commercial activities should be encouraged for the economic development of the town.
Forest based activities like selling of forest products can be another way of development
economy of the people.
As Town has high potential for tourism development, so tourism related activities like hotel
industry, tourist transportation should be encourage to form a major source of income
generation activity for many people.
Page 237
Economically
Vibrant
A
commercial
hub
Ecologically
Sustainable
Environmenta
lly Pleasing
In order to achieve the above vision, strategies have been suggested in the next chapter. Ultimately,
these strategies would be translated into tangible projects which would be viable and implementable.
River
and Lake
Economy
Rail
Infrstructure
Parks
Forests
Governance
Temples
Monumen
ts
Commercial
Hub
Page 238
Tourism Related Activities The water bodies and other tourist attractions have not been
adequately developed. It is proposed that once these are developed in the form of tourist
circuits, with transportation linkages, boarding and lodging facilities and other related tourism
infrastructure, with adequate marketing and publicity, tourism could be promoted in this region.
The water bodies can also be an area for development of parks, boating and water sport
activities. This can also have a spin off in terms of forward and backward linkages and
employment generation for the local population.
Religious Activities The local temples and parks are held in great reverence by the local
population and regularly, festivals and functions are held. Therefore, proper developments of
these sites along with facilities for the piligrims are needed so as to cater to the local sentiments
of the people.
Infrastructure Development
There cannot be two opinions on the fact that the civic infrastructure of Town needs to be improved. The
strategy for this is to urgently undertake projects, as identified later in this chapter, so that the required
facilities and amenities area provided to the residents in a timely manner so that the basic quality of life
can be achieved.
Slum Improvement
Slum improvement has to form a central part of town improvement. The strategy for improving the
slums is to upgrade them in-situ. There is a need to prepare a detailed plan for improving the slums and
it is suggested that tenure rights may be granted to the dwellers who do not have the title so that they
are able to upgrade their shelter on their own as there is no fear of eviction.
Page 239
ANNEXURES
Page 240
TO
ALLA
HABA
CH
AN TO
DR
AP
Community
Health Center
UR
NALLAH
KHAGHA
CPS
Nagar Parishad
Bus Stand
Office
Cemetery
Ground
T A M
A S
R
Guest House
Police Station Chak
Bazar
I V
NSPG
Water
College
Treatment Plant
St. Mary
School
Saraswati
Shushu Mandir
TO
GOURA
Pharmacy
College
H
LA
L
NA
TAMAS
RIVER
T
SAT O
PUR
A
T A M
A S
R I V E R
GR
AM
LEGEND
MUNICIPAL BOUNDARY
TO
SON
ARI
Kri
s
aj M hi
an
di
W
AR
Up
WARD BOUNDARY
SE
NG
AR
BUILTUP AREA
JHAR
WATER BODY
BADHERI
ROADS/ TRANSPORTATION
TO
REW
A
CLIENT:
Urban Administration & Development
Department, Madhya Pradesh
RF: 1:9000
0
90
180
270 360
540 Mts.
Project coordination:
Submitted By:
CITY DEVELOPMENT
PLAN OF CHAKGHAT
TO
ALLA
HABA
CH
AN TO
DR
AP
Community
Health Center
UR
NALLAH
KHAGHA
CPS
Nagar Parishad
Bus Stand
Office
Cemetery
Ground
T A M
A S
R
Guest House
Police Station Chak
Bazar
I V
NSPG
Water
College
Treatment Plant
St. Mary
School
Saraswati
Shushu Mandir
Pharmacy
College
H
LA
L
NA
TO
GOURA
TAMAS
RIVER
T
SAT O
PUR
A
T A M
A S
R I V E R
GR
AM
LEGEND
MUNICIPAL BOUNDARY
TO
SON
ARI
Kri
s
aj M hi
an
di
W
AR
Up
WARD BOUNDARY
SE
NG
AR
BUILTUP AREA
JHAR
WATER BODY
BADHERI
ROADS/ TRANSPORTATION
TO
REW
A
CLIENT:
Urban Administration & Development
Department, Madhya Pradesh
RF: 1:9000
PUCCA DRAINS
0
90
180
270 360
540 Mts.
Project coordination:
Submitted By:
CITY DEVELOPMENT
PLAN OF CHAKGHAT
TO
ALLA
HABA
CH
AN TO
DR
AP
UR
T A
I V
TO
GOURA
T A
M
T
SAT O
PUR
A
A S
TAMAS
RIVER
R I
V E
R
LEGEND
MUNICIPAL BOUNDARY
RESIDENTIAL
TO
SON
ARI
COMMERCIAL
PUBLIC AND SEMI PUBLIC
PUBLIC UTILITIES
WATER BODY
TO
REW
A
ROADS/ TRANSPORTATION
CLIENT:
Urban Administration & Development
Department, Madhya Pradesh
RF: 1:9000
AGRICULTURE
0
90
180
270 360
540 Mts.
Project coordination:
Submitted By:
CITY DEVELOPMENT
PLAN OF CHAKGHAT
1
2
3
10
5
77
66
9
11
12
14
LEGEND
MUNICIPAL BOUNDARY
WARD BOUNDARY
13
15
RF:1:11000
0 110 220 320 430 540
760
CLIENT:
Project coordinator:
Urban Administration & Development
Department ,Madhya Pradesh
Submitted By:
DMG Consulting Pvt.Ltd.
A-81, Sec-65, Noida (U.P)
CITY DEVELOPMENT
MAP OF CHAKGHAT
N.H
N.H
N.H
ALL
AHA
BA
N.H
CH
PU AND
RA RA
BUS
STAND
POUND
POLICE
STATION
LEGEND:
N.H
WATER
TANK
GOVT.
PRIMARY
SCHOOL
TAMAS
RIVER
N.H
MAHARAJA
TVS
AGENCY
GOVT.GIRLS
CPS
SCHOOL
SCHOOL NAGAR
PARISHAD
GOVT.
GUEST
HOUSE
WATER
TANK
N.P.BOUNDARY
GOVT.
