Achievement Vs Target(Supply + Erection ) for (New & R&M Works) under Special Plan(
Name of Agency: M/s East India Udyog limited,Ghaziabad
Districts:
Patna
R&M Work
7 Months
22.08.2014
NEW Work
10 Months
22.11.2014
Capacity
(in MVA)
Availability of land
Barh-2
2x10
Proposal Laying at DM
office
Parsa-Bazaar
2x10
Present Capacity
(in MVA)
3x5MVA
2 X 5 MVA + 1 X 3.15 MVA
2 X 5 MVA + 1 X 3.15 MVA
Proposed Capacity
(in MVA)
1X10+2x5=20
1X10+1x5+1x3.15=18.15
2X10+1x3.15=23.15
Name of PSS
1
2
3
4
5
6
7
8
9
10
12
13
Air-Force PSS.
Bihta-old PSS
Paliganj PSS
Mokama PSS
Fatuha PSS
Barh PSS
Hatidah PSS
Sabalpur
Bakhtiyarpur
2x5+1x1.6 MVA
2 X 5 MVA + 2X 3.15 MVA
1x5+2x3.15 MVA
2 X 5 MVA
3 X 5 MVA + 1 X 10 MVA
5 X 5MVA
3x5+1x3.15MVA MVA
1X10+1x5 +1x1.6=16.6
1X10+1x5+2x3.15=21.3
1X10+2x3.15=13.15
1X10+1x5=15
3X10+1X5=35
1X10+4X5=30
1X10+2X5+1x3.15=23.15
ny Limited:Patna
ecial Plan(BRGF) Phase-I
Date:- 26.03.15
GF) Phase I
Current work status
Work started at Parsa Bazar New PSS- 1),Boundary wall completed ,control
room , gaurd room,
roof casting , perapet work Completed & Equipment
foundation of 33 KV side has been completed upto Power Transformer
remaing 11 KV side under progress
Installed (1 No.)
Installed
Installed
Installed
Installed
Installed
Installed
Installed
(1
(1
(2
(1
(1
(1
(1
No.)
No.)
No.)
No.)
No.)
No.)
No.)
Date of Completion
04.10.2015
Devkuli
Capacity
(in MVA)
2x10
Availability of land
Proposal lying with DM
Name of PSS
Present Capacity
(in MVA)
Proposed Capacity
(in MVA)
1
2
3
Fatuha PSS
Biharibigha PSS
kanpa PSS
3 X 5 MVA + 1 X 10 MVA
1 X 5 MVA + 1 X 3.15 MVA
2 X 3. 15 MVA + 1 X 1.6 MVA
2X10+2X5=30
2X5=10
3X3.15=9.45
1
2
Dhanarua PSS
kewta Dariyapur PSS
2x3.15 MVA
1 X3.1 5 MVA
Page 5 of 90
1x10+2X3.15=16.30
1X5+1X3.15=8.15
tna
ial Plan(BRGF) Phase II
Date:- 26.03.15
04.10.2015
II
os.
Current work status
Installed (1 No.)
Installed (1 No.)
Page 6 of 90
Nalanda
Sl. No.
Name of PSS
Present Capacity
(in MVA)
Proposed Capacity
(in MVA)
Nalanda
3x5+1x3.15 MVA
1X10+2X5+1x3.15=23.15
2
3
4
5
3x5MVA+1x10 MVA
2 X 5 MVA
1X5+1x3.15
2 X 5 MVA
2X10+2X5=20
1X10+1X5=15
1X10+1X3.15=13.15
1x10+1X5=15
Page 7 of 90
:Patna
der Special Plan(BRGF) Phase-I
Date:- 26.03.15
Installed (1 No.)
Installed
Installed
Installed
Installed
(1 No.)
(1 No.)
(1 No.)
(1 No.)
