South Bihar Power Distribution Company Limited

Achievement Vs Target(Supply + Erection ) for (New & R&M Works) under Special Plan(
Name of Agency: M/s East India Udyog limited,Ghaziabad
Districts:

Patna

LOA No & Date: 1483 & 1484 Date :-29.11.13


Date of Agreement/Effective date: 23.01.14
Package Cost: 95.98 Crores
Date of
Complet
ion

R&M Work

7 Months

22.08.2014

NEW Work

10 Months

22.11.2014

Progress Report of Special Plan(BRGF) Phase I


Total No. of New PSS in scope:- 2 nos.
Sl. No.

Name of new PSS

Capacity
(in MVA)

Availability of land

Barh-2

2x10

Proposal Laying at DM
office

Parsa-Bazaar

2x10

Land Acquired on dated


15.05.2014

Present Capacity
(in MVA)
3x5MVA
2 X 5 MVA + 1 X 3.15 MVA
2 X 5 MVA + 1 X 3.15 MVA

Proposed Capacity
(in MVA)
1X10+2x5=20
1X10+1x5+1x3.15=18.15
2X10+1x3.15=23.15

Total No. of Augmentation PSS in scope:-12 nos.


Sl. No.

Name of PSS

1
2
3

Masaurhi New PSS


Kura Nawada PSS.
Sampatchak PSS-

4
5
6
7
8
9
10
12
13

Air-Force PSS.
Bihta-old PSS
Paliganj PSS
Mokama PSS
Fatuha PSS
Barh PSS
Hatidah PSS
Sabalpur
Bakhtiyarpur

2x5+1x1.6 MVA
2 X 5 MVA + 2X 3.15 MVA
1x5+2x3.15 MVA
2 X 5 MVA
3 X 5 MVA + 1 X 10 MVA
5 X 5MVA
3x5+1x3.15MVA MVA

1X10+1x5 +1x1.6=16.6
1X10+1x5+2x3.15=21.3
1X10+2x3.15=13.15
1X10+1x5=15
3X10+1X5=35
1X10+4X5=30
1X10+2X5+1x3.15=23.15

ny Limited:Patna
ecial Plan(BRGF) Phase-I
Date:- 26.03.15

GF) Phase I
Current work status

Work started at Parsa Bazar New PSS- 1),Boundary wall completed ,control
room , gaurd room,
roof casting , perapet work Completed & Equipment
foundation of 33 KV side has been completed upto Power Transformer
remaing 11 KV side under progress

Current work status


Installed (1 No.)
Installed (1 No.)
Installed (1 No.)

Installed (1 No.)
Installed
Installed
Installed
Installed
Installed
Installed
Installed

(1
(1
(2
(1
(1
(1
(1

No.)
No.)
No.)
No.)
No.)
No.)
No.)

South Bihar Power Distribution Company Limited:Patna


Achievement Vs Target(Supply + Erection ) for (New & R&M Works) under Special Plan(BRGF) Phase II

Name of Agency: M/s Supreme-VPIL JV


Districts: Patna
LOA No & Date: 583 & 584 Date :-25.02.14
Date of Agreement/Effective date: 03.04.14
Award Cost- 207.3 Crore

Date of Completion

04.10.2015

Progress Report of Special Plan(BRGF) Phase II


Total No. of New PSS in scope:- 1 nos.
Sl. No.

Name of new PSS

Devkuli

Capacity
(in MVA)
2x10

Availability of land
Proposal lying with DM

Total No. of Augmentation PSS in scope:- 05 nos.


Sl. No.

Name of PSS

Present Capacity
(in MVA)

Proposed Capacity
(in MVA)

1
2
3

Fatuha PSS
Biharibigha PSS
kanpa PSS

3 X 5 MVA + 1 X 10 MVA
1 X 5 MVA + 1 X 3.15 MVA
2 X 3. 15 MVA + 1 X 1.6 MVA

2X10+2X5=30
2X5=10
3X3.15=9.45

Additional Power Transformer

1
2

Dhanarua PSS
kewta Dariyapur PSS

2x3.15 MVA
1 X3.1 5 MVA

Page 5 of 90

1x10+2X3.15=16.30
1X5+1X3.15=8.15

tna
ial Plan(BRGF) Phase II
Date:- 26.03.15

04.10.2015
II

Current work status

os.
Current work status

Installed (1 No.)

Installed (1 No.)

Page 6 of 90

South Bihar Power Distribution Company Limited:Patna


Achievement Vs Target(Supply + Erection ) for (New & R&M Works) under Special Plan(B
Name of Agency: M/s East India Udyog limited,Ghaziabad
Districts:

Nalanda

LOA No & Date: 1483 & 1484 Date :-29.11.13


Date of Agreement/Effective date: 23.01.14
Package Cost: 95.98 Crores
Total No. of Augmentation PSS in scope:- 05 nos.

Sl. No.

Name of PSS

Present Capacity
(in MVA)

Proposed Capacity
(in MVA)

Nalanda

3x5+1x3.15 MVA

1X10+2X5+1x3.15=23.15

2
3
4
5

Rajgir PSS- 01 Nos.


Ekangersarai PSS- 01 Nos
Chandi PSS- 01 Nos.
Raitar PSS- 01 nos.

3x5MVA+1x10 MVA
2 X 5 MVA
1X5+1x3.15
2 X 5 MVA

2X10+2X5=20
1X10+1X5=15
1X10+1X3.15=13.15
1x10+1X5=15

Page 7 of 90

:Patna
der Special Plan(BRGF) Phase-I
Date:- 26.03.15

Current work status

Installed (1 No.)
Installed
Installed
Installed
Installed

(1 No.)
(1 No.)
(1 No.)
(1 No.)

3*5MVA,1*3.15MVA

Page 8 of 90

Page 9 of 90

South Bihar Power Distribution Company Limited:Patna


Achievement Vs Target(Supply + Erection ) for (New & R&M Works) under Special Plan(BRGF) PhaseName of Agency: M/s GOPIKRISHNA INFRASTRUCTURE PVT. LTD

Districts: Nalanda
LOA No & Date: 581 & 582 Date :-25.02.14
Date of Agreement/Effective date: 24.04.14
Award Cost-168.6 Crore

23.10.2015

Date of Completion

Total No. of Augmentation PSS in scope:- 02 nos.