SCHOOL
WATER
TREATMENT
PLANT
ST
MARY
SCHOOL
GOURA
SARASWATI
SHISHU
MANDIR
WARD BOUNDARY
TAMAS
RIVER
NATIONAL HIGHWAY
N.H
TAMAS
RIVER
SA
PUCCHA DRAIN
A
UR
TP
SO
N
AR
GRAIN
MANDI
WATER
TANK
SEGARWAR
BADHERI
N.H
REW
N.H
RF: 1:9000
0
CLIENT:
Urban Administration & Development
Department, Madhya Pradesh
Project coordination:
Submitted By:
90
180
270
360
540
CITY DEVELOPMENT
PLAN OF CHAKGHAT
WARD-08
WARD-01
WARD-02
WARD-10
WARD-03
WARD-07
04
D-
WARD-05
AR
W
LEGEND:
WARD-06
WARD-09
POPULATION DENSITY IN
PERSON PER HECTARE
WARD-12
BELOW 50
WARD-11
50-100
WARD-14
100-300
ABOVE-300
WARD-13
WARD-15
RF:1:9000
CLIENT:
Urban Administration & Development
Department, Madhya Pradesh
Project coordination:
Submitted By:
90
180
270
360
540
CITY DEVELOPMENT
PLAN OF CHAKGHAT
N.H
N.H
ALL TO
AHA
BAD
CH
N.H
AN TO
DR
AP
UR
N.H
BUS
STAND
POUND
POLICE
STATION
LEGEND:
N.H
WATER
TANK
GOVT.
PRIMARY
SCHOOL
TAMAS
RIVER
N.H
MAHARAJA
TVS
AGENCY
GOVT.GIRLS
CPS
SCHOOL
SCHOOL NAGAR
PARISHAD
GOVT.
GUEST
HOUSE
WATER
TANK
GOVT.
SCHOOL
ST
MARY
SCHOOL
TO
SATP
URA
N.P.BOUNDARY
TO
GOURA
WATER
TREATMENT
PLANT
SARASWATI
SHISHU
MANDIR
WARD BOUNDARY
TAMAS
RIVER
NATIONAL HIGHWAY
N.H
TAMAS
RIVER
PUCCHA DRAIN
TO
SON
ARI
GRAIN
MANDI
WATER
TANK
PROPOSED DRAIN
SEGARWAR
N.H
TO
REW
A
N.H
BADHERI
RF: 1:9000
0
CLIENT:
Urban Administration & Development
Department, Madhya Pradesh
90
180
270
360
540
Project coordination:
Submitted By:
CITY DEVELOPMENT
PLAN OF CHAKGHAT
TO
ALLA
HABA
D
CH
WARD-08
AN TO
DR
AP
UR
Community
Health Center
TN
LEGEND
WARD-01
MUNICIPAL BOUNDARY
WARD-02
NALLAH
WARD-03
WARD-10
BS
KHAGHA
CPS
WARD BOUNDARY
Nagar Parishad
Office
WARD-07
Bus Stand
Cemetery
Ground
04
D-
BUILTUP AREA
WARD-05
AR
T A M
A S
WATER BODY
WARD-06
Guest House
Police Station Cha
k Bazar
I V
EWARD-09
R
NSPG
Water
College
Treatment Plant
St. Mary
School
Saraswati
Shushu Mandir
Pharmacy
College
WARD-12
NA
GR
H
WARD-11
T A M
A S
R I V E R
KUTCHA ROADS
PROPOSED ROADS
TN
BS
TO
SON
ARI
Kri
s
aj M hi
an
di
AR
Up
WARD-13
GA
RW
WARD-15
JHAR
TO
REW
A
SE
N
TAMAS
RIVER
WARD-14
AM
T
SAT O
PUR
A
A
LL
PUCCA ROADS
TO
GOURA
CLIENT:
Urban Administration & Development
Department, Madhya Pradesh
BADHERI
RF: 1:9000
0
90
180
270 360
540 Mts.
Project coordination:
Submitted By:
CITY DEVELOPMENT
PLAN OF CHAKGHAT
TO
ALLA
HABA
D
Community
Health Center
WARD-08
AN TO
DR
AP
KUTCHA ROADS
E1
UR
SCHOOLS
WARD-01
E1
COLLEGES
E2
E3
WARD-02
WARD-10
NALLAH
KHAGHA
WARD-03
6
WARD-07
CH
Bus Stand
Cemetery
Ground
4
-0
RD
WARD-05
HOSPITAL
Nagar Parishad
Office
GUEST HOUSE
T A M
A S
LA
L
NA
T
SAT O
PUR
A
POLICE STATION
WARD-06
I V
EWARD-09
R
Chak
Bazar
2
NSPG
College
E1
St. Mary
School
Saraswati
Shu
WARD-12
shu Mandir
T A M
A S
WARD-14E1
AM
TO
SON
ARI
GR
AR
CEMETERY GROUND
R I V E R
CH
E1
E2
E3
E4
WARD-13
E2
E1
WARD-15
PG
E4
TO
REW
A
JHAR
BUS STAND
TO
GOURA
TAMAS
RIVER
WARD-11
E1
GA
RW
SE
N
Pharmacy
College
CLIENT:
Urban Administration & Development
Department, Madhya Pradesh
BADHERI
RF: 1:9000
0
90
180
270 360
PG
PROPOSED PLAYGROUND
CH
540 Mts.
Project coordination:
Submitted By:
CITY DEVELOPMENT
PLAN OF CHAKGHAT
TO
ALLA
HABA
D
CH
Community
Health Center
AN TO
DR
AP
UR
LEGEND
MUNICIPAL BOUNDARY
NALLAH
KHAGHA
WARD BOUNDARY
Nagar Parishad
Office
Bus Stand
Cemetery
Ground
BUILTUP AREA
T A M
A S
WATER BODY
Chak Bazar
I V
Water
Treatment Plant
Pharmacy
College
LA
PUCCA ROADS
TO
GOURA
KUTCHA ROADS
WATER SUPPLY PIPE LINE NETWORK
TAMAS
RIVER
L
NA
T
SAT O
PUR
A
T A M
A S
AM
R I V E R
INTAKE WELL
WATER TREATMENT PLANT
PROPOSED WATER FILTRATION PLANT
OVER HEAD TANKS (OHT)
JHAR
TO
REW
A
SE
N
GA
RW
AR
GR
TO
SON
ARI
CLIENT:
Urban Administration & Development
Department, Madhya Pradesh
BADHERI
RF: 1:9000
0
90
180
270 360
540 Mts.
Project coordination:
Submitted By:
CITY DEVELOPMENT
PLAN OF CHAKGHAT
TO
ALLA
HABA
CH
AN TO
DR
AP
Community
Health Center
UR
NALLAH
KHAGHA
CPS
Nagar Parishad
Bus Stand
Office
Cemetery
Ground
T A M
A S
R
Guest House
Police Station Chak
Bazar
I V
NSPG
Water
College
Treatment Plant
St. Mary
School
Saraswati
Shushu Mandir
Pharmacy
College
H
LA
L
NA
TO
GOURA
TAMAS
RIVER
T
SAT O
PUR
A
T A M
A S
R I V E R
GR
AM
LEGEND
MUNICIPAL BOUNDARY
TO
SON
ARI
Kri
s
aj M hi
an
di
W
AR
Up
WARD BOUNDARY
SE
NG
AR
BUILTUP AREA
JHAR
WATER BODY
BADHERI
PUCCA ROADS
TO
REW
A
KUTCHA ROADS
CLIENT:
Urban Administration & Development
Department, Madhya Pradesh
RF: 1:9000
0
90
180
270 360
540 Mts.
Project coordination:
Submitted By:
CITY DEVELOPMENT
PLAN OF CHAKGHAT
1
2
3
10
5
77
66
9
11
12
14
LEGEND
MUNICIPAL BOUNDARY
WARD BOUNDARY
13
15
SEX RATIO
BELOW 900
900 - 950
ABOVE 950
RF:1:11000
0 110 220 320 430 540
760
CLIENT:
Project coordinator:
Urban Administration & Development
Department ,Madhya Pradesh
Submitted By:
DMG Consulting Pvt.Ltd.
A-81, Sec-65, Noida (U.P)
CITY DEVELOPMENT
MAP OF CHAKGHAT
TO
ALLA
HABA
Community
Health Center
CH
AN TO
DR
AP
UR
NALLAH
KHAGHA
6
Cemetery
Ground
Bus Stand
Nagar Parishad
Office
LEGEND
T A M
A S
R
Chak
I V
MUNICIPAL BOUNDARY
2 Bazar
R
NSPG
College
St. Mary
School
Saraswati
Shushu Mandir
Pharmacy
College
H
LA
L
NA
TO
GOURA
WARD BOUNDARY
BUILTUP AREA
TAMAS
RIVER
T
SAT O
PUR
A
T A M
A S
WATER BODY
PUCCA ROADS
R I V E R
AM
KUTCHA ROADS
SCHOOLS
COLLEGES
SE
NG
AR
W
AR
GR
TO
SON
ARI
HOSPITAL
JHAR
BADHERI
GUEST HOUSE
TO
REW
A
POLICE STATION
CLIENT:
Urban Administration & Development
Department, Madhya Pradesh
RF: 1:9000
0
90
180
270 360
BUS STAND
CEMETERY GROUND
540 Mts.
Project coordination:
Submitted By:
CITY DEVELOPMENT
PLAN OF CHAKGHAT
WARD-08
WARD-01
WARD-02
WARD-10
LEGEND:
WARD-03
WARD-07
4
-0
WARD-05
D
AR
N.P BOUNDARY
WARD-06
WARD BOUNDARY
WARD-09
WARD-12
WATER BODIES
WARD-11
LOCATION OF URBAN
POOR CLUSTERS
WARD-14
WARD-13
WARD-15
RF:1:9000
CLIENT:
Urban Administration & Development
Department, Madhya Pradesh
Project coordination:
Submitted By:
90
180
270
360
540
CITY DEVELOPMENT
PLAN OF CHAKGHAT
WARD-08
WARD-01
WARD-02
WARD-10
WARD-03
WARD-07
04
D-
WARD-05
AR
W
WARD-06
WARD-09
LEGEND:
WARD-12
N.P BOUNDARY
WARD-11
WARD BOUNDARY
WARD-14
WARD-13
WARD-15
RF:1:9000
CLIENT:
Urban Administration & Development
Department, Madhya Pradesh
Project coordination:
Submitted By:
90
180
270
360
540
CITY DEVELOPMENT
PLAN OF CHAKGHAT
TO
ALLA
HABA
Community
Health Center
CH
AN TO
DR
AP
UR
NALLAH
KHAGHA
Nagar Parishad
Office
Bus Stand
Cemetery
Ground
T A M
A S
Chak Bazar
I V
Water
Treatment Plant
Pharmacy
College
H
LA
L
NA
TO
GOURA
LEGEND
TAMAS
RIVER
T
SAT O
PUR
A
T A M
A S
MUNICIPAL BOUNDARY
WARD BOUNDARY
R I V E R
AM
BUILTUP AREA
W
AR
GR
TO
SON
ARI
WATER BODY
SE
NG
AR
PUCCA ROADS
KUTCHA ROADS
JHAR
BADHERI
TO
REW
A
INTAKE WELL
CLIENT:
Urban Administration & Development
Department, Madhya Pradesh
RF: 1:9000
0
90
180
270 360
540 Mts.
Project coordination:
Submitted By:
CITY DEVELOPMENT
PLAN OF CHAKGHAT
The inter city public transport system for the town can be categorize into two parts i.e. State
Carriage and Private Carriage. State carriage includes buses by the State Government with fixed
routes and fare. The Private Carriage in under purely private domain and includes buses, jeeps,
matadors etc. operated by private operators. While as far as the inter city transportation of goods
is concerned, there are 15 transport agencies together with about 500 no. of trucks as listed
below:
Table 1: List of Transport Agencies for Inter City Goods Transport
S. No.
No. of Trucks
40
50
25
Yana Motors
35
08
10
40
18
35
10
06
11
11
12
10
13
70
14
R. K. Road Lines
50
15
Others
About 80
Total
488
At present there is no intra city public transport system exists in Chakghat. As the town is a very
small town all the important places such as major commercial and market areas, bus stands,
hospitals etc. are in the vicinity. Most of the local people generally use cycle, scooter, motorcycle
and walking etc. as mode of travel for short trips or intra zone trips.
ii
Sr. No.
Type of Roads
1.
3.77
2.
6.02
3.
4.21
4.
5.90
Total
19.89
Ward wise breakup of the above discussed road length and its indicators are shown in below in table
6.21. The town has overall per capita road length 1.86 meters and a road density of 10.68 km per sq. km.
Table 0.3: Ward Wise Detail of Road Length in Chakghat Town
Ward
iii
Total
Total
Area in
Road
Per Capita
No.
Population
2011
Sq. Km.
N.H.
- 27
Length
of
Roads
(in
kms.)
Density
(per sq.
km.)
Road
Length (in
mts.)
0.27
0.00
0.64
756
0.06
0.76
0.84
0.10
0.21
0.00
0.52
721
0.07
0.72
0.72
0.35
0.15
0.01
0.00
0.51
744
0.16
0.74
0.68
4.
0.28
0.00
0.05
0.00
0.33
503
0.23
0.50
0.66
5.
0.30
0.00
0.08
0.00
0.38
328
0.05
0.33
1.17
6.
0.25
0.20
0.33
0.00
0.78
404
0.04
0.40
1.94
7.