3*5MVA,1*3.15MVA
Page 8 of 90
Page 9 of 90
Districts: Nalanda
LOA No & Date: 581 & 582 Date :-25.02.14
Date of Agreement/Effective date: 24.04.14
Award Cost-168.6 Crore
23.10.2015
Date of Completion
Name of PSS
Present Capacity
(in MVA)
Proposed Capacity
(in MVA)
Nalanda PSS
1X10+2X5+1X3.15=23.15
Silao PSS
2X 3.15 MVA
1X5+1X3.15=8.15
3
4
Islampur PSS
Dhamauli PSS
Page 10 of 90
Date:- 26.03.15
.
Current work status
Page 11 of 90
Page 12 of 90
Gaya
7 Months
NEW Work
10 Months
Date of Completion
Sl. No.
Name of PSS
Present Capacity
(in MVA)
Tekari PSS
2 X 5 MVA
1X10+1X5=15
Belaganj PSS
2 X 5 MVA
1X10+1X5=15
Page 13 of 90
y Limited:Patna
rks) under Special Plan(BRGF) Phase-I
Date:- 26.03.15
06.08.2014
06.11.2014
RGF) Phase I
ope:- 2 nos.
Current work status
Installed (1 No.)
Installed (1 No.)
Page 14 of 90
Date:- 26.03.15
GAYA
Date of Completion
01.10.2015
Sl. No.
Name of PSS
NIL
Present
Capacity
(in MVA)
Proposed
Capacity
(in MVA)
Page 15 of 90
Nawada
Date of Completion
R&M Work
7 Months
NEW Work
10 Months
Capacity
(in MVA)
Availability of land
Majhwe
2x10
Mayabigha
2x10
Sl. No.
Name of PSS
Present Capacity
(in MVA)
Page 16 of 90
Proposed Capacity
(in MVA)
Govindpur PSS
2 x 3.15 MVA
Page 17 of 90
2x5=10
Patna
r Special Plan(BRGF) Phase-I
Date:- 26.03.15
06.08.2014
06.11.2014
ase I
os.
Current work status
os.
Page 18 of 90
Page 19 of 90
Name of PSS
1
2
3
Rajauli PSS
Hisua PSS
Kauakol PSS
4
5
Present Capacity
(in MVA)
2 X 5 MVA
1x3.15
1 X 1.65 + 1 X 3.15
Additional Power transformer
1 X 5 MVA + 1 X 10 MVA
1 X 5 MVA
Page 20 of 90
E PVT. LTD
23.10.2015
1X10+1X5=15
1x5=5
2X3.15=6.3
nal Power transformer
2x10+1X5=25
2x5=10
Page 21 of 90
Jahanabad
Date of Completion
R&M Work
7 Months
NEW Work
10 Months
Dakshini Jehanabad
Capacity
(in MVA)
2x10 MVA
Availability of land
Name of PSS
Present Capacity
(in MVA)
Proposed Capacity
(in MVA)
3X 5 MVA
1X10+2X5=25
Page 22 of 90
2 X 5 MVA
1X10+1X5=15
1X10+1X3.15=13.15
4
5
1X3.15 MVA
2X 3.15 MVA
1X5=5
2X5=10
Page 23 of 90
d:Patna
der Special Plan(BRGF) Phase-I
Date:- 26.03.15
06.08.2014
06.11.2014
Phase I
Installed (1 No.)
Installed (2 No.), (10MVA-1 No., 5MVA-1No.)
Installed (5MVA-1No.)
Page 25 of 90
Jahanabad
Name of new
PSS
NIL
Capacity
(in MVA)
Availability of land
Sl. No.
Name of PSS
NIL
Present Capacity
(in MVA)
Proposed Capacity
(in MVA)
Page 26 of 90
Plan(BRGF) Phase-II
Date:- 26.03.15
Page 27 of 90
South Bihar Power Distribution Company Limited:Patna Achievement Vs Target for Erection
(New & R&M Works) under Special Plan(BRGF) Phase-I
Name of Agency: M/s Supreme & co.-Utkal Glavanizers JV Kolkata
Districts:
Arwal
R&M Work
7 Months
NEW Work
10 Months
Name of PSS
Present Capacity
(in MVA)
Proposed
Capacity
(in MVA)
Arwal PSS
2 X 3.15 MVA
2X5
Ataullah PSS
Kurtha PSS
2 X 3.15 MVA
1 X 3.15 MVA
2X5
1X5
Page 28 of 90
02.09.2014
02.12.2014
ope:- 2 nos.