Sl. No.

Name of PSS

Present Capacity
(in MVA)

Proposed Capacity
(in MVA)

Nalanda PSS

3 X 5 MVA + 1 X 3.15 MVA

1X10+2X5+1X3.15=23.15

Silao PSS

2X 3.15 MVA

1X5+1X3.15=8.15

3
4

Islampur PSS
Dhamauli PSS

Additional Power Transformer - 2 nos.


1 X 5 MVA + 1X 3.15 MVA
1X10+1X5+1X3.15=18.15
1 x 3.15 MVA
1X5+1X3.15=8.15

Page 10 of 90

cial Plan(BRGF) Phase-II

Date:- 26.03.15

.
Current work status

Page 11 of 90

Page 12 of 90

South Bihar Power Distribution Company Limited:Patna


Achievement Vs Target for (Supply &Erection) (New & R&M Works) under Special Plan(BRG
Name of Agency: M/s GKC -APL joint venture,Hydrabad
Districts:

Gaya

LOA No & Date: 1545 & 1546 Date :-09.12.13


Date of Agreement/Effective date: 07.01.14
Package Cost: 85.20 Crores
R&M Work

7 Months

NEW Work

10 Months

Date of Completion

Progress Report of Special Plan(BRGF) Phase I


Total No. of Augmentation PSS in scope:- 2 nos.
Proposed
Capacity
(in MVA)

Sl. No.

Name of PSS

Present Capacity
(in MVA)

Tekari PSS

2 X 5 MVA

1X10+1X5=15

Belaganj PSS

2 X 5 MVA

1X10+1X5=15

Page 13 of 90

y Limited:Patna
rks) under Special Plan(BRGF) Phase-I
Date:- 26.03.15

06.08.2014
06.11.2014

RGF) Phase I

ope:- 2 nos.
Current work status

Installed (1 No.)
Installed (1 No.)

Page 14 of 90

South Bihar Power Distribution Company Limited:Patna


Achievement Vs Target for (Supply &Erection) (New & R&M Works) under Special Plan(BRGF) Phase-II

Date:- 26.03.15

Name of Agency: M/s Shirdi Sai Electricals Limited.


Districts:

GAYA

LOA No & Date: 585 & 586 Date :-25.02.14


Date of Agreement/Effective date: 05.04.14
Award Cost-170.04 Crore

Date of Completion

01.10.2015

Progress Report of Special Plan(BRGF) Phase II


Total No. of Augmentation PSS in scope:- Nil

Sl. No.

Name of PSS

NIL

Present
Capacity
(in MVA)

Proposed
Capacity
(in MVA)

Page 15 of 90

Current work status

South Bihar Power Distribution Company Limited:Patna


Achievement Vs Target for (Supply &Erection) (New & R&M Works) under Special Plan(BRGF) Pha
Name of Agency: M/s GKC -APL joint venture,Hydrabad
Districts:

Nawada

LOA No & Date: 1545 & 1546 Date :-09.12.13


Date of Agreement/Effective date: 07.01.14
Package Cost: 85.20 Crores

Date of Completion

R&M Work

7 Months

NEW Work

10 Months

Progress Report of Special Plan(BRGF) Phase I

Total No. of New PSS in scope:- 2 nos.


Sl. No.

Name of new PSS

Capacity
(in MVA)

Availability of land

Majhwe

2x10

Land Made available

Mayabigha

2x10

Land Made available

Total No. of Augmentation PSS in scope:- 1 nos.

Sl. No.

Name of PSS

Present Capacity
(in MVA)

Page 16 of 90

Proposed Capacity
(in MVA)

Govindpur PSS

2 x 3.15 MVA

Page 17 of 90

2x5=10

Patna
r Special Plan(BRGF) Phase-I

Date:- 26.03.15

06.08.2014
06.11.2014

ase I

os.
Current work status

Boundary wall work


Completed,MS Angle fixing &
Plastering Under Process
Boundary wall work
Completed,MS Angle fixing &
Plastering Under Process

os.

Current work status

Page 18 of 90

Page 19 of 90

South Bihar Power Distribution Company Limited:Patna


Achievement Vs Target for (Supply &Erection) (New & R&M Works) under Specia
Name of Agency: M/s GOPIKRISHNA INFRASTRUCTURE PVT. LTD
Districts: Nawada
LOA No & Date: 581 & 582 Date :-25.02.14
Date of Agreement/Effective date: 24.04.14
Award Cost-168.6 Crore
Date of Completion
Total No. of Augmentation PSS in scope:- 5 nos.
Sl. No.

Name of PSS

1
2
3

Rajauli PSS
Hisua PSS
Kauakol PSS

4
5

Nawada New PSS


orhanpur PSS

Present Capacity
(in MVA)
2 X 5 MVA
1x3.15
1 X 1.65 + 1 X 3.15
Additional Power transformer
1 X 5 MVA + 1 X 10 MVA
1 X 5 MVA

Page 20 of 90

tion Company Limited:Patna


w & R&M Works) under Special Plan(BRGF) Phase-II
Date:- 26.03.15

E PVT. LTD

23.10.2015

ion PSS in scope:- 5 nos.


Proposed Capacity
(in MVA)

Current work status

1X10+1X5=15
1x5=5
2X3.15=6.3
nal Power transformer
2x10+1X5=25
2x5=10

Page 21 of 90

South Bihar Power Distribution Company Limited:Patna


Achievement Vs Target for (Supply &Erection) (New & R&M Works) under Special Plan(B
Name of Agency: M/s GKC -APL joint venture,Hydrabad
Districts:

Jahanabad

LOA No & Date: 1545 & 1546 Date :-09.12.13


Date of Agreement/Effective date: 07.01.14
Package Cost: 85.20 Crores

Date of Completion

R&M Work

7 Months

NEW Work

10 Months

Progress Report of Special Plan(BRGF) Phase I

Total No. of New PSS in scope:- 1


Sl. No.