0.10
0.10
0.09
0.00
0.29
725
0.07
0.73
0.41
8.
0.60
0.20
0.51
1.31
798
1.00
0.80
1.64
9.
0.25
0.10
0.18
0.53
689
0.04
0.69
0.78
10.
0.30
0.90
1.43
4.29
1039
1.33
1.04
4.13
11.
0.30
0.05
0.16
0.51
546
0.05
0.55
0.93
12.
0.20
0.74
0.00
1.43
827
0.48
0.83
1.72
13.
0.00
0.35
1.35
3.32
1050
1.04
1.05
3.16
14.
0.35
1.92
3.61
585
0.23
0.59
6.17
15.
0.50
0.94
1.44
961
0.34
0.96
1.50
Total
4.21
5.90
19.89
10676
5.21
10.68
1.86
Pucca
Road
(within
Ward)
Kutcha
Road
(within
Ward)
Major
District
Roads
1.
0.22
0.15
2.
0.21
3.
1.34
6.02
1.66
0.49
1.62
3.77
Source: Area and Road Length Computed from Chakghat Digitized Map by DMG Consultant and Population as per
Census 2011.
Proper road width and spacing are important in reducing traffic on roads. Unfortunately many of the
important roads in town have become so narrow to facilitate the increasing flow of vehicles. The
unauthorized encroachment along both the sides of roads has covered all the available shoulders thereby
reducing ROW from 20m to 6m further decreased the carrying capacity of roads. The table 6.24
presented shows the important roads of the town and their existing width. There are 7 important roads
in the town. The Main town road (old NH-27), Chandrapur Road and Gaura Road are most important
roads as most of the residential, commercial and other activities are concentrated here.
Table 0.4: Major Roads of the Town
S.
No.
1.
60
2.
18 - 30
8 20
9 20
3.
iv
Chandrapur Road
S.
No.
4.
Gaura Road
6 - 15
5 -10
5.
15 24
6.
Satpura Road
9 25
7.
Sanauri Road
12 - 35
Source: Chakghat Nagar Parishad and Draft Master Plan Chakghat 2021
The overall condition of these existing roads is not good having pot holes in many places, no proper
drainage, no road furniture for guidance of movers etc. On the contrary, the electric poles situated on
both side of the roads at some places does not permit the traffic to use shoulders and further reduces
effective width of road.
At present both the sides of road is full of ribbon development. However, with increasing concentration
of activities in and around the core area of the town, pressure of traffic is increasing on all the major
roads of the town.
Primarily, the traffic and congestion is greatest in the wide junction (Old Chauraha near market area)
formed by the two major roads i.e. old NH-27 road and Chandrapur Road. This NH-27 (Allahabad Rewa)
and Chandrapur Road together with Satpura Road, Gaura Raod and Sanauri Road act as a major entrance
and exit point of the town.
Another major traffic generating centre of the town is the Galla Mandi (wholesale market for food item)
vegetable and fruit market and Grain Market (C-Class Mandi) by the Chandrapur Road, Old Chauraha and
NH-27 respectively. A huge number of cultivators and middle men come on a regular basis to sell their
crops in town from Satna, Rewa, Teonthar, Sirmaur, Mauganj etc. Because of this, the traffic scenario
becomes harsh as people travel and cluster in these particular areas. Moreover, the bus/taxi stand
developed under IDSMT scheme located nearby the main commercial area along the old NH-27 road
greatly adds up to the traffic congestion.
Furthermore, important centres such as Police Station, Educational Institutions, Guest House, Nagar
Parishad Office and informal shops are located in the core area of the town also one of the traffic
generating centres of the town since major administrative and commercial activities take place in this
area. The other important traffic generation centres in town includes1.
2.
3.
4.
vi
Chandrapur Road
Gaura Road from Chak/Gola Bazaar or Market to NH-27
Community Health Centre
Nehru College
vii
There is no provision have been made for organized on-street parking and off-street parking at major
commercial centres of the town. Most of the core market area of the town is characterized by narrow
roads with slow moving traffic. Unorganized on-street parking and informal shops leads to encroachment
on the ROW and absence of footpath force the pedestrians to walk on the carriageway. Thus, the
capacity of the road is further reduced resulting in conflict between pedestrians and vehicular traffic.
Therefore, there is urgent need/requirement of authorized parking as per the standards for major
commercial areas and in other important areas such as along NH-27, institutional areas etc. of the town.
COMPONENTS
viii
YEARS
COMPONENTS
YEARS
2011
2012
2013
2014
2015
2020
2025
2030
2035
Projected Population for 10676 11023 11381 11751 12133 14106 16399 19064 22163
Chakghat
Raod Network (in Km)
2011
2012
2013
2014
2015
2020
2025
2030
2035
19.89
19.89
19.89
19.89
19.89
19.89
19.89
19.89
19.89
16.01
16.53
17.07
17.63
18.20
21.16
24.60
28.60
33.24
Gaps
-3.88
-3.36
-2.28
-2.26
-1.69
1.27
4.71
8.71
13.35
2011
2012
2013
2014
2015
2020
2025
2030
2035
Up-gradation of Kutcha
Roads to Pucca Roads
5.90
Widening
roads
Important
6.02
Improvement of Junctions
and accident area (Nos.)
Other
Infrastructure
Facilities (in nos.)
2011
2012
2013
2014
2015
2020
2025
2030
2035
Development of Transport
Nagar (Truck Terminal)
Footpath (Sidewalk) in km
19.57
of
Source: Population Projection & DMG Assessment as per IRC and UDPFI Guidelines
Type of Roads
Norms
Current Status
ROW
Carriage Way
Arterial Road
50 60 m
21 m
60 m
60 m
Sub-Arterial Road
30 40 m
14 m
10 25 m
58m
Collector Road
20 30 m
10.5 m
46m
3m
Local Street
10 20 m
7.5 m
34m
3m
ix
Footpath (Sidewalk)
ROW
Carriage Way
The minimum width of footpath should be 1.5 m. The width should be increased by 1m in major
commercial or market areas to allow for dead width. Footpath adjoining shopping frontage should be at
least 3.5 m.
Table 0.7: Desirable of Footpaths
Capacity (Persons)
All in one Direction
In both Directions
800
1600
2400
3200
4000
1220
2400
3600
4800
6000
WEAKNESS
OPPORTUNITY
THREAT
Land availability for major projects like In the absence of adequate public transportation
systems in town, individual and personalized
development of Bus Terminal, Transport Nagar for
modes of transport would increase and that would
goods carriers and parking facilities.
pose a serious problem in terms of traffic jams on
PPP participation for development and
major roads, in addition to parking problems, at a
maintenance of Bus Terminal, Transport Nagar
later date.
and Parking facilities.
