Se deber disear dos atajados en el sector que se muestra en la carta del IGM, para fines de consumo animal, considerando los sgte. Animales a dotarles
Los Datos son:
Area de la cuenca
Pendiente Longitudinal
Caudal Quebrada.
Vacas
Ovejas y Cabras
Cerdos
Coeficiente de escorrentia
Ha
%
l/s
15.6
10.0
2.00
350.0
250.0
0.0
0.3
Disear:
a)
b)
c)
d)
e)
RESUMEN CLIMATOLOGICO
Perodo Considerado: 1970 - 2005
Estacin: EL TEJAR
Provincia: CERCADO
Departamento: TARIJA
NDICE
Unidad
[C]
Temp. Max. Media
[C]
Temp. Min. Media
[C]
Temp. Media
[C]
Temp.Max.Extr.
[C]
Temp.Min.Extr.
[das]
Das con Helada
[%]
Humed. Relativa
[Octas]
Nubosidad Media
[Hrs]
Insolacin Media
[mm/dia]
Evapo. Media
[cal/cm2/dia]
Radiacion Solar*
[mm]
Precipitacin
[mm]
Pp. Max. Diaria.
[das]
Das con Lluvia
Velocidad del viento [km/hr]
ENE.
FEB.
MAR.
ABR.
MAY.
JUN.
JUL.
AGO.
SEP.
27.4
26.8
26.8
26.1
25.3
24.7
24.6
25.8
26.3
14.6
14.1
13.7
11.0
6.0
2.7
2.5
4.9
7.7
21.0
20.5
20.2
18.6
15.7
13.7
13.5
15.4
17.0
36.0
36.2
35.2
36.6
36.0
35.8
35.5
38.0
39.0
6.0
4.5
6.5
-1.5
-4.0
-8.5
-7.5
-9.5
-4.5
68
70
70
67
61
57
55
53
54
5.6
5.8
5.9
6.6
7.4
7.4
7.5
7.7
7.5
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
448.8
445.6
417.1
388.9
372.0
342.3
349.3
392.0
413.7
209.4
187.1
201.5
105.1
36.5
17.3
7.0
9.5
10.6
91.5
80.0
71.0
33.0
20.0
19.0
17.5
23.0
15.4
15
13
11
4.8
4.6
4.5
4.8
4.4
4.2
5.3
6.4
8.3
SEP.
OCT.
DETERMINACION DE PARAMETROS
MESES
Das
Precip. Promedio
Ocurrencia 80%
Efectividad
0.80
ENE.
FEB.
MAR.
ABR.
MAY.
JUN.
JUL.
(mm)
AGO.
31
28
31
30
31
30
31
31
30
31
209.4
187.1
201.5
105.1
36.5
17.3
7.0
9.5
10.6
50.1
167.52
149.68
161.21
84.11
29.18
13.84
5.59
7.60
8.50
40.06
134.02
119.74
128.97
67.29
23.34
11.08
0.00
0.00
0.00
32.05
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
156498.1
156498.1
156498.1
156498.1
156498.1
156498.1
156498.1
156498.1
156498.1
156498.1
7865.11
7027.16
7568.69
3948.98
1369.89
650.00
ENE.
FEB.
1880.70
MAR.
ABR.
MAY.
JUN.
JUL.
AGO.
SEP.
OCT.
31.00
28.00
31.00
30.00
31.00
30.00
31.00
31.00
30.00
31.00
350.00
350.00
350.00
350.00
350.00
350.00
350.00
350.00
350.00
350.00
250.00
250.00
250.00
250.00
250.00
250.00
250.00
250.00
250.00
250.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
434.00
392.00
434.00
420.00
434.00
420.00
434.00
434.00
420.00
434.00
38.75
35.00
38.75
37.50
38.75
37.50
38.75
38.75
37.50
38.75
472.75
427.00
472.75
457.50
472.75
457.50
472.75
472.75
457.50
472.75
Ubicacin
CARAPARI
Superficie de la base del atajado
Area de aporte (ha)
15.65
Coeficiente de permeabilidad
Coeficiente de escorrentia
0.30
Superficie del espejo del agua
Ocurrencia de lluvias
0.8
Factor de precipitacion efectiva
0.8
Mes
Ene
Feb.
