S No

CRITERIA 1
a
b

CRITERIA 2

a
b
c

CRITERIA 6
a
b
c

CRITERIA 7
a

b
c

CRITERIA 8
a

CRITERIA 9
a

CRITERIA 15
a

CRITERIA 16
a

CRITERIA 20
a

CRITERIA 21

a
b
c
d
CRITERIA 22
a

CRITERIA 23

CRITERIA 24

CRITERIA 28

CRITERIA 29
a
b

CRITERIA 30
a

CRITERIA 32
a

CRITERIA 33
a
b

CRITERIA 34
a

b
c
d

Description
Site selection
Site in conformity to DP/Master plan/UDPFI
Site within 0.5 KM radius of existing bus stop commuter rail,light rail,
metrostation,brownfield site

Preserve & protect during construction/compensatory


depositery forestation
proper timing of construction with respective rain & confine
const. with pre designated areas
staging+spill prevent ,erosion+sedimentation control
Top soil preserve

Preserve existing veg. or replant ratio 1:3

Trees replanted 25% excess than minimum required

Enhance outdoor lighting system efficiency


Lumonious efficiency of 100% of outdoor lamps meets required
Automatic control of 100% outdoor light
Min. 25% of total no OR 15 % of total connected load whichever

higher to be soar powered

Plan utilise efficiently & Optimize on site circulation efficiency


Minimisation & consoliation of transportation / service corridoors
shading of pedestrain road
Use of aggregate utility corridors
Consolidation of utility corridors along previously disturbed
areas or along new roads

Provide at least, minimum level of sanitation /safty facilities for


construction workers
Safty during construction,NBC norms complying
Constructional practises
Storage,stacking & handling
Safty in construction of element of building
Health & sanitation facilities

Reduce air pollution during construction


Air pollution preventive measures (stage const. & clear veg.only
from areas where work has to begin min.3m high hoarding around
perimeter of building vegetation/mulch areas where vehicles do
not ply:Vehicle circulation paths coverrd/hard paved : water
spraying:cover dusty loads on vehicles with impervious sheeting etc
Utilisation of flyash in building structure
Minimum 15% replacement of portland cement with flyash by weight of
cement used in struct. Concrete

Addition points if more than 30%


Minimum 40% usages of fly ash by volume of material for 100% load
bearing & non load bearing walls

Certify minimum 30% replacement of OPC with flyash by weight of


cement used in plaster/masonry mortar

Reduce volum , weight & time of construction by adopting efficient


technology for eg.precast system, ready mix concrete ,and so on
Structural application -use of low energy mat/efficient tech min. 5%
reduction in embodied energy for 100%struct. System.
Non structural application use of low energy mat/efficient tech (such as
infill wall system) min, 5% reduction in embodied energy, for 100%
infill wall system , meeting equivalenty strength req.
Waste water treatment
Treated water should meet the disposal/reuse application stadards

Water recycle & reuse ( including rainwater)

Annual water reuse of 25%


Annual water reuse of 50%
Annual water reuse of 75%
Recharge of surplus rainwater into aquifer
Reduction in waste during construction
Segregation of inert and hazardous wastes AND recycling and safe

disposal of segregated wastes

Efficient waste
Provision of multi- coloured bins for waste segregation at source
Storage and disposal of wastes
Provision of space for hygenic storage of segregated waste

Water quality confirming to IS standereds

Accepatable outdoor & indoor noise levels


Outdoor noise levels within acceptable limits as set in CPCB envirnmental
Stadards- noise
Indoor noise levels are within accepatable limits as set in NBC 2005

Tobacco & smoke control

Company policy for ban/ prohabitation of smoking within bldg premises OR sig
templet
By HVAC/architectural consultant certifying that all

Energy Audit & validation

Energy system & water & waste management systems of building performing
as predicted & match the info provided at the time of award of provisional
Griha rating ( Mandatory & no points)
Operations & maintanance protocol for electrical and mechanical
equipment
Provision of meters for monitaring bldgs energy and water consumption
Provision for core facility/service group responsible for O & M of building
system after installation ( and inclusion of req.clauses in contract docs)

INNOVATION
Environmental education

Company Policy on green supply chain


Integrated pest maneagement
Life cycle coasting

Required

Site plan showing site & surrounding areas


upto 2Km radius.

Certificate from Architect for construction


stage completed as per planning
Required sedimentation tank at lowest point
of phase I
Proper stock of top soil ,Maximum Quantity of top soil
required to shif at safe place for fertility
As per our record only 1 mango tree preserve & available

Landscape plan showing plantation 25% in excess than


min . Required

Luminous efficiency of each type of lamp used in outdoor


manufacturer details of lamp,ballast,luminaries &
placement of automatic switch
Demarcatesolar lighting system for outdoor lighting in

layout & give the detail of same.

A narrative along with supporting drawing to prove


that road lengths & building footprint are minimised & that
all pedestrain roads have permanent shading
Site plan - section of aggregate utility coridor with utility line
Site plan -all services along with pedestrain & vehicular paths

Provision of safe drinking water & sanitation stystem to worker

Provide supporting documents

Provide supporting documents

Provide supporting documents

RMC

Low energy material

Type of treatment system ,Drawing with


Quantum of treated water, periodical quality checking
of sample, sludge dispose & reuse

Dual water system, calculation sheet representing the total quantity of


water treated
harvesting & being use of diffrant application, landscape

Narrative indicating the quantum of waste generated during construction


activity, & storage

facility for segregated inert & hazardous waste before recycle & disposal,
photograph of lacation
of storage facility .

Photographs
Photographs

Water flow diagram giving the complete collection ,treatment ,&


distrubution of different application
Quality report before & after treatment
Report certificate for local & munciple authority for munciple water.
Specification details indicating capacity & component of the treatment
plant along with drawing
Quality checking frequency & sampling plan for potable water
Sound audit report in spacified format ,noise level at site & outdoor at
diffrant location inside the
building

Company policy for ban/prohibition on smoking within building premises ,


if applicable with the
supportive documents verified & sign by responsible authority
On architectural drawing demostrating smoking zone on the building
periphery separated from non
smoking area

Drawing & document showing location of energy & water meter

Provide proof of the company policy for promotion of envirnmental


awareness with supportive documents
authority
Building Brocher, CD information leaf let small vidio documentary used to
creat awarness towards
environment issues in the owner
Photographs of demostarting the innovative strategies incorporated in
building
Proof of company policy on green supply chain

Possible
Total
with
Not
Points Possible Cost
possible

1
1

1
1
1
2

1
1

1
1
1

47

15

Remark

Required drawing from landscape


architect

Costing of lamp
Costing of lamp

Required calculation of concrete


quantity &
use for that with PO.

Required calculation of concrete


quantity &
use for that with PO.

Conducted by organisation recognised


by a
compenent authority it should follow
procedure
laid down by competent authority