Name of new PSS

Dakshini Jehanabad

Capacity
(in MVA)

2x10 MVA

Availability of land

Land made available11.09.2014

Total No. of Augmentation PSS in scope:- 5


Sl. No.

Name of PSS

Present Capacity
(in MVA)

Proposed Capacity
(in MVA)

Jehanabad PSS-01 Nos.

3X 5 MVA

1X10+2X5=25

Page 22 of 90

Erki PSS- 01 Nos.

2 X 5 MVA

1X10+1X5=15

Makhdumpur PSS- 01 Nos

1 X 5 MVA + 1 X 3.15 MVA

1X10+1X3.15=13.15

4
5

Kako PSS- 01 Nos.


Sakurabad PSS- 02 Nos

1X3.15 MVA
2X 3.15 MVA

1X5=5
2X5=10

Tehta PSS-1 No.

Page 23 of 90

d:Patna
der Special Plan(BRGF) Phase-I
Date:- 26.03.15

06.08.2014
06.11.2014

Phase I

Current work status

Boundary wall of PSS Completed. Equipment foundation of 33 KV


side has been completed upto transformer remaining 11 KV side
equipment foundations under progress & construction of control
room under progress .

Current work status


Installed (1 No.)
Page 24 of 90

Installed (1 No.)
Installed (2 No.), (10MVA-1 No., 5MVA-1No.)

Installed (5MVA-1No.)

Page 25 of 90

South Bihar Power Distribution Company Limited:Patna


Achievement Vs Target for (Supply &Erection) (New & R&M Works) under Special Plan(BRGF) Phas
Name of Agency: M/s
Districts:

Jahanabad

LOA No & Date:


Date of Agreement/Effective date:
Package Cost:
Date of Completion

Progress Report of Special Plan(BRGF) Phase II

Total No. of New PSS in scope:- 1


Sl. No.

Name of new
PSS

NIL

Capacity
(in MVA)

Availability of land

Total No. of Augmentation PSS in scope:- Nil

Sl. No.

Name of PSS

NIL

Present Capacity
(in MVA)

Proposed Capacity
(in MVA)

Page 26 of 90

Plan(BRGF) Phase-II
Date:- 26.03.15

Current work status

Current work status

Page 27 of 90

South Bihar Power Distribution Company Limited:Patna Achievement Vs Target for Erection
(New & R&M Works) under Special Plan(BRGF) Phase-I
Name of Agency: M/s Supreme & co.-Utkal Glavanizers JV Kolkata

Districts:

Arwal

LOA No & Date: 1689 & 1690 Date :-26.12.13


Date of Agreement/Effective date: 03.02.14
Package Cost: 64.33 Crores
Date of Completion

R&M Work

7 Months

NEW Work

10 Months

Total No. of Augmentation PSS in scope:- 2 nos.


Sl. No.

Name of PSS

Present Capacity
(in MVA)

Proposed
Capacity
(in MVA)

Arwal PSS

2 X 3.15 MVA

2X5

Ataullah PSS
Kurtha PSS

2 X 3.15 MVA
1 X 3.15 MVA

2X5
1X5

Page 28 of 90

chievement Vs Target for Erection


(BRGF) Phase-I
Date:- 26.03.15

02.09.2014
02.12.2014

ope:- 2 nos.
Current work status
Installed (2 No. 5 MVA)
Installed (2 No . 5 MVA)

Page 29 of 90

South Bihar Power Distribution Company Limited:Patna Achievement Vs Target for


Erection (New & R&M Works) under Special Plan(BRGF) Phase-II
Name of Agency: M/s Supreme & co.-Utkal Glavanizers JV Kolkata

Districts:

Arwal

LOA No & Date: 1689 & 1690 Date :-26.12.13


Date of Agreement/Effective date: 03.02.14
Package Cost: 64.33 Crores
Date of Completion

Progress Report of Special Plan(BRGF) Phase II


Total No. of New PSS in scope:- Nil
Sl. No.

Name of new PSS

NIL

Capacity
(in MVA)

Availability of
land

Total No. of Augmentation PSS in scope:- Nil


Sl. No.

Name of PSS

NIL

Present
Capacity
(in MVA)

Page 30 of 90

Proposed
Capacity
(in MVA)

Patna Achievement Vs Target for


cial Plan(BRGF) Phase-II
Date:- 26.03.15

(BRGF) Phase II
Current work status

in scope:- Nil
Current work status

Page 31 of 90

South Bihar Power Distribution Company Limited:Patna Achievement Vs Target for Erection (
under Special Plan(BRGF) Phase-I
Name of Agency: M/s Supreme & co.-Utkal Glavanizers JV Kolkata

Districts: Aurangabad
LOA No & Date: 1689 & 1690 Date :-26.12.13
Date of Agreement/Effective date: 03.02.14
Package Cost: 64.33 Crores
R&M Work

7 Months

NEW Work

10 Months

Date of Completion

Progress Report of Special Plan(BRGF) Phase I


Total No. of New PSS in scope:- 01
Sl. No.

Name of new PSS

Capacity
(in MVA)

G.T. Road

2x10

Availability of land

Land Acquired by 07.11.2014

2
Total No. of Augmentation PSS in scope:- 07

Sl. No.

Name of PSS

Present Capacity
(in MVA)

Proposed Capacity
(in MVA)

Aurangabad PSS-01 Nos.

4x5 MVA

1X10+3x5=25

Rafiganj PSS- 01 Nos.

2 X 5 MVA

1X10+1X5=15

Page 32 of 90

Barun PSS- 01 Nos

1X10+1X5+1X3.15=18.15

Amba PSS- 01 Nos.

2 X 5 MVA + 1 X 3.15 MVA


2 X 3.15 MVA

Madanpur PSS- 01 Nos.

1 x 3.15 MVA

1x5=5

Nabinagar PSS- 01 Nos.