Fund unavailability for road construction and
maintenance.
1.14 Issues
S. No.
xi
Horizon Period
Components
2015
2025
2035
100%
100%
/ 50%
100%
100%
60%
100%
100%
Development of
(Transport Nagar)
Truck
Terminal 70%
100%
100%
Junction
and
Improvement
Traffic
100%
100%
60%
100%
Parking Facilities
100%
100%
Signal 100%
100%
In order to address the above discussed issues and achieve the above outcomes in each of the
components of traffic and transportation in the town, strategies categories under short term measures,
medium term and long term action plans are elaborated below:
1. Short Term Measures: Short term measures includes immediate trouble shooting actions and
traffic management actions such as Intersection or junction improvement in the core areas and accident prone areas to
town.
Traffic signalization at major intersections or junctions and road stretch.
Removal of encroachments on major roads & pavements to provide free flow of traffic.
Conversion of existing bus stand into taxi or auto rickshaw stand.
Establishment of Traffic Police Stations and Traffic Management Centres.
These measures should be taken up on a continuous basis as the travel characteristics and
loading of different links, intersections etc. and change owing to natural growth and change in
land use.
2. Medium Term Action Plan: This aims at to the development of transportation infrastructure over
a perspective plan period of 5 15 Years to bring about coordinated development among
different components. These measures typically will include various infrastructure projects
including network improvements such as Road up-gradation - Improvement of all existing major roads connecting town to
peripheral areas through widening, strengthening and developing footpaths in phase
manner.
Up-gradation of existing kutcha roads into pucca ones.
New road formation/development for a total length of 13.3 km in different areas of the
town as per the future development of town.
Development, Operation and Maintenance of parking lots with payment on major roads
and commercial areas of town on PPP base.
Development of Bus Stand/Terminal on BOOT basis.
Development of Truck Terminal/ Transport Nagar on BOOT basis.
For Monitoring and Evaluation: Preparation of a detailed road register and designing and
implementing a system to update the same on a regular basis, including details of construction
and repair/maintenance history.
3. Long Term Action Plan: The long term action plan aims at to the development of structure plan
for the town with transit as one of the lead components, which will direct the urban growth so as
to bring about a structural fit between transit infrastructure and urban growth. This will also
include the introduction of eco-friendly intra-city public transport system and also examine a
comprehensive multi-modal Public Transport System to bring about the most optimal mix of
commuting within the town and thus providing a sustainable transit solution.
xii
Roads and
Transportation
Proposed Projects
-
9.1.1.1
The creation of a reliable, comfortable, attractive and affordable traffic management system is the longterm solution for solving the traffic problems in the city. Thus, constructions of new bus stand to provide
a high quality transit system. Provisions of parking facilities are envisaged to solve parking problem and
congestion in core areas. To achieve the goals in this sector the following projects are identified:
Code No.
xiii
Projects proposed
TT 1
TT 2
Project Cost
(in Lakh)
100.00
Department
Chakghat Nagar Parishad
Chakghat Nagar Parishad
Code No.
Projects proposed
Department
TT 3
TT 4
TT 5
TT 6
PWD
TT 7
xiv
Project Cost
(in Lakh)
75.00
1409.90
City Development
Plan for
Chakghat
Overview
Chakghat is a small town situated at 80 kms in north-east from Rewa town in Teonthar tehsil
of Rewa district. Which has 15 wards with a ULB's, Govt. of M.P..
GENERAL INFORMATION
Total Area
5.21 Sq.Km.
Total Population
No. of wards
15
Nearest Airport
Road Network
PHYSICAL INFORMATION
Altitude
Seasons
March-June (Summer)
July September (Monsoon)
October February (Winter)
Soil Type
Average Temperature
420C May-June
Rainfall
1100 mm (Annual)
Chakghat
Demographic profile
Decadal Growth (Population)
2001 9105
2011 10676
Literacy Rate
2001 62.56%
2011 69.88%
Sex Ratio
2001 889/1000
2011 909/1000
17.25%
Prevalent out migration as poor educational & health facilities and economic
Population Growth
Rate (%)
10.00
0.00
Rewa District
Chakghat Town
1961-1971
1971-1981
1981-1991
1991-2001
2001-2011
26.50
74.41
23.50
40.01
28.77
41.82
26.84
38.46
19.86
17.25
Population projection
Average Decadal Growth Rate of Chakghat town
1981 - 2011
32.51%
Population Projection*
2025 2026
16399
2035 - 2036
22163
2011
2012
2013
2014
2015
2020
2025
2030
2035
10676
11023
11381
11751
12133
14106
16399
19064
22163
1997
5.35 Persons
5.12 Persons
7.7 Persons
There are a total of 2843 (31.22%) workers in the town (2001 Census) and
majority of workers are engaged in tertiary activities such as trade &
commerce.
Workforce Distribution
Gender Wise Work Force Distribution
100.00
90.00
8%
80.00
4%
73%
In Percentage
15%
70.00
60.00
50.00
40.00
30.00
20.00
Cultivators
House Hold Industries
Agricultural Laborers
Others
10.00
0.00
Total WFPR
Primary
Secondary
Tertiary
Male
79.99
58.35
54.37
88.19
Female
20.01
41.65
45.63
11.81
Tourism
No significant historical or heritage monument recognized but has potential for tourism
development as the Tamas river which passes through the town, River Tamas touches
ward boundary of Ward No. 3 Tilak Ward; Ward No. 4 Ramlila Ward; Ward No. 11
Tamsa Ward; and Ward No. 12 Bhagat Singh Ward in the northern side of the town
and Ward No. 14 Dr. Rammanohar Lohia Ward and Ward No. 13 Rajiv Gandhi Ward
in the southern part of the town.
Lack of public transport ( poor frequency , bad condition of buses ) and poor condition
of roads affecting the movement of the tourist into the town.,
STRENGTH
WEAKNESS
Developed along two major roads which is No agency is responsible for development /
connecting Chandrapura to Gaura and Rewa to tourism sector at town level. Which can take the
Allahabad by NH-27.
responsibility to improve and development of the
Presence of water resource as Tamas River natural assets like Tamas river along the city.
which is touching major portion of the town as
boundary of the Wards No. 1,2, 3, 11, 12, 13
OPPORTUNITY
THREAT
Important tourist destinies within the Along the river presence of slum in ward no. 9
proximity of 40 Kms of the town those are near chauk bazar is making it worse, because
Kamayani
Devi
temple,
caves
under bank of the river is most vulnerable to become a
Vindhyachal Mountain, Buddhist Stupas of dumping site of the solid waste.
national importance in Tyonthar, Kunti water Improper infrastructure services, local
fall etc. So it can be developed as a nodal point awareness and un-developed river front along
of the tourism circuit.
the NH-27 which passes through west to east
Town is having huge agricultural land for from ward no1,2,3,4,5,6,7,9,10,12, which causes
cultivation where agro-based industries can for major hindrance for the development of the
be developed.
tourism.
