You are on page 1of 16
G Gammon OTHER SUBMISSION lork Package - 2120 - Hotel Concrete Superstructure 33039 Venetian Macau in Cotai, Macau SUBMISSION REF 'SUBT 5130 / MIS 1023, GBCML REF. “$3039 7 304,7.1/ 013603, Major Trade Contractor [Gammon Building Construction (Macau) Limited] Page:| (1 )of( 2 ) We submit herewith the following submission to HCEM for (¥ )Comment/ Approval (_) Information (_) Others EXPECTED COMMENT/APPROVAL DATE: 13.JUL 2006 LATEST APPROVAL DATE: 13 JUL 2006 Subject: Package 5130 — Hotel Fit Out VIP, Hospitality, Club Lounge ‘Submission of Method Statement for Floor Screeding / Concreting at L6 & L7 VIP Floor GEC VC wh_sets fet Geb ofenct | Authorized Representative ( )AEDAS wise of eel | sets of ena, (CORP wl_setsof onc (ses otenc. | Charlz Yan ()PBA—w_—eots of et | sete ofenct (7 )GBCML Ww! eteat enc eofenc. sas of en set of ene Signature CVMBIST RES je had received the above submission from Major Trade Contractor, Gammon Bulding Construction (Wiacau) Lid. Tho Submission is considered necessary for your corresponding response. Endorsed by: ‘kenneth Viu (Project Manager) Hsin Chong Engineering (Macau) Ltd CONSULTANT’S REPLY _tyhcsas/oar/paasmrs/ ise) [signature Date of issue (YW) [We forward herewith the above consullant’s response and endorse the same for your follow up action {Endorsed by. Date: Kenneth Vin (Project Manager) Hein Chong Engineering (Macau) Ltd Gor ( VG. w___eetsotenct( )PBA wl__seu Ofer ( JAEDAS w__setsofercl ( )L83w_eotrotenat (JOKPwi_sotsofencl (GBC w__ sas of ene, (1PBA wees ofenct —() Wee ofenet G Gammon OTHER SUBMISSION lork Package - 2120 - Hotel Concrete Superstricture 'J3039 Venetian Macau in Cotai, Macau ‘SUBMISSION ReF.; | SUB/5130/ 415 1025, GBCML REF.: J3039 7 3087.47 DI3603 Major Trade Contractor [Gammon Building Construction (Macau) Limited | Page:| ( 2 ) of ( 2 ) SUBJECT: Submission of Method Statement for Floor Screeding / Concreting at L6 & L7 VIP Floor Consultant Remark om Numbers Method Statement for Floor Sereeding / Conereting at L6 & L7 VIP Floor wae ps pceot a corsneton tout tater eng 6 “proses to coneructon sje changes Pescated © “fesuna pert poceeengto ftrestonoeotcten G Gammon 413039 - Venetian Macau in Cotai, Macau Package $130 - Fitting out works at L6 & L7 Method Statement for Floor Concreting/Sereeding at L6 & L7 VIP Floor 1. Zoning a. V.LP. Floor L6 & L7 are divided into 10 zones (Zone 1~ Zone 10) Please refer to attached Zoning Plan SK-060628-1. b. Bathrooms and respective functional rooms with waterproofing works will be proceeded late c. Lift lobby and adjoining corridors will be proceeded later 2. Material /Plants & Equipment a, Ready Mix Conerete B45/10P is designed for filling up to required floor level at L6(Please refers to Material Submission SUB/2120/M/ST/023) b. Cement and sand screed is designed for filling up required floor level at 17 c. The concrete (B45/10P) will be distributed by use of existing concrete pump to Floor L6 d. L7 cement sand screed will be mixed on site (Please refers to GBCML's method statement submission SUB/5130/MIS/005 and approval letter CMA-005526 dated 6 June 2006) 3. Tentative Programme a, Commencement Date : 5-7-2006 