You are on page 1of 9

Yuan H. A SWOT analysis of successful construction waste management.

J Cleaner Prod
2013; 39:18.
Yuan, H.P., Shen, L.Y., Hao, J.J.L., Lu, W.S., 2011. A model for cost benefit analysis of
construction and demolition waste management throughout the waste chain. Resour. Conserv.
Recycl. 6, 604-612.
Ling YY, Leo KC. Reusing timber formwork: importance of workmens efficiency and
attitude. Building and Environment 2000; 35 (2):13543. xde pdf
Duran X, Lenihan H, ORegen B. A model for assessing the economic viability of
construction and demolition waste recycling the case of Ireland. Resources, Conservation and
Recycling 2006;46:30220. xde pdf
Lu W., Yuan H., 2011. A framework for understanding waste management studies in
construction. Waste Manage. 6, 1252-1260.
Suresh Kumar Lachimpadi, Joy Jacqueline Pereira, Mohd Raihan Taha & Mazlin
Mokhtar, (2012)
Andrew Baldwin, Chi-Sun Poon, Li-Yin Shen, Simon Austin & Irene Wong (2009)
Environmental Protection Department (EPD) (2012) Hong Kong Environment 2012.
Hong Kong Government.
Poon CS, Yu TWA, Jaillon L. Reducing building waste on construction sites in Hong
Kong. Construction Management and Economics June 2004; 22:46170.
L. Jaillon, C.S. Poon, Y.H. Chiang (2009)
HKEPD (Hong Kong Environment Protection Department). Monitoring of solid waste in
Hong

Kong.

HKEPD;

_https://www.wastereduction.gov.hk/en/materials/info/msw2007.pdf_.

2007,

Lu WS, Tam VWY. Construction waste management policies and their effectiveness in
Hong Kong: A longitudinal review. Renewable & Sustainable Energy Reviews 2013; 23:21423.
Yuan HP, Lu WS, Hao JL. The evolution of construction waste sorting on-site.
Renewable and Sustainable Energy Reviews 2013; 20:48390.
Legislative Council Panel of the HKSARG, 2006. Progress Report on the Management of
Construction and Demolition Materials. Environmental Affairs, 24 April. HKSARG, Hong
Kong.
CIDB. http://www.cidb.gov.my/v6/?q=en/content/ibs-centre/constructionindustry-masterplan-cimp-malaysia; 2012 [accessed 06.03.12].
CIDB.

http://www.cidb.gov.my/v6/?q=en/content/ibs-centre/ibs-roadmap-2003-2010;

2011 [accessed 23.08.11].

Effie P, Christopher P, Rory P, Anis AA. Sustainable construction waste management in


Malaysia: a contractors perspective. In: Management and innovation for a sustainable built
environment; 2011.
Hamzah NH, Nafi MNA, Yacob J, Ashari AH, Daud Z, Sulain AS. A study on the
acceptance of IBS in construction industry in Kelantan: application of logistic regression
analysis;

2010,

http://instatmy.org.my/downloads/RCSS10/Proceedings/28P.pdf

[accessed

28.05.12].
Hamid ZA, Kamar KAM, Zain MZM, Ghani MK, Rahim AHA. Industrialised building
system (IBS) in Malaysia: the current state and R&D initiatives. Malaysian Construction
Research Journal 2008;1(2):111. xdee pdf
Tam VWY, Tam CM, Zeng SX, Ng WCY. Towards adoption of prefabrication in
construction. Building and Environment 2007b;42(10):364254. xde pdf
Kibert CJ. The next generation of sustainable construction. Building Research &
Information 2007;35(6):595601.

Begum RA, Satari SK, Pereira JJ. Waste generation and recycling: comparison of
conventional and industrialized building systems. American Journal of Environmental Sciences
2010;6(4):3838.
Legislative Council Panel of the HKSARG, 2006. Progress Report on the Management of
Construction and Demolition Materials. Environmental Affairs, 24 April. HKSARG, Hong
Kong.
Begum RA, Siwar C, Pereira JJ, Jaafar AH. A benefit-cost analysis on the economic
feasibility of construction waste minimisation: the case of Malaysia. Resources, Conservation
and Recycling 2006;48:8698. xde pdf
Tatum

C,

Vanegas

JA,

Williams

J.

