You are on page 1of 6

Logo

Adress

Check List of Erection Work


Project Name

Block Description :
Village Name

Habitation

Drawing No.

Sl. No.

QUALITY TO CHECK

STATUS

HT Line

HT Single Pole

a)

8mtr Single Pole (No.)

b)

Planting Depth (1570mm) Maintained

Yes/No

c)

Base Pad(400x400x70mm) Used

Yes/No

d)

Brick Batting(60:40) and ramming done as per TS

e)

Coil Earthing @ 1.2mtr from Pole

f)

GI Structures erected as per specification

g)

GI Structures on pole properly Earthed

HT Stay

Yes/No
Yes/No
Yes/No
Yes/No

(a)

Stay Angle(30 to 45deg)

Yes/No

(b)

HT Guy Insulator at 5mtr from GL

Yes/No

Stay Turn Buckle

Yes/No

(d)

Thimble used

Yes/No

(e)

Stay Binding as per specification(200mm)

Yes/No

(f)

Stay grouting(pcc 1:2:4) 0.2 CUM up to 800mm

Yes/No

(g)

Stay rod 100mm above GL

Yes/No

(c)

HT DP

a)

Base Pad(400x400x70mm) Used

b)

Brick Batting(60:40) and ramming done as per TS

c)

Pole center to pole center distance 1500mm


maintained

Yes/No

d)

Danger Board on DP as per TS

Yes/No

e)

Pipe Earthing done as per TS

Yes/No

f)

Barbed wire on DP

Yes/No

g)

GI Structures on pole properly Earthed

Yes/No

Yes/No
Yes/No

HT Stringing

a)

Average Span 67mtr maintained

Yes/No

b)

Mid Span jointing(Jointing Sleeve Uesd)

Yes/No

c)

Sagging

Yes/No

d)

Ground Clearance min 5.8mtr along the road


maintained

Yes/No

e)

Road Crossing clearance min 6.2mtr maintained

f)

HT Cradle guard done

LT Line

LT Single Pole

a)

Planting Depth (1570mm) Maintained

Yes/No

b)

Base Pad(400x400x70mm) Used

Yes/No

c)

Coil earthing done on every 3rd pole @1.2mtr from


pole center

Yes/No

d)

GI Structures on pole properly Earthed

Yes/No

e)

GI Structures erected as per TS

Yes/No

LT Stay

Yes/No
Yes/No

(a)

Stay Angle(30 to 45deg)

Yes/No

(b)

LT Guy Insulator at 3.5mtr from GL

Yes/No

(c)

Thimble used

Yes/No

(d)

Stay Binding as per TS(200mm)

Yes/No

(e)

Stay grouting(pcc 1:2:4) 0.2CUM up to 800mm

(f)

Stay rod 100mm above GL

Yes/No
Yes/No

3
(a)
(b)
c)

LT Stringing
Average Span 45mtr maintained
Mid Span jointing(Jointing Sleeve Uesd)
Sagging

Yes/No
Yes/No
Yes/No

(d)

Ground Clearance mini. 5.5mtr along the road


maintained

Yes/No

(e)

Road Crossing clearance min 5.8mtr maintained

DTR

a)

Pole center to pole center distance 2400mm


maintained

(b)

3 no. Earth pipes(depth of 1500mm and charcoal (or)


coke and salt in alternate layer of 300mm)are erected
diagonally at a distance 6550mm between them each.

Yes/No

Yes/No

Yes/No

Clamp & bolted with M12x35 on Earth pipe

(d)

Earth pipe should be 200mm below GL

(e)

Earthing Arrangement(8SWG GI wire or 4mm GI wire)

(f)

Yes/No
Yes/No

(a) One seperate connection from THREE 11KV


Lightining arrestors

Yes/No

(b)Each of the two remaining Earth pipes(i)One


separate connection from the neutral of the
transformer(b)one separate connection from the
transformer body and handle of 11KV AB switchOne
separate connection from the earthing terminal of the
poles.

Yes/No

Two earth pipes are internally connected

Yes/No

(g)

Danger board with Clamp fixed

Yes/No

(h)
(i)

Barbed wire with Clamp fixed

Yes/No

Sign Board fixed

Yes/No

(j)

Stay grouting(pcc 1:2:4) 0.2 CUM up to 800mm

Yes/No

BPL Connection
(a)BPL meter board fixed min. 1500mm height.
(b)Pole Clamp for 10SWG GI wire fixed

Yes/No

(c)Reel Insulators used( PVC cable through inside the


reel insulator & GI wire outside of the reel insulator)
(d)Say clamp uesd on GI bend pipe and stay fixed for
GI bend pipe.
(e)10SWG Gi wire runs outside the bend pipe and
connected to Earth nob on BPL Meter board.
(f)CFL given to BPL Consumer
(g)Piercing connector uesd for Service connection in
case of AB cable stringing.
(h)2 no meter seal used for Meter body and terminal
sealing of BPL energy meter
(i)Connection given to all listed BPL consumers.

Yes/No
Yes/No

Yes/No
Yes/No
Yes/No

Yes/No
Yes/No

(j)Left over BPL if any.If yes how many and why?

Yes/No

(1) Only REC standard and good quality erection work in accordance to approved drawings are acceptable.

Site Engineer

Manager

Remarks

Exception for Charcoal &


salt in case of marshy soil

ngs are acceptable.

Head