Current work status
Installed (2 No. 5 MVA)
Installed (2 No . 5 MVA)
Page 29 of 90
Districts:
Arwal
NIL
Capacity
(in MVA)
Availability of
land
Name of PSS
NIL
Present
Capacity
(in MVA)
Page 30 of 90
Proposed
Capacity
(in MVA)
(BRGF) Phase II
Current work status
in scope:- Nil
Current work status
Page 31 of 90
South Bihar Power Distribution Company Limited:Patna Achievement Vs Target for Erection (
under Special Plan(BRGF) Phase-I
Name of Agency: M/s Supreme & co.-Utkal Glavanizers JV Kolkata
Districts: Aurangabad
LOA No & Date: 1689 & 1690 Date :-26.12.13
Date of Agreement/Effective date: 03.02.14
Package Cost: 64.33 Crores
R&M Work
7 Months
NEW Work
10 Months
Date of Completion
Capacity
(in MVA)
G.T. Road
2x10
Availability of land
2
Total No. of Augmentation PSS in scope:- 07
Sl. No.
Name of PSS
Present Capacity
(in MVA)
Proposed Capacity
(in MVA)
4x5 MVA
1X10+3x5=25
2 X 5 MVA
1X10+1X5=15
Page 32 of 90
1X10+1X5+1X3.15=18.15
1 x 3.15 MVA
1x5=5
2x5=10
Gangti
2 x 3.15 MVA
1 x 3.15+1x5=8.15
Page 33 of 90
1x5+1X3.15=8.15
02.09.2014
02.12.2014
se I
Page 35 of 90
South Bihar Power Distribution Company Limited:Patna Achievement Vs Target for Erection (New & R&M
Works) under Special Plan(BRGF) Phase-II
Name of
new PSS
Capacity
(in MVA)
Availability of land
Bairiya
2x10
Mali
2x5
Deohara
2x5
Sl. No.
Name of
PSS
NIL
Present
Capacity
(in MVA)
Proposed Capacity
(in MVA)
Date:- 26.03.15
II
R&M Work
7 Months
NEW Work
10 Months
Capacity
(in MVA)
S.P. Jain
2x10
Agrair
2x10
Present Capacity
(in MVA)
Name of PSS
Page 38 of 90
Beda PSS
4x5 MVA
2
3
4
5
Takiya PSS
BMP PSS
Bikramganj PSS
Akodhi-Gola PSS
Indrapuri PSS
2x5+1x3.15+1x1.5 MVA
Kripabal
2 x 5+ 1 x 3.15MVA
8
11
12
13
14
15
16
Nokha
Dinara
Karbandhiya
Suryapur
Parsathua PSS
Naugain PSS
Chenari
1 x 3.15+1 x 5MVA
2 x 3.15
2x3.15 MVA
2 x 3.15
2 x 3.15
1 x 3.15+1 x 5MVA
1 x 3.15MVA+ 1 x 5MVA
Page 39 of 90
ement Vs Target (Supply + Erection ) for (New & R&M Works) under Special
(BRGF) Phase-I
Date:- 26.03.15
30.07.2014
30.10.2014
n(BRGF) Phase I
Availability of land
Dehri.
Page 40 of 90
1x10+3x5=25
1x5+2x10=25
2x5+2x10=30
1x10+1x5+1X3.15=18.15
1X10+1x3.15=13.15
Installed (1 No.)
Installed
Installed
Installed
Installed
(1
(1
(1
(1
No.)
No.)
No.)
No.)
3x5+1x3.15=18.15
1x10+1x5+1x3.15=18.15
Installed (1 No.)