1 X 5MVA + 1 X 1.6 MVA

2x5=10

Gangti

2 x 3.15 MVA

1 x 3.15+1x5=8.15

Page 33 of 90

1x5+1X3.15=8.15

rget for Erection (New & R&M Works)


Date:- 26.03.15

02.09.2014
02.12.2014

se I

Current work status


Soil Testing and Contour
Survey done

Current work status

Installed (1 No. 10 MVA)


Installed (1 No. 10 MVA)
Page 34 of 90

Installed (1 No. 10 MVA)

Installed (1 No. 5 MVA)

Page 35 of 90

South Bihar Power Distribution Company Limited:Patna Achievement Vs Target for Erection (New & R&M
Works) under Special Plan(BRGF) Phase-II

Name of Agency: M/s Supreme & co.-Utkal Glavanizers JV Kolkata


Districts: Aurangabad
LOA No & Date: 1689 & 1690 Date :-26.12.13
Date of Agreement/Effective date: 03.02.14
Package Cost: 64.33 Crores
Date of Completion

Progress Report of Special Plan(BRGF) Phase II


Total No. of New PSS in scope:- 03
Sl. No.

Name of
new PSS

Capacity
(in MVA)

Availability of land

Bairiya

2x10

NOC issued by CO, Nabinagar on dated-07.11.2014.

Mali

2x5

DM Returned file to civil SDO

Deohara

2x5

Proposal Sent to Commissioner

Total No. of Augmentation PSS in scope:- Nil

Sl. No.

Name of
PSS

NIL

Present
Capacity
(in MVA)

Proposed Capacity
(in MVA)

t for Erection (New & R&M

Date:- 26.03.15

II

Current work status

Current work status

South Bihar Power Distribution Company Limited:Patna Achievement Vs Target (Supply


Plan(BRGF) Phase-I
Name of Agency: M/s Vijay Electricals Limited Hyderabad
Districts: Rohtas
LOA No & Date: 1487 & 1488 Date :-29.11.13
Date of Agreement/Effective date: 31.12.13
Package Cost: 97.64 Crores
Date of
Completion

R&M Work

7 Months

NEW Work

10 Months

Progress Report of Special Plan(BRGF) Phase I


Total No. of New PSS in scope:- 02
Sl. No.

Name of new PSS

Capacity
(in MVA)

S.P. Jain

2x10

Agrair

2x10

Total No. of Augmentation PSS in scope:Sl. No.

Present Capacity
(in MVA)

Name of PSS

Page 38 of 90

Beda PSS

4x5 MVA

2
3
4
5

Takiya PSS
BMP PSS
Bikramganj PSS
Akodhi-Gola PSS

2 x 5MVA+1 x10 MVA


3X5+1x10 MVA
1 x 3.15+2 x 5MVA
1x3.15+1x5

Indrapuri PSS

2x5+1x3.15+1x1.5 MVA

Kripabal

2 x 5+ 1 x 3.15MVA

8
11
12
13
14
15
16

Nokha
Dinara
Karbandhiya
Suryapur
Parsathua PSS
Naugain PSS
Chenari

1 x 3.15+1 x 5MVA
2 x 3.15
2x3.15 MVA
2 x 3.15
2 x 3.15
1 x 3.15+1 x 5MVA
1 x 3.15MVA+ 1 x 5MVA

Page 39 of 90

ement Vs Target (Supply + Erection ) for (New & R&M Works) under Special
(BRGF) Phase-I
Date:- 26.03.15

30.07.2014
30.10.2014

n(BRGF) Phase I

Availability of land

Current work status

Proposal Sent by DM to Commissioner vide letter No. 139 dated


27.1.2015.

Proposal sent from land & Revenue Department to CE irrigation


department, Dehri.

Dehri.

mentation PSS in scope:- 16


Proposed Capacity
(in MVA)

Current work status

Page 40 of 90

1x10+3x5=25
1x5+2x10=25
2x5+2x10=30
1x10+1x5+1X3.15=18.15
1X10+1x3.15=13.15

Installed (1 No.)
Installed
Installed
Installed
Installed

(1
(1
(1
(1

No.)
No.)
No.)
No.)

3x5+1x3.15=18.15
1x10+1x5+1x3.15=18.15

Installed (1 No.)

1x10 +1x3.15=13.15
1x10+1x3.15=13.15
1x5+1x3.15=8.15
2x5=10
2x5=10
2x5=10
1x10+1x5=15

Installed (1 No.)
Installed (1 No.)

Installed (1 No.)

Page 41 of 90

South Bihar Power Distribution Company Limited:Patna Achievement Vs Target (Supply + Erection ) for (New &

Name of Agency: M/s Shirdi Sai Electricals Limited.


Districts:
ROHTAS
LOA No & Date: 585 & 586 Date :-25.02.14
Date of Agreement/Effective date: 05.04.14
Award Cost-170.04 Crore
Date of Completion - 01.10.2015

Progress Report of Special Plan(BRGF) Phase II


Total No. of New PSS in scope:- 02
Sl. No.

Name of new PSS

Matrayan

Natwar

Capacity
(in MVA)

Availability of land

Land Acquired on dated 25.07.14

2x10

Proposal returned from


Commissioner to DM with query

2x5

Total No. of Augmentation PSS in scope:- 3


Sl. No.

Name of PSS

Present Capacity
(in MVA)

Proposed Capacity
(in MVA)

BMP

Indrapuri

Kochas

2x5 +2x10 MVA

1x5+3x10 MVA

2x5+1x3.15+1x1.5 MVA

2X5+2X3.15=16.30

2x5+ 1x3.15 MVA

3x5=15 MVA

Additional Power Transform


1

Nokha

1x10+1x3.15 MVA

2x10+1x3.15 MVA

Kochas

2x5+1x3.15 MVA

3x5+1x3.15 MVA

) for (New & R&M Works) under Special Plan(BRGF) Phase-II

Date:- 26.03.15

hase II

Current work status


Boundary Wall completed , structure foundation under progress
& pit excavation of Control room going on.

3
Current work status

nsformer

South Bihar Power Distribution Company Limited:Patna Achievement Vs Target (


Name of Agency: M/s Vijay Electricals Limited Hyderabad
Districts:
Kaimur
LOA No & Date: 1487 & 1488 Date :-29.11.13
Date of Agreement/Effective date: 31.12.13
Package Cost: 97.64 Crores
Date of Completion

Total No. of Augmentat


Sl. No.