Constructability

improvement

using

prefabrication,preassembly, and modularization:. Austin, USA: Bureau of Engineering


Research,University of Texas at Austin; 1987. xde pdf
Chiang Y-H, Hon-Wan Chan E, Ka-Leung Lok L. Prefabrication and barriers to entry
acase study of public housing and institutional buildings in Hong Kong. HabitatInt 2006;30:482
99.
Yee AA, Eng PHD. Social and environmental benefits of precast concrete technology.
PCI J 2001;46:149.
Aye L, Ngo T, Crawford R, Gammampila R, Mendis P. Life cycle greenhouse gas
emissions and energy analysis of prefabricated reusable building modules. EnergyBuild
2012;47:15968. xde pdf
Zhang X, Shen L, Wu Y. Green strategy for gaining competitive advantage in housing
development: a China study. J Cleaner Prod 2011;19:15767. xde pdf

blum cari pdf:


Li Z, Shen GQ, Xue X. Critical review of the research on the management of prefabricated construction. Habitat Int 2014;43:2409.
Tam CM, Tam VW, Chan KW, William CY. Use of prefabrication to minimize
construction waste-a case study approach. Int J Constr Manage 2005;0:91101.
Riduan Yunus, Jay Yang, 2011
CIRIA, 1999. Standardisation and pre-assembly adding value to construction projects.
Report 176. CIRIA, London, UK.
Lawton, T., Moore, P., Cox, K., Clark, J., 2002. The gammon skanska construction
system. In: Proceedings of the International Conference Advances in Building Technology. vol.
2, Hong Kong, China, 46 December, pp. 10731080.
Tam VW, Tam C, Ng WC. On prefabrication implementation for different project types
and procurement methods in Hong Kong. J Eng Des Technol2007a;5:6880.
Tam, V.W.Y., Shen, L.Y., Tam, C.M., 2007c. Assessing the levels of material wastage
affected by sub-contracting relationships and projects types with their correlations. Build.
Environ. 42 (3), 14711477.
Poon CS, Yu TW, Ng LH. A guide for managing and minimizing building and demolition
waste. The Hong Kong Polytechnic University; 2001.
V. . Mega, Sustainable Cities for the Third Millennium: The Odyssey of Urban
Excellence. Springer Science, 2010.
B.-G. Hwang and Z. B. Yeo, Perception on benefits of construction waste management
in the Singapore construction industry, Engineering, Construction and Architectural
Management, vol. 18, no. 4, pp. 394406, 2011.
Z. M. Darus, N. A. Hashim, E. Salleh, L. C. Haw, A. K. A. Rashid, S. Nurhidayah, and A.
Manan, Development of Rating System For Sustainable Building In Malaysia, Wseas
Transactions on Environment and Development, vol. 5, no. 3, pp. 260272, 2009.