Mar.
Abr.
May.
Jun.
Dias
31
28
31
30
31
30
Precipicitacin/ocurr.(mm)
167.5
149.7
161.2
84.1
29.2
13.8
Precipitacin efectiva (mm)
134.02
119.74
128.97
67.29
23.34
0.00
ETo (mm/d)
0.00
0.00
0.00
0.00
0.00
0.00
ETo mm/mes
0.00
0.00
0.00
0.00
0.00
0.00
OFERTA DE AGUA
Volumen rea de aporte
7027.16
7568.69
3948.98
1369.89
650.00
Vesc(m3)
C 7865.11
(0.8 * P )
*A
Caudal quebrada (l/s)
2.00
2.00
2.00
2.00
2.00
2.00
Volumen quebrada (m3)
5356.8
4838.4
5356.8
5184
5356.8
5184
Volumen oferta total (m3)
13221.91 11865.56 12925.49
9132.98
6726.69 5834.00
DEMANDA PECUARIA
Ganado Mayor m3
434.00
420.00
434.00
420.00
V aporte V esc 434.00
V vert 392.00
Vcan
Ganado Menor m3
38.75
35.00
38.75
37.50
38.75
37.50
Vol total pecuario (m3)
472.75
427.00
472.75
457.50
472.75
457.50
PERDIDAS LOCALES
Por filtracin (m3)
18.66
16.86
18.66
18.06
18.66
18.06
Por evaporacin (m3)
1.88
1.88
1.88
1.88
1.88
1.88
Vol. Tot. Prdidas (m3)
20.54
18.73
20.54
19.94
20.54
19.94
N * C pec * t
CAPACIDAD ATAJADO
V pec
1000 445.73
Vol. Demanda total (m3)
493.29
493.29
477.44
493.29
477.44
Vol. Oferta total (m3)
13221.91 11865.56 12925.49
9132.98
6726.69 5834.00
Vol deficitario m3
ND
ND
ND
ND
ND
ND
Capacidad del atajado (m3)
Veva
A = 225
k = 3.10E-08
Aesp. = 625
Jul.
31
5.6
0.00
0.00
0.00
Ago.
31
7.6
0.00
0.00
0.00
Sep.
30
8.5
6.80
0.00
0.00
Oct.
31
40.1
32.05
0.00
0.00
0.00
0.00
0
0.00
0.00
0.00
0
0.00
0.00
0.00
0
0.00
1880.70
2.00
5356.8
7237.50
434.00
38.75
472.75
434.00
38.75
472.75
420.00
37.50
457.50
434.00
38.75
472.75
18.66
1.88
20.54
18.66
1.88
20.54
18.06
1.88
19.94
18.66
1.88
20.54
493.29
0.00
493.29
493.29
0.00
493.29
477.44
0.00
477.44
493.29
7237.50
ND
e
* Aesp
1000
Vfilt K * Abas * t
(Arcillo arenoso)
TAJADOS
Latitud S.:
Longitud W.:
Altura:
21 32' 35"
64 43' 16"
1,859 m.s.n.m.
OCT.
NOV.
DIC.
ANUAL
27.5
27.4
27.6
26.4
11.5
13.1
14.3
9.7
19.5
20.3
20.9
18.0
40.5
40.0
38.5
40.5
1.0
2.5
5.5
-9.5
23
57
62
66
62
7.3
6.5
5.9
6.8
3.00
3.00
3.00
446.2
453.0
448.8
409.8
50.1
118.0
170.1
1122.2
48.6
105.7
90.0
105.7
10
14
79
7.8
7.1
5.5
5.6
NOV.
DIC.
ANUAL
30
31
118.0
170.1
1122.2
94.37
136.08
897.74
75.50
108.86
718.19
0.30
0.30
156498.1
156498.1
4430.63
6388.80
NOV.