Name of PSS

1
2
3

Mohaniya PSS
Ramgarh PSS
Nuaon PSS

Kalyanpur PSS

Chaurasia PSS

Kudra PSS

Bhabhua New
Page 46 of 90

Chainpur

Karmchak

Page 47 of 90

chievement Vs Target (Supply + Erection ) for (New & R&M Works) under Special Plan(BRG

R&M Work

7 Months

NEW Work

10 Months

Total No. of Augmentation PSS in scope:- 09


Present Capacity
(in MVA)

Proposed Capacity
(in MVA)

3X5
3X5
2X3.15

1X10+2X5=20
1X10+2X5=20
1X5+1X3.15=8.15

1X3.15

1X5=5

1X3.15

1X5=5

3x5

1x10+2X5=20

2x5

1x10+1X5=15
Page 48 of 90

2X3.15

2x5=10

1x1.6

1x5=5

Page 49 of 90

under Special Plan(BRGF) Phase-I


Date:- 26.03.15

30.07.2014
30.10.2014

Current work status


Installed (1 Nos.)
Installed (1 Nos.)

Installed (1 Nos.)
Installed (1 Nos.)
Page 50 of 90

Page 51 of 90

South Bihar Power Distribution Company Limited:Patna Achievement Vs Target


(Supply + Erection ) for (New & R&M Works) under Special Plan(BRGF) Phase-II
Name of Agency: M/s Vijay Electricals Limited Hyderabad
Districts:

Kaimur

LOA No & Date: 1487 & 1488 Date :-29.11.13


Date of Agreement/Effective date: 31.12.13
Package Cost: 97.64 Crores
Date of Completion

Progress Report of Special Plan(BRGF) Phase II


Total No. of New PSS in scope:- 04
Sl. No.

Name of new PSS

Sarhaulla

Bhagwanpur

Pusauli-2

Kalani

Capacity
(in MVA)
2x10

Availability of land

Proposal with Commissioner

Land Acquired

2x10
2x10

2X5

Proposal with Commissioner

Proposal with Commissioner

Total No. of Augmentation PSS in scope:- Nil


Page 52 of 90

Sl. No.

Name of PSS

NIL

Present
Capacity
(in MVA)

Proposed Capacity
(in MVA)

Page 53 of 90

imited:Patna Achievement Vs Target


s) under Special Plan(BRGF) Phase-II
Date:- 26.03.15

Plan(BRGF) Phase II
Current work status
Commissioner returned proposal to
DM with letter no. 1148 dt.30.07.14

Land Acquired
Commissioner returned proposal to
DM with letter no. 1149 dt.30.07.14
Commissioner returned proposal to
DM with letter no. 1150 dt.30.07.14

Page 54 of 90

Current work status

Page 55 of 90

South Bihar Power Distribution C


Achievement Vs Target (Supply + Erection ) for (New & R
Name of Agency: M/s Bajaj Electricals Limited: Mumbai
Districts:
Bhojpur
LOA No & Date: 1485& 1486 dated 29.11.2013
Date of Agreement/Effective date: 31.12.2013
Package Cost: 65.45 Crores
Total No. of Augmentation
Sl. No.

Name of PSS

Koilwar PSS

Bihiya PSS

SHAHPUR

Zero-mile PSS

Garhani PSS.

Sandash PSS

Terari PSS

Saraiya PSS

Japani-farm PSS

Page 56 of 90

South Bihar Power Distribution Company Limited:Patna


ent Vs Target (Supply + Erection ) for (New & R&M Works) under Special Plan(BRGF) Phas

icals Limited: Mumbai

d 29.11.2013

: 31.12.2013
Total No. of Augmentation PSS in scope:- 9
Present Capacity
(in MVA)

Proposed Capacity
(in MVA)

( 2 x 5+ 1X3.15)MVA

1X10+2x5=30

2 X 5 MVA

2X10=20

( 2 x 3.15) MVA

1x10+1x3.15=13.15

2 X 5 MVA

1x10+1X5=15

(1 x3.15 + 1x 1.6)MVA

1X5+1x1.6=6.6

(2 x 3.15 )

1X5+1x3.15=8.15

( 2 x 3.15 )MVA

2X5=10

( 1 x 5 + 2 X10 )MVA

3X10=30

Page 57 of 90

Plan(BRGF) Phase-I
Date:- 26.03.15

Current work status


Installed ( 1 Nos.)
Installed ( 2 Nos.)
Installed (1 No.)
Installed (1 No.)
Installed (1 No.)
5 MVA Installed (1 No.)

Page 58 of 90

South Bihar Power Distribution Company Limited:Patna


Achievement Vs Target (Supply + Erection ) for (New & R&M Works) under Special Plan(BRGF) Phase-II

Name of Agency: M/s Supreme-VPIL JV


Districts: Bhojpur
LOA No & Date: 583 & 584 Date :-25.02.14
Date of Agreement/Effective date: 03.04.14
Award Cost- 207.3 Crore
Date of Completion

16.10.2015

Total No. of Augmentation PSS in scope:- 02


Sl. No.

Name of PSS

Present Capacity
(in MVA)

Proposed Capacity
(in MVA)

Piro PSS

1 x 5 + 1x3.15 MVA

Garhani PSS

1X3.15

1X10+1x3.15=13.5
1X5=5

Additional Power Transformer


1
2

Gidha PSS
Shahpur PSS

4 X 5MVA

4 X 5 + 1X10 =30

2 x 3.15 MVA

1 X 5 + 2 X 3.15 = 11.30

Page 59 of 90

d:Patna
der Special Plan(BRGF) Phase-II

Date:- 26.03.15

16.10.2015
02
Current work status

Installed (1 No. 10 MVA)

Received

Page 60 of 90

South Bihar Power Distribution Company Limited:Patna


Achievement Vs Target (Supply + Erection ) for (New & R&M Works) under Special Plan(BRGF)
Name of Agency: M/s Bajaj Electricals Limited: Mumbai
Districts:

Buxar

LOA No & Date: 1485& 1486 dated 29.11.2013


Date of Agreement/Effective date: 31.12.2013
Package Cost: 65.45 Crores

Date of Completion

Progress Report of Special Plan(BRGF) Phase I


Total No. of New PSS in scope:- 02
Sl. No.