1x10 +1x3.15=13.15
1x10+1x3.15=13.15
1x5+1x3.15=8.15
2x5=10
2x5=10
2x5=10
1x10+1x5=15
Installed (1 No.)
Installed (1 No.)
Installed (1 No.)
Page 41 of 90
South Bihar Power Distribution Company Limited:Patna Achievement Vs Target (Supply + Erection ) for (New &
Matrayan
Natwar
Capacity
(in MVA)
Availability of land
2x10
2x5
Name of PSS
Present Capacity
(in MVA)
Proposed Capacity
(in MVA)
BMP
Indrapuri
Kochas
1x5+3x10 MVA
2x5+1x3.15+1x1.5 MVA
2X5+2X3.15=16.30
3x5=15 MVA
Nokha
1x10+1x3.15 MVA
2x10+1x3.15 MVA
Kochas
2x5+1x3.15 MVA
3x5+1x3.15 MVA
Date:- 26.03.15
hase II
3
Current work status
nsformer
Name of PSS
1
2
3
Mohaniya PSS
Ramgarh PSS
Nuaon PSS
Kalyanpur PSS
Chaurasia PSS
Kudra PSS
Bhabhua New
Page 46 of 90
Chainpur
Karmchak
Page 47 of 90
chievement Vs Target (Supply + Erection ) for (New & R&M Works) under Special Plan(BRG
R&M Work
7 Months
NEW Work
10 Months
Proposed Capacity
(in MVA)
3X5
3X5
2X3.15
1X10+2X5=20
1X10+2X5=20
1X5+1X3.15=8.15
1X3.15
1X5=5
1X3.15
1X5=5
3x5
1x10+2X5=20
2x5
1x10+1X5=15
Page 48 of 90
2X3.15
2x5=10
1x1.6
1x5=5
Page 49 of 90
30.07.2014
30.10.2014
Installed (1 Nos.)
Installed (1 Nos.)
Page 50 of 90
Page 51 of 90
Kaimur
Sarhaulla
Bhagwanpur
Pusauli-2
Kalani
Capacity
(in MVA)
2x10
Availability of land
Land Acquired
2x10
2x10
2X5
Sl. No.
Name of PSS
NIL
Present
Capacity
(in MVA)
Proposed Capacity
(in MVA)
Page 53 of 90
Plan(BRGF) Phase II
Current work status
Commissioner returned proposal to
DM with letter no. 1148 dt.30.07.14
Land Acquired
Commissioner returned proposal to
DM with letter no. 1149 dt.30.07.14
Commissioner returned proposal to
DM with letter no. 1150 dt.30.07.14
Page 54 of 90
Page 55 of 90
Name of PSS
Koilwar PSS
Bihiya PSS
SHAHPUR
Zero-mile PSS
Garhani PSS.
Sandash PSS
Terari PSS
Saraiya PSS
Japani-farm PSS
Page 56 of 90
d 29.11.2013
: 31.12.2013
Total No. of Augmentation PSS in scope:- 9
Present Capacity
(in MVA)
Proposed Capacity
(in MVA)
( 2 x 5+ 1X3.15)MVA
1X10+2x5=30
2 X 5 MVA
2X10=20
( 2 x 3.15) MVA
1x10+1x3.15=13.15
2 X 5 MVA
1x10+1X5=15
(1 x3.15 + 1x 1.6)MVA
1X5+1x1.6=6.6
(2 x 3.15 )
1X5+1x3.15=8.15
( 2 x 3.15 )MVA
2X5=10
( 1 x 5 + 2 X10 )MVA
3X10=30
Page 57 of 90
Plan(BRGF) Phase-I
Date:- 26.03.15
Page 58 of 90
16.10.2015
Name of PSS
Present Capacity
(in MVA)
Proposed Capacity
(in MVA)
Piro PSS
1 x 5 + 1x3.15 MVA
Garhani PSS
1X3.15
1X10+1x3.15=13.5
1X5=5
Gidha PSS
Shahpur PSS
4 X 5MVA
4 X 5 + 1X10 =30
2 x 3.15 MVA
1 X 5 + 2 X 3.15 = 11.30
Page 59 of 90
d:Patna
der Special Plan(BRGF) Phase-II
Date:- 26.03.15
16.10.2015
02
Current work status
Received
Page 60 of 90
Buxar
Date of Completion
Pratapsagar
Capacity
(in MVA)
2x10
Availability of land
Land Available
Name of PSS
Present Capacity
(in MVA)
Proposed Capacity
(in MVA)
Simri
( 2 X 3.15)MVA
1X10+1X5=15
Dumraon
(2x5MVA)
1X10 + 1x 5 =15
Murar
1 X 3.15 MVA
1x5=5
Chausa
1x5+2x1.6=8.2
Limited:Patna
ks) under Special Plan(BRGF) Phase-I
Date:- 26.03.15
RGF) Phase I
Current work status
scope:- 02
Current work status
Date:- 26.03.15
Date of Completion
Rajpur
Kesath
Capacity
(in MVA)
2x5
2x5
Sl. No.
