Professional Documents
Culture Documents
TECHNOLOGY
DEPAERTMENT OF CIVIL
ENGINEERING TECHNOLOGY
EXPERIMENT: LEVELLING
(ESTABLISH TBM)
EDITION:
REVISION NO:
EFFECTIVE DATE:
AMENDMENT DATE:
MG02
EXPERIMENT TITLE
DATE
GROUP NO.
LECTURER/ INSTRUCTOR/ TUTOR
1)
2)
ATTENDANCE/PARTICIPATION/DISPLINE
/5%
INTRODUCTION:
/5%
PROCEDURE:
/5%
/15%
ANALYSIS
DISCUSSIONS:
ADDITIONAL QUESTIONS:
CONCLUSION:
/15%
/20%
/15%
/10%
EXAMINER COMMENTS:
/5%
REFERENCES:
/5%
TOTAL:
/100%
FACULTY : ENGINEERING
TECHNOLOGY
DEPAERTMENT OF CIVIL
ENGINEERING TECHNOLOGY
EXPERIMENT: LEVELLING
(ESTABLISH TBM)
EDITION:
REVISION NO:
EFFECTIVE DATE:
AMENDMENT DATE:
I hereby declare that I have prepared this report with my own efforts. I also admit to
not accept or provide any assistance in preparing this report and anything that is in
it is true.
1) Group Leader
Name
:
Matrix No. :
__________________________________________(Signature)
__________________________________
__________________________________
2) Group Member 1
Name
:
Matrix No :
__________________________________________(Signature)
__________________________________
___________________________________
3) Group Member 2
Name
:
Matrix No. :
__________________________________________(Signature)
__________________________________
__________________________________
FACULTY : ENGINEERING
TECHNOLOGY
DEPAERTMENT OF CIVIL
ENGINEERING TECHNOLOGY
EXPERIMENT: LEVELLING
(ESTABLISH TBM)
EDITION:
REVISION NO:
EFFECTIVE DATE:
AMENDMENT DATE:
1.0 INTRODUCTION :
Vertical Control in the general terms applied to say of the various processes each elevation of
by points or differences in the elevation are determined. It is vital operation in producing
necessary data for mapping, engineering design, and construction.
2.0 AIM :
To fly reduced level from known point (Benchmark or Temporary Benchmark) to unknown
point.
3.0 EQUIPMENTS :
9.1.1 A series of measurements of level loop were considered as shown in figure 3.3
9.1.2 BM A was started first, so the first reading measurement from Setup 1 was a back
sight to BM A, and the second reading was a foresight to CP1 known as a change Point.
9.1.3 The levelling staff then remains at CP1, while the instruments were moved to Setup
2. The sight reading to CP1 and foresight reading to CP2 and so on were taken.
9.1.4 Eventually, a Setup 4, a back sight reading was made to CP3, and foresight reading
to A.
9.1.5 The traverse was then closed. This allows a check on the levels, since the sum of
total loop changes in level should be zero.
9.2
Booking Procedures
9.2.1 The Rise and Fall Method
Figure 3.3: A sample of leveling loop
6.0
CALCULATION :
1.290
1.306
1.428
1.285
1.392
0.000
1.328
1.417
T=13.507
0.036
1.395
1.263
T=13.507
0.021
1.320
1.320
0.127
0.075
0.065
0.075
0.112
1.400
1.395
0.103
1.282
1.288
2.000
2.036
2.057
1.930
1.995
2.070
1.995
2.107
2.004
1.375
1.385
0.011
1.993
0.007
FALL
1.383
RISE
2.000
2.036
2.057
1.930
1.995
2.070
1.995
2.107
2.004
1.993
2.000
REDUCED
CORRECTION
RL ADJUSTED
LEVEL
1.386
FS
2.000
IS
1.376
BS
HoC
30
30
40
20
20
40
30
30
DIST
BM2=2.000
CP8
CP7
CP6
CP5
TBM2
CP4
CP3
CP2
CP1
BM2=2.000
REMARKS
Misclosure = (20
k )
0.254
= 20
= 10.07.
Total distance = 127 m
K
= Total distance 2
= 127 2
= 254 m.
(BS)
( FS )
(RISE)
= 13.507 km 13.507 km = 0 km
( FALL )
= 0.316 km 0.316 km = 0 km
7.0 DISCUSSION
During the process of levelling, precaution that needs to be considered while carrying out the
levelling includes,
The tripod must be in the stable state and the bubble at the level must be in the
centre.
While reading the measurements, make sure that the crosshair are visible.
Put a nail below the staff for more precise readings.
Put the level in its case before move to the next point.
The reading obtained did not contain any error. Therefore, the misclosure of the reading
is checked by calculating the limit of misclosure allowed.The formula of misclosure limit was
given by (20 D)mm , where D= length of traverse in km. The length of traverse of our set
up was 0.254km. The misclosure allowed is 10.07mm. The reading is acceptable.
The route we used for the levelling was from BM2 to TBM 2 and then back to BM 2. We had
marked down the spot we set up the levelling equipment and also the stuffs to make sure that the
reading obtained are more accurate.
8.0 CONCLUSION
The value of the misclosure that is 254 m indicates that our has been able to carry out the
levelling with a good accuracy and the value of
(BS)
( FS )
km.
9.0 REFERENCES
http://www.levelling.uhi.ac.uk/tutorial1_9.html
W.SCHOFIELD , 2007 , Engineering Surveying ,
6th