Name of new PSS

Pratapsagar

Capacity
(in MVA)

2x10

Availability of land

Land Available

Total No. of Augmentation PSS in scope:- 02


Sl. No.

Name of PSS

Present Capacity
(in MVA)

Proposed Capacity
(in MVA)

Simri

( 2 X 3.15)MVA

1X10+1X5=15

Dumraon

(2x5MVA)

1X10 + 1x 5 =15

Murar

1 X 3.15 MVA

1x5=5

Chausa

2 X 1.6 + 1X 3.15 MVA

1x5+2x1.6=8.2

Limited:Patna
ks) under Special Plan(BRGF) Phase-I

Date:- 26.03.15

RGF) Phase I
Current work status

Soil testing & Contour Survey done. Boundary wall,


stricture & equipment foundation & control room work
started simultaneously , Boundary wall completed 0.5
meter from ground level

scope:- 02
Current work status

5 MVA & 10 MVA Installed (1 No.)


Installed (1 No. 10 MVA)
Installed (1 No. 10 MVA)

Installed (1 No. 10 MVA)

South Bihar Power Distribution Company Limited:Patna


Achievement Vs Target (Supply + Erection ) for (New & R&M Works) under Special Plan(BRGF)
Phase-II

Date:- 26.03.15

Name of Agency: M/s Bajaj Electricals Limited: Mumbai


Districts: Buxar
LOA No & Date: 1485& 1486 dated 29.11.2013
Date of Agreement/Effective date: 31.12.2013
Package Cost: 65.45 Crores

Date of Completion

Progress Report of Special Plan(BRGF) Phase II


Total No. of New PSS in scope:- 02
Sl. No.

Name of new PSS

Rajpur

Kesath

Capacity
(in MVA)

Availability of land Current work status


Land Acquired

2x5
2x5

Proposal lying With DM

Total No. of Augmentation PSS in scope:- Nil

Sl. No.

Name of PSS

NIL

Present
Capacity
(in MVA)

Proposed Capacity
Current work status
(in MVA)

Page 65 of 90

South Bihar Power Distribution Company Limited:Patna


Achievement Vs Target for (Supply &Erection) (New & R&M Works) under Special Plan(BRGF) Phase-I

Name of Agency: M/s Bajaj Electricals Limited: Mumbai


Districts:

Bhagalpur

LOA No & Date: 1543 & 1544 dated 09.12.2013


Date of Agreement/Effective date: 31.12.2013
Package Cost: 86.51 Crores
R&M Work
NEW Work

Date of Completion

7 Months
10 Months

Progress Report of Special Plan(BRGF) Phase I


Total No. of New PSS in scope:- 01
Sl. No.

Name of new PSS

Capacity
(in MVA)

Availability of land

Dogachhi

2X10

Under Identification

Total No. of Augmentation PSS in scope:- 3 Nos.


Sl. No.

Name of PSS

Present Capacity
(in MVA)

Proposed Capacity
(in MVA)

Sultanganj PSS

3 X 5 MVA

1X10+2X5=20

Bihpur PSS

2 X 3. 15 MVA

1X5+1X3.15=8.15

Naugachiya

2X5+1X3.15MVA

1x10+1x5+1x3.15 =18.15

Page 66 of 90

Power Distribution Company Limited:Patna


&Erection) (New & R&M Works) under Special Plan(BRGF) Phase-I

Date:- 26.03.15

30.07.2014
30.10.2014

port of Special Plan(BRGF) Phase I


Current work status

Current work status

Installed (1 No. 10 MVA)


Installed (1 No. MVA)
Installed (1 No. 10 MVA)

Page 67 of 90

South Bihar Power Distribution Company Limited:Patna


Achievement Vs Target for (Supply &Erection) (New & R&M Works) under Special Plan(BRGF) Phase-II

Name of Agency: M/s Bajaj Electricals Limited: Mumbai


Districts:

Date:- 26.03.15

Bhagalpur

LOA No & Date: 1543 & 1544 dated 09.12.2013


Date of Agreement/Effective date: 31.12.2013
Package Cost: 86.51 Crores
Date of Completion

Progress Report of Special Plan(BRGF) Phase II


Total No. of New PSS in scope:- 01
Sl. No.

Name of new PSS

Gopalpur

Capacity
(in MVA)

2x5
Total No. of Augmentation PSS in scope:- Nil
Sl. No.

1
2

Name of PSS

Present
Capacity
(in MVA)

Availability of land

Current work status

Letter has been sent by


DCLR for released of
payment.

Proposed Capacity
(in MVA)

NIL

Page 68 of 90

Current work status

South Bihar Power Distribution Company Limited:Patna


Achievement Vs Target for (Supply &Erection) (New & R&M Works) under Special Plan(BRGF) Phase-I

Date:- 26.03.15

Name of Agency: M/s Bajaj Electricals Limited: Mumbai


Districts:

Banka

LOA No & Date: 1543 & 1544 dated 09.12.2013


Date of Agreement/Effective date: 31.12.2013
Package Cost: 86.51 Crores
R&M Work

7 Months

30.07.2014

NEW Work

10 Months

30.10.2014

Date of Completion

Progress Report of Special Plan(BRGF) Phase I


Total No. of New PSS in scope:- 01
Sl. No.

Name of new PSS

Nehru colony

Capacity
(in MVA)
2X10

Availability of land

Current work status


Land Made Available

Proposal sent to
31.12.2015, Boundary wall
cabinet on 15.12.2014 piling complete

Total No. of Augmentation PSS in scope:- 1


Sl. No.

Name of PSS

Present
Capacity
(in MVA)

Proposed Capacity
(in MVA)

Chanan PSS- 01 Nos.