Name of PSS
NIL
Present
Capacity
(in MVA)
Proposed Capacity
Current work status
(in MVA)
Page 65 of 90
Bhagalpur
Date of Completion
7 Months
10 Months
Capacity
(in MVA)
Availability of land
Dogachhi
2X10
Under Identification
Name of PSS
Present Capacity
(in MVA)
Proposed Capacity
(in MVA)
Sultanganj PSS
3 X 5 MVA
1X10+2X5=20
Bihpur PSS
2 X 3. 15 MVA
1X5+1X3.15=8.15
Naugachiya
2X5+1X3.15MVA
1x10+1x5+1x3.15 =18.15
Page 66 of 90
Date:- 26.03.15
30.07.2014
30.10.2014
Page 67 of 90
Date:- 26.03.15
Bhagalpur
Gopalpur
Capacity
(in MVA)
2x5
Total No. of Augmentation PSS in scope:- Nil
Sl. No.
1
2
Name of PSS
Present
Capacity
(in MVA)
Availability of land
Proposed Capacity
(in MVA)
NIL
Page 68 of 90
Date:- 26.03.15
Banka
7 Months
30.07.2014
NEW Work
10 Months
30.10.2014
Date of Completion
Nehru colony
Capacity
(in MVA)
2X10
Availability of land
Proposal sent to
31.12.2015, Boundary wall
cabinet on 15.12.2014 piling complete
Name of PSS
Present
Capacity
(in MVA)
Proposed Capacity
(in MVA)
2 X 3. 15 MVA
1X5+1X3.15=8.15
Page 69 of 90
Date:- 26.03.15
23.10.2015
NIL
Capacity
(in MVA)
Availability of land
Name of PSS
NIL
Present
Capacity
(in MVA)
Proposed Capacity
(in MVA)
Page 70 of 90
Districts: Munger
LOA No & Date: 1543 & 1544 dated 09.12.2013
Date of Agreement/Effective date: 31.12.2013
Package Cost: 86.51 Crores
R&M Work
NEW Work
Date of Completion
Shankerpur PSS
Capacity
(in MVA)
2X10
Name of PSS
Present Capacity
(in MVA)
1
2
Bariyarpur PSS
Tarapur PSS
1 X 5 MVA
2X5 MVA
Page 71 of 90
3
4
5
6
7
8
Karanchaura PSS
Bindwara PSS
Nandlalpur PSS
Safiabad PSS
Kaharagpur PSS
Dharhara PSS
Page 72 of 90
1 X 10 MVA + 2 X 5 MVA
2 X 5 MVA
2X5
2x5+2x3.15 MVA
2X3.15
2X3.15
Date:- 26.03.15
7 Months
10 Months
30.07.2014
30.10.2014
Proposed Capacity
(in MVA)
1X10=10
1X10+1x5=15
3X10=30
1X10+1X5=15
2X10=20
3x5+1x3.15 MVA
2X5=10
2X5=10
Page 74 of 90
Munger
Safiabad-2 PSS
Capacity
(in MVA)
2x10
Availability of land
Land Identified
Name of PSS
NIL
Present
Capacity
(in MVA)
Page 75 of 90
Proposed Capacity
(in MVA)
y Limited:Patna
ks) under Special Plan(BRGF) Phase-II
Date:- 26.03.15
RGF) Phase II
ope:- 01
Current work
status
in scope:- Nil
Current work
status
Page 76 of 90
Districts:
Lakhisarai
7 Months
NEW Work
10 Months
Date of Completion
Sl. No.