b. Sequence : Zone 7, &, 1, 2, 3, 4, 5, 6, 9, 10 (3 days for each zone) c. Timber curbs erection and preparation works ~ 2 days d. Concrete / Cement Sand Sereed pouring — I day €. Please refers to attached programme (ref. SP-01) 4, Level & Thickness of Floor Screeding (concrete) a, Please refers to attached plans SK-060628-2 & SK-060628-3 5. Misalliance a. Typical Interfacing details as per attached sketches SK-060628- 4 & SK- 060628-5 “Thickness of sereeding = Tome 350mm ‘Concrete Sereed at L6 NiatDatum Loss 20mm) WA CIS Sereed at L7 For Guest Room Area, no floor | Please refers t SK-O60628- screeding will be used and 5 and method statement adjust the level by timber plate | SUB/4130/MIS/O17 For Bathroom /waterproofing area, self-leveling sereed will beused (Pease refers to SK-060628-6) b. Quantities of concrete used for each zone is about 40m’ at 6/F yo-ds coe EEE mane rercwe nee] Toor aA TT ‘ujpsaing soojg £7 pue Bunsisue9 10014 9740} eumesBorg WHOL HONS EVR oTie WORN Bunwy - E19 sterDEE ese YeI99 & neDe UEIOURA BeOEr uowueDn LS) b-BE7O9-AS Yo pot by pap walshs or Hale ob Pag a | eay 4 A body ¢ 7 S-$<9990- Os? ak 342 hi yom a fit su May £ wil bl ceyiovade bet spr RRA. g-Reqege-s dpe pees bu upona} ~ {es : x i " res td Veet = vay DEPT Prt Per ae a ee ) rr analy ‘Najor Trade Contractor [Gammon Building Construction (Macau) Limited yor( t ‘We submit herewith the following submission to HCEM for (7) comment / approval (_ } information {_)others EXPECTED COMMENTIAPPROVAL DATE: 26 MAY 2005 [LATEST APPROVAL DATE: SUBJECT: CONCRETE MIXES (MACAU CONCRETE CO. LTD. DETALS: @ Catalogue _TestReport © JobRelerence Record 1D sample County of Odgin I Specifcaton —-—«_Others_Altached Summary Table DESCRIPTION OF MATERIAL: © Compled wth Specifeation «C1 Alternative Proposal Ca Nel wastes (+) w_meond | Rutoried Representative ()ASOAS wh_sasotend —(V)GBCML ws tent ()ORP w__seisofend, w_sasetona. | Charlz Yan (ree Saotons ()amatone | Pretanager (Aly, VR Submission Date TE Nay 2008 Sirah CvifQuarPive T je had received the above submission from Major Trade Contractor, Gammon Building Construction (Macau) Lid. The submission is considered necessary for your corresponding respons6. ndorsad by: Kenneth Via (Project Manager) sin Chona Engineering (Macau) Ltd. roomed conacon wit fate charge sna corona tage etn Je “tema prte praceaing i abaeton or onon jo (orward herewith the above consultant's response and endorse the same for your follow up acl indorsed by: ‘Kenneth Yiu (Project Manager) Hsin Chong Engineering (Macau) Lid. OG ( JVGL wL__semofenct ( )PBA wi__sotsof net (Oficial Use ()AEOAS wH__eusof mic. ( )LAB wl sets of nc. (JOR wi__setsofene —(GECM. wise of oa ()PBA— wsetbofonc. (wet ot net G Gammon J3039 - VENETIAN MACAU IN COTAI, MACAU WORK PACKAGE : 2120 - HOTEL CONCRETE SUPERSTRUCTURE rete Mixes (Macau Conorete Co. Lid.) ‘Submission Date: 12 May 2005 1.) Ready Mix Concrete B45/10 75mm Slump 2.) Ready Mix Concrete B45/10P 100mm Slump 3.) Ready Mix Concrete B45/20 75mm Slump 4) Ready Mix Concrete B45/20P 100mm Slump 5.) Ready Mix Concrete B45/20P,ES36 100mm Slump (Early Strength ~ 1SMPa at 1.5 days) 6.) Ready Mix Concrete B45/20 P+Xyp 100mm