2 X 3. 15 MVA

1X5+1X3.15=8.15

Page 69 of 90

Current work status

South Bihar Power Distribution Company Limited:Patna


Achievement Vs Target for (Supply &Erection) (New & R&M Works) under Special Plan(BRGF) Phase-II

Date:- 26.03.15

Name of Agency: M/s GOPIKRISHNA INFRASTRUCTURE PVT. LTD


Districts: Banka
LOA No & Date: 581 & 582 Date :-25.02.14
Date of Agreement/Effective date: 24.04.14
Award Cost-168.6 Crore
Date of Completion

23.10.2015

Progress Report of Special Plan(BRGF) Phase II


Total No. of New PSS in scope:- Nil
Sl. No.

Name of new PSS

NIL

Capacity
(in MVA)

Availability of land

Current work status

Total No. of Augmentation PSS in scope:- Nil


Sl. No.

Name of PSS

NIL

Present
Capacity
(in MVA)

Proposed Capacity
(in MVA)

Page 70 of 90

Current work status

South Bihar Power Distribution Compa


Achievement Vs Target for (Supply &Erection) (New & R&M W

Name of Agency: M/s Bajaj Electricals Limited: Mumbai

Districts: Munger
LOA No & Date: 1543 & 1544 dated 09.12.2013
Date of Agreement/Effective date: 31.12.2013
Package Cost: 86.51 Crores
R&M Work
NEW Work

Date of Completion

Progress Report of Special Pla


Total No. of New PSS in scope:- 01
Sl. No.

Name of new PSS

Shankerpur PSS

Capacity
(in MVA)
2X10

Total No. of Augmentation PSS in scope:- 08 Nos.


Sl. No.

Name of PSS

Present Capacity
(in MVA)

1
2

Bariyarpur PSS
Tarapur PSS

1 X 5 MVA
2X5 MVA

Page 71 of 90

3
4
5
6
7
8

Karanchaura PSS
Bindwara PSS
Nandlalpur PSS
Safiabad PSS
Kaharagpur PSS
Dharhara PSS

Page 72 of 90

1 X 10 MVA + 2 X 5 MVA
2 X 5 MVA
2X5
2x5+2x3.15 MVA
2X3.15
2X3.15

ower Distribution Company Limited:Patna


Erection) (New & R&M Works) under Special Plan(BRGF) Phase-I

Date:- 26.03.15

7 Months
10 Months

30.07.2014
30.10.2014

t of Special Plan(BRGF) Phase I


Availability of land

Current work status

Made Available 07.05.2014 -(Boundary wall completed and


Land Made Available 07.05.2014 Land
control room, structure foundation, equipment foundation work under
progress.)

Proposed Capacity
(in MVA)

Current work status

1X10=10
1X10+1x5=15

Installed (1 No. 10 MVA)


Installed (1 No. 10 MVA)
Page 73 of 90

3X10=30
1X10+1X5=15
2X10=20
3x5+1x3.15 MVA
2X5=10
2X5=10

Installed (2 No. 10 MVA)


Installed (1 No. 10 MVA)
Installed (2 No. 10 MVA)

Page 74 of 90

South Bihar Power Distribution Company Limited:Patna


Achievement Vs Target for (Supply &Erection) (New & R&M Works) under Special Plan(BRGF) Phase-II

Name of Agency: M/s Bajaj Electricals Limited: Mumbai


Districts:

Munger

LOA No & Date: 1543 & 1544 dated 09.12.2013


Date of Agreement/Effective date: 31.12.2013
Package Cost: 86.51 Crores
Date of Completion

Progress Report of Special Plan(BRGF) Phase II

Total No. of New PSS in scope:- 01


Sl. No.

Name of new PSS

Safiabad-2 PSS

Capacity
(in MVA)
2x10

Availability of land
Land Identified

Total No. of Augmentation PSS in scope:- Nil


Sl. No.

Name of PSS

NIL

Present
Capacity
(in MVA)

Page 75 of 90

Proposed Capacity
(in MVA)

y Limited:Patna
ks) under Special Plan(BRGF) Phase-II

Date:- 26.03.15

RGF) Phase II

ope:- 01
Current work
status

in scope:- Nil
Current work
status

Page 76 of 90

South Bihar Power Distribution Company Limited:Patna


Achievement Vs Target (Supply + Erection ) for (New & R&M Works) under Special Plan(BRGF) Phase-I
Name of Agency: M/s Techno Fab gamon Joint Ventures Limited: New Delhi

Districts:

Lakhisarai

LOA No & Date: 2014-579 & 580 dated 25.02.14


Date of Agreement/Effective date: 27.03.14
Package Cost: 83.86 Crores
R&M Work

7 Months

NEW Work

10 Months

Date of Completion

Total No. of Augmentation PSS in scope:- 6

Sl. No.

Name of PSS

Present Capacity
(in MVA)

Proposed Capacity
(in MVA)

Karyanand nagar PSS

3 X 5 MVA

2X10+1x5=25

Salempur PSS

2 X 5 MVA

2X10=20

Barahiya PSS

1X5+1x3.15

1X10+1X3.15=13.15

4
5
6

Court Area PSS


Haibatganj PSS

1x3.15+1x10 MVA

2x10 MVA=20MVA

2 X 3. 15 MVA + 1 X 1.6 MVA

2X5+1X1.6=11.6
1X5+1X3.15=8.15

Aure PSS

2 X 3. 15 MVA

Page 77 of 90

atna
Special Plan(BRGF) Phase-I
Date:- 26.03.15

26.10.2014
26.01.2015

Current work status

Installed-01 No 10 MVA.
Installed-02 Nos 10 MVA.
Installed-01 No 10 MVA.
Installed-01 No 10 MVA.

Page 78 of 90

South Bihar Power Distribution Company Limited:Patna


Achievement Vs Target (Supply + Erection ) for (New & R&M Works) under Special Plan(BRGF) Phase-II
Name of Agency: M/s Techno Fab gamon Joint Ventures Limited: New Delhi
Districts:

Lakhisarai

LOA No & Date: 2014-579 & 580 dated 25.02.14


Date of Agreement/Effective date: 27.03.14
Package Cost: 83.86 Crores
Date of Completion

Progress Report of Special Plan(BRGF) Phase II


Total No. of New PSS in scope:- 01
Sl. No.