Residential
Commercial
22.75%
4.93%
Industrial
0.34%
56.86%
4.49%
Public/Semi
Public and Public
Utilities
Transportation
10.63%
Water Body
Landuse distribution
Land use
Residential
Commercial
Industrial
PSP
Recreational
Transportation
Water Body
Total Developed
Area
Undeveloped Area/
Agricultural Land
Total Planning/
Municipal Area
49.48%
312.96
49.48
423.68
81.35
632.54
100.00
520.83
100.00
50.52%
20.21%
28.79%
Additional land
Required by 2021
69.90
31.21
26.67
15.64
27.00
42.67
9.34
222.43
-110.72
Residential111.71
Commercial
Industrial
16.58%
11.26%
8.45%
8.45%
6.26%
Water Body
Housing scenario
As per 2001 Census of India, there are 1505 households in Chakghat ULB's, Govt. of
M.P. (CNP).
Tempor
ary
5.09%
Semipermane
nt
26.77%
Rented
9.57%
Others
5.69%
Perman
ent
68.14%
Total Population
28,61,19,689
1,59,67,145
9,105
*10,676
Owned
84.74%
Average HH Size
5.12
7.27
6.05
5.35
Total Population
Non-Slum Slum
7469
3207
7712
3311
7962
3419
8221
3530
8488
3645
9869
4237
11473
4926
13337
5727
15505
6658
Existing Supply
Non-Slum Slum
1400
597
1400
597
1400
597
1400
597
1400
597
1400
597
1400
597
1400
597
1400
597
Housing Demand
Non-Slum Slum
1494
641
1542
662
1592
684
1644
706
1698
729
1974
847
2295
985
2667
1145
3101
1332
Housing Gap
Non-Slum Slum
94
44
142
65
192
87
244
109
298
132
574
250
895
388
1267
548
1701
735
1997
1400
597
138
94
44
4433
3101
1332
2436
1701
735
Total
Demand
2135
2205
2276
2350
2427
2821
3280
3813
4433
Total
Gap
138
208
279
353
430
824
1283
1816
2436
Swot analysis
STRENGTH
Chakghat lies in geologically safe seismic zone.
WEAKNESS
The current population is largely concentrated in the core
Developed along the corridors as an arterial road area that is the intersection of the arterial road from East
from Chandrapur to Goura and NH-27 from Rewa to to West and NH-27 North to South of the town.
Allahabad intersecting within the town where all High population density in core area and presence of
the wards of the town is accumulated.
slum area in ward no. 5 and 9 along the arterial road
Presence of the Tamas river as the major source of causing congestion and pressure on existing
the water plays a great role for the huge availability infrastructure.
of the organic/truck
8,10,12,13,14 and 15
farming
in
OPPORTUNITY
THREAT
River front development along River Tamas can Land encroachments along the arterial road and NH-27
create demand of tourism and commercial and river front as usual.
establishment of the town along the arterial road Presence of Tamas River a natural physical barrier
from East to West.
passing through the centre of the city hinders the overall
Development of agro-based industries can create development of town in south because only access to the
housing demand in wards 1,2,3,4.5.6 etc
southern wards is presence of one connectivity through
Better quality housing demand and cheap land the ward 9 and 12 along NH-27
values can attract real estate developers for Absence of dedicate planning agency which can take
development of new townships in peripheral areas care of the overall development of the town.
specially in wards 8,10,12,13,14.
Issues
8.43%
1.27%
2.54%
Tap
2.88%
Handpump
32.93%
51.94%
Tubewell
Well
River, Canal
Any other
Away
22.42%
Near
Premise
s
36.47%
Within
Premise
s
41.11%
Population
2011
2012
2013
2014
2015
2020
2025
2030
2035
10676
11023
11381
11751
12133
14106
16399
19064
22163
Domestic
Fire Demand
Water Demand (1%) (MLD)
1.44
0.014
1.48
0.014
1.54
0.015
1.59
0.016
1.64
0.016
1.90
0.019
2.21
0.022
2.57
0.025
2.99
0.029
Industrial
Demand (3%)
0.043
0.044
0.046
0.047
0.049
0.057
0.066
0.077
0.090
Considering
Losses (5%)
0.072
0.074
0.077
0.080
0.082
0.095
0.111
0.129
0.150
Total Demand
(MLD)
1.57
1.61
1.68
1.73
1.79
2.07
2.41
2.80
3.26
Supply Gaps
(MLD)
-1.38
-1.42
-1.49
-1.54
-1.60
-1.88
-2.22
-2.61
-3.07
Issues
Water distribution system is very old and has leakage problem due to which pressure remains
low.
All the existing 3 OHTs are not functional due to leakage problem.
The distribution system has limited coverage. Pipelines are mainly laid along the major roads, is
STRENGTH
WEAKNESS
Tamas river which is from the heart of The water distribution system is very old and has leakage
the city as the major source of water problem due to which pressure remains low.
supply.
Though pipelines are there along the roads but
Town has pipeline along the roads (NH- distribution system into the wards is missing.
27 and Arterial road) which is covering The capacity of water treatment plant is underutilized.
almost all the wards of the town for
Only 3 overhead tanks are there in wards 4,9 and 15 which
water supply.
is not sufficient to fulfill the current demand.
OPPORTUNITY
Provision of connecting all the houses
specially in populated areas like ward
no. 4,5,6,7 and 11,14 through pipes
with main line along the roads for the
proper distribution of the water.
Three over head tanks are present in
wards 4,9 and 15 which can be
repaired, thereby increase the storage
capacity.
THREAT
There are several drains/ storm water drains out falling in
the Tamas River specially from wards 3,4,5,6
The distribution system has limited coverage. Pipelines are
mainly laid along the major roads like in north part from
wards 1,3 to wards 10,12 (West to East) and along NH-27
towards wards 8,10 and in southern part of the town along
NH-27 in wards 11,13,14 and 15 (Towards south) is a
major constraint in distributing water to the end user in
internal areas.
Proposed Projects
Code No.