D. Shiers, J. Weston, E. Wilson, J. Glasson, and L. Deller, Implementing new EU


environmental law: the short life of the UK Site Waste Management Plan Regulations, Journal
of Environmental Planning and Management, no. July, pp. 120, May 2013.
CIPS, How to Develop a Waste Management and Disposal Strategy, United Kingdom,
2007.
H. Abanda, J. H. M. Tah, F. Cheung, and W. Zhou, Measuring the embodied energy ,
waste , CO 2 emissions , time and cost for building design and construction, in Proceedings of
the International conference on Computing in Civil and Building Engineering, 2010, no. 2000,
pp. 20002005.
D. Hou, A. Al-Tabbaa, P. Guthrie, and K. Watanabe, Sustainable waste and materials
management: national policy and global perspective., Environmental science & technology, vol.
46, no. 5, pp. 24945, Mar. 2012.
A. Vijayaraghavan, C. Yuan, and N. Diaz, Green Manufacturing. Boston, MA: Springer
US, 2013, pp. 117152.
D. A. Plesea and S. Visan, Good Practices Regarding Solid Waste Management
Recycling, The Bucharest Academy of Economy Studies, vol. 12, no. 27, pp. 228 241, 2010.
Defra, Government Revew of Waste Policy in England 2011, United Kingdom, 2011.
K.-L. Kramer, User Experience in the Age of Sustainability: A Practitioners Blueprint.
United States of America: Elsevier, 2012.
Department of Environment Affairs, Approach: Waste Hierachy and Regulatory Model,
Department of Environment Affairs: Natiopnal Waste Management Strategy, 2010.
M. Osmani, Construction Waste Minimization in the UK: Current Pressures for Change
and Approaches, Procedia - Social and Behavioral Sciences, vol. 40, pp. 3740, Jan. 2012.
WRAP, Achieving Good Practice Waste Minimisation and Management, United
Kingdom, 2012.
Y. Li and X. Zhang, Web-based construction waste estimation system for building
construction projects, Automation in Construction, May 2013.
R. Bhagwat, Site Waste Management Practices in Construction Industry in United
Kingdom, University of the Aegean, 2008.

L. Jaillon, C. S. Poon, and Y. H. Chiang, Quantifying the waste reduction potential of


using prefabrication in building construction in Hong Kong, Waste Management, vol. 29, no. 1,
pp. 309320, 2009.
Ben, Construction Waste - Lessons from Hong Kong, Waste Management World, 2013.
W. Lu and H. Yuan, Off-site sorting of construction waste: What can we learn from
Hong Kong?, Resources, Conservation and Recycling, vol. 69, pp. 100108, Dec. 2012.
Hong Kong Housing Authority, Use of Recycled Aggregates, The Government of the
Hong

Kong

Special

Administrative

Region,

2011.

[Online].

Available:

http://www.housingauthority.gov.hk/en/business-partnerships/resources/use-ofrecycledaggregates.
Zhang Chao, Ding Jizhong, Guo Jinsheng. (2002). Use of scrap concrete materials in
semi rigid base-course. Journal of Changan University (Natural Science Edition),china, 22,1-4.
Chi Sun Poon, Dixon Chan (2006). Feasible use of recycled concrete aggregates and
crushed clay brick as unbound road sub-base. Construction and Building aterials, 20,578-585.
A. T. W. Yu, C. S. Poon, A. Wong, R. Yip, and L. Jaillon, Impact of Construction Waste
Disposal Charging Scheme on work practices at construction sites in Hong Kong., Waste
management (New York, N.Y.), vol. 33, no. 1, pp. 13846, Jan. 2013.
R. E. Cordato, The Polluter Pays Principle: A Proper Guide for Environmental Policy,
2001.
J. Harrison, THE ROLE OF MATERIALS IN SUSTAINABLE CONSTRUCTION,
vol. 30, 2006.
D. Hoornweg, T. T. Leader, P. Lam, and M. Chaudhry, Waste Management in China :
Issues and Recommendations May 2005, 2005.
M. A. Shelbourn, D. M. Bouchlaghem, C. J. Anumba, P. M. Carillo, M. M. K. Khalfan,
and J. Glass, Managing Knowledge In The Context Of Sustainable Construction, vol. 11, no.
December 2005, pp. 5771, 2006.
K. Chung, I. Plant, and D. Works, Site Management Plan for Trip Ticket System, 2007.
S. Chung and C. W. H. Lo, Evaluating sustainability in waste management: the case of
construction and demolition, chemical and clinical wastes in Hong Kong, Resources,
Conservation and Recycling, vol. 37, no. 2, pp. 119145, Jan. 2003.