Name of new PSS

Pipariya

Capacity
(in MVA)
2x5

Availability of land
NOC Granted from DM

Total No. of Augmentation PSS in scope:- Nil


Sl. No.

Name of PSS

NIL

Present Capacity
(in MVA)

Page 79 of 90

Proposed Capacity
(in MVA)

d:Patna
er Special Plan(BRGF) Phase-II
Date:- 26.03.15

ase II

Current work status

Current work status

Page 80 of 90

South Bihar Power Distribution Company Limited:Pa


Achievement Vs Target (Supply + Erection ) for (New & R&M Works) under S
Name of Agency: M/s Techno Fab gamon Joint Ventures Limited: New Delhi

Districts:

Jamui

LOA No & Date: 2014-579 & 580 dated 25.02.14


Date of Agreement/Effective date: 27.03.14
Package Cost: 83.86 Crores
R&M Work

Date of Completion

NEW Work
Progress Report of Special Plan(BRGF) Phase I
Total No. of New PSS in scope:- 01

Sl. No.

Name of new PSS

Khairama PSS

Capacity
(in MVA)
2X10

Total No. of Augmentation PSS in scope:- 07


Sl. No.

Name of PSS

Present Capacity
(in MVA)

Jamui PSS-01 Nos.

3x5 + 1x 3.15 MVA


Page 81 of 90

2
3
4
5

Jhajha PSS- 01 Nos.


Khaira PSS- 02 Nos.
Laxmipur PSS- 02 Nos.
Sono PSS- 01 Nos.

1 X 5 MVA + 1 X 3.15 MVA


2 X 3.15 MVA
2 X 3.15 MVA
(1x5 + 1x 3.15 +1x1.6 MVA

Sikandra PSS- 01 Nos.

1x3.15 MVA

Chakai PSS- 01 Nos.

2 X 3.15 MVA

Page 82 of 90

ion Company Limited:Patna


w & R&M Works) under Special Plan(BRGF) Phase-I
Date:- 26.03.15

7 Months

26.10.2014

10 Months

26.01.2015

ial Plan(BRGF) Phase I

PSS in scope:- 01
Availability of land
Land made available

Current work status


Boundary wall and control room work
under progress

tion PSS in scope:- 07


Proposed Capacity
(in MVA)

Current work status

1X10+3X5=25
Page 83 of 90

1X10+1X5=15
2X5=10
2X5=10
3x5= 15

PTR Received

1x10=10

Installed-01 Nos.

1X5+1X3.15=8.15

Page 84 of 90

South Bihar Power Distribution Company Limited:Patna


Achievement Vs Target (Supply + Erection ) for (New & R&M Works) under Special Plan(BRGF) Phase-II
Name of Agency: M/s Techno Fab gamon Joint Ventures Limited: New Delhi
Districts: Jamui
LOA No & Date: 2014-579 & 580 dated 25.02.14
Date of Agreement/Effective date: 27.03.14
Package Cost: 83.86 Crores

Date of Completion

Progress Report of Special Plan(BRGF) Phase II


Total No. of New PSS in scope:- 01
Sl. No.

Name of new PSS

Jhajha-2 PSS

Capacity
(in MVA)
2x10

Availability of land
Letter lying with Commissioner

Total No. of Augmentation PSS in scope:- Nil


Sl. No.

Name of PSS

NIL

Present Capacity
(in MVA)

Page 85 of 90

Proposed Capacity
(in MVA)

Patna
er Special Plan(BRGF) Phase-II
Date:- 26.03.15

ase II

Current work status

Nil
Current work status

Page 86 of 90

South Bihar Power Distribution Company Limited:Patna


Achievement Vs Target (Supply + Erection ) for (New & R&M Works) under Special Plan(BRGF) Phase
Name of Agency: M/s Techno Fab gamon Joint Ventures Limited: New Delhi
Districts: Seikhpura
LOA No & Date: 2014-579 & 580 dated 25.02.14
Date of Agreement/Effective date: 27.03.14
Package Cost: 83.86 Crores
R&M Work

7 Months

NEW Work

10 Months

Date of Completion

Total No. of Augmentation PSS in scope:- 04


Sl. No.

Name of PSS

Present Capacity
(in MVA)

Proposed Capacity
(in MVA)

Sheikhpura PSS-01 Nos.

2 x 5+1 x 3.15 MVA

1X10+1X5+1x3.15=18.15

2
3
4

Ariyari PSS- 01 Nos.


Bhalua PSS- 01 Nos.

1 X 5 MVA
1 x 3.15 MVA

Onama PSS- 01 Nos.

2 X 3.15 MVA

1X10=10
1X5=5
1X5+1X3.15=8.15

Page 87 of 90

an(BRGF) Phase-I

Date:- 26.03.15

26.10.2014
26.01.2015

Current work status

Installed-01 Nos.
Installed-01 Nos.

Page 88 of 90

South Bihar Power Distribution Company Limited:Patna


Achievement Vs Target (Supply + Erection ) for (New & R&M Works) under Special Plan(BRGF) Phase-II
Name of Agency: M/s Techno Fab gamon Joint Ventures Limited: New Delhi

Districts: Seikhpura
LOA No & Date: 2014-579 & 580 dated 25.02.14
Date of Agreement/Effective date: 27.03.14
Package Cost: 83.86 Crores
Date of Completion

Progress Report of Special Plan(BRGF) Phase II


Total No. of New PSS in scope:- 01
Sl. No.

Name of new PSS

Kashera PSS

Capacity
(in MVA)
2x5

Availability of land
Land Acquired

Total No. of Augmentation PSS in scope:- Nil


Sl. No.

Name of PSS

NIL

Present
Capacity
(in MVA)

Page 89 of 90

Proposed Capacity
(in MVA)

d:Patna
der Special Plan(BRGF) Phase-II
Date:- 26.03.15

hase II
Current work status

Current work status

Page 90 of 90