Projects proposed
WS 1
WS 2
60.00
WS 3
74.00
WS 4
300.00
WS 5
235.00
WS 6
2.00
671.00
Department
Presently the town do not have underground sewerage system to serve its
S. No.
Horizon Period
Components
2015
2025
2035
100%
100%
Sewage
Treatment
Disposal Arrangement
100%
100%
As
per
WHO
Standards
100%
As
per
WHO
Standards
100%
and 80%
SWOT Analysis
STRENGTH
Town has good natural slope towards the Tamas river
from both north and south ends of the town.
OPPORTUNITY
Scope for development of low cost sanitation projects
specially in residential areas like in wards 3, 4, 5, 6, 7,
8, 14,15 along the major roads.
New sewerage schemes to increase the sewerage
coverage to 100%.
WEAKNESS
25% of the households have proper
toilets.
Open sewerage system in almost all
the wards of the town.
THREAT
Sewage flows through open drains,
channels & nalas in town and
disposes directly into the River
Tamas.
Sewerage and
Sanitation
Proposed Projects
Construction and renovation
Preparation of comprehensive
master plan for Sewerage and
Drainage System of town.
Construction of one STP and
Network lines.
Code No.
SS 1
Projects proposed
Construction of DEWATS in each wards
Rs 2000 per sq m of land under wet
land. Each plant need around 500 sq. m
Project Cost
(in Lakh)
150.00
Department
ULB's, Govt. of M.P.,
Govt. of M.P
SS 2
100.00
SS 3
87.00
SS 4
1.00
338.00
Drainage
SWOT Analysis
STRENGTH
WEAKNESS
Favourable natural slope towards the river Absence of the drains inside the wards like in
catchment area from both north and south
wards 9,14.15 etc.
ends of the town for development drainage Reduction in flow capacity of existing drains
system which will also help in cost reduction.
due to dumping of solid waste.
OPPORTUNITY
Making rainwater harvesting
THREAT
In ward 10 and 15, the waste water from
adjoining area spilled over the road and
Availability of land for the development of
creates unhygienic conditions.
waste water treatment plants in both the
side in ward no. 11 and 12.
Contamination of river water
Project Cost
(in Lakh)
-
Code No.
D1
Projects proposed
Preparation of DPR for Storm Water
Drainage System for entire town
D2
176
D3
70
246
Department
ULB's, Govt. of M.P.,
and CNP
It is been estimated that out of total waste generated (0.75 MT) and only 25% (0.18 MT) of
waste is been collected on daily from wards 1,2,3,4,5,6,7,8,14,15
The total quantity of solid waste generated in Chakghat town is 0.75 MT per day
3 no. of bins are at wards 4 and 8 but the waste generated from commercial and residential
areas of 2,3,5,6,9 disposed along the side of the road.
SWOT Analysis
STRENGTH
WEAKNESS
Straight access to the all wards through the Presence of urban poor specially in ward 9
major roads which can reduce the effort for suits to dump waste generated along the bank
waste collection.
of Tamas river
Most of portion of the waste generated is Door-to-Door waste collection system is not
biodegradable which can be dispose easily in in practice and collection efficiency (25%)..
the open spaces like in north wards 8,10 and Segregation of waste is not in practice
in SE of the town in ward 13 to increase the
Lack of dhallows and bins for waste storage.
fertility of the agricultural land.
No incineration unit is available for
biomedical waste.
OPPORTUNITY
Scope of PPP in terms of waste collection,
transportation and disposal of waste by
involving NGOs in town.
THREAT
Health hazards due to
cleanliness
negligence
for
Several layers are placed and compacted on top of each other to form a
refuse cell (up to 3 m thick).
At the end of each day the compacted refuse cell is covered with a layer of
compacted soil to prevent odors and windblown debris.
In the improved version of the sanitary landfill, bio-gas can be tapped for
energy generation
Code No.
SWM 1
Projects proposed
Preparation of Detailed Project Report
for Municipal Solid Waste
Management for entire town.
SWM 2
140
SWM 3
30
SWM 3
75
245
Department
ULB's, Govt. of M.P.,
Govt. of and CNP
Two major roads one is arterial road connecting Chandrapur to Gaura and NH27 from Chandrapur to Allahabad intersecting at the heart of the town called
Chouk Bazar and Sonauri to Satpura intersecting NH-27 from wards 12,13 and
14,15.
Total length of the roads in the town is 19.89 Kms according to the ULB's, Govt.
Travel
of M.P..Characteristics
Cycle
700 800
2 W (Motorcycles, Scooter)
600
3 W (Tempo, Auto)
45
50
There is a demand of about 16 Km of road in the town with total gap of 3.88
km.
At present the right of way is around 10-25 m which should be around 30-40 m
according to the norms.
SWOT Analysis
STRENGTH
WEAKNESS
Major road networks through the city Intersection of the major roads NH-27 and
with other towns like Allahabad, Arterial road is at ward no. 9 which is
Chandrapur, Goura, Satpura, Sonauri etc centre of the town.
(Arterial road from Chandrapur to Goura Right of way along the rods in commercial
and from Satpura to Sonauri and NH-27 area like in wards 4,5,6,9 is less.
from Allahabad to Rewa.
OPPORTUNITY
THREAT
Provision of providing service lane along In the absence of adequate public
the major roads specially in commercial transportation systems in town, individual
areas in wards 4,5,6,7 etc.
and personalized modes of transport
Land availability specially in wards would increase
parking facilities.
Proposed Projects
Project Cost
Department
(in Lakh)
Development of new Bus Stand with proper
500.00
ULB's, Govt. of M.P.
ISBT on BOOT basis in ward no. 10
Projects proposed
TT 2
500.00
TT 3
675.00
50.00
TT 5
50.00
TT 6
90.00
60.00
TT 4
TT 7
1925.00
Almost 25 % of street light to serve the citizen at ward level are not working
while around 10% are not working along the major roads of town. Though the
street light has been provided to urban poor residing in ward no. 2, 3, 5, 7
and 9 but level of provision is low as compared to other areas of the town.
e to Total
450
75.38%
150
20.94%
15
2.51%
0.50%
0.67%
597
100.00%
SWOT analysis
STRENGTH
WEAKNESS
Around 597 street poles are existed along the NH- Out of total 1494 households 253 households have
27, Goura road, Satpura road Chandrapur road
no connection and relies on other sources specially
which are covering almost all the wards of the
in slums wards 1,2,7 and 9
town.