Slump (Water-proofing) (To be confirmed on selection of additivies refer to RFI No. RFI-00102 issued on 26 April 2005.) -a@ Gammon OTHER SUBMISSION J30397 308.7110 256 ‘Mojo Trade Contractor |Gammon Building Construction (Macau) Limited | Page ‘We submit herewith the following submission to HCEM for (¥ ) Comment /Approval —(_) Information () Others THPECTED COMVENTIABPROVAL DATE T2UN08 [LATEST APPROVAL OATE" 21 JUN 08 Subject 4130 = Hotel BOR ABWE ethod $1 Screeding over Smm Thickness Remarks: (1) Method for flaor screeding had been approved under CMA 002673 dated 25 January 2006. {@) Inspection of floor screeding tal over 50mm thickness was approved and the inspection form is: ‘attached, Oo: Wivel—wi___setslend ( )AEDAS wh_setetenst ( (JOAP wists ( ()PRA wheter, ( i i i JOSDPLANTw___selsofena | Authorized Representative ) wel of ee » w__sesotert | Charlz Yan ) w_—stsoreret| Project Manager > eto en > seo nc. sets of en (Jew tata tone, (Y6BCML Ww _sats of orc, fa Wises of orc ‘Submission Date (OMY) 3 dune 2006 ‘bee: Architectural HSE /Top Builders AL je had received the above submission fom Major Trade Contractor, Gammon Building Construction (Macau) Utd. The lcubmission is considered necessary for your corresponding response. \dorsed by: “Kenneth Viu (Projet Manage) Hsin Chong Engineering (Macau) Lt. [ame in Bleck to [Signature Baie of fesue (VIMID) je forward herewith the above consultant's response and endorse the same for your fallow up action. :ndorsed by: Date: Kenneth Vio (Project Manager) Hsin Chong Engineering (Macau) Ltd. TOC 1VEL whe ofene (PER wi__sole ol one (Offeal Use ‘SUB /4130/ MIS / OFF "$3089 7308.74] 25GE, [ JAROAS wi_setsofend. (88 wi__suisafeneh ()0AP woot of (}68CM wists of ene. (POA wsomerenct —¢ ) | wh_setsofenet ‘Major Trade Contractor {Gammon Building Construction (Macau) Limited OTHER SUBMISSION (2 )of(2 ) ‘Gunuecr, Method Statement for Floor Screeding over 50mm Thickness Consuitant Remark Deseo Wothod Statement for Floor Screeding over 50mm. Thickness. Method Statement For Flooring Screeding Over 50mm Introduction This method statement concems about Floor Screeding thickness over 50mm. Eloor Screeding Materials © 1:3 Cement Sand > Gold Crap Brand ~ Portland Pulverized-fuel Ash Cement, ref 425 Preparation work 41. Site Cleaning - ensure slabs is free from debris ete 2. Fence off working area 3. Site surveying and setting out ‘Screeding 4. Set 1:2 coment sand leveling pad for flatness control where necessary. 2. Wet the concrete floor surfaces before screeding. 3. Apply 1:3 cement sand floor screeding mixed by hand , 40mm thickness for the 1 layer. 4, Alter 1/2 hours for setting, apply 1:3 cement sand floor screeding and additional chicken mesh added on the remaining 40mm thickness for the 2 layers. ii ‘Zonk + | was ZZ we SG Sotesking fo433. 493 thiekans 2% sewed ii (ouele) a 7 TS. £3 an ELT Tp oy scraeds QC S4tBAR thickwe: 4 c is A Roam J ] SCG cling Comer che). oJ L6 VIP Flee ber (FRU. + 33:5 ) 4h -060628-2 PPP ETee te! | Ti i | one iF i 322, hacks ; CL) it 38 lt VIP Flee (REL. +3835) Sk- obo628 -3 AS~BUILT LEVEL (FINISHING FLOOR LEVEL) \ BAY |p dose A eavest Peon TL $k-0b062%-!

You might also like