DIC.
30.00
31.00
350.00
350.00
250.00
250.00
0.00
0.00
40.00
40.00
5.00
5.00
4.00
4.00
420.00
434.00
37.50
38.75
457.50
472.75
41129.96741196
ANUAL
1403.00
Nov.
30
94.4
75.50
0.00
0.00
Dic.
31
136.1
108.86
0.00
0.00
4430.63
2.00
5184
9614.63
6388.80
2.00
5356.8
11745.60
420.00
37.50
457.50
434.00
38.75
472.75
18.06
1.88
19.94
18.66
1.88
20.54
477.44
9614.63
ND
493.29
11745.60
ND
1464.0
Resultados
Volumen de diseo
Altura de diseo
Talud interior
Talud exterior
Pendiente del terreno
Ancho de la base
NA
=Hb 1.0
=Ht
3.3
TERRAPLEN
=Hd 2.0
Camara
de llave
Filtro
Tuberia
=Hm
0.30
ALTURA MUERTA
Hd =
H m 0.15H d
ALTURA BORDE LIBRE
Hd
2
2.0
Hm =
0.3
[m]
Hd =
2.0
[m]
Hb =
1.0
[m]
Ht H m H d Hb
Ht =
3.3
[m]
[m]
[m]
[m]
[m]
ALTURA TOTAL
[m]
[m]
[m]
[m]
[m]
ANCHO DE CORONAMIENTO
Canc
H
d
2
Hd =
2.0
[m]
Canc =
1.0
[m]
h1
llave
Base de Atajado
Hb
10
Vert = 1
h1 = 2.0
h2 = 1.5
=a 15 [m]
h1
m
Adoptado
Vert =
h2
n
[m]
[m]
V
h1
m = 0.5
Exterior
V
h2
n = 0.6667
Vtp
Hd
S1 S 2
3
S1 a.b
Donde:
S1.S 2
2H d
S 2 A.B a
m
[m3]
[m2]
[m2]
2H d
. b
Si despejamos el largo de la base (b) siendo el ancho (a) dato asumido tendremos:
Jb 2 Kb L 0
k K 2 4.J .L
2J
a' a
a=
Hm =
m=
2H m
m
a' =
2H d
m
Hd =
3V
Hd
Vd =
Hd =
a' =
E D a' C C 2
16.2
15.0
0.3
0.5
[m]
[m]
[m]
[m]
C = 8.0
1500
[m3]
D = 2250.00
2.0
[m]
16.2
[m]
2.0
Ancho de la base
[m]
m = 0.5
E = 2056.40
F 2a 'C
F = 40.40
G a'2 a' C
G = 392.04
I a'2 C a' C 2
I = 3136.32
J F2 G
J = 1240.12
K 2 EF I
K = 169293.44
L E2
L = 4228780.96
[m]
K 2 4.J .L
2J
+
-
b1 = 103.598 [m]
b2 = 32.9153 [m]
b b?