Around one-fourth of the street lights are not
Adopting energy efficient products like CFL, LED
functioning along the roads. (wards 1,2,7,8,10)
etc. around 20% of the total along the major roads
and NH-27 specially in wards with population like
in wards 1,2,3,4,5,6,14,15 etc
OPPORTUNITY
THREAT
Provision of Energy saving initiatives , as around Power thefts through street lights
20% of the street lighting is with low consuming Strain on forest/wood resources as 1000
bulbs of LED and CFL.
households out of 1494 (around 67%) are using
Up-gradation of existing poles in terms of no. and
firewood for their cooking purposes.
spacing (40 m) from one to other along the major
roads NH-27 and arterial road East to West..
Code No.
Projects proposed
SL 1
148.00
Chakghat ULB's,
Govt. of M.P.
SL 2
90.00
Chakghat ULB's,
Govt. of M.P.
25.00
SL 4
125.00
Chakghat ULB's,
Govt. of M.P.
Chakghat ULB's,
Govt. of M.P.
SL 5
SL 3
5.00
393.00
Department
Chakghat ULB's,
Govt. of M.P.
30.04% (3207) of total population (10676) are slums out of which nearly 60% population (i.e.
1924) accounts for (BPL) population.
Working population are engaged in small scale industries or work as agricultural labourers.
Slums residing in Chakghat are located on government land.
Besides the notified slum locations, there are non-notified slums in ward nos. 2, 3, 5, 7 & 9 .
Children in slum goes Govt. School in in ward no. 9 near chouk for education and for health
facility they have to go community health centre 1.5 Km away in ward no. 10.
Population
NonSlum
Slum
Existing Supply
NonSlum
Slum
Housing Gap
Demand
NonSlum
Slum
NonSlum
Slum
2011
7469
3207
1400
597
1494
641
94
44
2012
7712
3311
1400
597
1542
662
142
65
2013
7962
3419
1400
597
1592
684
192
87
2014
8221
3530
1400
597
1644
706
244
109
2015
8488
3645
1400
597
1698
729
298
132
2020
9869
4237
1400
597
1974
847
574
250
2025
11473
4926
1400
597
2295
985
895
388
2030
13337
5727
1400
597
2667
1145
1267
548
2035
6658
1400
597
3101
Source:
DMG15505
Assessment
based on
Projected
Population
1332
1701
735
SWOT analysis
STRENGTH
WEAKNESS
Cheap and abundant availability of lands Access routs to these slums in 2,3,5,,7 is
around the populated area in wards, difficult in rainy season due to water logging.
8,10,12,14, and 15 which can be suitable for All the collector roads are kutcha roads in
the EWS housing for urban poor and for wards 2,3,5,9 within the slum area.
other development as well.
OPPORTUNITY
THREAT
Provision of implementing the slum area The slums are located in prime areas specially
rehabilitation programme in the town as in ward no. 9 along the Chandrapur road near
there is plenty of lands available in wards commercial area and in ward n. 5 which
8,10,12,14 etc.
vanishes the aesthetic sense of residential
The tribal target groups have affordability to area.
pay for EWS public housing specially in Poor sanitation and unhygienic environment
wards 3,5,6.
along the bank of the river responsible for the
Scope of developing small scale industries dumping waste which causes for the
related with agricultural activity to enhance contamination of the water in the river.
the economic status of the urban poor.
Urban
Poor
in 8,10,12,14,15
Projects proposed
UP 1
Project Cost
(in Lakh)
2041
2041
Department
MPHB; CNP
Health
facilities
Education
facilities
Problems / Requirements in
2035
Lack of specialty/intermediate
hospitals in the town.
Difficult to access health facility
for people who lives in southern
part of the town (wards
11,13,14,15)
Inadequate infrastructure in
health centre.
Absence of institution in southern
part of the town which comprises
ward no 11,13,14,115.
Proposed Projects
Increase bed capacity of existing
hospitals and construction of new
hospitals.
Construction
of
Multispecialty/intermediate hospital.
Construction of Poly-clinic
Increase in the no. of primary schools
and should be located evenly in all
direction of the town.
Improvement or development of the
infrastructure in the institutions like
playgrounds, health centres, buildings,
furniture, better toilet facilities etc.
Integrated schools and colleges with
hostels like ITI, MITI or Polytechnic
college.
Code No.
H1
H2
H3
Projects proposed
Project Cost
(in Lakh)
Department
150.00
Health Department,
Chakght
75.00
Health Department,
Chakghat
50.00
Health Department,
Chakghat
275.00
E2
E3
E4
E5
E6
E7
E8
Projects proposed
Development of 6 no. of Primary School by
2035 two in ward no. 8, and one in ward nos.
10, 13,14 and 15
Development of 2 no. of middle/higher
secondary school (one each in ward no. 10
&15)
Development of 1 no. of Integrated School with
Hostel Facility in ward no. 8
Establishment of 2 nos. of Informal and adult
literacy centers, Anganwadi centers
Construction of Polytechnic college/ Vocational
Training Institutes and it is in ward no. 13
Renovation of school buildings which are in bad
condition
Provision of equipments and necessary
infrastructure like provision of toilets, safe
drinking water, kitchen shed and electricity etc.
in education institutions.
Establishment of Public Library (1 in no.)
Project Cost
Department
(in Lakh)
300.00
ULB's, Govt. of M.P.
100.00
500.00
10.00
100.00
50.00
10.00
70.00
1140.00
Recreation
and
Entertainment
Heritage and
Tourism
Proposed Projects
Project Cost
(in Lakh)
Code No.
Projects proposed
T1
200.00
100.00
T3
50.00
T4
50.00
T5
35.00
T2
435.00
Department
Code No.
Projects proposed
Project
Cost (in
Lakh)
30.00
Department
O1
O2
15.00
30.00
O4
50.00
O4
30.00
O3
210.00
14000000
18000000
16000000
14000000
12000000
10000000
8000000
6000000
4000000
2000000
0
10000000
8000000
6000000
4000000
2000000
0
2008-09
Rupees e
12000000
2009-10
2010-11
2008-09
Total Expenditure
Financial Years
2009-10
2010-11
Financial Years
12000000
10000000
9000000
8000000
7000000
6000000
5000000
4000000
3000000
2000000
1000000
0
10000000
2008-09
2009-10
2010-11
Tax
Non Tax
Transfer
Income
grants
8000000
6000000
Operation and
Maintenance
4000000
Payment Interest
2000000
Others
0
2008-09
2009-10
2010-11
financial year
Capital expenditure
Code No.
Physical Infrastructure
Sectors
Water Supply
371
338
245
246
1925
393
Urban Poor
2041
Health Facilities
275
Educational Facilities
1140
Tourism
435
Other Components
210
30
Social Infrastructure
Total Cost
7649