Name of PSS
Present Capacity
(in MVA)
Proposed Capacity
(in MVA)
3 X 5 MVA
2X10+1x5=25
Salempur PSS
2 X 5 MVA
2X10=20
Barahiya PSS
1X5+1x3.15
1X10+1X3.15=13.15
4
5
6
1x3.15+1x10 MVA
2x10 MVA=20MVA
2X5+1X1.6=11.6
1X5+1X3.15=8.15
Aure PSS
2 X 3. 15 MVA
Page 77 of 90
atna
Special Plan(BRGF) Phase-I
Date:- 26.03.15
26.10.2014
26.01.2015
Installed-01 No 10 MVA.
Installed-02 Nos 10 MVA.
Installed-01 No 10 MVA.
Installed-01 No 10 MVA.
Page 78 of 90
Lakhisarai
Pipariya
Capacity
(in MVA)
2x5
Availability of land
NOC Granted from DM
Name of PSS
NIL
Present Capacity
(in MVA)
Page 79 of 90
Proposed Capacity
(in MVA)
d:Patna
er Special Plan(BRGF) Phase-II
Date:- 26.03.15
ase II
Page 80 of 90
Districts:
Jamui
Date of Completion
NEW Work
Progress Report of Special Plan(BRGF) Phase I
Total No. of New PSS in scope:- 01
Sl. No.
Khairama PSS
Capacity
(in MVA)
2X10
Name of PSS
Present Capacity
(in MVA)
2
3
4
5
1x3.15 MVA
2 X 3.15 MVA
Page 82 of 90
7 Months
26.10.2014
10 Months
26.01.2015
PSS in scope:- 01
Availability of land
Land made available
1X10+3X5=25
Page 83 of 90
1X10+1X5=15
2X5=10
2X5=10
3x5= 15
PTR Received
1x10=10
Installed-01 Nos.
1X5+1X3.15=8.15
Page 84 of 90
Date of Completion
Jhajha-2 PSS
Capacity
(in MVA)
2x10
Availability of land
Letter lying with Commissioner
Name of PSS
NIL
Present Capacity
(in MVA)
Page 85 of 90
Proposed Capacity
(in MVA)
Patna
er Special Plan(BRGF) Phase-II
Date:- 26.03.15
ase II
Nil
Current work status
Page 86 of 90
7 Months
NEW Work
10 Months
Date of Completion
Name of PSS
Present Capacity
(in MVA)
Proposed Capacity
(in MVA)
1X10+1X5+1x3.15=18.15
2
3
4
1 X 5 MVA
1 x 3.15 MVA
2 X 3.15 MVA
1X10=10
1X5=5
1X5+1X3.15=8.15
Page 87 of 90
an(BRGF) Phase-I
Date:- 26.03.15
26.10.2014
26.01.2015
Installed-01 Nos.
Installed-01 Nos.
Page 88 of 90
Districts: Seikhpura
LOA No & Date: 2014-579 & 580 dated 25.02.14
Date of Agreement/Effective date: 27.03.14
Package Cost: 83.86 Crores
Date of Completion
Kashera PSS
Capacity
(in MVA)
2x5
Availability of land
Land Acquired
Name of PSS
NIL
Present
Capacity
(in MVA)
Page 89 of 90
Proposed Capacity
(in MVA)
d:Patna
der Special Plan(BRGF) Phase-II
Date:- 26.03.15
hase II
Current work status