2H m
m
Hm =
m=
0.3
0.5
[m]
[m]
CALCULO DE A y B EN EL ATAJADO
Si
Hu = Hd+Hm
Hu =
h1 =
2.3
[m]
2.0
[m]
Hm
Ht
1 Ht
h1
x
x h1 .H t
h1
x = 4.6
x
Como:
A a 2. x
a=
B b 2. x
b=
[m]
15.0
31.7153 [m]
A = 24.2
[m]
B = 40.915
[m]
CALCULO DE AREAS
Area superior
S1 a.b
S1 = 475.7301 [m2]
Area inferior
S 2 A.B
S2 = 990.1513 [m2]
Vu
Hu =
Hu
S1 S 2 S1 .S 2
3
2.3
[m]
Vu =
1650.026
[m3]
Hm
1 Hm
h1
x
1
h1
Hm =
h1 =
0.3
[m]
2.0
[m]
x=
x h1.H m
x
Como:
A a 2.x
a=
15.0
[m]
A= 16.2
[m]
0.6
[m]
B b 2.x
b=
31.7153 [m]
S 2 AB
Vm
[m]
151.262
[m3]
Hm
S1 S 2 S1 .S 2
3
Vm =
b=77,65
m
B= 32.915
a=18m
P=
10
h1
h1
1
h2
m
=a 15 [m]
w a* p
m=
a=
Adonpado
w=
1.5
[m]
0.5
15.0
XA
YA m
( w b)
(m p )
( w b)
b
(m p)
b 1.868 * m
b= 0.81
X A=
-5.775
[m]
YA=
2.0775
[m]
X B=
16.35
[m]
Coordenada punto B
XB
b
a
(m p)
XB
b
a
(m p)
YB
p * b
(m p)
YB=
-0.135
[m]
Xc a
XC=
15.0
[m]
Yc b
YC=
-0.810
[m]
XD 0
XD=
0.0
[m]
YD b
YD=
-0.810
[m]
S1=
5.34
[m2]
S2=
0.66
[m2]
Cel=
6.67
[m2]
Coordenada punto C
Coordenada punto D
Cf
( x B y A ) ( x C y B ) ( x A y D ) ( x A y B ) ( x B y C ) ( xC y D )
2
Areas laterales
S1
( w b ) 2
2m
S2
b 2
2m
C el
C ef
( w b) 2
2m
( w b) 2
2(m p )
C ef
( w b) 2
2(m p )
Cef=
5.34
[m2]
VCE=
1254.36
[m3]
X E=
1.35
[m]
YE=
-0.14
[m]
XF =
6.60
[m]
YF=
2.49
[m]
VC (C f b)
a
2( w b) 3
( w b) 2 b 2 b( w b)
3m
3m( m p )
VCE (VC )
1.15
3 VOLUMEN DE TERRAPLEN
Coordenas punto E
b
(m p)
XE
YE
pb
(m p )
Coordenas punto F
XF
H1
m
YF H 1 b
Coordenas punto G
XG
H1
C
m
H1
C
m
XG
YG H 1 b
XG =
7.60
[m]
YG=
2.49
[m]
h=
0.76
[m]
XH=
13.34
[m]
YH=
-1.33
[m]
XI=
11.54
[m]
YI=
-0.14
[m]
Coordenas punto H
Ht
C
m
h p
XH
H1
( H 1 b) h
C
m
n p
YH p
(( H 1 b) h)
h
nP
Coordenas punto I
X1
H1
( H 1 b)
Pb
C
m
n
n(m P )
Y1
Pb
mP
Af
( X F YE ) ( X G YF ) ( X H YG ) ( X E YH ) ( X E YF ) ( X F YG ) ( X G YH ) ( X H YE )
2
Af= 20.79 [m2]
Area lateral
Al
( X F YE ) ( X G YF ) ( X I YG ) ( X E YI ) ( X E YF ) ( X F YG ) ( X G YI ) ( X I YE )
AE
A f AI
P=
YE=
XI=
m=
C=
0.1
-0.14
11.54
0.5
1
L` b ( X H X E ) * tg ( )
LI
H t b YE
P
a` X i * tg ( )
a=
4.20
[m]
LE=
5.02
[m]
RC=
5.75
[m]
Le
(90 2 * )( Rc )
180
Rc
( H t b) YE C
m
2
Vr ( A f L f ) (2( Al
VR= 1246.62 [m3]
Ll
) ( Al a`)) 2( Ae Le )
3
1246.62
Vce Vr
1254.4
[m3]
1246.6 [m3]
) ( X H YE )
) ( X I YE )
Tb2.A1ZyPbb22..y1ZZ A21Zy.
2 2 22
OBRAS COMPLEMENTARIAS
CAUDAL DE DISEO
El caudal de diso del canal de captacion o aduccion, el sedimentador, el canal de ingreso y el aliviadero
de un atajo se terminan en funcion de la superficie las caracteristicas de area de aporte, de la precipitacion
pluvial y sobre todo de la intensidad de las lluvias.