Environmental Protecting Department, The Government of the Hong Kong Special


Administrative Region, Laws & Regulation: Environmetal Legislation, 2012.
National Bereau of Statistics of China, China Statistical Yearbook, 2009.
R. Li and S. Liu, Municipal Solid Waste Management in China, Roskilde University
Digital Archive, 2010.
Danish Environmental Protection Agency, Waste in Denmark, 2012.
R. B. H. Tan and H. H. Khoo, Impact assessment of waste management options in
Singapore., Journal of the Air & Waste Management Association (1995), vol. 56, no. 3, pp.
24454, Mar. 2006.
A. Proverb, The Singapore Green Plan 2012, Singapore, 2012.
Y. L. Wang, Sustainable Infrastructure and its Application in Singapore, Advanced
Materials Research, vol. 450451, pp. 10691073, Jan. 2012.
K. C. Chew, Singapores strategies towards sustainable construction, The IES Journal
Part A: Civil & Structural Engineering, vol. 3, no. 3, pp. 196202, Aug. 2010.
H. Yuan, L. Shen, and J. Wang, Major obstacles to improving the performance of waste
management in Chinas construction industry, Facilities, vol. 29, no. 5/6, pp. 224242, 2011.
P. Villoria Saez, M. del Ro Merino, A. San-Antonio Gonzlez, and C. Porras-Amores,
Best practice measures assessment for construction and demolition waste management in
building constructions, Resources, Conservation and Recycling, vol. 75, pp. 5262, Jun. 2013.
Bossink, A.G. and Brouwers, H.J.H. (1996), Construction waste: quantification and
source evaluation, Journal of Construction Engineering and Management, Vol. 122 No. 1, pp.
55-60.
Dantata, N., Touran, A. and Wang, J. (2005), An analysis of cost and duration for
deconstruction and demolition of residential buildings in Massachusetts, Resources,
Conservation and Recycling, Vol. 44 No. 1, pp. 1-15.
Hadjieva-Zaharieva, R., Dimitrova, E. and Buyle-Bodin, F. (2003), Building waste
management in Bulgaria: challenges and opportunities, Waste Management, Vol. 23 No. 8, pp.
749-61.
Poon, C.S., Yu, A.T.W., Ng, L.H., 2003. Comparison of low-waste building technologies
adopted in public and private housing projects in Hong Kong. Eng. Constr. Architect. Manage.
10 (2), 8898.

Esin, T., Cosgun, N., 2007.Astudy conducted to reduce construction waste generation in
Turkey. Build. Environ. 42 (4), 16671674.
Hongping Yuan, 2013. Key indicators for assessing the effectiveness of waste
management in construction projects
Li

W,

Xu

SH.

The

building

junk

status

quo

research.

Construction

Technology2007;1:4803.
Alam Flora Sdn. Bhd. (2007). Recycle Now! You can make a difference. Retrieved from
http://www.alamflora.com.my/V3/recycling1.html [Accessed 3rd January 2010]
Nadzri Yahaya. (2007). Solid Waste Management. National Solid Waste Department.
Conference

on

Climate

Change

Preparedness.

Retrieved

from

http://inet02.undp.org.my/uploads/c_Solid_Waste_ Management_MHLG.pdf [Accessed 23rd


December 2009]
Japan International Cooperation Agency (2006). The study on national waste
minimisation in Malaysia.
Papargyropoulou,

Preece,

Padfield

and

CONSTRUCTION WASTE MANAGEMENT IN

Anis

(2011)

SUSTAINABLE

MALAYSIA: A CONTRACTORS

PERSPECTIVE
Fishbein, B.K.., Building for The Future: Strategies to Reduce Construction and
Demolition Waste in Municipal Projects,http://www.informinc.org/cdreport.html (12 January
2008).
Kang, X.P. (2005), The research of reducing methods of construction waste, Masters
thesis, Shenzhen University, Shenzhen (in Chinese).
http://www.bca.gov.sg/professionals/iquas/iso14000.html
http://www.wrap.org.uk/content/building-firms-set-benefit-bre%E2%80%99s-smartwastetool-and-wrap%E2%80%99s-waste-landfill-reporting-portalK. Siddiqui, The Political Economy of Development in Singapore, Research in Applied
Economics, vol. 2, no. 2, pp. 131, 2010.

J. Marusiak, Sustainable construction: Waste wanted, Asia Pacifics Sustainable


Business Community, 2012. [Online]. Available: http://www.ecobusiness.com/news/sustainableconstructionwaste-wanted/. [Accessed: 08-Jun-2013].

You might also like