Muchos lugares no disponen de un registro de intensidades de lluvias, lo cual dificulta la determinacion
de un caudal de diseo.
Para obtener el caudal de diseo para el proyecto de caso se analiza el volumen de oferta mensual de los
meses no deficitarios del periodo de lluvias (enero a abril donde el volumen del mes de abril seria el
critico ya que el volumen es:
Voferta = 5834.00 [m3]
Mes de abril
Se asume que la duracion minima corresponden a las lluvias acumulados del mes de abril
16
Horas
45
minutos
Datos basicos.
Voferta =
5834.00 [m3]
60300
sg
por lo tanto:
EL CAUDAL SERA:
Q=
Q=
V oferta
t
0.09675 [m3/s]
96.7496 [lt/s]
Q=
Q = 0.097 [m3/s]
97
[lt/s]
Este es el caudal de diseo del captacion o aduccion, del sedimentador, del canal de ingreso
y tambien en forma relacionada del aliviadero.
CANAL DE TIERRA
Datos iniciales.
Q= 0.097 m3/s
Km=
36
S= 0.005 m/m
Paso 1
Se asume este valor por que es canal de tierra excavado con pala
o dragado sin vegetacion
H
V
H=
V=
b
y
w=
Paso 2
1
2
2.00
z=
Valor asumido
0.50
F=
Paso 3
1.759
3
8
y=
0.238
[m]
v=
0.687
[m/s]
K m F s
Paso 4
Q
Q
A ( w z ) y 2
Paso 5
b w y
b=
0.475
[m]
h=
0.40
[m]
La altura total es
h 1.7 y
=h 0.40
V=2
=y 0.20
H=1
=b
0.50
Q v. A
Q = 0.097
[m3/s]
Q: Caudal
v: Velocidad del agua[m/s]
A: Superficie o area [m2]
[m3/s]
Datos basicos:
y = 1.0 [m]
v = 0.028 [m/s]
w = 0.0211 [m/s]
L = 2.0
[m]
[m]
Valor adoptado
Por lo tanto:
1.5 v. y
w
L = 1.991
d: Ancho el sedimentador
Q
d.y
v
A d.y
Q
v. y
d=
3.464
[m]
d=
3.5
[m]
h 1.1. y
h = 1.100
[m]
h=
1.10
[m]
CANAL DE INGRESO
Si el talud interior de los atajos tienen una pendiente fuerte (1:2 o 1:2.25) se constituye un canal de
ingreso revestido, desde el sedimentador hasta la base del atajado, para evitar la erosin del talud interior,
causa por la alta velocidad del agua.
Para el diseo del canal de ingreso se utiliza la formula emprica de Manning-Strickler de la misma forma
que para los canales de captacin o aduccion. El caudal de diseo del canal de ingreso es el mismo que el
canal de diseo de captacin puesto que el agua captada que ingresa al sedimentador es la misma que sale
de este e ingresa al atajado. A diferencia de los canales de captacin o aduccion, el canal de ingreso es
revestido y de forma rectangular.
Para disminuir la velocidad y evitar el desgaste de la solera se sugiere poner piedras de tamao de
0.1*0.005*0.02m en la solera as una rugosidad artificial.
EL CAUDAL SERA:
Q=
Q=
Vo ferta
t
0.09675 [m3/s]
96.7496 [lt/s]
Q=
Q = 0.097 [m3/s]
97
[lt/s]
Este es el caudal de diseo del captacion o aduccion, del sedimentador, del canal de ingreso
y tambien en forma relacionada del aliviadero.
CANAL REVESTIDO
Datos iniciales.
Q= 0.097 m3/s
Km=
56
S= 0.001 m/m
z=
0
Paso 1
w
Paso 2
b
y
w=
1.260
Valor asumido
Paso 3
2.00
K m F s
Paso 4
y=
0.309
[m]
y=
0.30
[m]
v=
0.54
[m/s]
Q
Q
A ( w z ) y 2
Q
Q
A ( w z ) y 2
Paso 5
b w y
b=
0.60
[m]
h=
0.45
[m]
La altura total es
h 1.5 y
La longitud del canal de ingreso esta comprendida entre 7.0 a 9,0m segn la ubicacin del
sedimentador.
Entre el sedimentador y el canal de ingreso al atajado se incorpora un canal de transicion
las dimensiones de este canal son:
j 1.5 b
j=
0.90
[m]
i 1.30 b
i=
0.78
[m]
i=
0.80
[m]
HC
0.45
= y 0.30
h=
0.15
0.15
=b
0.60
0.15
D=
L=
Q=
Hmax =
[plg]
16
[m]
0.0097 [m3/s]
2
[m]
Despues de la colocacion de tubos y la conformacion del terraplen, se coloca el filtro en el extremo inferior
del tubo. En el extremo extrerior se coloca el llave de paso y se construye la camara de proteccion.
= Canc
=Hb
NA
1.0
=Ht 3.30
=Hesp
=Hd
1.0
TERRAPLEN
2.0
Camara
de llave
Filtro
2.0
Tuberia
=Hm
0.30
Base de Atajado
llave
Para fines del manejo del agua es oportuno conocer el volumen del agua almacenada en toda altura del espejo
Vata
4.H esp
3m 2
Vata=
2
a b H esp
a * b H esp
Hesp =
a=
b=
m=
2.0
[m]
15.0
[m]
31.72
[m]
0.5
1335.85 m3
Mediante esta expresion se puede determinar el volumen del agua en el atajado mediante una medicion con
una regla lineal, pintada sobre el canal de ingreso.
Tambien es importante, por seguridad, conocer el tiempo del vaciado para toda altura del almacenamiento
del atajado. De acuerdo a la formula siguiente:
t : [s]
tiempo
H:
(Hesp =Hd ) altura del espejo del agua
[m]
Hm ax
2 a b H
2
k : 0.767
Factor de descarga anexo 3
z 5m
3m
H m in
z 5m 2
t=
3m
H m in
g=
9.81
[m/s2]
graveda
84.28 horas
ALIVIADER
El aliviadero es un canal de desvio del agua que seO
construye para controlar el nivel del espejo del agua
en el atajado. Si la altura de diseno sobrepasa la relacion que tiena con el bordo libre (Hb=Hd /2) existe el
el peligro de tubificacion y colapso del atajado.
El diseno del aliviadero se realiza sobre la base de las formulas de Manning-Strickler y de continuidad de
flujo.
Para el caudal de diseno se toma un caudal que sea cuatro veces mayor que el caudal de diseno del canal
de ingreso. Este caudal de diseno toma encuenta problemas escorrentia superficiales no controladas en
periodos de lluvia torrenciales que puedeningresar al atajo.
El aliviadero se construye preferentemente sobre un suelo estable y no enterraplenes recien formadas: esto;
para evitar rajaduras en la base y en las paredes causadas por el asentamiento.
Desde el aliviadero se conduce el agua a una quebrada aledana u otro sistema de drenaje controlado
EL CAUDAL SERA:
Qd =
0.097
Q=
[m3/s]
4*Qd
Q=
Q=
[m3/s]
0.388
388
[m3/s]
[lt/s]
Q=
0.388
[m3/s]
Este es el caudal de diseo del captacion o aduccion, del sedimentador, del canal de ingreso
y tambien en forma relacionada del aliviadero.
CANAL REVESTIDO DE CONCRETO
Datos iniciales.
Q=
0.388 m3/s
Km=
56
S=
0.001 m/m
z=
0
Paso 1
H
V
b
y
Paso 2
Z=
w=
Valor asumido
2.00
Valor asumido
Paso 3
1.260
3
8
K m F s
Paso 4
Q
Q
A ( w z ) y 2
y=
0.519
[m]
y=
0.50
[m]
v
Paso 5
Q
Q
A ( w z ) y 2
v=
0.78
[m/s]
b=
1.00
[m]
h=
0.75
[m]
0.50
[m]
b w y
La altura total es
h 1.5 y